1. A series of equal payments occurring at equal period of time to obtain a certain amount is
called :*
a) Fixed deposit
b) Equal deposit
c) Annuity
d) All of the above
2. The point of situation when the production if material is just sufficient sufficient to
consumption then it is called :*
a) Equivalent point
b) Breakeven point
c) Satisfaction point
d) All of the above
3. If the amount of principal are same then the value of compound interest for same time
period is :*
a) Less than simple interest
b) More than simple interest
c) Equal than simple interest
d) All of these
4. Two projects having same status except payback period which project will be selected :*
a) The project having more payback period
b) The project having less payback period
c) The project having equal payback period
d) All of the above
5. The benefit cost ratio :*
a) Directly proposal to discount rate
b) Inversely proposal to discount rate
c) No any relation with to discount rate
d) All the these
6. For occepiting of project the minimum value of benefit cost ratio should be :
a) Less than one
b) Equal to one
c) Greater than one
d) All the above
7. The average cost incurred in supplying a particular benefit over the entire life time of the
project is called: *
a) Project cost
b) Average life cycle cost
c) Maintenance cost
d) All of these
8. The type of indirect cost which canโ€™t measured and allocated to a specific output on work
activity is called :*
a) Project cost
b) Prime cost
c) Overhead cost
d) All of the above
9. Material cost is concerned with:
a) Direct cost
b) Indirect cost
c) Both a) and b) above
d) None of these
10. The difference between actual cost of the project with the budgeted cost is called :
a) Loss b) Profit
SUNIL KUMAR YADAV 2
c) Variance d) All of the above
11. For the selection of any project the NPV should be :
a) Zero
b) Less than zero
c) Both of above
d) None of the above
12. MARR ( marginal annual rate of return) is:*
a) Benefit coming befor investment
b) Benefit coming after investment
c) Neither benefit nor loss
d) All of the above
13. The difference of discounted benefit and cost is called :
a) NPV
b) PV
c) Benefit
d) All of the above
14. According to low of demands , if the price of goods increase then the demands of articles
:*
a) Increase
b) Decreases
c) Constant
d) All of the above
15. According to low of supply, if the price of goods increase then the demands of articles :*
a) Increase
b) Decrease
c) Constant
d) All of the above
16. The present value of an amount is โ€ฆโ€ฆ..as compared to future value :
a) Lesser
b) Greater
c) Constant
d) All of the above
17. The minimum NPV for selection of any project should be:
a) Zero
b) Less than zero
c) Greater than zero
d) All of the above
18. Internal rate of return should be :
a) Less than borrowing rate
b) More than borrowing rate
c) Equal than borrowing rate
d) All of the above
19. During calculation of IRR , NPV should be :
