SlideShare a Scribd company logo
1 of 1
2000mm
fire escape
2000mm
2000mm
fire escape
SCISSOR
LIFT
0000
datum
floor level
BIN STORE AREA
upto
mezz floor
1 2 3 4
DELIVERIES
up
up
up
up
up
up
up up
up
up
up
up
up
up
up up
up
up
up
up
up
up
1 2 3 4 5 6 7 8 9 10 11
121314151617
amps
ALLEY WAY TO
BOURNE STREET CARPARK
FlatEntrance
1
&
2
2220clear
up
up
E.D.A. 770m2
full height wall
Service and
Dump Station
UP
(NOACCESS)
MOTOR
ROOM
HOIST/
LIFT
7092
2965
1:12 ramp
+525 existing ramp
+1135m
CoverLevel
55.25
InvertLevel
53.36
Inspection
Chamber
MALE TOILETS
FEMALE TOILETS
cleaners
cpbd
store
cpbd
chemical store
MAIN LOBBY
OFFICE
CELLAR
wine gallery
USB=1.99
55.29
54.98
53.92
53.87
55.35
SERVICE STATION
MAIN RESTAURANT SEATING
STREET MARKET
glass
wash
54.98
54.98
up
55.35
Seating 108
RAISED SEATING AREA
covered delivery ramp
01
02
03
04
05
06
07
08
+108
+154
+154
+154
+154
+154
+153
+152
01
02
03
04
05
06
07
08
+108
+154
+154
+154
+154
+154
+153
+152
up
01+160
02+160
03+160
01+160
02+160
03+160
exterior stairs 01
stairs 01
stairs 03
up
stairs 05
stairs 06
exterior stairs 02
Raised
Plinth
SCISSOR
LIFT
upto
mezz floor
1 2 3 4
6000
5271
3906
6897
Freezer 30m2 Fridge 25m2
stairs 07
stairs 07
up
01+160
02+160
03+160
SERVER
DISABLED
REVISION DATE ITEM
CONSTRUCTION
DATE
July 2012
COSMO, Derby
DRAWN
PROJECT
PROJECT
TITLE
NUMBER
shown
SCALE
REVISION
CHECKED
INFORMATION ONLY
APPLICATION FOR LOCAL AUTHORITY
TENDER
TO THE CURRENT HEALTH AND SAFETY AT WORKS CONDITIONS AND LOCAL
12. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE OTHER RELEVANT
11. IN THE EVENT THAT DRAWING INFORMATION IS NOT THE SAME, AND IF THE
AND ARE NOT TO BE SCALED FROM THE THE DRAWINGS.
7. ALL FINISHES ARE TO BE CARRIED OUT TO A HIGH STANDARD.
8. ANY DIMENSIONS ARE TO BE TAKEN FROM THE SETTING OUT PLAN ONLY
THE PROPOSED PLAN IS TO BE READ AS CORRECT.
THAT ANY BUILDING IS CARRIED OUT UNDER THE LOCAL AUTHORITY
13. COPYRIGHT OF BLENHEIM DESIGN. NOT TO BE REPRODUCED
DESIGNER AND OR SUPERVISING OFFICER ARE UNAVAILABLE FOR COMMENT,
AND CONSTRUCTION DETAILS AND OFFER ALTERNATIVES TO THE DESIGNER
10. THE CONTRACTOR IS TO CHECK AND APPRAISE ALL DESIGN SHOP FITTING
9. IT IS THE CONTRACTORS RESPONSIBILITY TO UNDER TAKE AND ENSURE
FOR APPROVAL.
CONSULTANTS DRAWINGS.
AUTHORITY REGULATIONS.
REQUIREMENTS.
MANUFACTURERS RECOMMENDATIONS.
DETAILS ARE REQUIRED TO BE APPROVED BY BLENHEIM DESIGN PRIOR TO
BEFORE PROCEEDING WITH ANY WORK.
ARE TO BE CLASS 1 OR EQUIVALENT).
6. CONTRACTOR TO PROVIDE A WORKING ENVIRONMENT WHICH CONFORMS
5. ALL SPECIFIED ITEMS ARE TO BE INSTALLED IN ACCORDANCE WITH THE
4. ALL REQUESTED DRAWINGS SHOWING FIXINGS AND CONSTRUCTION
AND SPECIFICATIONS AND REPORT ANY DISCREPANCIES TO BLENHEIM DESIGN
2. CONTRACTOR MUST VERIFY ALL SITE DIMENSIONS, DRAWINGS, DETAILS
REGULATIONS IN THE APPLICABLE COUNTRY (IN A RESTAURANT ALL FINISHES
1. ALL FINISHES ARE TO CONFORM TO THE REQUIRED CURRENT BUILDING
COMMENCEMENT OF WORK.
GENERAL NOTES
Builders works drawing
MM
03-01BD 1232
BLENHEIM
DESIGN...
6 St Peters Place
Brighton
BN1 4SA
t: 01273 380001
info@blenheimdesign.com
one layer of 12.5 wallboard each side of
70mm gyproc studs to provide 1 /2 hr fire
resistance partition duty: medium to BS 5234
parts 1 & 2 1992. to be installed from structural
floor to slab.
Existing structure
ALL 1 & 1/2 HR FIRE RESISTING WALLS TO RUN FULL HEIGHT AND
SHOULD BE SUITABLY FIRE STOPPED TO MAINTAIN 1/2 & 1 HR
FIRE INTEGRITY.
CP
1/2F
L
FG
SD
SI
HD
FE
VP
B
CP
