2. SUBJECT : PRIMAVERA
FACULTY : SIR FAIZ
GROUP MEMBERS:
FARAZ KHAN 10655
ZAIN JAWAID 10238
ZIYAD HASAN 11091
HASNAIN SHEIKH 62811
3. TABLE OF CONTENT
PROJECT CHARTER
SCOPE DETAILS
SCHEDULE
BUDGET STRUCTURE
WBS
RISK REGISTER
RESOURCE BREAK DOWN STRUCTURE
LIST OF EMPLOYEES
TECHNICAL FEATURES
EQUIPMENTS
OUR SUCCESSFUL PROJECTS
4. PROJECT MANAGER FARAZ KHAN
TEAM MEMBERS VICE PRESIDENT,GM TECHNICAL
SPONSER CREEK MARINA PVT LTD
CONSULTANT MEINHARDT SINGAPORE
ENTRANCE LOBBY (TESTING & COMISSIONING)
SHOWFLAT (TESTING & COMISSIONING)
1-Jun-22
PROJECT TEAM APPROVAL/REVIEW COMMITTEE
FINANCIALS
BUDGET TO COMPLETE THIS PROJECT IS 50,000,000 PKR
MILESTONE SCHEDULE
MILESTONE SCHEDULE TARGET COMPLETION DATE ACTUAL DATE
INSTALLATION OF CURTAIN WALL
1) THERMAL BREAK WINDOW
2) VIEW OF NATURAL LANDSCAPE
RISK & ISSUES
DUE TO COVID UNCERTAINTY FOR IMPORTED ITEMS
LOCAL MATERIAL PRICES ARE HIGH DUE TO ESCALATION
ASSUMPTIONS
System to be Installed from technal France
Imported Glass to be processed from Dubai
Welcome to Creek Marina Residences, where dreams become reality. Karachi, the City of Lights. Shimmering on the coast of
the Arabian Sea, this growing metropolis houses a wealth of commercial, historical, and natural gem
PROJECT SCOPE PROJECT DELIVERABLES
PROJECT SPONSER:
PROJECT END DATE:
1-Feb-22 1-Jun-22
INSTALLATION OF GLAZING WORK ON FAÇADE TOWER 7 CREEK
MARINA
BUSINESS NEED
PROJECT CHARTER
PROJECT TITLE:
PROJECT START DATE:
FARAZ KHAN
CREEK MARINA PVT LTD
PROJECT MANAGER:
5. SCOPE DETAILS
SCOPE: INSTALLATION OF ALUMINIUM WITH GLASS (CURTAIN WALLS) GLAZING WORK ON THE FAÇADE
LOCATION: LEVEL 1 : ENTRANCE LOBBY
LEVEL 2: SHOW FLAT
COVERED AREA: LEVEL 1: 3000 SQM(SQUARE METER)
LEVEL 2: 2000 SQM (SQUARE METER)
LEVEL 1: 30,000,000 PKR ( THIRTY MILLIONS RUPEES)
LEVEL 2: 20,000,000 PKR ( TWENTY MILLIONS RUPEES)
TOTAL AMOUNT: 50,000,000 PKR ( FIFTY MILLIONS RUPEES)
DURATION: 4 MONTHS
DEVELOPER : CREEK MARINA PRIVATE LTD
CONTRACTOR: ALCOP
CONTRACT
AWARD
AMOUNT:
6. SCOPE OF THE PROJECT
BLOCK 7 LEVEL-1 ENTRANCE LOBBY (FAÇADE WORK)
7. SCOPE OF THE PROJECT
BLOCK 7 LEVEL-2 SHOW APARTMENT -3BR (FAÇADE WORK,A/C LEDGE
RAILING WORKS )
9. PROJECT NAME
PROJECT
DURATION
PROJECT
START DATE
PROJECT END
DATE
CREEK MARINA 4 MONTHS 1-Feb-22 1-Jun-22
JUNE
NO OPENINGS # LOCATION
DURATION
(Days)
START DATE END DATE
WEEK
1
WEEK
2
WEEK
3
WEEK
4
WEEK
1
WEEK
2
WEEK
3
WEEK
4
WEEK
1
WEEK
2
WEEK
3
WEEK
4
WEEK
1
WEEK
2
WEEK
3
WEEK
4
WEEK 1
INSTALLATION OF ALUMNIUM FRAMING
1 AW5 INSTALLATION OF ALUMNIUM FRAMING 50 1-Feb-22 23-Mar-22
2 AW6 INSTALLATION OF ALUMNIUM FRAMING 50 2-Feb-22 24-Mar-22
3 AW8 INSTALLATION OF ALUMNIUM FRAMING 50 3-Feb-22 25-Mar-22
4 AW9 INSTALLATION OF ALUMNIUM FRAMING 50 4-Feb-22 26-Mar-22
5 AW10 INSTALLATION OF ALUMNIUM FRAMING 50 5-Feb-22 27-Mar-22
6 AW11 INSTALLATION OF ALUMNIUM FRAMING 50 6-Feb-22 28-Mar-22
7 AW12 INSTALLATION OF ALUMNIUM FRAMING 50 7-Feb-22 29-Mar-22
GLASS PROCESSING AND TRANSIT TIME AT SITE 30 29-Mar-22 30-Apr-22
9 AW5 INSTALLATION OF GLASS PANEL 25 1-May-22 26-May-22
10 AW6 INSTALLATION OF GLASS PANEL 25 2-May-22 27-May-22
11 AW8 INSTALLATION OF GLASS PANEL 25 3-May-22 28-May-22
12 AW9 INSTALLATION OF GLASS PANEL 25 4-May-22 29-May-22
