NationalInstituteofStandardsandTechnology
NISTCampus
Gaithersburg,MD
NetZeroEnergyResidentialTestFacility
DRAWINGLIST
ARCHITECTURAL FIREPROTECTION
DESIGN CRITERIA, ABBREVIATIONS, & GEN. STRUCTURAL NOTES
ARCHITECTURAL SITE PLAN
ARCHITECTURAL SITE PLAN DETAILS
FOUNDATION PLAN
BASEMENT PLAN
FIRST FLOOR FRAMING PLAN
FIRST FLOOR PLAN
FIRST FLOOR KEY PLAN & WALL FRAMING ELEVATIONS
SCREEN PORCH & GARAGE KEY PLANS & WALL FRAMING ELEVS.
SECOND FLOOR & LOWER ATTIC FRAMING PLAN
SECOND FLOOR PLAN
SECOND FLOOR KEY PLAN & WALL FRAMING ELEVATIONS
ATTIC FRAMING PLAN
ROOF FRAMING PLAN
ROOF PLAN
LOWER ROOF OVERHANG FRAMING PLAN
UPPER ROOF OVERHANG FRAMING PLAN
FIRST AND SECOND FLOOR REFLECTED CEILING PLANS
A-001
A-101
A-101A
A-102
A-103
A-104
A-105
A-106
A-107
A-108
A-109
A-110
A-111
A-112
A-113
A-114
A-115
A-121
F-001 FIRE PROTECTION GENERAL NOTES, LEGEND, AND ABBREVIATIONS
F-101
F-102
F-103
F-104
BASEMENT FLOOR PLAN
FIRST FLOOR PLAN
SECOND FLOOR PLAN
ATTIC FLOOR PLAN
A F-601 FIRE PROTECTION DETAILS AND MATRIX
S
PLUMBING
BASEMENT FLOOR PLAN - PLUMBING
FIRST FLOOR PLAN - PLUMBING
SECOND FLOOR PLAN - PLUMBING
ATTIC FLOOR PLAN - PLUMBING
P-101
P-102
P-103
P-104
o
PLUMBING DETAILS
P-501
PROJECTDESCRIPTION
PLUMBING RISERS AND SCHEDULES
P-601
A-201
A-202
A-203
A-204
A-205
A-206
A-207
EXTERIOR ELEVATIONS
EXTERIOR ELEVATIONS
EXTERIOR ELEVATIONS
INTERIOR ELEVATIONS
INTERIOR ELEVATIONS
INTERIOR ELEVATIONS
INTERIOR ELEVATIONS
These plans describe an energy efficient net zero single family home to be built in Gaithersburg, MD. The home has four bedrooms, three full baths and a full
basement.The drawing set and specifications were developed by Building Science Corporation with support from the Department of Energy's Building America
Program. The home will be registered under USGBC's LEED for Homes program and will target Platinum Certification. During project planning and construction,
all efforts should be made to meet the goals of this project.
MECHANICAL
MECHANICAL LEGEND, SCHEDULES & DETAILS
MECHANICAL SITE PLAN
M-001
M-002
BUILDING CODE M-101
M-102
M-103
M-104
M-105
M-106
BASEMENT FLOOR PLAN - HVAC
FIRST FLOOR PLAN - HVAC
FIRST FLOOR PLAN GARAGE - HVAC
SECOND FLOOR PLAN - HVAC
ATTIC FLOOR PLAN - HVAC
BASEMENT FLOOR PLAN - RADIANT FLOOR HEAT
BUILDING SECTION
BUILDING SECTION
BUILDING SECTION
BUILDING SECTION
GARAGE, BREEZEWAY & SCREEN PORCH SECTIONS
A-301
A-302
A-303
A-304
A-305
These plans are submitted under the 2009 Edition of the International Residential Code For One-and Two-Family Dwellings.
SQUARE FOOTAGES - Area calculations according to ANSI Z765-2003
A-401
A-402
WALL SECTIONS & DETAILS
WALL SECTIONS MECHANICAL DETAILS
MECHANICAL DETAILS
M-501
M-502
1,518 sq. ft.
1,518 sq. ft.
1,191 sq. ft.
Basement
First Floor
Second Floor
REQUIRED CONSTRUCTION SEQUENCE - PART A
REQUIRED CONSTRUCTION SEQUENCE - PART B
REQUIRED CONSTRUCTION SEQUENCE - PART C
ADVANCED FRAMING DETAILS
WINDOW DETAILS & INSTALLATION SEQUENCE
DOOR DETAILS & INSTALLATION SEQUENCE
ENCLOSURE PENETRATION DETAILS & SEQUENCES
FOUNDATION DETAILS
HORIZONTAL DETAILS
VERTICAL DETAILS
ROOF DETAILS
A-501A
A-501B
A-501C
A-502
A-503
A-504
A-505
A-506
A-507
A-508
A-509
MECHANICAL SCHEDULES
M-601
ELECTRICAL
PROJECTTEAM
ELECTRICAL LEGEND, ABBREVIATIONS, SYMBOLS & LIGHTING FIXTURE
SCHEDULE
E-001
CLIENT MEP ENGINEER
EBL Engineers, LLC
8005 Harford Road
Baltimore, MD 21234
Contact: Ed Hubner
(410) 668-8000
ehubner@eblengineers.com
SPECIFICATIONS CONSULTANT
Kalin Associates
1121 Washington Street
Newton, MA 02465
Contact: Mark Kalin
(617) 964-5477
mkalin@kalinassociates.com
National Institute of Standards and Technology
100 Bureau Drive
Gaithersburg, MD 20899
Contact: Hunter Fanney
(301)975-5900
hunter.fanney@nist.gov
BASEMENT FLOOR PLAN - ELECTRICAL
FIRST FLOOR PLAN - LIGHTING
FIRST FLOOR PLAN - POWER
SECOND FLOOR PLAN - LIGHTING & POWER
ATTIC FLOOR PLAN - ELECTRICAL
E-101
E-102
E-103
E-104
E-105
A-601
A-602
A-603
WINDOW & DOOR SCHEDULES & TYPES
INTERIOR FINISH SCHEDULE
PENETRATION SCHEDULE
ELECTRICAL RISER DIAGRAM
ELECTRICAL DETAILS
E-501
E-502
A-701
A-702
FIRST FLOOR OPEN WEB FLOOR TRUSS TYPE ELEVATIONS
SECOND FLOOR OPEN WEB FLOOR TRUSS TYPE ELEVATIONS
ARCHITECT LEED for HOMES PROVIDER CONSTRUCTION MANAGER
ELECTRICAL PANEL SCHEDULES
E-601
Building Science Corporation
30 Forest Street
Somerville, MA 02143
Contact: Betsy Pettit
(978)589-5100
betsy@buildingscience.com
Everyday Green
1877 Ingleside Terrace NW
Washington, DC 20010
Contact: Andrea Foss
(202)213-6984
andrea@everydaygreen.com
Jacobs Engineering Group, Inc.
Contact:
AHIBIldlSa^Sa
U.S. Department of Energy
Research Toward Zero Energy Homes
BuildingScienceCorporation
30ForestStreet
Somerville,MA02143
978.589.5100
Contact:BetsyPettit
betsy@buildingscience.com
CONSTRUCTIONDOCUMENTS
31MARCH2010ISSUEDFORCONSTRUCTION U.S. DEPARTMENT OF
EnergyEfficiency&
RenewableEnergy
ENERGY
COPYRIGHT (C) 2009 BUILDING SCIENCE CORPORATION
DESIGNCRITERIA
GENERALSTRUCTURALNOTES
BUILDINGSCIENCE
CORPORATION
1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THESE PLANS, THE
INTERNATIONAL RESIDENTIAL CODE (IRC 2009), TRUSS MANUFACTURER
SHOP DRAWINGS, AND THE MATERIAL MANUFACTURERS' INSTALLATION
INSTRUCTIONS.
STRUCTURAL DESIGN CRITERIA
DESIGN ITEM CRITERIA CODE REFERENCE
GROUND SNOW LOAD 30 PSF — SEE NOTE 1 IRC 2009 FIG R301.2(5),
ASCE 7 FIG 7-1
2. WHERE CONFLICTING INFORMATION EXISTS BETWEEN THESE PLANS AND
OTHER REFERENCED REQUIREMENTS, THE MORE STRINGENT
REQUIREMENT SHALL APPLY UNLESS OTHERWISE APPROVED BY THE
DESIGN PROFESSIONAL RESPONSIBLE FOR THESE PLANS.
BASIC WIND SPEED 90 MPH (GUST) IRC 2003, FIG R301.2(4)
ASCE 7, FIG 6-1C
WIND EXPOSURE C IRC 2003, SEC R301.2.1.4
ASCE 7, Sect 6.5.6
3. THE CONTRACTOR IS RESPONSIBLE TO IDENTIFY AND RESOLVE ALL
CONFLICTS AND DISCREPANCIES PRIOR TO AND DURING CONSTRUCTION
AND FACILITATE PROPER CONSTRUCTION AS INTENDED BY THESE PLANS.
WIND BORNE DEBRIS REGION NO IRC 2009 Sect. R301.2.1.2
ASCE 7, Sect. 6.5.9
MAPPED SEISMIC HAZARD Ss = 0.16g
S1 = 0.05g ASCE 7, CH 11 &CH 22
4. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE
STRUCTURAL SUPPORT OF CONSTRUCTION LOADS DURING ALL PHASES OF
CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, FOUNDATION
BACKFILL, BRACING OF WALL FRAMING TO RESIST CONSTRUCTION FLOOR
LOADS AND LATERAL BUILDING LOADING, BRACING OF TRUSSES DURING
INSTALLATION AND SUBSEQUENT CONSTRUCTION LOADING, AND OTHER
CONDITIONS AS DICTATED BY THE CONTRACTOR’S CONSTRUCTION
PRACTICE.
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
SEISMIC SITE CLASS D (firm soil assumed)
(Fa = 1.6; Fv = 2.4) ASCE 7, Sect. 11.4.2
SEISMIC DESIGN SPECTRAL
ACCELERATION PARAMETERS SDS = 2/3(1.6)(0.16g) = 0.17g
SD1 = 2/3(2.4)(0.05g) = 0.08g ASCE 7, Sect. 11.4
SEISMIC DESIGN CATEGORY B CONSULTANT:
(IRC DWELLINGS EXEMPT) ASCE 7, Sect. 11.6
5. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT CONSTRUCTION
SAFETY REGULATIONS OF OSHA.
IRC 2009, FIG R301.2(2)
LIVE LOADS IRC 2009, TABLE R301.4
ASCE TABLE 4-1
FLOORS & DECKS
FLOORS (BEDROOM AREAS)
ATTIC WITH STORAGE
ATTIC W/O STORAGE
ROOF
40 PSF
30 PSF
20 PSF
10 PSF
20 PSF - SEE NOTE 2
6. ALL CONSTRUCTION SHALL BE PERFORMED IN A GOOD, WORKMANLIKE
MANNER FOLLOWING ACCEPTED CONSTRUCTION PRACTICES AND
TOLERANCES. DEFECTIVE OR DAMAGED MATERIALS SHALL NOT BE USED
AND SHALL BE REPLACED.
DEAD LOADS Main house roof/ceiling dead load is 20 psf to account
for solar panels and non-standard framing.
FLOOR
ROOF
WALL
10 PSF
15 PSF (20 PSF main house)
8 PSF
ENCLOSURETHERMALENVELOPECRITERIA r n
FROST DEPTH 30 INCHES Based on local practice
AIR-FREEZING INDEX 350 deg. F-DAYS ASCE 32-01, IRC FIG. R403.3(2)
COMPONENT R-VALUE U-VALUE
SOIL BEARING VALUE (ASD) 3,000 PSF-SEE NOTE 3 Based on preliminary information
for soils report provided by NIST
consultant (otherwise use
presumptive value per IRC Table
401.4.1)
FRAMED WALLS R-45
ROOF R-72 L J
WINDOWS U-0.19 LATERAL SOIL LOAD 45 PCF Backfill Soil Class I or II required per
IRC 2009 Table R404.1.2(4) and
Table 405.1
PROJECT:
BASEMENT WALLS R-23
NationalInstituteof
StandardsandTechnology
BASEMENT FLOOR R-10 CONVENTIONAL LIGHT-FRAME
CONSTRUCTION REQUIREMENTS SEE CODE REFERENCE IRC 2009, CH 3, 4, 5, 6, 8
IBC 2009, CH 18 AND SEC 2308
NOTES:
NetZeroEnergy
ResidentialTest
Facility
1. UNIFORM ROOF SNOW LOAD (23 PSF) SHALL BE USED ONLY WITH LOAD COMBINATIONS
INVOLVING MORE LOAD EFFECTS THAN DEAD PLUS SNOW. GROUND SNOW LOAD SHALL
BE USED FOR DESIGN OF ROOF FRAMING AND WHEN CHECKING D+S LOAD COMBINATION.
DRIFT SNOW LOAD OF 54 PSF SHALL BE USED FOR LOWER ROOFS.
ROOF LIVE LOADS SHALL BE USED FOR THE DESIGN OF ROOF ELEMENTS ONLY. THESE
LOADS ARE INTENDED TO ADDRESS MAINTENANCE, ACCESS, AND TEMPORARY
CONSTRUCTION LOADS AND ARE NOT INTENDED FOR USE IN COMBINATION WITH OTHER
LOAD EFFECTS.
MINIMUM 2,700 PSF SOIL BEARING VALUE REQUIRED FOR 36”X36” BASEMENT COLUMN
FOOTINGS; MINIMUM 1,500 PSF SOIL BEARING VALUE REQUIRED FOR CONTINUOUS
FOUNDATION WALLS.
2.
NIST Campus
Gaithersburg, MD
3.
U.S. Department of Energy
Research Toward Zero Energy Homes
ABBREVIATIONS U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
A.F.F. ABOVE FINISHED FLOOR
B.O. BOTTOM OF
BTW BETWEEN
C/L CENTER LINE
CLR. CLEAR
ELEVATION
EL.
ELEVATION
ELEV.
MARK DATE DESCRIPTION
EQ. EQUAL
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
GWB GYPSUM WALLBOARD
PROJECT NO: NIST NZERTF
HEAT RECOVERY VENTILATOR
HRV
A-PLOT-SPEC-NZERTF
CAD DWG FILE:
HVAC HEATING VENTILATING AND AIR CONDITIONING
CG
DRAWN BY:
INSUL INSULATION
CHECKED BY: BP
LSL LAMINATED STRAND LUMBER COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
MIN. MINIMUM
SHEET TITLE:
O.C. ON CENTER
DESIGNCRITERIA,
ABBREVIATIONS&
GEN.STRUCTURAL
NOTES
PCF POUNDS PER CUBIC FOOT
PHOTOVOLTAIC
PV
T&G TONGUE & GROOVE
T.O. TOP OF
TYPICAL
TYP.
I
W/ WITH
o
SCALE AS NOTED z
WD. WOOD
W/O WITHOUT
A-001
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
1. FOR PROPERTY LINE, LIMIT OF DISTURBANCE,
GRADING CHANGES, LANDSCAPING, AND
LOCATION OF BUILDING ON SITE, SEE
SITE/CIVIL DRAWINGS.
STEPS DOWN
TO GRADE (2
RISERS)
DRIP EDGE DRAINAGE
SYSTEM UNDER
PATIO, SEE 5/A-101A
PATIO WITH CONCRETE PAVER
UNIT AND VENEER STONE EDGE ,
SEE 4/A-101A
3'-0" WIDE
PEASTONE BED WITH
DRIP EDGE DRAINAGE
SYSTEM, TYP. SEE
2/A-101A
OUTDOOR
AIR-HANDLER
UNIT
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
i
i
TRANSFORMERS
I
:L: FUTURE
OUTDOOR
AIR-HANDLER
UNIT
CONSULTANT:
T
OUTDOOR
AIR-HANDLER
UNIT
r n
FUTURE
OUTDOOR
AIR-HANDLER
UNIT
MAX.y4" GRADE
INCREASE FROM
SIDEWALK TO
BREEZEWAY
SLAB
3'-0" WIDE
PEASTONE BED,
TYP. SEE 1/A-101A
CONCRETE
PAVERS
L J

PROJECT:
NationalInstituteof
StandardsandTechnology
MAX.y4" GRADE
INCREASE FROM
SIDEWALK TO PORCH
SLAB
prn' '
NetZeroEnergy
ResidentialTest
Facility
WALKWAY WITH
SLOPE <1:20

3'-0" WIDE CONCRETE
WALKWAY WITH 6" CONCRETE
PAVER EDGE EACH SIDE, TYP.
SEE 3/A-101 A, SIM.
 NIST Campus
Gaithersburg, MD
U.S. Department of Energy
Research Toward Zero Energy Homes
 U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy

ENERGY
CONCRETE DRIVEWAY
WALKWAY WITH
SLOPE <1:20
EXISTING TREE TO BE
REMOVED, TYP.
05/07/10 UPDATED
MARK DATE DESCRIPTION
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
PROJECT NO: NIST NZERTF
A-PLOT-PLAN-NZERTF
CAD DWG FILE:
DRAWN BY: HW
CHECKED BY: BP
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
SHEET TITLE:
ARCHITECTURAL
SITEPLAN
3'-0" WIDE CONCRETE
WALKWAY WITH 6" CONCRETE
PAVER EDGE EACH SIDE, TYP.
SEE 3/A-101A
SCALE AS NOTED
/
A-101
ARCHITECTURALSITEPLAN
SCALE: 1:10
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
PATIO CONCRETE PAVERS (SET IN
SAND WITH CRUSHED STONE
SUBBASE)
5’—0
>>
PE "7Ta TT
]
<7
A
A
<7.
I <7 4
-4
/:
STONE BED, DEPTH BASED
ON GRADE AND DEPTH NEEDED
TO CONNECT TO DRAIN
JH l A
JH J I
L,
b.
o k-
^43' p( p( j
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
A
- b
FILTER FABRIC
> [£>
EPDM MEMBRANE ATTACHED TO
BUILDING WALL, WRAPPED AROUND
PIPE AND EXTENDED UP TO EDGE OF
FILTER FABRIC
4 *
CONSULTANT:
6" PERFORATED PIPE CONNECTED TO
NON-PERFORATED PIPE DRAINING TO
DAYLIGHT (SEE SITE/CIVIL DRAWINGS)
FREE DRAINING BACKFILL:
UNIFIED SOIL CLASSIFICATION
SYSTEM TYPE GW, GP, SW, OR SP
DRIPEDGEDRAINAGEUNDERPATIO
5 SCALE: 3/4" = 1-0"
r n
t-fJh 3" DEEP, 3-0" WIDE PEASTONE BED
WITH BLACK STEEL EDGING OR OTHER
PERMEABLE MATERIAL
CONCRETE PAVER UNIT
WITH MIN. SOLAR REFLECTANCE
INDEX (SRI) OF 29; SET IN SAND
SLOPE GRADE AWAY FROM
FOUNDATION (5% MIN SLOPE)
Pk L J
PLANTING SOIL
STONE VENEER CAP
(COLORING AND
TEXTURE TO MATCH
GARAGE FACADE STONE)
~ y
PROJECT:
NationalInstituteof
StandardsandTechnology
n ^~l FILTER FABRIC
3“i
t-
</. •-
<7 o< >o
a c> a C: C: C: C:
o
3'-0" WIDE STONE BED, DEPTH BASED
ON GRADE AND DEPTH NEEDED TO
CONNECT TO DRAIN
4 8"-14" STONE VENEER
(COLORING, SHAPE AND
TEXTURE TO MATCH
GARAGE FACADE STONE)
>3 3 3 3 3 3 3 >^< $<
i=ni=ni=ni=ni=ni=rn=rrtern=
4
o< )0( )0( )0( )0( >o 3
a :: C: C: C:
b
=■
<j
NetZeroEnergy
Residential Test
Facility
A EPDM MEMBRANE ATTACHED TO
BUILDING WALL, WRAPPED AROUND
PIPE AND EXTENDED UP TO EDGE OF
FILTER FABRIC
6" PERFORATED PIPE, CONNECTED TO
NON-PERFORATED PIPE DRAINING TO
DAYLIGHT (SEE SITE/CIVIL DRAWINGS)
FREE DRAINING BACKFILL:
UNIFIED SOIL CLASSIFICATION
SYSTEM TYPE GW, GP, SW, OR SP
J
j 4 t
1 4'-6" OF CRUSHED STONE (CR)
4 '>
8" CONCRETE WALL WITH
WEEPHOLES AND SEAT
FOR STONE VENEER
tE
A
NIST Campus
Gaithersburg, MD
<i J
SOIL SUBGRADE (COMPACTED)
U.S. Department of Energy
Research Toward Zero Energy Homes
l=l l l=l l l=l 11 l l l l l l l l l l
PEASTONEBEDWITHDRIPEDGEDRAINAGE
SCALE: 3/4" = 1-0"
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
PATIOEDGE
SCALE: 1" = 1'-0"
05/07/10
CONCRETE CURB (AT DRIVEWAY) UPDATED
MARK DATE DESCRIPTION
3" DEEP, 3-0" WIDE PEASTONE BED
WITH BLACK STEEL EDGING OR OTHER
PERMEABLE MATERIAL
6" CONCRETE PAVER
EDGE PATTERN (BOTH SIDES) ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
SLOPE GRADE AWAY FROM
FOUNDATION (5% MIN SLOPE) PROJECT NO: NIST NZERTF
WALKWAY: CONCRETE
WITH MIN. SOLAR
REFLECTANCE INDEX
(SRI) OF 29
A-PLOT-PLAN-NZERTF
CAD DWG FILE:
PLANTING SOIL
T
DRAWN BY: HW
♦ ♦
o< o>< o>< o>< o>< o>< o>< o
9L ■:> ■:> ■:> ■:> ■:> ■:> v; t>
♦ ♦
H
CHECKED BY: BP
ao< o o< o< o< o< o
in FILTER FABRIC
DROUGHT-TOLERANT
TURF
b
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
o o o o o o o
o 6
3’-0" WIDE STONE BED, DEPTH BASED
ON GRADE AND ADJACENT STONE BEDS
b
- — b
SHEET TITLE:
DRIVEWAY: CONCRETE
WITH MIN. SOLAR
REFLECTANCE INDEX
(SRI) OF 29
FILTER FABRIC
it.
ARCHITECTURAL
SITEPLAN
DETAILS
4 *
NOTE: SEE SITE/CIVIL DRAWINGS
AND SPECIFICATIONS FOR
CONSTRUCTION DETAILS
♦
FREE DRAINING BACKFILL:
UNIFIED SOIL CLASSIFICATION
SYSTEM TYPE GW, GP, SW, OR SP I
o
SCALE AS NOTED z
A-101A
PAVINGPLAN PEASTONEBEDW/ODRIPEDGEDRAINAGE
SCALE: 1" = r-0' SCALE: 3/4" = 1'-0"
10" SONO TUBE FOOTINGS FOR
BREEZEWAY COLUMNS, PROVIDE
3 #4 REINFORCING, TYP. -
DRAIN A1 BASE OF WINDOW WELL
(CONNECTED TO BASEMENT
SUMP) |
v
ft 4ft
J I T *
F
-V
■ r
n n
©f it m
S6 n
CONDENSATE
DRAIN
THROUGH-WALL CONDUITS
FOR HEADER PIPES FOR
VERTICAL GROUND LOOP
SYSTEM
o -V
LU
Q
"si-
§
S1 THROUGH-WALL
CONDUITS FOR
HEADER PIPES FOR
HORIZONTAL
GROUND LOOP
SYSTEM
§
5
5 o
O
l V-7 o D
CO
CO
LU
CO
4" PERFORATED VENT BEDDED IN STONE
WITH "L" CONNECTION TO 4" RISER SOIL
GAS VENT THROUGH ROOF; SEE 4/A-506
SOIL GAS
VENT
c: §
CM
o
LJ -V
S5 WINDOWSILL___zk
'EL. -7-1" V
T.O.
4" CONCRETE SLAB
EMBEDDED HYDRONIC TUBING
W1.4 x W1.4 WELDED WIRE MESH AT MID-DEPTH
6 MIL POLYETHYLENE
2" XPS RIGID INSULATION
4" STONE PAD (NO FINES)
FILTER FABRIC
UNDISTURBED NATIVE SOIL
IJJ
F3
Q. O
SANITARY DRAIN
THROUGH SLAB
> 4" PVC PIPE THROUGH
BOTTOM OF FOOTING, TYP;
SEE 1/A-506
o
CM
/
O
I
CONDENSATE
DRAIN
O
I I
S6
be
CT>
CO
MINIMUM 4" DIAM.
STANDARD STEEL PIPE
O CM
CM
O THROUGH-STEM WALL
CONDUITS FOR FUTURE
HIGH VELOCITY HVAC AIR
TO AIR OUTDOOR UNIT (SEE
GENERAL SHEET NOTE #7)
CO
on CO
COLUMN (RATED FOR
MIN. 22,230 LB. LOAD)
O
o F10
3-0" X 3-0" X 1'-4"
CONCRETE FOOTING
TYP.
=T
W/ (4) #5 EACH WAY,
4'-6' FLOOR DRAIN 6K" W x 16y2" D BEAM POCKET,
1 SEE 2/A-506
TYP. o
S2
S6
-CJ------- ----- CJ------- ------CJ------
------|—r^—a-
------ ©©5 D
O'
LSL BEAM ABOVE
S3 S3 COLUMN ISOLATION
CONTROL JOINT, TYP.
_____ 12-4 3/4" ____
-------- CONDENSATE
DRAIN
it-
6%" W x 16/4" D BEAM
POCKET; SEE 2/A-506
12-4 3/4" 9-6 1/2" -- CONDENSATE DRAIN
I THROUGH-STEM
WALL CONDUITS FOR
C ENTRAL AIR TO AIR
OUTDOOR UNIT
7^
COLUMN AND FOOTING
DETAIL, TYP; SEE 3/A-506
4>
T.O. FOUNDATION
EL. +0,-0"
T.O. FOUNDATION S
EL. -r-2
±^F 9-4"
II
CD
CD
F9
THROUGH-STEM
WALL CONDUITS FOR
FUTURE AIR TO AIR
OUTDOOR UNIT
8" CONCRETE SLAB THIS
SECTION (UNDER BASE
OF BASEMENT STAIR)
FLOOR DRAIN
CD
i
O S6
O
O CONDENSATE DRAIN
SUMP PUMP: SUMP PUMP CROCK
TO HAVE AIR-TIGHT LID OR
CLOSURE
F10
T.O. SLAB
9
CONNECTION TO
STORM DRAIN WITH
CHECK 7ALVE
S4
4’-6"
~Z-9"
EL. -9-11 1/ 7^
7L
B
-v o
F7 THROUGH-WALL CONDUITS
FOR HEADER PIPES FOR
SLINKY LOOP SYSTEM
o
fUl
SUMP
THROUGH-WALL CONDUIT FOR
DOMESTIC AND SPRINKLER
WATER
CM
F12 -
GAS
CD
F11 CONNECTION
K ?’
9s oo
CN
CM
F4
ftft
F13
--- CM
- CONDENSATE
- DRAIN
F8 1—1
Hff B
=Hi/d
Jr
CO
JO"
F8 F2
ftftl ftr O
:—r-fp CM
-i.i i—i
Ett nt
ftttr A
ft) C/L
2’-6"
-,± y- THROUGH-STEM
WALL CONDUIT
FOR SUMP
DISCHARGE
CO
10" SONO TUBE FOOTINGS FOR LO
BOTTOM OF FOUNDATION WALL
DETAIL, TYP; SEE 1/A-506
o
I
4" DIAM. PERFORATED PERIMETER
DRAIN PIPE TYP; SEE 1/A-506
o
-v
F.1
-v
n
13’-5"
T.O. PORCH FDN WALL
4
r-
EL. HY-2 3/8
CD
CO
THROUGH-WALL INSTRUMENTATION
CONDUIT TO GARAGE SLAB
(3'-0" ABOVE BASEMENT SLAB) -
THROUGH-WALL PENETRATION FOR
INVERTER DISCONNECT UTILITY
THROUGH-WALL PENETRATION FOR
COMMUNICATION AND FIRE SAFETY
THROUGH-WALL PENETRATION FOR
FIRE DEPARTMENT CONNECTION
THROUGH-WALL CONDUIT FOR
UNMETERED ELECTRICAL WIRING
SLAB (3-0" ABOVE
BASEMENT SLAB)
st-
CD
CD
C/L
C/L
© ©
C/L
£JL
F1
7E
10"B
©
/
9
T.O. GARAGE FOUNDATION
=F
EL. -0-5'
T.O. GARAGE FOUNDATION AT FRONT OPENINGS
EL. -2-8" *
SLAB ON GRADE
ABOVE
*
T.O. GARAGE FOUNDATION AT SOUTH DOOR
EL. -2-1 3/4
4-2 1/4'
CM
i
Is-
i
oo
FRONT PORCH COLUMNS,
PROVIDE 3 #4 REINFORCING, TYP.
© © © A.1
C/L C/L C/L C/L
, , 5 1/2l' 11'-7' 11’-11" ir-7' 5 1/2"
7L 7L
"7 ^ 7 ~
TH|ROUGH-WALL CONDUIT FOR ELECTRICAL
WIRING FROM HOUSE METER
6" CONCRETE GARAGE FOUNDATION W^LL, TYP
2-0" CONCRETE FOOTING, TYP
7-0
11
THROUGH-WALL
INSTRUMENTATION
CONDUIT TO GARAGE
to
1
CO
-V
o
I
5 6 6.1
2 3 4.1
1 4 7
86-0"
■7 ~ ■7 ~
26-0' 16’-0" 36-0' 8-0'
-7 ~ y- y- y- y-
4"
2-0" CONCRETE FOOTING, TYP 7^
foundAtion wall
6" CONCRETE PORCH , TYP
CO
o
CM
1
Ob
00
1
Ob
CO
o
CN
F
E
E.1
CO
00
CO
C.1
c
k
I
s
CD
1
S2
10" CONCRETE FOUNDATION WALL, TYP.
2-0" CONCRETE FOOTING, TYP.
9-4
M
FOUNDATIONPLAN
SCALE: 1/4" = 1'-0"

o
S6
S6
F5
.u
CD
1
LO
O
1
CM
O
1
Ob
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
1. BASEMENT FOUNDATION WALL TO HAVE (1)
#4 HORIZONTAL REINFORCEMENT W/
MATCHING CORNER BAR AT TOP AND (1) AT
EACH MIDDLE THIRD, AND (1) #4 VERTICAL
REINFORCEMENT AT 48" O.C. LOCATED WITH
1-1/4" CONCRETE COVER MEASURED FROM
THE INSIDE FACE OF THE FOUNDATION WALL.
2. LOCATE 4" CONNECTION PIPE THROUGH
BASE OF FOOTING WITHIN 5’ OF EVERY
CORNER AND EVERY 15’ MAX ALONG LENGTH
OF WALL SEGMENT WITH MIN OF 1 PER WALL
SEGMENT.
3. LOCATE CONDENSATE DRAINS BASED ON
LAYOUT OF MECHANICAL EQUIPMENT
4. SEE A-506 FOR FOUNDATION DETAILS.
SEE A-603 FOR PENETRATION SCHEDULE.
5.
6. EL. +0-0" IN THE ARCHITECTURAL DRAWINGS
CORRESPONDS TO 461.30' IN THE SITE/CIVIL
DRAWINGS
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
IF THE HIGH VELOCITY HVAC OPTION IS NOT
AWARDED, THE PENETRATION FOR THE
CONDUITS WILL NOT BE PROVIDED.
7.
CONSULTANT:
OSHEETKEYNOTES
r n
L j
PROJECT:
PENETRATIONKEY
NationalInstituteof
StandardsandTechnology
S1. SOIL GAS VENT
S2. FLOOR DRAIN
NetZeroEnergy
Residential Test
Facility
S3. STEEL PIPE COLUMN
S4. SUMP PUMP
S5. SEWER CONNECTION
S6. CONDENSATE DRAIN
F1. VERTICAL GROUND LOOP SYSTEM
NIST Campus
Gaithersburg, MD
F2. SLINKY LOOP SYSTEM
F3. HORIZONTAL. GROUND. LOOP SYSTEM
U.S. Department of Energy
Research Toward Zero Energy Homes
F4. SUMP PUMP OUTLET
F5. INSTRUMENTATION CONDUIT
F6. GAS CONNECTION
F7. WATER CONNECTION
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
F8. ELECTRICITY CONNECTION
AIR-TO-AIR OUTDOOR UNIT CONNECTION
F9.
F10. FUTURE AIR-TO-AIR OUTDOOR UNIT
CONNECTION
F11. COMMUNICATION/FIRE SAFTEY CONNECTION
INVERTER UTILITY DISCONNECT
CONNECTION
F12.
07/27/10 UPDATED
F13. FIRE DEPARTMENT CONNECTION
06/29/10 UPDATED
MARK DATE DESCRIPTION
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
PROJECT NO: NIST NZERTF
A-PLOT-PLAN-NZERTF
CAD DWG FILE:
CG
DRAWN BY:
CHECKED BY: BP
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
SHEET TITLE:
FOUNDATIONPLAN
i
o
SCALE AS NOTED z
A-102
=
C/L
OF
BEAM
POCKET
CO
CM
o
SANITARY DRAIN
UTILITY SHAFT
OPENING
ABOVE
r
L
J
PREFABRICATED WINDOW
WELL WITH EGRESS
LADDER;
SEE 6/A-506
i
FLOOR DRAIN;
CONNECT TO SOIL
PIPE
6-0" HIGH PLYWOOD PANEL
WITH 2x4 STUD BACKING
CONDENSATE DRAIN;
CONNECT TO SUMP
ZQ
'0[
4.
4
SOIL GAS VENT
3-9'
I
CONDENSATE DRAIN;
CONNECT TO SUMP
O-
FLOOR DRAIN;
CONNECT TO SOIL
PIPE
<D CONDENSATE DRAIN;
CONNECT TO SUMP
o
□ SUMP
CONDENSATE DRAIN;
CONNECT TO SUMP
-v
cc
<
LU
12'-2‘ 5 1/2"
O
CM
CO
I
ABOVE
5 6 6.1
3 4.1
4 7
PATIO ABOVE
SLAB ON GRADE
ABOVE
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
1. BASEMENT AREA TO OUTSIDE FACE OF
FOUNDATION WALL:
1,518 SQ. FT.
SEE A-602 FOR FINISH SCHEDULE.
2.
F.1 30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
CONSULTANT:
F
OSHEETKEYNOTES
1. PROVIDE BLOCKING IN WALL TO SUPPORT
FUTURE STAIR LIFT. BLOCKING SHOULD
EXTEND UP TO A HEIGHT OF 3’-0" ABOVE
STAIR TREADS.
r n
STAIR FROM BASEMENT TO FIRST FLOOR TO
HAVE 16 RISERS AT 6-2/3", 15 TREADS AT 10"
WITH y4" NOSING.
2.
L J
PROJECT:
NationalInstituteof
StandardsandTechnology
NetZeroEnergy
ResidentialTest
Facility
D
NIST Campus
Gaithersburg, MD
U.S. Department of Energy
Research Toward Zero Energy Homes
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
B
A
MARK DATE DESCRIPTION
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
PROJECT NO: NIST NZERTF
A.1 A-PLOT-PLAN-NZERTF
CAD DWG FILE:
CG
DRAWN BY:
CHECKED BY: BP
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
SHEET TITLE:
BASEMENTPLAN
o
SCALE AS NOTED
A-103
2
1
F
E
© ©
E.1
SLAB ON GRADE
ABOVE
WALKWAY ABOVE
©
C.1
c
A
BASEMENTPLAN
SCALE: 1/4" = 1'-0"
UP
3-9
M
n
© © © ©
EGRESS
WINDOW
BLOCKING BETWEEN JOISTS
UNDER PARTITIONS PARALLEL TO
BUT BETWEEN JOISTS, TYPICAL
1-1/4" x 14" LSL RIM JOIST
ATTACHED TO FOUNDATION
THROUGH 2" XPS INSULATION
2" XPS INSULATION ON
FOUNDATION SHELF, TYPICAL
1-3/4" x 14" ENGINEERED WOOD
BLOCKING BETWEEN RIM JOIST
AND WEB JOIST, 4'-0" O.C., TYPICAL
3t-
CD
CD
2 5 6 6.1 7
F.1
8-0’
7L
o
2'-0" 2'-0" 2'-0"
v- —> — —> —
F
-v
1-1/4" x 14" LSL RIM JOIST
ATTACHED TO FOUNDATION
THROUGH 2" XPS INSULATION
/
14" DEEP OPEN WEB FLOOR
TRUSS TYPE "A" AT 24" O.C. WITH
T & G FLOOR SHEATHING; SEE
A-701 ,A-702 FOR TRUSS TYPES
o
o
CM
14" DEEP OPEN WEB FLOOR
TRUSS TYPE "A" AT 24" O.C. WITH
T & G FLOOR SHEATHING; SEE
A-701 ,A-702 FOR TRUSS TYPES
BEAM BELOW -
LSL 5-1/4" x 16" 1.55E
2'-0" 2'-0" 2'-0"
7^ 7^ 7^
CD
CO
CO
D
■V
1-1/4" x 14" LSL RIM JOIST
ATTACHED TO FOUNDATION
THROUGH 2" XPS INSULATION
CD
CD
14" DEEP OPEN WEB FLOOR
TRUSS TYPE "C" AT 24" O.C.
WITH l" T & G FLOOR
SHEATHING; SEE A-701,
A-702 FOR TRUSS TYPES
B
A
A.1
3 4.1
4
44'-0"
36-0'
14" DEEP OPEN WEB FLOOR
TRUSS TYPE "A1" AT 24" O.C.
WITH g" T & G FLOOR
SHEATHING; SEE A-701,A-702
FOR TRUSS TYPES
2x4 TREATED SILL PLATE
2x6 TREATED PLATE ON
FOUNDATION SHELF
n
o

