SlideShare a Scribd company logo
1 of 7
Download to read offline
All type and none type question answer
Concrete technology 12%
From RKS
1. The gypsum is added to the cement for :
a) Providing high strength to the cement
b) Controlling the initial setting time of cement
c) Lowering the initial setting time of cement
d) All of the above
2. The function of aggregates in concrete is to serve as :
a) Binding material
b) Filler
c) Catalyst
d) All of these
3. The presence of tricalcium silicate in cement :
a) Hydrates the cement rapidly
b) Generates less heat of hydration
c) Offers high resistance of sulphate attack
d) All of these
4. The aggregate which pass through 4.75mm is sieve and entrirdyretain an 75 micron is
sieve is called :
a) Cyclopean aggregates
b) Coarse aggregate
c) Fine aggregate
d) All –in – aggregate
5. The slump test of concrete is used to measure is:
a) Consistency
b) Mobility
c) Homogenous
d) All the these
6. For compacting large sections of mass concrete in structures, the types of vibrator used is:
a) Internal vibrator
b) Screed vibrator
c) From vibrator
d) All the these
7. For compacting plain concrete or one way reinforced concrete floor the vibrator used is:
a) Internal vibrator
b) Screed vibrator
c) From vibrator
d) All of above
8. Concrete gains strength due to :
a) Chemical reaction of cement with sand and course aggregates
b) Evaporation of water from of concrete
c) Hydration of cement
d) All of the above
ER. SUNIL KUMAR YADAV 1
9. Increase in fineness modulus of aggregate indicates :
a) Finer grading
b) Courses grading
c) Gap grading
d) All the above
10. Soundness test of cement by le-chatelier’s apparatus gives unsoundness due to :
a) Free lime only
b) Magnesia only
c) Both a) and b)
d) All of the above
11. The bulking of aggregate is due to :
a) Moisture content
b) Voids
c) Less compaction
d) All of the above
12. The tricalcium aluminates in cement has the property of :
a) Reacting fast with water
b) Causing initial setting of cement
c) Generating large amount of heat hydration
d) None of these
13. Water cement ratio is usually , expressed in :
a) Liter of water required per bag of cement
b) Liter of water required per kg of cement
c) Both a) and b)
d) None of these
D PRADAD
14. Pick up the incorrect statement from following :
a) Gypsum in cement decreases the setting time
b) The first component of cement which reacts with water is C2S
c) Bulking of sand is less when it’s particles are fine
d) All of the above
15. The increase in the strength of concrete with time is :
a) Linear
b) Non linear
c) Asymptotic
d) All of the above
16. The slump for beam slab is :
a) 75- 150 mm
b) 15- 30 mm
c) 50- 100 mm
d) All of the above
17. As the grade of concrete increase the quantity of cement required per cubic meter :
a) Increase
b) Decrease
c) Constant
d) All of the above
ER. SUNIL KUMAR YADAV 2
18. The inelastic behavior of concrete is due to the :
a) Shrinkage in concrete
b) Propagation of bound and mortar cracks
c) Presence of macro and micro cracks
d) All of the above
19. Quality control means :
a) Extra cost
b) A rational use of available resources
c) Adequate design to minimize cost
d) All of the above
20. The nature of fresh concrete is :
a) Elastic
b) Plastic
c) Rigid
d) All of the above
21. The concrete mixers are normally classified on the basis of :
a) The technique of discharging the mixed concrete
b) Capacity of batch handled
c) The no. of drums
d) All of the above
22. Steam curing is used in :
a) Columns only
b) Long slabs and column
c) Mass production of precast concrete
d) All of the above
23. Steam curing is not used with :
a) Ordinary Portland cement
b) High alumina cement
c) Rapid hardening cement
d) All of the above
24. Curing period is minimum for concrete using :
a) Ordinary Portland cement
b) High alumina cement
c) Rapid hardening cement
d) All of the above
25. The aggregate used for high strength concrete is :
a) Round aggregate
b) Irregular aggregate
c) Angular aggregates
d) All of the above
