BRICK- THE MOST FUNDAMENTAL BUILDING UNIT
THE MOST FUNDAMENTAL BUILDING UNIT
HAS BEEN GROSSLY MISUNDERSTOOD
NANAKSHAHI BRICKS
LAKHORI BRICKS
BRITISH BRICKS
MODULAR BRICKS
BRICK- THE MOST FUNDAMENTAL BUILDING UNIT
WHY DOES A WALLING MATERIAL
REQUIRE A CRUSHING STRENGTH OF 150
KG/SQ.CM?
UNIFORMLY DISTRIBUTED LOAD ON A
WALL IS LESS THAN 0.5 KG/SQ.CM
SOIL BEARING CAPACITY IS LESS
THAN 2 KG/SQ.CM
BRICK- THE MOST FUNDAMENTAL BUILDING UNIT
WHAT IS THE CRITERIA FOR AN APPROPRIATE WALLING MATERIAL?
CRUSHING OF THE BRICK IS A DIRECT CONSEQUENCE OF ITโ€™S
SURFACE REQUIREMENTS
โ€ขNON-ERODABLE IMPERMEABLE DIAPHRAGM
โ€ขLEAN BACK-UP MATERIAL WITH APPROPRIATE LOAD BEARING
CAPACITY
โ€ขLOW THERMAL CONDUCTIVITY
โ€ขCOLOUR AND TEXTURE
NON-ERODABLE IMPERMEABLE DIAPHRAGM
WATER FLOODED TO
FACILITATE CURING OF
MUD MORTAR USED
FOR APPLICATION OF
CLADDING.
ROPE WITH STONES
HANGING ON EITHER SIDE
TO ENSURE THAT THE
CLADDING MATERIAL
STAYS IN PLACE.
CLADDING MATERIAL
APPLIED
SIMULTANEOUSLY
WITH LAYING OF
RUBBLE MASONRY.
SECTION SHOWING TRADITIONAL METHODS
APPLICATION OF CLADDING
TODAY, CLADDING IS DONE AFTER COMPLETION OF MASONRY WORK.
DUE TO IMPROPER CURING OF MORTAR, CLADDING IS OFTEN FOUND TO DE-LINK FROM
THE WALL.
HORIZONTAL STONE
SLAB.
VERTICAL CLADDING
MATERIAL
SUPPORTED ON
HORIZONTAL SLAB.
Surya hotel,Delhi - CLADDING FALLING OFF WALLS DUE TO WRONG METHOD OF
APPLICATION
Solution to the problemSolution to the problem
HOLLOW CORE INTERLOCKING BLOCKS
LOCK PINS
M.S. HOLLOW
PIPE
GUDGEON PIN
M.S MOULD
INTERLOCKING BLOCK MOULD
STEPS OF CONSTRUCTION:STEPS OF CONSTRUCTION:
CASTING OF THE
BLOCKS:
1. Mixture of block is prepared
using cement, sand, aggregate and
other waste materials.
2. Coating of burnt oil on mould
so that that the concrete mix does
not stick.
3. Finishes laid on plastic sheet
inside mould.
1.1.
a.a.
1.b1.b
..
22
33
STEPS OF CONSTRUCTION:STEPS OF CONSTRUCTION:
CASTING OF THE
BLOCKS:
4. Rich cement slurry in the ratio
1:6 is poured over the finishes to
form the first impermeable
diaphragm.
5.The concrete mix is filled with
compaction done at regular
intervals.
6.Once the mould is half filled, a
hollow tube is passed through the
holes for creating the hollow
core.
4.b4.b
..
4.a4.a
..
5.a5.a
..
5.b5.b
..
6.a6.a
..
6.b6.b
..
STEPS OF CONSTRUCTION:STEPS OF CONSTRUCTION:
CASTING OF THE BLOCKS:
7.The remaining mould is
filled and the mixture
compacted.
8. Surface is smoothened and
a
layer of rich cement
slurry
with or without other
finishes
is poured.
9.After initial setting, the
moulds are carefully
removed from the diagonal
edges few minutes after
casting and left for drying for
about 48 hours to attain
strength.
7.b7.b
..
7.a7.a
..
8.a8.a
..
8.b8.b
..
8.c.8.c.
9.a9.a
..
9.b9.b
..
REMOVAL OF MOULDREMOVAL OF MOULD
9.c.9.c. 9.d9.d
..
9.e.9.e. 9.f.9.f.
NON-ERODABLE IMPERMEABLE DIAPHRAGM โ€“ HOLLOW CORE INTERLOCKING BLOCK
โ€ข INTEGRATED NON-ERODABLE
IMPERMEABLE DIAPHRAGM.
โ€ข IN THE HOLLOW CORE INTERLOCKING
BLOCKS, THE IMPERMEABLE NON-
ERODABLE DIAPHRAGM IS PROVIDED FOR
DURING THE TIME OF CASTING ITSELF.
โ€ข THE CLADDING MATERIAL WILL NEVER
DE-LINK.
turning trash into
cash
HOLLOW-CORE
INTERLOCKING
BLOCK
Canvas for the creativity of the
Artist and Artisan
Filling of waste polythene in
the hollows provides for
better thermal insulation.
Artwork with
Effective use of
Waste Materials
Thermal Lag of
Paper-mache block
is higher than brick
2-HR FIRE
RATING
SAVES
TRANSPORTATIO
N COST
SPEEDY
PRODUCTION
INTERNAL/
EXTERNAL USE
LIGHT WEIGHT
GREEN PRODUCT COST EFFECTIVE EASY ASSEMBLY
STRONG & DURABLE SIX BEST PRODUCTS 2001
CROSS-STITCHING THE WALL
Diagonal
Transfer of Thrust
Electrical conduits and pipes
accommodated in the hollow
core
HOLLOW CORE INTERLOCKING BLOCKS
TYPES OF BONDS
Making Paper Mache
A mixture of cement,
aggregate and 50% paper
mache
Women making paper-mache
blocks
Acrylic cutouts embedded in the diaphragm helps the children
identify the various characters and the vibrant colors add cheer
to the building.
Creating the
pattern
Concretizing
the pattern
with white
cement
Lean backing of
paper mache and
concrete
BUILT OF PAPER-MACHE
HOLLOW-CORE INTERLOCKING BLOCK BEING MADE AT HANDS-
ON WORKSHOP AT Anangpur Building Centre
HOLLOW CORE INTERLOCKING BLOCKS
INTEGRATION OF THE ARCHITECT, ENGINEER, ARTIST AND THE ARTISAN.

