1.0 INTRODUCTION AND BACKGROUND
1.1 Department of Roads (DOR) has formulated these standards with a view to
establish a common procedure for design and construction of road bridges in
Nepal.
2.0 DEFINITION OF DIFFERENT TERMS
Afflux: A rise in water level behind the bridge structures due to obstruction to flow.
Bridge: A structure that spans a body of water, a valley, or a road and affords passage
for pedestrians, or vehicles of all kinds, or any combination thereof.
Design Discharge: That maximum discharge which the structure allows to pass through
it with fully serving its function.
Design Life: Period of time after construction throughout which the structure fulfills its
function for which it is constructed.
Footpaths: A portion of the bridge deck intended for the movement of pedestrian traffic
which is usually separated from vehicular movement by raising or by safety curb.
Free board: A vertical clearance of the lowest point of superstructure from the highest
flood level.
HFL: Level of the highest flood ever recorded or the calculated level for the highest
possible flood of specified return period.
Curb: The edge of a sidewalk next to the main roadway. The wheel-guard in a bridge.
Permanent Bridge: A bridge intended to provide a reliable passage of vehicles across a
river or any obstacles without interruption throughout its design life in contrary to
Temporary Bridges such as submergible causeways, ferries etc.
Return period: Also known as a recurrence interval is an estimate of the interval of time
between flood or river discharge flow of a design intensity or size.
Raised Curb: A curb that is raised above the level of the carriageway.
Safety Curb: A curb that separates vehicular movement from pedestrian movement with
a barrier.
Temporary Bridge: A bridge constructed to provide passage of vehicles either for
relatively a short period of a few years or few months or low level structures like
submergible/vented causeways or pontoons functioning during the period of low
discharge only.
3.0 GERNERAL
3.1 DESIGN LIFE
All permanent bridges shall be designed for a design life of minimum 50 years. Traffic
projections shall be made for a period of 30 years.
3
3.2 DESIGN DISCHARGE
All permanent bridges shall be designed for a discharge of 100 yrs. return period. For
the calculation of design discharge empirical formulas especially developed for other
catchments shall not be used.
4.0 BRIDGE LOADINGS
4.1 ROAD BRIDGE LOADINGS
All permanent road bridges in Nepal shall be designed as per IRC loadings or AASHTO
loadings. All design shall be carried out in accordance to IRC standards for bridges
unless otherwise specified in this document.
5.0 GEOMETRIC STANDARDS
5.1 CARRIAGEWAY
• All bridges in Highways and Urban Roads shall be designed with a
minimum carriageway width of 7.5m.
• All bridges in Feeder Roads shall be designed with a minimum
carriageway width of 6.0m.
• No permanent bridge shall be designed with a carriageway width of less
than 6.0m except on minor (district and village) roads having length less
than 25m.
5.2 FOOTPATH
Footpaths shall be provided on all bridges located at settlement areas or on areas of
high movement of pedestrian traffic. They should be separated from the vehicular traffic
by safety curbs (in rural areas) and by raised footpath or curbs (in urban areas).The
width of the footpath should be decided according to projection of pedestrian traffic,
however, a minimum clear width(excluding the width of railings) of 1.0 m footpaths to be
provided, where necessary.
6.0 CLEARANCES
6.1 VERTICAL CLEARANCE
The vertical clearance is shown in Fig 6.1.
The vertical clearance of structures shall be,
I. For all roads not less than 4.75 m for through structures
II. Overhead wires, poles etc shall be at least 7.0 m above the highest point of the
road surface.
6.2 HORIZONTAL OR LATERAL CLEARANCE
The horizontal clearance is the clear width available for the passage of vehicular traffic
as shown on Fig. 6.1.
4
For culverts, the full roadway width as well as the width of shoulders shall be carried
through.
The size of curbs and footpaths shall be as shown in Fig. 6.1.
Fig. 6.1 Horizontal and Vertical Clearances
7.0 BRIDGE CLASSIFICATION
Classification of bridges shall be as follows:
Culvert : Length up to 6 m
Minor Bridge : When length ≤ 50 m (with span ≤ 25 m )
Major Bridge : When span >25 m or length >50 m(with smaller spans)
Special Bridge : Bridges that require special design considerations, whose
construction features(e.g. concrete girder bridges with >50m span, steel trusses >
100m span, arch bridges, suspension bridges, cable-stayed bridges and other non-
standard bridges).
5
8.0 FREE BOARD
8.1 MINIMUM FREE BOARD
In case of bridges over water bodies, the free board from the design HFL with afflux to
the lowest point of bridge superstructure shall not be less than 1.0 m. The minimum
freeboard shall be as shown on the following table.
Table 8.1
Discharge
m3
/sec
Minimum Free board, mm
Less than 200 1000
201-500 1200
501-2000 1500
2001-5000 2000
5000 and above More than 2000 (depending on the reliability of the available data
for the calculation of discharge)
9.0 CURBS AND SAFETY CURBS (BRIDGE BARRIERS)
Raised curbs shall not be less than 450 mm wide. Wider curbs shall be designed for
footway loadings. Height of raised curbs shall not be less than 200 mm.
The height of the safety bridge curb above the carriageway shall not be less than 500
mm from the safety consideration.
10.0 CARRIAGEWAY DRAINAGE
Transverse and longitudinal drainage of the carriageway shall be managed respectively
by providing a suitable cross fall and a camber or gradient. Water flowing down grade on
the approach should be intercepted and not permitted to run to the bridge.
The details of deck drains shall be such as to prevent the discharge of drainage water
against any portion of the structure and to prevent erosion adjacent to the outlet of the
drainage. Overhanging portion of concrete deck shall be provided with drip head or
notch, continuous where possible.
11.0 RAILINGS
Railings shall be provided along the edges of structures for protection of traffic and
pedestrians.
The height of the railing should be a minimum of 1.0 m from the top of the footpath or
curb surface.
12.0 MATERIAL SPECIFICATION
Material Specification is to be adopted as per Standard Specification for Road and
Bridges Works published by Ministry of Physical Planning and Works, Department of
Roads-2001.
13.0 PROVISION FOR UTILITIES
All bridges shall be designed taking into consideration the provision of carrying
utilities(electricity, water, telephone, cables etc.) through them wherever required.