26. The ferro cement is a composite material obtained by :
a) Random dispose of short , discontinuous fibres in the convential concrete
b) Reinforcing the cement mortar with steel fibrous in the form of wire mesh
c) Blending ferrous compounds in the ordinary Portland cement
ER. SUNIL KUMAR YADAV 3
d) All of the above
27. Plain cement concrete is strong in taking :
a) Tensile stress
b) Compressive stress
c) Shear stress
d) All of the above
28. The removal of excess air after placing concrete helps in increasing the strength of
concrete by :
a) 15 to 20 %
b) 20 to 30 %
c) 30 to 50 %
d) All of the above
29. Expansive cement expands mostly during it’s :
a) Initial hardening period
b) Final hardening period
c) Whole life
d) All of the above
30. Soundness of the material means the resistance of the material :
a) Moisture attack
b) Heat
c) Alternate freezing thawing
d) All of the above
31. The purpose of reinforcement in pestered concrete is :
a) To provide adequate bound stress
b) To resist tensile stress
c) To impart initial compressive stress in concrete
d) All of the above
32. Addition of pozzolana to cement :
a) Decrease workability
b) Increase strength
c) Increase heat of hydration
d) Decrease curing time
e) None of the above
33. Pick up the correct statement from following :
a) Segregation is necessary for a workable concrete
b) Consistency does not affect the workability of concrete
c) If the slump increase , workability decrease
d) If the concrete mix is dry , the slump is maximum
e) None of the above
34. Pick up the incorrect statement from following :
a) Space between the exterior walls of a ware house and bag piles should be 30 cm
b) Cement bags should preferably be piled on wooden planks
c) Cement bags should preferably be placed such that bags of one layers does not touch
the bags of the adjacent layers
d) Width and height of the pile should not exceed 3m and 2.7 m respectively
e) None of the above
ER. SUNIL KUMAR YADAV 4
35. Pick up the correct statement from following :
a) The free water is the amount of water added while mixing and the amount of water
held on the surface of the aggregates prior to mix
b) The total water is the free water and the amount actually absorbed by the aggregates
c) Both a) and b) of above
d) None of the above
36. Pick up the incorrect statement from following :
a) Admixtures accelerate hydration
b) Admixture make concrete water proff
c) Admixture make concrete acid proff
d) Admixture gives high strength
e) None of the above
37. Is sieve no. 10 mm and 4.75 mm are generally used for grading of :
a) Course aggregates
b) Fine aggregates
c) None of above
d) Both a) and b) above
38. When water cement ratio is increased , workability :
a) Increase
b) Decreases
c) Both a) and b) above
d) None of the above
39. The surface where two successive placements of concrete meet, is known as:
a) Construction joint
b) Expansion joint
c) Construction joint
d) Both a) and b) of above
40. Generally nominal mix is done by volume while design mix is done by :
a) Volume
b) Weight
c) Both a) and b) of above
d) Consolidation
41. Gel space ratio is defined as the ratio of :
a) Volume of hydrated cement to the sum of volume of hydrated cement and capillary
pores
b) The sum of volume of hydrated cement and capillary pores to volume of hydrated
cement
c) Both a) and b) of above
d) None of the above
42. Prestress is imparted to concrete by bearing in :
a) Pre tensioning
b) Post tensioning
c) Both a) and b) of above
d) None of the above
43. Choose the incorrect statement :
ER. SUNIL KUMAR YADAV 5
a) Arrow representing activity in CPM network is drawn without any scale
b) Head of an activity represents the finish of an activity
c) Tail of an activity represents the start of an activity
d) None of the above
44.
ER. SUNIL KUMAR YADAV 6
All the best
Answer:
1 B 11 A 21 B 31 C 41 B
2 B 12 D 22 A 32 C 42 A
3 A 13 A 23 C 33 E 43 B
4 C 14 A 24 B 34 E
5 A 15 B 25 C 35 E
6 A 16 A 26 B 36 D
7 B 17 C 27 B 37 E
8 C 18 A 28 B 38 B
9 B 19 B 29 B 39 A
10 A 20 B 30 B 40 C

