SlideShare a Scribd company logo
1 of 6
Download to read offline
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 617
“The role of time, cost and quality in project management.”
Nikhil Raj
1
, Mansingh Rathore
2
1Nikhil Raj M.tech & Patna, Bihar
2ManSingh Rathore M.tech & Jaipur
1 M.Tech Student, 2Assistant Professor, Civil Engineering
Department Poornima University, Jaipur, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Project management has emerged as a field of
practice that is being used increasingly by organizations to
achieve their business goals. Since the concept 'survivalofthe
fittest' best describes today's business environment, good
project management performance assessment tools are
needed in order to make an organization 'the bestofthebest'.
Project completion within time and cost, while maintaining
quality is very important for the success of projects.
Therefore, the purpose of this paper is to analyse the key
variables of time, cost and quality and determine their roles
in project management performance. A problem was
constructed together with different scenarios to analyse the
relations of these variables according to conditions given.
With the help of Microsoft Project, the authors were able to
narrow down the findings in all scenarios and summarizethe
patterns of strategies based on these variables to make an
appropriate decision on planning the project.
Key Words: Project Management, project success, project
performance, Cost.
1.INTRODUCTION
A project is a temporary endeavor undertaken to create a
unique product, service or result. One of the biggest
problems of project managers is to harmonize project cost,
time and quality. It is difficult to achieve this because cost,
time and quality are related in the way that changes of one
influence on the other two. Project managerstypicallytryto
balance the three when meeting project objectives,butthey
may make trade-offs among the three during project
implementation in order to meet objectives and satisfy
customers. There are many examples in practice that
projects were delivered on time and within budget but
failed to meet the expectations of end users. Every project
has an anticipated level of quality for the project
deliverables. The details and specifications set out by the
customer determine what the expected level of quality is
deliever. The implementation activities selected by some
construction companies in developing nations around the
world have been marred by flaws and occasionally failures
because of the rise in cost or the low level of quality, as
determined by the field survey, in addition to the difficulty
of work methods and the many different types of waste of
construction materials, which will lead to the inadequate
quantity of experience in this field despite its growing
influence. As a result, the research aims to develop and
apply general project planning mechanisms along with the
development of detailed plans to control the time factor in
addition to controlling the project's cost and the caliber of
the works that are executed.
1.1 PROJECT SUCCESS
There is a vast literature covering the factors that influence
project success. It suggests that project success depends on
effective multidisciplinaryefforts,involvingteamsofpeople
and support organizations interacting in a highly complex,
intricate, and sometimes evenchaoticway.Itimprovesboth
the speed and success of new product development (NPD)
projects by combining members from multiple functional
specialties to bring greater diversity of view point and
richer sources of information for the many decisions
inherent in the development process. Some engineers
regard their projects as a success simply because of the
good relation among the stakeholders, even though all of
the project cost, time and quality are performed below the
project baselines. In this study, we narrow down the key
variables relating to the success of project performances to
be time, cost and quality. Since they are the most standard
measures used
1.2 TIME:
In project management, time is an intangible resource that
is unique because it is absolutely finite and time availability
of a project is defined as the availability of time needed to
do a job assigned. Project time over run indicates an
extension of project completion time from the planned
duration. According to project managers manage three
areas relating to project time which involve maximizing
construction speed, maximizing delivery speed and
minimizing schedule growth. However, the project’s
completion time, sending it over budget, and damaging
team morale. Usually, the longer it takes to identify project
discrepancies, the more serious the potential damageisand
the more complex and costly the corrective measures will
be to the project.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 618
1.3 COST:
From a mathematical point of view, it suggests that each
activity has duration and corresponding cost attributes. It
further emphasizes that the activity control increases with
the shortening of the duration and the duration increases if
we decrease the activity cost. In reality, mostlarge,complex
development projects experience substantial cost and
schedule overruns. Usually, projects taking more time cost
more money. In a rapidly growing construction market, the
need to estimate the cost of quality in projects becomes a
vital task seeing as the objective of achievinga product with
a good quality is not only to meet the customer
requirements, but also to do it at the lowest cost.
1.4 QUALITY:
While project managementsuccessfocusesupontheproject
processes and he successful accomplishments of cost and
time objectives, product success deals with the quality of
the project’s final product and the quality objectives of the
project. They point out that successful commercialization of
quality products requires due attention to the complete
supply chain (both suppliers and distributors). However,
high failure rates suggest that management’s knowledge of
the transformation process whereby ideas are turned into
successful quality products is far from perfect, particularly
for more innovative development projects. Although the
ability to quickly introduce new products and adopt new
processes has become an important way of competing, the
introduction of successful productshasbecomeexceedingly
complex and requires a wide variety of assets, resources,
and capabilities.
2. LITERATURE REVIEW
[1] Prachi Ingle (2020) In the study Schedule, cost, and
quality are crucial performance areas that shouldn't be
overlooked. Project management teams should
concentrate on project activities, identify crucial tasks,
and reach precise milestones. They receive guidance on
how to improve cost-related areas by keeping an eye on
cash flows and performingearnedvalueanalysis.Thefinal
path model in terms of quality.Theprojectshouldconduct
quality audits and prevent nonconformities for projects.
[2] H M A Asfoor (2021) By utilizing contemporary
computer technologies like linear programming, which
can be explained in greater detail to investors or
stockholders to make the central plan more clearly
reduced the project fulfilment period and the critical
activities of time pressure technology programme at the
lowest cost to control both time and cost, excellentresults
have been achieved in terms of both time and cost
management.
[3] Pravin Namdev Pharne (2022) The goal of this study
was to comprehend theroleofplanning,monitoring,and
controlling in the development andtimelycompletionof
a construction project, as well as the necessity and
effectiveness of project management software like