: LL
□
CO
D= □ !
u 11
<£>
<£> <i> <i> <£>
<D
O
m
■»c
o
i
CN
1
F
E
E.1
C.1
C
14" DEEP OPEN WEB FLOOR
TRUSS TYPE "B" AT 24" O.C. WITH
T & G FLOOR SHEATHING; SEE
A-701,A-702 FOR TRUSS TYPES
1-%" x 14"
LSL HEADER
AT STAIR
OPENING
/
7
/■
1-1/4" x 14" LSL RIM
JOIST ATTACHED TO
FOUNDATION
THROUGH 2" XPS
INSULATION
A
-r BLOCKING BETWEEN JOISTS
UNDER PARTITIONS PARALLEL TO
BUT BETWEEN JOISTS, TYPICAL
14" DEEP OPEN WEB
FLOOR TRUSS TYPE "D" AT
24" O.C. WITH §" T & G
FLOOR SHEATHING; SEE
A-701,A-702 FOR TRUSS
TYPES
2’-0" 2’-0" 2’-0"
7^ 7^ 7^ 7^
FIRSTFLOORFRAMINGPLAN
SCALE: 1/4" = 1'-0"
1-3/4" x 14"
LSL HEADER
AT STAIR
OPENING
DASHED LINES INDICATE STUD
WALLS ABOVE
12-5 1/2' 3-10'
CD
CN
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
1. CONTRACTOR TO VERIFY ENGINEERED WOOD
PRODUCT (EWP) MEMBER SIZES WITH EWP
SUPPLIER.
EWP CONNECTIONS TO FOLLOW EWP SUPPLIER
INSTRUCTIONS.
2.
3. LIMIT THE OVERALL ESTIMATED WASTE FACTOR
ON THE FRAMING ORDER TO 10% OR LESS.
PROVIDE ENGINEERED WOOD BLOCKING
BETWEEN JOISTS UNDER PARTITIONS
PARALLEL TO, BUT BETWEEN, JOISTS;
COORDINATE LOCATION OF BLOCKING WITH
MECHANICAL DUCTWORK.
4.
SEE A-701 AND A-702 FOR OPEN WEB FLOOR
JOIST TYPES; OPEN WEB FLOOR JOISTS TO BE
CONSTRUCTED USING FSC-CERTIFIED WOOD;
OPEN WEB FLOOR JOISTS TO BE ENGINEERED
BY TRUSS SUPPLIER TO MEET LOCAL CODE.
5.
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
6. GENERAL STRUCTURAL FRAMING
CONNECTIONS:
LSL CEILING JOISTS TO FLOOR HEADERS: USP
THD179 ENGINEERED WOOD JOIST HANGER;
DOUBLE LSL FLOOR HEADER TO TRIMMER: USP
HD 410 DOUBLE HANGER. CONSULTANT:
STRUCTURAL FRAMING CONNECTIONS FOR
CENTER BEARING WALL (TO RESIST ROOF
UPLIFT):
RAFTER TO RIDGE BOARD: USP AC7 ANGLE
BRACKET WITH 4 10d NAILS EACH LEG
7.
RAFTER TO STUD IN ATTIC BEARING WALL: USP
LTW12 WITH R 10d NAILS EACH END
STUD IN ATTIC BEARING WALL TO CEILING
JOIST: USP LTW12 WITH 4 10d NAILS EACH END
CEILING JOIST TO STUD IN SECOND FLOOR
BEARING WALL: USP RT10 WITH 4 8d NAILS
EACH END (USE USP LTW12 AT CONNECTIONS
TO WALL HEADERS)
r n
STUD TO SOLE PLATE IN SECOND FLOOR
BEARING WALL: (2) USP S01 CLIP ANCHORS
SOLE PLATE TO FLOOR DECK: (2) #8x3" WOOD
SCREWS AT 12" O.C.
ATTIC FLUSH-FRAMED BEAM TO WALL STUDS
AT ENDS OF BEAM: USP LTW12 WITH 6 10d NAILS
EACH END OF STRAP; PROVIDE CONTINUOUS
LOAD PATH DOWN TO BASEMENT BEAM USING
SIMILAR SIZED STRAPS AT ALL FRAMING
JOINTS.
L J
PROJECT:
NationalInstituteof
StandardsandTechnology
OSHEETKEYNOTES
NetZeroEnergy
ResidentialTest
Facility
END OF FLOOR JOIST TO BE FULL BEARING
ON BEAM BELOW.
1.
2-2x6 BLOCKS IN FLOOR BELOW JACK STUDS
TO TRANSFER LOAD TO BEAM BELOW WHERE
JACKS STUDS ARE NOT ALIGNED WITH FLOOR
JOIST.
2.
NIST Campus
Gaithersburg, MD
U.S. Department of Energy
Research Toward Zero Energy Homes
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
MARK DATE DESCRIPTION
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
PROJECT NO: NIST NZERTF
A-PLOT-PLAN-NZERTF
CAD DWG FILE:
CG
DRAWN BY:
CHECKED BY: BP
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
SHEET TITLE:
FIRSTFLOOR
FRAMINGPLAN
o
SCALE AS NOTED
A-104
C/LOF
BEAM
cr
sri
p{(2
A lj
o
5-0" CLEAR
11"
x
UP
11ii
11
ii
7^
<2
■V
ATTIC ACCESS
ABOVE -
1
o
CO
GARAGE
CONCRETE STAIR AND LANDING
J
1
CO
CJ
l J
■V
8" CM
L_
+ -H 18
I
J CO CM
-2/A-294- i i
i LO LO
WINDOW
WELL
LO
28'-1 1/2
3ji
i
375"
ii
d-
"7
CO
8/A-204 I
CO
SEAT
6/A-204 -v
o
CONDUIT THROUGH WALL
TO FUTURE MULTI-SPLIT
OUTDOOR UNIT
-
r
□
SOI. GAS
----- VENT
—3/|lTH #1
4/A-|204
'd-
o
CM
I
< CM
OO
DINING
ROOM /
X o
i
CM
LO i
<
i
a
LO O
■I Ol
Ol
m-
>
■f]
i
<s>
N) a>
12 co
o
-i^ >
i
CO
ro
o
= O
- o ACCESS
PANEL ABOVE
4^
LO
2
r 4
CM I
I
CO
CO
< CD
= o U
o
©, ©54.
4-4^ --2-7 1/4' 3’-1" 4’-3 1/4
M
11-10"
1
■7
<2
-7 -7
/CCESS
PANEL ABOVE
<25
15
O co
3/A-207
11--1 1/4' 3-1" 3-11 3/4' 8-1 ,'-10 1/2;
I 5 1/2’
■ii
1
iL
BEARING WALL
MUDROOM 5 1/2 11
5 1/2" CL
©
I S>
O
CM
4- CM
-CO ■V
DOWN CO
CLOSE
5 T
UTILITY
co
o CO
I
II CM
CLOSET
5 1/2 11
1 1/2 HI
11/A-204
CT> I
1/A-205
® i
CD m
1
1
CO <
"nJ-
4i T o
12" 4'-9"/y5 1/2
11
2-3 1/2" 3’-10 4’-11 1/2" 2-1 1/2
11
9-10 1/2
M
~ 7 ~ h' t-
-7
!©, ENTRY
HALL
-
ol CO
CO
CO
> >
I
Q
t LO
ro LU
ro o
o o CM
LIVING ROOM
5 1/2" 4-2 M
cn 1 1
ACCESS
PANEL ABOVE
-h
<
co CD m
; S ;
<2 <
CO
o
CO
I
LO
-
<2
■7-^r
O
OFFICE / OPTIONAL
BEDROOM 4
■f^r
S) CO
o
LU
7/A-205
M—JP- CD
■
DO
Tf
a:
o o <
< CT>
o
I
LU
11'-6 1/2" 9'-
11
8-0"
12'-1
ID
f 4
<L (-
JJ
10
<2
1
T
o
l
LO
13
f )
3B CL
l 4
SEE 2/A-507, TY
6"
M
CL
SEE 1/A-507, TYP. ,'-7-
CL CL CL CL
CONCRETE SLAB W/ BROOM
FINISH: SLOPE SLAB 1/4":12
AWAY FROM HOUSE
FRONT
PORCH
11
CO
I
CO
1 II
-7
lAT
UNDERGROUND CONDUIT BETWEEN
GARAGE AND BASEMENT
1
SLOPE GARAGE SLAB 4" :12"
4" SLAB ON GRADE; SEE 1/A-305
SEE 4&5/A-507, TYP.
3-4
M
5-10" 8-10" 8-10" 30-8 1/8
n
5-10
n
3-4
n
4 -2 3/411
7^- 7^- 7— 7— 7— 7
e
CL CL CL CL
L T1’-7' 1T- TT" 1Y-T
xw
-71- 7L
0
"7
O
(2
■-11 ■
5-91/4
n
f
l
-sJ-
CO
-V
O
CM
O
I
CD
CM
O
W/D
5 1/2"
Oio
Kl
CO
1
CO
LU
O
O
00 ^
>IS
^4I
CH,
CM
LIFT
<<p (11) -|
25-1
UNDERGROUND CONDUIT BETWEE^
GARAGE AND BASEMENT
1^
SEE 3&7/A-507, TYP.
co
f )
<2
CD
1
LD
CL
CL
14-5 1/2' 5-9 1/4' 2’-9 1/4' 8-7 3/4' 8-7 3/4' 9-6 3/4' 6’-4 1/2' 3-9 1/4' 4’-2 3/4'
7— 7— 7L
7 ~ 7L 7L
7 ~ 7L
7 ~
4"
7^"
13-5'
8" 7— 7—
-V
-
CONCRETE PAVERS WITH 8"
CONCRETE WALL EDGE; STONE
VENEER ON TOP AND SID E OF
CONCRETE WALL; SEE 4/A101A
CONCRETE SLAB
W/ BROOM FINISH:
SLOPE TO FLOOR
DRAIN
DOWN FLOOR DRAIN; CONNECT TO
ROOF DRIP EDGE DRAINAGE
SYSTEM
PATIO -n
> o
o IM>
o o
o
CONDUIT THROUGH WALL FOR
FUTURE GAS WATER HEATER
SUPPLY/EXHAUST
SCREEN
PORCH
cn
CONCRETE PAD
FOR OUTDOOR
UNIT FOR GARAGE
HEAT PUMP
19
SEE 3/A-507
5/A-205
CL CL CL
CL
l
2'
-v
26-0' 16’-0" 2-0' 32-0' 2’-0" 8-0'
5 6 6.1
2 3 4.1
4 7
86’-0"
8' 3-0' 8" 5'-10"
CD
I
f^-
o
CM
V
B B
o
11"
-V BREEZEWAY
O.
© CD
CONCRETE WITH BROOM
FINISH
B B
11"
CM
f^-
1
CD
LO
1
F.1
F
-V
D
CD
1
CO
CO
CONDUIT THROUGH
WALL FOR FUTURE
GAS FURNACE
SUPPLY/EXHAUST
O
o
1
CO
B
-V
o
I
CM
A
CO
I
LO
A.1
O
00 1
1
o
CD
CM
CM
1
LO
O
1
CO
O
<2
CD
1
O
Z
<2 CD
CD
1
7—
7—
5'-9 1/4’
7—
F
E
E.1
CD
00
CO
C.1
c
A
8-10 1/4" 11'-4 1/2'
7^-
FIRSTFLOORPLAN
SCALE: 1/4" = 1'-0"
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
1. FIRST FLOOR AREA TO OUTSIDE FACE OF
STUD WALL: 1,518 SQ. FT.
2. DIMENSIONS ARE TO FACE OF STUD UNLESS
OTHERWISE NOTED.
INTERIOR PARTITIONS FRAMED WITH 2x4
WOOD STUDS UNLESS OTHERWISE NOTED.
3.
4. INTERIOR BEARING WALLS FRAMED WITH 2x6
WOOD STUDS UNLESS OTHERWISE NOTED.
5. INTERIOR DOORS TO BE CENTERED
BETWEEN THE NEAREST WALL
PERPENDICULAR ON EACH SIDE OF THE
DOOR UNLESS OTHERWISE NOTED.
6. SEE A-602 FOR FINISH SCHEDULE
REFER TO POCKET DOOR FRAME KIT
INSTALLATION INSTRUCTIONS TO DETERMINE
ROUGH OPENING OF POCKET DOOR.
7.
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
CONSULTANT:
OSHEETKEYNOTES
PROVIDE BLOCKING IN WALL TO SUPPORT
FUTURE STAIR LIFT. BLOCKING SHOULD
EXTEND UP TO A HEIGHT OF 3’-0" ABOVE
STAIR TREADS.
1.
2. STAIR FROM FIRST TO SECOND FLOOR TO
HAVE 16 RISERS AT 7%", 10" TREADS WITH %
NOSING.
3. CASED OPENING, 7-6" FINISHED HEIGHT
CASED OPENING, 6-8" FINISHED HEIGHT
DROPPED CEILING, 7-9" FINISHED HEIGHT
4.
r n
5.
18" x 18" ACCESS PANEL ABOVE DOOR FOR
ACCESS TO FCU-2 UNIT.
6.
CONCRETE GARAGE STAIR TO HAVE 4 RISERS
AT 6y2", 11" TREADS.
7.
8. GARAGE ATTIC ACCESS PANEL TO FIT WITHIN
ROOF TRUSSES; SEE A-112 ROOF FRAMING
PLAN FOR LOCATION AND SIZE. PANEL TO BE
FASTENED FROM BELOW AND REMOVABLE
WITHOUT REMOVING PANEL TRIM. ACCESS
PANEL TO BE INSULATED. CELLULOSE ATTIC
INSULATION SHALL BE HELD BACK FROM
ACCESS OPENING.
L J
PROJECT:
NationalInstituteof
StandardsandTechnology
9. SIZE OF CONCRETE PAD TO BE SPECIFIED BY
MANUFACTURER OF AIR-TO-AIR OUTDOOR
UNIT,
10. LOCATION OF FUTURE OUTDOOR AIR-TO-AIR
UNIT.
NetZeroEnergy
ResidentialTest
Facility
11. DO NOT SLOPE SLAB IN THIS AREA; THICKEN
SLAB UNDER CHAIR LIFT IF SPECIFIED BY
MANUFACTURER OF LIFT.
ODOORKEY NIST Campus
Gaithersburg, MD
1. 1 ’-8" x 6’-8" LH
U.S. Department of Energy
Research Toward Zero Energy Homes
2. (2) 1-10" x 6-8"
3. 2-4" x 6-8" LH
4. 2-4" x 6-8" RH
2-4" x 6'-8" POCKET
5.
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
6. 2-6" x 6'-8" RH
7. 2'-6" x 6'-8" LH
8. 2'-8" x 6'-8" LH
9. 2'-8" x 6'-8" RH
10. 3'-0" X 6'-8" LH
11. 3'-0" x 6'-8" RH
07/27/10 UPDATED
3'-0" x 6-8" POCKET
12.
06/29/10 UPDATED
13. 3'-0" x 7'-0" RH W/12" SIDELITES
MARK DATE DESCRIPTION
14. 3'-0" x 7'-0" LH ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
15. 3'-0" x 7'-0" RH
PROJECT NO: NIST NZERTF
16. 9'-0" x 8-0" OVERHEAD
A-PLOT-PLAN-NZERTF
CAD DWG FILE:
17. (2) 4'-6" x 8'-0'
CG
DRAWN BY:
18. 6'-0" x 6'-8" (1) LH PANEL, (1) FIXED PANEL CHECKED BY: BP
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
19. 3'-0" x 6-8" RH
SHEET TITLE:
FIRSTFLOORPLAN
i
o
SCALE AS NOTED z
A-105
u
ACTIVE
DOOR
©





(=
=
=
=
=!=
I
PASSIVE
DOOR
9'-0"
O'-O
M
O'-O"
GENERALSHEETNOTES
BLOCKING TO SUPPORT HANGER
FOR SCREEN PORCH END BEAM
O'-O
M
BUILDINGSCIENCE
CORPORATION
36'-0' 34'-6 3/4M
17'-3 1/4" '-8 1/4ii
8'-5 1/2ii
5'-11 1/4"
27'-1"
1. REAR WALL FRAMING ELEVATIONS DRAWN AS
SEEN FROM INTERIOR; INTERIOR BEARING
WALL FRAMING ELEVATION DRAWN AS SEEN
FROM THE FRONT; ALL OTHER ELEVATIONS
DRAWN AS SEEN FROM EXTERIOR
-7^
4
7
36'-0" 35'-8ii
25'-3 1/2" 10'-8" 14'-7 1/4 2'-6 1/4"
36'-0" 31-10 3/4' 22-1" ii
3-0 3/4' 8-5 1/2"
-7^
-7^ 7 “
36-0" 30-10" 25'-3 1/2" 14'-1 3/4" 2'-1" 2'-0' 2'-0" 2'-0'
7^ "7 ~ Y-
77©
9'-1 1/4" 8'-4 3/4" 4'-6 3/4" 3'-4M
13'-4" z^~ zz zziz ft 7^|ft ~7 Z7
4
7
,Z
TT TYPICAL WALL HEIGHT = 9'-1".
2.
^r
^4 X
3!
3.5" x 5.5" 1.3 =
LSL HEADEF
3. TYPICAL FIRST FLOOR WINDOW FRAMING HEAD
HEIGHT = 7'-6 3/4".
(2) 1.75" x 11.25" LSL
1.55E HEADER
(2) 1.75" x 11.25" LSL
1.55E HEADER /
 3.5" x 5.5" LSL
1.3E HEADER
3.5" x 5.5" LSL
1.3E HEADER
3.5" x 7.25" LSL
1.3E HEADER
^7
3.5" x 9.25” LSL
1.3E HEADER

(2)1.75” x
11.25” LSL
1.55E HEADER
3-10"
/ /
CT>
WINDOW AND EXTERIOR DOOR FRAMING
OPENING DIMENSIONS TO BE ADJUSTED PER
MANUFACTURER SELECTION AS FOLLOWS:
4.
CM
3'-2"
l
E > CM
C C&co
I
E - © —? !
I
6'-4 1/2ii
"mI-
A V-
-AS. 1/2' ©-
4-7 M
3-1 8'-1" 2-5' 2'-5' I
-A -A - © -©
©- 7< ' A
-A ©  LO
±5 i
A. FRAMING WIDTH FOR DOORS AND WINDOWS:
INCREASE THE MANUFACTURER'S
SPECIFIED ROUGH OPENING WIDTH BY
ADDING V2" TO EACH SIDE.
B. FRAMING HEIGHT FOR WINDOWS:
INCREASE THE MANUFACTURER'S
SPECIFIED ROUGH OPENING HEIGHT BY
ADDING V2" TO THE TOP AND 1" TO THE
BOTTOM.
C: FRAMING HEIGHT FOR DOORS:
INCREASE THE MANUFACTURER'S
SPECIFIED ROUGH OPENING HEIGHT BY
ADDING 1/2" TO THE TOP.
FRAMING STUDS TO BE FSC-CERTIFIED
LUMBER.
CNJ 
/
CD
/
/
CN CN

/
CN
© © © /
18
<D
CD CD
N-
/
CD
/ /
CD CD
/
/
c
&
■v -V
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
KT TK S S S KTT TT TT TT TT TTK SS S KTT TTK S E KT TK S S KT C C TK S KT C TK S S KT TK S E E S KT TK S E
IB1
H7 H6
CONSULTANT:
5.
1
■A
©------- LU
CN
O
LIMIT THE OVERALL ESTIMATED WASTE FACTOR
ON THE FRAMING ORDER TO 10% OR LESS.'
6.

CN
O
CD
H7 cn
i
/ STRUCTURAL SHEATHING CONNECTIONS (TO
RESIST ROOF UPLIFT):
7.
CO
CN
T £
CO
5-7" o
ny W CD
-©—V LAP SHEATHING ON RAFTER RIM BOARD:
MINIMUM 8d NAILS AT 3" O.C.
m O
CN
DO O i
X <
OO
o
HORIZONTAL SHEATHING EDGES AT BLOCKING
OR FRAMING: MINIMUM 8d NAILS AT 3" O.C.
/
(a
 
cn
/ HORIZONTAL SHEATHING EDGES BELOW
SECOND FLOOR: MINIMUM 8d NAILS AT 6" O.C.
/

CN
r i
 CD LO
<>
cn
i
OSHEETKEYNOTES
X
CN
□ CN
/
<
if)
Ol 
i
if)
4^
/ LO /
CO
00
J-
if)
LO
i
7
oo
X
 o
/
CN
< i
<
CO
o
L J
/

CN CN
PROJECT:
 if)
CD CD
i
/
/ CD CD
NationalInstituteof
StandardsandTechnology
in
/

U ./

M.
7 LU
/
00
00
 H6 CN
hJ
7'-3"
NetZeroEnergy
ResidentialTest
Facility
 2
o
t

x X a>
>
* n *
7i
o
00 00
 2'-7"
nni ^ pm PE y
n CN © 7!-
/ CN
O
IB1 CD
/
CO
if)
CO
"si-
 l o
U
t
in


NIST Campus
Gaithersburg, MD
/ if)
CN
/
if) 00
CN
NO
CD

i
^1"

o 
CO
X
if)
oo
t /
Ol
NO
U.S. Department of Energy
Research Toward Zero Energy Homes
(n i

NO
/ X
NO if)
if)
 2'-7"
V, o
/
t
if)
CD
Is-

i
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
co
LO
ENERGY
S>
i
o
7s LO
N-
O i
> oo
 LU
-V
T
NO
/
5'-7"
o
t; T
00 00
if)
y OsJ ^ ::=nLU
O i i
if)
CO
-N -N
OO
CD
X
4^
A  
©
CO LU
m
'I T— T
7  H2
x
H1
MARK DATE DESCRIPTION
O'-O" O'-O'
BLOCKING TO SUPPORT HANGER
FOR FRONT PORCH END BEAM
BLOCKING TO SUPPORT HANGER
FOR FRONT PORCH END BEAM
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
36’-0' 34-4 1/2" 28-6 1/2 M
21'-2 3/4" 10'-10 1/2" 5'-0 1/2M
8'-5 1/2M
5'-11 1/4"
7L
PROJECT NO: NIST NZERTF
36'-0" 30'-11 1/2' 25-1 1/2 M
14’-9 1/4" 7-5 1/2 M
r-7 1/5M
8-5 1/2" 2-6 1/4"
7^ 7 =
A-PLOT-PLAN-NZERTF
CAD DWG FILE:
2-0
M
2-0
M
2-0"
1?*- 7^
DRAWN BY: HW
^7 rz Tz
4 CHECKED BY: BP
 /
-4© -4©
'-Z,
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
3.5” x 5.5” 1.3 =
LSL HEADEF
3.5” x 5.5" 1.3 =
LSL HEADEF
3.5" x 5.5" 1.3 =
LSL HEADEF
3.5" x 5.5" 1.3 =
LSL HEADEF
3.5" x 5.5" 1.3 =
LSL HEADEF
 /
3.5" x 7.25" LSL
1.3E HEADER
6-2 1/2" /
/

2x4 STUD FOR STRUCTURAL
SHEATHING ATTACHMENT,
TYPICAL
/ 
/
SHEET TITLE:
3-2" 3-2
ii
3-2" 3-2
M
3-2
ii
-©
-© © © © ©
z' z!

 !
3-3 1/2"
N- N- i— i—
- © 00
/
/ 
1

FIRSTFLOORKEY
PLAN&WALL
FRAMING
ELEVATIONS
A A A A A
LO LO LO LO LO LO
00
/ /
CN

/

i

h-
/ /
13©
/ 
±<Z
ns

/

 /

/
s s
m m
c c
£
E KTC TK S KT C C TK S KT SS SS TK S KT C C TK S KT C TK E E S KT C TK S E
3 3/8"
1/2" 4'x8' PLYWOOD
STRUCTURAL SHEATHING,
TYPICAL
i
cz
o
SCALE AS NOTED
H1 H2 z
A-106
FIRSTFLOORKEYPLAN&WALLFRAMINGELEVATIONS
SCALE: 1/4" = 1'-0
H
21 '-11 1/4 7'-5 3/4"
26-0"
ii
—
12'-4 1/4" 4'-0 3/4’
26'-0'
2'-0ii
2'-0ii
 7^ TFFF fTF' 7F
4 I
22*
X 5-8 1/4
ii
CD
L
■f: I
A CO
.2^, .2^, .2^,
o
V
 7
 7 o
/I o
w
2X4 STUD FOR
STRUCTURAL
SHEATHING
ATTACHMENT, TYPICAL
ho
3.5" x 5.5" L5fL
1.3E HEADER
J
Z  -t*
NO
3.5" x 9.25" LSL
1.3E HEADER
f
o
col *
3'-2'
9-4"
<>
' 
Tl
v-
00 TCl
T
r^ Ul
6-9 1/2 M
I
A LO f^
©
00
,s]- oo 00

CD
CD Ol
7
i
00
CD
s
A 4^
*
4
5
00
FOUNDATION WALL,
TYPICAL
4^
K ’ TK S S S KT C TK S m A-----A
/
CO
r-3 1/21
oo
l_
l_ l
G1
GENERALSHEETNOTES
1. REAR WALL FRAMING ELEVATIONS DRAWN AS
SEEN FROM INTERIOR; ALL OTHER ELEVATIONS
DRAWN AS SEEN FROM EXTERIOR
TYPICAL GARAGE WALL HEIGHT = 9-4".
2.
3. TYPICAL GARAGE WINDOW FRAMING HEAD
HEIGHT= 6’-10y2" ABOVE TOP OF GARAGE
FOUNDATION WALL.
4. WINDOW AND EXTERIOR DOOR FRAMING
OPENING DIMENSIONS TO BE ADJUSTED PER
MANUFACTURER SELECTION AS FOLLOWS:
A. FRAMING WIDTH FOR DOORS AND WINDOWS:
INCREASE THE MANUFACTURER'S
SPECIFIED ROUGH OPENING BY ADDING y2"
TO EACH SIDE.
B. FRAMING HEIGHT FOR WINDOWS:
INCREASE THE MANUFACTURER'S
SPECIFIED ROUGH OPENING HEIGHT BY
ADDING y2" TO THE TOP AND 1" TO THE
BOTTOM.
C. FRAMING HEIGHT FOR DOORS:
INCREASE THE MANUFACTURER'S ROUGH
OPENING HEIGHT BY ADDING Vi' TO THE
TOP.
FRAMING STUDS TO BE FSC-CERTIFIED
LUMBER.
5.
6. LIMIT THE OVERALL ESTIMATED WASTE FACTOR
ON THE FRAMING ORDER TO 10% OR LESS.
STRUCTURAL SHEATHING CONNECTIONS ON
GARAGE (FOR BRACING):
7.
FASTEN PLYWOOD SHEATHING ON WEST WALL
WITH MINIMUM 8d NAILS AT 3" O.C.
OSHEETKEYNOTES
O'-O"
13'-5' 12-9 3/4' 8-9 3/4" 3-10 3/4' 7L
9-6 1/4" 4-7 1/4'
13-5' 7 1/4"
i1-
3.5” x 9.25" LSL
1.3E BEAM
-V
SC
(2) 2X6
POST
(2) 2X6
POST
00
LO
CO
CO
3-3 1/2’ 4-2 1/2’ 3-3 1/2’
7 - CO
-7' '
CO
X I
CM
—V
ES K C C K K C C K K C
SP2
SP2
H ft
4
o
O
J
CM
5-8 1/4" Jo
o o
v-
I
o
t
o I
I
o>
A o
c/)
CL
"D * Q_
3?
Cf.)
co
C/)
1 O
CO
CM
CO
/
I
I
LO
/
o o
I
LO
X
-2,-
o 3T
o
A 
CO
o o JJ
HI T > o>
O'-O"
21'-11 1/4" 7'-5 15/16"
26'-0"
26'-0' 18'-6 1/4" 4'-0 3/4"
7L
2'-0" 2'-0'
~? ~ ~? ~ ~? ~
xA
 7^7 FTF' ~FF F7
22. 2^. ^2. ^2. ^2.
X ft FT 7F
A
x 
/

3.5" X 5.5" LSL
1.3E HEADER
3.5" X 5.5" LSL
1.3E headef:
3'-2' -=f
3'-2" -?:
’A
■ A
7^7 O)
f^-
LO I
A A
/
LO
CM : =

4
5
I
c
CO
I
KT TK S S S S S S KT C TK S E
J
l_
G3
GARAGEKEYPLAN&WALLFRAMINGELEVATIONS SCREENPORCHKEYPLAN&WALLFRAMINGELEVATIONS
SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1’-0’
BUILDINGSCIENCE
CORPORATION
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
CONSULTANT:
r n
L j
PROJECT:
NationalInstituteof
StandardsandTechnology
NetZeroEnergy
Residential Test
Facility
NIST Campus
Gaithersburg, MD
U.S. Department of Energy
Research Toward Zero Energy Homes
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
MARK DATE DESCRIPTION
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
PROJECT NO: NIST NZERTF
A-PLOT-PLAN-NZERTF
CAD DWG FILE:
DRAWN BY: HW
CHECKED BY: BP
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
SHEET TITLE:
SCREENPORCH&
GARAGEKEY
PLANS&WALL
FRAMINGELEVS.
o
SCALE AS NOTED
A-107
~I
G2
00
I
I
CO
v|KS
0
E
S
s
s
S
K
S
w
s
s
s
E
5SZ

/

/
/
CM
/
/

/

/
3'-3
1/2
2L*.
2Li
2L*.
^2
2^.
^2
2^.
2^.
^2
^2
2^.
^2
2^.
■PI
77
FF©-
rr
T
r-6
1/2”
4
F
r-6
1/2"
9'-10
3/4”
23'-1"
13'-2
1/4”
23'-1"
O'-O'
G2
r
o
o
CO
ACTIVE
DOOR
o
CD
J
J
L
L





^PASSIVE
DOOR
X
B
,
II
.
II
fxxr
XT
i
G4
,o-,o
21'-5
3/4"
10-8
1/4"
l-£Z
12'-4
3/4"
1’-7
1/4"
r-p
1/2
1
1'-6
1/2
F
L2
FF-
IK
*
SINGLE
2x6
HEADER
SINGLE
2x6
HEADER
l
L-.6
I--,6
CT
W-
w-
l
CM
CM
16
16
/
K
CD
O)
w
E
IX
I
k
s
k
I
I
k
i
I
i
i
i
i
i
i
-r
G4
2'-0' 2'-0" 2'-0"
7^
2x4 VERTICAL WOOD STUD
BLOCKING
X 14" LSL RIM JOIST
1 '-5 1/2 ii
9-1
o
1
T
F
O
i
00
WX14" LSL RIM JOIST
2'-0'
36-0
M
2'-0"
5 6 6.1
4.1 7
8'-0'
7L
7^
F.1
[]
2'-0" 2'-0" 2'-0"
7^ 7 ~
-7<-
[]
t—r F
2x4 VERTICAL WOOD STUD
BLOCKING ALONG RAKE END RIM
JOIST BETWEEN SILL PLATE AND
FLOOR SHEATHING
14" DEEP OPEN WEB FLOOR
TRUSS TYPE "E" AT 24" O.C. WITH
T & G FLOOR SHEATHING; SEE
A-701 ,A-702 FOR TRUSS TYPES
14" DEEP OPEN WEB FLOOR
TRUSS TYPE "E" AT 24" O.C. WITH
T & G FLOOR SHEATHING; SEE
A-701 ,A-702 FOR TRUSS TYPES
m
m
m
O
o
CN
m
14" DEEP OPEN WEB FLOOR
TRUSS TYPE "E1" AT 24" O.C. WITH
T & G FLOOR SHEATHING; SEE
A-701, A-702 FOR TRUSS TYPES
WX14" LSL RIM (jOIST
iy4"X1iy4" LSL RIM JOIST
CD
CO
CO
D
2x4 VERTICAL WOOD STUD
BLOCKING ALONG RAKE
END RIM JOIST BETWEEN
SILL PLATE AND GABLE
WALL BOTTOM PLATE
1%" x 11 y4" LSL ENGINEERED
ATTIC JOISTS AT 24" O.C.
tr
o CO
CO
c/3
LU
O
— 14" DEEP OPEN WEB FLOOR
TRUSS TYPE "G" AT 24" O.C.
WITH g" T & G FLOOR
SHEATHING; SEE A-701,
A-702 FOR TRUSS TYPES
iy4"X 11-1/4" LSL
RIM JOIST
B
2'-0" 2'-0" o
CN
A
1)4" X 14" LSL RIM JOIST
A.1
2 3
1 4
2'-0' 2'-0'
■7 ~
F
=i
E
=i
BLOCKING BETWEEN JOISTS
UNDER PARITIONS ALIGNED WITH
BUT BETWEEN JOISTS, TYPICAL
J
I
/
E.1
o
WfF
=3
<D
C.1 CO
CO
DASHED LINES INDICATE
STUD WALLS ABOVE
CN
O
CO
1
iy4"X14" LSL RIM JOIST
c
2x4 VERTICAL WOOD STUD
BLOCKING ALONG RAKE END RIM
JOIST BETWEEN SILL PLATE AND
FLOOR SHEATHING
I
14" DEEP OPEN WEB FLOOR
TRUSS TYPE "F" AT 24" O.C. WITH
T & G FLOOR SHEATHING; SEE
A-701,A-702 FOR TRUSS TYPES
7 -
A
2'-0' 2'-0'
-7 ~ 7 ~
iy4-
SECONDFLOOR&LOWERATTICFRAMINGPLAN
SCALE: 1/4" = 1'-0"
JC
O
CL
C/3
co 5
LU g
o
O LU
<-ea
GENERALSHEETNOTES
1. CONTRACTOR TO VERIFY ENGINEERED WOOD
PRODUCT (EWP) MEMBER SIZES WITH EWP
SUPPLIER.
BUILDINGSCIENCE
CORPORATION
2. EWP CONNECTIONS TO FOLLOW EWP SUPPLIER
INSTRUCTIONS.
3. LIMIT THE OVERALL ESTIMATED WASTE FACTOR
ON THE FRAMING ORDER TO 10% OR LESS.
PROVIDE ENGINEERED WOOD BLOCKING
BETWEEN JOISTS UNDER PARTITIONS
PARALLEL TO, BUT BETWEEN, JOISTS;
COORDINATE LOCATION OF BLOCKING WITH
MECHANICAL DUCTWORK.
4.
SEE A-701 AND A-702 FOR OPEN WEB FLOOR
JOIST TYPES; OPEN WEB FLOOR JOISTS TO BE
CONSTRUCTED USING FSC-CERTIFIED WOOD;
OPEN WEB FLOOR JOISTS TO BE ENGINEERED
BY TRUSS SUPPLIER TO MEET LOCAL CODE.
5
6. GENERAL STRUCTURAL FRAMING
CONNECTIONS:
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
LSL CEILING JOISTS TO FLOOR HEADERS: USP
THD179 ENGINEERED WOOD JOIST HANGER;
DOUBLE LSL FLOOR HEADER TO TRIMMER: USP
HD 410 DOUBLE HANGER.
CONSULTANT:
STRUCTURAL FRAMING CONNECTIONS FOR
CENTER BEARING WALL (TO RESIST ROOF
UPLIFT):
7.
RAFTER TO RIDGE BOARD: USP AC7 ANGLE
BRACKET WITH 4 10d NAILS EACH LEG
RAFTER TO STUD IN ATTIC BEARING WALL: USP
LTW12 WITH R 10d NAILS EACH END
STUD IN ATTIC BEARING WALL TO CEILING
JOIST: USP LTW12 WITH 4 10d NAILS EACH END
CEILING JOIST TO STUD IN SECOND FLOOR
BEARING WALL: USP RT10 WITH 4 8d NAILS
EACH END (USE USP LTW12 AT CONNECTIONS
TO WALL HEADERS)
r n
STUD TO SOLE PLATE IN SECOND FLOOR
BEARING WALL: (2) USP S01 CLIP ANCHORS
SOLE PLATE TO FLOOR DECK: (2) #8x3" WOOD
SCREWS AT 12" O.C.
ATTIC FLUSH-FRAMED BEAM TO WALL STUDS
AT ENDS OF BEAM: USP LTW12 WITH 6 10d NAILS
EACH END OF STRAP; PROVIDE CONTINUOUS
LOAD PATH DOWN TO BASEMENT BEAM USING
SIMILAR SIZED STRAPS AT ALL FRAMING
JOINTS.
L J
PROJECT:
NationalInstituteof
StandardsandTechnology
OSHEETKEYNOTES
NetZeroEnergy
ResidentialTest
Facility
1. END OF FLOOR JOIST TO BE FULL BEARING ON
BEARING WALL BELOW.
2. FOR SIZE AND LOCATION OF HEADERS IN THE
BEARING WALL BELOW, SEE A-108, WALL IB1.
NIST Campus
Gaithersburg, MD
U.S. Department of Energy
Research Toward Zero Energy Homes
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
MARK DATE DESCRIPTION
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
PROJECT NO: NIST NZERTF
A-PLOT-PLAN-NZERTF
CAD DWG FILE:
CG
DRAWN BY:
CHECKED BY: BP
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
SHEET TITLE:
SECONDFLOOR
LOWERATTIC
FRAMINGPLAN
&
o
SCALE AS NOTED
A-108
:
0
T
I
0
i
n
LU
Tr
o
<
3-10
1/2"
m
x
IT
C/3
L
0
X
00
.0
CN
18'-1
1/4"
ACCtSS
FROM
BELOW
-'j
1
I
O
0
IWCT
^
r
-
t
I
>
F
14'-:
O
I
n
i
h
o
0
ACCESS
FROM
BELOW
CO
-V
01^5'-:
3“T 2' 14'-6 1/2"
4
->H‘-
o>
© h-
05
>
i MASTER BEDROOM
5iA-206 CO
CO
ro
o
3-5" 6-8 1/2" to
3]a-2(|)6
z
03
&
7^ o
:^/2
<
FLOOR
ACCESS
o
LO
F CO
o o 1 CLOSET
i i
3 1/2'
o] tol i-
a -v
CD
SOIL GAS
VENT ^
5 1/2" o CN
CM
©
0/A-206S-
<
Gk
CO N-
§/A-206
3-6 6-3’ LO
ft
CO
CM
©
© BATH #2
oo
<D
/(TTIC ACCESS W)/
PULLDOWN $T^IR
5 1^2" 3-9'
LU
2/A-205
CLOSET
©
HALL
l'-3 1 9-1" 4'-0 1/2" 2' 3 1/2'
5'-9'
r
^-7- 7^ 7^
I
© -BOWN-
O
5 1/2" 5 1/2'
®*
0, . . 5 1/2'
; f~~? ; ■ ~
©
CL.
CD
/ FLOOR
ACCESS
BEARING WALL
±
<TJ
5 1/2"
BEARING WALL
FLOOR ACCESS
7-11 1/2' , 2-9" 3 1/2' 10-8 1/2"
-*7
OPEN
TO
lJ
BELOW
>
lJ
O
^1
CLOSET
CM
BEDROOM 2 BEDROOM 3
CJ
S)
LA]
MASTER
BATH
r;W
A
u
a
A
CM
co
o
I
o
CM
CN
00
00
-V
CO
I
00
LO
CO
10-8 1/2' 10-8 1/2"
9-1
5 6 6.1
4.1 7
36'-0'
7^
8'-2‘ 12-9 1/2" 6-7 1/2' 2’-0"
4'-5'
7^ <- 7^ 7^ 7^
f"
tL
OL dL
2-0
M
8-10" 8-10 M
2-0
7-2" 7’-2'
7L 7" 7L 7 ~
____I
CL 0L dL
A
F.1
F
D
B
A
A.1
3 4
2-0’
-7^-
1L
V
o
o
u
2
1
F
r i
E
-
E.1
II
GARAGE ATTIC
ACCES HATCH
I
I
--l-L-
T
C.1
C
A
SECONDFLOORPLAN
SCALE: 1/4" = 1-0"
-v
CO
I
CM
-V
r^
i
05
INSTRUMENTATION CONDUIT
BETWEEN GARAGE ATTIC AND
2ND FLOOR FRAMING
CM
i
CO
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
1. SECOND FLOOR AREA TO OUTSIDE FACE OF
STUD WALL: 1,191 SQ. FT.
2. DIMENSIONS ARE TO FACE OF STUD UNLESS
OTHERWISE NOTED.
INTERIOR PARTITIONS FRAMED WITH 2x4
WOOD STUDS UNLESS OTHERWISE NOTED.
3.
4. INTERIOR BEARING WALLS FRAMED WITH 2x6
WOOD STUDS UNLESS OTHERWISE NOTED.
5. INTERIOR DOORS TO BE CENTERED BETWEEN
THE NEAREST WALL PERPENDICULAR ON
EACH SIDE OF THE DOOR UNLESS OTHERWISE
NOTED.
6. FLOOR ACCESS PANELS FIT WITHIN FRAMING
MEMBERS; SEE FRAMING PLAN. PANELS TO
BE COVERED WITH FINISH FLOORING. SEE
8/A-508.
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
SEE A-602 FOR FINISH SCHEDULE.
7.
8. REFER TO POCKET DOOR FRAME KIT
INSTALLATION INSTRUCTIONS TO DETERMINE
ROUGH OPENING FOR POCKET DOOR.
CONSULTANT:
OSHEETKEYNOTES
1. INSTRUMENTATION CONDUIT FROM GARAGE
ATTIC (THROUGH BREEZEWAY) TO ENTER
WALL THROUGH RIM JOIST (IN 2ND FLOOR
FRAMING). PENETRATION "E10", SEE A-603 FOR
PENETRATION SCHEDULE.
r n
2. AIR RETURN FOR FCU-1 LOCATED IN WALL
ABOVE DOOR
L J
PROJECT:
NationalInstituteof
StandardsandTechnology
NetZeroEnergy
Residential Test
Facility
oDOORKEY
NIST Campus
Gaithersburg, MD
1. 1 ’-8" x 6’-8" LH
2. (2) T-10" x 6’-8"
3. 2-4" x 6-8" LH
U.S. Department of Energy
Research Toward Zero Energy Homes
4. 2-4" x 6-8" RH
2-4" x 6-8" POCKET
5.
6. 2-6" x 6-8" RH
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
7. 2-6" x 6-8" LH
ENERGY
8. 2-8" x 6-8" LH
9. 2'-8" x 6-8" RH
10. 3'-0" X 6'-8" LH
11. 3'-0" x 6'-8" RH
3'-0" x 6'-8" POCKET
12.
13. 3-0" x 7'-0" RH W/12" SIDELITES
14. 3'-0" x 7'-0" LH
MARK DATE DESCRIPTION
15. 3'-0" x 7'-0" RH
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
16. 9'-0" x 8-0" OVERHEAD
17. (2) 4'-6" x 8-0' PROJECT NO: NIST NZERTF
A-PLOT-PLAN-NZERTF
CAD DWG FILE:
18. 6'-0" x 6'-8" (1) LH PANEL, (1) FIXED PANEL
CG
DRAWN BY:
19. 3-0" x 6-8" RH
CHECKED BY: BP
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
SHEET TITLE:
SECOND FLOOR
PLAN
i
o
SCALE AS NOTED z
A-109
O
O
CN
CM
©
H
LU
=
H
4©
z-.e
§
7
LJ
CO
10'-8”
4'-6
1/2"
6-10
1/2'
©
o
■v
1/A-206
2/A-206
co
6
SHELVES
CM
To
4
F
4
..8-6
I,
-6©P
2-7'
6-10
1/2'
ir-2"
©
4
o
L
?
rv
rvj
o
LO
CM
4-
4
GENERALSHEETNOTES
O'-O"
REAR WALL FRAMING ELEVATIONS DRAWN AS
SEEN FROM INTERIOR; INTERIOR BEARING
WALL FRAMING ELEVATION DRAWN AS SEEN
FROM THE FRONT; ALL OTHER ELEVATIONS
DRAWN AS SEEN FROM EXTERIOR
1.
O'-O’
BUILDINGSCIENCE
CORPORATION
32'-0" 26'-6" 12'-11 6-3 1/2" 7 “
36'-0' 34-0 1/4’ 28'-11 3/4" 25'-5" 22'-6 1/2' 12-9 3/4’ 4-10 1/4'
32'-0" 9-2" 2'-6 1/2'
2T-2"
7
7 “
36'-0' 31-3 3/4" 25-11 1/4" 22’-9 1/2' 13-5 1/2" 9-9 1/4' 2'-1 3/4'
2'-0"
7^
2 IK
IK 2. TYPICAL WALL HEIGHT = 9'-1".
3.5" x 11.25" LSL 1.3E BEAM
(FLUSH FRAMED)
3. TYPICAL SECOND FLOOR WINDOW FRAMING
HEAD HEIGHT = 7'-7 1/2".