More Related Content

What's hot

Pavement design
Pavement designPavement design
Pavement designhusna004
 
Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wallGhanashyam Prajapati
 
Limit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed ConceptLimit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed ConceptCivil Insider
 
Workability of Concrete
Workability  of ConcreteWorkability  of Concrete
Workability of ConcreteGulraizArshad1
 
PAVEMENT DESIGN
PAVEMENT DESIGNPAVEMENT DESIGN
PAVEMENT DESIGNArun Karthik
 
Properties of concrete
Properties of concreteProperties of concrete
Properties of concreteshruthiv19
 
Shrinkage of concrete
Shrinkage of concreteShrinkage of concrete
Shrinkage of concretePramod GK
 
Limit state of serviceability
Limit state of serviceabilityLimit state of serviceability
Limit state of serviceabilityCharul Sharma
 
Analysis & design of T-Beam bridge
Analysis & design of T-Beam bridgeAnalysis & design of T-Beam bridge
Analysis & design of T-Beam bridgeElamathy Murugan
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problemdhineshkumar002
 
Eccentric connections in steel structure
Eccentric connections in steel structureEccentric connections in steel structure
Eccentric connections in steel structureSarvesh Sureshrao Chikte
 
Bridge loading
Bridge loadingBridge loading
Bridge loadingkapilpant12
 
Combined footing 1-1-18
Combined footing 1-1-18Combined footing 1-1-18
Combined footing 1-1-18SubhashPatankar2
 
REPORT ON PLASTERING
REPORT ON PLASTERINGREPORT ON PLASTERING
REPORT ON PLASTERINGMehul Gohil
 
Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineeringKHUSHBU SHAH
 

What's hot (20)

Pavement design
Pavement designPavement design
Pavement design
 
Construction of diaphragm wall
Construction of diaphragm wallConstruction of diaphragm wall
Construction of diaphragm wall
 
Limit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed ConceptLimit state, working stress, ultimate load method - Detailed Concept
Limit state, working stress, ultimate load method - Detailed Concept
 
Design of staircases
Design of staircasesDesign of staircases
Design of staircases
 
Workability of Concrete
Workability  of ConcreteWorkability  of Concrete
Workability of Concrete
 
PAVEMENT DESIGN
PAVEMENT DESIGNPAVEMENT DESIGN
PAVEMENT DESIGN
 
Properties of concrete
Properties of concreteProperties of concrete
Properties of concrete
 
Shrinkage of concrete
Shrinkage of concreteShrinkage of concrete
Shrinkage of concrete
 
Limit state of serviceability
Limit state of serviceabilityLimit state of serviceability
Limit state of serviceability
 
Analysis & design of T-Beam bridge
Analysis & design of T-Beam bridgeAnalysis & design of T-Beam bridge
Analysis & design of T-Beam bridge
 
Introduction & under ground water tank problem
Introduction & under ground water tank problemIntroduction & under ground water tank problem
Introduction & under ground water tank problem
 
Eccentric connections in steel structure
Eccentric connections in steel structureEccentric connections in steel structure
Eccentric connections in steel structure
 
Bridge loading
Bridge loadingBridge loading
Bridge loading
 
Cofferdams
Cofferdams Cofferdams
Cofferdams
 
river training work
river training workriver training work
river training work
 
Combined footing 1-1-18
Combined footing 1-1-18Combined footing 1-1-18
Combined footing 1-1-18
 
REPORT ON PLASTERING
REPORT ON PLASTERINGREPORT ON PLASTERING
REPORT ON PLASTERING
 
Intze tank design
Intze tank designIntze tank design
Intze tank design
 
Transportation engineering
Transportation engineeringTransportation engineering
Transportation engineering
 
Bleeding in concrete
Bleeding in concreteBleeding in concrete
Bleeding in concrete
 

Similar to Concrete Technology Questions and Answers

1.construction material
1.construction material1.construction material
1.construction materialMani Das
 
Concrete mcq with ans.pdf
Concrete mcq with ans.pdfConcrete mcq with ans.pdf
Concrete mcq with ans.pdfRoshani Shahi
 
MMUP exam quastions (provided by people who took the exam)
MMUP exam quastions (provided by people who took the exam)MMUP exam quastions (provided by people who took the exam)
MMUP exam quastions (provided by people who took the exam)Waseem Ahmad
 
Mmup questionnaire 5
Mmup questionnaire 5Mmup questionnaire 5
Mmup questionnaire 5Omar Selim
 