More Related Content

What's hot

Ferro cement
Ferro cementFerro cement
Ferro cement
Dhruvil Patel
ย 
Lecture bricks and blocks masonry
Lecture bricks and blocks masonryLecture bricks and blocks masonry
Lecture bricks and blocks masonry
Est
ย 

What's hot (20)

Structural clay products (Conventional & Fly ash bricks)
Structural clay products (Conventional & Fly ash bricks)Structural clay products (Conventional & Fly ash bricks)
Structural clay products (Conventional & Fly ash bricks)
ย 
specification of Rcc
specification of Rccspecification of Rcc
specification of Rcc
ย 
Brick masonry
Brick masonryBrick masonry
Brick masonry
ย 
Ferro cement 5 04 2018
Ferro cement 5 04 2018Ferro cement 5 04 2018
Ferro cement 5 04 2018
ย 
Ferrocement block as a masonry unit project ppt
Ferrocement block as a masonry unit project pptFerrocement block as a masonry unit project ppt
Ferrocement block as a masonry unit project ppt
ย 
A presentation on ferro cement
A presentation on ferro cementA presentation on ferro cement
A presentation on ferro cement
ย 
Ferro cement
Ferro cementFerro cement
Ferro cement
ย 
Ferrocement
Ferrocement Ferrocement
Ferrocement
ย 
blockwork
 blockwork blockwork
blockwork
ย 
brick as a building material
brick as a building materialbrick as a building material
brick as a building material
ย 
Engineered demolition techniques for dilapidated structures
Engineered demolition techniques for dilapidated structuresEngineered demolition techniques for dilapidated structures
Engineered demolition techniques for dilapidated structures
ย 
Ferrouscementhouse 2
Ferrouscementhouse 2Ferrouscementhouse 2
Ferrouscementhouse 2
ย 
Ferrocement
FerrocementFerrocement
Ferrocement
ย 
Brick masonary
Brick masonaryBrick masonary
Brick masonary
ย 
Ferrocement
FerrocementFerrocement
Ferrocement
ย 
Underwater Repair (RR&S)
Underwater Repair (RR&S) Underwater Repair (RR&S)
Underwater Repair (RR&S)
ย 
Lecture bricks and blocks masonry
Lecture bricks and blocks masonryLecture bricks and blocks masonry
Lecture bricks and blocks masonry
ย 
Ferrocement
FerrocementFerrocement
Ferrocement
ย 
Presentation on how to do AAC Blockwork
Presentation on how to do AAC BlockworkPresentation on how to do AAC Blockwork
Presentation on how to do AAC Blockwork
ย 
Ct block work system.docx
Ct block work system.docxCt block work system.docx
Ct block work system.docx
ย 

