SlideShare a Scribd company logo
1 of 8
Download to read offline
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2980
SELECTION OF CANAL ALIGNMENT FOR THE INTERLINKING OF
DAMANGANGA (EKADARE) AND GODAVARI VALLEY USING QGIS
1J Maghrabi, 2P Rana, 3A Rakshe, 4S Kurane, 5A Morade
1 Assistant Professor, Department of Civil Engineering,
2, 3, 4, 5 Students, Department of Civil Engineering,
Terna Engineering College,
Nerul, Navi Mumbai- 400 706
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Water scarcity is the major issue faced by the world and it is rapidly rising in India. To overcome this problem
many methods have been adopted, interlinking of rivers is one of them. Connecting the rivers with the help of canals and
reservoirs is called interlinking. In India, National Water Development Agency (NWDA) have proposed various links for this
purpose. Amongst these link Daman Ganga (Ekadare) - Godavari Valley link is selected and 4 alignments are proposed
considering various factors. QGIS software is used for this project.
Keywords: Water, interlinking, rivers, canal, alignment, QGIS.
1. INTRODUCTION
Water scarcity is a major issue that is rising very rapidly in India. India being water stressed nation, is standing on thebrinkof
an acute water crisis. The solutions proposed to solve the water scarcity problems are rainwater harvesting, water
conservation, waste water recycling and much more. The one of the major solution to solve this problem is inter linking of
rivers which was introduced in the year 1982 in India. The Interlinking of Rivers is the concept of connecting the rivers of the
country by networks of reservoirs and canals. Through interlinking, water can be transferred from elevated surplus areas to
low-lying deficit areas. Interlinking of riversconsistsofmultifaceteddataonagrarian, environmental,hydrogeological,political
and socio-economic aspects. Data is derived from a variety of sources, including remote sensing photos, aerial photography,
paper maps, and field data. For easy retrieval, analysis, effective planning and execution and decisionmakingonsuchcomplex
project issues, the data and information related to it should be stored in digital form at one place.
1.1 Literature review
Akruti K Patel et.al, (2015): They proposed the planning of interlinking of River Shetrunji and River Dhatarwadi by a canal
using Remote Sensing and GIS. The slope map and contour map were prepared with the help of ARC GIS software. The canal
alignment is planned based on the data acquired in such a way that the surplus water from Shetrunji Dam flows to the
Dhatarwadi Dam by gravity level passing through the threetalukas. Threecrossdrainageworksarerequiredbecausethecanal
crosses the natural streams of the Bagad River, Malan River, and Zolapur River.
Heena K Kanjani et.al, (2016): She conducted a case study to propose the interlinking canal alignment from Kandana Dam to
Watrak Dam which is located in the northern part of GujaratusingRemoteSensingand GeographicalInformationSystem (GIS).
The satellite image data and geo spatial data were obtained from the BISAG and thematic layers were made using visual
interpretation technique of ARC GIS. Three alignment of canals were proposed based on the I.S. code of lined canal.
Considering economy, suitability and land use requirement that is based on GIS study;approximately38kmlength ofinterlink
canal has been proposed. The water through the canal will flow with the help of gravity passing through loamy soil.
Anupriya et.al, (2018): Using GIS and Open Source Maps, they investigated the Vidarbha region (OSM). The topography
characteristics and potential of water storage capacity with water shading of the Vidarbha region were analysed using Q GIS
2.14.12 with grass 7.2.0 and Cgiar-csi. The softwares were used to create the various data needed for the linkage. Examining
such an environmental issue with software proves to be a significant step in the right direction.
1.2 Objectives
a) The core objective of the project is to analyze the most suitable path for interlinking of Damanganga River and Gangapur
Reservoir using the QGIS software.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2981
b) To find out the proposed location of dam near Ekadare.
c) To divert the surplus water using canal, ducts and drains to increase the area under irrigation.
2. METHODOLOGY
2.1 Study area
NWDA has carried out studies and proposed diversion of surplus water available at dependable yield of Damanganga basin
upto proposed Ekadare dam site to existing Gangapur reservoir in Godavari Valley.
Damanganga:The Daman Ganga originates in the Sahyadri hills near Ambegaon village in the Dindori taluka of Maharashtra's
Nasik district. Major part of the river lies in Maharashtra. It is 131.30 km long from point oforigintotheArabianSea. 20°19′N,
72°50′E are the coordinates. Dawn, Shrimat, Val, Rayte, Lendi, Vagh, and Dudhni are important tributariesoftheDamanganga
River.
Godavari Valley:The Upper Godavari sub-basin, which lies between 18°42' and 20°28'northlatitudeand73°26'to 77°46' east