a) Positive
b) Negative
c) Zero
d) All of the above
20. As indirect cost of project increase , the profit of project :
a) Increases
b) Decrease
c) Constant
d) All of the above
21. Amount of money payable to a beneficiary at a regular intervals for a prescribed period
of time out a fund reserved for the purpose is:
a) Interest
b) Principal amount
c) Benefit cost ratio
d) All of the above
D PRADAD
22. In a project equal investment is done for future value then it is called :
a) Future investment
b) Capital recovery
c) Sinking fund
d) All of the above
23. If production is less than breakeven point ,the product will be :
SUNIL KUMAR YADAV 3
a) Less than consumption
b) Equal to consumption
c) Greater than consumption
d) All of the above
24. As the benefit cost ratio of a project increase then attractive ness of project increase .but
minimum value of benefit cost ratio should be โ€ฆ..for acceptions of project.
a) Less than one
b) Equal to one
c) Greater than one
d) All of the above
25. During analysis of any project, numerical value of net present worth is found negative
then , internal rate of return should be:
a) Minimum discount rate
b) Medium discount rate
c) Maximum discount rate
d) All of the above
26. In a project equal investment is done to obtain a fixed amount in the future , this amount
is known as :
a) Sinking fund
b) Capital recovery
c) Uniform series
d) All of the above
27. The financial analysis helps to judge :
a) The operational efficiency of the form
b) The financial position of the firm
c) Both of above
d) None of the above
28. The sunk cost includes :
a) A past expenditure
b) An unrecovered balance
c) An invested capital that canโ€™t be retired
d) All of the above
29. In market , supply increase in demand the curve found between them is:
a) Higher infleltration rate
b) To show efficiencies
c) To show lower infiltration
d) None of the above
R Agar
30. Ratio analysis of a construction form is used for analysis by:
a) Share holders
b) Formโ€™s management
c) Banks of the firm
d) Financial analysis
e) All the these
31. Pick up the ratio which gives us sufficient information by which to judge the financial
condition and performance of the firm , from the following :
a) Liquidity ratio
b) Financial leverage ratio
c) Acidity ratio
d) Profitability
e) None of these
SUNIL KUMAR YADAV 4
32. Current ratio is :
a)
๐‘๐‘ข๐‘Ÿ๐‘Ÿ๐‘’๐‘›๐‘ก ๐‘Ž๐‘ ๐‘ ๐‘’๐‘ ๐‘ก๐‘ 
๐‘๐‘ข๐‘Ÿ๐‘Ÿ๐‘’๐‘›๐‘ก ๐‘™๐‘–๐‘๐‘™๐‘–๐‘ก๐‘–๐‘’๐‘ 
b)
๐‘๐‘ข๐‘Ÿ๐‘Ÿ๐‘’๐‘›๐‘ก ๐‘Ž๐‘ ๐‘ ๐‘’๐‘ ๐‘ก๐‘ +๐‘™๐‘œ๐‘Ž๐‘›๐‘ ๐‘ 
๐‘๐‘ข๐‘Ÿ๐‘Ÿ๐‘’๐‘›๐‘ก ๐‘™๐‘–๐‘๐‘™๐‘–๐‘ก๐‘–๐‘’๐‘ 
c)
๐‘๐‘ข๐‘Ÿ๐‘Ÿ๐‘’๐‘›๐‘ก ๐‘Ž๐‘ ๐‘ ๐‘’๐‘ ๐‘ก๐‘ +๐‘™๐‘œ๐‘Ž๐‘›๐‘  ๐‘Ž๐‘‘๐‘ฃ๐‘Ž๐‘›๐‘๐‘’๐‘ 
๐‘๐‘ข๐‘Ÿ๐‘Ÿ๐‘’๐‘›๐‘ก ๐‘™๐‘–๐‘๐‘™๐‘–๐‘ก๐‘–๐‘’๐‘ 
d) None of these
All the best
Answer:
1 C 11 A 21 C 31 E
2 B 12 A 22 C 32 D
3 B 13 A 23 A 33
4 B 14 B 24 B 34
5 B 15 A 25 A 35
6 B 16 A 26 A 36
7 B 17 A 27 B 37
8 C 18 B 28 B 38
9 A 19 C 29 D 39
10 C 20 B 30 D 40

