SlideShare a Scribd company logo
1 of 15
Download to read offline
Add :Rm 1806,Block 3, Jinyun COFCO, Qianjin 2 Road,Xixiang,Baoan District, Shenzhen City, China
TEL: 0755-83203237; FAX:0755-23240492 website:www.smthelp.com
Fully automatic loader
machine
Operation Manual
Please read the instructions carefully before user operation
1st
Preface
First of all, we sincerely thank you for choosing the SMT peripheral automation equipment
produced by our company. This company specialized production: conveyor, automatic feeding
detection machine, vacuum suction machine, stacked on the machine, parallel transfer, angle
conveyor, turning machine,machine, double buffer for the same reflow furnace system, a
series of automated production equipment. According to the customer's requirements, we can
develop and design a series of automation equipment, in order to meet the customer's high
efficiency, energy saving, downsizing and other production needs. This manual describes the
use of methods and equipment maintenance and precautions, in front of the machine, please
carefully read this manual, and it will be properly preserved, wrong operation may cause the
device does not operate normally or damaged parts. Due to man-made equipment failure or
parts damage, will not apply to the company's exemption free warranty service range. Without
permission of the company, please do not disassemble or replace the equipment parts, nor
applicable to the company's free warranty warranty service range. As to the improvement and
partial renewal of the product, we will not make further instructions. If you have any doubts,
please contact our company for consultation.
Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com
2nd
一、Equipment technical parameters
Equipment type:S-LD460
Description: on board operation of PCB board in SMD production line with this device
PCB Maximum specification(mm):50*50~535*460
Working height(mm):900±20(std)
PCB board time:6。0 sec
Step selection:10。 20。 30。 40mm selectable
Power Supply:AC 220V±10V, 50/60HZ
Machine outline size:1250(L)*1490(W)*1250(H)±20mm
weight(KG):300
Compressed air supply pressure:4-6bar
Compressed air flow:Max 10 litres /minute
Circuit board thickness:Minimum0.4mm deep
Power: maximum 300 volt ampere
Box number: the stop 1 (or specified)
Direction: left to right or right to left
Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com
3rd
二、General precautions
1. 1.operator obligations
1) please read the instructions and the instructions of the attached machine in detail, and
operate the equipment according to the instructions.
2) comply with the safety standards of the equipment, and ensure compliance with the
regulations.
3) please use protective equipment and clothing in accordance with the provisions of.
4) do not touch electrical equipment with wet hands.
5) in operation, please ensure safety if you want to tidy up the equipment perimeter.
6) any part of the body must not enter the equipment during the operation.
7) in case of abnormal operation, please stop immediately and handle or contact the
company according to the exception handling method.
8) every day after the job, please clean the equipment surrounding.
9) after daily operation, when you want to leave the equipment, please control the power
supply and main control valve in accordance with the correct method.
10) prohibit the transformation of the very stop loop and action confirmation.
11) prohibit the transformation is the stop button, and confirm the safety shield off the
safety switch, photoelectric tube, safety etc..
12) prohibit the occurrence of safety switch pull out or safety protection function
cancellation.
13) Regular maintenance and confirm whether the stop action is normal or not. But at this
point, you must put other people can not be near the signs notice placed in a clear
position, inform the device is currently very stop or automatic safety device is being
tested. However, the need for security and adjustment and the licensee are not
subject to this restriction.
2. regular maintenance and confirmation of very safe test and protection action is normal.
But at this point, you need to put other people not close to the signs notice placed in a
clear position, inform the device, the current automatic safety device is being tested.
3. Condition change restrictions
1) Set the conditions for this device (voltage, current, pressure, speed and other
equipment on the nameplate, marking that display settings), if want to change, must
be responsible for the leader's permission, set the condition of change must be
recorded before and after the change of value.
2) the quality determination of the workpiece must be carried out according to the
sampling period stipulated by the detailed management document of the project. If
Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com
4th
there is an abnormality, the responsible person or leader should be reported
immediately, and comply with the instructions.0
3) Safety confirmation during overhaul.
4) The following steps shall be taken to ensure safety during overhaul and repair.
5) Stop the equipment and confirm that the facility stops in safe position.
6) When entering the equipment, please confirm the status of the safety agencies, if
necessary, you can set up special personnel custody or pull the safety switch lock and
safety pin, and carry it with you.
7) The main power box switch, motor switch and other power supply must be cut off, the
locking device must be locked and so on.
8) Using specified components.
9) Fuses and other over-current protectors and repair parts and so on, please use the
specified product.
10) To correctly operate the equipment and correct safety operation, please pay attention
to the nameplate posted on this equipment. This nameplate is very important. Please
don't damage it or tear it off. If the nameplate is damaged or missing, please be sure
to contact the responsible person or leader.
Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com
5th
三、Function and operation instructions
(一)、Preparation before starting
1、Horizontal position:
(1)All cup adjustment must be balanced and stressed simultaneously to avoid vibration
during mechanical operation.
(2)After adjusting the level, the cup foot screw should be fixed tightly.
2、Gas source:
(1)The air supply in 4-6kg/cm², pressure regulating valve to adjust the 4kg/cm²气.
(2)Gas source must be clean, waterless and dry.
3、、Installation position:
Do not put on mechanical installation of dust, oil mist, conductive dust, corrosive gas,
flammable gas, moisture, shock, high temperature and outdoor environments.
4、Working group:
(1) please check whether the power supply meets the requirements after power supply,
whether the power switch is normal, and the power can be switched on normally.
(2) check whether the emergency stop switch and the protection device are normal after
power on.
(3) the moving part is mainly responsible for the constant speed motor and the cylinder, each
part, position detection by travel switch or induction electric eye.
(4) do not make the cylinder speed run too fast, smooth and supple as well.
(5) the position sensor to adjust good position.
(6) the position of each sensor can be input from PLC to detect the indicator lamp.
(7) each output condition is detected from the PLC output point indicator.