Primavera P6. By using the Primavera software,
construction project delays are reduced to a minimum.
Primavera is used to manage resources and materials
more effectively. The study served as a reference for
understanding how construction projects were
progressing and for identifying theparticularissuesthat
cropped up along the way. As a result, the study
provides information about project management
effectiveness and cost reduction. The findings of this
study demonstrate the shortcomings of the current
project management methodology. A new that is
effective and economical.
[4] Dušan Aničić (2019) Due to the influence of different
factors affecting project implementation costs and time,
as well as the income from specific project
implementation, it primarily refers to the financial part
of project construction.Numerousmethodsforchoosing
projects have been developed by economic theory and
practise, including financial, marketing, logical, etc. The
cost-benefit analysis, evaluation models, and various
economic models based on cash flow analysis are just a
few of the mathematical models and benefit
measurement techniques used in PMI standards. With
net present value, profitabilityindex,andinternal return
rate being the most prevalent in practise, investment
project profitability evaluation is frequently carried out
using static methods (which do not evaluate time value
of money) and dynamic methods.
[5] Žanesa Ljevo (2020) The research findings in Bosnia
and Herzegovina are the quality models of the project
management process of the phases throughout the
project life cycle (construction projects). They are
simple to use in similar environments because we are
aware that not all quality models will be effective in all
circumstances.
However, in the case studies, interviewswereconducted
face-to-face with participants of that project phase. The
survey covered investor, contractor/subcontractor,
designer, project manager, and consultant like different
management perspectives included in the project
management process. Planning and control are
extremely simple to accomplish when using some of the
project management software packages.
3 MANAGING CONSTRUCTION PROJECTS
SUCCESSFULLY
Implementing the design specifications will enable the
project to succeed and fulfil the goal it was intended to
achieve.
By making available all sources for project management in
this integration between these elements and suitableuseto
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 619
complete any section with the best possible use of time
when implementing, project management must reach the
equilibrium between the highly efficient with lower cost in
the shortest time. Project preferences must also be
recognized.
Start creating various work environments for employeesso
they can form an efficient work team. This can be done by:
Care should be taken in the leader staff selection at the top
of management administration.Creatinga workplacewhere
a welcoming atmosphere predominates
Coordination meetings between project participants,
including implementers and designers, as well as
supervision and follow-up are held in order to change
designs, address issues and challenges, quickly implement
alternatives, and cut down on time.
Delivering all the materials and tools required for the
project's establishment and successinaccordancewithpre-
planned schedules to minimize time and money wasted.
This can be achieved by selecting raw material suppliers
nearby the worksite with simple processing capabilities.
The projects whose implementation utilised project
management. It was noted that time is regarded as the
project's most important factor, followed by quality and
cost, and that the three must be balanced. The following
drawbacks frequently show up because construction
projects place so much emphasis on timing:
a. Because of speed, poor implementationaffectsthequality
level.
b. There will be an increase in the amount of waste in
construction materials.
c. Using up employees' energy by making them work
overtime, which has a negative impact on the level of
productivity and output.
3.1 CONCEPTUAL PLAN
The integration of all the major production and
implementation components is a requirementforachieving
a standard central plan for the expeditedimplementation of
the construction project. Because of the activities' shorter
duration, consideration of the factors affecting cost and
quality needed for the project, and full compliance with the
standards of the designer and the stakeholders at the same
time, the main goal of the production process is stability.
The project's central concern, along with the fact that these
variables, such as raw materials, instruments, equipment
types, or work activities, can be understood, adjusted, or
fixed, has stimulated the project's implementation.Possible
suggestions for project planning in this study include an
expedited implementation process (see fig).
Fig 3.1: The main strategy for the quick project
implementation.
The company's management will have opportunities to
address needs that dependonthefollowingvariables]when
using this model in general planning.
1. The size of the labour force has changed.
2. Benefit from overtime.
3. Include any meals required for the job.
4. Coping with potential difficulties.
5. Using contractors to split the workload.
6. Preparing for the possibility that the employer may issue
change orders.
7. Anticipate price variations to meet needs.
8. Make the most of upcoming technological advancements.
The building construction project has 31 componentsand a
245-day overall duration. The following time and financial
resources have been set aside by the company for the
project during the study:
1. Under normal circumstances, the project will end up
costing Rs. 10,800,000.00.
2. Under normal circumstances, the project will be
completed in 365 days.
Available
capabilities
Production rates
Accelerated
Expectation
Requirements
change orders
Production
plan
Career rates
The size of
the
work force
Project
central plan
template
Master
Plan
Production efficiency
determinants
1. machines and equipment
2. human skills
3. raw materials
4. extra time
5. Work meals
6. Subcontractors
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 620
TABLE 1: DETAILS OF ACTIVITIES / DURATION AND
ACTIVITIES PREDECESSOR
Activity Description Duration
(Weeks)
Predecessor(s
1 Preliminaries 3
2 Earthwork (cut & Filling) 4
3 External RCC retaining wall 2
4 Pilling works 2
5 RCC Pile Cap2 2 4
6 Stump 2 3,4
7 Ground beam 2 5
8 Ground floor slab work 1 6,7
9 RCC Column 1 7
10 SuspendedRCCBeams,Slab,
stairs
2 7
11 Steel structure work 2 8,9
12 Roofing work 2 10
13 Wall 4 11,12
14 Wall finishing 2 13
15 Floor finishing 1 13
16 Door & window 1 13
17 Drainage surrounding
building
3 12
18 Apron & RCC Ramp work 2 17
19 Sanitary & Plumbing 2 17
20 Sanitary & plumbing work
finishing
2 19
21 Painting 2 14,15
22 Electrical & telephone
installation
8 12
23 Fire fighting Installing 8 12
24 Landscaping 1 7
25 Weight bridge office 8 7
26 T NB Sub station 10 7
27 Refuse chamber 4 7
28 External Drainage work 7 7
29 Road work 4 17
30 Main Entrance gate 7 29
31 Site Clearing work 1 30
The three possibilities are listed as follows:
Scenario 1: Despite the project's limited resource
availability, the deadline for completion is set.
Scenario 2: The Company wants to shortentheconstruction
period while imposing the lowest possible cost.
Scenario 3: The Company wants to maintain quality while
shortening the construction period.
Microsoft Office Project will be used to analyze and model
the three scenarios in this project. Additionally, a manual