Similar to Appropriate Low cost Technologies-1 interlocking blocks

Concrete framework
Concrete frameworkConcrete framework
Concrete framework
Justin Myint
ย 
A technical seminar bubble deck slab.pptx
A technical seminar bubble deck slab.pptxA technical seminar bubble deck slab.pptx
A technical seminar bubble deck slab.pptx
hkhemanth564
ย 
Self compacting concrete
Self compacting concreteSelf compacting concrete
Self compacting concrete
Sukhdeep Jat
ย 

Similar to Appropriate Low cost Technologies-1 interlocking blocks (20)

Concrete structures
Concrete structures Concrete structures
Concrete structures
ย 
Concrete structures
Concrete structures Concrete structures
Concrete structures
ย 
Concrete framework
Concrete frameworkConcrete framework
Concrete framework
ย 
selfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptxselfcompactingconcretescc-160316004923.pptx
selfcompactingconcretescc-160316004923.pptx
ย 
Low cost puneet
Low cost puneetLow cost puneet
Low cost puneet
ย 
Unit 5 maintenance and repair methods for rcc mrs
Unit 5 maintenance and repair methods for rcc mrsUnit 5 maintenance and repair methods for rcc mrs
Unit 5 maintenance and repair methods for rcc mrs
ย 
Building Materials & Construction Module-2
Building Materials & Construction Module-2Building Materials & Construction Module-2
Building Materials & Construction Module-2
ย 
New materials and technologies used in NISM Mumbai
New materials and technologies used in NISM MumbaiNew materials and technologies used in NISM Mumbai
New materials and technologies used in NISM Mumbai
ย 
Sample copy of IT PPT.pptx
Sample copy of IT PPT.pptxSample copy of IT PPT.pptx
Sample copy of IT PPT.pptx
ย 
A technical seminar bubble deck slab.pptx
A technical seminar bubble deck slab.pptxA technical seminar bubble deck slab.pptx
A technical seminar bubble deck slab.pptx
ย 
A technical seminar bubble deck slab.pptx
A technical seminar bubble deck slab.pptxA technical seminar bubble deck slab.pptx
A technical seminar bubble deck slab.pptx
ย 
Low cost construction
Low cost constructionLow cost construction
Low cost construction
ย 
Blockwork system
Blockwork systemBlockwork system
Blockwork system
ย 
Cement Manufacturing Plant Construction
Cement Manufacturing Plant ConstructionCement Manufacturing Plant Construction
Cement Manufacturing Plant Construction
ย 
Building Materials & Construction Module - 3
Building Materials & Construction Module - 3Building Materials & Construction Module - 3
Building Materials & Construction Module - 3
ย 
Box Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptxBox Pushing Technology Presentation.pptx
Box Pushing Technology Presentation.pptx
ย 
Self compacting concrete
Self compacting concreteSelf compacting concrete
Self compacting concrete
ย 
MASHOOR PPT.pptx
MASHOOR PPT.pptxMASHOOR PPT.pptx
MASHOOR PPT.pptx
ย 
Unit 6..pptx
Unit 6..pptxUnit 6..pptx
Unit 6..pptx
ย 
Concrete blocks and their types
Concrete blocks and their typesConcrete blocks and their types
Concrete blocks and their types
ย 

More from Manav Mahajan

Frank L. Wright : Falling waters and key projects
Frank L. Wright : Falling waters and key projectsFrank L. Wright : Falling waters and key projects
Frank L. Wright : Falling waters and key projects
Manav Mahajan
ย 

More from Manav Mahajan (11)

