6.eastimating and costing
1. SUNIL KUMAR YADAV 1
All type and none type question answer
Estimating and costing 10%
From RKS
1. Bearms are provided in canals if these are e:
a) Fully in excavation
b) Partially in excavation and partially in embankment
c) Fully in embankment
d) All of above
2. The terms VAT is stand for :
a) vaucher and tax
b) variation and tax
c) value and tax
d) All of above
3. Provisional sum provided in the bill of quantities is paid to the contractor on the basis of :
a) Lump sum
b) Percentage of work
c) Actual work
d) All of these
4. Specification of work is required only when the work is carried out by:
a) Muster roll
b) Users committee
c) Contractor
d) All the above
5. Center line method of estimation is mostly used for :
a) Culvert work
b) Building work
c) Bridge work
d) All the above
6. The measurement is made in square meter in case of :*
a) Cement concrete in foundation
b) RCC structure
c) Hollow concrete structure
d) None of these
7. The “center line method “ is specially adopted for estimating :
a) Circular building
b) Hexagonal building
c) Other geometric shape building
d) All the above
D PRADAD
8. The unit of cribbing is:
a) M
b) M2
c) M3
d) All of the above
9. The cost of supplementary and revised estimate is :
a) Less than estimated cost
b) More than estimated cost
c) Equal than estimated cost
d) All of the above
10. Normally which one contract gives the maximum value of project :
a) Labour contract
b) Item rate contract
c) LS contract
d) All of the above
11. For the approval of any project a no. of sanction is followed out. which one is initially
done:
2. SUNIL KUMAR YADAV 2
a) Administrative sanction
b) Expenditure sanction
c) Technical sanction
d) All of the above
12. Rate analysis prepared by ministry of transport and work includes :
a) Labour & material
b) Labour, material &equipment
c) Labour, material & supervisor
d) All of the above
13. Full payment of contractor is done :
a) After agreement
b) After construction
c) After maintenance
d) All of the above
14. According to ISI method of measurement the order is in the sequence :
a) Length , Breath , Height
b) Breath, Length , Height
c) Height , length ,Breath
d) All of the above
15. Break wall are measured in m2 if the thickness of wall is :
a) 10 cm
b) 20 cm
c) 30 cm
d) All of the above
16. Tentative cost of a road project is calculated by :
a) Road per meter length
b) Road per square meter length
c) Road per cff length
d) All of the above
17. Demolition means :
a) Same as dismental
b) Breaking up the structure
c) Breaking up the structure with care
d) All of the above
18. Dismental means :
a) Same as dismental
b) Breaking up the structure
c) Breaking up the structure with care
d) All of the above
19. Salvage value of any structure is:
a) Less than the scrap value
b) More than the scrap value
c) Equal than the scrap value
d) All of the above
20. The amount of capital from required to be invested to receive a net annual income as an
annuity of Rs 1/- at certain rate of interest is called :
a) Year’s capital
b) Year’s interest
c) Year’s purchase
d) All of the above
21. In a linear depreciation method of property valuation depreciation is imposed on costs
related to :
a) Land
b) Building
c) Services
d) All of the above
22. In a linear depreciation method of property valuation depreciation is imposed on costs
related to :
a) 1 bigha =20 katha
b) 1 katha =3645 ft2
c) 1 ropani = 5476 ft2
d) None of the above
3. SUNIL KUMAR YADAV 3
R Agar
23. Pick up the incorrect statement from following
a) The built up covered area at the floor level of any storey of a building is called plinth
area
b) The usable covered area of the rooms of any storey of a building is called carpet area
c) The carpet narea of a building along with area of its kitchen , Pantry , store , lavatory ,
bathroom and glazed veranda, is called floor area.
d) None of these
24. Pick up the incorrect statement from following
a) No deduction is made for the volume occupied by reinforcement
b) No deduction is made for the opening up to 0.1 sq. m
c) No deduction is made for the volume occupied by pipe , not exceeding 100 sq. cm in
cross section
d) No deduction is made for the ends of dissimilar structures up to 500 sq. cm cross-
sectional area
e) All of the above
All the best
Answer:
1 B 11 A 21 B
2 C 12 B 22 D
3 C 13 C 23 D
4 C 14 A 24 E
5 B 15 A 25
6 D 16 A 26
7 D 17 B 27
8 B 18 C 28
9 A 19 B 29
10 B 20 C 30