analysis is also completed in order to validate the results. A
discussion and conclusion that are pertinent to the project
management variables described in the preceding
introduction can be drawn from the analysis' findings.
4. METHODLOGY
This section describes theprogrammesandresourcesbeing
used for this project to analyse the three scenarios as well
as the procedures and terminology used to produce the
analysis's results. Microsoft Office Project will be used in
this project to create a Gantt Chart scheduleandanalysethe
critical path with regard to the scenarios listed in the
previous introduction. Although third-partyadd-onsforthe
critical chain and event chain methodologies are available,
the application only generates critical path schedules.
Schedules can be resource levelled,anda Ganttchartisused
to show chains. Microsoft OfficeProjectcanalsodistinguish
between various user classes.
Different levels of access to projects, views, and other data
may be available to these various classes of users. Custom
data is stored in an enterprise global that is accessible to all
users and includes calendars, views, tables, filters, and
fields. The dates of the critical path tasks must be
transferred if an earlier completion date for the project is
required. The process of reducing a project's overall
duration without altering the relationshipsbetweentasksis
also referred to as "crashing" a project. Adding more
resources to the task is typically necessary to prevent a
project crash.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 621
5. RESULT AND ANALYSIS
This section explains the Microsoft Project resultsinlightof
the three analyses that were taken into account. All three
cases are presumed to have started on January 5, 2021.
A. Scenario 1: The project Duration is Fixed and Material
resources are limited.
Due to a lack of resources, the project's duration must be
fixed, and Saturdays and Sundays are not counted as
working days. The completion dateisJanuary6,2022,and
the overall timeline is 365 days.
B. Scenario 2: Reduced Project Time with Minimum Costs
Implied.
The project's duration must beshortened,anda minimum
cost requirement is imposed. Saturdays and Sundays are
designated as the project's general working hours. The
duration remains 175 days, but the completion date is
moved up to September 27, 2021.
C. Scenario 3: KeepingtheProject'sQualityWhileShortening
the Project's Duration.
While maintaining quality, the project's duration must be
shortened. The optimistic, expected, and pessimistic
durations as well as duration weights are defined foreach
task using the PERT Analysis. The duration weights are
assumed to be 1, 4, and 1, respectively, for the optimistic,
expected, and pessimistic cases (the weight values must
sum to 6). The pessimistic duration is 7 days later, the
optimistic duration is 7 days earlier (for tasks whose
durations are already 7 days, their optimistic durations
are assumed to stick to 7 days), and the expectedduration
is the specified number of days as in Table I. The
generated durations for these cases aredisplayedinTable
ii.
TABLE 2: TYPE OF DURATION GENERATEDTA
Types of Duration Days
Optimistic 275
Expected 365
After using Microsoft Project to analyze this situation, the
results show that our project's overall timeline would be
175 days if we did not count Saturdays and Sundays as
working days. The duration of all activities and
predecessors as organized in Table I currently not only
satisfies the timeline but also outperforms expectations by
being cut by a period of 70 days as compared to the
scheduled target of project completion, which is 245 days.
The activities and durations in Table I shouldn't change in
this scenario because the project time needs to be fixed and
resources are scarce. The results for this scenario simply
show the durations and activities that are established in
Table I.
6. CONCLUSIONS
1.The project's overall planning It appears that the value of
developing levels of planning is commensurate with the
characteristics of rapid implementation tools and includes
specific plans to oversee all of these procedures while
supporting and taking into account the factors of time, cost,
and quality.
2. The development of the central plan model's goals are to
improve the project's entire regulatory process by putting
the project's goals, resources, production rates, and
necessary skillfulness into the schedule applying in a way
that ensures the project's ability to be completed
practically.
3. This plan aims to achieve the highest possible level of
workability by defining an element of a special system to
control the production processes intheprojectandcreating
a model for procedures that determine theadministration's
scope, measure performance, compare it to standards and
targets, identify variations, and take appropriate and ready
corrective actions.
4. By applying contemporary computer technologies, such
as linear programming, to the control of time and cost,
excellent results have been achieved. Linear programming
can be explained in greater detail to investors or
stockholders to make the central plan more clearly reduce
the project completion period and the critical activities of
time pressure technology programme at the lowest cost to
control both time and cost.
5. The availability of cash flow from the employer is one of
the most crucial factors because it is essential to pay all
project workers, material suppliers,equipmentcontractors,
and others on time and without delay in order to maintain
the flow of work within the timetable.
6. The paper led to the adoption of the accelerated
implementation process in critical activities of
circumstances that demandtheproject becompletedwithin
a specific short period of time, with the need to provide
experienced and effective employeesforthistypeof project,
with the commitment of the construction companies to
submit detailed plans and the central plan for the
implementation of the project to the employer within the
suggestions for the purpose of developing the In order to
reduce planning time and costs, government agencies,
private construction firms, and technical department staff
may be required to use modern software and technology.
REFERENCES
[1] Naomi Brookes. (2013). Construction Project
Management. Research gate.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 622
[2] H M A Asfoor , A A T AL-Jandeel,K K Igorevich and L A
Ivanovna (2022) Control of Time, Cost and Quality of
Construction Project Management. E3S Web of
Conferences.
[3] M. Radujković, M. Sjekavica, "Project Management
Success Factors, Creative Construc-tion", CCC 2017,
Primosten, Croatia, Procedia Engineering 196, (2017)
[4] Zilberova, I., Petrov, K., & Artsishevsky, M.(2020,
February). Actual problems of management quality
control of a constructioncompany. In IOP Conference
Series: Materials Science and Engineering (Vol. 753.p.
042020). IOP Publishing.
[5] Shirina E, Gaybarian O, Myasischev G 2017 Effective
management of construction company in terms of
linguistic communication IOP Conf. Series: Earth and
Environmental Science 90012077.
[6] Kerzner, H., (2017) Project Management: A System
Approach to Planning, SchedulingandControlling,John
Wiley & Sons, New York.
[7] Shaqour, E. N. (2021). The role of implementing BIM
applications in enhancing project management
knowledge areas in Egypt. Ain Shams Engineering
Journal.
[8] Khodeir, L. M., & Nessim, A. A. (2018). BIM2BEM
integrated approach: Examining status of the adoption
of building information modelling and building energy
models in Egyptian architectural firms. Ain Shams
Engineering Journal, 9(4), 1781-1790.