More Related Content

What's hot

Railway engineering.
Railway engineering.Railway engineering.
Railway engineering.Md Khan
 
Railway engineering By T.Ravi Prakash/Kongu Engineering College
Railway engineering By T.Ravi Prakash/Kongu Engineering CollegeRailway engineering By T.Ravi Prakash/Kongu Engineering College
Railway engineering By T.Ravi Prakash/Kongu Engineering Collegeravicivil
 
Civil engineering in indian railways spce
Civil engineering in indian railways spceCivil engineering in indian railways spce
Civil engineering in indian railways spceirkportal
 
Transportation engineering 2
Transportation engineering   2Transportation engineering   2
Transportation engineering 2R VIJAYAKUMAR
 
Transportation engineering 1
Transportation engineering   1Transportation engineering   1
Transportation engineering 1R VIJAYAKUMAR
 
RAILWAY ENGINEERING
RAILWAY ENGINEERINGRAILWAY ENGINEERING
RAILWAY ENGINEERINGfye7884
 
BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONMasudul Robin
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringLatif Hyder Wadho
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railwayKHUSHBU SHAH
 
Introduction to railway engineering
Introduction to railway engineeringIntroduction to railway engineering
Introduction to railway engineeringSatyapal Singh
 
Highway Cross-sectional Elements
Highway Cross-sectional ElementsHighway Cross-sectional Elements
Highway Cross-sectional ElementsAkshathaBhandary
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackKHUSHBU SHAH
 
3.TRAFFIC REGULATION (TE) 2170613 GTU
3.TRAFFIC REGULATION (TE)  2170613 GTU3.TRAFFIC REGULATION (TE)  2170613 GTU
3.TRAFFIC REGULATION (TE) 2170613 GTUVATSAL PATEL
 