1/2F
L
FG
PP
SD
EL
SI
HD
FE
VP
SC
CO
W
CO
W
STANDARDS REQUIRED TO BE ACHIEVED IN RESPECT OF FIRE & SAFETY MATTERS.
1 DOORS AND PARTITIONS REQUIRED TO BE FIRE RESISTING ARE TO BE IN ACCORDANCE WITH BRITISH
STANDARD BS 476 1972 AS AMENDED.
2 FIRE RESISTING DOORS REQUIRED TO RESIST THE PASSAGE OF SMOKE AT AMBIENT TEMPERATURE
CONDITIONS SHOULD, UNLESS TESTED IN ACCORDANCE WITH BS 476 SECTION 31.1 1983
3 THE FIRE ALARM SYSTEM TO COMPLY WITH BRITISH STANDARDS BS 5839 PART 1 2002. THE ATTENTION
OF THE DESIGN INSTALLING ENGINEER SHOULD BE DRAWN TO PARAGRAPH 4.3 (CONSULTATION RECORDS)
OF BS 5839 PART 1 2002 WHICH REQUIRES CONSULTATION WITH THE FIRE AUTHORITY.
4 THE EMERGENCY LIGHTING INSTALLATION IS TO COMPLY WITH BRITISH STANDARD BS 5266 PART 1 1999
THE ATTENTION OF THE DESIGN INSTALLING ENGINEER SHOULD BE DRAWN TO PARAGRAPH 3.1
(CONSULTATION AND RECORDS) OF BS 5266 PART 1 1999. WHICH REQUIRES CONSULTATION WITH THE
FIRE AUTHORITY.
5 FIRE SAFETY RELATED SIGNS AND NOTICES ARE TO CONFORM TO CURRENT BRITISH STANDARDS.
6 ILLUMINATED 'EXIT' SIGNS ARE TO CONFORM TO BS 5499 PARTS 1, 3 & 4.
7 FIRE FIGHTING EQUIPMENT IS TO COMPLY WITH BS EN3 1-6, BS 7863 (1996), BS 7867 (1997) AND BS 5306
8 UPHOLSTERED SEATING FURNITURE MUST SATISFY, AS A MINIMUM STANDARD, IGNITION SOURCE O
(CIGARETTE TEST) AND CRIB IGNITION SOURCE 5 AS SPECIFIED IN BS 5852 1990. 'METHODS OF TEST FOR
ASSESSMENT OF THE INGITABILITY OF UPHOLSTERED SEATING BY SMOLDERING AND FLAMING IGNITION
IF IN ORDER TO SECURE COMPLIANCE WITH THE ABOVE STANDARDS WITH THE FABRIC SUBMITTED FOR
TEST HAS BEEN TREATED BEFOREHAND WITH A FIRE RETARDANT PRODUCT, THE TESTING LABORATORY
MUST BE INSTRUCTED TO SUBJECT HE SAMPLES TO BE TREATED TO A WATER SOAK TEST. IN ACCORDANCE
WITH BS 5651 1989 PARAGRAPH 3, BEFORE THE BS 5852 TESTS ARE CARRIED OUT. A COPY OF THE
LABORATORY TEST REPORT FROM AN ACCREDITED TESTING LABORATORY IDENTIFYING COMPLIANCE OF
THE FURNISHING COMPOSITE WITH THE ABOVE MENTIONED BRITISH STANDARDS MUST BE FORWARDED
TO THE LOCAL AUTHORITY BEFORE INSTALLATION AND CONFIRMATION THAT THE FURNISHING SPECIFIED
IN THIS CERTIFICATE HAVE BEEN INSTALLED IN THE PREMISES.
9 CURTAINS AND OTHER TEXTILE HANGINGS MUST BE INHERENTLY FLAME RETARDANT OR BE TREATED
WITH A DURABLE FLAME FLAME RETARDANT. THEY MUST BE CAPABLE OF COMPLYING WITH 'TYPE B'
PERFORMANCE REQUIREMENTS OF BS 5857 PART 2 1980 - 'SPECIFICATION FOR FABRICS FOR CURTAIN AND
DRAPES - FLAMMABILITY REQUIREMENTS'
10 ARTIFICIAL FOLIAGE AND OTHER DECORATIVE EFFECTS ARE TO BE FIRE RETARDET TO THE
SATISFACTION OF THE FIRE AUTHORITY.
11 LININGS AND SURFACE FINISHES OF WALLS AND CEILING SHOULD HAVE SURFACE SPREAD OF FLAME
RATING AS DEFINED IN THE BUILDING REGULATIONS 1991.
12. CERTIFICATES OF INSTALLATION TEST WILL BE REQUIRED IN RESPECT OF ITEMS NUMBER 3,4,6,8 AND 9
ABOVE AND MAY BE REQUIRED FOR ITEM 2.
NOTE:
ANY REFERENCE TO A BRITISH STANDARD (BS) SHOULD TAKEN TO INCLUDE THE EQUIVALENT EUROPEAN
STANDARD IF RELEVANT AND THE LATEST VERSION IN THE SPEC MENTIONED IS SUPERSEDED.
Restaurant seated and queuing customers
TOTAL NUMBER OF OCCUPANCY + 30 STAFF
FEMALE/DISABLED
Ambulant Disabled customers:
The Scheme has been designed to comply with Part M of the building
Toilet accomodation
The toilet accomodation is based upon BS 6465 Part 1 2006, Sanitary
instalations. Table 9 - Full on license. Ratio of male to female being 50% each.
Clear Means of escape width required for 350 persons
WHB's
1750mm
Urinals WC's