(8) its running program has been controlled by internal programming, and customers can not
change it.
( 二 ) Operation button function description
1 、 emergency button: may at any time terminate any emergency operation,
after the opening of the.
2、 automatic: machine into automatic operation.
3、 reset: when abnormal alarm processing.
4、 Stop: stop everything.
5、 manual: machine into manual operation
6、 manual operation time:
Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com
6th
(1) return button: when the lift is in the upper limit, Magazine discharges. When the elevator is
in the lower limit, the Magazine enters the lifting platform.
(2) push plate button: when the long drop table is not in the upper and lower limit, the push
plate button is effective.
(3) clamping button: clamping cylinder moves.
(4) rising button: the lifting platform rises. When Magazine is in the elevator, it needs to be
clamped first, then it can rise and descend.
(5) drop button: the landing gear is descending. When the Magazine is in the elevator, it needs
to be clamped first, then it can rise and descend.
(6) selection: lifting cell number, optional range of 1 to 4 grid.
(7) code: machine running state.
(三 ) the indication of the three color lamp:
Green light: that the machine is in automatic operation, normal operation.
Yellow light: in manual state, can operate manual function.
Red light: abnormal operation or emergency button press, red light, and buzzer sound.( 四 )
Matters needing attention before starting:
1、Has the emergency button been restored.
2、Check if the air pressure is normal(5~6Kg/cm²)
3. Make sure that no PCB stays between the line and between the line and the transmitter to
open the power.
4. Confirm whether the track chain is open before and after, and whether the width adjustment
is consistent.
5, the track is installed correctly and induction electric eye is normal.
6, check the width of the PCB block is appropriate.
Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com
7th
四、Conversion of new model operation procedure
1, according to manual operation, first select the spacing between the PCB board.
2. Adjust the Magazine to the PCB width of the new model so that PCB can easily insert
Magazine.
3, and then put a PCB full of Magazine on the lower belt,
4, press the box, let Magazine into the lift, and then press the clamping key, and then click the
rising key
5, Magazine will automatically rise to the position of the first board
6, the use of hand, the push rod is adjusted to just in the center line of PCB
7, a guide plate block adjustment to just the width of protection in PCB plate by electric eye
complete induction.
8, according to the push plate can launch Magazine PCB key test.
9, press the exit key, press the automatic operation to make the machine enter the automatic
mode, the machine is ready, waiting for the board signal.
Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com
8th
五、Machine operation
(一)Schematic diagram of operation panel
(二)Schematic diagram of operation panel circuit
GND
SB0
SB1
SB2
SB3
SB4
SB5
SB6
SB7
SB8
SB9
SBA
VCC
L0
L1
L2
L3
L4
L5
L6
L7
L8
L10
L11
L14
L9
Manual click valid
效
Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com
9th
六、Electrical circuit diagram
(一)、Sensor distribution diagram
Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com
10th
(二)Signal connection
Signal plug for connection with rear engineering machine
8
4 7
11
12
13
14
3
2
1
(三)Control panel conversion diagram
Three color light output interface
Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com
11th
(四)Distribution diagram of electric box
Input signal
PLC editable
controller
Relay board
Motor control
Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com
12th
五、Display code query table
Code Internal triggering Explain
00 R3E R222 Standby (no tricolor light)
33 R308 The device is now running manually (three color
indicator Huang Dengliang)
22 R309 The device is now running automatically (the green
light of the tricolor indicator)
70 XE Stop and start, (three color light red light)
71 T4 The lower limit is induced to
72 T56 The upper limit position is sensed
73 T5 Push rod cylinder push plate complete export
protection inductor induction
74 T0 Timeout for radio sensing
75 T1 Out of box induction timeout alarm
76 T10 Push board timeout alarm
77 T52 Rising super time police, X0 did not feel
78 R1A Out of box timeout
79 T7 The cylinder is not at origin
80 R85 The inductor is protected when the hand rises
81 R86 The inductor is sensed when manually rising
Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com
13th
六、Fault and elimination
fault Causes and Solutions
The total power light
doesn't work
Please check that the plug is inserted correctly on the
220V/AC socket. And make sure the socket has
electricity
The low voltage
power supply lamp
doesn't work
Please check whether the emergency stop is open and
whether the internal low voltage insurance is normal
No action of the
cylinder
Check whether the gas supply and pressure are
reached, whether the total gas switch is opened,
whether the work light of the solenoid valve is turned
on or not, and check whether the protective sensors
are normal
Blocking doesn't
work
Check whether the gas supply and pressure are
reached, whether the total gas switch is opened,
whether the work light of the solenoid valve is turned
on or not, and check whether the sensor is induced
and transported to PLC
The lifting platform
does not rise and fall
Please check whether meet the rise and fall of the
cylinder condition, origin whether feel safe to shoot is
sensed, out of the box is sensitive to induction
The lifting platform
does not move
Please check whether the push plate cylinder
completely return to X8 without induction, and the
launch of PCB protection is no magic eye induction X4
without induction, feeder protection XF electric eye
sensor
Three color lights are
not bright
Please check if the inner bulb is abnormal and loose
Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com
14th
八、Safety precautions
1. aspects of personal safety
1) Before starting the equipment, it is necessary to determine whether the on-site
personnel are in safe position
2) Maintenance is not allowed in the operation of the equipment
3) Equipment maintenance, should first determine the power switch, gas supply and
other power switch is closed, before it can be maintained
4) During the operation of the equipment, the operator should not touch or touch the
parts of the equipment so as to avoid danger
2. aspects of equipment safety
5) The equipment is fully automatic electronic control system, all control components,
PLC instruction contact, or mechanical input and output type equipment prohibited
unauthorized change
6) The equipment is an irreversible device, power components, motor operation,
maintenance and care, please pay attention to power wiring and direction of
operation
7) The manual switch and the automatic switch knob of each electromagnetic valve
are used in the forced switch of each electric box of the equipment. Unauthorized
use of the equipment without the permission of the person in charge of the
equipment is strictly prohibited.
8) In case of mechanical failure, the equipment should be shut down immediately
and notify the relevant personnel to repair.