Mmup questionnaire 3
Mmup questionnaire 3Mmup questionnaire 3
Mmup questionnaire 3Omar Selim
 
Concrete technology-questions
Concrete technology-questionsConcrete technology-questions
Concrete technology-questionsHimansuKunwar1
 
59105128 civil-engineering-objective-type-questions
59105128 civil-engineering-objective-type-questions59105128 civil-engineering-objective-type-questions
59105128 civil-engineering-objective-type-questionsBRJROHIT
 
Mcqforcivilengineers 140220073640-phpapp02
Mcqforcivilengineers 140220073640-phpapp02Mcqforcivilengineers 140220073640-phpapp02
Mcqforcivilengineers 140220073640-phpapp02Aleksandra Stojmenovska
 
Mmup questionnaire 6
Mmup questionnaire 6Mmup questionnaire 6
Mmup questionnaire 6Omar Selim
 
Mmup questionnaire 9
Mmup questionnaire 9Mmup questionnaire 9
Mmup questionnaire 9Omar Selim
 
Mmup questionnaire 2
Mmup questionnaire 2Mmup questionnaire 2
Mmup questionnaire 2Omar Selim
 
Mmup questionnaire 8
Mmup questionnaire 8Mmup questionnaire 8
Mmup questionnaire 8Omar Selim
 
Concrete design mix (ss)
Concrete design mix (ss)Concrete design mix (ss)
Concrete design mix (ss)Kezar Ali. Shah
 
Mmup questionnaire 1
Mmup questionnaire 1Mmup questionnaire 1
Mmup questionnaire 1Omar Selim
 
Mechanical Previous Year questions 2021
Mechanical Previous Year questions 2021Mechanical Previous Year questions 2021
Mechanical Previous Year questions 2021deepa sahu
 
civil engineering question with Answer RCC
civil engineering question with Answer RCCcivil engineering question with Answer RCC
civil engineering question with Answer RCCkuldeep kumar
 
Mmup questionnaire 10
Mmup questionnaire 10Mmup questionnaire 10
Mmup questionnaire 10Omar Selim
 
Topic 2
Topic 2Topic 2
Topic 2majitra
 

Similar to Concrete Technology Questions and Answers (20)

1.construction material
1.construction material1.construction material
1.construction material
 
Concrete mcq with ans.pdf
Concrete mcq with ans.pdfConcrete mcq with ans.pdf
Concrete mcq with ans.pdf
 
MMUP exam quastions (provided by people who took the exam)
MMUP exam quastions (provided by people who took the exam)MMUP exam quastions (provided by people who took the exam)
MMUP exam quastions (provided by people who took the exam)
 
Mmup questionnaire 5
Mmup questionnaire 5Mmup questionnaire 5
Mmup questionnaire 5
 
Mmup questionnaire 3
Mmup questionnaire 3Mmup questionnaire 3
Mmup questionnaire 3
 
Concrete technology-questions
Concrete technology-questionsConcrete technology-questions
Concrete technology-questions
 
59105128 civil-engineering-objective-type-questions
59105128 civil-engineering-objective-type-questions59105128 civil-engineering-objective-type-questions
59105128 civil-engineering-objective-type-questions
 
Mcqforcivilengineers 140220073640-phpapp02
Mcqforcivilengineers 140220073640-phpapp02Mcqforcivilengineers 140220073640-phpapp02
Mcqforcivilengineers 140220073640-phpapp02
 
ME 1.pdf
ME 1.pdfME 1.pdf
ME 1.pdf
 
Mmup questionnaire 6
Mmup questionnaire 6Mmup questionnaire 6
Mmup questionnaire 6
 
Mmup questionnaire 9
Mmup questionnaire 9Mmup questionnaire 9
Mmup questionnaire 9
 
Mmup questionnaire 2
Mmup questionnaire 2Mmup questionnaire 2
Mmup questionnaire 2
 
Mmup questionnaire 8
Mmup questionnaire 8Mmup questionnaire 8
Mmup questionnaire 8
 
Concrete design mix (ss)
Concrete design mix (ss)Concrete design mix (ss)
Concrete design mix (ss)
 
Mmup questionnaire 1
Mmup questionnaire 1Mmup questionnaire 1
Mmup questionnaire 1
 