N/A 7 7
OCCUPANCY LEVELS
Area
Means of Escape Capacity for COSMO RESTAURANT
Ocupancy rates are based upon current Building Regulations
Whole demise in total 1645 sq m
Total
Restaurant and public toilet area
Staff and kitchen area
Exterior seating area
996 sq m
649 sq m
N/A
350
N/A
Class B Standard ie. 12mm laminated or toughened
All front of house glazing to comply with BS 6206 1981
GLAZING
MALE 4 2 4
External seating area
320
Two layer of 12.5 wallboard each side of
70mm gyproc studs to provide 1 hr fire
resistance. To be installed from structural
floor to slab.
100mm thick Thermalite party wall from
Hanson use with thin layer mortar, with
12.5mm walboard on inside. Installed to BS
5628: Parts 1
NEW COCRETE
EXTERIOR RAMP,
COMPLETE WITH THE
HANDRAIL
EXISTING PARTITION
TO BE DEMOLISHED
TO STRUCTURAL
ENGINEERS DETAILS
CREATE A NEW
WALL OPENING
TO STR. ENG.
DETAILS
One fully disabled toilet is situated on the ground floor.
EXISTING STAIRS
ARE TO BE
DEMOLISHED TO
CREATE LEVELED
FLOOR AREA
THROUGHOUT
EXISTING STAGE
STAIRS ARE TO BE
REMOVED
EXISTING PARTITION
TO BE DEMOLISHED
PP
PP
PP
B
COCO
WW
B
COCO
WW
B
COCO
WW
B
COCO
WW
B
COCO
WW
B
COCO
WW
B
COCO
WW
B
COCO
WW
B
COCO
WW
B
COCO
WW
B
COCO
WW
CPCP
CPCP
CPCP
CPCP
CPCP
CPCP
CPCP
B
COCO
WW
B
COCO
WW
B
COCO
WW
COCO
WW
COCO
WW
COCO
WW
COCO
WW
COCO
WW
SISI
SDSDEL
HDEL HDEL
HDEL
HDEL
HDEL
HDEL
HDEL
HDEL
HDEL
HDEL
SDSDEL
SDSDEL
SDSDEL
SDSDEL
SDSDEL
SDEL
SDSDEL
SDSDEL
SDSDEL
SDSDEL
SDSDEL
SDSDEL
SDSDEL
SDSDEL
SDSDEL
SDSDEL
SDSDEL SDSDEL
SDSDEL
SDSDEL
SDSDEL SDSDEL
SDSDEL
SDSDEL
SDSDEL
SDSDEL
SDSDEL
SDSD
SDEL
SDSDEL
SISI
SISI
CREATE A NEW
WALL OPENING
TO STR. ENG.
DETAILS
SDSDEL
SDSDELSDSDEL
SDSDEL
SDSDEL
SDSDEL
SDSDEL
HDEL
SDSDEL
SDSDELSDSDEL
SDSDEL
SDSDEL
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
SC
HDEL
SDSDEL
SDSDEL
1/2F1/2F
1/2F1/2F
1/2F1/2F
1/2F1/2F
1/2F1/2F 1/2F1/2F
1/2F1/2F
1/2F1/2F
1/2F1/2F
1/2F1/2F
1/2F1/2F
1/2F1/2F
1/2F1/2F 1/2F1/2F
1/2F1/2F
1/2F1/2F
1/2F1/2F
1/2F1/2F
1/2F1/2F
1/2F1/2F
1/2F1/2F
1/2F
1/2F
1/2F1/2F
1/2F1/2F
1/2F1/2F
LL
LL
SC
1/2F1/2F
L
L
L
FGFG
FGFG
FGFG
FGFG
FGFG FGFG
FG
FG
FG
FG
FG
FG
SISI
FEFE
FEFE
FEFE
FEFE
FEFE
FG
FG
FG
FG
FG
FEFE
PP SISI
F
A 19-07-12 SUSPENDED FLOOR OMITTED, FEW WALLS AMENDED
B 01-08-12 Some walls moved to allow for the new kitchen layout
SDSDEL
SDSDEL
ALL STRUCTURAL COLUMNS ARE TO BE PREPARED TO RECEIVE 1
HR FR INTUMISCENT PAINT
AREA BETWEEN THE FIRST AND GROUND FLOOR IS TO BE 1 HR FR
RESISTANT, ONE LAYER OF 12.7MM FIRE SHIELD C GYPSUM
APPLYED TO 50X100MM WOOD JOISTS WITH 5D NAILS 1-5/8
LONG. 13MM WOOD STRUCTURAL PANEL APPLYED AT RIGHT
ANGLE WITH 8 D NAILS, READY TO RECEIVE FINAL FLOOR FINISH
AMBULANCE DISABLED
STAIRS, 160MM CLOSED
RISERS AND 250MM
GOING COMPLETE WITH
CONTRASTING NOSING, ref
GA1403(S) Gooding
aluminium
1696
1372
1723
1772
1772
1474
1700
EL
AMBULANCE DISABLED
STAIRS, 160MM CLOSED
RISERS AND 250MM
GOING COMPLETE WITH
CONTRASTING NOSING, ref
GA1403(S) Gooding
aluminium AMBULANCE DISABLED
STAIRS, 160MM CLOSED
RISERS AND 250MM
GOING COMPLETE WITH
CONTRASTING NOSING, ref
GA1403(S) Gooding
aluminium
C 08-08-12 server room added
D 17-08-12 Notes added to reflect building regulation comments
VPVP
VPVP
VPVP
VPVP
VPVP
VPVP
VPVP
VPVP
VPVP
VPVP
VPVP
VPVP
VPVP
E 23-08-12 Door at the stage area changed
F 10-09-12 Disabled toilet changed + portable ramp added
SDSDEL
SDEL
PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT
PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT

More Related Content

What's hot

House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad SubmissionYolanda Sewpersad
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residentialgrahamelanders
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestationYousef Riad
 
14325 connels house drafting (1)
14325 connels house drafting (1)14325 connels house drafting (1)
14325 connels house drafting (1)Yousef Riad
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of QuantityArissa Loh
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQashleyyeap
 
Experiences Olaya- Frasers-ID Package- Public Spaces
Experiences Olaya- Frasers-ID Package- Public SpacesExperiences Olaya- Frasers-ID Package- Public Spaces
Experiences Olaya- Frasers-ID Package- Public SpacesAmer El Malki
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaAaron Kaira
 
02-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 2018
02-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 201802-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 2018
02-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 2018Faculty of fine arts -Cairo. Egypt.
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Lee Pei Gie
 
FULL MPH Doc1 - Charles Roucher
FULL MPH Doc1 - Charles RoucherFULL MPH Doc1 - Charles Roucher
FULL MPH Doc1 - Charles RoucherCharles Roucher
 

What's hot (18)

House Harripersad Submission
House Harripersad SubmissionHouse Harripersad Submission
House Harripersad Submission
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
Freelance project management residential
Freelance project management residentialFreelance project management residential
Freelance project management residential
 
abermain.firestation
abermain.firestationabermain.firestation
abermain.firestation
 
14325 connels house drafting (1)
14325 connels house drafting (1)14325 connels house drafting (1)
14325 connels house drafting (1)
 
Final Bills of Quantity
Final Bills of QuantityFinal Bills of Quantity
Final Bills of Quantity
 
Measurement II BQ
Measurement II BQMeasurement II BQ
Measurement II BQ
 
Experiences Olaya- Frasers-ID Package- Public Spaces
Experiences Olaya- Frasers-ID Package- Public SpacesExperiences Olaya- Frasers-ID Package- Public Spaces
Experiences Olaya- Frasers-ID Package- Public Spaces
 
8 months work
8 months work8 months work
8 months work
 
Design Portfolio by Aaron Kaira
Design Portfolio by Aaron KairaDesign Portfolio by Aaron Kaira
Design Portfolio by Aaron Kaira
 
02-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 2018
02-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 201802-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 2018
02-Working details-Partition-Gypsum Board-KNAUF-by Prof Dr. Ehab Ezzat 2018
 