Railway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bdRailway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bdMd. Sultan Ali
 
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERING
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERINGALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERING
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERINGEduHUBOnline
 
Chapter 1-road-cross-section-elements
Chapter 1-road-cross-section-elementsChapter 1-road-cross-section-elements
Chapter 1-road-cross-section-elementspreginamichael
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway EngineeringLatif Hyder Wadho
 
Planning principles of Railways Engineering
Planning principles of Railways EngineeringPlanning principles of Railways Engineering
Planning principles of Railways EngineeringLatif Hyder Wadho
 

What's hot (20)

Railway engineering.
Railway engineering.Railway engineering.
Railway engineering.
 
Railway engineering By T.Ravi Prakash/Kongu Engineering College
Railway engineering By T.Ravi Prakash/Kongu Engineering CollegeRailway engineering By T.Ravi Prakash/Kongu Engineering College
Railway engineering By T.Ravi Prakash/Kongu Engineering College
 
Civil engineering in indian railways spce
Civil engineering in indian railways spceCivil engineering in indian railways spce
Civil engineering in indian railways spce
 
Railway Track Maintenance
Railway Track  MaintenanceRailway Track  Maintenance
Railway Track Maintenance
 
Transportation engineering 2
Transportation engineering   2Transportation engineering   2
Transportation engineering 2
 
Transportation engineering 1
Transportation engineering   1Transportation engineering   1
Transportation engineering 1
 
RAILWAY ENGINEERING
RAILWAY ENGINEERINGRAILWAY ENGINEERING
RAILWAY ENGINEERING
 
BANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATIONBANGLADESH RAILWAY COMUNICATION
BANGLADESH RAILWAY COMUNICATION
 
Railway engineering
Railway engineeringRailway engineering
Railway engineering
 
Surveys & alignment of Railway Engineering
Surveys & alignment of Railway EngineeringSurveys & alignment of Railway Engineering
Surveys & alignment of Railway Engineering
 
Chapter 5 Introduction to railway
Chapter 5 Introduction to railwayChapter 5 Introduction to railway
Chapter 5 Introduction to railway
 
Introduction to railway engineering
Introduction to railway engineeringIntroduction to railway engineering
Introduction to railway engineering
 
Highway Cross-sectional Elements
Highway Cross-sectional ElementsHighway Cross-sectional Elements
Highway Cross-sectional Elements
 
Chapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway trackChapter 7 Maintenance of railway track
Chapter 7 Maintenance of railway track
 
3.TRAFFIC REGULATION (TE) 2170613 GTU
3.TRAFFIC REGULATION (TE)  2170613 GTU3.TRAFFIC REGULATION (TE)  2170613 GTU
3.TRAFFIC REGULATION (TE) 2170613 GTU
 
Railway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bdRailway engineering-jdge@railway.gov.bd
Railway engineering-jdge@railway.gov.bd
 
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERING
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERINGALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERING
ALIGNMENT OF RAILWAY LINE |ALIGNMENT OF RAILWAY TRACK |RAILWAY ENGINEERING
 
Chapter 1-road-cross-section-elements
Chapter 1-road-cross-section-elementsChapter 1-road-cross-section-elements
Chapter 1-road-cross-section-elements
 
Rail gauges & rail sections Railway Engineering
Rail gauges & rail sections  Railway EngineeringRail gauges & rail sections  Railway Engineering
Rail gauges & rail sections Railway Engineering
 
Planning principles of Railways Engineering
Planning principles of Railways EngineeringPlanning principles of Railways Engineering
Planning principles of Railways Engineering
 

Similar to Nepal bridge standards 2067

Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Ankit Singh
 
DESIGN OF T BEAM BRIDGE PROCEDURE
DESIGN OF T BEAM BRIDGE PROCEDUREDESIGN OF T BEAM BRIDGE PROCEDURE
DESIGN OF T BEAM BRIDGE PROCEDUREbabji syed
 