longitude, includes the Godavari's reach from its source to its convergence with the Manjra River but excludes the Pravara,
Purna, and Manjra rivers' catchment areas. The river flows through Nashik district, eventually reaching the Gangapur
Reservoir, which was created by a dam of the same name, and subsequently the Kashyapi Dam. The Kashyapi dam rises41.75
m above the lowest foundation. The gross storage capacity is 0.05269 km3 and the volume content is 0.05174 km3.
2.2 Flowchart
Figure 1 gives the flowchart on methodology used in the study.
2.3 Proposed Ekadare Dam:
It is proposed to build a new dam on the Damanganga River near Ekadare village inNashik districttodivertexcess watertothe
Kashyapi Dam via a canal. The proposed Ekadare Dam is located at 20°11′24′′ N, 73°32′20′′ E. The dam was chosen for this
location based on the following criteria:
1. The presence of a suitable foundation.
2. Minimum length of the dam, which came out to be 320 m using Google Earth Pro Software.
Fig -1: Methodology Flowchart
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2982
3. It should not be too far from the Kashyapi dam, as this will lengthen the interlink and increase the project's cost.
Catchment Area: 182 km
2.4 Creation of Maps Using QGIS Software:
Fig -2: Contour Map
Fig -3: Slope Map
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2983
2.4 Alignments
Some of the basic requirements for canal alignment were as follows:
1. The canal alignments were chosen in such a way that water flowed primarily through gravity, with as little pumping as
feasible.
2. Landuse land cover maps were used to identify and avoid built-up regions.
3. The alignments provided run through the most of the open land possible.
4. The majority of the time, road and river networks were avoided so that cross drainage work would be minimal.
The four canal alignments are investigated based on geology, hydrology, andlanduse,withthe mostsuitablealignmentchosen
based on topographic circumstances and meeting the canal alignment criteria.
Figure 2 shows contour map, slope map and LULC map that are used for passing the alignments.
2.4.1 Canal Alignment 1:
Between Ekadare Dam and Kashyapi Dam, a canal alignment was suggested. The canal runs from the proposed Ekadare
Reservoir's left bank to a sump at RD 4.7 km, FSL 550 m, and a lift of 170 m. Then it flows up to RD 6.7 km by gravity. The link
then takes off from the sump at FSL 540 m, pumping through a pipe line to a sump at RD 7.9 km, FSL 715 m, withalift of175m.
The canal runs from a sump at RD 7.9 km through a tunnel to RD 12.7 km on the upper bank of KashyapiReservoir,withanFSL
of 715 m. In the tunnel, water flows due to gravity. The canal is 12.7 km long in total. The total lifting head is 345 m. Shingdari,
Cholmukh, Kulwandi, Shivaji Nagar, Holdar Nagar, and Kashyapnagar are among the villages served by the link. It crosses a
major road at a distance of 3.58 km, necessitating the construction of an overbridge.Only one cross drainage work is required
in this case. This alignment has the shortest length of the four proposed alignments. Figure 5 shows canal alignment 1.
Fig -4: LULC Map.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2984
2.4.2 Canal Alignment 2:
The alignment runs from the proposed Ekadare Reservoir's lower right banktoasump atRD5.15kmatFSL510m withaliftof
140 m.Then it flows up to RD 8.15 km due to gravity. The link then takes off from the sump at FSL 490m bypumpingthrougha
pipe line to a sump at RD 9.7 km at FSL 700 m with a lift of 210 m. The canal starts with an FSL of 700 m from a sump at RD 9.7
km and continues through a tunnel to RD 13.2 km on the upper bank of Kashyapi Reservoir. In the tunnel, water flows due to
gravity. The canal is 13.2 kilometres long in total. A total of 350 m of lifting head is available. Ruipetha, Murmuti, Fanaspada,
Pate, Donwade, Umbardahad, Vaishnavnagar, and Indiranagar are the villages covered by this link. It crosses five roads at
distances of 1.16 kilometres, 5.24 kilometres, 5.94 kilometres,7.82kilometres,and10.7kilometres,respectively,andthusover
bridges must be provided at those points. At a chainage of 5.43 kilometres, it crosses a stream, necessitating cross drainage
work.It is the second shortest of the four alignments.In comparison to other alignments, it necessitates morecross drainages.
Figure 6 shows canal alignment 2.
2.4.3 Canal Alignment 3:
The alignment runs from the proposed Ekadare Reservoir's lower right bank to a sump at RD 2.6 km, FSL 404 m, with a 34 m
lift.The link then starts pumping to a sump at RD 4.8 km, which is at FSL 486 metres. It's an 82-meter lift.Thelinkthenascends
through a pipe line from sump at RD 4.8 km to a sump at RD 6.1 km at FSL 681 m, with a lift of 195 m.The canal, then runs with
an FSL of 681 m from a sump at RD 6.1 km to RD 9.2 km through tunnel. In the tunnel, the water flows by gravity. The canal
then takes off from RD 9.2 km at FSL 673 m to RD 18.6 km at FSL 635 m through gravity. The canal is 18.6 kilometres long in
Fig-5: Alignment 1