More Related Content

Similar to 5.economics

Mcq of-corporate-finance
Mcq of-corporate-financeMcq of-corporate-finance
Mcq of-corporate-finance
abhishekkumar4959
ย 
102 eabd chapterwisemcq
102  eabd chapterwisemcq102  eabd chapterwisemcq
102 eabd chapterwisemcq
ASM's IBMR- Chinchwad
ย 
Fin 370 final exam set 5
Fin 370 final exam set 5Fin 370 final exam set 5
Fin 370 final exam set 5
gnffg
ย 
Fin 370 final exam set 5
Fin 370 final exam set 5Fin 370 final exam set 5
Fin 370 final exam set 5
nbvghytr657
ย 
Fin 370 final exam set 5
Fin 370 final exam set 5Fin 370 final exam set 5
Fin 370 final exam set 5
smith54655
ย 
Financial & management accounting unsolvrd1
Financial & management accounting unsolvrd1Financial & management accounting unsolvrd1
Financial & management accounting unsolvrd1
mralam3
ย 
1.The concept of present value relates to the idea that a)Th.pdf
1.The concept of present value relates to the idea that  a)Th.pdf1.The concept of present value relates to the idea that  a)Th.pdf
1.The concept of present value relates to the idea that a)Th.pdf
aliradios
ย 
Fina521 lecture 3_investment_criteria_2013-10-09-1
Fina521 lecture 3_investment_criteria_2013-10-09-1Fina521 lecture 3_investment_criteria_2013-10-09-1
Fina521 lecture 3_investment_criteria_2013-10-09-1
Landry De Chabe
ย 
1) ________ is the logical integration of techniques to gather and.docx
1) ________ is the logical integration of techniques to gather and.docx1) ________ is the logical integration of techniques to gather and.docx
1) ________ is the logical integration of techniques to gather and.docx
dorishigh
ย 
FIN 370 Final Exam A++1) The goal of the firm should beA. maxi.docx
FIN 370 Final Exam A++1) The goal of the firm should beA. maxi.docxFIN 370 Final Exam A++1) The goal of the firm should beA. maxi.docx
FIN 370 Final Exam A++1) The goal of the firm should beA. maxi.docx
mydrynan
ย 
CFIN 601 - Corporate FinanceComprehensive Individual Assignment.docx
CFIN 601 - Corporate FinanceComprehensive Individual Assignment.docxCFIN 601 - Corporate FinanceComprehensive Individual Assignment.docx
CFIN 601 - Corporate FinanceComprehensive Individual Assignment.docx
tidwellveronique
ย 
Fin 370 final exam mcq`s correct answers 100%
Fin 370 final exam mcq`s correct answers 100%Fin 370 final exam mcq`s correct answers 100%
Fin 370 final exam mcq`s correct answers 100%
liamSali
ย 

Similar to 5.economics (20)

Mcq of-corporate-finance
Mcq of-corporate-financeMcq of-corporate-finance
Mcq of-corporate-finance
ย 
102 eabd chapterwisemcq
102  eabd chapterwisemcq102  eabd chapterwisemcq
102 eabd chapterwisemcq
ย 
Fin 370 final exam set 5
Fin 370 final exam set 5Fin 370 final exam set 5
Fin 370 final exam set 5
ย 
Fin 370 final exam set 5
Fin 370 final exam set 5Fin 370 final exam set 5
Fin 370 final exam set 5
ย 
Fin 370 final exam set 5
Fin 370 final exam set 5Fin 370 final exam set 5
Fin 370 final exam set 5
ย 
Accounting
AccountingAccounting
Accounting
ย 
Financial & management accounting unsolvrd1
Financial & management accounting unsolvrd1Financial & management accounting unsolvrd1
Financial & management accounting unsolvrd1
ย 
1.The concept of present value relates to the idea that a)Th.pdf
1.The concept of present value relates to the idea that  a)Th.pdf1.The concept of present value relates to the idea that  a)Th.pdf
1.The concept of present value relates to the idea that a)Th.pdf
ย 
FINANCIAL MANAGEMENT,WCM MOST IMPORTANT AND EXPECTED MCQ.pptx
FINANCIAL MANAGEMENT,WCM MOST IMPORTANT AND EXPECTED MCQ.pptxFINANCIAL MANAGEMENT,WCM MOST IMPORTANT AND EXPECTED MCQ.pptx
FINANCIAL MANAGEMENT,WCM MOST IMPORTANT AND EXPECTED MCQ.pptx
ย 
Fina521 lecture 3_investment_criteria_2013-10-09-1
Fina521 lecture 3_investment_criteria_2013-10-09-1Fina521 lecture 3_investment_criteria_2013-10-09-1
Fina521 lecture 3_investment_criteria_2013-10-09-1
ย 
NET-SET Unit Financial Management
NET-SET Unit Financial ManagementNET-SET Unit Financial Management
NET-SET Unit Financial Management
ย 
FM 111
FM 111FM 111
FM 111
ย 
1) ________ is the logical integration of techniques to gather and.docx
1) ________ is the logical integration of techniques to gather and.docx1) ________ is the logical integration of techniques to gather and.docx
1) ________ is the logical integration of techniques to gather and.docx
ย 
FIN 370 Final Exam A++1) The goal of the firm should beA. maxi.docx
FIN 370 Final Exam A++1) The goal of the firm should beA. maxi.docxFIN 370 Final Exam A++1) The goal of the firm should beA. maxi.docx
FIN 370 Final Exam A++1) The goal of the firm should beA. maxi.docx
ย 
Eco 550 final exam strayer new
Eco 550 final exam   strayer newEco 550 final exam   strayer new
Eco 550 final exam strayer new
ย 
Eco 550 final exam strayer new
Eco 550 final exam   strayer newEco 550 final exam   strayer new
Eco 550 final exam strayer new
ย 
Eco 550 final exam strayer new
Eco 550 final exam   strayer newEco 550 final exam   strayer new
Eco 550 final exam strayer new
ย 
Eco 550 final exam strayer new
Eco 550 final exam   strayer newEco 550 final exam   strayer new
Eco 550 final exam strayer new
ย 
CFIN 601 - Corporate FinanceComprehensive Individual Assignment.docx
CFIN 601 - Corporate FinanceComprehensive Individual Assignment.docxCFIN 601 - Corporate FinanceComprehensive Individual Assignment.docx
CFIN 601 - Corporate FinanceComprehensive Individual Assignment.docx
ย 
Fin 370 final exam mcq`s correct answers 100%
Fin 370 final exam mcq`s correct answers 100%Fin 370 final exam mcq`s correct answers 100%
Fin 370 final exam mcq`s correct answers 100%
ย 