More Related Content

Similar to The role of time, cost and quality in project management

Project Management Course & Tutorial by eAcademy.lk
Project Management Course & Tutorial by eAcademy.lkProject Management Course & Tutorial by eAcademy.lk
Project Management Course & Tutorial by eAcademy.lkUdara Sandaruwan
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET Journal
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsIRJET Journal
 
Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013IRJET Journal
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
1-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp011-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp01Amy Roman
 
1.7 project management
1.7 project management1.7 project management
1.7 project managementexemplar2401
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...IRJET Journal
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET Journal
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introductionasim78
 
Project typed
Project typedProject typed
Project typedRahul
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewIRJET Journal
 
Project M&E (unit 1-4)
Project M&E (unit 1-4)Project M&E (unit 1-4)
Project M&E (unit 1-4)Regmi Milan
 
PMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_Management
PMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_ManagementPMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_Management
PMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_ManagementMurari Thayi, PgMP, PMP
 
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...Dr. Amarjeet Singh
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET Journal
 

Similar to The role of time, cost and quality in project management (20)

Project Management Course & Tutorial by eAcademy.lk
Project Management Course & Tutorial by eAcademy.lkProject Management Course & Tutorial by eAcademy.lk
Project Management Course & Tutorial by eAcademy.lk
 
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
IRJET- Implementing Time and Cost Optimization in Commercial Building using P...
 