13 AW10 INSTALLATION OF GLASS PANEL 25 5-May-22 30-May-22
14 AW11 INSTALLATION OF GLASS PANEL 25 6-May-22 31-May-22
15 AW12 INSTALLATION OF GLASS PANEL 25 7-May-22 1-Jun-22
INSTALLATION OF GLASS PANEL
MAY
INSTALLATION OF ALUMNIUM FRAME
GLASS PROCESSING AND TRANSIT TIME @ SITE
DATE: 5 /1/2022
FEB MAR APR
10. WBS
Baker rod placed on
either sides of
windows jambs
Silicon sealant
across jambs
Cutting of Alumnium
as per size
Fixing of Alumnium
frame
Processing of Glass
Resizing of Glass
Installation of Gaskit on
Alumnium frame
Placement of Glass
Installation of Curtain
Wall
Finishing
layout of windows
Installation of
bracket
Pressure plate on
Glass
14. Project
(Sindh /
DIRECTOR
(Farhan Saeed)
Legal Consultant Company
Secretary
Chief Operating Officer
(Faraz Siddiqui)
General Manager
(Sales)
Marketing
Manager
General Manager
(Technical) HR Manager
General Manager
(Finance) Factory
Manager
Manager Finance Team
Marketing
Officer
Sales Manager
(Punjab / KPK)
Sales Manager
Balochistan))
Asst. Project
Manager 1
Asst. Project
Manager 2
Asst. Project
Manager 3
Installation
Manager
Aluminiu
m
Fabrication
Staff
ACP
Fabrication
Staff
Sales Engineer Sales Engineer
Project
Supervisor
1
Project
Supervisor
2
Project
Supervisor
3
Site Works
Team
Site Works
Team
Site Works
Team
Site Works
Team
Site Works
Team
Site Works
Team
RESOURCE BREAKDOWN STRUCTURE
15.
16. LIST OF KEY PERSONNEL
NAME DESIGNATION EXPERIENCE
A) Head Office
M. Farhan Saeed Director 25 Years.
Faraz Siddiqui Chief Operating Offer 15 Years.
Engr. Ijlal Hasan General Manager-Technical 47 Years.
M. Hanif General Manager-Sales 38 Years.
Engr. M Faraz khan Projects Manager 08 Years.
B) Regional Office (Punjab & KPK)
Mr. Nadeem-ul-Haq. Regional Manager 40 Years.
Mr. Faisal Jillani Sales Manger 12 Years
C) Site Execution
Khursheed Anwar Senior Project Manager 25 Years.
Fahad Khatri Project Manager 10 Years.
M. Faheem Project Manager 10 Years.
M. Shameem Factory Manager 15 Years.
Besides the above Management Team the Projects & Installation Team
comprises of 06 independent units for each assigned project headed by an
experienced foreman.
17. 1) TECHNICAL FEATURES
TECHNAL® Architectural Aluminum system is based on Thermal Break
System Aluminum profiles and accessories with 28mm for curtain walls,
Doors & windows:
a) TECHNAL® MX – TECHNAL fully capped curtain wall is considered
for integrated Doors / Windows with Fixed glazing.
The selection of mullion is based on TECHNAL structural calculations
by considering wind pressure of 2500 Pa with deflection L/175 & L/240
+ 6.35mm for span more than 4.1m.
b) TECHNAL® FY55 – TECHNAL thermally broken range is considered
for fixed and casement window.
c) TECHNAL® PY55 – TECHNAL thermally broken range is considered
for hinged doors with open-in / out / double action option using plinth
profile.
d) TECHNAL® P70 CL – TECHNAL thermally broken range is
considered for the sliders without fly screen.
e) Aluminum profiles is considered in Anodized Finish.
f) Glass comprising of 8mm Sunguard HP Silver 35 Tempered Glass +
12mm black air spacer + 6mm clear Tempered glass.
g) Glass will be processed in UAE by Future Architectural Glass LLC.
Proposed glass is manufactured by AGC.