Appropriate Low Cost technologies- 5 works2
Appropriate Low Cost technologies- 5 works2Appropriate Low Cost technologies- 5 works2
Appropriate Low Cost technologies- 5 works2
ย 
Appropriate Low Cost technologies-5 works
Appropriate Low Cost technologies-5 worksAppropriate Low Cost technologies-5 works
Appropriate Low Cost technologies-5 works
ย 
Appropriate Low cost Technologies-4 domes and space frames
Appropriate Low cost Technologies-4  domes and space framesAppropriate Low cost Technologies-4  domes and space frames
Appropriate Low cost Technologies-4 domes and space frames
ย 
Appropriate Low cost Technologies-3 roofing systems
Appropriate Low cost Technologies-3  roofing systemsAppropriate Low cost Technologies-3  roofing systems
Appropriate Low cost Technologies-3 roofing systems
ย 
Appropriate Low cost Technologies-2 ramlochan tile
Appropriate Low cost Technologies-2  ramlochan tileAppropriate Low cost Technologies-2  ramlochan tile
Appropriate Low cost Technologies-2 ramlochan tile
ย 
Appropriate Low cost Technologies-0 introduction
Appropriate Low cost Technologies-0  introductionAppropriate Low cost Technologies-0  introduction
Appropriate Low cost Technologies-0 introduction
ย 
Vastu shastra in modern world
Vastu  shastra in modern worldVastu  shastra in modern world
Vastu shastra in modern world
ย 
Services in a Commercial Building
Services in a Commercial BuildingServices in a Commercial Building
Services in a Commercial Building
ย 
Bionic Architecture
Bionic ArchitectureBionic Architecture
Bionic Architecture
ย 
Ecology and Environment- A Comprehensive Relationship
Ecology and Environment- A Comprehensive RelationshipEcology and Environment- A Comprehensive Relationship
Ecology and Environment- A Comprehensive Relationship
ย 
Frank L. Wright : Falling waters and key projects
Frank L. Wright : Falling waters and key projectsFrank L. Wright : Falling waters and key projects
Frank L. Wright : Falling waters and key projects
ย 

Recently uploaded

Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
dharasingh5698
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
SUHANI PANDEY
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
amitlee9823
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
9953056974 Low Rate Call Girls In Saket, Delhi NCR
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
sivaprakash250
ย 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
Epec Engineered Technologies
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
ย 

Recently uploaded (20)

Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
ย 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
ย 
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor ๐Ÿ“ฑ {7001035870} VIP Escorts chittoor
ย 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
ย 
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
VIP Model Call Girls Kothrud ( Pune ) Call ON 8005736733 Starting From 5K to ...
ย 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
ย 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
ย 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ย 
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night StandCall Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
Call Girls In Bangalore โ˜Ž 7737669865 ๐Ÿฅต Book Your One night Stand
ย 
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar  โ‰ผ๐Ÿ” Delhi door step de...
Call Now โ‰ฝ 9953056974 โ‰ผ๐Ÿ” Call Girls In New Ashok Nagar โ‰ผ๐Ÿ” Delhi door step de...
ย 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
ย 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
ย 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
ย 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
ย 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
ย 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
ย 
2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects2016EF22_0 solar project report rooftop projects
2016EF22_0 solar project report rooftop projects
ย 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
ย 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
ย 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
ย 