More from Mani Das

201911121130435dca470798b5a1
201911121130435dca470798b5a1201911121130435dca470798b5a1
201911121130435dca470798b5a1
Mani Das
ย 
1.5 class c,d,e
1.5 class c,d,e1.5 class c,d,e
1.5 class c,d,e
Mani Das
ย 
Survey handsout question for sub er and asst
Survey handsout question for sub er and asstSurvey handsout question for sub er and asst
Survey handsout question for sub er and asst
Mani Das
ย 
Estimating and costing complete note
Estimating and costing complete noteEstimating and costing complete note
Estimating and costing complete note
Mani Das
ย 
Chapter 5 average
Chapter 5 averageChapter 5 average
Chapter 5 average
Mani Das
ย 
Chap 2 classification
Chap 2 classificationChap 2 classification
Chap 2 classification
Mani Das
ย 
Chap 1 table chart
Chap 1 table chartChap 1 table chart
Chap 1 table chart
Mani Das
ย 
Chap 1 arithmetical reasoning
Chap 1 arithmetical reasoningChap 1 arithmetical reasoning
Chap 1 arithmetical reasoning
Mani Das
ย 
Chap 1 analogy
Chap 1 analogyChap 1 analogy
Chap 1 analogy
Mani Das
ย 
Irrigation and hydrology
Irrigation and hydrologyIrrigation and hydrology
Irrigation and hydrology
Mani Das
ย 
Group c airport converted
Group c airport convertedGroup c airport converted
Group c airport converted
Mani Das
ย 
8.drawing technicue
8.drawing technicue8.drawing technicue
8.drawing technicue
Mani Das
ย 
7.surveying
7.surveying7.surveying
7.surveying
Mani Das
ย 
6.eastimating and costing
6.eastimating and costing6.eastimating and costing
6.eastimating and costing
Mani Das
ย 
3.structure engineering
3.structure engineering3.structure engineering
3.structure engineering
Mani Das
ย 

More from Mani Das (20)