Mechanical Previous Year questions 2021
Mechanical Previous Year questions 2021Mechanical Previous Year questions 2021
Mechanical Previous Year questions 2021
 
civil engineering question with Answer RCC
civil engineering question with Answer RCCcivil engineering question with Answer RCC
civil engineering question with Answer RCC
 
Mmup questionnaire 10
Mmup questionnaire 10Mmup questionnaire 10
Mmup questionnaire 10
 
ME REVIEWER
ME REVIEWERME REVIEWER
ME REVIEWER
 
Topic 2
Topic 2Topic 2
Topic 2
 

More from Mani Das

201911121130435dca470798b5a1
201911121130435dca470798b5a1201911121130435dca470798b5a1
201911121130435dca470798b5a1Mani Das
 
1.5 class a,b
1.5 class a,b1.5 class a,b
1.5 class a,bMani Das
 
Nepal bridge standards 2067
Nepal bridge standards 2067Nepal bridge standards 2067
Nepal bridge standards 2067Mani Das
 
1.5 class c,d,e
1.5 class c,d,e1.5 class c,d,e
1.5 class c,d,eMani Das
 
Survey handsout question for sub er and asst
Survey handsout question for sub er and asstSurvey handsout question for sub er and asst
Survey handsout question for sub er and asstMani Das
 
Estimating and costing complete note
Estimating and costing complete noteEstimating and costing complete note
Estimating and costing complete noteMani Das
 
Chapter 5 average
Chapter 5 averageChapter 5 average
Chapter 5 averageMani Das
 
Chap 2 classification
Chap 2 classificationChap 2 classification
Chap 2 classificationMani Das
 
Chap 1 table chart
Chap 1 table chartChap 1 table chart
Chap 1 table chartMani Das
 
Chap 1 arithmetical reasoning
Chap 1 arithmetical reasoningChap 1 arithmetical reasoning
Chap 1 arithmetical reasoningMani Das
 
Chap 1 analogy
Chap 1 analogyChap 1 analogy
Chap 1 analogyMani Das
 
Irrigation and hydrology
Irrigation and hydrologyIrrigation and hydrology
Irrigation and hydrologyMani Das
 
High way
High wayHigh way
High wayMani Das
 
Group c airport converted
Group c airport convertedGroup c airport converted
Group c airport convertedMani Das
 
Group d converted
Group d convertedGroup d converted
Group d convertedMani Das
 
9.epp
9.epp9.epp
9.eppMani Das
 
8.drawing technicue
8.drawing technicue8.drawing technicue
8.drawing technicueMani Das
 
7.surveying
7.surveying7.surveying
7.surveyingMani Das
 
6.eastimating and costing
6.eastimating and costing6.eastimating and costing
6.eastimating and costingMani Das
 
5.economics
5.economics5.economics
5.economicsMani Das
 

More from Mani Das (20)

201911121130435dca470798b5a1
201911121130435dca470798b5a1201911121130435dca470798b5a1
201911121130435dca470798b5a1
 
1.5 class a,b
1.5 class a,b1.5 class a,b
1.5 class a,b
 
Nepal bridge standards 2067
Nepal bridge standards 2067Nepal bridge standards 2067
Nepal bridge standards 2067
 
1.5 class c,d,e
1.5 class c,d,e1.5 class c,d,e
1.5 class c,d,e
 
Survey handsout question for sub er and asst
Survey handsout question for sub er and asstSurvey handsout question for sub er and asst
Survey handsout question for sub er and asst
 
Estimating and costing complete note
Estimating and costing complete noteEstimating and costing complete note
Estimating and costing complete note
 
Chapter 5 average
Chapter 5 averageChapter 5 average
Chapter 5 average
 
Chap 2 classification
Chap 2 classificationChap 2 classification
Chap 2 classification
 
Chap 1 table chart
Chap 1 table chartChap 1 table chart
Chap 1 table chart
 
Chap 1 arithmetical reasoning
Chap 1 arithmetical reasoningChap 1 arithmetical reasoning
Chap 1 arithmetical reasoning
 
Chap 1 analogy
Chap 1 analogyChap 1 analogy
Chap 1 analogy
 
Irrigation and hydrology
Irrigation and hydrologyIrrigation and hydrology
Irrigation and hydrology
 