TRANSPORTATION ENGINEERING railway track gauge
TRANSPORTATION ENGINEERING railway track gaugeTRANSPORTATION ENGINEERING railway track gauge
TRANSPORTATION ENGINEERING railway track gaugeJangid Devendra
 
259107634-Indian-Railway-Engineering-Practice.pdf
259107634-Indian-Railway-Engineering-Practice.pdf259107634-Indian-Railway-Engineering-Practice.pdf
259107634-Indian-Railway-Engineering-Practice.pdfRaj Bakhtani
 
CONVERSION OF LEVEL CROSSING INTO ROAD OVER/UNDER BRIDGES
CONVERSION OF LEVEL CROSSING INTO ROAD OVER/UNDER BRIDGESCONVERSION OF LEVEL CROSSING INTO ROAD OVER/UNDER BRIDGES
CONVERSION OF LEVEL CROSSING INTO ROAD OVER/UNDER BRIDGESSABYASACHI DALAI
 
IRJET - Analysis of Skew Bridge using Computational Method
IRJET - Analysis of Skew Bridge using Computational MethodIRJET - Analysis of Skew Bridge using Computational Method
IRJET - Analysis of Skew Bridge using Computational MethodIRJET Journal
 
ELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGES
ELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGESELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGES
ELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGESSABYASACHI DALAI
 
unit-5-bridge-engg-components-classification-data-collection-site-selection-e...
unit-5-bridge-engg-components-classification-data-collection-site-selection-e...unit-5-bridge-engg-components-classification-data-collection-site-selection-e...
unit-5-bridge-engg-components-classification-data-collection-site-selection-e...SalmanRabbani5
 
Bandra+worli+sea+link
Bandra+worli+sea+linkBandra+worli+sea+link
Bandra+worli+sea+linkASHOK KUMAR
 
Bridge
Bridge Bridge
Bridge illpa
 
Geometric design of highway
Geometric design of  highwayGeometric design of  highway
Geometric design of highwayPratikShinde113
 
Railway_Bridge_and_Tunnel_Engineering.pdf
Railway_Bridge_and_Tunnel_Engineering.pdfRailway_Bridge_and_Tunnel_Engineering.pdf
Railway_Bridge_and_Tunnel_Engineering.pdfSwapnilGorade1
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenenceGhanashyam Prajapati
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railwaysVipul Naidu
 

Similar to Nepal bridge standards 2067 (20)

Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)Design of t beam bridge using wsm(2)
Design of t beam bridge using wsm(2)
 
DESIGN OF T BEAM BRIDGE PROCEDURE
DESIGN OF T BEAM BRIDGE PROCEDUREDESIGN OF T BEAM BRIDGE PROCEDURE
DESIGN OF T BEAM BRIDGE PROCEDURE
 
TRANSPORTATION ENGINEERING railway track gauge
TRANSPORTATION ENGINEERING railway track gaugeTRANSPORTATION ENGINEERING railway track gauge
TRANSPORTATION ENGINEERING railway track gauge
 
259107634-Indian-Railway-Engineering-Practice.pdf
259107634-Indian-Railway-Engineering-Practice.pdf259107634-Indian-Railway-Engineering-Practice.pdf
259107634-Indian-Railway-Engineering-Practice.pdf
 
CONVERSION OF LEVEL CROSSING INTO ROAD OVER/UNDER BRIDGES
CONVERSION OF LEVEL CROSSING INTO ROAD OVER/UNDER BRIDGESCONVERSION OF LEVEL CROSSING INTO ROAD OVER/UNDER BRIDGES
CONVERSION OF LEVEL CROSSING INTO ROAD OVER/UNDER BRIDGES
 
IRJET - Analysis of Skew Bridge using Computational Method
IRJET - Analysis of Skew Bridge using Computational MethodIRJET - Analysis of Skew Bridge using Computational Method
IRJET - Analysis of Skew Bridge using Computational Method
 
ELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGES
ELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGESELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGES
ELIMINATION OF LEVEL CROSSING BY CONSTRUCTION OF ROAD OVER/UNDER BRIDGES
 
1Bridges.ppt
1Bridges.ppt1Bridges.ppt
1Bridges.ppt
 
unit-5-bridge-engg-components-classification-data-collection-site-selection-e...
unit-5-bridge-engg-components-classification-data-collection-site-selection-e...unit-5-bridge-engg-components-classification-data-collection-site-selection-e...
unit-5-bridge-engg-components-classification-data-collection-site-selection-e...
 