s m
 /  /  /
-----------“r=
o
' 5" LSL
ADER =
3.5" x 5.5" LSL
1.3E HEADER
3.5" x 5.5" LSL
1.3E HEADER
3.5" x li
1.3E F
o

 / V 4. WINDOW AND EXTERIOR DOOR FRAMING
OPENING DIMENSIONS TO BE ADJUSTED PER
MANUFACTURER SELECTION AS FOLLOWS:
/
2 17)
00 CM CD CD
/ 5.5" x 3.5' 5.5" x 3.5"
LSL. 1.3E
HEADER
(FLATWISE)
2'-9 1/2"
5.5"): 3.5"
LSL 1.3E
HEADER
(FLAT/VISE)
5.5" x 3.5' 5.5" x 3.5"
LSL 1.3E
HEADER
(FLATWISE)
I I
2"
I"
5' CN OJ
G G
LSL 1.3E LSL 1.3E
HEADER
(FLA'"WISE)
2'-C| 1/2"
/ /
CO <- 7"
HEADER
(FLATWISE)
Z—X—V
71
is
A. FRAMING WIDTH FOR DOORS AND WINDOWS:
INCREASE THE MANUFACTURER'S
SPECIFIED ROUGH OPENING WIDTH BY
ADDING V2" TO EACH SIDE.
B. FRAMING HEIGHT FOR WINDOWS:
INCREASE THE MANUFACTURER'S
SPECIFIED ROUGH OPENING HEIGHT BY
ADDING©’ TO THE TOP AND 1" TO THE
BOTTOM.
C: FRAMING HEIGHT FOR DOORS:
INCREASE THE MANUFACTURER'S
SPECIFIED ROUGH OPENING HEIGHT BY
ADDING 1/2" TO THE TOP.
FRAMING STUDS TO BE FSC-CERTIFIED
LUMBER.
o
 3'-6
3'-@*'
E E CO
I
/  /  / / 
o
CT>
1/2' 2'-4 1/2" 2'-5 1/2' 7 !
2'-5 9'-1"
"2 7 © V © -A
y v 7 " 7 "
© fc©
© © Ss®
CM
T 7 2
r
/ 1 
x
7
CM CM CM
co V
L 
 L

X X 7“
CT> 05 O) CT> CT>
00 X X X X X X X
-t*
CD CD CD CD CD
V. m
© X. © © © © 2 M X. UK 30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
2 2 2 2 2 2 2 2 2
c tR
2 2 2
SKT
2 2 2
C Tk
Xr
E KT TK S TK TK KT TKS SS KT TK S S TK TK E S KT C S KT C TK S :
2 2
+ CO
C/D
7
CO :22r
2
IB2
2
.©
H12 CO
T
X4
£ o
i
£ LO
2
2 , 2'-5" oc
5.
7 ! '
LU
O CONSULTANT:
D
^4
o Q CO
X©
LU
o ,7 V
6. LIMIT THE OVERALL ESTIMATED WASTE FACTOR
ON THE FRAMING ORDER TO 10% OR LESS.'
CO
77
V CM
7
2 2
7T CP
vr
7
X
2
7
CM
5'-4"
i
7. STRUCTURAL SHEATHING CONNECTIONS (TO
RESIST ROOF UPLIFT):
I
H12 CM
fO
O
I *7 CD
i
CD 1
LAP SHEATHING ON RAFTER RIM BOARD:
MINIMUM 8d NAILS AT 3" O.C.
o
"x
CO
CO
ro
ro
00
X 2 2
V 2
00
■>
©
<© 12
©
HORIZONTAL SHEATHING EDGES AT BLOCKING
OR FRAMING: MINIMUM 8d NAILS AT 3" O.C.
fO
C
1"
X
CD
00 I
2
vn HORIZONTAL SHEATHING EDGES BELOW
SECOND FLOOR: MINIMUM 8d NAILS AT 6" O.C.
W
 7 CO
5-7" CO o
k CM
O CM
S
GO
/x
>
ro
I r n
OSHEETKEYNOTES
Z
2
r
©. 2
2-5"
2 2
-7T
©
1
9'-1" 2”’ Q o
I
0) V
CM
7
V
CO
rv
x
I
£
ro
v
m m
X X'
D
L J
m
O m
m
73 w
©
CO
CO
CO
co
PROJECT:
CO
(J)
CJ)
NationalInstituteof
StandardsandTechnology
CO
CO 77
CD
CD
1
1
00
00
CO
CO
CO
77T
NetZeroEnergy
ResidentialTest
Facility
X X

JOT non L CO
00
CO
CD
©—©—"a O
-m
o 
IB2
ro
o ■V <n
X X
ur
O
o
CD
NIST Campus
Gaithersburg, MD
co
V
1
©
—V
<0-
7^
CD
CO
00
CO
T
5
U.S. Department of Energy
Research Toward Zero Energy Homes
CN
CO
CM
I
CO
TT’'
o
CO
CO
40
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
9'-1"
ENERGY
co
V
2
CCL
'
f 9'-1
7 — 7—
z:
7
7
m Mil------ ran m—n
X
I__ ____I
GO GO
■xj
H9
o
r^-
MARK DATE DESCRIPTION
X
ro
O'-O'
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
PROJECT NO: NIST NZERTF
32’-0" 28’-5 1/2" 17'-9 3/4" 10'-9 1/2' 7—
A-PLOT-PLAN-NZERTF
CAD DWG FILE:
32-0" 21’-2 1/2' 14'-2 1/4" 3'-6 1/2'
T7-
1/2" 4'x8' PLYWOOD
STRUCTURAL SHEATHING,
TYPICAL
7—
DRAWN BY: HW
2'-0"
/
ZL
2 CHECKED BY: BP
TO
4.
CO
 /
^ X ^ X
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
 /  /

^£1. 2X. ^£l. X
CO-
/ ©
M
3.5" x 7.25" LSL
1.3E HEADER
3.5" X 5.5" LS L
1.3E HEADER
3.5" x 7.25" LSL
1.3E HEADER
/
 SHEET TITLE:
o CO
1" 3'-4 1/2' r
7' 7' 00
/ 
© © -© ©
~!
CO
1 1
SECONDFLOOR
KEYPLAN&WALL
FRAMING
ELEVATIONS
O LO IO LO
/  / 
B B B B B CO
00
/

 2x4 STUD FOR STRUCTURAl
SHEATHING ATTACHMENT,
TYPICAL
CO
ro
/ ©
k CO
00
^v
vr X
o
CO
2 2 2
© x © 2 © 2 J© 2 2 2
2 CO
2
2 2 2 2
c tT
x- X X X
S KT C C SKT TKS KT C c: c C TJ S
©L
4^
2
co
-m
-----V 1
co
2 CL
O
SCALE AS NOTED
H9 z
2------V
SECONDFLOORKEYPLAN&WALLFRAMINGELEVATIONS
A-110
SCALE: 1/4" = 1'-0"
DOUBLE JOIST
©
1
©
CONTINUOUS 3-1/2" x 11-1/4" LSL 1.3E
FLUSH FRAMED HEADER
CO
J
DOUBLE JOIST
-v
UTIL
n SHAFT
.-v
CN
2
t
■It
r-: 1/4’
7'-1 1/4’ 4'-6"
DOUBLE JOIST
2
©
5 6 6.1
4.1 7
32-0' 2-0"
7^ 7^
F.1
ATTIC JOIST ADJACENT TO
ROOF RAFTER, TYPICAL
x 11-1/4" RIM LSL
BOARD
2'-0' 2'-0' 2'-0' 2-0" ,2’-1 1/2"
7L 7" 7" 7^
F
-v
2x4 VERTICAL WD STUD
BLOCKING ALONG RAKE END RIM
JOIST BETWEEN TOP PLATE OF
WALL BELOW AND BOTTOM PLATE
OF GABLE WALL
1)4" x 11)4" LSL RIM JOIST
o
o
CN
BLOCKING AT 2'-0" O.C.
if
/ 2x6 VERTICAL WD STUD GABLE
WALL (BALLOON FRAME) ON TOP
PLATE AT 2ND FLOOR FRAMING
D
J
2 x 6 WD STUD 24 O.C. BEARING WALL
CONTINUES TO ROOF RAFTERS ABOVE
i
CD
CO
2x4 VERTICAL WD STUD
BLOCKING ALONG RAKE END RIM
JOIST BETWEEN TOP PLATE OF
WALL BELOW AND BOTTOM PLATE
OF GABLE WALL
i
B
= A
A.1
2 3
1 4
2'-0'
-7^- ■7 ~
1-1/4’
/ 1
-10 1/2’ 2'-0 2'-0'
7L
7 ~
F
2x4 VERTICAL WD STUD
BLOCKING ALONG RAKE END RIM
JOIST BETWEEN TOP PLATE OF
WALL BELOW AND BOTTOM PLATE
OF GABLE WALL
E
iy4"X1iy4" LSL RIM JOIST
BLOCKING AT 2’-0” O.C.
©
E.1
rl
2x6 VERTICAL WD STUD GABLE
WALL (BALLOON FRAME) ON TOP
PLATE AT 2ND FLOOR FRAMING
C.1 7 ~
ar
w
hr
C
2x4 VERTICAL WD STUD
BLOCKING ALONG RAKE END RIM
JOIST BETWEEN TOP PLATE OF
WALL BELOW AND BOTTOM PLATE
OF GABLE WALL
A
1-1/4" x 11-1/4” LSL RIM
BOARD
ATTICFRAMINGPLAN
SCALE: 1/4” = 1’-0"
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
1. CONTRACTOR TO VERIFY ENGINEERED WOOD
PRODUCT (EWP) MEMBER SIZES WITH EWP
SUPPLIER.
2. EWP CONNECTIONS TO FOLLOW EWP SUPPLIER
INSTRUCTIONS.
3. LIMIT THE OVERALL ESTIMATED WASTE FACTOR
ON THE FRAMING ORDER TO 10% OR LESS.
GENERAL STRUCTURAL FRAMING
CONNECTIONS:
4.
LSL CEILING JOISTS TO FLOOR HEADERS: USP
THD179 ENGINEERED WOOD JOIST HANGER;
DOUBLE LSL FLOOR HEADER TO TRIMMER: USP
HD 410 DOUBLE HANGER.
5. STRUCTURAL FRAMING CONNECTIONS FOR
CENTER BEARING WALL (TO RESIST ROOF
UPLIFT):
RAFTER TO RIDGE BOARD: USP AC7 ANGLE
BRACKET WITH 4 10d NAILS EACH LEG
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
RAFTER TO STUD IN ATTIC BEARING WALL: USP
LTW12 WITH R 10d NAILS EACH END
STUD IN ATTIC BEARING WALL TO CEILING
JOIST: USP LTW12 WITH 4 10d NAILS EACH END
CONSULTANT:
CEILING JOIST TO STUD IN SECOND FLOOR
BEARING WALL: USP RT10 WITH 4 8d NAILS
EACH END (USE USP LTW12 AT CONNECTIONS
TO WALL HEADERS)
STUD TO SOLE PLATE IN SECOND FLOOR
BEARING WALL: (2) USP S01 CLIP ANCHORS
SOLE PLATE TO FLOOR DECK: (2) #8x3” WOOD
SCREWS AT 12” O.C.
ATTIC FLUSH-FRAMED BEAM TO WALL STUDS
AT ENDS OF BEAM: USP LTW12 WITH 6 10d NAILS
EACH END OF STRAP; PROVIDE CONTINUOUS
LOAD PATH DOWN TO BASEMENT BEAM USING
SIMILAR SIZED STRAPS AT ALL FRAMING
JOINTS.
r n
QSHEETKEYNOTES
FOR LOCATION OF FLUSH FRAMED
HEADER AND SUPPORT, SEE A-110,
WALL IB2
1. L J
PROJECT:
2. FOR SIZE AND LOCATION OF
HEADERS IN THE BEARING WALL
BELOW SEE A-110, WALL IB2. NationalInstituteof
StandardsandTechnology
NetZeroEnergy
ResidentialTest
Facility
NIST Campus
Gaithersburg, MD
U.S. Department of Energy
Research Toward Zero Energy Homes
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
MARK DATE DESCRIPTION
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
PROJECT NO: NIST NZERTF
A-PLOT-PLAN-NZERTF
CAD DWG FILE:
CG
DRAWN BY:
CHECKED BY: BP
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
SHEET TITLE:
ATTIC FRAMING
PLAN
o
SCALE AS NOTED
A-111
1
3
/
4
"
X11
y
4
"
LSL
ENGINEERED
CEILING
JOISTS
AT
24”
O.C.
1%"
X
11K"
LSL
ENGINEERED
CEILING
JOISTS
AT
24”
O.C.
4:12 SLOPED
ROOF RAFTER
/
BEARING WALL (2 x 6 @ 24 " O.C.)
EXTENDED TO SUPPORT ROOF
RAFTERS
4:12 SLOPED
ROOF RAFTER
9.67:12 SLOPED
LEDGER BOARD
1-1/4" x 11%" IISL RIM
BOARD
2-0 2-0 2-0
7L
9.67:12 SLOPED
LEDGER BOARD
4:12 SLOPED ROOF RAFTER
WOOD BLOCKING
BETWEEN TRUSSES
2x6 RAFTER PLATE ON
Vs FLOOR SHEATHING
2x6 RAFTER PLATE ON
Vs FLOOR SHEATHING
F
9.67:12 SLOPED
LEDGER BOARD
o
o
CM
FRAMING MEMBERS FOR
ONE-STORY ROOM BELOW
2x6 RAFTER P .ATE
2'-0" 2 x 12 RIM BOARD
2'-0"
D
2x14 RIDGE BOARD
CD
CD
2x6 RAFTER P.ATE
ON CEILING JOISTS
WOOD BLOCKING
BETWEEN UPPER
RAFTERS
B
O
CM
A
2x12 RIM BOARD
FRAMING MEMBERS FOR
ONE-STORY ROOM BELOW
2x6 RAFTER PLATE ON
Vs" FLOOR S HEATHING
A.1
5 6 6.1 7
2'-°" 8'-0'
F.1
o
o
ATTIC ACCESS
o
CO
it:
4:12 SLOPED ROOF RAFTER
4.1
32'-0'
1-1/4" x 1iy4" LSL RIM
BOARD
2 3
1 4
26-0' 2-0" ,
7L
2x6 RAFTER PLATE ON
Vs" FLOOR SHEATHING
2-0' 2'-0'
2'-0'
*
—? ~
F
2'-0' 2'-0'
-7—
E Jr
E.1
o
CM
C.1
c
A
ROOFFRAMINGPLAN
SCALE: 1/4" = 1'-0"
?s:
9.67:12 SLOPED
LEDGER BOARD
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
1. CONTRACTOR TO VERIFY ENGINEERED WOOD
PRODUCT (EWP) MEMBER SIZES WITH EWP
SUPPLIER.
EWP CONNECTIONS TO FOLLOW EWP SUPPLIER
INSTRUCTIONS.
2.
3. LIMIT THE OVERALL ESTIMATED WASTE FACTOR
ON THE FRAMING ORDER TO 10% OR LESS.
4. SAWN LUMBER RAFTERS AND BLOCKING TO BE
FSC CERTIFIED.
5. GENERAL STRUCTURAL FRAMING
CONNECTIONS:
LSL CEILING JOISTS TO FLOOR HEADERS: USP
THD179 ENGINEERED WOOD JOIST HANGER;
DOUBLE LSL FLOOR HEADER TO TRIMMER: USP
HD 410 DOUBLE HANGER.
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
6. SEE A-305 FOR GARAGE ROOF TRUSS TYPES;
TRUSSES TO BE CONSTRUCTED USING
FSC-CERTIFIED WOOD; ROOF TRUSSES TO BE
ENGINEERED BY TRUSS SUPPLIER TO MEET
LOCAL CODE.
7. STRUCTURAL FRAMING CONNECTIONS FOR
CENTER BEARING WALL (TO RESIST ROOF
UPLIFT):
CONSULTANT:
RAFTER TO RIDGE BOARD: USP AC7 ANGLE
BRACKET WITH 4 10d NAILS EACH LEG
RAFTER TO STUD IN ATTIC BEARING WALL: USP
LTW12 WITH R 10d NAILS EACH END
STUD IN ATTIC BEARING WALL TO CEILING
JOIST: USP LTW12 WITH 4 10d NAILS EACH END
CEILING JOIST TO STUD IN SECOND FLOOR
BEARING WALL: USP RT10 WITH 4 8d NAILS
EACH END (USE USP LTW12 AT CONNECTIONS
TO WALL HEADERS)
r n
STUD TO SOLE PLATE IN SECOND FLOOR
BEARING WALL: (2) USP S01 CLIP ANCHORS
SOLE PLATE TO FLOOR DECK: (2) #8x3" WOOD
SCREWS AT 12" O.C.
ATTIC FLUSH-FRAMED BEAM TO WALL STUDS
AT ENDS OF BEAM: USP LTW12 WITH 6 10d NAILS
EACH END OF STRAP; PROVIDE CONTINUOUS
LOAD PATH DOWN TO BASEMENT BEAM USING
SIMILAR SIZED STRAPS AT ALL FRAMING
JOINTS.
L J
PROJECT:
NationalInstituteof
StandardsandTechnology
NetZeroEnergy
ResidentialTest
Facility
OSHEETKEYNOTES
NIST Campus
Gaithersburg, MD
U.S. Department of Energy
Research Toward Zero Energy Homes
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
MARK DATE DESCRIPTION
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
PROJECT NO: NIST NZERTF
A-PLOT-PLAN-NZERTF
CAD DWG FILE:
CG
DRAWN BY:
CHECKED BY: BP
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
SHEET TITLE:
ROOF FRAMING
PLAN
o
SCALE AS NOTED
A-112
1%"
X
1
V/s
LSL
ENGINEERED
ROOF
RAFTERS
AT
24"
O.C.
WITH
4"
PLYWOOD
SHEATHING
WITH
H-CLIPS
Q
7)
<
O
m
m
O
Q
cr
1
1%"
x
1
V/s"
LSL
ENGINEERED
ROOF
RAFTERS
AT
24'
|
O.C.
WITH
4"
PLYWOOD
SHEATHING
WITH
H-CLIPS
cn
4^
X
2X12
COMMON
RAFTERS
AT
24"
O.C.;
1/2"
PLYWOOD
SHEATHING
WITH
H-CLIPS
2x4
ROOF
TRUSSES
AT
24"
O.C.
W/
USP
RT10
W/
3
8-d
NAILS
EACH
END
ON
EACH
TRUSS;
5/8"
PLYWOOD
SHEATHING
WITH
H-CLIPS
T
1
I
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
1. ROOF PENETRATIONS TO BE LOCATED SO AS
TO AVOID POSSIBILITY OF SHADING
PHOTOVOLTAIC ARRAY.
AT HOUSE, CONTINUOUS FULLY-ADHERED
PEEL AND STICK ROOFING MEMBRANE TO BE
APPLIED SHINGLE STYLE OVER ENTIRE ROOF
INCLUDING OVERHANGS AT EAVES AND
RAKES AND OVER PORCHES AND
BREEZEWAY.
2.
5 6 6.1
2 3 4.1
1 4 7
3. AT HOUSE, CONTINUOUS FULLY-ADHERED
PEEL AND STICK ROOFING MEMBRANE TO BE
EXTENDED MIN. 12" UP PLYWOOD WALL
SHEATHING AT ALL ROOF-WALL
INTERSECTIONS EXCEPT WHERE PORCH OR
BREEZEWAY ROOF MEETS WALL.
32'-0'
2-0' 2'-0" 8-0’
7^ 7^ 7 ~ 7 ~ 7 ~
4. AT HOUSE, ADDITIONAL STRIP OF
FULLY-ADHERED PEEL AND STICK ROOFING
MEMBRANE TO BE APPLIED AT ALL
ROOF-WALL INTERSECTIONS EXTENDING MIN.
12" OVER ROOF MEMBRANE AND 12" UP FACE
OF WALL INSULATING SHEATHING.
F.1 30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
AT GARAGE, CONTINUOUS FULLY-ADHERED
PEEL AND STICK ROOFING MEMBRANCE TO
BE APPLIED TO 4:12 SECTION OF ROOF AND
AT EAVE OF 9.67:12 SLOPE EXTENDING A MIN.
OF 36" FROM THE EXTERIOR WALL TOWARDS
THE RIDGE.
5.
Cl
CONSULTANT:
o
o
SEE A-603 FOR PENETRATION SCHEDULE.
6.
LINE OF CLADDING BELOW
F F
Jr
OSHEETKEYNOTES
LINE OF STUD WALLS BELOW
r n
I
LINE OF CLADDING BELOW
E <D
CD
1
LINE OF STUD WALLS BELOW
O)
CM
CM T” "
CD CM
| R1 R2 o
CJ> o
o 0 CM
L J
CM
PROJECT:
SOIL GAS VENT
PENETRATIONKEY
E.1
NationalInstituteof
StandardsandTechnology
^r PLUMBING STACK VENT
R1. PLUMBING STACK VENT
CM
R2. SOIL GAS VENT
VERTICAL RACK PV PANEL
MOUNTING SYSTEM, TYP
CONDUIT FOR
PV ARRAY
CONDUIT FOR
PV ARRAY
NetZeroEnergy
ResidentialTest
Facility
R3. PV CONDUIT
o
CM CONDUIT FOR
PV ARRAY
CM
CM -
CD D
r
O R3 R3 O R3
CT>
T
C.1 7 ROW x 6 COLUMN PV ARRAY
CD NIST Campus
Gaithersburg, MD
o>
CM
U.S. Department of Energy
Research Toward Zero Energy Homes
CM CM
CD
^r CM
3
CD
L J CD OJ
C ct>
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
CD
ENERGY
I*-
I (D C7)
<75
CM
B
Jr
1
o
LINE OF STUD WALLS iBELOW CM
A A
-V
06/29/10 UPDATED
LINE OF CLADDING BELOW
MARK DATE DESCRIPTION
CM CM
r n
co
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
ID
PROJECT NO: NIST NZERTF
A.1
i "V
A-PLOT-PLAN-NZERTF
CAD DWG FILE:
SOLAR HOT WATER PANELS
CG
DRAWN BY:
1 1
CHECKED BY: BP
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
SHEET TITLE:
ROOFPLAN
ROOFPLAN o
SCALE AS NOTED
1 SCALE: 1/4" = 1’-0"
A-113
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
1. LIMIT THE OVERALL ESTIMATED WASTE FACTOR
ON THE FRAMING ORDER TO 10% OR LESS
2. STRUCTURAL FRAMING CONNECTIONS FOR 2x4
ROOF OVERHANG OUTRIGGERS (TO RESIST
WIND UPLIFT):
(1) #10 x 5" WOOD SCREW THROUGH 2x4 INTO
RAFTER RIM BOARD;
(1) #10 x 5" WOOD SCREW THROUGH 2x4 INTO
RAFTER, 4" FROM END OF 2x4.
STRUCTURAL FRAMING CONNECTIONS FOR
FRONT PORCH ROOF TO RESIST WIND UPLIFT:
5 6 6.1
2 3 4.1
1 4 7
3.
15'-5" 7^
RAFTER LEDGER TO WALL STUDS: (2) %" LAG
SCREWS AT 24" O.C. (MINIMUM PENETRATION
INTO STUD OF 2");
1'-0" 13'-5" r-o’
----;L 7!------------ 7 ~
■V
r-o1
CEILING JOIST LEDGER TO WALL STUDS: (1) %'
LAG SCREW AT 24" O.C. (MINIMUM
PENETRATION INTO STUD OF 2");
2X4 FASCIA NAIL ER
F.1 30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
3.5" x 9.25" LSL 1.3E
BEAM
1-3/4" x 9.25" LSL 1.3E BELOW RAFTER TO LEDGER: USP AC7 ANGLE BRACKET;
1-3/4" x 9.255" LSL. 1.3E BELOW CEILING JOIST TO LEDGER: 4 16d TOE-NAILS OR
USE USP A3 ANGLE BRACKET.
o
CONSULTANT:
STRUCTURAL FRAMING CONNECTIONS FOR
BREEZEWAY:
24'-1 4.
2X12 RAFTERS AT 24" O.C.;
ROOF SHEATHING
WITH H-CLIPS; 2x6 CEILING
JOISTS BELOW AT 24" O.C.
iL
USE TIE STRAP AT EACH RAFTER TO TIE
RAFTERS TO CEILING JOISTS.
22-9'
1'-4" 2X12 LEDGER INSTALLED ON TOP
OF WALL RIGID INSULATION
7'
o 5. STRUCTURAL FRAMING CONNECTIONS FOR
FRONT PORCH AND BREEZEWAY COLUMNS (TO
RESIST WIND UPLIFT):
<j>
L
CM
Zl z
N
F F BEAM TO STRUCTURAL COLUMN AND COLUMN
BASE TO SONOTUBE CONNECTION TO FOLLOW
COLUMN SUPPLIER'S INSTRUCTIONS; UPLIFT
LOAD IS 800 LBS NOMINAL.
-v U t
w ___I J
i
i
2X4 FASCIA NAILER
2X4 OUTLOOK AT 24" O.C. INSTALLED
ON TOP OF ROOF SHEATHING WITHIN
ROOF RIGID INSULATION, TYP.
2X6 FASTENED BACK
--------- — -----------T0-2X8 LEDGER, TYP.
6. STRUCTURAL FRAMING CONNECTIONS FOR
SCREEN PORCH ROOF (TO RESIST WIND UPLIFT
AND FOR BRACING):
/
r i
i
:i 2X LEDGER ON TCP OF
ROOF RIGID INSULATION
FASTEN 2x LEDGER AT SLOPE-CUT ENDS OF
RAFTERS TO WALL STUDS AT 24" O.C. USING (2)
%" LAG SCREWS, TOP AND BOTTOM,
PENETRATING MINIMUM 2-1/2" INTO STUDS
ALONG LENGTH OF LEDGER;
E m L
2X8 LEDGER INSTALLED ON TOP
OF WALL RIGID INSULATION 2X4 FASCIA NAIL ER
A-/
2X4 OUTLOOK
ON TOP OF ROOF SHEATHING WITHIN
ROOF RIGID INSULATION, TYP.
24" O.C. INSTALLED
15'-0"
FASTEN PORCH ROOF SHEATHING TO LEDGER
USING 8d COMMON NAILS AT 3" O.C.
"7 ~
4'-0' 7'-0' 4-0'
7 ~ -7<- -7<- 7 ~
L J
2x FRAMING MEMBERS TO BE FSC-CERTIFIED.
7.
2X4 LEDGER INSTALLED ON TOP
OF ROOF SHEATHING
-v
PROJECT:
(2)1.75" x 9.25 LSL 1.55E BEAM
oo i
m.
H m
E.1 J
-V
NationalInstituteof
StandardsandTechnology
;l i
m 2X4 FASCIA NAIL ER
OSHEETKEYNOTES
CNJ 1 I
uJ
l±l J 2X4 OUTLOOK AT 24" O.C. INSTALLED
ON TOP OF ROOF SHEATHING WITHIN
ROOF RIGID INSULATION, TYP.
—u
o
2X12 RAFTERS AT 24" O.C. ; §" ROOF
SHEATHING WITH H-CLIPS;
2x6 CEILING JOISTS BELOW AT 24" O.C.
1. CONCEALED HANGER SCREWED THROUGH
INSULATION TO BLOCKING IN HOUSE WALL NetZeroEnergy
ResidentialTest
Facility
LO
-V

CNJ
■
2x12 RIDGE
BOARD
(2)1.75" x 9.25 LSL 1.55E BEAM
"1 CM
J
fry n T3 A
ll
O
D
r j-
— L i
m
m
C.1 "V
m
3 m
00
NIST Campus
Gaithersburg, MD
■
STRUCTURAL COLUMN, TYP.
2X4 FASCIA NAILER m
U.S. Department of Energy
Research Toward Zero Energy Homes
m
m CO ■'vf
CD
CNJ
r
c I
J' L T
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
2X4 FASCIA NAILER
S)
2X4 OUTLOOK AT 24" O.C. INSTALLED
ON TOP OF ROOF SHEATHING WITHIN
ROOF RIGID INSULATION, TYP.
2X4 LEDGER INSTALLED ON TOP
OF ROOF SHEATHING
1 r
B
■V
HATCH INDICATES EXTENT OF
MAIN HOUSE FRAMING
CD
II It
r n r i r <N
A A
-V
2X LEDGER ON TOP OF ROOF
RIGID INSULATION
2X10 LEDGER INSTALLED ON TOP
OF WALL RIGID INSULATION
1 -3/4" x 9.25 LSL 1,3E BELOW
STRUCTURAL COLUMN, TYP.
/
<D
1 MARK DATE DESCRIPTION
2X4 FASCIA
NAILER
2XLEDGER ON
TOP OF ROOF
RIGID INSULATIO
2X12 RAFTERS AT 24" O.C. ; §" ROOF SHEATHING WITH H-CLIPS;
2x6 CEILING JOISTS BELOW AT 24" O.C. K ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
CNJ
LD O
CD
(2)1.75" x 9.25 LSL 1.55E BEAM (2)1.75" x 9.25 LSL 1.55E BEAM (2)1.75" x 9.25 LSL 1.55E BEAM l PROJECT NO: NIST NZERTF
z. ii! A.1
-v A-PLOT-PLAN-NZERTF
CAD DWG FILE:
2X4 FASCIA NAILER (2) 1-3/4" x 9.25" L
1.3E BELOW
3L 00
CG
DRAWN BY:
-v -N-
CHECKED BY: BP
, 2'-0'
1'-(» 1/2"
2'-0" ,
1'-6 1/2'
7 ~ V- v-
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
ir-11" 11'-7'
11 ’-7'
7 — v- 7 7 — 7 ~
1-9 1/2'
-9 1/2'
1
SHEET TITLE:
6-8' 1'-4"
7 ~ / y-
LOWERROOF
OVERHANG
FRAMINGPLAN
38-8' 8-0'
7 — 7
I
LOWERROOFOVERHANGFRAMINGPLAN o
SCALE AS NOTED z
1 SCALE: 1/4" = 1'-0"
A-114
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
1. LIMIT THE OVERALL ESTIMATED WASTE FACTOR
ON THE FRAMING ORDER TO 10% OR LESS
2. STRUCTURAL FRAMING CONNECTIONS FOR 2x4
ROOF OVERHANG OUTRIGGERS (TO RESIST
WIND UPLIFT):
(1) #10 x 5" WOOD SCREW THROUGH 2x4 INTO
RAFTER RIM BOARD;
(1) #10 x 5" WOOD SCREW THROUGH 2x4 INTO
RAFTER, 4" FROM END OF 2x4.
2x FRAMING MEMBERS TO BE FSC-CERTIFIED.
5 6 6.1
2 3 4.1
1 4 7
3.
F.1
f" 30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
CONSULTANT:
34-8'
1-4" , 2-0 28’-0’ ■ 2-0" r-4"
7^ 7^ 7 “
“V
LO
CM
Irtt

CM
F F
-V
OSHEETKEYNOTES
ii—
i
o o
CM CM
-V
r n
i
r i
E
f
*
L J
L
PROJECT:
E.1 in n
NationalInstituteof
StandardsandTechnology
r-: v;
X i
.J,
pi
CO CM
CO
NetZeroEnergy
ResidentialTest
Facility
CO -T]-
CM CO
CO
CO
D
I
jj-
C.1
NIST Campus
Gaithersburg, MD
4f
U.S. Department of Energy
Research Toward Zero Energy Homes
-j|
•*r
&
2X4 FASCIA NAILER, TYP.
c I_ 2X4 OUTLOOK AT 24" O.C. INSTALLED
ON TOP OF ROOF SHEATHING WITHIN
ROOF RIGID INSULATION, TYP.
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
■M-
2X4 INSTALLED ON TOP
OF ROOF SHEATHING, TYP.
r,J
±
-zs
i
HATCH INDICATES EXTENT OF
MAIN HOUSE FRAMING
B
t
I
O O
I I
CM CM
I
A A
-V -V
I
U
CM CM
MARK DATE DESCRIPTION
■v ■V ■V ■V
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
1’-4" 2-0 28’-0' 2’-0" 1’-4"
-7^-
7
34-8' PROJECT NO: NIST NZERTF
A.1 A-PLOT-PLAN-NZERTF
CAD DWG FILE:
CG
DRAWN BY:
CHECKED BY: BP
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
SHEET TITLE:
UPPERROOF
OVERHANG
FRAMINGPLAN
i
UPPERROOFOVERHANGFRAMINGPLAN o
SCALE AS NOTED z
1 SCALE: 1/4" = 1'-0"
A-115
FIRSTFLOORREFLECTEDCEILINGPLAN
SCALE: 1/4"= 1'-0 ii
r
-i
i HT
i EQ. EQ.
O -7
+ CO
LU ■7 ■
I -V CM
CM
,S4
0
LU
2'-8
11
0
0 LU
LU
IEI -v
EQ. EQ.
a
LU
2'-0' 2'-0'
:S4 -v
7L 7^ 7L
■^7
EQ. EQ. CO
-p -
CM
SLOPED
CEILING
CO
I
O
a LU
R4;
LU
r-6 1/2"
7 ^
a
LU
I I I 7,
EQ. EQ.
O -7
0
ACCESS -
ATTIC PULL
DOWN STAIR
LU
LU
EQ.
EQ.
MR4
+
~A
a o
2-0 M2'K LU U
iV
I I II UJ
!r
1'-1 3/4’ 1'-1 3/4’ --
3'-6 1/4'
CM
4-4" 1
CM LO
O
1/2
M
CO
f
a 0
CO
CO
LU LU
Kl
EQ. EQ. EQ. EQ.
7L 7L
"7
-v
-v -v
EQ. EQ.
7L - ^
“7
5> CM
a o
(J)
LU LU
CD
I__
SECONDFLOORREFLECTEDCEILINGPLAN
SCALE: 1/4" = 1'-0"
SLOPED
CEILING
10 1/2
11
CM
CM
CO
o I
CM
CO
;R3
5-11 1/4’
11-1
M
5-11 1/4’
10 1/2"
CM
CM
O
CO
I
I
CO
CM
■r
’c
&-8" A.F.F. 7’-6" A.F.F.
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
1. CEILING ELEMENTS SHOWN FOR LOCATION
ONLY; SEE E-001 FOR LIGHT FIXTURE
SCHEDULE; SEE M-001 FOR DUCTWORK
LEGEND. REFER TO MECHANICAL AND
ELECTRICAL DRAWINGS FOR FIXTURE AND
GRILLE SPECIFICATIONS.
2. ALL CEILING HEIGHTS AT 9’-0" A.F.F., UNLESS
OTHERWISE NOTED.
3. SEE SPRINKLER PLAN FOR SPRINKLER HEAD
LOCATIONS.
DIMENSIONS ARE TO FACE OF STUD AND
CENTER OF CEILING ELEMENT.
4.
SITE-BUILT ACCESS PANELS FIT WITHIN
FRAMING MEMBERS ABOVE. SEE FRAMING
PLANS FOR SIZE AND LOCATION. APPLY
1-1/2" x %" FLAT TRIM AROUND EDGE OF
PANEL. PANEL TO BE FASTENED AND
REMOVABLE FROM BELOW WITHOUT
REMOVING THE TRIM. PANEL FINISH TO
MATCH CEILING FINISH. SEE 7/A-508.
5.
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
CROWN MOULDING EXTENDS 5" FROM GWB,
SEE INTERIOR ELEVATIONS FOR EXTENT OF
CROWN MOULDING.
6.
CONSULTANT:
r n
L j
PROJECT:
NationalInstituteof
StandardsandTechnology
NetZeroEnergy
Residential Test
Facility
NIST Campus
Gaithersburg, MD
MSS
U.S. Department of Energy
Research Toward Zero Energy Homes
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
MARK DATE DESCRIPTION
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
PROJECT NO: NIST NZERTF
A-PLOT-PLAN-NZERTF
CAD DWG FILE:
CG
DRAWN BY:
CHECKED BY: BP
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
SHEET TITLE:
FIRST&SECOND
FLOORREFLECTED
CEILINGPLANS
o
SCALE AS NOTED
A-121
T
EQ.
EQ.
„6-,8
O
e
o
m
m
*
~o
-Y-
3-0
1/2"
3-0
1/2"
o
CD
TO
TO
o
o
m
m
4^
4^
o
o
¥-
EQ.
EQ.
CO
CO
4.
4-
ACCESS
PANEL
□
7'-6"
A.F.F.
IM)
00
CM
CM
CM
EQ.
EQ.
4.
CM
D
*
A
an
-4-
o
EQ.
EQ.
4
CO
TO
m
CM
TO
CM
ro
ro
TO
TO
TO
ACCESS
PANEL
o
^7
CM
o
m
co
r
“F
7'-9"
A.F.F.
CN
TO
I
I
+
CO
¥■
3'-2'
4'-3"
4'-4
1/2"
o
2'-7
3/4"
1
CO
CO
CM
I'D
•v
-v
CM
U
*
CO
O
CO
CO
■
'Jr

CO
LO
m
CM
CM
o
CM
CM
CM
CM
4
CH
TO
m
CO
Ob
o
CO
GO
4
II
6'-8"
A.F.F.
II
0
m
CO
4^
LO
-Y
EQ.
EQ.
-V
TO
EQ.
EQ.
-4
4
LL
EQ.
0
EQ.
0
EQ.
,
EQ.
ACCESS
PANEL
LL
m
m
-Y
<
4^
4-4'
TO
00
CO
CO
0
-4
-4
4-
,.t7/e
l
-
z
m
CM
n
4,
4,
J
L
-----------
1
GENERALSHEETNOTES
B D F
A.1 A
BUILDINGSCIENCE
CORPORATION
1. FIRST FLOOR SOFFITS AND SECOND FLOOR
SOFFITS TO ALIGN AROUND PERIMETER OF
HOUSE.
SEE A-601 FOR WINDOW SCHEDULE.
2.
3. SEE A-603 FOR PENETRATION SCHEDULE.
1 SIDING TO BE PAINTED P-12.
4.
A-304
ALL TRIM AND SOFFITS TO BE PAINTED P-13.
5.
SOIL GAS
VENT
12 ALL DOORS TO BE PAINTED P-14.
6.
12
©
©
4