Time, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction ProjectsTime, Cost, and Quality Trade-off Analysis in Construction Projects
Time, Cost, and Quality Trade-off Analysis in Construction Projects
 
Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013Construction Project Scheduling of MK Apartment using MS Project 2013
Construction Project Scheduling of MK Apartment using MS Project 2013
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
1-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp011-7Projectmanagement-120312002842-Phpapp01
1-7Projectmanagement-120312002842-Phpapp01
 
1.7 project management
1.7 project management1.7 project management
1.7 project management
 
IRJET- Identification of Constraints and there Impact on Construction Pro...
IRJET-  	  Identification of Constraints and there Impact on Construction Pro...IRJET-  	  Identification of Constraints and there Impact on Construction Pro...
IRJET- Identification of Constraints and there Impact on Construction Pro...
 
IRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project FailureIRJET- A Study on Project Management Techniques to Avoid Project Failure
IRJET- A Study on Project Management Techniques to Avoid Project Failure
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introduction
 
H1303055462
H1303055462H1303055462
H1303055462
 
Project typed
Project typedProject typed
Project typed
 
Element of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A ReviewElement of Cost overrun and Delay in Construction: A Review
Element of Cost overrun and Delay in Construction: A Review
 
Project M&E (unit 1-4)
Project M&E (unit 1-4)Project M&E (unit 1-4)
Project M&E (unit 1-4)
 
1 ch1
1 ch11 ch1
1 ch1
 
PMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_Management
PMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_ManagementPMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_Management
PMIBC162001_PMIBC-16-2-001_Murari_Construction_Program_Management
 
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...
Assessment of Project Monitoring and Control Techniques in Ondo State Agency ...
 
Project management – standard for today´s modern company
Project management – standard for today´s modern companyProject management – standard for today´s modern company
Project management – standard for today´s modern company
 
Project Management U 1.pptx
Project Management U 1.pptxProject Management U 1.pptx
Project Management U 1.pptx
 
IRJET- An Overview on Project Management
IRJET- An Overview on Project ManagementIRJET- An Overview on Project Management
IRJET- An Overview on Project Management
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage examplePragyanshuParadkar1
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxk795866
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 

Recently uploaded (20)

Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
DATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage exampleDATA ANALYTICS PPT definition usage example
DATA ANALYTICS PPT definition usage example
 
young call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Serviceyoung call girls in Green Park🔝 9953056974 🔝 escort Service
young call girls in Green Park🔝 9953056974 🔝 escort Service
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Introduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptxIntroduction-To-Agricultural-Surveillance-Rover.pptx
Introduction-To-Agricultural-Surveillance-Rover.pptx
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 