Bandra+worli+sea+link
Bandra+worli+sea+linkBandra+worli+sea+link
Bandra+worli+sea+link
 
Bridge engineering
Bridge engineeringBridge engineering
Bridge engineering
 
Bridge
Bridge Bridge
Bridge
 
Designing the highway
Designing the highwayDesigning the highway
Designing the highway
 
Bridge Engg
Bridge Engg Bridge Engg
Bridge Engg
 
Bridge
BridgeBridge
Bridge
 
Geometric design of highway
Geometric design of  highwayGeometric design of  highway
Geometric design of highway
 
Railway_Bridge_and_Tunnel_Engineering.pdf
Railway_Bridge_and_Tunnel_Engineering.pdfRailway_Bridge_and_Tunnel_Engineering.pdf
Railway_Bridge_and_Tunnel_Engineering.pdf
 
Railway track construction, drainage & maintenence
Railway track  construction, drainage & maintenenceRailway track  construction, drainage & maintenence
Railway track construction, drainage & maintenence
 
Metro Work
Metro WorkMetro Work
Metro Work
 
Unit ii railways
Unit ii railwaysUnit ii railways
Unit ii railways
 

More from Mani Das

201911121130435dca470798b5a1
201911121130435dca470798b5a1201911121130435dca470798b5a1
201911121130435dca470798b5a1Mani Das
 
1.5 class a,b
1.5 class a,b1.5 class a,b
1.5 class a,bMani Das
 
1.5 class c,d,e
1.5 class c,d,e1.5 class c,d,e
1.5 class c,d,eMani Das
 
Survey handsout question for sub er and asst
Survey handsout question for sub er and asstSurvey handsout question for sub er and asst
Survey handsout question for sub er and asstMani Das
 
Estimating and costing complete note
Estimating and costing complete noteEstimating and costing complete note
Estimating and costing complete noteMani Das
 
Chapter 5 average
Chapter 5 averageChapter 5 average
Chapter 5 averageMani Das
 
Chap 2 classification
Chap 2 classificationChap 2 classification
Chap 2 classificationMani Das
 
Chap 1 table chart
Chap 1 table chartChap 1 table chart
Chap 1 table chartMani Das
 
Chap 1 arithmetical reasoning
Chap 1 arithmetical reasoningChap 1 arithmetical reasoning
Chap 1 arithmetical reasoningMani Das
 
Chap 1 analogy
Chap 1 analogyChap 1 analogy
Chap 1 analogyMani Das
 
Irrigation and hydrology
Irrigation and hydrologyIrrigation and hydrology
Irrigation and hydrologyMani Das
 
Group c airport converted
Group c airport convertedGroup c airport converted
Group c airport convertedMani Das
 
Group d converted
Group d convertedGroup d converted
Group d convertedMani Das
 
8.drawing technicue
8.drawing technicue8.drawing technicue
8.drawing technicueMani Das
 
7.surveying
7.surveying7.surveying
7.surveyingMani Das
 
6.eastimating and costing
6.eastimating and costing6.eastimating and costing
6.eastimating and costingMani Das
 
5.economics
5.economics5.economics
5.economicsMani Das
 
4. construction management
4. construction management4. construction management
4. construction managementMani Das
 

More from Mani Das (20)

201911121130435dca470798b5a1
201911121130435dca470798b5a1201911121130435dca470798b5a1
201911121130435dca470798b5a1
 
1.5 class a,b
1.5 class a,b1.5 class a,b
1.5 class a,b
 
1.5 class c,d,e
1.5 class c,d,e1.5 class c,d,e
1.5 class c,d,e
 
Survey handsout question for sub er and asst
Survey handsout question for sub er and asstSurvey handsout question for sub er and asst
Survey handsout question for sub er and asst
 