7545 102 final elevations as proposed
7545 102 final elevations as proposed7545 102 final elevations as proposed
7545 102 final elevations as proposed
 
Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )Bill of Quantities ( Door and Window )
Bill of Quantities ( Door and Window )
 
Versaloc
VersalocVersaloc
Versaloc
 
FULL MPH Doc1 - Charles Roucher
FULL MPH Doc1 - Charles RoucherFULL MPH Doc1 - Charles Roucher
FULL MPH Doc1 - Charles Roucher
 
Car park bq
Car park bqCar park bq
Car park bq
 
15-106 3
15-106 315-106 3
15-106 3
 
Working drawings sample
Working drawings sampleWorking drawings sample
Working drawings sample
 

Similar to BD 1232 rev F -03-01 Building

Construction management sample drawing file
Construction management sample drawing fileConstruction management sample drawing file
Construction management sample drawing fileLing Ma
 
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03Ian de Mink
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSunit Dhingra
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksMaja Myall
 
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEduardo H. Pare
 
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSSPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEduardo H. Pare
 
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEduardo H. Pare
 
Isokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructionsIsokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructionsSchiedel UK
 
Portfolio 2019
Portfolio 2019Portfolio 2019
Portfolio 2019Ali Belal
 
ICS 5000 commercial flue system instructions
ICS 5000 commercial flue system instructionsICS 5000 commercial flue system instructions
ICS 5000 commercial flue system instructionsSchiedel UK
 
BR07 Proposed Section A - A
BR07 Proposed Section A - ABR07 Proposed Section A - A
BR07 Proposed Section A - Asarah ralphs
 
Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...
Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...
Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...Rashid Guliyev
 
Capalli Botha - Sheet - Pg_01 - Construction Plans03
Capalli Botha - Sheet - Pg_01 - Construction Plans03Capalli Botha - Sheet - Pg_01 - Construction Plans03
Capalli Botha - Sheet - Pg_01 - Construction Plans03Ian de Mink
 

Similar to BD 1232 rev F -03-01 Building (20)

Studiowork submissions
Studiowork submissionsStudiowork submissions
Studiowork submissions
 
Studiowork submission
Studiowork submission Studiowork submission
Studiowork submission
 
Construction management sample drawing file
Construction management sample drawing fileConstruction management sample drawing file
Construction management sample drawing file
 
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
Capalli Botha - Sheet - Pg_02 - Elevations & Sections03
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
 
3. Hansons lodge.pdf
3. Hansons lodge.pdf3. Hansons lodge.pdf
3. Hansons lodge.pdf
 
Working drawings
Working drawingsWorking drawings
Working drawings
 
BD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders WorksBD1230 Plans REV K.-03-01 Builders Works
BD1230 Plans REV K.-03-01 Builders Works
 
house plans
house planshouse plans
house plans
 
You need the house plans
You need the house plansYou need the house plans
You need the house plans
 
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSEDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
EDUARDO H. PARE SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
 
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKSSPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
SPECS & SW_BUILDING & UNDERGROUND CABLES CIVIL WORKS
 
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONSEDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
EDUARDO H. PARE CIVIL, STRUCTURAL AND ARCHITECTURAL SPECIFICATIONS
 
Isokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructionsIsokern Celsius stove system installation instructions
Isokern Celsius stove system installation instructions
 
Portfolio 2019
Portfolio 2019Portfolio 2019
Portfolio 2019
 
15-0478_WD_B
15-0478_WD_B15-0478_WD_B
15-0478_WD_B
 
ICS 5000 commercial flue system instructions
ICS 5000 commercial flue system instructionsICS 5000 commercial flue system instructions
ICS 5000 commercial flue system instructions
 
BR07 Proposed Section A - A
BR07 Proposed Section A - ABR07 Proposed Section A - A
BR07 Proposed Section A - A
 
Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...
Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...
Bs 2594 specification for carbon steel welded horizontal cylindrical storage ...
 
Capalli Botha - Sheet - Pg_01 - Construction Plans03
Capalli Botha - Sheet - Pg_01 - Construction Plans03Capalli Botha - Sheet - Pg_01 - Construction Plans03
Capalli Botha - Sheet - Pg_01 - Construction Plans03
 