201911121130435dca470798b5a1
201911121130435dca470798b5a1201911121130435dca470798b5a1
201911121130435dca470798b5a1
ย 
1.5 class a,b
1.5 class a,b1.5 class a,b
1.5 class a,b
ย 
Nepal bridge standards 2067
Nepal bridge standards 2067Nepal bridge standards 2067
Nepal bridge standards 2067
ย 
1.5 class c,d,e
1.5 class c,d,e1.5 class c,d,e
1.5 class c,d,e
ย 
Survey handsout question for sub er and asst
Survey handsout question for sub er and asstSurvey handsout question for sub er and asst
Survey handsout question for sub er and asst
ย 
Estimating and costing complete note
Estimating and costing complete noteEstimating and costing complete note
Estimating and costing complete note
ย 
Chapter 5 average
Chapter 5 averageChapter 5 average
Chapter 5 average
ย 
Chap 2 classification
Chap 2 classificationChap 2 classification
Chap 2 classification
ย 
Chap 1 table chart
Chap 1 table chartChap 1 table chart
Chap 1 table chart
ย 
Chap 1 arithmetical reasoning
Chap 1 arithmetical reasoningChap 1 arithmetical reasoning
Chap 1 arithmetical reasoning
ย 
Chap 1 analogy
Chap 1 analogyChap 1 analogy
Chap 1 analogy
ย 
Irrigation and hydrology
Irrigation and hydrologyIrrigation and hydrology
Irrigation and hydrology
ย 
High way
High wayHigh way
High way
ย 
Group c airport converted
Group c airport convertedGroup c airport converted
Group c airport converted
ย 
Group d converted
Group d convertedGroup d converted
Group d converted
ย 
9.epp
9.epp9.epp
9.epp
ย 
8.drawing technicue
8.drawing technicue8.drawing technicue
8.drawing technicue
ย 
7.surveying
7.surveying7.surveying
7.surveying
ย 
6.eastimating and costing
6.eastimating and costing6.eastimating and costing
6.eastimating and costing
ย 
3.structure engineering
3.structure engineering3.structure engineering
3.structure engineering
ย 

Recently uploaded

Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ankushspencer015
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
amitlee9823
ย 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Christo Ananth
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
ย 

Recently uploaded (20)

chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
ย 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
ย 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
ย 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
ย 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
ย 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
ย 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
ย 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
ย 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
ย 
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...Booking open Available Pune Call Girls Pargaon  6297143586 Call Hot Indian Gi...
Booking open Available Pune Call Girls Pargaon 6297143586 Call Hot Indian Gi...
ย 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
ย 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
ย 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
ย 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
ย 