Estimating and costing complete note
Estimating and costing complete noteEstimating and costing complete note
Estimating and costing complete note
 
Chapter 5 average
Chapter 5 averageChapter 5 average
Chapter 5 average
 
Chap 2 classification
Chap 2 classificationChap 2 classification
Chap 2 classification
 
Chap 1 table chart
Chap 1 table chartChap 1 table chart
Chap 1 table chart
 
Chap 1 arithmetical reasoning
Chap 1 arithmetical reasoningChap 1 arithmetical reasoning
Chap 1 arithmetical reasoning
 
Chap 1 analogy
Chap 1 analogyChap 1 analogy
Chap 1 analogy
 
Irrigation and hydrology
Irrigation and hydrologyIrrigation and hydrology
Irrigation and hydrology
 
High way
High wayHigh way
High way
 
Group c airport converted
Group c airport convertedGroup c airport converted
Group c airport converted
 
Group d converted
Group d convertedGroup d converted
Group d converted
 
9.epp
9.epp9.epp
9.epp
 
8.drawing technicue
8.drawing technicue8.drawing technicue
8.drawing technicue
 
7.surveying
7.surveying7.surveying
7.surveying
 
6.eastimating and costing
6.eastimating and costing6.eastimating and costing
6.eastimating and costing
 
5.economics
5.economics5.economics
5.economics
 
4. construction management
4. construction management4. construction management
4. construction management
 

Recently uploaded

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 

Recently uploaded (20)