BD 1232 rev F -03-01 Building

  • 1. 2000mm fire escape 2000mm 2000mm fire escape SCISSOR LIFT 0000 datum floor level BIN STORE AREA upto mezz floor 1 2 3 4 DELIVERIES up up up up up up up up up up up up up up up up up up up up up up 1 2 3 4 5 6 7 8 9 10 11 121314151617 amps ALLEY WAY TO BOURNE STREET CARPARK FlatEntrance 1 & 2 2220clear up up E.D.A. 770m2 full height wall Service and Dump Station UP (NOACCESS) MOTOR ROOM HOIST/ LIFT 7092 2965 1:12 ramp +525 existing ramp +1135m CoverLevel 55.25 InvertLevel 53.36 Inspection Chamber MALE TOILETS FEMALE TOILETS cleaners cpbd store cpbd chemical store MAIN LOBBY OFFICE CELLAR wine gallery USB=1.99 55.29 54.98 53.92 53.87 55.35 SERVICE STATION MAIN RESTAURANT SEATING STREET MARKET glass wash 54.98 54.98 up 55.35 Seating 108 RAISED SEATING AREA covered delivery ramp 01 02 03 04 05 06 07 08 +108 +154 +154 +154 +154 +154 +153 +152 01 02 03 04 05 06 07 08 +108 +154 +154 +154 +154 +154 +153 +152 up 01+160 02+160 03+160 01+160 02+160 03+160 exterior stairs 01 stairs 01 stairs 03 up stairs 05 stairs 06 exterior stairs 02 Raised Plinth SCISSOR LIFT upto mezz floor 1 2 3 4 6000 5271 3906 6897 Freezer 30m2 Fridge 25m2 stairs 07 stairs 07 up 01+160 02+160 03+160 SERVER DISABLED REVISION DATE ITEM CONSTRUCTION DATE July 2012 COSMO, Derby DRAWN PROJECT PROJECT TITLE NUMBER shown SCALE REVISION CHECKED INFORMATION ONLY APPLICATION FOR LOCAL AUTHORITY TENDER TO THE CURRENT HEALTH AND SAFETY AT WORKS CONDITIONS AND LOCAL 12. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH THE OTHER RELEVANT 11. IN THE EVENT THAT DRAWING INFORMATION IS NOT THE SAME, AND IF THE AND ARE NOT TO BE SCALED FROM THE THE DRAWINGS. 7. ALL FINISHES ARE TO BE CARRIED OUT TO A HIGH STANDARD. 8. ANY DIMENSIONS ARE TO BE TAKEN FROM THE SETTING OUT PLAN ONLY THE PROPOSED PLAN IS TO BE READ AS CORRECT. THAT ANY BUILDING IS CARRIED OUT UNDER THE LOCAL AUTHORITY 13. COPYRIGHT OF BLENHEIM DESIGN. NOT TO BE REPRODUCED DESIGNER AND OR SUPERVISING OFFICER ARE UNAVAILABLE FOR COMMENT, AND CONSTRUCTION DETAILS AND OFFER ALTERNATIVES TO THE DESIGNER 10. THE CONTRACTOR IS TO CHECK AND APPRAISE ALL DESIGN SHOP FITTING 9. IT IS THE CONTRACTORS RESPONSIBILITY TO UNDER TAKE AND ENSURE FOR APPROVAL. CONSULTANTS DRAWINGS. AUTHORITY REGULATIONS. REQUIREMENTS. MANUFACTURERS RECOMMENDATIONS. DETAILS ARE REQUIRED TO BE APPROVED BY BLENHEIM DESIGN PRIOR TO BEFORE PROCEEDING WITH ANY WORK. ARE TO BE CLASS 1 OR EQUIVALENT). 6. CONTRACTOR TO PROVIDE A WORKING ENVIRONMENT WHICH CONFORMS 5. ALL SPECIFIED ITEMS ARE TO BE INSTALLED IN ACCORDANCE WITH THE 4. ALL REQUESTED DRAWINGS SHOWING FIXINGS AND CONSTRUCTION AND SPECIFICATIONS AND REPORT ANY DISCREPANCIES TO BLENHEIM DESIGN 2. CONTRACTOR MUST VERIFY ALL SITE DIMENSIONS, DRAWINGS, DETAILS REGULATIONS IN THE APPLICABLE COUNTRY (IN A RESTAURANT ALL FINISHES 1. ALL FINISHES ARE TO CONFORM TO THE REQUIRED CURRENT BUILDING COMMENCEMENT OF WORK. GENERAL NOTES Builders works drawing MM 03-01BD 1232 BLENHEIM DESIGN... 6 St Peters Place Brighton BN1 4SA t: 01273 380001 info@blenheimdesign.com one layer of 12.5 wallboard each side of 70mm gyproc studs to provide 1 /2 hr fire resistance partition duty: medium to BS 5234 parts 1 & 2 1992. to be installed from structural floor to slab. Existing structure ALL 1 & 1/2 HR FIRE RESISTING WALLS TO RUN FULL HEIGHT AND SHOULD BE SUITABLY FIRE STOPPED TO MAINTAIN 1/2 & 1 HR FIRE INTEGRITY. CP 1/2F L FG SD SI HD FE VP B CP 1/2F L FG PP SD EL SI HD FE VP SC CO W CO W STANDARDS REQUIRED TO BE ACHIEVED IN RESPECT OF FIRE & SAFETY MATTERS. 