Fig-6: Alignment 2
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2985
total. The total lifting head is 311 m. Thus at three points, pumping is required. Dolharmal, Kohor, Ladachi, Sadgaon, and
Dhondegaon are the villages covered by this link.It crosses eight roads at distances of1.6km,3.3km,4.6km,9.48km,12.5km,
13.86 km, 14.45 km, 15.37 km, and 17.9 km, respectively, and thus over bridges must beprovidedatthosepoints.Itcrossesthe
stream at a distance of 2.4 km, necessitating cross drainage work. Thus at nine different locations, cross drainage work is
required. Figure 7 shows canal alignment 3.
2.4.4 Canal Alignment 4:
The alignment runs from the proposed Ekadare Reservoir's lower right bank to a sump at RD 4.2 km at FSL 515 m with a liftof
145 m. Then it flows up to RD 10.2 km due to gravity. The link then takes off from the sump at FSL 505 m, pumping through a
pipe line to a sump at RD 11.9 km, FSL 720 m, with a lift of 215 m. The canal runs from a sump at RD 11.9 km through a tunnel
to RD 15.2 km on the upper bank of Kashyapi Reservoir, with an FSL of 720 metres to 660 m, respectively.In the tunnel, water
flows due to gravity. The canal is 15.2 km long in total. The total lifting head length is 360 m. Dolharma, Ruipetha, Fanaspada,
Pate, Donwade, Vaishnavnagar, and Indiranagar are the villages covered by this link. It crosses six roadsatdistancesof1.7km,
3.5 km, 5.32 km, 7.79 km, 9.14 km, and 12.82 km, respectively, and thus over bridges must be provided at those points. The
amount of arable land covered is greater but the requirementofcrossdrainageworkis more.Figure8showscanalalignment4.
Fig-7: Alignment 3
Fig-8: Alignment 4
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2986
3. Results
A comparison of all four alignments is shown in the table. It shows the length of the alignments, the number of cross drainage
works necessary, the amount of pumping required, total gravity flow, and tunnel length. Alignment 1 is the shortest whereas
alignment 3 is the longest.
4. Conclusion
The analysis of maps such as slope maps, contour maps, land use land cover maps of the area between the proposed Ekadare
dam and the Kashyapi dam led to the selection of a suitable interlinking canal to carry surplus water from the Ekadare dam to
the Kashyapi dam. Based on the GIS study, various alternative proposals were considered, taking into account length,
suitability, pumping, and land use requirements.Civil engineering structures suchasroads,bridges,andotherstructureswere
taken into account when choosing canal alignment streams.The alignment 1 hasbeenchosenasthemostsuitablebasedonthe
tabulated data in result table, as it is the shortest link (12.7 km) and has the lowest CD works with two stage pumping and a
total lift of 345 m.
Alignment Length Image Remarks
1 12.7 km
• Shortest link
• Only one cross drainage work is required.
• Covers significant cultivable area
• Two stage pumping is required with total lift of 345 m.
• Total Gravity flow- 6.8 km (53%)
• Tunnel Length- 4.8 km.
2 13.2 km
• Second shortest link.
• Cross drainage work is required at six locations.
• Covers more cultivable area
• Two stage pumping is required with total lift of 350 m.
• Total Gravity flow- 6.5 km(49%)
• Tunnel Length- 3.5 km.
3 18.6 km
• Longest link.
• Cross drainage work is required at nine locations.
• Three stage pumping is required with total lift of 311 m
• Total Gravity flow- 12.5 km (67%)
• Tunnel Length- 3.1 km.
4 15.2 km
• Cross drainage work is required at six locations
• Covers more cultivable area
• Two stage pumping is required with total lift of 360 m.
• Total Gravity flow- 9.5 km(62.5%)
• Tunnel Length- 3.3 km.
Table-1: Comparison of Alignments
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2987
4.1 Scope for future studies
a) The project can be used as a base for cost estimation which will include the cost of Dam construction, Canal construction,
Pumping Station and sump construction, Cost of Cutting & Filling of Earthwork, Cost of Pumping. The results may vary
depending on the cost analysis and cost-benefit ratio, and the chosen alignment can be changed.
b) Design of Tunnel,
c) Design of Canal,
d) Design of Pipeline.
REFERENCES
[1] Anupriya and Chamat L 2018 Study of interlinking of riversbyusingGeographic InformationSystem (GIS)withQUANTUM-
GIS IJERT vol. 7 issue 03.
[2] Patel A, Singh N and Prakash I 2015 Planning of river inter- linking canal system between Shetrunji river and Dhatarwadi
river, Saurashtra, India, using remote sensing and GIS IJSTE vol 1 issue 11.
[3] Kanjani H, Motiani A, Prakash I and Mehmood K 2016 Selection of inter-linking canal alignment from Kadana Dam to
Watrak Dam, Gujarat, using remote sensing and GIS IJSTE vol 2 issue 11.
[4] Krishnaveni M, Prakashvel J, Kaarmegam M 2003 GIS and Visualisation Capabilities for Interlinking of Indian Rivers
[5] Integrated State Water Plan for Godavari Basin in Maharashtra Volume 1: Integrated Plan 2017
[6] Integrated State Water Plan for West Flowing River Basin in Maharashtra Volume II: Integrated Plan 2018