(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 

Nepal bridge standards 2067

  • 1. Government of Nepal Ministry of Physical Planning and Works Department of Roads NEPAL BRIDGE STANDARDS-2067 Kathmandu-2067
  • 2. 1 Acronyms DOR-Department of Roads IRC-Indian Roads Congress AASHTO-American Association of State Highway and Transportation officials HFL-Highest Flood Level
  • 3. 2 1.0 INTRODUCTION AND BACKGROUND 1.1 Department of Roads (DOR) has formulated these standards with a view to establish a common procedure for design and construction of road bridges in Nepal. 2.0 DEFINITION OF DIFFERENT TERMS Afflux: A rise in water level behind the bridge structures due to obstruction to flow. Bridge: A structure that spans a body of water, a valley, or a road and affords passage for pedestrians, or vehicles of all kinds, or any combination thereof. Design Discharge: That maximum discharge which the structure allows to pass through it with fully serving its function. Design Life: Period of time after construction throughout which the structure fulfills its function for which it is constructed. Footpaths: A portion of the bridge deck intended for the movement of pedestrian traffic which is usually separated from vehicular movement by raising or by safety curb. Free board: A vertical clearance of the lowest point of superstructure from the highest flood level. HFL: Level of the highest flood ever recorded or the calculated level for the highest possible flood of specified return period. Curb: The edge of a sidewalk next to the main roadway. The wheel-guard in a bridge. Permanent Bridge: A bridge intended to provide a reliable passage of vehicles across a river or any obstacles without interruption throughout its design life in contrary to Temporary Bridges such as submergible causeways, ferries etc. Return period: Also known as a recurrence interval is an estimate of the interval of time between flood or river discharge flow of a design intensity or size. Raised Curb: A curb that is raised above the level of the carriageway. Safety Curb: A curb that separates vehicular movement from pedestrian movement with a barrier. Temporary Bridge: A bridge constructed to provide passage of vehicles either for relatively a short period of a few years or few months or low level structures like submergible/vented causeways or pontoons functioning during the period of low discharge only. 3.0 GERNERAL 3.1 DESIGN LIFE All permanent bridges shall be designed for a design life of minimum 50 years. Traffic projections shall be made for a period of 30 years.
  • 4. 3 3.2 DESIGN DISCHARGE All permanent bridges shall be designed for a discharge of 100 yrs. return period. For the calculation of design discharge empirical formulas especially developed for other catchments shall not be used. 4.0 BRIDGE LOADINGS 4.1 ROAD BRIDGE LOADINGS All permanent road bridges in Nepal shall be designed as per IRC loadings or AASHTO loadings. All design shall be carried out in accordance to IRC standards for bridges unless otherwise specified in this document. 5.0 GEOMETRIC STANDARDS 5.1 CARRIAGEWAY • All bridges in Highways and Urban Roads shall be designed with a minimum carriageway width of 7.5m. • All bridges in Feeder Roads shall be designed with a minimum carriageway width of 6.0m. • No permanent bridge shall be designed with a carriageway width of less than 6.0m except on minor (district and village) roads having length less than 25m. 5.2 FOOTPATH Footpaths shall be provided on all bridges located at settlement areas or on areas of high movement of pedestrian traffic. They should be separated from the vehicular traffic by safety curbs (in rural areas) and by raised footpath or curbs (in urban areas).The width of the footpath should be decided according to projection of pedestrian traffic, however, a minimum clear width(excluding the width of railings) of 1.0 m footpaths to be provided, where necessary. 6.0 CLEARANCES 6.1 VERTICAL CLEARANCE The vertical clearance is shown in Fig 6.1. The vertical clearance of structures shall be, I. For all roads not less than 4.75 m for through structures II. Overhead wires, poles etc shall be at least 7.0 m above the highest point of the road surface. 6.2 HORIZONTAL OR LATERAL CLEARANCE The horizontal clearance is the clear width available for the passage of vehicular traffic as shown on Fig. 6.1.
  • 5. 4 For culverts, the full roadway width as well as the width of shoulders shall be carried through. The size of curbs and footpaths shall be as shown in Fig. 6.1. Fig. 6.1 Horizontal and Vertical Clearances 7.0 BRIDGE CLASSIFICATION Classification of bridges shall be as follows: Culvert : Length up to 6 m Minor Bridge : When length ≤ 50 m (with span ≤ 25 m ) Major Bridge : When span >25 m or length >50 m(with smaller spans) Special Bridge : Bridges that require special design considerations, whose construction features(e.g. concrete girder bridges with >50m span, steel trusses > 100m span, arch bridges, suspension bridges, cable-stayed bridges and other non- standard bridges).
  • 6. 5 8.0 FREE BOARD 8.1 MINIMUM FREE BOARD In case of bridges over water bodies, the free board from the design HFL with afflux to the lowest point of bridge superstructure shall not be less than 1.0 m. The minimum freeboard shall be as shown on the following table. Table 8.1 Discharge m3 /sec Minimum Free board, mm Less than 200 1000 201-500 1200 501-2000 1500 2001-5000 2000 5000 and above More than 2000 (depending on the reliability of the available data for the calculation of discharge) 9.0 CURBS AND SAFETY CURBS (BRIDGE BARRIERS) Raised curbs shall not be less than 450 mm wide. Wider curbs shall be designed for footway loadings. Height of raised curbs shall not be less than 200 mm. The height of the safety bridge curb above the carriageway shall not be less than 500 mm from the safety consideration. 10.0 CARRIAGEWAY DRAINAGE Transverse and longitudinal drainage of the carriageway shall be managed respectively by providing a suitable cross fall and a camber or gradient. Water flowing down grade on the approach should be intercepted and not permitted to run to the bridge. The details of deck drains shall be such as to prevent the discharge of drainage water against any portion of the structure and to prevent erosion adjacent to the outlet of the drainage. Overhanging portion of concrete deck shall be provided with drip head or notch, continuous where possible. 11.0 RAILINGS Railings shall be provided along the edges of structures for protection of traffic and pedestrians. The height of the railing should be a minimum of 1.0 m from the top of the footpath or curb surface. 12.0 MATERIAL SPECIFICATION Material Specification is to be adopted as per Standard Specification for Road and Bridges Works published by Ministry of Physical Planning and Works, Department of Roads-2001. 13.0 PROVISION FOR UTILITIES All bridges shall be designed taking into consideration the provision of carrying utilities(electricity, water, telephone, cables etc.) through them wherever required.