The role of time, cost and quality in project management

  • 1. © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 617 “The role of time, cost and quality in project management.” Nikhil Raj 1 , Mansingh Rathore 2 1Nikhil Raj M.tech & Patna, Bihar 2ManSingh Rathore M.tech & Jaipur 1 M.Tech Student, 2Assistant Professor, Civil Engineering Department Poornima University, Jaipur, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Project management has emerged as a field of practice that is being used increasingly by organizations to achieve their business goals. Since the concept 'survivalofthe fittest' best describes today's business environment, good project management performance assessment tools are needed in order to make an organization 'the bestofthebest'. Project completion within time and cost, while maintaining quality is very important for the success of projects. Therefore, the purpose of this paper is to analyse the key variables of time, cost and quality and determine their roles in project management performance. A problem was constructed together with different scenarios to analyse the relations of these variables according to conditions given. With the help of Microsoft Project, the authors were able to narrow down the findings in all scenarios and summarizethe patterns of strategies based on these variables to make an appropriate decision on planning the project. Key Words: Project Management, project success, project performance, Cost. 1.INTRODUCTION A project is a temporary endeavor undertaken to create a unique product, service or result. One of the biggest problems of project managers is to harmonize project cost, time and quality. It is difficult to achieve this because cost, time and quality are related in the way that changes of one influence on the other two. Project managerstypicallytryto balance the three when meeting project objectives,butthey may make trade-offs among the three during project implementation in order to meet objectives and satisfy customers. There are many examples in practice that projects were delivered on time and within budget but failed to meet the expectations of end users. Every project has an anticipated level of quality for the project deliverables. The details and specifications set out by the customer determine what the expected level of quality is deliever. The implementation activities selected by some construction companies in developing nations around the world have been marred by flaws and occasionally failures because of the rise in cost or the low level of quality, as determined by the field survey, in addition to the difficulty of work methods and the many different types of waste of construction materials, which will lead to the inadequate quantity of experience in this field despite its growing influence. As a result, the research aims to develop and apply general project planning mechanisms along with the development of detailed plans to control the time factor in addition to controlling the project's cost and the caliber of the works that are executed. 1.1 PROJECT SUCCESS There is a vast literature covering the factors that influence project success. It suggests that project success depends on effective multidisciplinaryefforts,involvingteamsofpeople and support organizations interacting in a highly complex, intricate, and sometimes evenchaoticway.Itimprovesboth the speed and success of new product development (NPD) projects by combining members from multiple functional specialties to bring greater diversity of view point and richer sources of information for the many decisions inherent in the development process. Some engineers regard their projects as a success simply because of the good relation among the stakeholders, even though all of the project cost, time and quality are performed below the project baselines. In this study, we narrow down the key variables relating to the success of project performances to be time, cost and quality. Since they are the most standard measures used 1.2 TIME: In project management, time is an intangible resource that is unique because it is absolutely finite and time availability of a project is defined as the availability of time needed to do a job assigned. Project time over run indicates an extension of project completion time from the planned duration. According to project managers manage three areas relating to project time which involve maximizing construction speed, maximizing delivery speed and minimizing schedule growth. However, the project’s completion time, sending it over budget, and damaging team morale. Usually, the longer it takes to identify project discrepancies, the more serious the potential damageisand the more complex and costly the corrective measures will be to the project. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 618 1.3 COST: From a mathematical point of view, it suggests that each activity has duration and corresponding cost attributes. It further emphasizes that the activity control increases with the shortening of the duration and the duration increases if we decrease the activity cost. In reality, mostlarge,complex development projects experience substantial cost and schedule overruns. Usually, projects taking more time cost more money. In a rapidly growing construction market, the need to estimate the cost of quality in projects becomes a vital task seeing as the objective of achievinga product with a good quality is not only to meet the customer requirements, but also to do it at the lowest cost. 1.4 QUALITY: While project managementsuccessfocusesupontheproject processes and he successful accomplishments of cost and time objectives, product success deals with the quality of the project’s final product and the quality objectives of the project. They point out that successful commercialization of quality products requires due attention to the complete supply chain (both suppliers and distributors). However, high failure rates suggest that management’s knowledge of the transformation process whereby ideas are turned into successful quality products is far from perfect, particularly for more innovative development projects. Although the ability to quickly introduce new products and adopt new processes has become an important way of competing, the introduction of successful productshasbecomeexceedingly complex and requires a wide variety of assets, resources, and capabilities. 2. LITERATURE REVIEW [1] Prachi Ingle (2020) In the study Schedule, cost, and quality are crucial performance areas that shouldn't be overlooked. Project management teams should concentrate on project activities, identify crucial tasks, and reach precise milestones. They receive guidance on how to improve cost-related areas by keeping an eye on cash flows and performingearnedvalueanalysis.Thefinal path model in terms of quality.Theprojectshouldconduct quality audits and prevent nonconformities for projects. [2] H M A Asfoor (2021) By utilizing contemporary computer technologies like linear programming, which can be explained in greater detail to investors or stockholders to make the central plan more clearly reduced the project fulfilment period and the critical activities of time pressure technology programme at the lowest cost to control both time and cost, excellentresults have been achieved in terms of both time and cost management. [3] Pravin Namdev Pharne (2022) The goal of this study was to comprehend theroleofplanning,monitoring,and controlling in the development andtimelycompletionof a construction project, as well as the necessity and effectiveness of project management software like Primavera P6. By using