More Related Content

Similar to SELECTION OF CANAL ALIGNMENT FOR THE INTERLINKING OF DAMANGANGA (EKADARE) AND GODAVARI VALLEY USING QGIS

DESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITY
DESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITYDESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITY
DESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITYIRJET Journal
 
FORECASTING OF GROUNDWATER QUALITY IN AND AROUND BELLANDUR LAKE BY VISUAL MOD...
FORECASTING OF GROUNDWATER QUALITY IN AND AROUND BELLANDUR LAKE BY VISUAL MOD...FORECASTING OF GROUNDWATER QUALITY IN AND AROUND BELLANDUR LAKE BY VISUAL MOD...
FORECASTING OF GROUNDWATER QUALITY IN AND AROUND BELLANDUR LAKE BY VISUAL MOD...IRJET Journal
 
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation System
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation SystemIRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation System
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation SystemIRJET Journal
 
TEMPORAL MAPPING AND MONITORING DYNAMICS OF PANDU RIVER UTTAR PRADESH USING R...
TEMPORAL MAPPING AND MONITORING DYNAMICS OF PANDU RIVER UTTAR PRADESH USING R...TEMPORAL MAPPING AND MONITORING DYNAMICS OF PANDU RIVER UTTAR PRADESH USING R...
TEMPORAL MAPPING AND MONITORING DYNAMICS OF PANDU RIVER UTTAR PRADESH USING R...IRJET Journal
 
2007 hassan and islam - application of GIS for drinking water - paper_108
2007 hassan and islam - application of GIS for drinking water - paper_1082007 hassan and islam - application of GIS for drinking water - paper_108
2007 hassan and islam - application of GIS for drinking water - paper_108SM Tanvir Hassan
 
IRJET- Estimation of Hydrological and Hydraulics Parameters for Bridge De...
IRJET-  	  Estimation of Hydrological and Hydraulics Parameters for Bridge De...IRJET-  	  Estimation of Hydrological and Hydraulics Parameters for Bridge De...
IRJET- Estimation of Hydrological and Hydraulics Parameters for Bridge De...IRJET Journal
 
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...IRJET Journal
 
WATERSHED PRIORITIZATION IN RELATION TO SOIL EROSION USING GEOSPATIAL TECHNIQ...
WATERSHED PRIORITIZATION IN RELATION TO SOIL EROSION USING GEOSPATIAL TECHNIQ...WATERSHED PRIORITIZATION IN RELATION TO SOIL EROSION USING GEOSPATIAL TECHNIQ...
WATERSHED PRIORITIZATION IN RELATION TO SOIL EROSION USING GEOSPATIAL TECHNIQ...IRJET Journal
 
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIRENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIRIRJET Journal
 
Analysis Of Water Balance and Its Effect on Tube well Efficiency
Analysis Of Water Balance and Its Effect on Tube well EfficiencyAnalysis Of Water Balance and Its Effect on Tube well Efficiency
Analysis Of Water Balance and Its Effect on Tube well EfficiencyIRJET Journal
 
“Analysis Of Water Balance and Its Effect on Tube well Efficiency”
“Analysis Of Water Balance and Its Effect on Tube well Efficiency”“Analysis Of Water Balance and Its Effect on Tube well Efficiency”
“Analysis Of Water Balance and Its Effect on Tube well Efficiency”IRJET Journal
 
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...IRJET Journal
 
ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJI
ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJIANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJI
ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJIIRJET Journal
 
Selection of alignment for feeder canal from pillaipally flood flow canal to ...
Selection of alignment for feeder canal from pillaipally flood flow canal to ...Selection of alignment for feeder canal from pillaipally flood flow canal to ...
Selection of alignment for feeder canal from pillaipally flood flow canal to ...eSAT Journals
 
DEM GENERATION AND RIVER ANALYSIS USING HEC-RAS MODEL, HARIDWAR DISTRICT, UTT...
DEM GENERATION AND RIVER ANALYSIS USING HEC-RAS MODEL, HARIDWAR DISTRICT, UTT...DEM GENERATION AND RIVER ANALYSIS USING HEC-RAS MODEL, HARIDWAR DISTRICT, UTT...
DEM GENERATION AND RIVER ANALYSIS USING HEC-RAS MODEL, HARIDWAR DISTRICT, UTT...IRJET Journal
 
Presentation of GIS Works by Adil Latif
Presentation of GIS Works by Adil LatifPresentation of GIS Works by Adil Latif
Presentation of GIS Works by Adil LatifAdil Latif
 
IRJET- Highway Networking System
IRJET-  	  Highway Networking SystemIRJET-  	  Highway Networking System
IRJET- Highway Networking SystemIRJET Journal
 
Numerical Simulation of Lake Tap Flow
Numerical Simulation of Lake Tap FlowNumerical Simulation of Lake Tap Flow
Numerical Simulation of Lake Tap FlowIRJET Journal
 
IRJET- Selection of Artificial Recharge Structures using GIS and GEO Physical...
IRJET- Selection of Artificial Recharge Structures using GIS and GEO Physical...IRJET- Selection of Artificial Recharge Structures using GIS and GEO Physical...
IRJET- Selection of Artificial Recharge Structures using GIS and GEO Physical...IRJET Journal
 