More Related Content

What's hot

5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementationsudarshan jadwal
 
CASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair Manual
CASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair ManualCASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair Manual
CASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair Manualhksemd yjekmd
 
5S Implementation Presentation
5S Implementation Presentation 5S Implementation Presentation
5S Implementation Presentation Pranav B. Gujjar
 
5-S details, presented at BSTQM
5-S details, presented at BSTQM5-S details, presented at BSTQM
5-S details, presented at BSTQMEngr. Abdun Noor
 
KOMATSU WA270-3 WHEEL LOADER Service Repair Manual SN:WA270H20051 and up
KOMATSU WA270-3 WHEEL LOADER Service Repair Manual SN:WA270H20051 and upKOMATSU WA270-3 WHEEL LOADER Service Repair Manual SN:WA270H20051 and up
KOMATSU WA270-3 WHEEL LOADER Service Repair Manual SN:WA270H20051 and upjkmsmns
 
5S Training Presentation
5S Training Presentation5S Training Presentation
5S Training PresentationParth Devariya
 
Presentation - introduction to 5S
Presentation - introduction to 5SPresentation - introduction to 5S
Presentation - introduction to 5SJan Sabat
 
5S: Definition and Benefits
5S: Definition and Benefits5S: Definition and Benefits
5S: Definition and BenefitsAbdullah Saif
 
5s system PDF from Floor Tape to visual Labels
5s system PDF from Floor Tape to visual Labels5s system PDF from Floor Tape to visual Labels
5s system PDF from Floor Tape to visual LabelsBen Geck
 
Manual de armado 830 e 1ac
Manual de armado 830 e 1acManual de armado 830 e 1ac
Manual de armado 830 e 1acbellavista481
 
64840372 04-matriz-iper-completa-2011 (1)
64840372 04-matriz-iper-completa-2011 (1)64840372 04-matriz-iper-completa-2011 (1)
64840372 04-matriz-iper-completa-2011 (1)paulminiguano
 
Procedimiento Escrito De Trabajo Seguro – PETS.pdf
Procedimiento Escrito De Trabajo Seguro – PETS.pdfProcedimiento Escrito De Trabajo Seguro – PETS.pdf
Procedimiento Escrito De Trabajo Seguro – PETS.pdfluis alberto quispe vasquez
 
The 5S Store 5S Training Presentation
The 5S Store 5S Training PresentationThe 5S Store 5S Training Presentation
The 5S Store 5S Training PresentationDavid Visco
 
Instructivo de seguridad para trabajos electricos
Instructivo de seguridad para trabajos electricosInstructivo de seguridad para trabajos electricos
Instructivo de seguridad para trabajos electricosojedajoser
 
5s training slides_432
5s training slides_4325s training slides_432
5s training slides_432Mahesh Kumar
 

What's hot (20)

5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation5S Presentation for beginners and professionals for implementation
5S Presentation for beginners and professionals for implementation
 
CASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair Manual
CASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair ManualCASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair Manual
CASE CX31B COMPACT HYDRAULIC EXCAVATOR Service Repair Manual
 
5S Implementation Presentation
5S Implementation Presentation 5S Implementation Presentation
5S Implementation Presentation
 
5-S details, presented at BSTQM
5-S details, presented at BSTQM5-S details, presented at BSTQM
5-S details, presented at BSTQM
 
KOMATSU WA270-3 WHEEL LOADER Service Repair Manual SN:WA270H20051 and up
KOMATSU WA270-3 WHEEL LOADER Service Repair Manual SN:WA270H20051 and upKOMATSU WA270-3 WHEEL LOADER Service Repair Manual SN:WA270H20051 and up
KOMATSU WA270-3 WHEEL LOADER Service Repair Manual SN:WA270H20051 and up
 
5s ppt
5s ppt5s ppt
5s ppt
 
5S Training Presentation
5S Training Presentation5S Training Presentation
5S Training Presentation
 
5 S
5 S5 S
5 S
 
Presentation - introduction to 5S
Presentation - introduction to 5SPresentation - introduction to 5S
Presentation - introduction to 5S
 
Manipulacion de cargas
Manipulacion de cargasManipulacion de cargas
Manipulacion de cargas
 
5S: Definition and Benefits
5S: Definition and Benefits5S: Definition and Benefits
5S: Definition and Benefits
 
6S training presentation
6S training presentation6S training presentation
6S training presentation
 
5s system PDF from Floor Tape to visual Labels
5s system PDF from Floor Tape to visual Labels5s system PDF from Floor Tape to visual Labels
5s system PDF from Floor Tape to visual Labels
 
Manual de armado 830 e 1ac
Manual de armado 830 e 1acManual de armado 830 e 1ac
Manual de armado 830 e 1ac
 
64840372 04-matriz-iper-completa-2011 (1)
64840372 04-matriz-iper-completa-2011 (1)64840372 04-matriz-iper-completa-2011 (1)
64840372 04-matriz-iper-completa-2011 (1)
 
Procedimiento Escrito De Trabajo Seguro – PETS.pdf
Procedimiento Escrito De Trabajo Seguro – PETS.pdfProcedimiento Escrito De Trabajo Seguro – PETS.pdf
Procedimiento Escrito De Trabajo Seguro – PETS.pdf
 
Visual Factory
Visual FactoryVisual Factory
Visual Factory
 
The 5S Store 5S Training Presentation
The 5S Store 5S Training PresentationThe 5S Store 5S Training Presentation
The 5S Store 5S Training Presentation
 
Instructivo de seguridad para trabajos electricos
Instructivo de seguridad para trabajos electricosInstructivo de seguridad para trabajos electricos
Instructivo de seguridad para trabajos electricos
 
5s training slides_432
5s training slides_4325s training slides_432
5s training slides_432
 