5.economics

  • 1. SUNIL KUMAR YADAV 1 All type and none type question answer Economics 8% From RKS 1. A series of equal payments occurring at equal period of time to obtain a certain amount is called :* a) Fixed deposit b) Equal deposit c) Annuity d) All of the above 2. The point of situation when the production if material is just sufficient sufficient to consumption then it is called :* a) Equivalent point b) Breakeven point c) Satisfaction point d) All of the above 3. If the amount of principal are same then the value of compound interest for same time period is :* a) Less than simple interest b) More than simple interest c) Equal than simple interest d) All of these 4. Two projects having same status except payback period which project will be selected :* a) The project having more payback period b) The project having less payback period c) The project having equal payback period d) All of the above 5. The benefit cost ratio :* a) Directly proposal to discount rate b) Inversely proposal to discount rate c) No any relation with to discount rate d) All the these 6. For occepiting of project the minimum value of benefit cost ratio should be : a) Less than one b) Equal to one c) Greater than one d) All the above 7. The average cost incurred in supplying a particular benefit over the entire life time of the project is called: * a) Project cost b) Average life cycle cost c) Maintenance cost d) All of these 8. The type of indirect cost which canโ€™t measured and allocated to a specific output on work activity is called :* a) Project cost b) Prime cost c) Overhead cost d) All of the above 9. Material cost is concerned with: a) Direct cost b) Indirect cost c) Both a) and b) above d) None of these 10. The difference between actual cost of the project with the budgeted cost is called : a) Loss b) Profit
  • 2. SUNIL KUMAR YADAV 2 c) Variance d) All of the above 11. For the selection of any project the NPV should be : a) Zero b) Less than zero c) Both of above d) None of the above 12. MARR ( marginal annual rate of return) is:* a) Benefit coming befor investment b) Benefit coming after investment c) Neither benefit nor loss d) All of the above 13. The difference of discounted benefit and cost is called : a) NPV b) PV c) Benefit d) All of the above 14. According to low of demands , if the price of goods increase then the demands of articles :* a) Increase b) Decreases c) Constant d) All of the above 15. According to low of supply, if the price of goods increase then the demands of articles :* a) Increase b) Decrease c) Constant d) All of the above 16. The present value of an amount is โ€ฆโ€ฆ..as compared to future value : a) Lesser b) Greater c) Constant d) All of the above 17. The minimum NPV for selection of any project should be: a) Zero b) Less than zero c) Greater than zero d) All of the above 18. Internal rate of return should be : a) Less than borrowing rate b) More than borrowing rate c) Equal than borrowing rate d) All of the above 19. During calculation of IRR , NPV should be : a) Positive b) Negative c) Zero d) All of the above 20. As indirect cost of project increase , the profit of project : a) Increases b) Decrease c) Constant d) All of the above 21. Amount of money payable to a beneficiary at a regular intervals for a prescribed period of time out a fund reserved for the purpose is: a) Interest b) Principal amount c) Benefit cost ratio d) All of the above D PRADAD 22. In a project equal investment is done for future value then it is called : a) Future investment b) Capital recovery c) Sinking fund d) All of the above 23. If production is less than breakeven point ,the product will be :
  • 3. SUNIL KUMAR YADAV 3 a) Less than consumption b) Equal to consumption c) Greater than consumption d) All of the above 24. As the benefit cost ratio of a project increase then attractive ness of project increase .but minimum value of benefit cost ratio should be โ€ฆ..for acceptions of project. a) Less than one b) Equal to one c) Greater than one d) All of the above 25. During analysis of any project, numerical value of net present worth is found negative then , internal rate of return should be: a) Minimum discount rate b) Medium discount rate c) Maximum discount rate d) All of the above 26. In a project equal investment is done to obtain a fixed amount in the future , this amount is known as : a) Sinking fund b) Capital recovery c) Uniform series d) All of the above 27. The financial analysis helps to judge : a) The operational efficiency of the form b) The financial position of the firm c) Both of above d) None of the above 28. The sunk cost includes : a) A past expenditure b) An unrecovered balance c) An invested capital that canโ€™t be retired d) All of the above 29. In market , supply increase in demand the curve found between them is: a) Higher infleltration rate b) To show efficiencies c) To show lower infiltration d) None of the above R Agar 30. Ratio analysis of a construction form is used for analysis by: a) Share holders b) Formโ€™s management c) Banks of the firm d) Financial analysis e) All the these 31. Pick up the ratio which gives us sufficient information by which to judge the financial condition and performance of the firm , from the following : a) Liquidity ratio b) Financial leverage ratio c) Acidity ratio d) Profitability e) None of these
  • 4. SUNIL KUMAR YADAV 4 32. Current ratio is : a) ๐‘๐‘ข๐‘Ÿ๐‘Ÿ๐‘’๐‘›๐‘ก ๐‘Ž๐‘ ๐‘ ๐‘’๐‘ ๐‘ก๐‘  ๐‘๐‘ข๐‘Ÿ๐‘Ÿ๐‘’๐‘›๐‘ก ๐‘™๐‘–๐‘๐‘™๐‘–๐‘ก๐‘–๐‘’๐‘  b) ๐‘๐‘ข๐‘Ÿ๐‘Ÿ๐‘’๐‘›๐‘ก ๐‘Ž๐‘ ๐‘ ๐‘’๐‘ ๐‘ก๐‘ +๐‘™๐‘œ๐‘Ž๐‘›๐‘ ๐‘  ๐‘๐‘ข๐‘Ÿ๐‘Ÿ๐‘’๐‘›๐‘ก ๐‘™๐‘–๐‘๐‘™๐‘–๐‘ก๐‘–๐‘’๐‘  c) ๐‘๐‘ข๐‘Ÿ๐‘Ÿ๐‘’๐‘›๐‘ก ๐‘Ž๐‘ ๐‘ ๐‘’๐‘ ๐‘ก๐‘ +๐‘™๐‘œ๐‘Ž๐‘›๐‘  ๐‘Ž๐‘‘๐‘ฃ๐‘Ž๐‘›๐‘๐‘’๐‘  ๐‘๐‘ข๐‘Ÿ๐‘Ÿ๐‘’๐‘›๐‘ก ๐‘™๐‘–๐‘๐‘™๐‘–๐‘ก๐‘–๐‘’๐‘  d) None of these All the best Answer: 1 C 11 A 21 C 31 E 2 B 12 A 22 C 32 D 3 B 13 A 23 A 33 4 B 14 B 24 B 34 5 B 15 A 25 A 35 6 B 16 A 26 A 36 7 B 17 A 27 B 37 8 C 18 B 28 B 38 9 A 19 C 29 D 39 10 C 20 B 30 D 40