Similar to SELECTION OF CANAL ALIGNMENT FOR THE INTERLINKING OF DAMANGANGA (EKADARE) AND GODAVARI VALLEY USING QGIS (20)

DESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITY
DESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITYDESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITY
DESIGN OF WATER TREATMENT PLANT FOR DAVANGERE CITY
 
FORECASTING OF GROUNDWATER QUALITY IN AND AROUND BELLANDUR LAKE BY VISUAL MOD...
FORECASTING OF GROUNDWATER QUALITY IN AND AROUND BELLANDUR LAKE BY VISUAL MOD...FORECASTING OF GROUNDWATER QUALITY IN AND AROUND BELLANDUR LAKE BY VISUAL MOD...
FORECASTING OF GROUNDWATER QUALITY IN AND AROUND BELLANDUR LAKE BY VISUAL MOD...
 
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation System
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation SystemIRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation System
IRJET - Study for Pipe Distribution Network (PDN) in Aruna Dam Irrigation System
 
TEMPORAL MAPPING AND MONITORING DYNAMICS OF PANDU RIVER UTTAR PRADESH USING R...
TEMPORAL MAPPING AND MONITORING DYNAMICS OF PANDU RIVER UTTAR PRADESH USING R...TEMPORAL MAPPING AND MONITORING DYNAMICS OF PANDU RIVER UTTAR PRADESH USING R...
TEMPORAL MAPPING AND MONITORING DYNAMICS OF PANDU RIVER UTTAR PRADESH USING R...
 
2007 hassan and islam - application of GIS for drinking water - paper_108
2007 hassan and islam - application of GIS for drinking water - paper_1082007 hassan and islam - application of GIS for drinking water - paper_108
2007 hassan and islam - application of GIS for drinking water - paper_108
 
IRJET- Estimation of Hydrological and Hydraulics Parameters for Bridge De...
IRJET-  	  Estimation of Hydrological and Hydraulics Parameters for Bridge De...IRJET-  	  Estimation of Hydrological and Hydraulics Parameters for Bridge De...
IRJET- Estimation of Hydrological and Hydraulics Parameters for Bridge De...
 
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...
IRJET- A Study of Application of Qanat System using Modern Techniques for Oas...
 
WATERSHED PRIORITIZATION IN RELATION TO SOIL EROSION USING GEOSPATIAL TECHNIQ...
WATERSHED PRIORITIZATION IN RELATION TO SOIL EROSION USING GEOSPATIAL TECHNIQ...WATERSHED PRIORITIZATION IN RELATION TO SOIL EROSION USING GEOSPATIAL TECHNIQ...
WATERSHED PRIORITIZATION IN RELATION TO SOIL EROSION USING GEOSPATIAL TECHNIQ...
 
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIRENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
ENVIRONMENTAL IMPACT ASSESSMENT ON DAL LAKE SRINAGAR KASHMIR
 
Analysis Of Water Balance and Its Effect on Tube well Efficiency
Analysis Of Water Balance and Its Effect on Tube well EfficiencyAnalysis Of Water Balance and Its Effect on Tube well Efficiency
Analysis Of Water Balance and Its Effect on Tube well Efficiency
 
“Analysis Of Water Balance and Its Effect on Tube well Efficiency”
“Analysis Of Water Balance and Its Effect on Tube well Efficiency”“Analysis Of Water Balance and Its Effect on Tube well Efficiency”
“Analysis Of Water Balance and Its Effect on Tube well Efficiency”
 
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...
IRJET- Design and Mapping of Underground Sewerage Network using GIS & GPS - A...
 
ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJI
ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJIANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJI
ANALYSIS AND OPTIMIZATION OF WATER DISTRIBUTION SYSTEM AT AMBAJI
 
Selection of alignment for feeder canal from pillaipally flood flow canal to ...
Selection of alignment for feeder canal from pillaipally flood flow canal to ...Selection of alignment for feeder canal from pillaipally flood flow canal to ...
Selection of alignment for feeder canal from pillaipally flood flow canal to ...
 
DEM GENERATION AND RIVER ANALYSIS USING HEC-RAS MODEL, HARIDWAR DISTRICT, UTT...
DEM GENERATION AND RIVER ANALYSIS USING HEC-RAS MODEL, HARIDWAR DISTRICT, UTT...DEM GENERATION AND RIVER ANALYSIS USING HEC-RAS MODEL, HARIDWAR DISTRICT, UTT...
DEM GENERATION AND RIVER ANALYSIS USING HEC-RAS MODEL, HARIDWAR DISTRICT, UTT...
 