Appropriate Low cost Technologies-1 interlocking blocks

  • 1. Hollow core interlocking BlocksHollow core interlocking Blocks Part 1 Appropriate technologies Ar. Manav Mahajan
  • 2. BRICK- THE MOST FUNDAMENTAL BUILDING UNIT THE MOST FUNDAMENTAL BUILDING UNIT HAS BEEN GROSSLY MISUNDERSTOOD
  • 4. BRICK- THE MOST FUNDAMENTAL BUILDING UNIT WHY DOES A WALLING MATERIAL REQUIRE A CRUSHING STRENGTH OF 150 KG/SQ.CM? UNIFORMLY DISTRIBUTED LOAD ON A WALL IS LESS THAN 0.5 KG/SQ.CM SOIL BEARING CAPACITY IS LESS THAN 2 KG/SQ.CM
  • 5. BRICK- THE MOST FUNDAMENTAL BUILDING UNIT WHAT IS THE CRITERIA FOR AN APPROPRIATE WALLING MATERIAL? CRUSHING OF THE BRICK IS A DIRECT CONSEQUENCE OF ITโ€™S SURFACE REQUIREMENTS โ€ขNON-ERODABLE IMPERMEABLE DIAPHRAGM โ€ขLEAN BACK-UP MATERIAL WITH APPROPRIATE LOAD BEARING CAPACITY โ€ขLOW THERMAL CONDUCTIVITY โ€ขCOLOUR AND TEXTURE
  • 6. NON-ERODABLE IMPERMEABLE DIAPHRAGM WATER FLOODED TO FACILITATE CURING OF MUD MORTAR USED FOR APPLICATION OF CLADDING. ROPE WITH STONES HANGING ON EITHER SIDE TO ENSURE THAT THE CLADDING MATERIAL STAYS IN PLACE. CLADDING MATERIAL APPLIED SIMULTANEOUSLY WITH LAYING OF RUBBLE MASONRY. SECTION SHOWING TRADITIONAL METHODS APPLICATION OF CLADDING TODAY, CLADDING IS DONE AFTER COMPLETION OF MASONRY WORK. DUE TO IMPROPER CURING OF MORTAR, CLADDING IS OFTEN FOUND TO DE-LINK FROM THE WALL. HORIZONTAL STONE SLAB. VERTICAL CLADDING MATERIAL SUPPORTED ON HORIZONTAL SLAB. Surya hotel,Delhi - CLADDING FALLING OFF WALLS DUE TO WRONG METHOD OF APPLICATION
  • 7. Solution to the problemSolution to the problem HOLLOW CORE INTERLOCKING BLOCKS
  • 8. LOCK PINS M.S. HOLLOW PIPE GUDGEON PIN M.S MOULD INTERLOCKING BLOCK MOULD
  • 9. STEPS OF CONSTRUCTION:STEPS OF CONSTRUCTION: CASTING OF THE BLOCKS: 1. Mixture of block is prepared using cement, sand, aggregate and other waste materials. 2. Coating of burnt oil on mould so that that the concrete mix does not stick. 3. Finishes laid on plastic sheet inside mould. 1.1. a.a. 1.b1.b .. 22 33
  • 10. STEPS OF CONSTRUCTION:STEPS OF CONSTRUCTION: CASTING OF THE BLOCKS: 4. Rich cement slurry in the ratio 1:6 is poured over the finishes to form the first impermeable diaphragm. 5.The concrete mix is filled with compaction done at regular intervals. 6.Once the mould is half filled, a hollow tube is passed through the holes for creating the hollow core. 4.b4.b .. 4.a4.a .. 5.a5.a .. 5.b5.b .. 6.a6.a .. 6.b6.b ..
  • 11. STEPS OF CONSTRUCTION:STEPS OF CONSTRUCTION: CASTING OF THE BLOCKS: 7.The remaining mould is filled and the mixture compacted. 8. Surface is smoothened and a layer of rich cement slurry with or without other finishes is poured. 9.After initial setting, the moulds are carefully removed from the diagonal edges few minutes after casting and left for drying for about 48 hours to attain strength. 7.b7.b .. 7.a7.a .. 8.a8.a .. 8.b8.b .. 8.c.8.c. 9.a9.a .. 9.b9.b ..
  • 12. REMOVAL OF MOULDREMOVAL OF MOULD 9.c.9.c. 9.d9.d .. 9.e.9.e. 9.f.9.f.
  • 13. NON-ERODABLE IMPERMEABLE DIAPHRAGM โ€“ HOLLOW CORE INTERLOCKING BLOCK โ€ข INTEGRATED NON-ERODABLE IMPERMEABLE DIAPHRAGM. โ€ข IN THE HOLLOW CORE INTERLOCKING BLOCKS, THE IMPERMEABLE NON- ERODABLE DIAPHRAGM IS PROVIDED FOR DURING THE TIME OF CASTING ITSELF. โ€ข THE CLADDING MATERIAL WILL NEVER DE-LINK.
  • 14. turning trash into cash HOLLOW-CORE INTERLOCKING BLOCK Canvas for the creativity of the Artist and Artisan Filling of waste polythene in the hollows provides for better thermal insulation. Artwork with Effective use of Waste Materials Thermal Lag of Paper-mache block is higher than brick
  • 15. 2-HR FIRE RATING SAVES TRANSPORTATIO N COST SPEEDY PRODUCTION INTERNAL/ EXTERNAL USE LIGHT WEIGHT GREEN PRODUCT COST EFFECTIVE EASY ASSEMBLY STRONG & DURABLE SIX BEST PRODUCTS 2001
  • 16. CROSS-STITCHING THE WALL Diagonal Transfer of Thrust Electrical conduits and pipes accommodated in the hollow core
  • 17. HOLLOW CORE INTERLOCKING BLOCKS TYPES OF BONDS
  • 18.
  • 19.
  • 20. Making Paper Mache A mixture of cement, aggregate and 50% paper mache Women making paper-mache blocks Acrylic cutouts embedded in the diaphragm helps the children identify the various characters and the vibrant colors add cheer to the building. Creating the pattern Concretizing the pattern with white cement Lean backing of paper mache and concrete BUILT OF PAPER-MACHE
  • 21. HOLLOW-CORE INTERLOCKING BLOCK BEING MADE AT HANDS- ON WORKSHOP AT Anangpur Building Centre
  • 22.
  • 23. HOLLOW CORE INTERLOCKING BLOCKS INTEGRATION OF THE ARCHITECT, ENGINEER, ARTIST AND THE ARTISAN.