CEILINGS OF PORCHES AND BREEZEWAY TO
BE PAINTED P-15.
7.
4
R2
FRONT PORCH AND BREEZEWAY COLUMNS
TO BE PAINTED P-13.
8.
©
12 12 9. EL. +0'-0" IN THE ARCHITECTURAL DRAWINGS
CORRESPONDS TO 461.30' IN THE SITE/CIVIL
DRAWINGS.
9.67 9.67
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
IF THE HIGH VELOCITY HVAC OPTION IS NOT
AWARDED, THE PENETRATION FOR THE
CONNECTION WILL NOT BE PROVIDED.
10.
4 B.O. CEILING JOISTS ALIGN
EL. +19-7 1/4ii
<£>
2k 2k 2k
OSHEETKEYNOTES
2
©
D
© CONSULTANT:
1. ASPHALT ROOF SHINGLES
(*>
B 2. 1" x 8f" FRIEZE BOARD TRIM MOULDING
f x 8 TRIM WITH 3" CROWN MOULDING
1" X 85" TRIM
FIBER CEMENT SIDING, 4" EXPOSURE
2x2 TRIM
12
12
22 12 3.
9.67
12 9.67 4
4 4.
12
4 5.
$
T.O. SECOND FLOOR SUBFLOOR
EL. +10-6 1/411
6.
ALIGN
f x 10 TRIM
1" x 4 5" WINDOW TRIM
BUILT-UP WINDOW CROWN
1" x 6" DOOR TRIM
7.
©
$
B.O. FLOOR JOISTS 2k
±k 2k 2k.
EL. +9'-3 3/811
8.
24
© 9.
F F r n
23 10.
28
BUILT-UP DOOR CROWN
5/4 x 8 TRIM
f x 6 RAKE EDGE TRIM WITH 3" CROWN
MOULDING
11.
I
CONDUIT FOR FUTURE GAS
FURNACE SUPPLY/EXHAUST 12.
A A
13.
© E3
U E3 □ E3 □ E3
E4
1" x 81" BEAM TRIM
EGRESS WINDOW WELL AND LADDER
©© 14.
T.O. FIRST FLOOR SUBFLOOR F'0 F9
F4 F10 E11 E11
15.
$
Or
EL. +0-2 3/8
II
L J
CONNECTION FOR
FUTURE MULTISPLIT
OUTDOOR UNIT 1'5
T.O. FOUNDATION WALL r 16. STONE VENEER AT GARAGE FOUNDATION WALL
/
CONDUIT SUMP
PUMP OUTLET r 29
EL. +0-0 PROJECT:
17. CONCRETE DECK
CONNECTION
FOR FUTURE
AIR-TO-AIR
OUTDOOR UNIT
CONNECTION
FOR CENTRAL
AIR-TO-AIR
OUTDOOR UNIT
© 18. CONCRETE WALL WITH STONE VENEER EDGES
CONNECTION FOR FUTURE
HIGH VELOCITY HVAC
AIR-TO-AIR OUTDOOR UNIT
(SEE GENERAL SHEET
NOTE #10)
JHI
Jt
NationalInstituteof
StandardsandTechnology
19. LOAD-BEARING COLUMN
B 20. EXTERIOR LANTERN
21. PV ARRAY
J'L
NetZeroEnergy
ResidentialTest
Facility
22. SOLAR COLLECTOR (HOT WATER SYSTEM)
23. SCREEN PANEL
l_ J
RIGHTSIDE(EAST)ELEVATION
2 SCALE: 1/4" = 1'-0" 24. PREFABRICATED PILASTER
25. FIBER CEMENT PANEL
5
1 2 3 6
4 7
26. FIBER CEMENT TRIM
NIST Campus
Gaithersburg, MD
27. 2" SILL
28. KICK-OUT FLASHING
29. ALUMINUM COIL STOCK COVERING
1 2 1 1 1
U.S. Department of Energy
Research Toward Zero Energy Homes
A-305 A-305 A-303 A-302 A-301
OWINDOWKEY
A. 3-0" x 5'-5" DH
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
3'-2^" x 5-2" DH
B.
© c. 2'-1" x 3'-7" DH
© D. 2'-8" x 2'-3" AWN
E. 2'-3" x 4'-0" DH
© B.O. CEILING JOISTS 3'-4" x 2'-3" AWN
F.
EL. +19-7 1/4II
08/03/10 UPDATED
G. 3'-4" x 2'-7" AWN
8
2 07/27/10 UPDATED
06/29/10 UPDATED
© PENETRATIONKEY
©
©
©
MARK DATE DESCRIPTION
© ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
B B B B B E1. COLLECTOR PANEL CONDUIT
EXTERIOR LANTERN
E2.
PROJECT NO: NIST NZERTF
© E3. WEATHER PROTECTED OUTLET A-PLOT-ELEV-NZERTF
CAD DWG FILE:
T.O. SECOND FLOOR SUBFLOOR CG
DRAWN BY:
E1 E1 E4. CONDUIT FOR FUTURE GAS FURNACE
EL. +10-6 1/411
©
CHECKED BY: BP
E5. DRYER VENT
* B.O. FLOOR JOISTS COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
E6. RANGE HOOD VENT
EL. +9'-3 3/811
© HRV EXHAUST
E7. SHEET TITLE:
<•>
A A E8. HRV INLET
E2 E2
□□□□ □□□□
□□□□ EXTERIOR
ELEVATIONS
<Z> E9. INSTRUMENTATION CONDUIT
E2 E2 A A A A A
19
29
E10. CONDUIT FOR FUTURE GAS WATER HEATER
©
A
/ E11. FUTURE MULTI-SPLIT OUTDOOR UNIT
CONNECTION
T.O. FIRST FLOOR SUBFLOOR ^
16
EL. +0-2 3/8
=«^=
I E12. HOSE BIBB
OUNDAT ON WALL
CONDUIT FOR COLLECTOR PANEL THROUGH
WALL AT RIM JOIST UNDER FRONT PORCH
ROOF
I
L. +0'-0 F4. SUMP PUMP OUTLET o
SCALE AS NOTED z
r
■ !
F9. AIR-TO-AIR OUTDOOR UNIT CONNECTION
O. GARAGE SLAB (LOWEST PT) A,
EL. -2'-4" (458.3T)
T.
F10. FUTURE AIR-TO-AIR OUTDOOR UNIT
CONNECTION
A-201
FRONT(SOUTH)ELEVATION
1 R1. PLUMBING STACK VENT
SCALE: 1/4" = 1'-0"
R2. SOIL GAS VENT
GENERALSHEETNOTES
F D B
E C A A.1
BUILDINGSCIENCE
CORPORATION
1. FIRST FLOOR SOFFITS AND SECOND FLOOR
SOFFITS TO ALIGN AROUND PERIMETER OF
HOUSE.
I SEE A-601 FOR WINDOW SCHEDULE.
2.
3. SEE A-603 FOR PENETRATION SCHEDULE.
1 SIDING TO BE PAINTED P-12.
4.
A-304
ALL TRIM AND SOFFITS TO BE PAINTED P-13.
5.
PLUMBING
STACK VENT
ALL DOORS TO BE PAINTED P-14.
6.
I 12
4 12 CEILINGS OF PORCHES AND BREEZEWAY TO
BE PAINTED P-15.
7.
4
R1
© FRONT PORCH AND BREEZEWAY COLUMNS
TO BE PAINTED P-13.
8.
12 12 9. EL. +0'-0" IN THE ARCHITECTURAL DRAWINGS
CORRESPONDS TO 461.30' IN THE SITE/CIVIL
DRAWINGS.
13
9.67 9.67
12 30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
<E>
4 B.O. CEILING JOISTS
OSHEETKEYNOTES
ALIGN
EL. +19-7 1/4n
©
©
± 2
1. ASPHALT ROOF SHINGLES
D
© CONSULTANT:
1" x 8f" FRIEZE BOARD TRIM MOULDING
f x 8 TRIM WITH 3" CROWN MOULDING
1" X 85" TRIM
FIBER CEMENT SIDING, 4" EXPOSURE
2x2 TRIM
f x 10 TRIM
1"x4 WINDOW TRIM
BUILT-UP WINDOW CROWN
1" x 6" DOOR TRIM
BUILT-UP DOOR CROWN
5/4 x 8 TRIM
2.
© © 3.
A 4.
© 12 22
I 5.
4
12
23 6.
4
HRV
4 T.O. SECOND FLOOR SUBFLOOR 7.
INLET
E9
EL. +10-6 1/4" □ 8.
O
ALIGN
E8
± 9.
4 B.O. FLOOR JOISTS ^lz
EL. +9-3 3/8" 10.
:
© 11.
r n
© 12.
27 E2
© f x 6 RAKE EDGE TRIM WITH 3" CROWN
MOULDING
1" x 81" BEAM TRIM
EGRESS WINDOW WELL AND LADDER
STONE VENEER AT GARAGE FOUNDATION WALL
13.
25
A
28
©© 14.
E3
E3 19
15.
o □
© 16.
4 T.O. FIRST FLOOR SUBFLOOR
17. CONCRETE DECK
EL. +0-2 3/8" tr
L J
CONCRETE WALL WITH STONE VENEER EDGES
T.O. FOUNDATION WALL 18.
©
EL. +0-011
PROJECT:
19. LOAD-BEARING COLUMN
□
CONDUIT FOR INSTRUMENTATION
THROUGH WALL AT RIM JOIST
UNDER BREEZEWAY ROOF
20. EXTERIOR LANTERN
NationalInstituteof
StandardsandTechnology
4 T.O. GARAGE SLAB (LOWEST PT)
EL. -2'-4" 21. PV ARRAY
22. SOLAR COLLECTOR (HOT WATER SYSTEM)
23. SCREEN PANEL
NetZeroEnergy
Residential Test
Facility
LEFTSIDE(WEST)ELEVATION 24. PREFABRICATED PILASTER
2 25. FIBER CEMENT PANEL
SCALE: 1/4" = 1'-0"
26. FIBER CEMENT TRIM
5
6 4 3 2 1
7 27. 2" SILL
28. KICK-OUT FLASHING
NIST Campus
Gaithersburg, MD
29. ALUMINUM COIL STOCK COVERING
I I I
1 1 1 3 1
A-301 A-302 A-303 A-305 A-305
U.S. Department of Energy
Research Toward Zero Energy Homes
oWINDOWKEY
I I I
R2 R1 A. 3-0" x 5'-5" DH
SOIL GAS
VENT 3'-25" x 5'-2" DH
B.
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
© ENERGY
c. 2'-1" x 3'-7" DH
PLUMBING
STACK VENT
© 2'-8" x 2'-3" AWN
D.
I I I
I
© E. 2'-3" x 4'-0" DH
F. 3-4" x 2'-3" AWN
4 B.O. CEILING JOISTS
EL. +19-7 1/411
G. 3-4" x 2'-7" AWN
©
I I I 08/03/10 UPDATED
cm rm <*>
<D 07/27/10 UPDATED
□m □m
G G
PENETRATIONKEY 06/29/10 UPDATED
E E
MARK DATE DESCRIPTION
© COLLECTOR PANEL CONDUIT
E1.
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
I I I E2. EXTERIOR LANTERN
PROJECT NO: NIST NZERTF
E3. WEATHER PROTECTED OUTLET
DRYER VENT RANGE HOOD HRV EXHAUST
IN SOFFIT — VENT IN SOFFIT " IN SOFFIT
4 T.O. SECOND FLOOR SUBFLOOR A-PLOT-ELEV-NZERTF
CAD DWG FILE:
CONDUIT FOR FUTURE GAS FURNACE
E4.
EL. +10-6 1/4" CG
a hi DRAWN BY:
t±
m
3 E5. DRYER VENT
XL n xu f CHECKED BY: BP
4 B.O. FLOOR JOISTS E6
E5 E7
E6. RANGE HOOD VENT
EL. +9-3 3/8"
© COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
an □m E7. HRV EXHAUST
©
rn nnn SHEET TITLE:
© E8. HRV INLET
E2 E2
C C
19
E E
© E9. INSTRUMENTATION CONDUIT
EXTERIOR
ELEVATIONS
A
27
© E10. CONDUIT FOR FUTURE GAS WATER HEATER
A A
E3
ZL
?| E12
O E10 E11. FUTURE MULTI-SPLIT OUTDOOR UNIT
CONNECTION
E3
4 T.O. FIRST FLOOR SUBFLOOR
©© E3 O
EL. +0-2 3/8"
I I
T E12. HOSE BIBB
4 T.O. FOUNDATION WALL L.
EL. +0-0M
o()o F4. SUMP PUMP OUTLET
I
29 cr
HOSE O
SCALE AS NOTED
AIR-TO-AIR OUTDOOR UNIT CONNECTION
F9. z
CONDUIT FOR FUTURE GAS WATER
HEATER SUPPLY/EXHAUST
BIBB
4 T.O. GARAGE SLAB (LOWEST PT)
FUTURE AIR-TO-AIR OUTDOOR UNIT
CONNECTION
F10.
EL. -2'-411
A-202
REAR(NORTH)ELEVATION R1. PLUMBING STACK VENT
SCALE: 1/4" = 1'-0" R2. SOIL GAS VENT
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
1. FIRST FLOOR SOFFITS AND SECOND FLOOR
SOFFITS TO ALIGN AROUND PERIMETER OF
HOUSE.
SEE A-601 FOR WINDOW SCHEDULE.
2.
3. SEE A-603 FOR PENETRATION SCHEDULE.
SIDING TO BE PAINTED P-12.
4.
ALL TRIM AND SOFFITS TO BE PAINTED P-13.
5.
E C
ALL DOORS TO BE PAINTED P-14.
6.
CEILINGS OF PORCHES AND BREEZEWAY TO
BE PAINTED P-15.
7.
I FRONT PORCH AND BREEZEWAY COLUMNS
TO BE PAINTED P-13.
8.
9. EL. +0'-0" IN THE ARCHITECTURAL DRAWINGS
CORRESPONDS TO 461.30' IN THE SITE/CIVIL
DRAWINGS.
T.O. GARAGE ROOF RIDGE
EL. +18-10 30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
12
I 9.67
OSHEETKEYNOTES
12
1. ASPHALT ROOF SHINGLES
9.67
CONSULTANT:
1" x 8f" FRIEZE BOARD TRIM MOULDING
f x 8 TRIM WITH 3" CROWN MOULDING
1" X 85" TRIM
FIBER CEMENT SIDING, 4" EXPOSURE
2x2 TRIM
f x 10 TRIM
1"x4 WINDOW TRIM
BUILT-UP WINDOW CROWN
1" x 6" DOOR TRIM
BUILT-UP DOOR CROWN
5/4 x 8 TRIM
2.
I
3.
12
13
4 4.
<2> 5.
B.O. CEILING JOISTS 6.
<£>
4
EL. +8-11 4 7.
8.
<4
4) 9.
A <±>
□□□□
□□□□
□□□□ □□□□
□□□
10.
4) 11.
E2 E2 r n
<Z> 12.
f x 6 RAKE EDGE TRIM WITH 3" CROWN
MOULDING
1" x 81" BEAM TRIM
EGRESS WINDOW WELL AND LADDER
STONE VENEER AT GARAGE FOUNDATION WALL
13.
T.O. HOUSE FOUNDATION WALL
EL. +0-0
14.
f
GARAGE FOUNDATION WALlX 15.
T.O. ;■
EL. -0'-5’ 16.
i-
17. CONCRETE DECK L J
4 GRADE AND T.O. GARAGE SLAB LOWEST POINT
CONCRETE WALL WITH STONE VENEER EDGES
18.
EL. -2'-4
PROJECT:
19. LOAD-BEARING COLUMN
*
T.O. GARAGE FOOTING
EL. -4-0 20. EXTERIOR LANTERN
NationalInstituteof
StandardsandTechnology
21. PV ARRAY
22. SOLAR COLLECTOR (HOT WATER SYSTEM)
23. SCREEN PANEL
NetZeroEnergy
Residential Test
Facility
LEFTSIDE(WEST)GARAGEELEVATION 24. PREFABRICATED PILASTER
2 25. FIBER CEMENT PANEL
SCALE: 1/4"= 1'-0"
26. FIBER CEMENT TRIM
27. 2" SILL
28. KICK-OUT FLASHING
NIST Campus
Gaithersburg, MD
29. ALUMINUM COIL STOCK COVERING
U.S. Department of Energy
Research Toward Zero Energy Homes
C E
oWINDOWKEY
A. 3-0" x 5-5" DH
I
3-24" x 5'-2" DH
B.
U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
c. 2'-1" x 3'-7" DH
$
T.O. GARAGE ROOF RIDGE
2'-8" x 2'-3" AWN
EL. +18-10 D.
12
I E. 2'-3" x 4'-0" DH
9.67
F. 3-4" x 2'-3" AWN
12
G. 3-4" x 2'-7" AWN
9.67
<£>
08/03/10 UPDATED
I 07/27/10 UPDATED
12 06/29/10 UPDATED
13
PENETRATIONKEY
4
MARK DATE DESCRIPTION
E9 12
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
E1. COLLECTOR PANEL CONDUIT
B.O. CEILING JOISTS
<4
EL. +8-11 E2. EXTERIOR LANTERN
<£>
<s> PROJECT NO: NIST NZERTF
E3. WEATHER PROTECTED OUTLET
A-PLOT-ELEV-NZERTF
CAD DWG FILE:
20
E4. CONDUIT FOR FUTURE GAS FURNACE CG
DRAWN BY:
4)
E2
CHECKED BY: BP
E5. DRYER VENT
4)
1
<=> COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
E6. RANGE HOOD VENT
<z> E7. HRV EXHAUST
SHEET TITLE:
T.O. HOUSE FOUNDATION WALL
E8. HRV INLET
EL. +0-0
EXTERIOR
ELEVATIONS
E9. INSTRUMENTATION CONDUIT
—
*
T.O. GARAGE FOUNDATION WALL
E10. CONDUIT FOR FUTURE GAS WATER HEATER
EL. -0'-5
CONDUIT FOR INSTRUMENTATION
THROUGH WALL AT RIM JOIST
UNDER BREEZEWAY ROOF
E11. FUTURE MULTI-SPLIT OUTDOOR UNIT
CONNECTION
4 GRADE AND T.O. GARAGE SLAB LOWEST POINT
EL. -2'-4
E12. HOSE BIBB
T.O. GARAGE FOOTING
EL. -4'-0 F4. SUMP PUMP OUTLET
O
SCALE AS NOTED
F9. AIR-TO-AIR OUTDOOR UNIT CONNECTION
F10. FUTURE AIR-TO-AIR OUTDOOR UNIT
CONNECTION
A-203
RIGHTSIDE(EAST)GARAGEELEVATION R1. PLUMBING STACK VENT
SCALE: 1/4"= 1'-0"
R2. SOIL GAS VENT
K3
O o
W363a
00 □
©
©
7
©
©
2
zx
o o
o o
K2
2 5" FILLER B18 SB36 24" DISHWASHER B18 3" FILLER
KITCHENELEVATION
SCALE: 1/2"= 1'-0 ii
10'-7 1/4"
3" FILLER
f" END PANEL
3’ FILLER
f" END PANEL
W3615
3 7
13-5'
7L
W3615 (2) (31" DEEP) W2415 W2115
7 7
K5
3n
END
4
PANEL
7
oI
CT>
O
1
CO
^-----V
CD
W2433 -W2433-
W2133 W2133
D
© ©©
©©
©
© ©
LU CO
O
o o
3n
3" FILLER REF
(2" FILLER
ABOVE)
END B24
PANEL
B21 30" BUILT-IN OVEN
WITH COOKTOP
B21 3" FILLER
4
KITCHENELEVATION
W2415 31 FILLER
^—v
X
CD
7
0
O)
-V
o
o
o
W2115
i r
x
7
0
o
J L
SCALE: 1/2" = 1'-0"
3-6
X
5-11"
7L
1 5-10'
7^
K7
Pf
"zur
BUILT-IN
MICROWAVE [I
O
□
END PANEL B18 B3012 (24" DEEP) B18 3 j FILLER
ISLANDELEVATION
SCALE: 1/2" = 1'-0’
RANGE HOOD
WITH VENT
O O o
13
o
EQ. EQ. I
7 CM
BATH#1ELEVATION BATH#1ELEVATION BATH#1ELEVATION BATH#1ELEVATION
SCALE: 1/2" = 1'-0’ SCALE: 1/2"= 1'-0' SCALE: 1/2"= 1'-0" SCALE: 1/2"= 1'-0"
1'-0" 8-0 11
9-5 3-6 5-0
^—v "v
V
®—^ 7® x
CD
1
V —r
G7 G7 00
CD
^------V -V
5 1/2m
EQ. EQ.
-7 — 7- 7 —
5'-0"
7— 7—
EH*
r-6" 3-5" 1
7— 7^ 7^
□M
o o
(G13) G3 G3
1 1
CD CD
5-11 11
©
0
©
I
CD
1
5-10" 111
6"
i"- 7^
’t
1 1 1 1 "v -v
7 7 o o o o
/
EQ. EQ.
I
o o o
831 @©
©©
1 1
K2
co CO CO
K3
3E
f
©
3 j" FILLER
B30 (15" DEEP)
3" FILLER 3" FILLER
z—v -z—v ■V
B30 (15" DEEP) f" END PANEL END PANEL
4 3/8"
<L
<k
OPENINGELEVATION HALFWALLELEVATION ISLANDELEVATION ISLANDELEVATION
SCALE: 1/2"= 1'-0 SCALE: 1/2" = 1'-0’ SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0"
11
AIR
7 7 7
7 7 1
00
7
RETURN O O o o
TT
o o
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
1. ALL TROPICAL WOOD, IF USED, MUST BE
FSC-CERTIFIED.
2. SEE A-602 FOR FINISH SCHEDULE.
ALIGN SWITCH AND RECEPTACLE PLATES WITH
TOP OF TILE IN KITCHENS AND BATHROOMS.
3.
OSHEETKEYNOTES
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
GENERAL:
G1. CROWN MOULDING
G2. BASE MOULDING
G3. PAINTED WALL
CONSULTANT:
G4. WINDOW HEAD TRIM
G5. 1x4 WINDOW JAMB TRIM
G6. WINDOWSILL TRIM
G7. CASED OPENING HEAD TRIM
G8. 1x6 CASED OPENING JAMB TRIM
G9. CASED OPENING BASE TRIM
G10. DOOR HEAD TRIM
G11. 1x4 DOOR JAMB TRIM
G12. INTERIOR DOOR
G13. BUILT-UP COLUMN
G14. COLUMN BASE TRIM r n
G15. WOOD PANEL
G16. WOOD CAP
G17. MANTLE
G18. MANTLE TRIM
G19. BASE CABINET
G20. WOOD SHELF
G21. 1 "x4" DOOR HEAD TRIM L J
BATH: PROJECT:
B1. TILE
NationalInstituteof
StandardsandTechnology
B2. HAND HELD SHOWER
B3. SHOWER SEAT
GRAB BAR
B4.
TOWEL BAR
B5.
NetZeroEnergy
Residential Test
Facility
TOWEL RING
B6.
B7. TOILET PAPER HOLDER
B8. MIRROR
FRAMELESS MIRROR
B9.
B10. ACCESSIBLE LAVATORY
NIST Campus
Gaithersburg, MD
B11. ACCESSIBLE TOILET
B12. TOILET
B13. BATHTUB
B14. VANITY BASE CABINET
U.S. Department of Energy
Research Toward Zero Energy Homes
B15. SOLID SURFACE BACKSPLASH
B16. SOLID SURFACE COUNTERTOP
B17. FRAMELESS GLASS SHOWER DOOR, TEMPERED
B18. SOLID SURFACE BATHTUB DECK
B19. 6" DEEP NICHE U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
ENERGY
KITCHEN:
K1. WALL CABINET
K2. BASE CABINET
K3. END PANEL
K4. SUPPORT BRACKET
K5. RANGE HOOD EXHAUST DUCT
K6. TILE BACKSPLASH
K7. SOLID SURFACE BACKSPLASH
K8. SOLID SURFACE COUNTERTOP
MARK DATE DESCRIPTION
STAIR:
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
S1. WOOD HANDRAIL
S2. WOOD BALUSTER
PROJECT NO: NIST NZERTF
S3. WOOD TREAD
A-PLOT-ELEV-NZERTF
CAD DWG FILE:
S4. WOOD TRIM
KG, HW
DRAWN BY:
S5. WOOD STRINGER
CHECKED BY: BP
S6. WOOD POST
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
SCREEN PORCH:
P1. EXTERIOR WATER TABLE SHEET TITLE:
P2. PORCH DOOR
INTERIOR
ELEVATIONS
P3. EXTERIOR FIBER CEMENT LAP SIDING
% x 6 DOOR TRIM
% TRIM BOARD
3" CROWN
P4.
P5.
P6.
P7. 5 1/2" BASE
P8. FIBER CEMENT PANEL BOARD
P9. %" WALL CAP
P10. SCREEN PANEL
I
oc
o
SCALE AS NOTED z
P11. SCREEN DOOR
P12. 3 1/2" TRIM
A-204
P13. 10" TRIM BOARD W/ INSET PANEL
P14. 21/2" BEADBOARD
P15. TRIM BOARD
„0-,6
m
r-6'
3-0"
<
Q.
Q
^
ALIGN
PLATE
WITH
T.O.
TILE;
ALIGN
PLATE
WITH
T.O.
TILE
-Nco
3-0"
ALIGN
PLATE
WITH
T
O
O
o
I
m]
9'-O'
7
,o-z
7
7
6'-9"
ALIGN
PLATE
WITH
T.O.
TILE
3'-4'
7
3'-0'
2'-10"
w
M.
ot
p
*
ut
M.
7
7
(U>
2'-3'
@0
00
CM
A
R
7
7
7
KJ
H
r-6"
LO
H
00
S
IM
7
r-6"
<
cy
co
CM
OO
1
f
CM
CO
II
CD
4^
CO
O
cd
CD
CO
DO
m
00
,0-6
7
,o-z
M
a
A-
CO
-1^
LO
CO
CM
o
CD
CD
1
I
DO
CD
CD
DO
7
7
9-0'
7
7
3-0'
M
4
CD
<8Hk
o
CM
o
CM
I
z]
t=
i=
CM
1=1
r
CD
14
CO
CM
LO
CD
CD
CD
m
7
7
9-0'
7
7
,o-z
7
3'-6"
3'-0"
w
w
CD
p
Y7
’la
14
CO
CN
O
a
CD
co
m
tr
GENERALSHEETNOTES
BUILDINGSCIENCE
CORPORATION
1. ALL TROPICAL WOOD, IF USED, MUST BE
FSC-CERTIFIED.
20'-0" 15'-6"
7^- 7^- 7^-
2. SEE A-602 FOR FINISH SCHEDULE.
8-0" 12'-0' 4'-10" 5'-10' 4'-10"
7^- 7^ 7^ 7^ 7^ 7^ 7L
ALIGN SWITCH AND RECEPTACLE PLATES WITH
TOP OF TILE IN KITCHENS AND BATHROOMS.
3.
Z------ V
m
z
o
55" FLAT
SCREEN TV
G5 G5 -=f
OSHEETKEYNOTES
Tl T
WALL
SCONCE
WALL
SCONCE
0 -V
30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
G6
CD
G3
h-
GENERAL:
o o
G3
CT> CD
G1. CROWN MOULDING
■v
[ ]
G2. BASE MOULDING
CN
G1 G3. PAINTED WALL
CONSULTANT:
v =
-2 CD
G4. WINDOW HEAD TRIM
G16 CD
G5. 1x4 WINDOW JAMB TRIM
O O o o o o o o o o o
G6. WINDOWSILL TRIM

o
©
^7
©)
G7. CASED OPENING HEAD TRIM
CO
(G19)
G8. 1x6 CASED OPENING JAMB TRIM
(G1 CD
G9. CASED OPENING BASE TRIM
mi mi
-v ■v
©0
^--------"s------V m------------------- V G10. DOOR HEAD TRIM
2 1/8"
2 1/8"
G11. 1x4 DOOR JAMB TRIM
LIVINGROOMELEVATION LIVINGROOMELEVATION G12. INTERIOR DOOR
G13. BUILT-UP COLUMN
SCALE: 1/2" = 1’-0' SCALE: 1/2" = 1'-0’
G14. COLUMN BASE TRIM r n
G15. WOOD PANEL
G16. WOOD CAP
G17. MANTLE
G18. MANTLE TRIM
12'-5"
7^ ~? ~
9-10' G19. BASE CABINET
7 ~
G20. WOOD SHELF
Z------ V Z------ V
P6 G21. 1 "x4" DOOR HEAD TRIM
P6 L J
CM CM
P5
)
BATH:
t } PROJECT:
T B1. TILE
P8 CEILING
FAN/LIGHT NationalInstituteof
StandardsandTechnology
B2. HAND HELD SHOWER
B3. SHOWER SEAT
GRAB BAR
B4.
P13 TOWEL BAR
B5.
NetZeroEnergy
ResidentialTest
Facility
CO
TOWEL RING
B6.
LO
B7. TOILET PAPER HOLDER
P1
B8. MIRROR
o o
7 7 CO 05 CT>
G1 PH FRAMELESS MIRROR
B9.
o
P2 CD
B10. ACCESSIBLE LAVATORY
P10
NIST Campus
Gaithersburg, MD
B11. ACCESSIBLE TOILET
7
^7
B12. TOILET
mi
TT B13. BATHTUB
-v
T7
WALL
SCONCE u 'sE
P15 B14. VANITY BASE CABINET
U.S. Department of Energy
Research Toward Zero Energy Homes
"sE ^E CO
CO CO CO
B15. SOLID SURFACE BACKSPLASH
CN
CN CN
© B16. SOLID SURFACE COUNTERTOP
P7
B17. FRAMELESS GLASS SHOWER DOOR, TEMPERED
B18. SOLID SURFACE BATHTUB DECK
Z--------- "7------- V Z-------- ' 7------ V
6"
f
OD
SCREENPORCHELEVATION SCREENPORCHELEVATION B19. 6" DEEP NICHE U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
4
5 ENERGY
CO
<^==i SCALE: 1/2"= 1'-0" SCALE: 1/2" = 1'-0’ KITCHEN:
CD
■V
□
K1. WALL CABINET
K2. BASE CABINET
K3. END PANEL
o
CO
K4. SUPPORT BRACKET
17'-6" K5. RANGE HOOD EXHAUST DUCT
3-0'
9-0' K6. TILE BACKSPLASH
7‘ 7L
7 ~
■^7---------------^ 7
4-6' 6 12-6" K7. SOLID SURFACE BACKSPLASH
7 -------------- 7 ” 7-
K8. SOLID SURFACE COUNTERTOP
—v
■^t—v
7 7 MARK DATE DESCRIPTION
■^7------V
V
STAIR:
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
■^7
WALL
SCONCE
n- S1. WOOD HANDRAIL
CM
S2. WOOD BALUSTER
n-
->7
PROJECT NO: NIST NZERTF
CM
~ ^ 7------------=-----------
CD
-^7------------V
S3. WOOD TREAD
7 A-PLOT-ELEV-NZERTF
CAD DWG FILE:
->7
S4. WOOD TRIM
co KG, HW
DRAWN BY:
^7
S5. WOOD STRINGER
ID
3 1/2" CHECKED BY: BP
S6. WOOD POST
CO
G11 COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
CD
SCREEN PORCH:
o
o
CD
P1. EXTERIOR WATER TABLE
CT>
SHEET TITLE:
(G1 o
(Ji P2. PORCH DOOR
i^i
S1 CD
■7
00
INTERIOR
ELEVATIONS
P3. EXTERIOR FIBER CEMENT LAP SIDING
% x 6 DOOR TRIM
% TRIM BOARD
3" CROWN
7 ^ 7
r-- CD
"7
CO S1 P4.
S2 CD
P5.
P6.
S2
o
P7. 5 1/2" BASE
CO
P8. FIBER CEMENT PANEL BOARD
P9. %" WALL CAP
P10. SCREEN PANEL
I
**------V
^------ V o
SCALE AS NOTED
E
z
G2
^7--------*7--------V
P11. SCREEN DOOR
P12. 3 1/2" TRIM
A-205
STAIRELEVATION BALCONYELEVATION OPENINGELEVATION P13. 10" TRIM BOARD W/ INSET PANEL
3 2 1 P14. 21/2" BEADBOARD
P15. TRIM BOARD
SCALE: 1/2"= 1'-0" SCALE: 1/2"= 1'-0' SCALE: 1/2"= 1'-0'
6-0" 5-10' 6-0" 9'-8'
GENERALSHEETNOTES
-?*- -?*- -?*-
BUILDINGSCIENCE
CORPORATION
3-2' 2-8" 5-0" 1’-0"
7^ 7^ 7^ 7^
"7 ~ 7 ~
1. ALL TROPICAL WOOD, IF USED, MUST BE
FSC-CERTIFIED.
2. SEE A-602 FOR FINISH SCHEDULE.
■v -v
ALIGN SWITCH AND RECEPTACLE PLATES WITH
TOP OF TILE IN KITCHENS AND BATHROOMS.
3.
(G10)
G3
■v
6
o o o o
OSHEETKEYNOTES
B15
ct> CD CD CD
1
@0 30 FOREST STREET SOMERVILLE, MA
T: (978) 589-5100 F: (978) 589-5103
www.buildingscience.com
2-7'
o o o
4’ CD
CO
B6 ■^r-v
Is- h- Is-
LO
CO
GENERAL:
co O CO
1
B7 G1. CROWN MOULDING
/n
% i
-V
s G2. BASE MOULDING
I
■v
G3. PAINTED WALL
B19 1
o o CONSULTANT:
ITT!
ITT)
CO CO
G4. WINDOW HEAD TRIM
o CM
CM
13 B1
G5. 1x4 WINDOW JAMB TRIM
LO
fi AX G6. WINDOWSILL TRIM
le
■y—y y------- y—y—y—y y—y—y y-------- y------ y—y
G7. CASED OPENING HEAD TRIM
G8. 1x6 CASED OPENING JAMB TRIM
G9. CASED OPENING BASE TRIM
G10. DOOR HEAD TRIM
BATH#2ELEVATION BATH#2ELEVATION BATH#2ELEVATION BATH#2ELEVATION G11. 1x4 DOOR JAMB TRIM
G12. INTERIOR DOOR
SCALE: 1/2"= 1'-0" SCALE: 1/2" = 1'-0’ SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0"
G13. BUILT-UP COLUMN
G14. COLUMN BASE TRIM r n
5'-0" 10'-9 1/2" 9'-9"
9-9"
7 ~ 7 ~ 7 ~ 7 ~ 71 7 ~ 71 7 ~
G15. WOOD PANEL
G16. WOOD CAP
6-9" 3'-0' 4-0" 61/2,; 6’-3'
7 ~
7 ~ 7 ~ 71 7 ~
G17. MANTLE
G18. MANTLE TRIM
G19. BASE CABINET
y y ■V y y
m m m
z G20. WOOD SHELF
G21. 1 "x4" DOOR HEAD TRIM L J
Q0^0□ BATH: PROJECT:
-V -V -V
B1. TILE
■v -v
-v
NationalInstituteof
StandardsandTechnology
B2. HAND HELD SHOWER
o
B3. SHOWER SEAT
3-10" 2’-0" CD
PH
7 ~ 7^ 7 ~
GRAB BAR
B4.
€>- y
TOWEL BAR
B5.
NetZeroEnergy
Residential Test
Facility
2'. 6"
6"^
o o o o
7 ~
TOWEL RING
B6.
B5
X
CD CD CD CD
CN
s
© €) y B7. TOILET PAPER HOLDER
CM
EQ. EQ. 9’
o o o
o
B8. MIRROR
15 CT> O)
7^

1/ M 1/ M
B1 G6 B6 t-v
Is- Is-
co CO
CD
€)- FRAMELESS MIRROR
B9.
O
-v -v
£“7
/
17 B10. ACCESSIBLE LAVATORY
CD
S NIST Campus
Gaithersburg, MD
B1 o B11. ACCESSIBLE TOILET
o o IF
14
B1 B12. TOILET
o o 18) o
B18 -v
T T
CO CO CO
/ I B13. BATHTUB

13
/
l CD
I B14. VANITY BASE CABINET

/
M&5K
U.S. Department of Energy
Research Toward Zero Energy Homes
13 G2
i
G2 / B15. SOLID SURFACE BACKSPLASH
y--------y-------y-------y y--------y-------y-------y y------ y------V y------ y------y------y------V
VC60 B16. SOLID SURFACE COUNTERTOP
£ B17. FRAMELESS GLASS SHOWER DOOR, TEMPERED
B18. SOLID SURFACE BATHTUB DECK
B19. 6" DEEP NICHE U.S. DEPARTMENT OF
Energy Efficiency &
Renewable Energy
BATH#2ELEVATION MASTERBATHELEVATION MASTERBATHELEVATION MASTERBATHELEVATION ENERGY
KITCHEN:
SCALE: 1/2"= 1'-0" SCALE: 1/2" = 1'-0’ SCALE: 1/2"= 1'-0' SCALE: 1/2" = 1’-0'
K1. WALL CABINET
K2. BASE CABINET
10’-9 1/2' 15-1 1/2" 15-1 1/2' K3. END PANEL
7 ~
7 ~ 7 ~ 7 ~ 7 ~ 7 ~
K4. SUPPORT BRACKET
6-7 1/2' 101 2'-6" 2'-6" 3'-6" 3'-6" 3-1 1/2" 10-8' 4-5 1/2'
3'-4' K5. RANGE HOOD EXHAUST DUCT
7 ~ 7 ~ 7 ~ 7^
7 ~ 7 ~ 7 ~ 7 ~ 7 ~ 7 ~
K6. TILE BACKSPLASH
K7. SOLID SURFACE BACKSPLASH
y y—y y------ V
<§>—[3 3 <§>—El ©---El SI
Z z z K8. SOLID SURFACE COUNTERTOP
MARK DATE DESCRIPTION
STAIR:
ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION
y
S1. WOOD HANDRAIL
7 7
8~Q^Q~9 S2. WOOD BALUSTER
y
: :
PROJECT NO: NIST NZERTF
S3. WOOD TREAD
A-PLOT-ELEV-NZERTF
CAD DWG FILE:
o
S4. WOOD TRIM
CD
KG, HW
DRAWN BY:
EQ. EQ. S5. WOOD STRINGER
7 ~ 7 CD
CHECKED BY: BP
S6. WOOD POST
N-
II
B9
COPYRIGHT © 2009
BUILDING SCIENCE CORPORATION
o o o
O) O) (J) SCREEN PORCH:
(G20)
CD
P1. EXTERIOR WATER TABLE SHEET TITLE:
o (G1
15 O)
v P2. PORCH DOOR
n-
CD
2 INTERIOR
ELEVATIONS
P3. EXTERIOR FIBER CEMENT LAP SIDING
P4. % x 6 DOOR TRIM
P5. % TRIM BOARD
P6. 3" CROWN
P7. 5 1/2" BASE
O O o o
o o o o
EQ. EQ.
1
o o "
00 CO
I I
EQ. EQ. EQ. EQ. T
7 “ 7 “
CD
(G1
P8. FIBER CEMENT PANEL BOARD
0 0 -y
—v —v ----- V
P9. %" WALL CAP
P10. SCREEN PANEL
VC78 I
3/4' 3/4" 2 1/8" o
SCALE AS NOTED
FILLER FILLER <L <L
z
P11. SCREEN DOOR
P12. 3 1/2" TRIM
A-206
MASTERBATHELEVATION MASTERBEDROOMELEVATION MASTERBEDROOMELEVATION P13. 10" TRIM BOARD W/ INSET PANEL
3 2 1 P14. 21/2" BEADBOARD
P15. TRIM BOARD
SCALE: 1/2" = 1’-O' SCALE: 1/2" = 1’-O' SCALE: 1/2" = 1’-O'
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file
Construction management sample drawing file

More Related Content

What's hot

Green Building Construction: Case study on Green Building
Green Building Construction: Case study on Green BuildingGreen Building Construction: Case study on Green Building
Green Building Construction: Case study on Green BuildingKetulKhatri
 
Green Building
Green BuildingGreen Building
Green BuildingKousikRoy7
 
Building condition assessment
Building condition assessmentBuilding condition assessment
Building condition assessmentabhishekabhi123
 
Annexures for national building code(nbc 2016)
Annexures for national building code(nbc 2016)Annexures for national building code(nbc 2016)
Annexures for national building code(nbc 2016)Sorab Mishra
 
LEED & Indoor Air Quality John P. Lapotaire, CIEC
LEED & Indoor Air Quality John P. Lapotaire, CIEC LEED & Indoor Air Quality John P. Lapotaire, CIEC
LEED & Indoor Air Quality John P. Lapotaire, CIEC John P. Lapotaire, CIEC.
 