Presentation of GIS Works by Adil Latif
Presentation of GIS Works by Adil LatifPresentation of GIS Works by Adil Latif
Presentation of GIS Works by Adil Latif
 
IRJET- Highway Networking System
IRJET-  	  Highway Networking SystemIRJET-  	  Highway Networking System
IRJET- Highway Networking System
 
Silt in Canals
Silt in CanalsSilt in Canals
Silt in Canals
 
Numerical Simulation of Lake Tap Flow
Numerical Simulation of Lake Tap FlowNumerical Simulation of Lake Tap Flow
Numerical Simulation of Lake Tap Flow
 
IRJET- Selection of Artificial Recharge Structures using GIS and GEO Physical...
IRJET- Selection of Artificial Recharge Structures using GIS and GEO Physical...IRJET- Selection of Artificial Recharge Structures using GIS and GEO Physical...
IRJET- Selection of Artificial Recharge Structures using GIS and GEO Physical...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Recently uploaded (20)

Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
(SHREYA) Chakan Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Esc...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 

SELECTION OF CANAL ALIGNMENT FOR THE INTERLINKING OF DAMANGANGA (EKADARE) AND GODAVARI VALLEY USING QGIS

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2980 SELECTION OF CANAL ALIGNMENT FOR THE INTERLINKING OF DAMANGANGA (EKADARE) AND GODAVARI VALLEY USING QGIS 1J Maghrabi, 2P Rana, 3A Rakshe, 4S Kurane, 5A Morade 1 Assistant Professor, Department of Civil Engineering, 2, 3, 4, 5 Students, Department of Civil Engineering, Terna Engineering College, Nerul, Navi Mumbai- 400 706 ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Water scarcity is the major issue faced by the world and it is rapidly rising in India. To overcome this problem many methods have been adopted, interlinking of rivers is one of them. Connecting the rivers with the help of canals and reservoirs is called interlinking. In India, National Water Development Agency (NWDA) have proposed various links for this purpose. Amongst these link Daman Ganga (Ekadare) - Godavari Valley link is selected and 4 alignments are proposed considering various factors. QGIS software is used for this project. Keywords: Water, interlinking, rivers, canal, alignment, QGIS. 1. INTRODUCTION Water scarcity is a major issue that is rising very rapidly in India. India being water stressed nation, is standing on thebrinkof an acute water crisis. The solutions proposed to solve the water scarcity problems are rainwater harvesting, water conservation, waste water recycling and much more. The one of the major solution to solve this problem is inter linking of rivers which was introduced in the year 1982 in India. The Interlinking of Rivers is the concept of connecting the rivers of the country by networks of reservoirs and canals. Through interlinking, water can be transferred from elevated surplus areas to low-lying deficit areas. Interlinking of riversconsistsofmultifaceteddataonagrarian, environmental,hydrogeological,political and socio-economic aspects. Data is derived from a variety of sources, including remote sensing photos, aerial photography, paper maps, and field data. For easy retrieval, analysis, effective planning and execution and decisionmakingonsuchcomplex project issues, the data and information related to it should be stored in digital form at one place. 1.1 Literature review Akruti K Patel et.al, (2015): They proposed the planning of interlinking of River Shetrunji and River Dhatarwadi by a canal using Remote Sensing and GIS. The slope map and contour map were prepared with the help of ARC GIS software. The canal alignment is planned based on the data acquired in such a way that the surplus water from Shetrunji Dam flows to the Dhatarwadi Dam by gravity level passing through the threetalukas. Threecrossdrainageworksarerequiredbecausethecanal crosses the natural streams of the Bagad River, Malan River, and Zolapur River. Heena K Kanjani et.al, (2016): She conducted a case study to propose the interlinking canal alignment from Kandana Dam to Watrak Dam which is located in the northern part of GujaratusingRemoteSensingand GeographicalInformationSystem (GIS). The satellite image data and geo spatial data were obtained from the BISAG and thematic layers were made using visual interpretation technique of ARC GIS. Three alignment of canals were proposed based on the I.S. code of lined canal. Considering economy, suitability and land use requirement that is based on GIS study;approximately38kmlength ofinterlink canal has been proposed. The water through the canal will flow with the help of gravity passing through loamy soil. Anupriya et.al, (2018): Using GIS and Open Source Maps, they investigated the Vidarbha region (OSM). The topography characteristics and potential of water storage capacity with water shading of the Vidarbha region were analysed using Q GIS 2.14.12 with grass 7.2.0 and Cgiar-csi. The softwares were used to create the various data needed for the linkage. Examining such an environmental issue with software proves to be a significant step in the right direction. 1.2 Objectives a) The core objective of the project is to analyze the most suitable path for interlinking of Damanganga River and Gangapur Reservoir using the QGIS software.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2981 b) To find out the proposed location of dam near Ekadare. c) To divert the surplus water using canal, ducts and drains to increase the area under irrigation. 