Similar to Full Automatic Pcb loader Operation manual

Automatic+pcb+cleaner+operations+manual english version by Southern Machinery
Automatic+pcb+cleaner+operations+manual english version by Southern MachineryAutomatic+pcb+cleaner+operations+manual english version by Southern Machinery
Automatic+pcb+cleaner+operations+manual english version by Southern Machinerywendy wu
 
Vacuum loader user manual
Vacuum loader user manualVacuum loader user manual
Vacuum loader user manualssuser660147
 
small-hole-edm-manual.pdf
small-hole-edm-manual.pdfsmall-hole-edm-manual.pdf
small-hole-edm-manual.pdfRobin Yu
 
Сүлжих машины эд анги
Сүлжих машины эд анги Сүлжих машины эд анги
Сүлжих машины эд анги Nael Narantsengel
 
Af3 instruction manual-cm specialist
Af3 instruction manual-cm specialistAf3 instruction manual-cm specialist
Af3 instruction manual-cm specialistEko Kiswanto
 
Buddy High Volume Filling and Capping Machines
Buddy High Volume Filling and Capping Machines Buddy High Volume Filling and Capping Machines
Buddy High Volume Filling and Capping Machines RogerQi2
 
MAHABIR - Double Side Planner Manual
MAHABIR - Double Side Planner ManualMAHABIR - Double Side Planner Manual
MAHABIR - Double Side Planner ManualMahabirIndustries1
 
Cr1.cr1 b instruction manual(bfp-a8054j)
Cr1.cr1 b instruction manual(bfp-a8054j)Cr1.cr1 b instruction manual(bfp-a8054j)
Cr1.cr1 b instruction manual(bfp-a8054j)Abe Paih
 
Ultrasonic vibrating screen manual
Ultrasonic vibrating screen manualUltrasonic vibrating screen manual
Ultrasonic vibrating screen manualSimba Zhao
 
69302050 dk7740 a-wire-cut
69302050 dk7740 a-wire-cut69302050 dk7740 a-wire-cut
69302050 dk7740 a-wire-cutTrung Quoc Le
 
69302050 dk7740 a-wire-cut
69302050 dk7740 a-wire-cut69302050 dk7740 a-wire-cut
69302050 dk7740 a-wire-cutTrung Quoc Le
 
Suko introduction of ptfe molding machine
Suko introduction of ptfe molding machineSuko introduction of ptfe molding machine
Suko introduction of ptfe molding machineYuan Gao
 
Fanuc 0i maintenance manual CNC milling machine
Fanuc 0i maintenance manual CNC milling machineFanuc 0i maintenance manual CNC milling machine
Fanuc 0i maintenance manual CNC milling machineCNCDATAN
 

Similar to Full Automatic Pcb loader Operation manual (20)

Pcb buffer conveyor operation manual
Pcb buffer conveyor operation manualPcb buffer conveyor operation manual
Pcb buffer conveyor operation manual
 
Automatic+pcb+cleaner+operations+manual english version by Southern Machinery
Automatic+pcb+cleaner+operations+manual english version by Southern MachineryAutomatic+pcb+cleaner+operations+manual english version by Southern Machinery
Automatic+pcb+cleaner+operations+manual english version by Southern Machinery
 
Vacuum loader user manual
Vacuum loader user manualVacuum loader user manual
Vacuum loader user manual
 
Pcb automatic vaccum loader user guidance | SunzonTech
Pcb automatic vaccum loader user guidance | SunzonTechPcb automatic vaccum loader user guidance | SunzonTech
Pcb automatic vaccum loader user guidance | SunzonTech
 
Mwhe manual
Mwhe manualMwhe manual
Mwhe manual
 
small-hole-edm-manual.pdf
small-hole-edm-manual.pdfsmall-hole-edm-manual.pdf
small-hole-edm-manual.pdf
 
S 1688 stencil cleaner machine operation instruction manual smthelp
S 1688 stencil cleaner machine operation instruction manual smthelpS 1688 stencil cleaner machine operation instruction manual smthelp
S 1688 stencil cleaner machine operation instruction manual smthelp
 
Сүлжих машины эд анги
Сүлжих машины эд анги Сүлжих машины эд анги
Сүлжих машины эд анги
 
Pcb extend and retract gate conveyor user's manual
Pcb extend and retract gate conveyor user's manualPcb extend and retract gate conveyor user's manual
Pcb extend and retract gate conveyor user's manual
 
Tp 502 manual-deleliste
Tp 502 manual-delelisteTp 502 manual-deleliste
Tp 502 manual-deleliste
 
Af3 instruction manual-cm specialist
Af3 instruction manual-cm specialistAf3 instruction manual-cm specialist
Af3 instruction manual-cm specialist
 
Buddy High Volume Filling and Capping Machines
Buddy High Volume Filling and Capping Machines Buddy High Volume Filling and Capping Machines
Buddy High Volume Filling and Capping Machines
 
MAHABIR - Double Side Planner Manual
MAHABIR - Double Side Planner ManualMAHABIR - Double Side Planner Manual
MAHABIR - Double Side Planner Manual
 
Standby valve user guide
Standby valve user guideStandby valve user guide
Standby valve user guide
 
Cr1.cr1 b instruction manual(bfp-a8054j)
Cr1.cr1 b instruction manual(bfp-a8054j)Cr1.cr1 b instruction manual(bfp-a8054j)
Cr1.cr1 b instruction manual(bfp-a8054j)
 
Ultrasonic vibrating screen manual
Ultrasonic vibrating screen manualUltrasonic vibrating screen manual
Ultrasonic vibrating screen manual
 
69302050 dk7740 a-wire-cut
69302050 dk7740 a-wire-cut69302050 dk7740 a-wire-cut
69302050 dk7740 a-wire-cut
 
69302050 dk7740 a-wire-cut
69302050 dk7740 a-wire-cut69302050 dk7740 a-wire-cut
69302050 dk7740 a-wire-cut
 
Suko introduction of ptfe molding machine
Suko introduction of ptfe molding machineSuko introduction of ptfe molding machine
Suko introduction of ptfe molding machine
 