the Primavera software, construction project delays are reduced to a minimum. Primavera is used to manage resources and materials more effectively. The study served as a reference for understanding how construction projects were progressing and for identifying theparticularissuesthat cropped up along the way. As a result, the study provides information about project management effectiveness and cost reduction. The findings of this study demonstrate the shortcomings of the current project management methodology. A new that is effective and economical. [4] Dušan Aničić (2019) Due to the influence of different factors affecting project implementation costs and time, as well as the income from specific project implementation, it primarily refers to the financial part of project construction.Numerousmethodsforchoosing projects have been developed by economic theory and practise, including financial, marketing, logical, etc. The cost-benefit analysis, evaluation models, and various economic models based on cash flow analysis are just a few of the mathematical models and benefit measurement techniques used in PMI standards. With net present value, profitabilityindex,andinternal return rate being the most prevalent in practise, investment project profitability evaluation is frequently carried out using static methods (which do not evaluate time value of money) and dynamic methods. [5] Žanesa Ljevo (2020) The research findings in Bosnia and Herzegovina are the quality models of the project management process of the phases throughout the project life cycle (construction projects). They are simple to use in similar environments because we are aware that not all quality models will be effective in all circumstances. However, in the case studies, interviewswereconducted face-to-face with participants of that project phase. The survey covered investor, contractor/subcontractor, designer, project manager, and consultant like different management perspectives included in the project management process. Planning and control are extremely simple to accomplish when using some of the project management software packages. 3 MANAGING CONSTRUCTION PROJECTS SUCCESSFULLY Implementing the design specifications will enable the project to succeed and fulfil the goal it was intended to achieve. By making available all sources for project management in this integration between these elements and suitableuseto
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 619 complete any section with the best possible use of time when implementing, project management must reach the equilibrium between the highly efficient with lower cost in the shortest time. Project preferences must also be recognized. Start creating various work environments for employeesso they can form an efficient work team. This can be done by: Care should be taken in the leader staff selection at the top of management administration.Creatinga workplacewhere a welcoming atmosphere predominates Coordination meetings between project participants, including implementers and designers, as well as supervision and follow-up are held in order to change designs, address issues and challenges, quickly implement alternatives, and cut down on time. Delivering all the materials and tools required for the project's establishment and successinaccordancewithpre- planned schedules to minimize time and money wasted. This can be achieved by selecting raw material suppliers nearby the worksite with simple processing capabilities. The projects whose implementation utilised project management. It was noted that time is regarded as the project's most important factor, followed by quality and cost, and that the three must be balanced. The following drawbacks frequently show up because construction projects place so much emphasis on timing: a. Because of speed, poor implementationaffectsthequality level. b. There will be an increase in the amount of waste in construction materials. c. Using up employees' energy by making them work overtime, which has a negative impact on the level of productivity and output. 3.1 CONCEPTUAL PLAN The integration of all the major production and implementation components is a requirementforachieving a standard central plan for the expeditedimplementation of the construction project. Because of the activities' shorter duration, consideration of the factors affecting cost and quality needed for the project, and full compliance with the standards of the designer and the stakeholders at the same time, the main goal of the production process is stability. The project's central concern, along with the fact that these variables, such as raw materials, instruments, equipment types, or work activities, can be understood, adjusted, or fixed, has stimulated the project's implementation.Possible suggestions for project planning in this study include an expedited implementation process (see fig). Fig 3.1: The main strategy for the quick project implementation. The company's management will have opportunities to address needs that dependonthefollowingvariables]when using this model in general planning. 1. The size of the labour force has changed. 2. Benefit from overtime. 3. Include any meals required for the job. 4. Coping with potential difficulties. 5. Using contractors to split the workload. 6. Preparing for the possibility that the employer may issue change orders. 7. Anticipate price variations to meet needs. 8. Make the most of upcoming technological advancements. The building construction project has 31 componentsand a 245-day overall duration. The following time and financial resources have been set aside by the company for the project during the study: 1. Under normal circumstances, the project will end up costing Rs. 10,800,000.00. 2. Under normal circumstances, the project will be completed in 365 days. Available capabilities Production rates Accelerated Expectation Requirements change orders Production plan Career rates The size of the work force Project central plan template Master Plan Production efficiency determinants 1. machines and equipment 2. human skills 3. raw materials 4. extra time 5. Work meals 6. Subcontractors
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 620 TABLE 1: DETAILS OF ACTIVITIES / DURATION AND ACTIVITIES PREDECESSOR Activity Description Duration (Weeks) Predecessor(s 1 Preliminaries 3 2 Earthwork (cut & Filling) 4 3 External RCC retaining wall 2 4 Pilling works 2 5 RCC Pile Cap2 2 4 6 Stump 2 3,4 7 Ground beam 2 5 8 Ground floor slab work 1 6,7 9 RCC Column 1 7 10 SuspendedRCCBeams,Slab, stairs 2 7 11 Steel structure work 2 8,9 12 Roofing work 2 10 13 Wall 4 11,12 14 Wall finishing 2 13 15 Floor finishing 1 13 16 Door & window 1 13 17 Drainage surrounding building 3 12 18 Apron & RCC Ramp work 2 17 19 Sanitary & Plumbing 2 17 20 Sanitary & plumbing work finishing 2 19 21 Painting 2 14,15 22 Electrical & telephone installation 8 12 23 Fire fighting Installing 8 12 24 Landscaping 1 7 25 Weight bridge office 8 7 26 T NB Sub station 10 7 27 Refuse chamber 4 7 28 External Drainage work 7 7 29 Road work 4 17 30 Main Entrance gate 7 29 31 Site Clearing work 1 30 The three possibilities are listed as follows: Scenario 1: Despite the project's limited resource availability, the deadline for completion is set. Scenario 2: The Company wants to shortentheconstruction period while imposing the lowest possible cost. Scenario 3: The Company wants to maintain quality while shortening the construction period. Microsoft Office Project will be used to analyze and model the three scenarios in this project. Additionally, a manual analysis is also completed in order to validate the results. A discussion and conclusion that are pertinent to the project management variables described in the preceding introduction can be drawn from the analysis' findings. 