2. METHODOLOGY 2.1 Study area NWDA has carried out studies and proposed diversion of surplus water available at dependable yield of Damanganga basin upto proposed Ekadare dam site to existing Gangapur reservoir in Godavari Valley. Damanganga:The Daman Ganga originates in the Sahyadri hills near Ambegaon village in the Dindori taluka of Maharashtra's Nasik district. Major part of the river lies in Maharashtra. It is 131.30 km long from point oforigintotheArabianSea. 20°19′N, 72°50′E are the coordinates. Dawn, Shrimat, Val, Rayte, Lendi, Vagh, and Dudhni are important tributariesoftheDamanganga River. Godavari Valley:The Upper Godavari sub-basin, which lies between 18°42' and 20°28'northlatitudeand73°26'to 77°46' east longitude, includes the Godavari's reach from its source to its convergence with the Manjra River but excludes the Pravara, Purna, and Manjra rivers' catchment areas. The river flows through Nashik district, eventually reaching the Gangapur Reservoir, which was created by a dam of the same name, and subsequently the Kashyapi Dam. The Kashyapi dam rises41.75 m above the lowest foundation. The gross storage capacity is 0.05269 km3 and the volume content is 0.05174 km3. 2.2 Flowchart Figure 1 gives the flowchart on methodology used in the study. 2.3 Proposed Ekadare Dam: It is proposed to build a new dam on the Damanganga River near Ekadare village inNashik districttodivertexcess watertothe Kashyapi Dam via a canal. The proposed Ekadare Dam is located at 20°11′24′′ N, 73°32′20′′ E. The dam was chosen for this location based on the following criteria: 1. The presence of a suitable foundation. 2. Minimum length of the dam, which came out to be 320 m using Google Earth Pro Software. Fig -1: Methodology Flowchart
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2982 3. It should not be too far from the Kashyapi dam, as this will lengthen the interlink and increase the project's cost. Catchment Area: 182 km 2.4 Creation of Maps Using QGIS Software: Fig -2: Contour Map Fig -3: Slope Map
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2983 2.4 Alignments Some of the basic requirements for canal alignment were as follows: 1. The canal alignments were chosen in such a way that water flowed primarily through gravity, with as little pumping as feasible. 2. Landuse land cover maps were used to identify and avoid built-up regions. 3. The alignments provided run through the most of the open land possible. 4. The majority of the time, road and river networks were avoided so that cross drainage work would be minimal. The four canal alignments are investigated based on geology, hydrology, andlanduse,withthe mostsuitablealignmentchosen based on topographic circumstances and meeting the canal alignment criteria. Figure 2 shows contour map, slope map and LULC map that are used for passing the alignments. 2.4.1 Canal Alignment 1: Between Ekadare Dam and Kashyapi Dam, a canal alignment was suggested. The canal runs from the proposed Ekadare Reservoir's left bank to a sump at RD 4.7 km, FSL 550 m, and a lift of 170 m. Then it flows up to RD 6.7 km by gravity. The link then takes off from the sump at FSL 540 m, pumping through a pipe line to a sump at RD 7.9 km, FSL 715 m, withalift of175m. The canal runs from a sump at RD 7.9 km through a tunnel to RD 12.7 km on the upper bank of KashyapiReservoir,withanFSL of 715 m. In the tunnel, water flows due to gravity. The canal is 12.7 km long in total. The total lifting head is 345 m. Shingdari, Cholmukh, Kulwandi, Shivaji Nagar, Holdar Nagar, and Kashyapnagar are among the villages served by the link. It crosses a major road at a distance of 3.58 km, necessitating the construction of an overbridge.Only one cross drainage work is required in this case. This alignment has the shortest length of the four proposed alignments. Figure 5 shows canal alignment 1. Fig -4: LULC Map.
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2984 2.4.2 Canal Alignment 2: The alignment runs from the proposed Ekadare Reservoir's lower right banktoasump atRD5.15kmatFSL510m withaliftof 140 m.Then it flows up to RD 8.15 km due to gravity. The link then takes off from the sump at FSL 490m bypumpingthrougha pipe line to a sump at RD 9.7 km at FSL 700 m with a lift of 210 m. The canal starts with an FSL of 700 m from a sump at RD 9.7 km and continues through a tunnel to RD 13.2 km on the upper bank of Kashyapi Reservoir. In the tunnel, water flows due to gravity. The canal is 13.2 kilometres long in total. A total of 350 m of lifting head is available. Ruipetha, Murmuti, Fanaspada, Pate, Donwade, Umbardahad, Vaishnavnagar, and Indiranagar are the villages covered by this link. It crosses five roads at distances of 1.16 kilometres, 5.24 kilometres, 5.94 kilometres,7.82kilometres,and10.7kilometres,respectively,andthusover bridges must be provided at those points. At a chainage of 5.43 kilometres, it crosses a stream, necessitating cross drainage work.It is the second shortest of the four alignments.In comparison to other alignments, it necessitates morecross drainages. Figure 6 shows canal alignment 2. 2.4.3 Canal Alignment 3: The alignment runs from the proposed Ekadare Reservoir's lower right bank to a sump at RD 2.6 km, FSL 404 m, with a 34 m lift.The link then starts pumping to a sump at RD 4.8 km, which is at FSL 486 metres. It's an 82-meter lift.Thelinkthenascends through a pipe line from sump at RD 4.8 km to a sump at RD 6.1 km at FSL 681 m, with a lift of 195 m.The canal, then runs with an FSL of 681 m from a sump at RD 6.1 km to RD 9.2 km through tunnel. In the tunnel, the water flows by gravity. The canal then takes off from RD 9.2 km at FSL 673 m to RD 18.6 km at FSL 635 m through gravity. The canal is 18.6 kilometres long in Fig-5: Alignment 1 Fig-6: Alignment 2