Fanuc 0i maintenance manual CNC milling machine
Fanuc 0i maintenance manual CNC milling machineFanuc 0i maintenance manual CNC milling machine
Fanuc 0i maintenance manual CNC milling machine
 

More from Shenzhen Southern Machinery Sales And Service Co., Ltd

More from Shenzhen Southern Machinery Sales And Service Co., Ltd (20)

S 680 a smt reel scrap tape cutter machine
S 680 a smt reel scrap tape cutter  machineS 680 a smt reel scrap tape cutter  machine
S 680 a smt reel scrap tape cutter machine
 
CE certificates s3000 radial auto insertion machine
CE certificates s3000 radial auto insertion machineCE certificates s3000 radial auto insertion machine
CE certificates s3000 radial auto insertion machine
 
SMT, EMS X-Ray AX9100
SMT, EMS X-Ray AX9100SMT, EMS X-Ray AX9100
SMT, EMS X-Ray AX9100
 
Southern machinery board handling system catalog
Southern machinery board handling system catalogSouthern machinery board handling system catalog
Southern machinery board handling system catalog
 
Upgrade Universal stand alone auto insertion machine to Automatic Board Handl...
Upgrade Universal stand alone auto insertion machine to Automatic Board Handl...Upgrade Universal stand alone auto insertion machine to Automatic Board Handl...
Upgrade Universal stand alone auto insertion machine to Automatic Board Handl...
 
S 7350 dual beam odd form insertion machine -- Made in China
S 7350 dual beam odd form insertion machine -- Made in ChinaS 7350 dual beam odd form insertion machine -- Made in China
S 7350 dual beam odd form insertion machine -- Made in China
 
Southern machinery odd form assembly solution -Power Supply PCBA
Southern machinery odd form assembly solution  -Power Supply PCBASouthern machinery odd form assembly solution  -Power Supply PCBA
Southern machinery odd form assembly solution -Power Supply PCBA
 
Helps the Environment -- S1688 stencil cleaner machine
Helps the Environment -- S1688 stencil cleaner machine Helps the Environment -- S1688 stencil cleaner machine
Helps the Environment -- S1688 stencil cleaner machine
 
One key point to consider Radial machine spare parts design and manufacturing
One key point to consider Radial machine spare parts design and manufacturingOne key point to consider Radial machine spare parts design and manufacturing
One key point to consider Radial machine spare parts design and manufacturing
 
Providing total SMT solutions
Providing total SMT solutionsProviding total SMT solutions
Providing total SMT solutions
 
FRM -10 SHENZHEN SOUTHERN MACHINERY SALES AND SERVICE CO. LTD
FRM -10 SHENZHEN SOUTHERN MACHINERY SALES AND SERVICE CO. LTDFRM -10 SHENZHEN SOUTHERN MACHINERY SALES AND SERVICE CO. LTD
FRM -10 SHENZHEN SOUTHERN MACHINERY SALES AND SERVICE CO. LTD
 
Letter dated 29Jan16
Letter dated 29Jan16Letter dated 29Jan16
Letter dated 29Jan16
 
Cpk problem solving_pcba smt machine
Cpk problem solving_pcba smt machineCpk problem solving_pcba smt machine
Cpk problem solving_pcba smt machine
 
Universal Auto Insertion Machine spare parts - Screw
Universal Auto Insertion Machine spare parts - ScrewUniversal Auto Insertion Machine spare parts - Screw
Universal Auto Insertion Machine spare parts - Screw
 
Smt total solutions: Nozzle,Feeder and Spare Parts
Smt total solutions: Nozzle,Feeder and Spare PartsSmt total solutions: Nozzle,Feeder and Spare Parts
Smt total solutions: Nozzle,Feeder and Spare Parts
 
SMT Light Emitting Diode (LED) Workshop
SMT Light Emitting Diode (LED) WorkshopSMT Light Emitting Diode (LED) Workshop
SMT Light Emitting Diode (LED) Workshop
 
SMT pick n Place machine Juki nozzle catalogue-rev-c3
SMT pick n Place machine Juki   nozzle catalogue-rev-c3SMT pick n Place machine Juki   nozzle catalogue-rev-c3
SMT pick n Place machine Juki nozzle catalogue-rev-c3
 
Smt pick n place machine competition
Smt pick n place machine competitionSmt pick n place machine competition
Smt pick n place machine competition
 
SMT machine maintenance Jig / Tools for FUJI xp 141 e241e341e
SMT machine maintenance Jig / Tools for FUJI  xp 141 e241e341eSMT machine maintenance Jig / Tools for FUJI  xp 141 e241e341e
SMT machine maintenance Jig / Tools for FUJI xp 141 e241e341e
 
SMT machine Training Manual for FUJI CP6 Series Level 3
SMT machine Training Manual for FUJI  CP6 Series Level 3SMT machine Training Manual for FUJI  CP6 Series Level 3
SMT machine Training Manual for FUJI CP6 Series Level 3
 

Recently uploaded

Pulmonary drug delivery system M.pharm -2nd sem P'ceutics
Pulmonary drug delivery system M.pharm -2nd sem P'ceuticsPulmonary drug delivery system M.pharm -2nd sem P'ceutics
Pulmonary drug delivery system M.pharm -2nd sem P'ceuticssakshisoni2385
 
300003-World Science Day For Peace And Development.pptx
300003-World Science Day For Peace And Development.pptx300003-World Science Day For Peace And Development.pptx
300003-World Science Day For Peace And Development.pptxryanrooker
 
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 bAsymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 bSérgio Sacani
 
GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)Areesha Ahmad
 
Zoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdfZoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdfSumit Kumar yadav
 
Velocity and Acceleration PowerPoint.ppt
Velocity and Acceleration PowerPoint.pptVelocity and Acceleration PowerPoint.ppt
Velocity and Acceleration PowerPoint.pptRakeshMohan42
 