PRESENTATION ON DUCT DESIGN
PRESENTATION ON DUCT DESIGNPRESENTATION ON DUCT DESIGN
PRESENTATION ON DUCT DESIGNRakshit vadi
 
concept of cost Efficient construction
concept of cost Efficient construction concept of cost Efficient construction
concept of cost Efficient construction Jifara Chimdi
 
The Importance Of The Construction Submittal Process
The Importance Of The Construction Submittal ProcessThe Importance Of The Construction Submittal Process
The Importance Of The Construction Submittal ProcessSafe Rise
 
Energy efficient building
Energy efficient buildingEnergy efficient building
Energy efficient buildingShivani Singh
 
Intelligent Building Management Systems
Intelligent Building Management SystemsIntelligent Building Management Systems
Intelligent Building Management SystemsKhaled Ali
 

What's hot (20)

Detailed engineering-design-phase
Detailed engineering-design-phaseDetailed engineering-design-phase
Detailed engineering-design-phase
 
Green Building Construction: Case study on Green Building
Green Building Construction: Case study on Green BuildingGreen Building Construction: Case study on Green Building
Green Building Construction: Case study on Green Building
 
Green Building
Green BuildingGreen Building
Green Building
 
Building condition assessment
Building condition assessmentBuilding condition assessment
Building condition assessment
 
Annexures for national building code(nbc 2016)
Annexures for national building code(nbc 2016)Annexures for national building code(nbc 2016)
Annexures for national building code(nbc 2016)
 
MEP- Building services
MEP- Building servicesMEP- Building services
MEP- Building services
 
LEED & Indoor Air Quality John P. Lapotaire, CIEC
LEED & Indoor Air Quality John P. Lapotaire, CIEC LEED & Indoor Air Quality John P. Lapotaire, CIEC
LEED & Indoor Air Quality John P. Lapotaire, CIEC
 
PRESENTATION ON DUCT DESIGN
PRESENTATION ON DUCT DESIGNPRESENTATION ON DUCT DESIGN
PRESENTATION ON DUCT DESIGN
 
Building maintenance
Building maintenanceBuilding maintenance
Building maintenance
 
GRIHA RATING SYSTEM
GRIHA RATING SYSTEMGRIHA RATING SYSTEM
GRIHA RATING SYSTEM
 
concept of cost Efficient construction
concept of cost Efficient construction concept of cost Efficient construction
concept of cost Efficient construction
 
Fire Fighting System
Fire Fighting SystemFire Fighting System
Fire Fighting System
 
Energy Analysis
Energy AnalysisEnergy Analysis
Energy Analysis
 
ASHRAE62.1-2019.pdf
ASHRAE62.1-2019.pdfASHRAE62.1-2019.pdf
ASHRAE62.1-2019.pdf
 
The Importance Of The Construction Submittal Process
The Importance Of The Construction Submittal ProcessThe Importance Of The Construction Submittal Process
The Importance Of The Construction Submittal Process
 
Energy efficient building
Energy efficient buildingEnergy efficient building
Energy efficient building
 
1 Fire safety design principles
1  Fire safety design principles1  Fire safety design principles
1 Fire safety design principles
 
Dry riser system
Dry riser systemDry riser system
Dry riser system
 
Electrical design
Electrical designElectrical design
Electrical design
 
Intelligent Building Management Systems
Intelligent Building Management SystemsIntelligent Building Management Systems
Intelligent Building Management Systems
 

Similar to Construction management sample drawing file

Item # 4 - 260 Retama (Compatibility Only)
Item # 4 - 260 Retama (Compatibility Only)Item # 4 - 260 Retama (Compatibility Only)
Item # 4 - 260 Retama (Compatibility Only)ahcitycouncil
 
BD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingBD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingMaja Myall
 
131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINELee Yung Anchor
 
The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15Antoinette Pope
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdfMin Khant Kyaw
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdfMin Khant Kyaw
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major projectYolanda Sewpersad
 
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).khaledalshami93
 
Design basis report on-14.11.2016
Design basis report  on-14.11.2016Design basis report  on-14.11.2016
Design basis report on-14.11.2016bhavesh raysoni
 
Prima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptxPrima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptxZiyad Zaidi
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSunit Dhingra
 
Engineering constructionmethodsguidelinescbs(2)
Engineering constructionmethodsguidelinescbs(2)Engineering constructionmethodsguidelinescbs(2)
Engineering constructionmethodsguidelinescbs(2)Devinder Chawla
 
IRJET- Analysis & Design of Reinforced Concrete Building (G+4) using ETABS
IRJET- Analysis & Design of Reinforced Concrete Building (G+4) using ETABSIRJET- Analysis & Design of Reinforced Concrete Building (G+4) using ETABS
IRJET- Analysis & Design of Reinforced Concrete Building (G+4) using ETABSIRJET Journal
 
IRJET- Parametric Study of Foundation of Tension and Suspension Tower wit...
IRJET-  	  Parametric Study of Foundation of Tension and Suspension Tower wit...IRJET-  	  Parametric Study of Foundation of Tension and Suspension Tower wit...
IRJET- Parametric Study of Foundation of Tension and Suspension Tower wit...IRJET Journal
 

Similar to Construction management sample drawing file (20)

Item # 4 - 260 Retama (Compatibility Only)
Item # 4 - 260 Retama (Compatibility Only)Item # 4 - 260 Retama (Compatibility Only)
Item # 4 - 260 Retama (Compatibility Only)
 
BD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 BuildingBD 1232 rev F -03-01 Building
BD 1232 rev F -03-01 Building
 
131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE131002-60319-Jackson Airport-LA-COMBINE
131002-60319-Jackson Airport-LA-COMBINE
 
The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15The Fragrance Outlet - Grand Rapids, MI 8.20.15
The Fragrance Outlet - Grand Rapids, MI 8.20.15
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
 
SAMPLE PORTFOLIO
SAMPLE PORTFOLIOSAMPLE PORTFOLIO
SAMPLE PORTFOLIO
 
KFC - Surprise, AZ
KFC - Surprise, AZKFC - Surprise, AZ
KFC - Surprise, AZ
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
Icf Board
Icf BoardIcf Board
Icf Board
 
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
Graduation Project (DESIGN AND ANALYSIS OF MULTI-TOWER STRUCTURE USING ETABS).
 
Design basis report on-14.11.2016
Design basis report  on-14.11.2016Design basis report  on-14.11.2016
Design basis report on-14.11.2016
 
General structural notes
General structural notesGeneral structural notes
General structural notes
 
Prima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptxPrima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptx
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
 
Engineering constructionmethodsguidelinescbs(2)
Engineering constructionmethodsguidelinescbs(2)Engineering constructionmethodsguidelinescbs(2)
Engineering constructionmethodsguidelinescbs(2)
 
IRJET- Analysis & Design of Reinforced Concrete Building (G+4) using ETABS
IRJET- Analysis & Design of Reinforced Concrete Building (G+4) using ETABSIRJET- Analysis & Design of Reinforced Concrete Building (G+4) using ETABS
IRJET- Analysis & Design of Reinforced Concrete Building (G+4) using ETABS
 
3. Hansons lodge.pdf
3. Hansons lodge.pdf3. Hansons lodge.pdf
3. Hansons lodge.pdf
 
working drawings
working drawingsworking drawings
working drawings
 
IRJET- Parametric Study of Foundation of Tension and Suspension Tower wit...
IRJET-  	  Parametric Study of Foundation of Tension and Suspension Tower wit...IRJET-  	  Parametric Study of Foundation of Tension and Suspension Tower wit...
IRJET- Parametric Study of Foundation of Tension and Suspension Tower wit...
 

More from Ling Ma

Line type key
Line type keyLine type key
Line type keyLing Ma
 
Mortar for brickwork
Mortar for brickworkMortar for brickwork
Mortar for brickworkLing Ma
 
Minimum width of strip footings
 Minimum width of strip footings Minimum width of strip footings
Minimum width of strip footingsLing Ma
 
Maximum dimensions of building or compartment
Maximum dimensions of building or compartment Maximum dimensions of building or compartment
Maximum dimensions of building or compartment Ling Ma
 
Maximum height of buildings
Maximum height of buildingsMaximum height of buildings
Maximum height of buildingsLing Ma
 
Fire resistance of structural elements
Fire resistance of structural elementsFire resistance of structural elements
Fire resistance of structural elementsLing Ma
 

More from Ling Ma (6)

Line type key
Line type keyLine type key
Line type key
 
Mortar for brickwork
Mortar for brickworkMortar for brickwork
Mortar for brickwork
 
Minimum width of strip footings
 Minimum width of strip footings Minimum width of strip footings
Minimum width of strip footings
 
Maximum dimensions of building or compartment
Maximum dimensions of building or compartment Maximum dimensions of building or compartment
Maximum dimensions of building or compartment
 
Maximum height of buildings
Maximum height of buildingsMaximum height of buildings
Maximum height of buildings
 
Fire resistance of structural elements
Fire resistance of structural elementsFire resistance of structural elements
Fire resistance of structural elements
 

Recently uploaded

Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)wesley chun
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Scriptwesley chun
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfsudhanshuwaghmare1
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationRadu Cotescu
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CVKhem
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024The Digital Insurer
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking MenDelhi Call girls
 

Recently uploaded (20)

Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 

Construction management sample drawing file

  • 1. NationalInstituteofStandardsandTechnology NISTCampus Gaithersburg,MD NetZeroEnergyResidentialTestFacility DRAWINGLIST ARCHITECTURAL FIREPROTECTION DESIGN CRITERIA, ABBREVIATIONS, & GEN. STRUCTURAL NOTES ARCHITECTURAL SITE PLAN ARCHITECTURAL SITE PLAN DETAILS FOUNDATION PLAN BASEMENT PLAN FIRST FLOOR FRAMING PLAN FIRST FLOOR PLAN FIRST FLOOR KEY PLAN & WALL FRAMING ELEVATIONS SCREEN PORCH & GARAGE KEY PLANS & WALL FRAMING ELEVS. SECOND FLOOR & LOWER ATTIC FRAMING PLAN SECOND FLOOR PLAN SECOND FLOOR KEY PLAN & WALL FRAMING ELEVATIONS ATTIC FRAMING PLAN ROOF FRAMING PLAN ROOF PLAN LOWER ROOF OVERHANG FRAMING PLAN UPPER ROOF OVERHANG FRAMING PLAN FIRST AND SECOND FLOOR REFLECTED CEILING PLANS A-001 A-101 A-101A A-102 A-103 A-104 A-105 A-106 A-107 A-108 A-109 A-110 A-111 A-112 A-113 A-114 A-115 A-121 F-001 FIRE PROTECTION GENERAL NOTES, LEGEND, AND ABBREVIATIONS F-101 F-102 F-103 F-104 BASEMENT FLOOR PLAN FIRST FLOOR PLAN SECOND FLOOR PLAN ATTIC FLOOR PLAN A F-601 FIRE PROTECTION DETAILS AND MATRIX S PLUMBING BASEMENT FLOOR PLAN - PLUMBING FIRST FLOOR PLAN - PLUMBING SECOND FLOOR PLAN - PLUMBING ATTIC FLOOR PLAN - PLUMBING P-101 P-102 P-103 P-104 o PLUMBING DETAILS P-501 PROJECTDESCRIPTION PLUMBING RISERS AND SCHEDULES P-601 A-201 A-202 A-203 A-204 A-205 A-206 A-207 EXTERIOR ELEVATIONS EXTERIOR ELEVATIONS EXTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS INTERIOR ELEVATIONS These plans describe an energy efficient net zero single family home to be built in Gaithersburg, MD. The home has four bedrooms, three full baths and a full basement.The drawing set and specifications were developed by Building Science Corporation with support from the Department of Energy's Building America Program. The home will be registered under USGBC's LEED for Homes program and will target Platinum Certification. During project planning and construction, all efforts should be made to meet the goals of this project. MECHANICAL MECHANICAL LEGEND, SCHEDULES & DETAILS MECHANICAL SITE PLAN M-001 M-002 BUILDING CODE M-101 M-102 M-103 M-104 M-105 M-106 BASEMENT FLOOR PLAN - HVAC FIRST FLOOR PLAN - HVAC FIRST FLOOR PLAN GARAGE - HVAC SECOND FLOOR PLAN - HVAC ATTIC FLOOR PLAN - HVAC BASEMENT FLOOR PLAN - RADIANT FLOOR HEAT BUILDING SECTION BUILDING SECTION BUILDING SECTION BUILDING SECTION GARAGE, BREEZEWAY & SCREEN PORCH SECTIONS A-301 A-302 A-303 A-304 A-305 These plans are submitted under the 2009 Edition of the International Residential Code For One-and Two-Family Dwellings. SQUARE FOOTAGES - Area calculations according to ANSI Z765-2003 A-401 A-402 WALL SECTIONS & DETAILS WALL SECTIONS MECHANICAL DETAILS MECHANICAL DETAILS M-501 M-502 1,518 sq. ft. 1,518 sq. ft. 1,191 sq. ft. Basement First Floor Second Floor REQUIRED CONSTRUCTION SEQUENCE - PART A REQUIRED CONSTRUCTION SEQUENCE - PART B REQUIRED CONSTRUCTION SEQUENCE - PART C ADVANCED FRAMING DETAILS WINDOW DETAILS & INSTALLATION SEQUENCE DOOR DETAILS & INSTALLATION SEQUENCE ENCLOSURE PENETRATION DETAILS & SEQUENCES FOUNDATION DETAILS HORIZONTAL DETAILS VERTICAL DETAILS ROOF DETAILS A-501A A-501B A-501C A-502 A-503 A-504 A-505 A-506 A-507 A-508 A-509 MECHANICAL SCHEDULES M-601 ELECTRICAL PROJECTTEAM ELECTRICAL LEGEND, ABBREVIATIONS, SYMBOLS & LIGHTING FIXTURE SCHEDULE E-001 CLIENT MEP ENGINEER EBL Engineers, LLC 8005 Harford Road Baltimore, MD 21234 Contact: Ed Hubner (410) 668-8000 ehubner@eblengineers.com SPECIFICATIONS CONSULTANT Kalin Associates 1121 Washington Street Newton, MA 02465 Contact: Mark Kalin (617) 964-5477 mkalin@kalinassociates.com National Institute of Standards and Technology 100 Bureau Drive Gaithersburg, MD 20899 Contact: Hunter Fanney (301)975-5900 hunter.fanney@nist.gov BASEMENT FLOOR PLAN - ELECTRICAL FIRST FLOOR PLAN - LIGHTING FIRST FLOOR PLAN - POWER SECOND FLOOR PLAN - LIGHTING & POWER ATTIC FLOOR PLAN - ELECTRICAL E-101 E-102 E-103 E-104 E-105 A-601 A-602 A-603 WINDOW & DOOR SCHEDULES & TYPES INTERIOR FINISH SCHEDULE PENETRATION SCHEDULE ELECTRICAL RISER DIAGRAM ELECTRICAL DETAILS E-501 E-502 A-701 A-702 FIRST FLOOR OPEN WEB FLOOR TRUSS TYPE ELEVATIONS SECOND FLOOR OPEN WEB FLOOR TRUSS TYPE ELEVATIONS ARCHITECT LEED for HOMES PROVIDER CONSTRUCTION MANAGER ELECTRICAL PANEL SCHEDULES E-601 Building Science Corporation 30 Forest Street Somerville, MA 02143 Contact: Betsy Pettit (978)589-5100 betsy@buildingscience.com Everyday Green 1877 Ingleside Terrace NW Washington, DC 20010 Contact: Andrea Foss (202)213-6984 andrea@everydaygreen.com Jacobs Engineering Group, Inc. Contact: AHIBIldlSa^Sa U.S. Department of Energy Research Toward Zero Energy Homes BuildingScienceCorporation 30ForestStreet Somerville,MA02143 978.589.5100 Contact:BetsyPettit betsy@buildingscience.com CONSTRUCTIONDOCUMENTS 31MARCH2010ISSUEDFORCONSTRUCTION U.S. DEPARTMENT OF EnergyEfficiency& RenewableEnergy ENERGY COPYRIGHT (C) 2009 BUILDING SCIENCE CORPORATION
  • 2. DESIGNCRITERIA GENERALSTRUCTURALNOTES BUILDINGSCIENCE CORPORATION 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THESE PLANS, THE INTERNATIONAL RESIDENTIAL CODE (IRC 2009), TRUSS MANUFACTURER SHOP DRAWINGS, AND THE MATERIAL MANUFACTURERS' INSTALLATION INSTRUCTIONS. STRUCTURAL DESIGN CRITERIA DESIGN ITEM CRITERIA CODE REFERENCE GROUND SNOW LOAD 30 PSF — SEE NOTE 1 IRC 2009 FIG R301.2(5), ASCE 7 FIG 7-1 2. WHERE CONFLICTING INFORMATION EXISTS BETWEEN THESE PLANS AND OTHER REFERENCED REQUIREMENTS, THE MORE STRINGENT REQUIREMENT SHALL APPLY UNLESS OTHERWISE APPROVED BY THE DESIGN PROFESSIONAL RESPONSIBLE FOR THESE PLANS. BASIC WIND SPEED 90 MPH (GUST) IRC 2003, FIG R301.2(4) ASCE 7, FIG 6-1C WIND EXPOSURE C IRC 2003, SEC R301.2.1.4 ASCE 7, Sect 6.5.6 3. THE CONTRACTOR IS RESPONSIBLE TO IDENTIFY AND RESOLVE ALL CONFLICTS AND DISCREPANCIES PRIOR TO AND DURING CONSTRUCTION AND FACILITATE PROPER CONSTRUCTION AS INTENDED BY THESE PLANS. WIND BORNE DEBRIS REGION NO IRC 2009 Sect. R301.2.1.2 ASCE 7, Sect. 6.5.9 MAPPED SEISMIC HAZARD Ss = 0.16g S1 = 0.05g ASCE 7, CH 11 &CH 22 4. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE STRUCTURAL SUPPORT OF CONSTRUCTION LOADS DURING ALL PHASES OF CONSTRUCTION INCLUDING, BUT NOT LIMITED TO, FOUNDATION BACKFILL, BRACING OF WALL FRAMING TO RESIST CONSTRUCTION FLOOR LOADS AND LATERAL BUILDING LOADING, BRACING OF TRUSSES DURING INSTALLATION AND SUBSEQUENT CONSTRUCTION LOADING, AND OTHER CONDITIONS AS DICTATED BY THE CONTRACTOR’S CONSTRUCTION PRACTICE. 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com SEISMIC SITE CLASS D (firm soil assumed) (Fa = 1.6; Fv = 2.4) ASCE 7, Sect. 11.4.2 SEISMIC DESIGN SPECTRAL ACCELERATION PARAMETERS SDS = 2/3(1.6)(0.16g) = 0.17g SD1 = 2/3(2.4)(0.05g) = 0.08g ASCE 7, Sect. 11.4 SEISMIC DESIGN CATEGORY B CONSULTANT: (IRC DWELLINGS EXEMPT) ASCE 7, Sect. 11.6 5. CONTRACTOR SHALL COMPLY WITH THE MOST CURRENT CONSTRUCTION SAFETY REGULATIONS OF OSHA. IRC 2009, FIG R301.2(2) LIVE LOADS IRC 2009, TABLE R301.4 ASCE TABLE 4-1 FLOORS & DECKS FLOORS (BEDROOM AREAS) ATTIC WITH STORAGE ATTIC W/O STORAGE ROOF 40 PSF 30 PSF 20 PSF 10 PSF 20 PSF - SEE NOTE 2 6. ALL CONSTRUCTION SHALL BE PERFORMED IN A GOOD, WORKMANLIKE MANNER FOLLOWING ACCEPTED CONSTRUCTION PRACTICES AND TOLERANCES. DEFECTIVE OR DAMAGED MATERIALS SHALL NOT BE USED AND SHALL BE REPLACED. DEAD LOADS Main house roof/ceiling dead load is 20 psf to account for solar panels and non-standard framing. FLOOR ROOF WALL 10 PSF 15 PSF (20 PSF main house) 8 PSF ENCLOSURETHERMALENVELOPECRITERIA r n FROST DEPTH 30 INCHES Based on local practice AIR-FREEZING INDEX 350 deg. F-DAYS ASCE 32-01, IRC FIG. R403.3(2) COMPONENT R-VALUE U-VALUE SOIL BEARING VALUE (ASD) 3,000 PSF-SEE NOTE 3 Based on preliminary information for soils report provided by NIST consultant (otherwise use presumptive value per IRC Table 401.4.1) FRAMED WALLS R-45 ROOF R-72 L J WINDOWS U-0.19 LATERAL SOIL LOAD 45 PCF Backfill Soil Class I or II required per IRC 2009 Table R404.1.2(4) and Table 405.1 PROJECT: BASEMENT WALLS R-23 NationalInstituteof StandardsandTechnology BASEMENT FLOOR R-10 CONVENTIONAL LIGHT-FRAME CONSTRUCTION REQUIREMENTS SEE CODE REFERENCE IRC 2009, CH 3, 4, 5, 6, 8 IBC 2009, CH 18 AND SEC 2308 NOTES: NetZeroEnergy ResidentialTest Facility 1. UNIFORM ROOF SNOW LOAD (23 PSF) SHALL BE USED ONLY WITH LOAD COMBINATIONS INVOLVING MORE LOAD EFFECTS THAN DEAD PLUS SNOW. GROUND SNOW LOAD SHALL BE USED FOR DESIGN OF ROOF FRAMING AND WHEN CHECKING D+S LOAD COMBINATION. DRIFT SNOW LOAD OF 54 PSF SHALL BE USED FOR LOWER ROOFS. ROOF LIVE LOADS SHALL BE USED FOR THE DESIGN OF ROOF ELEMENTS ONLY. THESE LOADS ARE INTENDED TO ADDRESS MAINTENANCE, ACCESS, AND TEMPORARY CONSTRUCTION LOADS AND ARE NOT INTENDED FOR USE IN COMBINATION WITH OTHER LOAD EFFECTS. MINIMUM 2,700 PSF SOIL BEARING VALUE REQUIRED FOR 36”X36” BASEMENT COLUMN FOOTINGS; MINIMUM 1,500 PSF SOIL BEARING VALUE REQUIRED FOR CONTINUOUS FOUNDATION WALLS. 2. NIST Campus Gaithersburg, MD 3. U.S. Department of Energy Research Toward Zero Energy Homes ABBREVIATIONS U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY A.F.F. ABOVE FINISHED FLOOR B.O. BOTTOM OF BTW BETWEEN C/L CENTER LINE CLR. CLEAR ELEVATION EL. ELEVATION ELEV. MARK DATE DESCRIPTION EQ. EQUAL ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION GWB GYPSUM WALLBOARD PROJECT NO: NIST NZERTF HEAT RECOVERY VENTILATOR HRV A-PLOT-SPEC-NZERTF CAD DWG FILE: HVAC HEATING VENTILATING AND AIR CONDITIONING CG DRAWN BY: INSUL INSULATION CHECKED BY: BP LSL LAMINATED STRAND LUMBER COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION MIN. MINIMUM SHEET TITLE: O.C. ON CENTER DESIGNCRITERIA, ABBREVIATIONS& GEN.STRUCTURAL NOTES PCF POUNDS PER CUBIC FOOT PHOTOVOLTAIC PV T&G TONGUE & GROOVE T.O. TOP OF TYPICAL TYP. I W/ WITH o SCALE AS NOTED z WD. WOOD W/O WITHOUT A-001
  • 3. GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION 1. FOR PROPERTY LINE, LIMIT OF DISTURBANCE, GRADING CHANGES, LANDSCAPING, AND LOCATION OF BUILDING ON SITE, SEE SITE/CIVIL DRAWINGS. STEPS DOWN TO GRADE (2 RISERS) DRIP EDGE DRAINAGE SYSTEM UNDER PATIO, SEE 5/A-101A PATIO WITH CONCRETE PAVER UNIT AND VENEER STONE EDGE , SEE 4/A-101A 3'-0" WIDE PEASTONE BED WITH DRIP EDGE DRAINAGE SYSTEM, TYP. SEE 2/A-101A OUTDOOR AIR-HANDLER UNIT 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com i i TRANSFORMERS I :L: FUTURE OUTDOOR AIR-HANDLER UNIT CONSULTANT: T OUTDOOR AIR-HANDLER UNIT r n FUTURE OUTDOOR AIR-HANDLER UNIT MAX.y4" GRADE INCREASE FROM SIDEWALK TO BREEZEWAY SLAB 3'-0" WIDE PEASTONE BED, TYP. SEE 1/A-101A CONCRETE PAVERS L J PROJECT: NationalInstituteof StandardsandTechnology MAX.y4" GRADE INCREASE FROM SIDEWALK TO PORCH SLAB prn' ' NetZeroEnergy ResidentialTest Facility WALKWAY WITH SLOPE <1:20 3'-0" WIDE CONCRETE WALKWAY WITH 6" CONCRETE PAVER EDGE EACH SIDE, TYP. SEE 3/A-101 A, SIM. NIST Campus Gaithersburg, MD U.S. Department of Energy Research Toward Zero Energy Homes U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY CONCRETE DRIVEWAY WALKWAY WITH SLOPE <1:20 EXISTING TREE TO BE REMOVED, TYP. 05/07/10 UPDATED MARK DATE DESCRIPTION ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION PROJECT NO: NIST NZERTF A-PLOT-PLAN-NZERTF CAD DWG FILE: DRAWN BY: HW CHECKED BY: BP COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION SHEET TITLE: ARCHITECTURAL SITEPLAN 3'-0" WIDE CONCRETE WALKWAY WITH 6" CONCRETE PAVER EDGE EACH SIDE, TYP. SEE 3/A-101A SCALE AS NOTED / A-101 ARCHITECTURALSITEPLAN SCALE: 1:10
  • 4. GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION PATIO CONCRETE PAVERS (SET IN SAND WITH CRUSHED STONE SUBBASE) 5’—0 >> PE "7Ta TT ] <7 A A <7. I <7 4 -4 /: STONE BED, DEPTH BASED ON GRADE AND DEPTH NEEDED TO CONNECT TO DRAIN JH l A JH J I L, b. o k- ^43' p( p( j 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com A - b FILTER FABRIC > [£> EPDM MEMBRANE ATTACHED TO BUILDING WALL, WRAPPED AROUND PIPE AND EXTENDED UP TO EDGE OF FILTER FABRIC 4 * CONSULTANT: 6" PERFORATED PIPE CONNECTED TO NON-PERFORATED PIPE DRAINING TO DAYLIGHT (SEE SITE/CIVIL DRAWINGS) FREE DRAINING BACKFILL: UNIFIED SOIL CLASSIFICATION SYSTEM TYPE GW, GP, SW, OR SP DRIPEDGEDRAINAGEUNDERPATIO 5 SCALE: 3/4" = 1-0" r n t-fJh 3" DEEP, 3-0" WIDE PEASTONE BED WITH BLACK STEEL EDGING OR OTHER PERMEABLE MATERIAL CONCRETE PAVER UNIT WITH MIN. SOLAR REFLECTANCE INDEX (SRI) OF 29; SET IN SAND SLOPE GRADE AWAY FROM FOUNDATION (5% MIN SLOPE) Pk L J PLANTING SOIL STONE VENEER CAP (COLORING AND TEXTURE TO MATCH GARAGE FACADE STONE) ~ y PROJECT: NationalInstituteof StandardsandTechnology n ^~l FILTER FABRIC 3“i t- </. •- <7 o< >o a c> a C: C: C: C: o 3'-0" WIDE STONE BED, DEPTH BASED ON GRADE AND DEPTH NEEDED TO CONNECT TO DRAIN 4 8"-14" STONE VENEER (COLORING, SHAPE AND TEXTURE TO MATCH GARAGE FACADE STONE) >3 3 3 3 3 3 3 >^< $< i=ni=ni=ni=ni=ni=rn=rrtern= 4 o< )0( )0( )0( )0( >o 3 a :: C: C: C: b =■ <j NetZeroEnergy Residential Test Facility A EPDM MEMBRANE ATTACHED TO BUILDING WALL, WRAPPED AROUND PIPE AND EXTENDED UP TO EDGE OF FILTER FABRIC 6" PERFORATED PIPE, CONNECTED TO NON-PERFORATED PIPE DRAINING TO DAYLIGHT (SEE SITE/CIVIL DRAWINGS) FREE DRAINING BACKFILL: UNIFIED SOIL CLASSIFICATION SYSTEM TYPE GW, GP, SW, OR SP J j 4 t 1 4'-6" OF CRUSHED STONE (CR) 4 '> 8" CONCRETE WALL WITH WEEPHOLES AND SEAT FOR STONE VENEER tE A NIST Campus Gaithersburg, MD <i J SOIL SUBGRADE (COMPACTED) U.S. Department of Energy Research Toward Zero Energy Homes l=l l l=l l l=l 11 l l l l l l l l l l PEASTONEBEDWITHDRIPEDGEDRAINAGE SCALE: 3/4" = 1-0" U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY PATIOEDGE SCALE: 1" = 1'-0" 05/07/10 CONCRETE CURB (AT DRIVEWAY) UPDATED MARK DATE DESCRIPTION 3" DEEP, 3-0" WIDE PEASTONE BED WITH BLACK STEEL EDGING OR OTHER PERMEABLE MATERIAL 6" CONCRETE PAVER EDGE PATTERN (BOTH SIDES) ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION SLOPE GRADE AWAY FROM FOUNDATION (5% MIN SLOPE) PROJECT NO: NIST NZERTF WALKWAY: CONCRETE WITH MIN. SOLAR REFLECTANCE INDEX (SRI) OF 29 A-PLOT-PLAN-NZERTF CAD DWG FILE: PLANTING SOIL T DRAWN BY: HW ♦ ♦ o< o>< o>< o>< o>< o>< o>< o 9L ■:> ■:> ■:> ■:> ■:> ■:> v; t> ♦ ♦ H CHECKED BY: BP ao< o o< o< o< o< o in FILTER FABRIC DROUGHT-TOLERANT TURF b COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION o o o o o o o o 6 3’-0" WIDE STONE BED, DEPTH BASED ON GRADE AND ADJACENT STONE BEDS b - — b SHEET TITLE: DRIVEWAY: CONCRETE WITH MIN. SOLAR REFLECTANCE INDEX (SRI) OF 29 FILTER FABRIC it. ARCHITECTURAL SITEPLAN DETAILS 4 * NOTE: SEE SITE/CIVIL DRAWINGS AND SPECIFICATIONS FOR CONSTRUCTION DETAILS ♦ FREE DRAINING BACKFILL: UNIFIED SOIL CLASSIFICATION SYSTEM TYPE GW, GP, SW, OR SP I o SCALE AS NOTED z A-101A PAVINGPLAN PEASTONEBEDW/ODRIPEDGEDRAINAGE SCALE: 1" = r-0' SCALE: 3/4" = 1'-0"
  • 5. 10" SONO TUBE FOOTINGS FOR BREEZEWAY COLUMNS, PROVIDE 3 #4 REINFORCING, TYP. - DRAIN A1 BASE OF WINDOW WELL (CONNECTED TO BASEMENT SUMP) | v ft 4ft J I T * F -V ■ r n n ©f it m S6 n CONDENSATE DRAIN THROUGH-WALL CONDUITS FOR HEADER PIPES FOR VERTICAL GROUND LOOP SYSTEM o -V LU Q "si- § S1 THROUGH-WALL CONDUITS FOR HEADER PIPES FOR HORIZONTAL GROUND LOOP SYSTEM § 5 5 o O l V-7 o D CO CO LU CO 4" PERFORATED VENT BEDDED IN STONE WITH "L" CONNECTION TO 4" RISER SOIL GAS VENT THROUGH ROOF; SEE 4/A-506 SOIL GAS VENT c: § CM o LJ -V S5 WINDOWSILL___zk 'EL. -7-1" V T.O. 4" CONCRETE SLAB EMBEDDED HYDRONIC TUBING W1.4 x W1.4 WELDED WIRE MESH AT MID-DEPTH 6 MIL POLYETHYLENE 2" XPS RIGID INSULATION 4" STONE PAD (NO FINES) FILTER FABRIC UNDISTURBED NATIVE SOIL IJJ F3 Q. O SANITARY DRAIN THROUGH SLAB > 4" PVC PIPE THROUGH BOTTOM OF FOOTING, TYP; SEE 1/A-506 o CM / O I CONDENSATE DRAIN O I I S6 be CT> CO MINIMUM 4" DIAM. STANDARD STEEL PIPE O CM CM O THROUGH-STEM WALL CONDUITS FOR FUTURE HIGH VELOCITY HVAC AIR TO AIR OUTDOOR UNIT (SEE GENERAL SHEET NOTE #7) CO on CO COLUMN (RATED FOR MIN. 22,230 LB. LOAD) O o F10 3-0" X 3-0" X 1'-4" CONCRETE FOOTING TYP. =T W/ (4) #5 EACH WAY, 4'-6' FLOOR DRAIN 6K" W x 16y2" D BEAM POCKET, 1 SEE 2/A-506 TYP. o S2 S6 -CJ------- ----- CJ------- ------CJ------ ------|—r^—a- ------ ©©5 D O' LSL BEAM ABOVE S3 S3 COLUMN ISOLATION CONTROL JOINT, TYP. _____ 12-4 3/4" ____ -------- CONDENSATE DRAIN it- 6%" W x 16/4" D BEAM POCKET; SEE 2/A-506 12-4 3/4" 9-6 1/2" -- CONDENSATE DRAIN I THROUGH-STEM WALL CONDUITS FOR C ENTRAL AIR TO AIR OUTDOOR UNIT 7^ COLUMN AND FOOTING DETAIL, TYP; SEE 3/A-506 4> T.O. FOUNDATION EL. +0,-0" T.O. FOUNDATION S EL. -r-2 ±^F 9-4" II CD CD F9 THROUGH-STEM WALL CONDUITS FOR FUTURE AIR TO AIR OUTDOOR UNIT 8" CONCRETE SLAB THIS SECTION (UNDER BASE OF BASEMENT STAIR) FLOOR DRAIN CD i O S6 O O CONDENSATE DRAIN SUMP PUMP: SUMP PUMP CROCK TO HAVE AIR-TIGHT LID OR CLOSURE F10 T.O. SLAB 9 CONNECTION TO STORM DRAIN WITH CHECK 7ALVE S4 4’-6" ~Z-9" EL. -9-11 1/ 7^ 7L B -v o F7 THROUGH-WALL CONDUITS FOR HEADER PIPES FOR SLINKY LOOP SYSTEM o fUl SUMP THROUGH-WALL CONDUIT FOR DOMESTIC AND SPRINKLER WATER CM F12 - GAS CD F11 CONNECTION K ?’ 9s oo CN CM F4 ftft F13 --- CM - CONDENSATE - DRAIN F8 1—1 Hff B =Hi/d Jr CO JO" F8 F2 ftftl ftr O :—r-fp CM -i.i i—i Ett nt ftttr A ft) C/L 2’-6" -,± y- THROUGH-STEM WALL CONDUIT FOR SUMP DISCHARGE CO 10" SONO TUBE FOOTINGS FOR LO BOTTOM OF FOUNDATION WALL DETAIL, TYP; SEE 1/A-506 o I 4" DIAM. PERFORATED PERIMETER DRAIN PIPE TYP; SEE 1/A-506 o -v F.1 -v n 13’-5" T.O. PORCH FDN WALL 4 r- EL. HY-2 3/8 CD CO THROUGH-WALL INSTRUMENTATION CONDUIT TO GARAGE SLAB (3'-0" ABOVE BASEMENT SLAB) - THROUGH-WALL PENETRATION FOR INVERTER DISCONNECT UTILITY THROUGH-WALL PENETRATION FOR COMMUNICATION AND FIRE SAFETY THROUGH-WALL PENETRATION FOR FIRE DEPARTMENT CONNECTION THROUGH-WALL CONDUIT FOR UNMETERED ELECTRICAL WIRING SLAB (3-0" ABOVE BASEMENT SLAB) st- CD CD C/L C/L © © C/L £JL F1 7E 10"B © / 9 T.O. GARAGE FOUNDATION =F EL. -0-5' T.O. GARAGE FOUNDATION AT FRONT OPENINGS EL. -2-8" * SLAB ON GRADE ABOVE * T.O. GARAGE FOUNDATION AT SOUTH DOOR EL. -2-1 3/4 4-2 1/4' CM i Is- i oo FRONT PORCH COLUMNS, PROVIDE 3 #4 REINFORCING, TYP. © © © A.1 C/L C/L C/L C/L , , 5 1/2l' 11'-7' 11’-11" ir-7' 5 1/2" 7L 7L "7 ^ 7 ~ TH|ROUGH-WALL CONDUIT FOR ELECTRICAL WIRING FROM HOUSE METER 6" CONCRETE GARAGE FOUNDATION W^LL, TYP 2-0" CONCRETE FOOTING, TYP 7-0 11 THROUGH-WALL INSTRUMENTATION CONDUIT TO GARAGE to 1 CO -V o I 5 6 6.1 2 3 4.1 1 4 7 86-0" ■7 ~ ■7 ~ 26-0' 16’-0" 36-0' 8-0' -7 ~ y- y- y- y- 4" 2-0" CONCRETE FOOTING, TYP 7^ foundAtion wall 6" CONCRETE PORCH , TYP CO o CM 1 Ob 00 1 Ob CO o CN F E E.1 CO 00 CO C.1 c k I s CD 1 S2 10" CONCRETE FOUNDATION WALL, TYP. 2-0" CONCRETE FOOTING, TYP. 9-4 M FOUNDATIONPLAN SCALE: 1/4" = 1'-0" o S6 S6 F5 .u CD 1 LO O 1 CM O 1 Ob GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION 1. BASEMENT FOUNDATION WALL TO HAVE (1) #4 HORIZONTAL REINFORCEMENT W/ MATCHING CORNER BAR AT TOP AND (1) AT EACH MIDDLE THIRD, AND (1) #4 VERTICAL REINFORCEMENT AT 48" O.C. LOCATED WITH 1-1/4" CONCRETE COVER MEASURED FROM THE INSIDE FACE OF THE FOUNDATION WALL. 2. LOCATE 4" CONNECTION PIPE THROUGH BASE OF FOOTING WITHIN 5’ OF EVERY CORNER AND EVERY 15’ MAX ALONG LENGTH OF WALL SEGMENT WITH MIN OF 1 PER WALL SEGMENT. 3. LOCATE CONDENSATE DRAINS BASED ON LAYOUT OF MECHANICAL EQUIPMENT 4. SEE A-506 FOR FOUNDATION DETAILS. SEE A-603 FOR PENETRATION SCHEDULE. 5. 6. EL. +0-0" IN THE ARCHITECTURAL DRAWINGS CORRESPONDS TO 461.30' IN THE SITE/CIVIL DRAWINGS 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com IF THE HIGH VELOCITY HVAC OPTION IS NOT AWARDED, THE PENETRATION FOR THE CONDUITS WILL NOT BE PROVIDED. 7. CONSULTANT: OSHEETKEYNOTES r n L j PROJECT: PENETRATIONKEY NationalInstituteof StandardsandTechnology S1. SOIL GAS VENT S2. FLOOR DRAIN NetZeroEnergy Residential Test Facility S3. STEEL PIPE COLUMN S4. SUMP PUMP S5. SEWER CONNECTION S6. CONDENSATE DRAIN F1. VERTICAL GROUND LOOP SYSTEM NIST Campus Gaithersburg, MD F2. SLINKY LOOP SYSTEM F3. HORIZONTAL. GROUND. LOOP SYSTEM U.S. Department of Energy Research Toward Zero Energy Homes F4. SUMP PUMP OUTLET F5. INSTRUMENTATION CONDUIT F6. GAS CONNECTION F7. WATER CONNECTION U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY F8. ELECTRICITY CONNECTION AIR-TO-AIR OUTDOOR UNIT CONNECTION F9. F10. FUTURE AIR-TO-AIR OUTDOOR UNIT CONNECTION F11. COMMUNICATION/FIRE SAFTEY CONNECTION INVERTER UTILITY DISCONNECT CONNECTION F12. 07/27/10 UPDATED F13. FIRE DEPARTMENT CONNECTION 06/29/10 UPDATED MARK DATE DESCRIPTION ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION PROJECT NO: NIST NZERTF A-PLOT-PLAN-NZERTF CAD DWG FILE: CG DRAWN BY: CHECKED BY: BP COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION SHEET TITLE: FOUNDATIONPLAN i o SCALE AS NOTED z A-102 = C/L OF BEAM POCKET CO CM o
  • 6. SANITARY DRAIN UTILITY SHAFT OPENING ABOVE r L J PREFABRICATED WINDOW WELL WITH EGRESS LADDER; SEE 6/A-506 i FLOOR DRAIN; CONNECT TO SOIL PIPE 6-0" HIGH PLYWOOD PANEL WITH 2x4 STUD BACKING CONDENSATE DRAIN; CONNECT TO SUMP ZQ '0[ 4. 4 SOIL GAS VENT 3-9' I CONDENSATE DRAIN; CONNECT TO SUMP O- FLOOR DRAIN; CONNECT TO SOIL PIPE <D CONDENSATE DRAIN; CONNECT TO SUMP o □ SUMP CONDENSATE DRAIN; CONNECT TO SUMP -v cc < LU 12'-2‘ 5 1/2" O CM CO I ABOVE 5 6 6.1 3 4.1 4 7 PATIO ABOVE SLAB ON GRADE ABOVE GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION 1. BASEMENT AREA TO OUTSIDE FACE OF FOUNDATION WALL: 1,518 SQ. FT. SEE A-602 FOR FINISH SCHEDULE. 2. F.1 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com CONSULTANT: F OSHEETKEYNOTES 1. PROVIDE BLOCKING IN WALL TO SUPPORT FUTURE STAIR LIFT. BLOCKING SHOULD EXTEND UP TO A HEIGHT OF 3’-0" ABOVE STAIR TREADS. r n STAIR FROM BASEMENT TO FIRST FLOOR TO HAVE 16 RISERS AT 6-2/3", 15 TREADS AT 10" WITH y4" NOSING. 2. L J PROJECT: NationalInstituteof StandardsandTechnology NetZeroEnergy ResidentialTest Facility D NIST Campus Gaithersburg, MD U.S. Department of Energy Research Toward Zero Energy Homes U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY B A MARK DATE DESCRIPTION ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION PROJECT NO: NIST NZERTF A.1 A-PLOT-PLAN-NZERTF CAD DWG FILE: CG DRAWN BY: CHECKED BY: BP COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION SHEET TITLE: BASEMENTPLAN o SCALE AS NOTED A-103 2 1 F E © © E.1 SLAB ON GRADE ABOVE WALKWAY ABOVE © C.1 c A BASEMENTPLAN SCALE: 1/4" = 1'-0" UP 3-9 M n © © © © EGRESS WINDOW
  • 7. BLOCKING BETWEEN JOISTS UNDER PARTITIONS PARALLEL TO BUT BETWEEN JOISTS, TYPICAL 1-1/4" x 14" LSL RIM JOIST ATTACHED TO FOUNDATION THROUGH 2" XPS INSULATION 2" XPS INSULATION ON FOUNDATION SHELF, TYPICAL 1-3/4" x 14" ENGINEERED WOOD BLOCKING BETWEEN RIM JOIST AND WEB JOIST, 4'-0" O.C., TYPICAL 3t- CD CD 2 5 6 6.1 7 F.1 8-0’ 7L o 2'-0" 2'-0" 2'-0" v- —> — —> — F -v 1-1/4" x 14" LSL RIM JOIST ATTACHED TO FOUNDATION THROUGH 2" XPS INSULATION / 14" DEEP OPEN WEB FLOOR TRUSS TYPE "A" AT 24" O.C. WITH T & G FLOOR SHEATHING; SEE A-701 ,A-702 FOR TRUSS TYPES o o CM 14" DEEP OPEN WEB FLOOR TRUSS TYPE "A" AT 24" O.C. WITH T & G FLOOR SHEATHING; SEE A-701 ,A-702 FOR TRUSS TYPES BEAM BELOW - LSL 5-1/4" x 16" 1.55E 2'-0" 2'-0" 2'-0" 7^ 7^ 7^ CD CO CO D ■V 1-1/4" x 14" LSL RIM JOIST ATTACHED TO FOUNDATION THROUGH 2" XPS INSULATION CD CD 14" DEEP OPEN WEB FLOOR TRUSS TYPE "C" AT 24" O.C. WITH l" T & G FLOOR SHEATHING; SEE A-701, A-702 FOR TRUSS TYPES B A A.1 3 4.1 4 44'-0" 36-0' 14" DEEP OPEN WEB FLOOR TRUSS TYPE "A1" AT 24" O.C. WITH g" T & G FLOOR SHEATHING; SEE A-701,A-702 FOR TRUSS TYPES 2x4 TREATED SILL PLATE 2x6 TREATED PLATE ON FOUNDATION SHELF n o : LL □ CO D= □ ! u 11 <£> <£> <i> <i> <£> <D O m ■»c o i CN 1 F E E.1 C.1 C 14" DEEP OPEN WEB FLOOR TRUSS TYPE "B" AT 24" O.C. WITH T & G FLOOR SHEATHING; SEE A-701,A-702 FOR TRUSS TYPES 1-%" x 14" LSL HEADER AT STAIR OPENING / 7 /■ 1-1/4" x 14" LSL RIM JOIST ATTACHED TO FOUNDATION THROUGH 2" XPS INSULATION A -r BLOCKING BETWEEN JOISTS UNDER PARTITIONS PARALLEL TO BUT BETWEEN JOISTS, TYPICAL 14" DEEP OPEN WEB FLOOR TRUSS TYPE "D" AT 24" O.C. WITH §" T & G FLOOR SHEATHING; SEE A-701,A-702 FOR TRUSS TYPES 2’-0" 2’-0" 2’-0" 7^ 7^ 7^ 7^ FIRSTFLOORFRAMINGPLAN SCALE: 1/4" = 1'-0" 1-3/4" x 14" LSL HEADER AT STAIR OPENING DASHED LINES INDICATE STUD WALLS ABOVE 12-5 1/2' 3-10' CD CN GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION 1. CONTRACTOR TO VERIFY ENGINEERED WOOD PRODUCT (EWP) MEMBER SIZES WITH EWP SUPPLIER. EWP CONNECTIONS TO FOLLOW EWP SUPPLIER INSTRUCTIONS. 2. 3. LIMIT THE OVERALL ESTIMATED WASTE FACTOR ON THE FRAMING ORDER TO 10% OR LESS. PROVIDE ENGINEERED WOOD BLOCKING BETWEEN JOISTS UNDER PARTITIONS PARALLEL TO, BUT BETWEEN, JOISTS; COORDINATE LOCATION OF BLOCKING WITH MECHANICAL DUCTWORK. 4. SEE A-701 AND A-702 FOR OPEN WEB FLOOR JOIST TYPES; OPEN WEB FLOOR JOISTS TO BE CONSTRUCTED USING FSC-CERTIFIED WOOD; OPEN WEB FLOOR JOISTS TO BE ENGINEERED BY TRUSS SUPPLIER TO MEET LOCAL CODE. 5. 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com 6. GENERAL STRUCTURAL FRAMING CONNECTIONS: LSL CEILING JOISTS TO FLOOR HEADERS: USP THD179 ENGINEERED WOOD JOIST HANGER; DOUBLE LSL FLOOR HEADER TO TRIMMER: USP HD 410 DOUBLE HANGER. CONSULTANT: STRUCTURAL FRAMING CONNECTIONS FOR CENTER BEARING WALL (TO RESIST ROOF UPLIFT): RAFTER TO RIDGE BOARD: USP AC7 ANGLE BRACKET WITH 4 10d NAILS EACH LEG 7. RAFTER TO STUD IN ATTIC BEARING WALL: USP LTW12 WITH R 10d NAILS EACH END STUD IN ATTIC BEARING WALL TO CEILING JOIST: USP LTW12 WITH 4 10d NAILS EACH END CEILING JOIST TO STUD IN SECOND FLOOR BEARING WALL: USP RT10 WITH 4 8d NAILS EACH END (USE USP LTW12 AT CONNECTIONS TO WALL HEADERS) r n STUD TO SOLE PLATE IN SECOND FLOOR BEARING WALL: (2) USP S01 CLIP ANCHORS SOLE PLATE TO FLOOR DECK: (2) #8x3" WOOD SCREWS AT 12" O.C. ATTIC FLUSH-FRAMED BEAM TO WALL STUDS AT ENDS OF BEAM: USP LTW12 WITH 6 10d NAILS EACH END OF STRAP; PROVIDE CONTINUOUS LOAD PATH DOWN TO BASEMENT BEAM USING SIMILAR SIZED STRAPS AT ALL FRAMING JOINTS. L J PROJECT: NationalInstituteof StandardsandTechnology OSHEETKEYNOTES NetZeroEnergy ResidentialTest Facility END OF FLOOR JOIST TO BE FULL BEARING ON BEAM BELOW. 1. 2-2x6 BLOCKS IN FLOOR BELOW JACK STUDS TO TRANSFER LOAD TO BEAM BELOW WHERE JACKS STUDS ARE NOT ALIGNED WITH FLOOR JOIST. 2. NIST Campus Gaithersburg, MD U.S. Department of Energy Research Toward Zero Energy Homes U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY MARK DATE DESCRIPTION ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION PROJECT NO: NIST NZERTF A-PLOT-PLAN-NZERTF CAD DWG FILE: CG DRAWN BY: CHECKED BY: BP COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION SHEET TITLE: FIRSTFLOOR FRAMINGPLAN o SCALE AS NOTED A-104 C/LOF BEAM
  • 8. cr sri p{(2 A lj o 5-0" CLEAR 11" x UP 11ii 11 ii 7^ <2 ■V ATTIC ACCESS ABOVE - 1 o CO GARAGE CONCRETE STAIR AND LANDING J 1 CO CJ l J ■V 8" CM L_ + -H 18 I J CO CM -2/A-294- i i i LO LO WINDOW WELL LO 28'-1 1/2 3ji i 375" ii d- "7 CO 8/A-204 I CO SEAT 6/A-204 -v o CONDUIT THROUGH WALL TO FUTURE MULTI-SPLIT OUTDOOR UNIT - r □ SOI. GAS ----- VENT —3/|lTH #1 4/A-|204 'd- o CM I < CM OO DINING ROOM / X o i CM LO i < i a LO O ■I Ol Ol m- > ■f] i <s> N) a> 12 co o -i^ > i CO ro o = O - o ACCESS PANEL ABOVE 4^ LO 2 r 4 CM I I CO CO < CD = o U o ©, ©54. 4-4^ --2-7 1/4' 3’-1" 4’-3 1/4 M 11-10" 1 ■7 <2 -7 -7 /CCESS PANEL ABOVE <25 15 O co 3/A-207 11--1 1/4' 3-1" 3-11 3/4' 8-1 ,'-10 1/2; I 5 1/2’ ■ii 1 iL BEARING WALL MUDROOM 5 1/2 11 5 1/2" CL © I S> O CM 4- CM -CO ■V DOWN CO CLOSE 5 T UTILITY co o CO I II CM CLOSET 5 1/2 11 1 1/2 HI 11/A-204 CT> I 1/A-205 ® i CD m 1 1 CO < "nJ- 4i T o 12" 4'-9"/y5 1/2 11 2-3 1/2" 3’-10 4’-11 1/2" 2-1 1/2 11 9-10 1/2 M ~ 7 ~ h' t- -7 !©, ENTRY HALL - ol CO CO CO > > I Q t LO ro LU ro o o o CM LIVING ROOM 5 1/2" 4-2 M cn 1 1 ACCESS PANEL ABOVE -h < co CD m ; S ; <2 < CO o CO I LO - <2 ■7-^r O OFFICE / OPTIONAL BEDROOM 4 ■f^r S) CO o LU 7/A-205 M—JP- CD ■ DO Tf a: o o < < CT> o I LU 11'-6 1/2" 9'- 11 8-0" 12'-1 ID f 4 <L (- JJ 10 <2 1 T o l LO 13 f ) 3B CL l 4 SEE 2/A-507, TY 6" M CL SEE 1/A-507, TYP. ,'-7- CL CL CL CL CONCRETE SLAB W/ BROOM FINISH: SLOPE SLAB 1/4":12 AWAY FROM HOUSE FRONT PORCH 11 CO I CO 1 II -7 lAT UNDERGROUND CONDUIT BETWEEN GARAGE AND BASEMENT 1 SLOPE GARAGE SLAB 4" :12" 4" SLAB ON GRADE; SEE 1/A-305 SEE 4&5/A-507, TYP. 3-4 M 5-10" 8-10" 8-10" 30-8 1/8 n 5-10 n 3-4 n 4 -2 3/411 7^- 7^- 7— 7— 7— 7 e CL CL CL CL L T1’-7' 1T- TT" 1Y-T xw -71- 7L 0 "7 O (2 ■-11 ■ 5-91/4 n f l -sJ- CO -V O CM O I CD CM O W/D 5 1/2" Oio Kl CO 1 CO LU O O 00 ^ >IS ^4I CH, CM LIFT <<p (11) -| 25-1 UNDERGROUND CONDUIT BETWEE^ GARAGE AND BASEMENT 1^ SEE 3&7/A-507, TYP. co f ) <2 CD 1 LD CL CL 14-5 1/2' 5-9 1/4' 2’-9 1/4' 8-7 3/4' 8-7 3/4' 9-6 3/4' 6’-4 1/2' 3-9 1/4' 4’-2 3/4' 7— 7— 7L 7 ~ 7L 7L 7 ~ 7L 7 ~ 4" 7^" 13-5' 8" 7— 7— -V - CONCRETE PAVERS WITH 8" CONCRETE WALL EDGE; STONE VENEER ON TOP AND SID E OF CONCRETE WALL; SEE 4/A101A CONCRETE SLAB W/ BROOM FINISH: SLOPE TO FLOOR DRAIN DOWN FLOOR DRAIN; CONNECT TO ROOF DRIP EDGE DRAINAGE SYSTEM PATIO -n > o o IM> o o o CONDUIT THROUGH WALL FOR FUTURE GAS WATER HEATER SUPPLY/EXHAUST SCREEN PORCH cn CONCRETE PAD FOR OUTDOOR UNIT FOR GARAGE HEAT PUMP 19 SEE 3/A-507 5/A-205 CL CL CL CL l 2' -v 26-0' 16’-0" 2-0' 32-0' 2’-0" 8-0' 5 6 6.1 2 3 4.1 4 7 86’-0" 8' 3-0' 8" 5'-10" CD I f^- o CM V B B o 11" -V BREEZEWAY O. © CD CONCRETE WITH BROOM FINISH B B 11" CM f^- 1 CD LO 1 F.1 F -V D CD 1 CO CO CONDUIT THROUGH WALL FOR FUTURE GAS FURNACE SUPPLY/EXHAUST O o 1 CO B -V o I CM A CO I LO A.1 O 00 1 1 o CD CM CM 1 LO O 1 CO O <2 CD 1 O Z <2 CD CD 1 7— 7— 5'-9 1/4’ 7— F E E.1 CD 00 CO C.1 c A 8-10 1/4" 11'-4 1/2' 7^- FIRSTFLOORPLAN SCALE: 1/4" = 1'-0" GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION 1. FIRST FLOOR AREA TO OUTSIDE FACE OF STUD WALL: 1,518 SQ. FT. 2. DIMENSIONS ARE TO FACE OF STUD UNLESS OTHERWISE NOTED. INTERIOR PARTITIONS FRAMED WITH 2x4 WOOD STUDS UNLESS OTHERWISE NOTED. 3. 4. INTERIOR BEARING WALLS FRAMED WITH 2x6 WOOD STUDS UNLESS OTHERWISE NOTED. 5. INTERIOR DOORS TO BE CENTERED BETWEEN THE NEAREST WALL PERPENDICULAR ON EACH SIDE OF THE DOOR UNLESS OTHERWISE NOTED. 6. SEE A-602 FOR FINISH SCHEDULE REFER TO POCKET DOOR FRAME KIT INSTALLATION INSTRUCTIONS TO DETERMINE ROUGH OPENING OF POCKET DOOR. 7. 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com CONSULTANT: OSHEETKEYNOTES PROVIDE BLOCKING IN WALL TO SUPPORT FUTURE STAIR LIFT. BLOCKING SHOULD EXTEND UP TO A HEIGHT OF 3’-0" ABOVE STAIR TREADS. 1. 2. STAIR FROM FIRST TO SECOND FLOOR TO HAVE 16 RISERS AT 7%", 10" TREADS WITH % NOSING. 3. CASED OPENING, 7-6" FINISHED HEIGHT CASED OPENING, 6-8" FINISHED HEIGHT DROPPED CEILING, 7-9" FINISHED HEIGHT 4. r n 5. 18" x 18" ACCESS PANEL ABOVE DOOR FOR ACCESS TO FCU-2 UNIT. 6. CONCRETE GARAGE STAIR TO HAVE 4 RISERS AT 6y2", 11" TREADS. 7. 8. GARAGE ATTIC ACCESS PANEL TO FIT WITHIN ROOF TRUSSES; SEE A-112 ROOF FRAMING PLAN FOR LOCATION AND SIZE. PANEL TO BE FASTENED FROM BELOW AND REMOVABLE WITHOUT REMOVING PANEL TRIM. ACCESS PANEL TO BE INSULATED. CELLULOSE ATTIC INSULATION SHALL BE HELD BACK FROM ACCESS OPENING. L J PROJECT: NationalInstituteof StandardsandTechnology 9. SIZE OF CONCRETE PAD TO BE SPECIFIED BY MANUFACTURER OF AIR-TO-AIR OUTDOOR UNIT, 10. LOCATION OF FUTURE OUTDOOR AIR-TO-AIR UNIT. NetZeroEnergy ResidentialTest Facility 11. DO NOT SLOPE SLAB IN THIS AREA; THICKEN SLAB UNDER CHAIR LIFT IF SPECIFIED BY MANUFACTURER OF LIFT. ODOORKEY NIST Campus Gaithersburg, MD 1. 1 ’-8" x 6’-8" LH U.S. Department of Energy Research Toward Zero Energy Homes 2. (2) 1-10" x 6-8" 3. 2-4" x 6-8" LH 4. 2-4" x 6-8" RH 2-4" x 6'-8" POCKET 5. U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY 6. 2-6" x 6'-8" RH 7. 2'-6" x 6'-8" LH 8. 2'-8" x 6'-8" LH 9. 2'-8" x 6'-8" RH 10. 3'-0" X 6'-8" LH 11. 3'-0" x 6'-8" RH 07/27/10 UPDATED 3'-0" x 6-8" POCKET 12. 06/29/10 UPDATED 13. 3'-0" x 7'-0" RH W/12" SIDELITES MARK DATE DESCRIPTION 14. 3'-0" x 7'-0" LH ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION 15. 3'-0" x 7'-0" RH PROJECT NO: NIST NZERTF 16. 9'-0" x 8-0" OVERHEAD A-PLOT-PLAN-NZERTF CAD DWG FILE: 17. (2) 4'-6" x 8'-0' CG DRAWN BY: 18. 6'-0" x 6'-8" (1) LH PANEL, (1) FIXED PANEL CHECKED BY: BP COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION 19. 3'-0" x 6-8" RH SHEET TITLE: FIRSTFLOORPLAN i o SCALE AS NOTED z A-105 u ACTIVE DOOR © (= = = = =!= I PASSIVE DOOR 9'-0"