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2985 total. The total lifting head is 311 m. Thus at three points, pumping is required. Dolharmal, Kohor, Ladachi, Sadgaon, and Dhondegaon are the villages covered by this link.It crosses eight roads at distances of1.6km,3.3km,4.6km,9.48km,12.5km, 13.86 km, 14.45 km, 15.37 km, and 17.9 km, respectively, and thus over bridges must beprovidedatthosepoints.Itcrossesthe stream at a distance of 2.4 km, necessitating cross drainage work. Thus at nine different locations, cross drainage work is required. Figure 7 shows canal alignment 3. 2.4.4 Canal Alignment 4: The alignment runs from the proposed Ekadare Reservoir's lower right bank to a sump at RD 4.2 km at FSL 515 m with a liftof 145 m. Then it flows up to RD 10.2 km due to gravity. The link then takes off from the sump at FSL 505 m, pumping through a pipe line to a sump at RD 11.9 km, FSL 720 m, with a lift of 215 m. The canal runs from a sump at RD 11.9 km through a tunnel to RD 15.2 km on the upper bank of Kashyapi Reservoir, with an FSL of 720 metres to 660 m, respectively.In the tunnel, water flows due to gravity. The canal is 15.2 km long in total. The total lifting head length is 360 m. Dolharma, Ruipetha, Fanaspada, Pate, Donwade, Vaishnavnagar, and Indiranagar are the villages covered by this link. It crosses six roadsatdistancesof1.7km, 3.5 km, 5.32 km, 7.79 km, 9.14 km, and 12.82 km, respectively, and thus over bridges must be provided at those points. The amount of arable land covered is greater but the requirementofcrossdrainageworkis more.Figure8showscanalalignment4. Fig-7: Alignment 3 Fig-8: Alignment 4
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2986 3. Results A comparison of all four alignments is shown in the table. It shows the length of the alignments, the number of cross drainage works necessary, the amount of pumping required, total gravity flow, and tunnel length. Alignment 1 is the shortest whereas alignment 3 is the longest. 4. Conclusion The analysis of maps such as slope maps, contour maps, land use land cover maps of the area between the proposed Ekadare dam and the Kashyapi dam led to the selection of a suitable interlinking canal to carry surplus water from the Ekadare dam to the Kashyapi dam. Based on the GIS study, various alternative proposals were considered, taking into account length, suitability, pumping, and land use requirements.Civil engineering structures suchasroads,bridges,andotherstructureswere taken into account when choosing canal alignment streams.The alignment 1 hasbeenchosenasthemostsuitablebasedonthe tabulated data in result table, as it is the shortest link (12.7 km) and has the lowest CD works with two stage pumping and a total lift of 345 m. Alignment Length Image Remarks 1 12.7 km • Shortest link • Only one cross drainage work is required. • Covers significant cultivable area • Two stage pumping is required with total lift of 345 m. • Total Gravity flow- 6.8 km (53%) • Tunnel Length- 4.8 km. 2 13.2 km • Second shortest link. • Cross drainage work is required at six locations. • Covers more cultivable area • Two stage pumping is required with total lift of 350 m. • Total Gravity flow- 6.5 km(49%) • Tunnel Length- 3.5 km. 3 18.6 km • Longest link. • Cross drainage work is required at nine locations. • Three stage pumping is required with total lift of 311 m • Total Gravity flow- 12.5 km (67%) • Tunnel Length- 3.1 km. 4 15.2 km • Cross drainage work is required at six locations • Covers more cultivable area • Two stage pumping is required with total lift of 360 m. • Total Gravity flow- 9.5 km(62.5%) • Tunnel Length- 3.3 km. Table-1: Comparison of Alignments
  • 8. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 07 | July 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 2987 4.1 Scope for future studies a) The project can be used as a base for cost estimation which will include the cost of Dam construction, Canal construction, Pumping Station and sump construction, Cost of Cutting & Filling of Earthwork, Cost of Pumping. The results may vary depending on the cost analysis and cost-benefit ratio, and the chosen alignment can be changed. b) Design of Tunnel, c) Design of Canal, d) Design of Pipeline. REFERENCES [1] Anupriya and Chamat L 2018 Study of interlinking of riversbyusingGeographic InformationSystem (GIS)withQUANTUM- GIS IJERT vol. 7 issue 03. [2] Patel A, Singh N and Prakash I 2015 Planning of river inter- linking canal system between Shetrunji river and Dhatarwadi river, Saurashtra, India, using remote sensing and GIS IJSTE vol 1 issue 11. [3] Kanjani H, Motiani A, Prakash I and Mehmood K 2016 Selection of inter-linking canal alignment from Kadana Dam to Watrak Dam, Gujarat, using remote sensing and GIS IJSTE vol 2 issue 11. [4] Krishnaveni M, Prakashvel J, Kaarmegam M 2003 GIS and Visualisation Capabilities for Interlinking of Indian Rivers [5] Integrated State Water Plan for Godavari Basin in Maharashtra Volume 1: Integrated Plan 2017 [6] Integrated State Water Plan for West Flowing River Basin in Maharashtra Volume II: Integrated Plan 2018