Proteomics: types, protein profiling steps etc.
Proteomics: types, protein profiling steps etc.Proteomics: types, protein profiling steps etc.
Proteomics: types, protein profiling steps etc.Silpa
 
Molecular markers- RFLP, RAPD, AFLP, SNP etc.
Molecular markers- RFLP, RAPD, AFLP, SNP etc.Molecular markers- RFLP, RAPD, AFLP, SNP etc.
Molecular markers- RFLP, RAPD, AFLP, SNP etc.Silpa
 
Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....
Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....
Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....muralinath2
 
development of diagnostic enzyme assay to detect leuser virus
development of diagnostic enzyme assay to detect leuser virusdevelopment of diagnostic enzyme assay to detect leuser virus
development of diagnostic enzyme assay to detect leuser virusNazaninKarimi6
 
Introduction of DNA analysis in Forensic's .pptx
Introduction of DNA analysis in Forensic's .pptxIntroduction of DNA analysis in Forensic's .pptx
Introduction of DNA analysis in Forensic's .pptxrohankumarsinghrore1
 
Thyroid Physiology_Dr.E. Muralinath_ Associate Professor
Thyroid Physiology_Dr.E. Muralinath_ Associate ProfessorThyroid Physiology_Dr.E. Muralinath_ Associate Professor
Thyroid Physiology_Dr.E. Muralinath_ Associate Professormuralinath2
 
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune Waterworlds
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune WaterworldsBiogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune Waterworlds
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune WaterworldsSérgio Sacani
 
Digital Dentistry.Digital Dentistryvv.pptx
Digital Dentistry.Digital Dentistryvv.pptxDigital Dentistry.Digital Dentistryvv.pptx
Digital Dentistry.Digital Dentistryvv.pptxMohamedFarag457087
 
Chemistry 5th semester paper 1st Notes.pdf
Chemistry 5th semester paper 1st Notes.pdfChemistry 5th semester paper 1st Notes.pdf
Chemistry 5th semester paper 1st Notes.pdfSumit Kumar yadav
 
Conjugation, transduction and transformation
Conjugation, transduction and transformationConjugation, transduction and transformation
Conjugation, transduction and transformationAreesha Ahmad
 
biology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGYbiology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGY1301aanya
 

Recently uploaded (20)

Pulmonary drug delivery system M.pharm -2nd sem P'ceutics
Pulmonary drug delivery system M.pharm -2nd sem P'ceuticsPulmonary drug delivery system M.pharm -2nd sem P'ceutics
Pulmonary drug delivery system M.pharm -2nd sem P'ceutics
 
300003-World Science Day For Peace And Development.pptx
300003-World Science Day For Peace And Development.pptx300003-World Science Day For Peace And Development.pptx
300003-World Science Day For Peace And Development.pptx
 
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 bAsymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
Asymmetry in the atmosphere of the ultra-hot Jupiter WASP-76 b
 
GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)GBSN - Microbiology (Unit 2)
GBSN - Microbiology (Unit 2)
 
Zoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdfZoology 5th semester notes( Sumit_yadav).pdf
Zoology 5th semester notes( Sumit_yadav).pdf
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
PATNA CALL GIRLS 8617370543 LOW PRICE ESCORT SERVICE
PATNA CALL GIRLS 8617370543 LOW PRICE ESCORT SERVICEPATNA CALL GIRLS 8617370543 LOW PRICE ESCORT SERVICE
PATNA CALL GIRLS 8617370543 LOW PRICE ESCORT SERVICE
 
Velocity and Acceleration PowerPoint.ppt
Velocity and Acceleration PowerPoint.pptVelocity and Acceleration PowerPoint.ppt
Velocity and Acceleration PowerPoint.ppt
 
Proteomics: types, protein profiling steps etc.
Proteomics: types, protein profiling steps etc.Proteomics: types, protein profiling steps etc.
Proteomics: types, protein profiling steps etc.
 
Molecular markers- RFLP, RAPD, AFLP, SNP etc.
Molecular markers- RFLP, RAPD, AFLP, SNP etc.Molecular markers- RFLP, RAPD, AFLP, SNP etc.
Molecular markers- RFLP, RAPD, AFLP, SNP etc.
 
Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....
Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....
Human & Veterinary Respiratory Physilogy_DR.E.Muralinath_Associate Professor....
 
Clean In Place(CIP).pptx .
Clean In Place(CIP).pptx                 .Clean In Place(CIP).pptx                 .
Clean In Place(CIP).pptx .
 
development of diagnostic enzyme assay to detect leuser virus
development of diagnostic enzyme assay to detect leuser virusdevelopment of diagnostic enzyme assay to detect leuser virus
development of diagnostic enzyme assay to detect leuser virus
 
Introduction of DNA analysis in Forensic's .pptx
Introduction of DNA analysis in Forensic's .pptxIntroduction of DNA analysis in Forensic's .pptx
Introduction of DNA analysis in Forensic's .pptx
 
Thyroid Physiology_Dr.E. Muralinath_ Associate Professor
Thyroid Physiology_Dr.E. Muralinath_ Associate ProfessorThyroid Physiology_Dr.E. Muralinath_ Associate Professor
Thyroid Physiology_Dr.E. Muralinath_ Associate Professor
 
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune Waterworlds
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune WaterworldsBiogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune Waterworlds
Biogenic Sulfur Gases as Biosignatures on Temperate Sub-Neptune Waterworlds
 
Digital Dentistry.Digital Dentistryvv.pptx
Digital Dentistry.Digital Dentistryvv.pptxDigital Dentistry.Digital Dentistryvv.pptx
Digital Dentistry.Digital Dentistryvv.pptx
 
Chemistry 5th semester paper 1st Notes.pdf
Chemistry 5th semester paper 1st Notes.pdfChemistry 5th semester paper 1st Notes.pdf
Chemistry 5th semester paper 1st Notes.pdf
 
Conjugation, transduction and transformation
Conjugation, transduction and transformationConjugation, transduction and transformation
Conjugation, transduction and transformation
 
biology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGYbiology HL practice questions IB BIOLOGY
biology HL practice questions IB BIOLOGY
 