  • 9. O'-O M O'-O" GENERALSHEETNOTES BLOCKING TO SUPPORT HANGER FOR SCREEN PORCH END BEAM O'-O M BUILDINGSCIENCE CORPORATION 36'-0' 34'-6 3/4M 17'-3 1/4" '-8 1/4ii 8'-5 1/2ii 5'-11 1/4" 27'-1" 1. REAR WALL FRAMING ELEVATIONS DRAWN AS SEEN FROM INTERIOR; INTERIOR BEARING WALL FRAMING ELEVATION DRAWN AS SEEN FROM THE FRONT; ALL OTHER ELEVATIONS DRAWN AS SEEN FROM EXTERIOR -7^ 4 7 36'-0" 35'-8ii 25'-3 1/2" 10'-8" 14'-7 1/4 2'-6 1/4" 36'-0" 31-10 3/4' 22-1" ii 3-0 3/4' 8-5 1/2" -7^ -7^ 7 “ 36-0" 30-10" 25'-3 1/2" 14'-1 3/4" 2'-1" 2'-0' 2'-0" 2'-0' 7^ "7 ~ Y- 77© 9'-1 1/4" 8'-4 3/4" 4'-6 3/4" 3'-4M 13'-4" z^~ zz zziz ft 7^|ft ~7 Z7 4 7 ,Z TT TYPICAL WALL HEIGHT = 9'-1". 2. ^r ^4 X 3! 3.5" x 5.5" 1.3 = LSL HEADEF 3. TYPICAL FIRST FLOOR WINDOW FRAMING HEAD HEIGHT = 7'-6 3/4". (2) 1.75" x 11.25" LSL 1.55E HEADER (2) 1.75" x 11.25" LSL 1.55E HEADER / 3.5" x 5.5" LSL 1.3E HEADER 3.5" x 5.5" LSL 1.3E HEADER 3.5" x 7.25" LSL 1.3E HEADER ^7 3.5" x 9.25” LSL 1.3E HEADER (2)1.75” x 11.25” LSL 1.55E HEADER 3-10" / / CT> WINDOW AND EXTERIOR DOOR FRAMING OPENING DIMENSIONS TO BE ADJUSTED PER MANUFACTURER SELECTION AS FOLLOWS: 4. CM 3'-2" l E > CM C C&co I E - © —? ! I 6'-4 1/2ii "mI- A V- -AS. 1/2' ©- 4-7 M 3-1 8'-1" 2-5' 2'-5' I -A -A - © -© ©- 7< ' A -A © LO ±5 i A. FRAMING WIDTH FOR DOORS AND WINDOWS: INCREASE THE MANUFACTURER'S SPECIFIED ROUGH OPENING WIDTH BY ADDING V2" TO EACH SIDE. B. FRAMING HEIGHT FOR WINDOWS: INCREASE THE MANUFACTURER'S SPECIFIED ROUGH OPENING HEIGHT BY ADDING V2" TO THE TOP AND 1" TO THE BOTTOM. C: FRAMING HEIGHT FOR DOORS: INCREASE THE MANUFACTURER'S SPECIFIED ROUGH OPENING HEIGHT BY ADDING 1/2" TO THE TOP. FRAMING STUDS TO BE FSC-CERTIFIED LUMBER. CNJ / CD / / CN CN / CN © © © / 18 <D CD CD N- / CD / / CD CD / / c & ■v -V 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com KT TK S S S KTT TT TT TT TT TTK SS S KTT TTK S E KT TK S S KT C C TK S KT C TK S S KT TK S E E S KT TK S E IB1 H7 H6 CONSULTANT: 5. 1 ■A ©------- LU CN O LIMIT THE OVERALL ESTIMATED WASTE FACTOR ON THE FRAMING ORDER TO 10% OR LESS.' 6. CN O CD H7 cn i / STRUCTURAL SHEATHING CONNECTIONS (TO RESIST ROOF UPLIFT): 7. CO CN T £ CO 5-7" o ny W CD -©—V LAP SHEATHING ON RAFTER RIM BOARD: MINIMUM 8d NAILS AT 3" O.C. m O CN DO O i X < OO o HORIZONTAL SHEATHING EDGES AT BLOCKING OR FRAMING: MINIMUM 8d NAILS AT 3" O.C. / (a cn / HORIZONTAL SHEATHING EDGES BELOW SECOND FLOOR: MINIMUM 8d NAILS AT 6" O.C. / CN r i CD LO <> cn i OSHEETKEYNOTES X CN □ CN / < if) Ol i if) 4^ / LO / CO 00 J- if) LO i 7 oo X o / CN < i < CO o L J / CN CN PROJECT: if) CD CD i / / CD CD NationalInstituteof StandardsandTechnology in / U ./ M. 7 LU / 00 00 H6 CN hJ 7'-3" NetZeroEnergy ResidentialTest Facility 2 o t x X a> > * n * 7i o 00 00 2'-7" nni ^ pm PE y n CN © 7!- / CN O IB1 CD / CO if) CO "si- l o U t in NIST Campus Gaithersburg, MD / if) CN / if) 00 CN NO CD i ^1" o CO X if) oo t / Ol NO U.S. Department of Energy Research Toward Zero Energy Homes (n i NO / X NO if) if) 2'-7" V, o / t if) CD Is- i U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy co LO ENERGY S> i o 7s LO N- O i > oo LU -V T NO / 5'-7" o t; T 00 00 if) y OsJ ^ ::=nLU O i i if) CO -N -N OO CD X 4^ A © CO LU m 'I T— T 7 H2 x H1 MARK DATE DESCRIPTION O'-O" O'-O' BLOCKING TO SUPPORT HANGER FOR FRONT PORCH END BEAM BLOCKING TO SUPPORT HANGER FOR FRONT PORCH END BEAM ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION 36’-0' 34-4 1/2" 28-6 1/2 M 21'-2 3/4" 10'-10 1/2" 5'-0 1/2M 8'-5 1/2M 5'-11 1/4" 7L PROJECT NO: NIST NZERTF 36'-0" 30'-11 1/2' 25-1 1/2 M 14’-9 1/4" 7-5 1/2 M r-7 1/5M 8-5 1/2" 2-6 1/4" 7^ 7 = A-PLOT-PLAN-NZERTF CAD DWG FILE: 2-0 M 2-0 M 2-0" 1?*- 7^ DRAWN BY: HW ^7 rz Tz 4 CHECKED BY: BP / -4© -4© '-Z, COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION 3.5” x 5.5” 1.3 = LSL HEADEF 3.5” x 5.5" 1.3 = LSL HEADEF 3.5" x 5.5" 1.3 = LSL HEADEF 3.5" x 5.5" 1.3 = LSL HEADEF 3.5" x 5.5" 1.3 = LSL HEADEF / 3.5" x 7.25" LSL 1.3E HEADER 6-2 1/2" / / 2x4 STUD FOR STRUCTURAL SHEATHING ATTACHMENT, TYPICAL / / SHEET TITLE: 3-2" 3-2 ii 3-2" 3-2 M 3-2 ii -© -© © © © © z' z! ! 3-3 1/2" N- N- i— i— - © 00 / / 1 FIRSTFLOORKEY PLAN&WALL FRAMING ELEVATIONS A A A A A LO LO LO LO LO LO 00 / / CN / i h- / / 13© / ±<Z ns / / / s s m m c c £ E KTC TK S KT C C TK S KT SS SS TK S KT C C TK S KT C TK E E S KT C TK S E 3 3/8" 1/2" 4'x8' PLYWOOD STRUCTURAL SHEATHING, TYPICAL i cz o SCALE AS NOTED H1 H2 z A-106 FIRSTFLOORKEYPLAN&WALLFRAMINGELEVATIONS SCALE: 1/4" = 1'-0 H
  • 10. 21 '-11 1/4 7'-5 3/4" 26-0" ii — 12'-4 1/4" 4'-0 3/4’ 26'-0' 2'-0ii 2'-0ii 7^ TFFF fTF' 7F 4 I 22* X 5-8 1/4 ii CD L ■f: I A CO .2^, .2^, .2^, o V 7 7 o /I o w 2X4 STUD FOR STRUCTURAL SHEATHING ATTACHMENT, TYPICAL ho 3.5" x 5.5" L5fL 1.3E HEADER J Z -t* NO 3.5" x 9.25" LSL 1.3E HEADER f o col * 3'-2' 9-4" <> ' Tl v- 00 TCl T r^ Ul 6-9 1/2 M I A LO f^ © 00 ,s]- oo 00 CD CD Ol 7 i 00 CD s A 4^ * 4 5 00 FOUNDATION WALL, TYPICAL 4^ K ’ TK S S S KT C TK S m A-----A / CO r-3 1/21 oo l_ l_ l G1 GENERALSHEETNOTES 1. REAR WALL FRAMING ELEVATIONS DRAWN AS SEEN FROM INTERIOR; ALL OTHER ELEVATIONS DRAWN AS SEEN FROM EXTERIOR TYPICAL GARAGE WALL HEIGHT = 9-4". 2. 3. TYPICAL GARAGE WINDOW FRAMING HEAD HEIGHT= 6’-10y2" ABOVE TOP OF GARAGE FOUNDATION WALL. 4. WINDOW AND EXTERIOR DOOR FRAMING OPENING DIMENSIONS TO BE ADJUSTED PER MANUFACTURER SELECTION AS FOLLOWS: A. FRAMING WIDTH FOR DOORS AND WINDOWS: INCREASE THE MANUFACTURER'S SPECIFIED ROUGH OPENING BY ADDING y2" TO EACH SIDE. B. FRAMING HEIGHT FOR WINDOWS: INCREASE THE MANUFACTURER'S SPECIFIED ROUGH OPENING HEIGHT BY ADDING y2" TO THE TOP AND 1" TO THE BOTTOM. C. FRAMING HEIGHT FOR DOORS: INCREASE THE MANUFACTURER'S ROUGH OPENING HEIGHT BY ADDING Vi' TO THE TOP. FRAMING STUDS TO BE FSC-CERTIFIED LUMBER. 5. 6. LIMIT THE OVERALL ESTIMATED WASTE FACTOR ON THE FRAMING ORDER TO 10% OR LESS. STRUCTURAL SHEATHING CONNECTIONS ON GARAGE (FOR BRACING): 7. FASTEN PLYWOOD SHEATHING ON WEST WALL WITH MINIMUM 8d NAILS AT 3" O.C. OSHEETKEYNOTES O'-O" 13'-5' 12-9 3/4' 8-9 3/4" 3-10 3/4' 7L 9-6 1/4" 4-7 1/4' 13-5' 7 1/4" i1- 3.5” x 9.25" LSL 1.3E BEAM -V SC (2) 2X6 POST (2) 2X6 POST 00 LO CO CO 3-3 1/2’ 4-2 1/2’ 3-3 1/2’ 7 - CO -7' ' CO X I CM —V ES K C C K K C C K K C SP2 SP2 H ft 4 o O J CM 5-8 1/4" Jo o o v- I o t o I I o> A o c/) CL "D * Q_ 3? Cf.) co C/) 1 O CO CM CO / I I LO / o o I LO X -2,- o 3T o A CO o o JJ HI T > o> O'-O" 21'-11 1/4" 7'-5 15/16" 26'-0" 26'-0' 18'-6 1/4" 4'-0 3/4" 7L 2'-0" 2'-0' ~? ~ ~? ~ ~? ~ xA 7^7 FTF' ~FF F7 22. 2^. ^2. ^2. ^2. X ft FT 7F A x / 3.5" X 5.5" LSL 1.3E HEADER 3.5" X 5.5" LSL 1.3E headef: 3'-2' -=f 3'-2" -?: ’A ■ A 7^7 O) f^- LO I A A / LO CM : = 4 5 I c CO I KT TK S S S S S S KT C TK S E J l_ G3 GARAGEKEYPLAN&WALLFRAMINGELEVATIONS SCREENPORCHKEYPLAN&WALLFRAMINGELEVATIONS SCALE: 1/4" = 1'-0" SCALE: 1/4" = 1’-0’ BUILDINGSCIENCE CORPORATION 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com CONSULTANT: r n L j PROJECT: NationalInstituteof StandardsandTechnology NetZeroEnergy Residential Test Facility NIST Campus Gaithersburg, MD U.S. Department of Energy Research Toward Zero Energy Homes U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY MARK DATE DESCRIPTION ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION PROJECT NO: NIST NZERTF A-PLOT-PLAN-NZERTF CAD DWG FILE: DRAWN BY: HW CHECKED BY: BP COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION SHEET TITLE: SCREENPORCH& GARAGEKEY PLANS&WALL FRAMINGELEVS. o SCALE AS NOTED A-107 ~I G2 00 I I CO v|KS 0 E S s s S K S w s s s E 5SZ / / / CM / / / / 3'-3 1/2 2L*. 2Li 2L*. ^2 2^. ^2 2^. 2^. ^2 ^2 2^. ^2 2^. ■PI 77 FF©- rr T r-6 1/2” 4 F r-6 1/2" 9'-10 3/4” 23'-1" 13'-2 1/4” 23'-1" O'-O' G2 r o o CO ACTIVE DOOR o CD J J L L ^PASSIVE DOOR X B , II . II fxxr XT i G4 ,o-,o 21'-5 3/4" 10-8 1/4" l-£Z 12'-4 3/4" 1’-7 1/4" r-p 1/2 1 1'-6 1/2 F L2 FF- IK * SINGLE 2x6 HEADER SINGLE 2x6 HEADER l L-.6 I--,6 CT W- w- l CM CM 16 16 / K CD O) w E IX I k s k I I k i I i i i i i i -r G4
  • 11. 2'-0' 2'-0" 2'-0" 7^ 2x4 VERTICAL WOOD STUD BLOCKING X 14" LSL RIM JOIST 1 '-5 1/2 ii 9-1 o 1 T F O i 00 WX14" LSL RIM JOIST 2'-0' 36-0 M 2'-0" 5 6 6.1 4.1 7 8'-0' 7L 7^ F.1 [] 2'-0" 2'-0" 2'-0" 7^ 7 ~ -7<- [] t—r F 2x4 VERTICAL WOOD STUD BLOCKING ALONG RAKE END RIM JOIST BETWEEN SILL PLATE AND FLOOR SHEATHING 14" DEEP OPEN WEB FLOOR TRUSS TYPE "E" AT 24" O.C. WITH T & G FLOOR SHEATHING; SEE A-701 ,A-702 FOR TRUSS TYPES 14" DEEP OPEN WEB FLOOR TRUSS TYPE "E" AT 24" O.C. WITH T & G FLOOR SHEATHING; SEE A-701 ,A-702 FOR TRUSS TYPES m m m O o CN m 14" DEEP OPEN WEB FLOOR TRUSS TYPE "E1" AT 24" O.C. WITH T & G FLOOR SHEATHING; SEE A-701, A-702 FOR TRUSS TYPES WX14" LSL RIM (jOIST iy4"X1iy4" LSL RIM JOIST CD CO CO D 2x4 VERTICAL WOOD STUD BLOCKING ALONG RAKE END RIM JOIST BETWEEN SILL PLATE AND GABLE WALL BOTTOM PLATE 1%" x 11 y4" LSL ENGINEERED ATTIC JOISTS AT 24" O.C. tr o CO CO c/3 LU O — 14" DEEP OPEN WEB FLOOR TRUSS TYPE "G" AT 24" O.C. WITH g" T & G FLOOR SHEATHING; SEE A-701, A-702 FOR TRUSS TYPES iy4"X 11-1/4" LSL RIM JOIST B 2'-0" 2'-0" o CN A 1)4" X 14" LSL RIM JOIST A.1 2 3 1 4 2'-0' 2'-0' ■7 ~ F =i E =i BLOCKING BETWEEN JOISTS UNDER PARITIONS ALIGNED WITH BUT BETWEEN JOISTS, TYPICAL J I / E.1 o WfF =3 <D C.1 CO CO DASHED LINES INDICATE STUD WALLS ABOVE CN O CO 1 iy4"X14" LSL RIM JOIST c 2x4 VERTICAL WOOD STUD BLOCKING ALONG RAKE END RIM JOIST BETWEEN SILL PLATE AND FLOOR SHEATHING I 14" DEEP OPEN WEB FLOOR TRUSS TYPE "F" AT 24" O.C. WITH T & G FLOOR SHEATHING; SEE A-701,A-702 FOR TRUSS TYPES 7 - A 2'-0' 2'-0' -7 ~ 7 ~ iy4- SECONDFLOOR&LOWERATTICFRAMINGPLAN SCALE: 1/4" = 1'-0" JC O CL C/3 co 5 LU g o O LU <-ea GENERALSHEETNOTES 1. CONTRACTOR TO VERIFY ENGINEERED WOOD PRODUCT (EWP) MEMBER SIZES WITH EWP SUPPLIER. BUILDINGSCIENCE CORPORATION 2. EWP CONNECTIONS TO FOLLOW EWP SUPPLIER INSTRUCTIONS. 3. LIMIT THE OVERALL ESTIMATED WASTE FACTOR ON THE FRAMING ORDER TO 10% OR LESS. PROVIDE ENGINEERED WOOD BLOCKING BETWEEN JOISTS UNDER PARTITIONS PARALLEL TO, BUT BETWEEN, JOISTS; COORDINATE LOCATION OF BLOCKING WITH MECHANICAL DUCTWORK. 4. SEE A-701 AND A-702 FOR OPEN WEB FLOOR JOIST TYPES; OPEN WEB FLOOR JOISTS TO BE CONSTRUCTED USING FSC-CERTIFIED WOOD; OPEN WEB FLOOR JOISTS TO BE ENGINEERED BY TRUSS SUPPLIER TO MEET LOCAL CODE. 5 6. GENERAL STRUCTURAL FRAMING CONNECTIONS: 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com LSL CEILING JOISTS TO FLOOR HEADERS: USP THD179 ENGINEERED WOOD JOIST HANGER; DOUBLE LSL FLOOR HEADER TO TRIMMER: USP HD 410 DOUBLE HANGER. CONSULTANT: STRUCTURAL FRAMING CONNECTIONS FOR CENTER BEARING WALL (TO RESIST ROOF UPLIFT): 7. RAFTER TO RIDGE BOARD: USP AC7 ANGLE BRACKET WITH 4 10d NAILS EACH LEG RAFTER TO STUD IN ATTIC BEARING WALL: USP LTW12 WITH R 10d NAILS EACH END STUD IN ATTIC BEARING WALL TO CEILING JOIST: USP LTW12 WITH 4 10d NAILS EACH END CEILING JOIST TO STUD IN SECOND FLOOR BEARING WALL: USP RT10 WITH 4 8d NAILS EACH END (USE USP LTW12 AT CONNECTIONS TO WALL HEADERS) r n STUD TO SOLE PLATE IN SECOND FLOOR BEARING WALL: (2) USP S01 CLIP ANCHORS SOLE PLATE TO FLOOR DECK: (2) #8x3" WOOD SCREWS AT 12" O.C. ATTIC FLUSH-FRAMED BEAM TO WALL STUDS AT ENDS OF BEAM: USP LTW12 WITH 6 10d NAILS EACH END OF STRAP; PROVIDE CONTINUOUS LOAD PATH DOWN TO BASEMENT BEAM USING SIMILAR SIZED STRAPS AT ALL FRAMING JOINTS. L J PROJECT: NationalInstituteof StandardsandTechnology OSHEETKEYNOTES NetZeroEnergy ResidentialTest Facility 1. END OF FLOOR JOIST TO BE FULL BEARING ON BEARING WALL BELOW. 2. FOR SIZE AND LOCATION OF HEADERS IN THE BEARING WALL BELOW, SEE A-108, WALL IB1. NIST Campus Gaithersburg, MD U.S. Department of Energy Research Toward Zero Energy Homes U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY MARK DATE DESCRIPTION ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION PROJECT NO: NIST NZERTF A-PLOT-PLAN-NZERTF CAD DWG FILE: CG DRAWN BY: CHECKED BY: BP COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION SHEET TITLE: SECONDFLOOR LOWERATTIC FRAMINGPLAN & o SCALE AS NOTED A-108 : 0 T I 0 i n LU Tr o < 3-10 1/2" m x IT C/3 L 0 X 00 .0 CN 18'-1 1/4" ACCtSS FROM BELOW -'j 1 I O 0 IWCT ^ r - t I > F 14'-: O I n i h o 0 ACCESS FROM BELOW
  • 12. CO -V 01^5'-: 3“T 2' 14'-6 1/2" 4 ->H‘- o> © h- 05 > i MASTER BEDROOM 5iA-206 CO CO ro o 3-5" 6-8 1/2" to 3]a-2(|)6 z 03 & 7^ o :^/2 < FLOOR ACCESS o LO F CO o o 1 CLOSET i i 3 1/2' o] tol i- a -v CD SOIL GAS VENT ^ 5 1/2" o CN CM © 0/A-206S- < Gk CO N- §/A-206 3-6 6-3’ LO ft CO CM © © BATH #2 oo <D /(TTIC ACCESS W)/ PULLDOWN $T^IR 5 1^2" 3-9' LU 2/A-205 CLOSET © HALL l'-3 1 9-1" 4'-0 1/2" 2' 3 1/2' 5'-9' r ^-7- 7^ 7^ I © -BOWN- O 5 1/2" 5 1/2' ®* 0, . . 5 1/2' ; f~~? ; ■ ~ © CL. CD / FLOOR ACCESS BEARING WALL ± <TJ 5 1/2" BEARING WALL FLOOR ACCESS 7-11 1/2' , 2-9" 3 1/2' 10-8 1/2" -*7 OPEN TO lJ BELOW > lJ O ^1 CLOSET CM BEDROOM 2 BEDROOM 3 CJ S) LA] MASTER BATH r;W A u a A CM co o I o CM CN 00 00 -V CO I 00 LO CO 10-8 1/2' 10-8 1/2" 9-1 5 6 6.1 4.1 7 36'-0' 7^ 8'-2‘ 12-9 1/2" 6-7 1/2' 2’-0" 4'-5' 7^ <- 7^ 7^ 7^ f" tL OL dL 2-0 M 8-10" 8-10 M 2-0 7-2" 7’-2' 7L 7" 7L 7 ~ ____I CL 0L dL A F.1 F D B A A.1 3 4 2-0’ -7^- 1L V o o u 2 1 F r i E - E.1 II GARAGE ATTIC ACCES HATCH I I --l-L- T C.1 C A SECONDFLOORPLAN SCALE: 1/4" = 1-0" -v CO I CM -V r^ i 05 INSTRUMENTATION CONDUIT BETWEEN GARAGE ATTIC AND 2ND FLOOR FRAMING CM i CO GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION 1. SECOND FLOOR AREA TO OUTSIDE FACE OF STUD WALL: 1,191 SQ. FT. 2. DIMENSIONS ARE TO FACE OF STUD UNLESS OTHERWISE NOTED. INTERIOR PARTITIONS FRAMED WITH 2x4 WOOD STUDS UNLESS OTHERWISE NOTED. 3. 4. INTERIOR BEARING WALLS FRAMED WITH 2x6 WOOD STUDS UNLESS OTHERWISE NOTED. 5. INTERIOR DOORS TO BE CENTERED BETWEEN THE NEAREST WALL PERPENDICULAR ON EACH SIDE OF THE DOOR UNLESS OTHERWISE NOTED. 6. FLOOR ACCESS PANELS FIT WITHIN FRAMING MEMBERS; SEE FRAMING PLAN. PANELS TO BE COVERED WITH FINISH FLOORING. SEE 8/A-508. 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com SEE A-602 FOR FINISH SCHEDULE. 7. 8. REFER TO POCKET DOOR FRAME KIT INSTALLATION INSTRUCTIONS TO DETERMINE ROUGH OPENING FOR POCKET DOOR. CONSULTANT: OSHEETKEYNOTES 1. INSTRUMENTATION CONDUIT FROM GARAGE ATTIC (THROUGH BREEZEWAY) TO ENTER WALL THROUGH RIM JOIST (IN 2ND FLOOR FRAMING). PENETRATION "E10", SEE A-603 FOR PENETRATION SCHEDULE. r n 2. AIR RETURN FOR FCU-1 LOCATED IN WALL ABOVE DOOR L J PROJECT: NationalInstituteof StandardsandTechnology NetZeroEnergy Residential Test Facility oDOORKEY NIST Campus Gaithersburg, MD 1. 1 ’-8" x 6’-8" LH 2. (2) T-10" x 6’-8" 3. 2-4" x 6-8" LH U.S. Department of Energy Research Toward Zero Energy Homes 4. 2-4" x 6-8" RH 2-4" x 6-8" POCKET 5. 6. 2-6" x 6-8" RH U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy 7. 2-6" x 6-8" LH ENERGY 8. 2-8" x 6-8" LH 9. 2'-8" x 6-8" RH 10. 3'-0" X 6'-8" LH 11. 3'-0" x 6'-8" RH 3'-0" x 6'-8" POCKET 12. 13. 3-0" x 7'-0" RH W/12" SIDELITES 14. 3'-0" x 7'-0" LH MARK DATE DESCRIPTION 15. 3'-0" x 7'-0" RH ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION 16. 9'-0" x 8-0" OVERHEAD 17. (2) 4'-6" x 8-0' PROJECT NO: NIST NZERTF A-PLOT-PLAN-NZERTF CAD DWG FILE: 18. 6'-0" x 6'-8" (1) LH PANEL, (1) FIXED PANEL CG DRAWN BY: 19. 3-0" x 6-8" RH CHECKED BY: BP COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION SHEET TITLE: SECOND FLOOR PLAN i o SCALE AS NOTED z A-109 O O CN CM © H LU = H 4© z-.e § 7 LJ CO 10'-8” 4'-6 1/2" 6-10 1/2' © o ■v 1/A-206 2/A-206 co 6 SHELVES CM To 4 F 4 ..8-6 I, -6©P 2-7' 6-10 1/2' ir-2" © 4 o L ? rv rvj o LO CM 4- 4
  • 13. GENERALSHEETNOTES O'-O" REAR WALL FRAMING ELEVATIONS DRAWN AS SEEN FROM INTERIOR; INTERIOR BEARING WALL FRAMING ELEVATION DRAWN AS SEEN FROM THE FRONT; ALL OTHER ELEVATIONS DRAWN AS SEEN FROM EXTERIOR 1. O'-O’ BUILDINGSCIENCE CORPORATION 32'-0" 26'-6" 12'-11 6-3 1/2" 7 “ 36'-0' 34-0 1/4’ 28'-11 3/4" 25'-5" 22'-6 1/2' 12-9 3/4’ 4-10 1/4' 32'-0" 9-2" 2'-6 1/2' 2T-2" 7 7 “ 36'-0' 31-3 3/4" 25-11 1/4" 22’-9 1/2' 13-5 1/2" 9-9 1/4' 2'-1 3/4' 2'-0" 7^ 2 IK IK 2. TYPICAL WALL HEIGHT = 9'-1". 3.5" x 11.25" LSL 1.3E BEAM (FLUSH FRAMED) 3. TYPICAL SECOND FLOOR WINDOW FRAMING HEAD HEIGHT = 7'-7 1/2". s m / / / -----------“r= o ' 5" LSL ADER = 3.5" x 5.5" LSL 1.3E HEADER 3.5" x 5.5" LSL 1.3E HEADER 3.5" x li 1.3E F o / V 4. WINDOW AND EXTERIOR DOOR FRAMING OPENING DIMENSIONS TO BE ADJUSTED PER MANUFACTURER SELECTION AS FOLLOWS: / 2 17) 00 CM CD CD / 5.5" x 3.5' 5.5" x 3.5" LSL. 1.3E HEADER (FLATWISE) 2'-9 1/2" 5.5"): 3.5" LSL 1.3E HEADER (FLAT/VISE) 5.5" x 3.5' 5.5" x 3.5" LSL 1.3E HEADER (FLATWISE) I I 2" I" 5' CN OJ G G LSL 1.3E LSL 1.3E HEADER (FLA'"WISE) 2'-C| 1/2" / / CO <- 7" HEADER (FLATWISE) Z—X—V 71 is A. FRAMING WIDTH FOR DOORS AND WINDOWS: INCREASE THE MANUFACTURER'S SPECIFIED ROUGH OPENING WIDTH BY ADDING V2" TO EACH SIDE. B. FRAMING HEIGHT FOR WINDOWS: INCREASE THE MANUFACTURER'S SPECIFIED ROUGH OPENING HEIGHT BY ADDING©’ TO THE TOP AND 1" TO THE BOTTOM. C: FRAMING HEIGHT FOR DOORS: INCREASE THE MANUFACTURER'S SPECIFIED ROUGH OPENING HEIGHT BY ADDING 1/2" TO THE TOP. FRAMING STUDS TO BE FSC-CERTIFIED LUMBER. o 3'-6 3'-@*' E E CO I / / / / o CT> 1/2' 2'-4 1/2" 2'-5 1/2' 7 ! 2'-5 9'-1" "2 7 © V © -A y v 7 " 7 " © fc© © © Ss® CM T 7 2 r / 1 x 7 CM CM CM co V L L X X 7“ CT> 05 O) CT> CT> 00 X X X X X X X -t* CD CD CD CD CD V. m © X. © © © © 2 M X. UK 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com 2 2 2 2 2 2 2 2 2 c tR 2 2 2 SKT 2 2 2 C Tk Xr E KT TK S TK TK KT TKS SS KT TK S S TK TK E S KT C S KT C TK S : 2 2 + CO C/D 7 CO :22r 2 IB2 2 .© H12 CO T X4 £ o i £ LO 2 2 , 2'-5" oc 5. 7 ! ' LU O CONSULTANT: D ^4 o Q CO X© LU o ,7 V 6. LIMIT THE OVERALL ESTIMATED WASTE FACTOR ON THE FRAMING ORDER TO 10% OR LESS.' CO 77 V CM 7 2 2 7T CP vr 7 X 2 7 CM 5'-4" i 7. STRUCTURAL SHEATHING CONNECTIONS (TO RESIST ROOF UPLIFT): I H12 CM fO O I *7 CD i CD 1 LAP SHEATHING ON RAFTER RIM BOARD: MINIMUM 8d NAILS AT 3" O.C. o "x CO CO ro ro 00 X 2 2 V 2 00 ■> © <© 12 © HORIZONTAL SHEATHING EDGES AT BLOCKING OR FRAMING: MINIMUM 8d NAILS AT 3" O.C. fO C 1" X CD 00 I 2 vn HORIZONTAL SHEATHING EDGES BELOW SECOND FLOOR: MINIMUM 8d NAILS AT 6" O.C. W 7 CO 5-7" CO o k CM O CM S GO /x > ro I r n OSHEETKEYNOTES Z 2 r ©. 2 2-5" 2 2 -7T © 1 9'-1" 2”’ Q o I 0) V CM 7 V CO rv x I £ ro v m m X X' D L J m O m m 73 w © CO CO CO co PROJECT: CO (J) CJ) NationalInstituteof StandardsandTechnology CO CO 77 CD CD 1 1 00 00 CO CO CO 77T NetZeroEnergy ResidentialTest Facility X X JOT non L CO 00 CO CD ©—©—"a O -m o IB2 ro o ■V <n X X ur O o CD NIST Campus Gaithersburg, MD co V 1 © —V <0- 7^ CD CO 00 CO T 5 U.S. Department of Energy Research Toward Zero Energy Homes CN CO CM I CO TT’' o CO CO 40 U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy 9'-1" ENERGY co V 2 CCL ' f 9'-1 7 — 7— z: 7 7 m Mil------ ran m—n X I__ ____I GO GO ■xj H9 o r^- MARK DATE DESCRIPTION X ro O'-O' ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION PROJECT NO: NIST NZERTF 32’-0" 28’-5 1/2" 17'-9 3/4" 10'-9 1/2' 7— A-PLOT-PLAN-NZERTF CAD DWG FILE: 32-0" 21’-2 1/2' 14'-2 1/4" 3'-6 1/2' T7- 1/2" 4'x8' PLYWOOD STRUCTURAL SHEATHING, TYPICAL 7— DRAWN BY: HW 2'-0" / ZL 2 CHECKED BY: BP TO 4. CO / ^ X ^ X COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION / / ^£1. 2X. ^£l. X CO- / © M 3.5" x 7.25" LSL 1.3E HEADER 3.5" X 5.5" LS L 1.3E HEADER 3.5" x 7.25" LSL 1.3E HEADER / SHEET TITLE: o CO 1" 3'-4 1/2' r 7' 7' 00 / © © -© © ~! CO 1 1 SECONDFLOOR KEYPLAN&WALL FRAMING ELEVATIONS O LO IO LO / / B B B B B CO 00 / 2x4 STUD FOR STRUCTURAl SHEATHING ATTACHMENT, TYPICAL CO ro / © k CO 00 ^v vr X o CO 2 2 2 © x © 2 © 2 J© 2 2 2 2 CO 2 2 2 2 2 c tT x- X X X S KT C C SKT TKS KT C c: c C TJ S ©L 4^ 2 co -m -----V 1 co 2 CL O SCALE AS NOTED H9 z 2------V SECONDFLOORKEYPLAN&WALLFRAMINGELEVATIONS A-110 SCALE: 1/4" = 1'-0"
  • 14. DOUBLE JOIST © 1 © CONTINUOUS 3-1/2" x 11-1/4" LSL 1.3E FLUSH FRAMED HEADER CO J DOUBLE JOIST -v UTIL n SHAFT .-v CN 2 t ■It r-: 1/4’ 7'-1 1/4’ 4'-6" DOUBLE JOIST 2 © 5 6 6.1 4.1 7 32-0' 2-0" 7^ 7^ F.1 ATTIC JOIST ADJACENT TO ROOF RAFTER, TYPICAL x 11-1/4" RIM LSL BOARD 2'-0' 2'-0' 2'-0' 2-0" ,2’-1 1/2" 7L 7" 7" 7^ F -v 2x4 VERTICAL WD STUD BLOCKING ALONG RAKE END RIM JOIST BETWEEN TOP PLATE OF WALL BELOW AND BOTTOM PLATE OF GABLE WALL 1)4" x 11)4" LSL RIM JOIST o o CN BLOCKING AT 2'-0" O.C. if / 2x6 VERTICAL WD STUD GABLE WALL (BALLOON FRAME) ON TOP PLATE AT 2ND FLOOR FRAMING D J 2 x 6 WD STUD 24 O.C. BEARING WALL CONTINUES TO ROOF RAFTERS ABOVE i CD CO 2x4 VERTICAL WD STUD BLOCKING ALONG RAKE END RIM JOIST BETWEEN TOP PLATE OF WALL BELOW AND BOTTOM PLATE OF GABLE WALL i B = A A.1 2 3 1 4 2'-0' -7^- ■7 ~ 1-1/4’ / 1 -10 1/2’ 2'-0 2'-0' 7L 7 ~ F 2x4 VERTICAL WD STUD BLOCKING ALONG RAKE END RIM JOIST BETWEEN TOP PLATE OF WALL BELOW AND BOTTOM PLATE OF GABLE WALL E iy4"X1iy4" LSL RIM JOIST BLOCKING AT 2’-0” O.C. © E.1 rl 2x6 VERTICAL WD STUD GABLE WALL (BALLOON FRAME) ON TOP PLATE AT 2ND FLOOR FRAMING C.1 7 ~ ar w hr C 2x4 VERTICAL WD STUD BLOCKING ALONG RAKE END RIM JOIST BETWEEN TOP PLATE OF WALL BELOW AND BOTTOM PLATE OF GABLE WALL A 1-1/4" x 11-1/4” LSL RIM BOARD ATTICFRAMINGPLAN SCALE: 1/4” = 1’-0" GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION 1. CONTRACTOR TO VERIFY ENGINEERED WOOD PRODUCT (EWP) MEMBER SIZES WITH EWP SUPPLIER. 2. EWP CONNECTIONS TO FOLLOW EWP SUPPLIER INSTRUCTIONS. 3. LIMIT THE OVERALL ESTIMATED WASTE FACTOR ON THE FRAMING ORDER TO 10% OR LESS. GENERAL STRUCTURAL FRAMING CONNECTIONS: 4. LSL CEILING JOISTS TO FLOOR HEADERS: USP THD179 ENGINEERED WOOD JOIST HANGER; DOUBLE LSL FLOOR HEADER TO TRIMMER: USP HD 410 DOUBLE HANGER. 5. STRUCTURAL FRAMING CONNECTIONS FOR CENTER BEARING WALL (TO RESIST ROOF UPLIFT): RAFTER TO RIDGE BOARD: USP AC7 ANGLE BRACKET WITH 4 10d NAILS EACH LEG 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com RAFTER TO STUD IN ATTIC BEARING WALL: USP LTW12 WITH R 10d NAILS EACH END STUD IN ATTIC BEARING WALL TO CEILING JOIST: USP LTW12 WITH 4 10d NAILS EACH END CONSULTANT: CEILING JOIST TO STUD IN SECOND FLOOR BEARING WALL: USP RT10 WITH 4 8d NAILS EACH END (USE USP LTW12 AT CONNECTIONS TO WALL HEADERS) STUD TO SOLE PLATE IN SECOND FLOOR BEARING WALL: (2) USP S01 CLIP ANCHORS SOLE PLATE TO FLOOR DECK: (2) #8x3” WOOD SCREWS AT 12” O.C. ATTIC FLUSH-FRAMED BEAM TO WALL STUDS AT ENDS OF BEAM: USP LTW12 WITH 6 10d NAILS EACH END OF STRAP; PROVIDE CONTINUOUS LOAD PATH DOWN TO BASEMENT BEAM USING SIMILAR SIZED STRAPS AT ALL FRAMING JOINTS. r n QSHEETKEYNOTES FOR LOCATION OF FLUSH FRAMED HEADER AND SUPPORT, SEE A-110, WALL IB2 1. L J PROJECT: 2. FOR SIZE AND LOCATION OF HEADERS IN THE BEARING WALL BELOW SEE A-110, WALL IB2. NationalInstituteof StandardsandTechnology NetZeroEnergy ResidentialTest Facility NIST Campus Gaithersburg, MD U.S. Department of Energy Research Toward Zero Energy Homes U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY MARK DATE DESCRIPTION ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION PROJECT NO: NIST NZERTF A-PLOT-PLAN-NZERTF CAD DWG FILE: CG DRAWN BY: CHECKED BY: BP COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION SHEET TITLE: ATTIC FRAMING PLAN o SCALE AS NOTED A-111 1 3 / 4 " X11 y 4 " LSL ENGINEERED CEILING JOISTS AT 24” O.C. 1%" X 11K" LSL ENGINEERED CEILING JOISTS AT 24” O.C.
  • 15. 4:12 SLOPED ROOF RAFTER / BEARING WALL (2 x 6 @ 24 " O.C.) EXTENDED TO SUPPORT ROOF RAFTERS 4:12 SLOPED ROOF RAFTER 9.67:12 SLOPED LEDGER BOARD 1-1/4" x 11%" IISL RIM BOARD 2-0 2-0 2-0 7L 9.67:12 SLOPED LEDGER BOARD 4:12 SLOPED ROOF RAFTER WOOD BLOCKING BETWEEN TRUSSES 2x6 RAFTER PLATE ON Vs FLOOR SHEATHING 2x6 RAFTER PLATE ON Vs FLOOR SHEATHING F 9.67:12 SLOPED LEDGER BOARD o o CM FRAMING MEMBERS FOR ONE-STORY ROOM BELOW 2x6 RAFTER P .ATE 2'-0" 2 x 12 RIM BOARD 2'-0" D 2x14 RIDGE BOARD CD CD 2x6 RAFTER P.ATE ON CEILING JOISTS WOOD BLOCKING BETWEEN UPPER RAFTERS B O CM A 2x12 RIM BOARD FRAMING MEMBERS FOR ONE-STORY ROOM BELOW 2x6 RAFTER PLATE ON Vs" FLOOR S HEATHING A.1 5 6 6.1 7 2'-°" 8'-0' F.1 o o ATTIC ACCESS o CO it: 4:12 SLOPED ROOF RAFTER 4.1 32'-0' 1-1/4" x 1iy4" LSL RIM BOARD 2 3 1 4 26-0' 2-0" , 7L 2x6 RAFTER PLATE ON Vs" FLOOR SHEATHING 2-0' 2'-0' 2'-0' * —? ~ F 2'-0' 2'-0' -7— E Jr E.1 o CM C.1 c A ROOFFRAMINGPLAN SCALE: 1/4" = 1'-0" ?s: 9.67:12 SLOPED LEDGER BOARD GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION 1. CONTRACTOR TO VERIFY ENGINEERED WOOD PRODUCT (EWP) MEMBER SIZES WITH EWP SUPPLIER. EWP CONNECTIONS TO FOLLOW EWP SUPPLIER INSTRUCTIONS. 2. 3. LIMIT THE OVERALL ESTIMATED WASTE FACTOR ON THE FRAMING ORDER TO 10% OR LESS. 4. SAWN LUMBER RAFTERS AND BLOCKING TO BE FSC CERTIFIED. 5. GENERAL STRUCTURAL FRAMING CONNECTIONS: LSL CEILING JOISTS TO FLOOR HEADERS: USP THD179 ENGINEERED WOOD JOIST HANGER; DOUBLE LSL FLOOR HEADER TO TRIMMER: USP HD 410 DOUBLE HANGER. 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com 6. SEE A-305 FOR GARAGE ROOF TRUSS TYPES; TRUSSES TO BE CONSTRUCTED USING FSC-CERTIFIED WOOD; ROOF TRUSSES TO BE ENGINEERED BY TRUSS SUPPLIER TO MEET LOCAL CODE. 7. STRUCTURAL FRAMING CONNECTIONS FOR CENTER BEARING WALL (TO RESIST ROOF UPLIFT): CONSULTANT: RAFTER TO RIDGE BOARD: USP AC7 ANGLE BRACKET WITH 4 10d NAILS EACH LEG RAFTER TO STUD IN ATTIC BEARING WALL: USP LTW12 WITH R 10d NAILS EACH END STUD IN ATTIC BEARING WALL TO CEILING JOIST: USP LTW12 WITH 4 10d NAILS EACH END CEILING JOIST TO STUD IN SECOND FLOOR BEARING WALL: USP RT10 WITH 4 8d NAILS EACH END (USE USP LTW12 AT CONNECTIONS TO WALL HEADERS) r n STUD TO SOLE PLATE IN SECOND FLOOR BEARING WALL: (2) USP S01 CLIP ANCHORS SOLE PLATE TO FLOOR DECK: (2) #8x3" WOOD SCREWS AT 12" O.C. ATTIC FLUSH-FRAMED BEAM TO WALL STUDS AT ENDS OF BEAM: USP LTW12 WITH 6 10d NAILS EACH END OF STRAP; PROVIDE CONTINUOUS LOAD PATH DOWN TO BASEMENT BEAM USING SIMILAR SIZED STRAPS AT ALL FRAMING JOINTS. L J PROJECT: NationalInstituteof StandardsandTechnology NetZeroEnergy ResidentialTest Facility OSHEETKEYNOTES NIST Campus Gaithersburg, MD U.S. Department of Energy Research Toward Zero Energy Homes U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY MARK DATE DESCRIPTION ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION PROJECT NO: NIST NZERTF A-PLOT-PLAN-NZERTF CAD DWG FILE: CG DRAWN BY: CHECKED BY: BP COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION SHEET TITLE: ROOF FRAMING PLAN o SCALE AS NOTED A-112 1%" X 1 V/s LSL ENGINEERED ROOF RAFTERS AT 24" O.C. WITH 4" PLYWOOD SHEATHING WITH H-CLIPS Q 7) < O m m O Q cr 1 1%" x 1 V/s" LSL ENGINEERED ROOF RAFTERS AT 24' | O.C. WITH 4" PLYWOOD SHEATHING WITH H-CLIPS cn 4^ X 2X12 COMMON RAFTERS AT 24" O.C.; 1/2" PLYWOOD SHEATHING WITH H-CLIPS 2x4 ROOF TRUSSES AT 24" O.C. W/ USP RT10 W/ 3 8-d NAILS EACH END ON EACH TRUSS; 5/8" PLYWOOD SHEATHING WITH H-CLIPS T 1 I
  • 16. GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION 1. ROOF PENETRATIONS TO BE LOCATED SO AS TO AVOID POSSIBILITY OF SHADING PHOTOVOLTAIC ARRAY. AT HOUSE, CONTINUOUS FULLY-ADHERED PEEL AND STICK ROOFING MEMBRANE TO BE APPLIED SHINGLE STYLE OVER ENTIRE ROOF INCLUDING OVERHANGS AT EAVES AND RAKES AND OVER PORCHES AND BREEZEWAY. 2. 5 6 6.1 2 3 4.1 1 4 7 3. AT HOUSE, CONTINUOUS FULLY-ADHERED PEEL AND STICK ROOFING MEMBRANE TO BE EXTENDED MIN. 12" UP PLYWOOD WALL SHEATHING AT ALL ROOF-WALL INTERSECTIONS EXCEPT WHERE PORCH OR BREEZEWAY ROOF MEETS WALL. 32'-0' 2-0' 2'-0" 8-0’ 7^ 7^ 7 ~ 7 ~ 7 ~ 4. AT HOUSE, ADDITIONAL STRIP OF FULLY-ADHERED PEEL AND STICK ROOFING MEMBRANE TO BE APPLIED AT ALL ROOF-WALL INTERSECTIONS EXTENDING MIN. 12" OVER ROOF MEMBRANE AND 12" UP FACE OF WALL INSULATING SHEATHING. F.1 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com AT GARAGE, CONTINUOUS FULLY-ADHERED PEEL AND STICK ROOFING MEMBRANCE TO BE APPLIED TO 4:12 SECTION OF ROOF AND AT EAVE OF 9.67:12 SLOPE EXTENDING A MIN. OF 36" FROM THE EXTERIOR WALL TOWARDS THE RIDGE. 5. Cl CONSULTANT: o o SEE A-603 FOR PENETRATION SCHEDULE. 6. LINE OF CLADDING BELOW F F Jr OSHEETKEYNOTES LINE OF STUD WALLS BELOW r n I LINE OF CLADDING BELOW E <D CD 1 LINE OF STUD WALLS BELOW O) CM CM T” " CD CM | R1 R2 o CJ> o o 0 CM L J CM PROJECT: SOIL GAS VENT PENETRATIONKEY E.1 NationalInstituteof StandardsandTechnology ^r PLUMBING STACK VENT R1. PLUMBING STACK VENT CM R2. SOIL GAS VENT VERTICAL RACK PV PANEL MOUNTING SYSTEM, TYP CONDUIT FOR PV ARRAY CONDUIT FOR PV ARRAY NetZeroEnergy ResidentialTest Facility R3. PV CONDUIT o CM CONDUIT FOR PV ARRAY CM CM - CD D r O R3 R3 O R3 CT> T C.1 7 ROW x 6 COLUMN PV ARRAY CD NIST Campus Gaithersburg, MD o> CM U.S. Department of Energy Research Toward Zero Energy Homes CM CM CD ^r CM 3 CD L J CD OJ C ct> U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy CD ENERGY I*- I (D C7) <75 CM B Jr 1 o LINE OF STUD WALLS iBELOW CM A A -V 06/29/10 UPDATED LINE OF CLADDING BELOW MARK DATE DESCRIPTION CM CM r n co ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION ID PROJECT NO: NIST NZERTF A.1 i "V A-PLOT-PLAN-NZERTF CAD DWG FILE: SOLAR HOT WATER PANELS CG DRAWN BY: 1 1 CHECKED BY: BP COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION SHEET TITLE: ROOFPLAN ROOFPLAN o SCALE AS NOTED 1 SCALE: 1/4" = 1’-0" A-113