1 DOORS AND PARTITIONS REQUIRED TO BE FIRE RESISTING ARE TO BE IN ACCORDANCE WITH BRITISH STANDARD BS 476 1972 AS AMENDED. 2 FIRE RESISTING DOORS REQUIRED TO RESIST THE PASSAGE OF SMOKE AT AMBIENT TEMPERATURE CONDITIONS SHOULD, UNLESS TESTED IN ACCORDANCE WITH BS 476 SECTION 31.1 1983 3 THE FIRE ALARM SYSTEM TO COMPLY WITH BRITISH STANDARDS BS 5839 PART 1 2002. THE ATTENTION OF THE DESIGN INSTALLING ENGINEER SHOULD BE DRAWN TO PARAGRAPH 4.3 (CONSULTATION RECORDS) OF BS 5839 PART 1 2002 WHICH REQUIRES CONSULTATION WITH THE FIRE AUTHORITY. 4 THE EMERGENCY LIGHTING INSTALLATION IS TO COMPLY WITH BRITISH STANDARD BS 5266 PART 1 1999 THE ATTENTION OF THE DESIGN INSTALLING ENGINEER SHOULD BE DRAWN TO PARAGRAPH 3.1 (CONSULTATION AND RECORDS) OF BS 5266 PART 1 1999. WHICH REQUIRES CONSULTATION WITH THE FIRE AUTHORITY. 5 FIRE SAFETY RELATED SIGNS AND NOTICES ARE TO CONFORM TO CURRENT BRITISH STANDARDS. 6 ILLUMINATED 'EXIT' SIGNS ARE TO CONFORM TO BS 5499 PARTS 1, 3 & 4. 7 FIRE FIGHTING EQUIPMENT IS TO COMPLY WITH BS EN3 1-6, BS 7863 (1996), BS 7867 (1997) AND BS 5306 8 UPHOLSTERED SEATING FURNITURE MUST SATISFY, AS A MINIMUM STANDARD, IGNITION SOURCE O (CIGARETTE TEST) AND CRIB IGNITION SOURCE 5 AS SPECIFIED IN BS 5852 1990. 'METHODS OF TEST FOR ASSESSMENT OF THE INGITABILITY OF UPHOLSTERED SEATING BY SMOLDERING AND FLAMING IGNITION IF IN ORDER TO SECURE COMPLIANCE WITH THE ABOVE STANDARDS WITH THE FABRIC SUBMITTED FOR TEST HAS BEEN TREATED BEFOREHAND WITH A FIRE RETARDANT PRODUCT, THE TESTING LABORATORY MUST BE INSTRUCTED TO SUBJECT HE SAMPLES TO BE TREATED TO A WATER SOAK TEST. IN ACCORDANCE WITH BS 5651 1989 PARAGRAPH 3, BEFORE THE BS 5852 TESTS ARE CARRIED OUT. A COPY OF THE LABORATORY TEST REPORT FROM AN ACCREDITED TESTING LABORATORY IDENTIFYING COMPLIANCE OF THE FURNISHING COMPOSITE WITH THE ABOVE MENTIONED BRITISH STANDARDS MUST BE FORWARDED TO THE LOCAL AUTHORITY BEFORE INSTALLATION AND CONFIRMATION THAT THE FURNISHING SPECIFIED IN THIS CERTIFICATE HAVE BEEN INSTALLED IN THE PREMISES. 9 CURTAINS AND OTHER TEXTILE HANGINGS MUST BE INHERENTLY FLAME RETARDANT OR BE TREATED WITH A DURABLE FLAME FLAME RETARDANT. THEY MUST BE CAPABLE OF COMPLYING WITH 'TYPE B' PERFORMANCE REQUIREMENTS OF BS 5857 PART 2 1980 - 'SPECIFICATION FOR FABRICS FOR CURTAIN AND DRAPES - FLAMMABILITY REQUIREMENTS' 10 ARTIFICIAL FOLIAGE AND OTHER DECORATIVE EFFECTS ARE TO BE FIRE RETARDET TO THE SATISFACTION OF THE FIRE AUTHORITY. 11 LININGS AND SURFACE FINISHES OF WALLS AND CEILING SHOULD HAVE SURFACE SPREAD OF FLAME RATING AS DEFINED IN THE BUILDING REGULATIONS 1991. 12. CERTIFICATES OF INSTALLATION TEST WILL BE REQUIRED IN RESPECT OF ITEMS NUMBER 3,4,6,8 AND 9 ABOVE AND MAY BE REQUIRED FOR ITEM 2. NOTE: ANY REFERENCE TO A BRITISH STANDARD (BS) SHOULD TAKEN TO INCLUDE THE EQUIVALENT EUROPEAN STANDARD IF RELEVANT AND THE LATEST VERSION IN THE SPEC MENTIONED IS SUPERSEDED. Restaurant seated and queuing customers TOTAL NUMBER OF OCCUPANCY + 30 STAFF FEMALE/DISABLED Ambulant Disabled customers: The Scheme has been designed to comply with Part M of the building Toilet accomodation The toilet accomodation is based upon BS 6465 Part 1 2006, Sanitary