Full Automatic Pcb loader Operation manual

  • 1. Add :Rm 1806,Block 3, Jinyun COFCO, Qianjin 2 Road,Xixiang,Baoan District, Shenzhen City, China TEL: 0755-83203237; FAX:0755-23240492 website:www.smthelp.com Fully automatic loader machine Operation Manual Please read the instructions carefully before user operation
  • 2. 1st Preface First of all, we sincerely thank you for choosing the SMT peripheral automation equipment produced by our company. This company specialized production: conveyor, automatic feeding detection machine, vacuum suction machine, stacked on the machine, parallel transfer, angle conveyor, turning machine,machine, double buffer for the same reflow furnace system, a series of automated production equipment. According to the customer's requirements, we can develop and design a series of automation equipment, in order to meet the customer's high efficiency, energy saving, downsizing and other production needs. This manual describes the use of methods and equipment maintenance and precautions, in front of the machine, please carefully read this manual, and it will be properly preserved, wrong operation may cause the device does not operate normally or damaged parts. Due to man-made equipment failure or parts damage, will not apply to the company's exemption free warranty service range. Without permission of the company, please do not disassemble or replace the equipment parts, nor applicable to the company's free warranty warranty service range. As to the improvement and partial renewal of the product, we will not make further instructions. If you have any doubts, please contact our company for consultation.
  • 3. Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com 2nd 一、Equipment technical parameters Equipment type:S-LD460 Description: on board operation of PCB board in SMD production line with this device PCB Maximum specification(mm):50*50~535*460 Working height(mm):900±20(std) PCB board time:6。0 sec Step selection:10。 20。 30。 40mm selectable Power Supply:AC 220V±10V, 50/60HZ Machine outline size:1250(L)*1490(W)*1250(H)±20mm weight(KG):300 Compressed air supply pressure:4-6bar Compressed air flow:Max 10 litres /minute Circuit board thickness:Minimum0.4mm deep Power: maximum 300 volt ampere Box number: the stop 1 (or specified) Direction: left to right or right to left
  • 4. Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com 3rd 二、General precautions 1. 1.operator obligations 1) please read the instructions and the instructions of the attached machine in detail, and operate the equipment according to the instructions. 2) comply with the safety standards of the equipment, and ensure compliance with the regulations. 3) please use protective equipment and clothing in accordance with the provisions of. 4) do not touch electrical equipment with wet hands. 5) in operation, please ensure safety if you want to tidy up the equipment perimeter. 6) any part of the body must not enter the equipment during the operation. 7) in case of abnormal operation, please stop immediately and handle or contact the company according to the exception handling method. 8) every day after the job, please clean the equipment surrounding. 9) after daily operation, when you want to leave the equipment, please control the power supply and main control valve in accordance with the correct method. 10) prohibit the transformation of the very stop loop and action confirmation. 11) prohibit the transformation is the stop button, and confirm the safety shield off the safety switch, photoelectric tube, safety etc.. 12) prohibit the occurrence of safety switch pull out or safety protection function cancellation. 13) Regular maintenance and confirm whether the stop action is normal or not. But at this point, you must put other people can not be near the signs notice placed in a clear position, inform the device is currently very stop or automatic safety device is being tested. However, the need for security and adjustment and the licensee are not subject to this restriction. 2. regular maintenance and confirmation of very safe test and protection action is normal. But at this point, you need to put other people not close to the signs notice placed in a clear position, inform the device, the current automatic safety device is being tested. 3. Condition change restrictions 1) Set the conditions for this device (voltage, current, pressure, speed and other equipment on the nameplate, marking that display settings), if want to change, must be responsible for the leader's permission, set the condition of change must be recorded before and after the change of value. 2) the quality determination of the workpiece must be carried out according to the sampling period stipulated by the detailed management document of the project. If
  • 5. Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com 4th there is an abnormality, the responsible person or leader should be reported immediately, and comply with the instructions.0 3) Safety confirmation during overhaul. 4) The following steps shall be taken to ensure safety during overhaul and repair. 5) Stop the equipment and confirm that the facility stops in safe position. 6) When entering the equipment, please confirm the status of the safety agencies, if necessary, you can set up special personnel custody or pull the safety switch lock and safety pin, and carry it with you. 7) The main power box switch, motor switch and other power supply must be cut off, the locking device must be locked and so on. 8) Using specified components. 9) Fuses and other over-current protectors and repair parts and so on, please use the specified product. 10) To correctly operate the equipment and correct safety operation, please pay attention to the nameplate posted on this equipment. This nameplate is very important. Please don't damage it or tear it off. If the nameplate is damaged or missing, please be sure to contact the responsible person or leader.
  • 6. Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com 5th 三、Function and operation instructions (一)、Preparation before starting 1、Horizontal position: (1)All cup adjustment must be balanced and stressed simultaneously to avoid vibration during mechanical operation. (2)After adjusting the level, the cup foot screw should be fixed tightly. 2、Gas source: (1)The air supply in 4-6kg/cm², pressure regulating valve to adjust the 4kg/cm²气. (2)Gas source must be clean, waterless and dry. 3、、Installation position: Do not put on mechanical installation of dust, oil mist, conductive dust, corrosive gas, flammable gas, moisture, shock, high temperature and outdoor environments. 4、Working group: (1) please check whether the power supply meets the requirements after power supply, whether the power switch is normal, and the power can be switched on normally. (2) check whether the emergency stop switch and the protection device are normal after power on. (3) the moving part is mainly responsible for the constant speed motor and the cylinder, each part, position detection by travel switch or induction electric eye. (4) do not make the cylinder speed run too fast, smooth and supple as well. (5) the position sensor to adjust good position. (6) the position of each sensor can be input from PLC to detect the indicator lamp. (7) each output condition is detected from the PLC output point indicator. (8) its running program has been controlled by internal programming, and customers can not change it. ( 二 ) Operation button function description 1 、 emergency button: may at any time terminate any emergency operation, after the opening of the. 2、 automatic: machine into automatic operation. 3、 reset: when abnormal alarm processing. 4、 Stop: stop everything. 5、 manual: machine into manual operation 6、 manual operation time:
  • 7. Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com 6th (1) return button: when the lift is in the upper limit, Magazine discharges. When the elevator is in the lower limit, the Magazine enters the lifting platform. (2) push plate button: when the long drop table is not in the upper and lower limit, the push plate button is effective. (3) clamping button: clamping cylinder moves. (4) rising button: the lifting platform rises. When Magazine is in the elevator, it needs to be clamped first, then it can rise and descend. (5) drop button: the landing gear is descending. When the Magazine is in the elevator, it needs to be clamped first, then it can rise and descend. (6) selection: lifting cell number, optional range of 1 to 4 grid. (7) code: machine running state. (三 ) the indication of the three color lamp: Green light: that the machine is in automatic operation, normal operation. Yellow light: in manual state, can operate manual function. Red light: abnormal operation or emergency button press, red light, and buzzer sound.( 四 ) Matters needing attention before starting: 1、Has the emergency button been restored. 2、Check if the air pressure is normal(5~6Kg/cm²) 3. Make sure that no PCB stays between the line and between the line and the transmitter to open the power. 4. Confirm whether the track chain is open before and after, and whether the width adjustment is consistent. 5, the track is installed correctly and induction electric eye is normal. 6, check the width of the PCB block is appropriate.
  • 8. Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com 7th 四、Conversion of new model operation procedure 1, according to manual operation, first select the spacing between the PCB board. 2. Adjust the Magazine to the PCB width of the new model so that PCB can easily insert Magazine. 3, and then put a PCB full of Magazine on the lower belt, 4, press the box, let Magazine into the lift, and then press the clamping key, and then click the rising key 5, Magazine will automatically rise to the position of the first board 6, the use of hand, the push rod is adjusted to just in the center line of PCB 7, a guide plate block adjustment to just the width of protection in PCB plate by electric eye complete induction. 8, according to the push plate can launch Magazine PCB key test. 9, press the exit key, press the automatic operation to make the machine enter the automatic mode, the machine is ready, waiting for the board signal.
  • 9. Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com 8th 五、Machine operation (一)Schematic diagram of operation panel (二)Schematic diagram of operation panel circuit GND SB0 SB1 SB2 SB3 SB4 SB5 SB6 SB7 SB8 SB9 SBA VCC L0 L1 L2 L3 L4 L5 L6 L7 L8 L10 L11 L14 L9 Manual click valid 效
  • 10. Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com 9th 六、Electrical circuit diagram (一)、Sensor distribution diagram
  • 11. Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com 10th (二)Signal connection Signal plug for connection with rear engineering machine 8 4 7 11 12 13 14 3 2 1 (三)Control panel conversion diagram Three color light output interface
  • 12. Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com 11th (四)Distribution diagram of electric box Input signal PLC editable controller Relay board Motor control
  • 13. Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com 12th 五、Display code query table Code Internal triggering Explain 00 R3E R222 Standby (no tricolor light) 33 R308 The device is now running manually (three color indicator Huang Dengliang) 22 R309 The device is now running automatically (the green light of the tricolor indicator) 70 XE Stop and start, (three color light red light) 71 T4 The lower limit is induced to 72 T56 The upper limit position is sensed 73 T5 Push rod cylinder push plate complete export protection inductor induction 74 T0 Timeout for radio sensing 75 T1 Out of box induction timeout alarm 76 T10 Push board timeout alarm 77 T52 Rising super time police, X0 did not feel 78 R1A Out of box timeout 79 T7 The cylinder is not at origin 80 R85 The inductor is protected when the hand rises 81 R86 The inductor is sensed when manually rising
  • 14. Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com 13th 六、Fault and elimination fault Causes and Solutions The total power light doesn't work Please check that the plug is inserted correctly on the 220V/AC socket. And make sure the socket has electricity The low voltage power supply lamp doesn't work Please check whether the emergency stop is open and whether the internal low voltage insurance is normal No action of the cylinder Check whether the gas supply and pressure are reached, whether the total gas switch is opened, whether the work light of the solenoid valve is turned on or not, and check whether the protective sensors are normal Blocking doesn't work Check whether the gas supply and pressure are reached, whether the total gas switch is opened, whether the work light of the solenoid valve is turned on or not, and check whether the sensor is induced and transported to PLC The lifting platform does not rise and fall Please check whether meet the rise and fall of the cylinder condition, origin whether feel safe to shoot is sensed, out of the box is sensitive to induction The lifting platform does not move Please check whether the push plate cylinder completely return to X8 without induction, and the launch of PCB protection is no magic eye induction X4 without induction, feeder protection XF electric eye sensor Three color lights are not bright Please check if the inner bulb is abnormal and loose
  • 15. Shenzhen Touthern Machinery Sales and Service Co. Ltd www.smthelp.com 14th 八、Safety precautions 1. aspects of personal safety 1) Before starting the equipment, it is necessary to determine whether the on-site personnel are in safe position 2) Maintenance is not allowed in the operation of the equipment 3) Equipment maintenance, should first determine the power switch, gas supply and other power switch is closed, before it can be maintained 4) During the operation of the equipment, the operator should not touch or touch the parts of the equipment so as to avoid danger 2. aspects of equipment safety 5) The equipment is fully automatic electronic control system, all control components, PLC instruction contact, or mechanical input and output type equipment prohibited unauthorized change 6) The equipment is an irreversible device, power components, motor operation, maintenance and care, please pay attention to power wiring and direction of operation 7) The manual switch and the automatic switch knob of each electromagnetic valve are used in the forced switch of each electric box of the equipment. Unauthorized use of the equipment without the permission of the person in charge of the equipment is strictly prohibited. 8) In case of mechanical failure, the equipment should be shut down immediately and notify the relevant personnel to repair.