High way
High wayHigh way
High way
 
Group c airport converted
Group c airport convertedGroup c airport converted
Group c airport converted
 
Group d converted
Group d convertedGroup d converted
Group d converted
 
9.epp
9.epp9.epp
9.epp
 
8.drawing technicue
8.drawing technicue8.drawing technicue
8.drawing technicue
 
7.surveying
7.surveying7.surveying
7.surveying
 
6.eastimating and costing
6.eastimating and costing6.eastimating and costing
6.eastimating and costing
 
5.economics
5.economics5.economics
5.economics
 

Recently uploaded

Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 

Recently uploaded (20)

Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 

Concrete Technology Questions and Answers

  • 1. All type and none type question answer Concrete technology 12% From RKS 1. The gypsum is added to the cement for : a) Providing high strength to the cement b) Controlling the initial setting time of cement c) Lowering the initial setting time of cement d) All of the above 2. The function of aggregates in concrete is to serve as : a) Binding material b) Filler c) Catalyst d) All of these 3. The presence of tricalcium silicate in cement : a) Hydrates the cement rapidly b) Generates less heat of hydration c) Offers high resistance of sulphate attack d) All of these 4. The aggregate which pass through 4.75mm is sieve and entrirdyretain an 75 micron is sieve is called : a) Cyclopean aggregates b) Coarse aggregate c) Fine aggregate d) All –in – aggregate 5. The slump test of concrete is used to measure is: a) Consistency b) Mobility c) Homogenous d) All the these 6. For compacting large sections of mass concrete in structures, the types of vibrator used is: a) Internal vibrator b) Screed vibrator c) From vibrator d) All the these 7. For compacting plain concrete or one way reinforced concrete floor the vibrator used is: a) Internal vibrator b) Screed vibrator c) From vibrator d) All of above 8. Concrete gains strength due to : a) Chemical reaction of cement with sand and course aggregates b) Evaporation of water from of concrete c) Hydration of cement d) All of the above ER. SUNIL KUMAR YADAV 1
  • 2. 9. Increase in fineness modulus of aggregate indicates : a) Finer grading b) Courses grading c) Gap grading d) All the above 10. Soundness test of cement by le-chatelier’s apparatus gives unsoundness due to : a) Free lime only b) Magnesia only c) Both a) and b) d) All of the above 11. The bulking of aggregate is due to : a) Moisture content b) Voids c) Less compaction d) All of the above 12. The tricalcium aluminates in cement has the property of : a) Reacting fast with water b) Causing initial setting of cement c) Generating large amount of heat hydration d) None of these 13. Water cement ratio is usually , expressed in : a) Liter of water required per bag of cement b) Liter of water required per kg of cement c) Both a) and b) d) None of these D PRADAD 14. Pick up the incorrect statement from following : a) Gypsum in cement decreases the setting time b) The first component of cement which reacts with water is C2S c) Bulking of sand is less when it’s particles are fine d) All of the above 15. The increase in the strength of concrete with time is : a) Linear b) Non linear c) Asymptotic d) All of the above 16. The slump for beam slab is : a) 75- 150 mm b) 15- 30 mm c) 50- 100 mm d) All of the above 17. As the grade of concrete increase the quantity of cement required per cubic meter : a) Increase b) Decrease c) Constant d) All of the above ER. SUNIL KUMAR YADAV 2
  • 3. 18. The inelastic behavior of concrete is due to the : a) Shrinkage in concrete b) Propagation of bound and mortar cracks c) Presence of macro and micro cracks d) All of the above 19. Quality control means : a) Extra cost b) A rational use of available resources c) Adequate design to minimize cost d) All of the above 20. The nature of fresh concrete is : a) Elastic b) Plastic c) Rigid d) All of the above 21. The concrete mixers are normally classified on the basis of : a) The technique of discharging the mixed concrete b) Capacity of batch handled c) The no. of drums d) All of the above 22. Steam curing is used in : a) Columns only b) Long slabs and column c) Mass production of precast concrete d) All of the above 23. Steam curing is not used with : a) Ordinary Portland cement b) High alumina cement c) Rapid hardening cement d) All of the above 24. Curing period is minimum for concrete using : a) Ordinary Portland cement b) High alumina cement c) Rapid hardening cement d) All of the above 25. The aggregate used for high strength concrete is : a) Round aggregate b) Irregular aggregate c) Angular aggregates d) All of the above 26. The ferro cement is a composite material obtained by : a) Random dispose of short , discontinuous fibres in the convential concrete b) Reinforcing the cement mortar with steel fibrous in the form of wire mesh c) Blending ferrous compounds in the ordinary Portland cement ER. SUNIL KUMAR YADAV 3