instalations. Table 9 - Full on license. Ratio of male to female being 50% each. Clear Means of escape width required for 350 persons WHB's 1750mm Urinals WC's N/A 7 7 OCCUPANCY LEVELS Area Means of Escape Capacity for COSMO RESTAURANT Ocupancy rates are based upon current Building Regulations Whole demise in total 1645 sq m Total Restaurant and public toilet area Staff and kitchen area Exterior seating area 996 sq m 649 sq m N/A 350 N/A Class B Standard ie. 12mm laminated or toughened All front of house glazing to comply with BS 6206 1981 GLAZING MALE 4 2 4 External seating area 320 Two layer of 12.5 wallboard each side of 70mm gyproc studs to provide 1 hr fire resistance. To be installed from structural floor to slab. 100mm thick Thermalite party wall from Hanson use with thin layer mortar, with 12.5mm walboard on inside. Installed to BS 5628: Parts 1 NEW COCRETE EXTERIOR RAMP, COMPLETE WITH THE HANDRAIL EXISTING PARTITION TO BE DEMOLISHED TO STRUCTURAL ENGINEERS DETAILS CREATE A NEW WALL OPENING TO STR. ENG. DETAILS One fully disabled toilet is situated on the ground floor. EXISTING STAIRS ARE TO BE DEMOLISHED TO CREATE LEVELED FLOOR AREA THROUGHOUT EXISTING STAGE STAIRS ARE TO BE REMOVED EXISTING PARTITION TO BE DEMOLISHED PP PP PP B COCO WW B COCO WW B COCO WW B COCO WW B COCO WW B COCO WW B COCO WW B COCO WW B COCO WW B COCO WW B COCO WW CPCP CPCP CPCP CPCP CPCP CPCP CPCP B COCO WW B COCO WW B COCO WW COCO WW COCO WW COCO WW COCO WW COCO WW SISI SDSDEL HDEL HDEL HDEL HDEL HDEL HDEL HDEL HDEL HDEL HDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSDEL SDSD SDEL SDSDEL SISI SISI CREATE A NEW WALL OPENING TO STR. ENG. DETAILS SDSDEL SDSDELSDSDEL SDSDEL SDSDEL SDSDEL SDSDEL HDEL SDSDEL SDSDELSDSDEL SDSDEL SDSDEL SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC SC HDEL SDSDEL SDSDEL 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F 1/2F 1/2F 1/2F1/2F 1/2F1/2F 1/2F1/2F LL LL SC 1/2F1/2F L L L FGFG FGFG FGFG FGFG FGFG FGFG FG FG FG FG FG FG SISI FEFE FEFE FEFE FEFE FEFE FG FG FG FG FG FEFE PP SISI F A 19-07-12 SUSPENDED FLOOR OMITTED, FEW WALLS AMENDED B 01-08-12 Some walls moved to allow for the new kitchen layout SDSDEL SDSDEL ALL STRUCTURAL COLUMNS ARE TO BE PREPARED TO RECEIVE 1 HR FR INTUMISCENT PAINT AREA BETWEEN THE FIRST AND GROUND FLOOR IS TO BE 1 HR FR RESISTANT, ONE LAYER OF 12.7MM FIRE SHIELD C GYPSUM APPLYED TO 50X100MM WOOD JOISTS WITH 5D NAILS 1-5/8 LONG. 13MM WOOD STRUCTURAL PANEL APPLYED AT RIGHT ANGLE WITH 8 D NAILS, READY TO RECEIVE FINAL FLOOR FINISH AMBULANCE DISABLED STAIRS, 160MM CLOSED RISERS AND 250MM GOING COMPLETE WITH CONTRASTING NOSING, ref GA1403(S) Gooding aluminium 1696 1372 1723 1772 1772 1474 1700 EL AMBULANCE DISABLED STAIRS, 160MM CLOSED RISERS AND 250MM GOING COMPLETE WITH CONTRASTING NOSING, ref GA1403(S) Gooding aluminium AMBULANCE DISABLED STAIRS, 160MM CLOSED RISERS AND 250MM GOING COMPLETE WITH CONTRASTING NOSING, ref GA1403(S) Gooding aluminium C 08-08-12 server room added D 17-08-12 Notes added to reflect building regulation comments VPVP VPVP VPVP VPVP VPVP VPVP VPVP VPVP VPVP VPVP VPVP VPVP VPVP E 23-08-12 Door at the stage area changed F 10-09-12 Disabled toilet changed + portable ramp added SDSDEL SDEL PRODUCED BY AN AUTODESK EDUCATIONAL PRODUCTPRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT PRODUCEDBYANAUTODESKEDUCATIONALPRODUCT