4. METHODLOGY This section describes theprogrammesandresourcesbeing used for this project to analyse the three scenarios as well as the procedures and terminology used to produce the analysis's results. Microsoft Office Project will be used in this project to create a Gantt Chart scheduleandanalysethe critical path with regard to the scenarios listed in the previous introduction. Although third-partyadd-onsforthe critical chain and event chain methodologies are available, the application only generates critical path schedules. Schedules can be resource levelled,anda Ganttchartisused to show chains. Microsoft OfficeProjectcanalsodistinguish between various user classes. Different levels of access to projects, views, and other data may be available to these various classes of users. Custom data is stored in an enterprise global that is accessible to all users and includes calendars, views, tables, filters, and fields. The dates of the critical path tasks must be transferred if an earlier completion date for the project is required. The process of reducing a project's overall duration without altering the relationshipsbetweentasksis also referred to as "crashing" a project. Adding more resources to the task is typically necessary to prevent a project crash.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 621 5. RESULT AND ANALYSIS This section explains the Microsoft Project resultsinlightof the three analyses that were taken into account. All three cases are presumed to have started on January 5, 2021. A. Scenario 1: The project Duration is Fixed and Material resources are limited. Due to a lack of resources, the project's duration must be fixed, and Saturdays and Sundays are not counted as working days. The completion dateisJanuary6,2022,and the overall timeline is 365 days. B. Scenario 2: Reduced Project Time with Minimum Costs Implied. The project's duration must beshortened,anda minimum cost requirement is imposed. Saturdays and Sundays are designated as the project's general working hours. The duration remains 175 days, but the completion date is moved up to September 27, 2021. C. Scenario 3: KeepingtheProject'sQualityWhileShortening the Project's Duration. While maintaining quality, the project's duration must be shortened. The optimistic, expected, and pessimistic durations as well as duration weights are defined foreach task using the PERT Analysis. The duration weights are assumed to be 1, 4, and 1, respectively, for the optimistic, expected, and pessimistic cases (the weight values must sum to 6). The pessimistic duration is 7 days later, the optimistic duration is 7 days earlier (for tasks whose durations are already 7 days, their optimistic durations are assumed to stick to 7 days), and the expectedduration is the specified number of days as in Table I. The generated durations for these cases aredisplayedinTable ii. TABLE 2: TYPE OF DURATION GENERATEDTA Types of Duration Days Optimistic 275 Expected 365 After using Microsoft Project to analyze this situation, the results show that our project's overall timeline would be 175 days if we did not count Saturdays and Sundays as working days. The duration of all activities and predecessors as organized in Table I currently not only satisfies the timeline but also outperforms expectations by being cut by a period of 70 days as compared to the scheduled target of project completion, which is 245 days. The activities and durations in Table I shouldn't change in this scenario because the project time needs to be fixed and resources are scarce. The results for this scenario simply show the durations and activities that are established in Table I. 6. CONCLUSIONS 1.The project's overall planning It appears that the value of developing levels of planning is commensurate with the characteristics of rapid implementation tools and includes specific plans to oversee all of these procedures while supporting and taking into account the factors of time, cost, and quality. 2. The development of the central plan model's goals are to improve the project's entire regulatory process by putting the project's goals, resources, production rates, and necessary skillfulness into the schedule applying in a way that ensures the project's ability to be completed practically. 3. This plan aims to achieve the highest possible level of workability by defining an element of a special system to control the production processes intheprojectandcreating a model for procedures that determine theadministration's scope, measure performance, compare it to standards and targets, identify variations, and take appropriate and ready corrective actions. 4. By applying contemporary computer technologies, such as linear programming, to the control of time and cost, excellent results have been achieved. Linear programming can be explained in greater detail to investors or stockholders to make the central plan more clearly reduce the project completion period and the critical activities of time pressure technology programme at the lowest cost to control both time and cost. 5. The availability of cash flow from the employer is one of the most crucial factors because it is essential to pay all project workers, material suppliers,equipmentcontractors, and others on time and without delay in order to maintain the flow of work within the timetable. 6. The paper led to the adoption of the accelerated implementation process in critical activities of circumstances that demandtheproject becompletedwithin a specific short period of time, with the need to provide experienced and effective employeesforthistypeof project, with the commitment of the construction companies to submit detailed plans and the central plan for the implementation of the project to the employer within the suggestions for the purpose of developing the In order to reduce planning time and costs, government agencies, private construction firms, and technical department staff may be required to use modern software and technology. REFERENCES [1] Naomi Brookes. (2013). Construction Project Management. Research gate.
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 10 | Oct 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 622 [2] H M A Asfoor , A A T AL-Jandeel,K K Igorevich and L A Ivanovna (2022) Control of Time, Cost and Quality of Construction Project Management. E3S Web of Conferences. [3] M. Radujković, M. Sjekavica, "Project Management Success Factors, Creative Construc-tion", CCC 2017, Primosten, Croatia, Procedia Engineering 196, (2017) [4] Zilberova, I., Petrov, K., & Artsishevsky, M.(2020, February). Actual problems of management quality control of a constructioncompany. In IOP Conference Series: Materials Science and Engineering (Vol. 753.p. 042020). IOP Publishing. [5] Shirina E, Gaybarian O, Myasischev G 2017 Effective management of construction company in terms of linguistic communication IOP Conf. Series: Earth and Environmental Science 90012077. [6] Kerzner, H., (2017) Project Management: A System Approach to Planning, SchedulingandControlling,John Wiley & Sons, New York. [7] Shaqour, E. N. (2021). The role of implementing BIM applications in enhancing project management knowledge areas in Egypt. Ain Shams Engineering Journal. [8] Khodeir, L. M., & Nessim, A. A. (2018). BIM2BEM integrated approach: Examining status of the adoption of building information modelling and building energy models in Egyptian architectural firms. Ain Shams Engineering Journal, 9(4), 1781-1790.