  • 4. d) All of the above 27. Plain cement concrete is strong in taking : a) Tensile stress b) Compressive stress c) Shear stress d) All of the above 28. The removal of excess air after placing concrete helps in increasing the strength of concrete by : a) 15 to 20 % b) 20 to 30 % c) 30 to 50 % d) All of the above 29. Expansive cement expands mostly during it’s : a) Initial hardening period b) Final hardening period c) Whole life d) All of the above 30. Soundness of the material means the resistance of the material : a) Moisture attack b) Heat c) Alternate freezing thawing d) All of the above 31. The purpose of reinforcement in pestered concrete is : a) To provide adequate bound stress b) To resist tensile stress c) To impart initial compressive stress in concrete d) All of the above 32. Addition of pozzolana to cement : a) Decrease workability b) Increase strength c) Increase heat of hydration d) Decrease curing time e) None of the above 33. Pick up the correct statement from following : a) Segregation is necessary for a workable concrete b) Consistency does not affect the workability of concrete c) If the slump increase , workability decrease d) If the concrete mix is dry , the slump is maximum e) None of the above 34. Pick up the incorrect statement from following : a) Space between the exterior walls of a ware house and bag piles should be 30 cm b) Cement bags should preferably be piled on wooden planks c) Cement bags should preferably be placed such that bags of one layers does not touch the bags of the adjacent layers d) Width and height of the pile should not exceed 3m and 2.7 m respectively e) None of the above ER. SUNIL KUMAR YADAV 4
  • 5. 35. Pick up the correct statement from following : a) The free water is the amount of water added while mixing and the amount of water held on the surface of the aggregates prior to mix b) The total water is the free water and the amount actually absorbed by the aggregates c) Both a) and b) of above d) None of the above 36. Pick up the incorrect statement from following : a) Admixtures accelerate hydration b) Admixture make concrete water proff c) Admixture make concrete acid proff d) Admixture gives high strength e) None of the above 37. Is sieve no. 10 mm and 4.75 mm are generally used for grading of : a) Course aggregates b) Fine aggregates c) None of above d) Both a) and b) above 38. When water cement ratio is increased , workability : a) Increase b) Decreases c) Both a) and b) above d) None of the above 39. The surface where two successive placements of concrete meet, is known as: a) Construction joint b) Expansion joint c) Construction joint d) Both a) and b) of above 40. Generally nominal mix is done by volume while design mix is done by : a) Volume b) Weight c) Both a) and b) of above d) Consolidation 41. Gel space ratio is defined as the ratio of : a) Volume of hydrated cement to the sum of volume of hydrated cement and capillary pores b) The sum of volume of hydrated cement and capillary pores to volume of hydrated cement c) Both a) and b) of above d) None of the above 42. Prestress is imparted to concrete by bearing in : a) Pre tensioning b) Post tensioning c) Both a) and b) of above d) None of the above 43. Choose the incorrect statement : ER. SUNIL KUMAR YADAV 5
  • 6. a) Arrow representing activity in CPM network is drawn without any scale b) Head of an activity represents the finish of an activity c) Tail of an activity represents the start of an activity d) None of the above 44. ER. SUNIL KUMAR YADAV 6
  • 7. All the best Answer: 1 B 11 A 21 B 31 C 41 B 2 B 12 D 22 A 32 C 42 A 3 A 13 A 23 C 33 E 43 B 4 C 14 A 24 B 34 E 5 A 15 B 25 C 35 E 6 A 16 A 26 B 36 D 7 B 17 C 27 B 37 E 8 C 18 A 28 B 38 B 9 B 19 B 29 B 39 A 10 A 20 B 30 B 40 C