  • 17. GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION 1. LIMIT THE OVERALL ESTIMATED WASTE FACTOR ON THE FRAMING ORDER TO 10% OR LESS 2. STRUCTURAL FRAMING CONNECTIONS FOR 2x4 ROOF OVERHANG OUTRIGGERS (TO RESIST WIND UPLIFT): (1) #10 x 5" WOOD SCREW THROUGH 2x4 INTO RAFTER RIM BOARD; (1) #10 x 5" WOOD SCREW THROUGH 2x4 INTO RAFTER, 4" FROM END OF 2x4. STRUCTURAL FRAMING CONNECTIONS FOR FRONT PORCH ROOF TO RESIST WIND UPLIFT: 5 6 6.1 2 3 4.1 1 4 7 3. 15'-5" 7^ RAFTER LEDGER TO WALL STUDS: (2) %" LAG SCREWS AT 24" O.C. (MINIMUM PENETRATION INTO STUD OF 2"); 1'-0" 13'-5" r-o’ ----;L 7!------------ 7 ~ ■V r-o1 CEILING JOIST LEDGER TO WALL STUDS: (1) %' LAG SCREW AT 24" O.C. (MINIMUM PENETRATION INTO STUD OF 2"); 2X4 FASCIA NAIL ER F.1 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com 3.5" x 9.25" LSL 1.3E BEAM 1-3/4" x 9.25" LSL 1.3E BELOW RAFTER TO LEDGER: USP AC7 ANGLE BRACKET; 1-3/4" x 9.255" LSL. 1.3E BELOW CEILING JOIST TO LEDGER: 4 16d TOE-NAILS OR USE USP A3 ANGLE BRACKET. o CONSULTANT: STRUCTURAL FRAMING CONNECTIONS FOR BREEZEWAY: 24'-1 4. 2X12 RAFTERS AT 24" O.C.; ROOF SHEATHING WITH H-CLIPS; 2x6 CEILING JOISTS BELOW AT 24" O.C. iL USE TIE STRAP AT EACH RAFTER TO TIE RAFTERS TO CEILING JOISTS. 22-9' 1'-4" 2X12 LEDGER INSTALLED ON TOP OF WALL RIGID INSULATION 7' o 5. STRUCTURAL FRAMING CONNECTIONS FOR FRONT PORCH AND BREEZEWAY COLUMNS (TO RESIST WIND UPLIFT): <j> L CM Zl z N F F BEAM TO STRUCTURAL COLUMN AND COLUMN BASE TO SONOTUBE CONNECTION TO FOLLOW COLUMN SUPPLIER'S INSTRUCTIONS; UPLIFT LOAD IS 800 LBS NOMINAL. -v U t w ___I J i i 2X4 FASCIA NAILER 2X4 OUTLOOK AT 24" O.C. INSTALLED ON TOP OF ROOF SHEATHING WITHIN ROOF RIGID INSULATION, TYP. 2X6 FASTENED BACK --------- — -----------T0-2X8 LEDGER, TYP. 6. STRUCTURAL FRAMING CONNECTIONS FOR SCREEN PORCH ROOF (TO RESIST WIND UPLIFT AND FOR BRACING): / r i i :i 2X LEDGER ON TCP OF ROOF RIGID INSULATION FASTEN 2x LEDGER AT SLOPE-CUT ENDS OF RAFTERS TO WALL STUDS AT 24" O.C. USING (2) %" LAG SCREWS, TOP AND BOTTOM, PENETRATING MINIMUM 2-1/2" INTO STUDS ALONG LENGTH OF LEDGER; E m L 2X8 LEDGER INSTALLED ON TOP OF WALL RIGID INSULATION 2X4 FASCIA NAIL ER A-/ 2X4 OUTLOOK ON TOP OF ROOF SHEATHING WITHIN ROOF RIGID INSULATION, TYP. 24" O.C. INSTALLED 15'-0" FASTEN PORCH ROOF SHEATHING TO LEDGER USING 8d COMMON NAILS AT 3" O.C. "7 ~ 4'-0' 7'-0' 4-0' 7 ~ -7<- -7<- 7 ~ L J 2x FRAMING MEMBERS TO BE FSC-CERTIFIED. 7. 2X4 LEDGER INSTALLED ON TOP OF ROOF SHEATHING -v PROJECT: (2)1.75" x 9.25 LSL 1.55E BEAM oo i m. H m E.1 J -V NationalInstituteof StandardsandTechnology ;l i m 2X4 FASCIA NAIL ER OSHEETKEYNOTES CNJ 1 I uJ l±l J 2X4 OUTLOOK AT 24" O.C. INSTALLED ON TOP OF ROOF SHEATHING WITHIN ROOF RIGID INSULATION, TYP. —u o 2X12 RAFTERS AT 24" O.C. ; §" ROOF SHEATHING WITH H-CLIPS; 2x6 CEILING JOISTS BELOW AT 24" O.C. 1. CONCEALED HANGER SCREWED THROUGH INSULATION TO BLOCKING IN HOUSE WALL NetZeroEnergy ResidentialTest Facility LO -V CNJ ■ 2x12 RIDGE BOARD (2)1.75" x 9.25 LSL 1.55E BEAM "1 CM J fry n T3 A ll O D r j- — L i m m C.1 "V m 3 m 00 NIST Campus Gaithersburg, MD ■ STRUCTURAL COLUMN, TYP. 2X4 FASCIA NAILER m U.S. Department of Energy Research Toward Zero Energy Homes m m CO ■'vf CD CNJ r c I J' L T U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY 2X4 FASCIA NAILER S) 2X4 OUTLOOK AT 24" O.C. INSTALLED ON TOP OF ROOF SHEATHING WITHIN ROOF RIGID INSULATION, TYP. 2X4 LEDGER INSTALLED ON TOP OF ROOF SHEATHING 1 r B ■V HATCH INDICATES EXTENT OF MAIN HOUSE FRAMING CD II It r n r i r <N A A -V 2X LEDGER ON TOP OF ROOF RIGID INSULATION 2X10 LEDGER INSTALLED ON TOP OF WALL RIGID INSULATION 1 -3/4" x 9.25 LSL 1,3E BELOW STRUCTURAL COLUMN, TYP. / <D 1 MARK DATE DESCRIPTION 2X4 FASCIA NAILER 2XLEDGER ON TOP OF ROOF RIGID INSULATIO 2X12 RAFTERS AT 24" O.C. ; §" ROOF SHEATHING WITH H-CLIPS; 2x6 CEILING JOISTS BELOW AT 24" O.C. K ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION CNJ LD O CD (2)1.75" x 9.25 LSL 1.55E BEAM (2)1.75" x 9.25 LSL 1.55E BEAM (2)1.75" x 9.25 LSL 1.55E BEAM l PROJECT NO: NIST NZERTF z. ii! A.1 -v A-PLOT-PLAN-NZERTF CAD DWG FILE: 2X4 FASCIA NAILER (2) 1-3/4" x 9.25" L 1.3E BELOW 3L 00 CG DRAWN BY: -v -N- CHECKED BY: BP , 2'-0' 1'-(» 1/2" 2'-0" , 1'-6 1/2' 7 ~ V- v- COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION ir-11" 11'-7' 11 ’-7' 7 — v- 7 7 — 7 ~ 1-9 1/2' -9 1/2' 1 SHEET TITLE: 6-8' 1'-4" 7 ~ / y- LOWERROOF OVERHANG FRAMINGPLAN 38-8' 8-0' 7 — 7 I LOWERROOFOVERHANGFRAMINGPLAN o SCALE AS NOTED z 1 SCALE: 1/4" = 1'-0" A-114
  • 18. GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION 1. LIMIT THE OVERALL ESTIMATED WASTE FACTOR ON THE FRAMING ORDER TO 10% OR LESS 2. STRUCTURAL FRAMING CONNECTIONS FOR 2x4 ROOF OVERHANG OUTRIGGERS (TO RESIST WIND UPLIFT): (1) #10 x 5" WOOD SCREW THROUGH 2x4 INTO RAFTER RIM BOARD; (1) #10 x 5" WOOD SCREW THROUGH 2x4 INTO RAFTER, 4" FROM END OF 2x4. 2x FRAMING MEMBERS TO BE FSC-CERTIFIED. 5 6 6.1 2 3 4.1 1 4 7 3. F.1 f" 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com CONSULTANT: 34-8' 1-4" , 2-0 28’-0’ ■ 2-0" r-4" 7^ 7^ 7 “ “V LO CM Irtt CM F F -V OSHEETKEYNOTES ii— i o o CM CM -V r n i r i E f * L J L PROJECT: E.1 in n NationalInstituteof StandardsandTechnology r-: v; X i .J, pi CO CM CO NetZeroEnergy ResidentialTest Facility CO -T]- CM CO CO CO D I jj- C.1 NIST Campus Gaithersburg, MD 4f U.S. Department of Energy Research Toward Zero Energy Homes -j| •*r & 2X4 FASCIA NAILER, TYP. c I_ 2X4 OUTLOOK AT 24" O.C. INSTALLED ON TOP OF ROOF SHEATHING WITHIN ROOF RIGID INSULATION, TYP. U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY ■M- 2X4 INSTALLED ON TOP OF ROOF SHEATHING, TYP. r,J ± -zs i HATCH INDICATES EXTENT OF MAIN HOUSE FRAMING B t I O O I I CM CM I A A -V -V I U CM CM MARK DATE DESCRIPTION ■v ■V ■V ■V ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION 1’-4" 2-0 28’-0' 2’-0" 1’-4" -7^- 7 34-8' PROJECT NO: NIST NZERTF A.1 A-PLOT-PLAN-NZERTF CAD DWG FILE: CG DRAWN BY: CHECKED BY: BP COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION SHEET TITLE: UPPERROOF OVERHANG FRAMINGPLAN i UPPERROOFOVERHANGFRAMINGPLAN o SCALE AS NOTED z 1 SCALE: 1/4" = 1'-0" A-115
  • 19. FIRSTFLOORREFLECTEDCEILINGPLAN SCALE: 1/4"= 1'-0 ii r -i i HT i EQ. EQ. O -7 + CO LU ■7 ■ I -V CM CM ,S4 0 LU 2'-8 11 0 0 LU LU IEI -v EQ. EQ. a LU 2'-0' 2'-0' :S4 -v 7L 7^ 7L ■^7 EQ. EQ. CO -p - CM SLOPED CEILING CO I O a LU R4; LU r-6 1/2" 7 ^ a LU I I I 7, EQ. EQ. O -7 0 ACCESS - ATTIC PULL DOWN STAIR LU LU EQ. EQ. MR4 + ~A a o 2-0 M2'K LU U iV I I II UJ !r 1'-1 3/4’ 1'-1 3/4’ -- 3'-6 1/4' CM 4-4" 1 CM LO O 1/2 M CO f a 0 CO CO LU LU Kl EQ. EQ. EQ. EQ. 7L 7L "7 -v -v -v EQ. EQ. 7L - ^ “7 5> CM a o (J) LU LU CD I__ SECONDFLOORREFLECTEDCEILINGPLAN SCALE: 1/4" = 1'-0" SLOPED CEILING 10 1/2 11 CM CM CO o I CM CO ;R3 5-11 1/4’ 11-1 M 5-11 1/4’ 10 1/2" CM CM O CO I I CO CM ■r ’c &-8" A.F.F. 7’-6" A.F.F. GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION 1. CEILING ELEMENTS SHOWN FOR LOCATION ONLY; SEE E-001 FOR LIGHT FIXTURE SCHEDULE; SEE M-001 FOR DUCTWORK LEGEND. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR FIXTURE AND GRILLE SPECIFICATIONS. 2. ALL CEILING HEIGHTS AT 9’-0" A.F.F., UNLESS OTHERWISE NOTED. 3. SEE SPRINKLER PLAN FOR SPRINKLER HEAD LOCATIONS. DIMENSIONS ARE TO FACE OF STUD AND CENTER OF CEILING ELEMENT. 4. SITE-BUILT ACCESS PANELS FIT WITHIN FRAMING MEMBERS ABOVE. SEE FRAMING PLANS FOR SIZE AND LOCATION. APPLY 1-1/2" x %" FLAT TRIM AROUND EDGE OF PANEL. PANEL TO BE FASTENED AND REMOVABLE FROM BELOW WITHOUT REMOVING THE TRIM. PANEL FINISH TO MATCH CEILING FINISH. SEE 7/A-508. 5. 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com CROWN MOULDING EXTENDS 5" FROM GWB, SEE INTERIOR ELEVATIONS FOR EXTENT OF CROWN MOULDING. 6. CONSULTANT: r n L j PROJECT: NationalInstituteof StandardsandTechnology NetZeroEnergy Residential Test Facility NIST Campus Gaithersburg, MD MSS U.S. Department of Energy Research Toward Zero Energy Homes U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY MARK DATE DESCRIPTION ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION PROJECT NO: NIST NZERTF A-PLOT-PLAN-NZERTF CAD DWG FILE: CG DRAWN BY: CHECKED BY: BP COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION SHEET TITLE: FIRST&SECOND FLOORREFLECTED CEILINGPLANS o SCALE AS NOTED A-121 T EQ. EQ. „6-,8 O e o m m * ~o -Y- 3-0 1/2" 3-0 1/2" o CD TO TO o o m m 4^ 4^ o o ¥- EQ. EQ. CO CO 4. 4- ACCESS PANEL □ 7'-6" A.F.F. IM) 00 CM CM CM EQ. EQ. 4. CM D * A an -4- o EQ. EQ. 4 CO TO m CM TO CM ro ro TO TO TO ACCESS PANEL o ^7 CM o m co r “F 7'-9" A.F.F. CN TO I I + CO ¥■ 3'-2' 4'-3" 4'-4 1/2" o 2'-7 3/4" 1 CO CO CM I'D •v -v CM U * CO O CO CO ■ 'Jr CO LO m CM CM o CM CM CM CM 4 CH TO m CO Ob o CO GO 4 II 6'-8" A.F.F. II 0 m CO 4^ LO -Y EQ. EQ. -V TO EQ. EQ. -4 4 LL EQ. 0 EQ. 0 EQ. , EQ. ACCESS PANEL LL m m -Y < 4^ 4-4' TO 00 CO CO 0 -4 -4 4- ,.t7/e l - z m CM n 4, 4, J L ----------- 1
  • 20. GENERALSHEETNOTES B D F A.1 A BUILDINGSCIENCE CORPORATION 1. FIRST FLOOR SOFFITS AND SECOND FLOOR SOFFITS TO ALIGN AROUND PERIMETER OF HOUSE. SEE A-601 FOR WINDOW SCHEDULE. 2. 3. SEE A-603 FOR PENETRATION SCHEDULE. 1 SIDING TO BE PAINTED P-12. 4. A-304 ALL TRIM AND SOFFITS TO BE PAINTED P-13. 5. SOIL GAS VENT 12 ALL DOORS TO BE PAINTED P-14. 6. 12 © © 4 CEILINGS OF PORCHES AND BREEZEWAY TO BE PAINTED P-15. 7. 4 R2 FRONT PORCH AND BREEZEWAY COLUMNS TO BE PAINTED P-13. 8. © 12 12 9. EL. +0'-0" IN THE ARCHITECTURAL DRAWINGS CORRESPONDS TO 461.30' IN THE SITE/CIVIL DRAWINGS. 9.67 9.67 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com IF THE HIGH VELOCITY HVAC OPTION IS NOT AWARDED, THE PENETRATION FOR THE CONNECTION WILL NOT BE PROVIDED. 10. 4 B.O. CEILING JOISTS ALIGN EL. +19-7 1/4ii <£> 2k 2k 2k OSHEETKEYNOTES 2 © D © CONSULTANT: 1. ASPHALT ROOF SHINGLES (*> B 2. 1" x 8f" FRIEZE BOARD TRIM MOULDING f x 8 TRIM WITH 3" CROWN MOULDING 1" X 85" TRIM FIBER CEMENT SIDING, 4" EXPOSURE 2x2 TRIM 12 12 22 12 3. 9.67 12 9.67 4 4 4. 12 4 5. $ T.O. SECOND FLOOR SUBFLOOR EL. +10-6 1/411 6. ALIGN f x 10 TRIM 1" x 4 5" WINDOW TRIM BUILT-UP WINDOW CROWN 1" x 6" DOOR TRIM 7. © $ B.O. FLOOR JOISTS 2k ±k 2k 2k. EL. +9'-3 3/811 8. 24 © 9. F F r n 23 10. 28 BUILT-UP DOOR CROWN 5/4 x 8 TRIM f x 6 RAKE EDGE TRIM WITH 3" CROWN MOULDING 11. I CONDUIT FOR FUTURE GAS FURNACE SUPPLY/EXHAUST 12. A A 13. © E3 U E3 □ E3 □ E3 E4 1" x 81" BEAM TRIM EGRESS WINDOW WELL AND LADDER ©© 14. T.O. FIRST FLOOR SUBFLOOR F'0 F9 F4 F10 E11 E11 15. $ Or EL. +0-2 3/8 II L J CONNECTION FOR FUTURE MULTISPLIT OUTDOOR UNIT 1'5 T.O. FOUNDATION WALL r 16. STONE VENEER AT GARAGE FOUNDATION WALL / CONDUIT SUMP PUMP OUTLET r 29 EL. +0-0 PROJECT: 17. CONCRETE DECK CONNECTION FOR FUTURE AIR-TO-AIR OUTDOOR UNIT CONNECTION FOR CENTRAL AIR-TO-AIR OUTDOOR UNIT © 18. CONCRETE WALL WITH STONE VENEER EDGES CONNECTION FOR FUTURE HIGH VELOCITY HVAC AIR-TO-AIR OUTDOOR UNIT (SEE GENERAL SHEET NOTE #10) JHI Jt NationalInstituteof StandardsandTechnology 19. LOAD-BEARING COLUMN B 20. EXTERIOR LANTERN 21. PV ARRAY J'L NetZeroEnergy ResidentialTest Facility 22. SOLAR COLLECTOR (HOT WATER SYSTEM) 23. SCREEN PANEL l_ J RIGHTSIDE(EAST)ELEVATION 2 SCALE: 1/4" = 1'-0" 24. PREFABRICATED PILASTER 25. FIBER CEMENT PANEL 5 1 2 3 6 4 7 26. FIBER CEMENT TRIM NIST Campus Gaithersburg, MD 27. 2" SILL 28. KICK-OUT FLASHING 29. ALUMINUM COIL STOCK COVERING 1 2 1 1 1 U.S. Department of Energy Research Toward Zero Energy Homes A-305 A-305 A-303 A-302 A-301 OWINDOWKEY A. 3-0" x 5'-5" DH U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY 3'-2^" x 5-2" DH B. © c. 2'-1" x 3'-7" DH © D. 2'-8" x 2'-3" AWN E. 2'-3" x 4'-0" DH © B.O. CEILING JOISTS 3'-4" x 2'-3" AWN F. EL. +19-7 1/4II 08/03/10 UPDATED G. 3'-4" x 2'-7" AWN 8 2 07/27/10 UPDATED 06/29/10 UPDATED © PENETRATIONKEY © © © MARK DATE DESCRIPTION © ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION B B B B B E1. COLLECTOR PANEL CONDUIT EXTERIOR LANTERN E2. PROJECT NO: NIST NZERTF © E3. WEATHER PROTECTED OUTLET A-PLOT-ELEV-NZERTF CAD DWG FILE: T.O. SECOND FLOOR SUBFLOOR CG DRAWN BY: E1 E1 E4. CONDUIT FOR FUTURE GAS FURNACE EL. +10-6 1/411 © CHECKED BY: BP E5. DRYER VENT * B.O. FLOOR JOISTS COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION E6. RANGE HOOD VENT EL. +9'-3 3/811 © HRV EXHAUST E7. SHEET TITLE: <•> A A E8. HRV INLET E2 E2 □□□□ □□□□ □□□□ EXTERIOR ELEVATIONS <Z> E9. INSTRUMENTATION CONDUIT E2 E2 A A A A A 19 29 E10. CONDUIT FOR FUTURE GAS WATER HEATER © A / E11. FUTURE MULTI-SPLIT OUTDOOR UNIT CONNECTION T.O. FIRST FLOOR SUBFLOOR ^ 16 EL. +0-2 3/8 =«^= I E12. HOSE BIBB OUNDAT ON WALL CONDUIT FOR COLLECTOR PANEL THROUGH WALL AT RIM JOIST UNDER FRONT PORCH ROOF I L. +0'-0 F4. SUMP PUMP OUTLET o SCALE AS NOTED z r ■ ! F9. AIR-TO-AIR OUTDOOR UNIT CONNECTION O. GARAGE SLAB (LOWEST PT) A, EL. -2'-4" (458.3T) T. F10. FUTURE AIR-TO-AIR OUTDOOR UNIT CONNECTION A-201 FRONT(SOUTH)ELEVATION 1 R1. PLUMBING STACK VENT SCALE: 1/4" = 1'-0" R2. SOIL GAS VENT
  • 21. GENERALSHEETNOTES F D B E C A A.1 BUILDINGSCIENCE CORPORATION 1. FIRST FLOOR SOFFITS AND SECOND FLOOR SOFFITS TO ALIGN AROUND PERIMETER OF HOUSE. I SEE A-601 FOR WINDOW SCHEDULE. 2. 3. SEE A-603 FOR PENETRATION SCHEDULE. 1 SIDING TO BE PAINTED P-12. 4. A-304 ALL TRIM AND SOFFITS TO BE PAINTED P-13. 5. PLUMBING STACK VENT ALL DOORS TO BE PAINTED P-14. 6. I 12 4 12 CEILINGS OF PORCHES AND BREEZEWAY TO BE PAINTED P-15. 7. 4 R1 © FRONT PORCH AND BREEZEWAY COLUMNS TO BE PAINTED P-13. 8. 12 12 9. EL. +0'-0" IN THE ARCHITECTURAL DRAWINGS CORRESPONDS TO 461.30' IN THE SITE/CIVIL DRAWINGS. 13 9.67 9.67 12 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com <E> 4 B.O. CEILING JOISTS OSHEETKEYNOTES ALIGN EL. +19-7 1/4n © © ± 2 1. ASPHALT ROOF SHINGLES D © CONSULTANT: 1" x 8f" FRIEZE BOARD TRIM MOULDING f x 8 TRIM WITH 3" CROWN MOULDING 1" X 85" TRIM FIBER CEMENT SIDING, 4" EXPOSURE 2x2 TRIM f x 10 TRIM 1"x4 WINDOW TRIM BUILT-UP WINDOW CROWN 1" x 6" DOOR TRIM BUILT-UP DOOR CROWN 5/4 x 8 TRIM 2. © © 3. A 4. © 12 22 I 5. 4 12 23 6. 4 HRV 4 T.O. SECOND FLOOR SUBFLOOR 7. INLET E9 EL. +10-6 1/4" □ 8. O ALIGN E8 ± 9. 4 B.O. FLOOR JOISTS ^lz EL. +9-3 3/8" 10. : © 11. r n © 12. 27 E2 © f x 6 RAKE EDGE TRIM WITH 3" CROWN MOULDING 1" x 81" BEAM TRIM EGRESS WINDOW WELL AND LADDER STONE VENEER AT GARAGE FOUNDATION WALL 13. 25 A 28 ©© 14. E3 E3 19 15. o □ © 16. 4 T.O. FIRST FLOOR SUBFLOOR 17. CONCRETE DECK EL. +0-2 3/8" tr L J CONCRETE WALL WITH STONE VENEER EDGES T.O. FOUNDATION WALL 18. © EL. +0-011 PROJECT: 19. LOAD-BEARING COLUMN □ CONDUIT FOR INSTRUMENTATION THROUGH WALL AT RIM JOIST UNDER BREEZEWAY ROOF 20. EXTERIOR LANTERN NationalInstituteof StandardsandTechnology 4 T.O. GARAGE SLAB (LOWEST PT) EL. -2'-4" 21. PV ARRAY 22. SOLAR COLLECTOR (HOT WATER SYSTEM) 23. SCREEN PANEL NetZeroEnergy Residential Test Facility LEFTSIDE(WEST)ELEVATION 24. PREFABRICATED PILASTER 2 25. FIBER CEMENT PANEL SCALE: 1/4" = 1'-0" 26. FIBER CEMENT TRIM 5 6 4 3 2 1 7 27. 2" SILL 28. KICK-OUT FLASHING NIST Campus Gaithersburg, MD 29. ALUMINUM COIL STOCK COVERING I I I 1 1 1 3 1 A-301 A-302 A-303 A-305 A-305 U.S. Department of Energy Research Toward Zero Energy Homes oWINDOWKEY I I I R2 R1 A. 3-0" x 5'-5" DH SOIL GAS VENT 3'-25" x 5'-2" DH B. U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy © ENERGY c. 2'-1" x 3'-7" DH PLUMBING STACK VENT © 2'-8" x 2'-3" AWN D. I I I I © E. 2'-3" x 4'-0" DH F. 3-4" x 2'-3" AWN 4 B.O. CEILING JOISTS EL. +19-7 1/411 G. 3-4" x 2'-7" AWN © I I I 08/03/10 UPDATED cm rm <*> <D 07/27/10 UPDATED □m □m G G PENETRATIONKEY 06/29/10 UPDATED E E MARK DATE DESCRIPTION © COLLECTOR PANEL CONDUIT E1. ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION I I I E2. EXTERIOR LANTERN PROJECT NO: NIST NZERTF E3. WEATHER PROTECTED OUTLET DRYER VENT RANGE HOOD HRV EXHAUST IN SOFFIT — VENT IN SOFFIT " IN SOFFIT 4 T.O. SECOND FLOOR SUBFLOOR A-PLOT-ELEV-NZERTF CAD DWG FILE: CONDUIT FOR FUTURE GAS FURNACE E4. EL. +10-6 1/4" CG a hi DRAWN BY: t± m 3 E5. DRYER VENT XL n xu f CHECKED BY: BP 4 B.O. FLOOR JOISTS E6 E5 E7 E6. RANGE HOOD VENT EL. +9-3 3/8" © COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION an □m E7. HRV EXHAUST © rn nnn SHEET TITLE: © E8. HRV INLET E2 E2 C C 19 E E © E9. INSTRUMENTATION CONDUIT EXTERIOR ELEVATIONS A 27 © E10. CONDUIT FOR FUTURE GAS WATER HEATER A A E3 ZL ?| E12 O E10 E11. FUTURE MULTI-SPLIT OUTDOOR UNIT CONNECTION E3 4 T.O. FIRST FLOOR SUBFLOOR ©© E3 O EL. +0-2 3/8" I I T E12. HOSE BIBB 4 T.O. FOUNDATION WALL L. EL. +0-0M o()o F4. SUMP PUMP OUTLET I 29 cr HOSE O SCALE AS NOTED AIR-TO-AIR OUTDOOR UNIT CONNECTION F9. z CONDUIT FOR FUTURE GAS WATER HEATER SUPPLY/EXHAUST BIBB 4 T.O. GARAGE SLAB (LOWEST PT) FUTURE AIR-TO-AIR OUTDOOR UNIT CONNECTION F10. EL. -2'-411 A-202 REAR(NORTH)ELEVATION R1. PLUMBING STACK VENT SCALE: 1/4" = 1'-0" R2. SOIL GAS VENT
  • 22. GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION 1. FIRST FLOOR SOFFITS AND SECOND FLOOR SOFFITS TO ALIGN AROUND PERIMETER OF HOUSE. SEE A-601 FOR WINDOW SCHEDULE. 2. 3. SEE A-603 FOR PENETRATION SCHEDULE. SIDING TO BE PAINTED P-12. 4. ALL TRIM AND SOFFITS TO BE PAINTED P-13. 5. E C ALL DOORS TO BE PAINTED P-14. 6. CEILINGS OF PORCHES AND BREEZEWAY TO BE PAINTED P-15. 7. I FRONT PORCH AND BREEZEWAY COLUMNS TO BE PAINTED P-13. 8. 9. EL. +0'-0" IN THE ARCHITECTURAL DRAWINGS CORRESPONDS TO 461.30' IN THE SITE/CIVIL DRAWINGS. T.O. GARAGE ROOF RIDGE EL. +18-10 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com 12 I 9.67 OSHEETKEYNOTES 12 1. ASPHALT ROOF SHINGLES 9.67 CONSULTANT: 1" x 8f" FRIEZE BOARD TRIM MOULDING f x 8 TRIM WITH 3" CROWN MOULDING 1" X 85" TRIM FIBER CEMENT SIDING, 4" EXPOSURE 2x2 TRIM f x 10 TRIM 1"x4 WINDOW TRIM BUILT-UP WINDOW CROWN 1" x 6" DOOR TRIM BUILT-UP DOOR CROWN 5/4 x 8 TRIM 2. I 3. 12 13 4 4. <2> 5. B.O. CEILING JOISTS 6. <£> 4 EL. +8-11 4 7. 8. <4 4) 9. A <±> □□□□ □□□□ □□□□ □□□□ □□□ 10. 4) 11. E2 E2 r n <Z> 12. f x 6 RAKE EDGE TRIM WITH 3" CROWN MOULDING 1" x 81" BEAM TRIM EGRESS WINDOW WELL AND LADDER STONE VENEER AT GARAGE FOUNDATION WALL 13. T.O. HOUSE FOUNDATION WALL EL. +0-0 14. f GARAGE FOUNDATION WALlX 15. T.O. ;■ EL. -0'-5’ 16. i- 17. CONCRETE DECK L J 4 GRADE AND T.O. GARAGE SLAB LOWEST POINT CONCRETE WALL WITH STONE VENEER EDGES 18. EL. -2'-4 PROJECT: 19. LOAD-BEARING COLUMN * T.O. GARAGE FOOTING EL. -4-0 20. EXTERIOR LANTERN NationalInstituteof StandardsandTechnology 21. PV ARRAY 22. SOLAR COLLECTOR (HOT WATER SYSTEM) 23. SCREEN PANEL NetZeroEnergy Residential Test Facility LEFTSIDE(WEST)GARAGEELEVATION 24. PREFABRICATED PILASTER 2 25. FIBER CEMENT PANEL SCALE: 1/4"= 1'-0" 26. FIBER CEMENT TRIM 27. 2" SILL 28. KICK-OUT FLASHING NIST Campus Gaithersburg, MD 29. ALUMINUM COIL STOCK COVERING U.S. Department of Energy Research Toward Zero Energy Homes C E oWINDOWKEY A. 3-0" x 5-5" DH I 3-24" x 5'-2" DH B. U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY c. 2'-1" x 3'-7" DH $ T.O. GARAGE ROOF RIDGE 2'-8" x 2'-3" AWN EL. +18-10 D. 12 I E. 2'-3" x 4'-0" DH 9.67 F. 3-4" x 2'-3" AWN 12 G. 3-4" x 2'-7" AWN 9.67 <£> 08/03/10 UPDATED I 07/27/10 UPDATED 12 06/29/10 UPDATED 13 PENETRATIONKEY 4 MARK DATE DESCRIPTION E9 12 ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION E1. COLLECTOR PANEL CONDUIT B.O. CEILING JOISTS <4 EL. +8-11 E2. EXTERIOR LANTERN <£> <s> PROJECT NO: NIST NZERTF E3. WEATHER PROTECTED OUTLET A-PLOT-ELEV-NZERTF CAD DWG FILE: 20 E4. CONDUIT FOR FUTURE GAS FURNACE CG DRAWN BY: 4) E2 CHECKED BY: BP E5. DRYER VENT 4) 1 <=> COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION E6. RANGE HOOD VENT <z> E7. HRV EXHAUST SHEET TITLE: T.O. HOUSE FOUNDATION WALL E8. HRV INLET EL. +0-0 EXTERIOR ELEVATIONS E9. INSTRUMENTATION CONDUIT — * T.O. GARAGE FOUNDATION WALL E10. CONDUIT FOR FUTURE GAS WATER HEATER EL. -0'-5 CONDUIT FOR INSTRUMENTATION THROUGH WALL AT RIM JOIST UNDER BREEZEWAY ROOF E11. FUTURE MULTI-SPLIT OUTDOOR UNIT CONNECTION 4 GRADE AND T.O. GARAGE SLAB LOWEST POINT EL. -2'-4 E12. HOSE BIBB T.O. GARAGE FOOTING EL. -4'-0 F4. SUMP PUMP OUTLET O SCALE AS NOTED F9. AIR-TO-AIR OUTDOOR UNIT CONNECTION F10. FUTURE AIR-TO-AIR OUTDOOR UNIT CONNECTION A-203 RIGHTSIDE(EAST)GARAGEELEVATION R1. PLUMBING STACK VENT SCALE: 1/4"= 1'-0" R2. SOIL GAS VENT
  • 23. K3 O o W363a 00 □ © © 7 © © 2 zx o o o o K2 2 5" FILLER B18 SB36 24" DISHWASHER B18 3" FILLER KITCHENELEVATION SCALE: 1/2"= 1'-0 ii 10'-7 1/4" 3" FILLER f" END PANEL 3’ FILLER f" END PANEL W3615 3 7 13-5' 7L W3615 (2) (31" DEEP) W2415 W2115 7 7 K5 3n END 4 PANEL 7 oI CT> O 1 CO ^-----V CD W2433 -W2433- W2133 W2133 D © ©© ©© © © © LU CO O o o 3n 3" FILLER REF (2" FILLER ABOVE) END B24 PANEL B21 30" BUILT-IN OVEN WITH COOKTOP B21 3" FILLER 4 KITCHENELEVATION W2415 31 FILLER ^—v X CD 7 0 O) -V o o o W2115 i r x 7 0 o J L SCALE: 1/2" = 1'-0" 3-6 X 5-11" 7L 1 5-10' 7^ K7 Pf "zur BUILT-IN MICROWAVE [I O □ END PANEL B18 B3012 (24" DEEP) B18 3 j FILLER ISLANDELEVATION SCALE: 1/2" = 1'-0’ RANGE HOOD WITH VENT O O o 13 o EQ. EQ. I 7 CM BATH#1ELEVATION BATH#1ELEVATION BATH#1ELEVATION BATH#1ELEVATION SCALE: 1/2" = 1'-0’ SCALE: 1/2"= 1'-0' SCALE: 1/2"= 1'-0" SCALE: 1/2"= 1'-0" 1'-0" 8-0 11 9-5 3-6 5-0 ^—v "v V ®—^ 7® x CD 1 V —r G7 G7 00 CD ^------V -V 5 1/2m EQ. EQ. -7 — 7- 7 — 5'-0" 7— 7— EH* r-6" 3-5" 1 7— 7^ 7^ □M o o (G13) G3 G3 1 1 CD CD 5-11 11 © 0 © I CD 1 5-10" 111 6" i"- 7^ ’t 1 1 1 1 "v -v 7 7 o o o o / EQ. EQ. I o o o 831 @© ©© 1 1 K2 co CO CO K3 3E f © 3 j" FILLER B30 (15" DEEP) 3" FILLER 3" FILLER z—v -z—v ■V B30 (15" DEEP) f" END PANEL END PANEL 4 3/8" <L <k OPENINGELEVATION HALFWALLELEVATION ISLANDELEVATION ISLANDELEVATION SCALE: 1/2"= 1'-0 SCALE: 1/2" = 1'-0’ SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0" 11 AIR 7 7 7 7 7 1 00 7 RETURN O O o o TT o o GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION 1. ALL TROPICAL WOOD, IF USED, MUST BE FSC-CERTIFIED. 2. SEE A-602 FOR FINISH SCHEDULE. ALIGN SWITCH AND RECEPTACLE PLATES WITH TOP OF TILE IN KITCHENS AND BATHROOMS. 3. OSHEETKEYNOTES 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com GENERAL: G1. CROWN MOULDING G2. BASE MOULDING G3. PAINTED WALL CONSULTANT: G4. WINDOW HEAD TRIM G5. 1x4 WINDOW JAMB TRIM G6. WINDOWSILL TRIM G7. CASED OPENING HEAD TRIM G8. 1x6 CASED OPENING JAMB TRIM G9. CASED OPENING BASE TRIM G10. DOOR HEAD TRIM G11. 1x4 DOOR JAMB TRIM G12. INTERIOR DOOR G13. BUILT-UP COLUMN G14. COLUMN BASE TRIM r n G15. WOOD PANEL G16. WOOD CAP G17. MANTLE G18. MANTLE TRIM G19. BASE CABINET G20. WOOD SHELF G21. 1 "x4" DOOR HEAD TRIM L J BATH: PROJECT: B1. TILE NationalInstituteof StandardsandTechnology B2. HAND HELD SHOWER B3. SHOWER SEAT GRAB BAR B4. TOWEL BAR B5. NetZeroEnergy Residential Test Facility TOWEL RING B6. B7. TOILET PAPER HOLDER B8. MIRROR FRAMELESS MIRROR B9. B10. ACCESSIBLE LAVATORY NIST Campus Gaithersburg, MD B11. ACCESSIBLE TOILET B12. TOILET B13. BATHTUB B14. VANITY BASE CABINET U.S. Department of Energy Research Toward Zero Energy Homes B15. SOLID SURFACE BACKSPLASH B16. SOLID SURFACE COUNTERTOP B17. FRAMELESS GLASS SHOWER DOOR, TEMPERED B18. SOLID SURFACE BATHTUB DECK B19. 6" DEEP NICHE U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy ENERGY KITCHEN: K1. WALL CABINET K2. BASE CABINET K3. END PANEL K4. SUPPORT BRACKET K5. RANGE HOOD EXHAUST DUCT K6. TILE BACKSPLASH K7. SOLID SURFACE BACKSPLASH K8. SOLID SURFACE COUNTERTOP MARK DATE DESCRIPTION STAIR: ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION S1. WOOD HANDRAIL S2. WOOD BALUSTER PROJECT NO: NIST NZERTF S3. WOOD TREAD A-PLOT-ELEV-NZERTF CAD DWG FILE: S4. WOOD TRIM KG, HW DRAWN BY: S5. WOOD STRINGER CHECKED BY: BP S6. WOOD POST COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION SCREEN PORCH: P1. EXTERIOR WATER TABLE SHEET TITLE: P2. PORCH DOOR INTERIOR ELEVATIONS P3. EXTERIOR FIBER CEMENT LAP SIDING % x 6 DOOR TRIM % TRIM BOARD 3" CROWN P4. P5. P6. P7. 5 1/2" BASE P8. FIBER CEMENT PANEL BOARD P9. %" WALL CAP P10. SCREEN PANEL I oc o SCALE AS NOTED z P11. SCREEN DOOR P12. 3 1/2" TRIM A-204 P13. 10" TRIM BOARD W/ INSET PANEL P14. 21/2" BEADBOARD P15. TRIM BOARD „0-,6 m r-6' 3-0" < Q. Q ^ ALIGN PLATE WITH T.O. TILE; ALIGN PLATE WITH T.O. TILE -Nco 3-0" ALIGN PLATE WITH T O O o I m] 9'-O' 7 ,o-z 7 7 6'-9" ALIGN PLATE WITH T.O. TILE 3'-4' 7 3'-0' 2'-10" w M. ot p * ut M. 7 7 (U> 2'-3' @0 00 CM A R 7 7 7 KJ H r-6" LO H 00 S IM 7 r-6" < cy co CM OO 1 f CM CO II CD 4^ CO O cd CD CO DO m 00 ,0-6 7 ,o-z M a A- CO -1^ LO CO CM o CD CD 1 I DO CD CD DO 7 7 9-0' 7 7 3-0' M 4 CD <8Hk o CM o CM I z] t= i= CM 1=1 r CD 14 CO CM LO CD CD CD m 7 7 9-0' 7 7 ,o-z 7 3'-6" 3'-0" w w CD p Y7 ’la 14 CO CN O a CD co m tr
  • 24. GENERALSHEETNOTES BUILDINGSCIENCE CORPORATION 1. ALL TROPICAL WOOD, IF USED, MUST BE FSC-CERTIFIED. 20'-0" 15'-6" 7^- 7^- 7^- 2. SEE A-602 FOR FINISH SCHEDULE. 8-0" 12'-0' 4'-10" 5'-10' 4'-10" 7^- 7^ 7^ 7^ 7^ 7^ 7L ALIGN SWITCH AND RECEPTACLE PLATES WITH TOP OF TILE IN KITCHENS AND BATHROOMS. 3. Z------ V m z o 55" FLAT SCREEN TV G5 G5 -=f OSHEETKEYNOTES Tl T WALL SCONCE WALL SCONCE 0 -V 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com G6 CD G3 h- GENERAL: o o G3 CT> CD G1. CROWN MOULDING ■v [ ] G2. BASE MOULDING CN G1 G3. PAINTED WALL CONSULTANT: v = -2 CD G4. WINDOW HEAD TRIM G16 CD G5. 1x4 WINDOW JAMB TRIM O O o o o o o o o o o G6. WINDOWSILL TRIM o © ^7 ©) G7. CASED OPENING HEAD TRIM CO (G19) G8. 1x6 CASED OPENING JAMB TRIM (G1 CD G9. CASED OPENING BASE TRIM mi mi -v ■v ©0 ^--------"s------V m------------------- V G10. DOOR HEAD TRIM 2 1/8" 2 1/8" G11. 1x4 DOOR JAMB TRIM LIVINGROOMELEVATION LIVINGROOMELEVATION G12. INTERIOR DOOR G13. BUILT-UP COLUMN SCALE: 1/2" = 1’-0' SCALE: 1/2" = 1'-0’ G14. COLUMN BASE TRIM r n G15. WOOD PANEL G16. WOOD CAP G17. MANTLE G18. MANTLE TRIM 12'-5" 7^ ~? ~ 9-10' G19. BASE CABINET 7 ~ G20. WOOD SHELF Z------ V Z------ V P6 G21. 1 "x4" DOOR HEAD TRIM P6 L J CM CM P5 ) BATH: t } PROJECT: T B1. TILE P8 CEILING FAN/LIGHT NationalInstituteof StandardsandTechnology B2. HAND HELD SHOWER B3. SHOWER SEAT GRAB BAR B4. P13 TOWEL BAR B5. NetZeroEnergy ResidentialTest Facility CO TOWEL RING B6. LO B7. TOILET PAPER HOLDER P1 B8. MIRROR o o 7 7 CO 05 CT> G1 PH FRAMELESS MIRROR B9. o P2 CD B10. ACCESSIBLE LAVATORY P10 NIST Campus Gaithersburg, MD B11. ACCESSIBLE TOILET 7 ^7 B12. TOILET mi TT B13. BATHTUB -v T7 WALL SCONCE u 'sE P15 B14. VANITY BASE CABINET U.S. Department of Energy Research Toward Zero Energy Homes "sE ^E CO CO CO CO B15. SOLID SURFACE BACKSPLASH CN CN CN © B16. SOLID SURFACE COUNTERTOP P7 B17. FRAMELESS GLASS SHOWER DOOR, TEMPERED B18. SOLID SURFACE BATHTUB DECK Z--------- "7------- V Z-------- ' 7------ V 6" f OD SCREENPORCHELEVATION SCREENPORCHELEVATION B19. 6" DEEP NICHE U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy 4 5 ENERGY CO <^==i SCALE: 1/2"= 1'-0" SCALE: 1/2" = 1'-0’ KITCHEN: CD ■V □ K1. WALL CABINET K2. BASE CABINET K3. END PANEL o CO K4. SUPPORT BRACKET 17'-6" K5. RANGE HOOD EXHAUST DUCT 3-0' 9-0' K6. TILE BACKSPLASH 7‘ 7L 7 ~ ■^7---------------^ 7 4-6' 6 12-6" K7. SOLID SURFACE BACKSPLASH 7 -------------- 7 ” 7- K8. SOLID SURFACE COUNTERTOP —v ■^t—v 7 7 MARK DATE DESCRIPTION ■^7------V V STAIR: ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION ■^7 WALL SCONCE n- S1. WOOD HANDRAIL CM S2. WOOD BALUSTER n- ->7 PROJECT NO: NIST NZERTF CM ~ ^ 7------------=----------- CD -^7------------V S3. WOOD TREAD 7 A-PLOT-ELEV-NZERTF CAD DWG FILE: ->7 S4. WOOD TRIM co KG, HW DRAWN BY: ^7 S5. WOOD STRINGER ID 3 1/2" CHECKED BY: BP S6. WOOD POST CO G11 COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION CD SCREEN PORCH: o o CD P1. EXTERIOR WATER TABLE CT> SHEET TITLE: (G1 o (Ji P2. PORCH DOOR i^i S1 CD ■7 00 INTERIOR ELEVATIONS P3. EXTERIOR FIBER CEMENT LAP SIDING % x 6 DOOR TRIM % TRIM BOARD 3" CROWN 7 ^ 7 r-- CD "7 CO S1 P4. S2 CD P5. P6. S2 o P7. 5 1/2" BASE CO P8. FIBER CEMENT PANEL BOARD P9. %" WALL CAP P10. SCREEN PANEL I **------V ^------ V o SCALE AS NOTED E z G2 ^7--------*7--------V P11. SCREEN DOOR P12. 3 1/2" TRIM A-205 STAIRELEVATION BALCONYELEVATION OPENINGELEVATION P13. 10" TRIM BOARD W/ INSET PANEL 3 2 1 P14. 21/2" BEADBOARD P15. TRIM BOARD SCALE: 1/2"= 1'-0" SCALE: 1/2"= 1'-0' SCALE: 1/2"= 1'-0'
  • 25. 6-0" 5-10' 6-0" 9'-8' GENERALSHEETNOTES -?*- -?*- -?*- BUILDINGSCIENCE CORPORATION 3-2' 2-8" 5-0" 1’-0" 7^ 7^ 7^ 7^ "7 ~ 7 ~ 1. ALL TROPICAL WOOD, IF USED, MUST BE FSC-CERTIFIED. 2. SEE A-602 FOR FINISH SCHEDULE. ■v -v ALIGN SWITCH AND RECEPTACLE PLATES WITH TOP OF TILE IN KITCHENS AND BATHROOMS. 3. (G10) G3 ■v 6 o o o o OSHEETKEYNOTES B15 ct> CD CD CD 1 @0 30 FOREST STREET SOMERVILLE, MA T: (978) 589-5100 F: (978) 589-5103 www.buildingscience.com 2-7' o o o 4’ CD CO B6 ■^r-v Is- h- Is- LO CO GENERAL: co O CO 1 B7 G1. CROWN MOULDING /n % i -V s G2. BASE MOULDING I ■v G3. PAINTED WALL B19 1 o o CONSULTANT: ITT! ITT) CO CO G4. WINDOW HEAD TRIM o CM CM 13 B1 G5. 1x4 WINDOW JAMB TRIM LO fi AX G6. WINDOWSILL TRIM le ■y—y y------- y—y—y—y y—y—y y-------- y------ y—y G7. CASED OPENING HEAD TRIM G8. 1x6 CASED OPENING JAMB TRIM G9. CASED OPENING BASE TRIM G10. DOOR HEAD TRIM BATH#2ELEVATION BATH#2ELEVATION BATH#2ELEVATION BATH#2ELEVATION G11. 1x4 DOOR JAMB TRIM G12. INTERIOR DOOR SCALE: 1/2"= 1'-0" SCALE: 1/2" = 1'-0’ SCALE: 1/2" = 1'-0" SCALE: 1/2" = 1'-0" G13. BUILT-UP COLUMN G14. COLUMN BASE TRIM r n 5'-0" 10'-9 1/2" 9'-9" 9-9" 7 ~ 7 ~ 7 ~ 7 ~ 71 7 ~ 71 7 ~ G15. WOOD PANEL G16. WOOD CAP 6-9" 3'-0' 4-0" 61/2,; 6’-3' 7 ~ 7 ~ 7 ~ 71 7 ~ G17. MANTLE G18. MANTLE TRIM G19. BASE CABINET y y ■V y y m m m z G20. WOOD SHELF G21. 1 "x4" DOOR HEAD TRIM L J Q0^0□ BATH: PROJECT: -V -V -V B1. TILE ■v -v -v NationalInstituteof StandardsandTechnology B2. HAND HELD SHOWER o B3. SHOWER SEAT 3-10" 2’-0" CD PH 7 ~ 7^ 7 ~ GRAB BAR B4. €>- y TOWEL BAR B5. NetZeroEnergy Residential Test Facility 2'. 6" 6"^ o o o o 7 ~ TOWEL RING B6. B5 X CD CD CD CD CN s © €) y B7. TOILET PAPER HOLDER CM EQ. EQ. 9’ o o o o B8. MIRROR 15 CT> O) 7^ 1/ M 1/ M B1 G6 B6 t-v Is- Is- co CO CD €)- FRAMELESS MIRROR B9. O -v -v £“7 / 17 B10. ACCESSIBLE LAVATORY CD S NIST Campus Gaithersburg, MD B1 o B11. ACCESSIBLE TOILET o o IF 14 B1 B12. TOILET o o 18) o B18 -v T T CO CO CO / I B13. BATHTUB 13 / l CD I B14. VANITY BASE CABINET / M&5K U.S. Department of Energy Research Toward Zero Energy Homes 13 G2 i G2 / B15. SOLID SURFACE BACKSPLASH y--------y-------y-------y y--------y-------y-------y y------ y------V y------ y------y------y------V VC60 B16. SOLID SURFACE COUNTERTOP £ B17. FRAMELESS GLASS SHOWER DOOR, TEMPERED B18. SOLID SURFACE BATHTUB DECK B19. 6" DEEP NICHE U.S. DEPARTMENT OF Energy Efficiency & Renewable Energy BATH#2ELEVATION MASTERBATHELEVATION MASTERBATHELEVATION MASTERBATHELEVATION ENERGY KITCHEN: SCALE: 1/2"= 1'-0" SCALE: 1/2" = 1'-0’ SCALE: 1/2"= 1'-0' SCALE: 1/2" = 1’-0' K1. WALL CABINET K2. BASE CABINET 10’-9 1/2' 15-1 1/2" 15-1 1/2' K3. END PANEL 7 ~ 7 ~ 7 ~ 7 ~ 7 ~ 7 ~ K4. SUPPORT BRACKET 6-7 1/2' 101 2'-6" 2'-6" 3'-6" 3'-6" 3-1 1/2" 10-8' 4-5 1/2' 3'-4' K5. RANGE HOOD EXHAUST DUCT 7 ~ 7 ~ 7 ~ 7^ 7 ~ 7 ~ 7 ~ 7 ~ 7 ~ 7 ~ K6. TILE BACKSPLASH K7. SOLID SURFACE BACKSPLASH y y—y y------ V <§>—[3 3 <§>—El ©---El SI Z z z K8. SOLID SURFACE COUNTERTOP MARK DATE DESCRIPTION STAIR: ISSUE: 03/31/10 ISSUED FOR CONSTRUCTION y S1. WOOD HANDRAIL 7 7 8~Q^Q~9 S2. WOOD BALUSTER y : : PROJECT NO: NIST NZERTF S3. WOOD TREAD A-PLOT-ELEV-NZERTF CAD DWG FILE: o S4. WOOD TRIM CD KG, HW DRAWN BY: EQ. EQ. S5. WOOD STRINGER 7 ~ 7 CD CHECKED BY: BP S6. WOOD POST N- II B9 COPYRIGHT © 2009 BUILDING SCIENCE CORPORATION o o o O) O) (J) SCREEN PORCH: (G20) CD P1. EXTERIOR WATER TABLE SHEET TITLE: o (G1 15 O) v P2. PORCH DOOR n- CD 2 INTERIOR ELEVATIONS P3. EXTERIOR FIBER CEMENT LAP SIDING P4. % x 6 DOOR TRIM P5. % TRIM BOARD P6. 3" CROWN P7. 5 1/2" BASE O O o o o o o o EQ. EQ. 1 o o " 00 CO I I EQ. EQ. EQ. EQ. T 7 “ 7 “ CD (G1 P8. FIBER CEMENT PANEL BOARD 0 0 -y —v —v ----- V P9. %" WALL CAP P10. SCREEN PANEL VC78 I 3/4' 3/4" 2 1/8" o SCALE AS NOTED FILLER FILLER <L <L z P11. SCREEN DOOR P12. 3 1/2" TRIM A-206 MASTERBATHELEVATION MASTERBEDROOMELEVATION MASTERBEDROOMELEVATION P13. 10" TRIM BOARD W/ INSET PANEL 3 2 1 P14. 21/2" BEADBOARD P15. TRIM BOARD SCALE: 1/2" = 1’-O' SCALE: 1/2" = 1’-O' SCALE: 1/2" = 1’-O'