International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 04 | Apr 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 115
Project Review Management System
Neha Aadke1, Pratika Chavan2, Vighnesh Ganji3, Nikhil Gupta4 , Asst. Prof. Priyanka Bhilare5
1B.E. Computer Science, Rajiv Gandhi Institute of Technology, Mumbai University, Maharashtra, India
2B.E. Computer Science, Rajiv Gandhi Institute of Technology, Mumbai University, Maharashtra, India
3B.E. Computer Science, Rajiv Gandhi Institute of Technology, Mumbai University, Maharashtra, India
4B.E. Computer Science, Rajiv Gandhi Institute of Technology, Mumbai University, Maharashtra, India
5Assistant Professor, Dept. of Computer Science Engineering, Rajiv Gandhi Institute of Technology, Mumbai
University, Maharashtra, India
---------------------------------------------------------------------***---------------------------------------------------------------------
Abstract - Project reviews play a crucial role in effective
project management by facilitating progress evaluation,
identifying improvement opportunities, and ensuring
alignment with project objectives. However, conducting
project reviews can be a challenging and time-consuming
process, requiring coordination among multiple
stakeholders and data sources. To tackle these challenges,
we propose the Project Review Management System
(PRMS), a web-based platform designed to streamline the
project review process, automate data collection and
analysis, and enable real-time reporting and collaboration.
Our system employs cutting-edge technology and robust
features to simplify the project review process and provide
users with an intuitive interface for easy navigation.
This paper outlines the design, development, and evaluation
of the PRMS, including its key features and functionalities.
We also discuss the potential impact of the system on
project management and provide evidence-based
recommendations for its implementation. The PRMS has the
potential to revolutionize the project review process,
improving efficiency, reducing errors, and enhancing
collaboration among stakeholders. By automating data
collection and analysis, our system reduces the burden on
project managers, enabling them to focus on critical
decision-making and action planning.
1. INTRODUCTION
Project reviews play a vital role in project management, as
they enable project managers to evaluate the progress
made towards achieving project goals, identify any issues,
and take corrective actions to ensure project success.
However, the conventional approach to conducting project
reviews can be tedious, time-consuming, and error-prone,
involving multiple stakeholders and documentation
reviews.
To overcome these challenges, we have developed the
Project Review Management System (PRMS), a cutting-
edge web-based platform that streamlines the project
review process, automates data collection and analysis,
and facilitates real-time reporting and collaboration. The
PRMS offers a user-friendly interface that simplifies the
review process, making it faster and more efficient, and
enables project managers and stakeholders to get a
comprehensive view of project performance.
The PRMS offers a range of advanced features, including a
centralized database that stores project-related data,
automated data collection and analysis tools, customizable
dashboards and reports, and collaboration tools that
enable stakeholders to work together in real time. These
features enable project managers to monitor project
progress and performance in real-time, identify issues as
they arise, and take corrective actions promptly to ensure
project success.
The PRMS also offers a range of benefits to project
managers and stakeholders, including increased
transparency and accountability, reduced costs and delays,
improved decision-making, and enhanced communication
and collaboration. With the PRMS, project managers can
ensure that their projects are on track, identify any issues
early on, and take corrective actions promptly to ensure
project success.
2. LITERATURE SURVEY
2.1 Existing system
[1]The user's information needs can be met through a
search query, which serves as an input to a search box.
The query is then processed by the search system, which
retrieves relevant information based on the query's
content.
[2]To design and develop a comprehensive system that
encompasses all aspects of project review in a university
setting. This system effectively addresses challenges
related to declaration review, and process management of
research projects, and enhances project management
efficiency, thereby reducing the workload of project
management personnel.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 04 | Apr 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 116
[3]We aim to develop and deploy a web-based project
management software solution with accompanying mobile
applications, featuring a robust integration with
Geographic Information Systems (GIS) technology for
enhanced functionality and effectiveness.
[4]An evaluation of current software projects reveals that
researchers are inclined to propose frameworks for
application development and strategies for incorporating
these frameworks into project workflows, with the aim of
advancing this field.
2.2 Drawbacks
[1]This model was experiencing issues with retrieval due
to the presence of several bugs. These bugs were
impacting the accuracy and completeness of search results
by causing errors in the model's algorithms, data
structures, or input data. As a result, the retrieval process
was unable to function correctly and was returning
incomplete, inaccurate, or irrelevant information.
[2]The papers and documents that were uploaded were
not accessible to other students due to an access control
limitation. The system may have been designed to restrict
access to only the user who uploaded the files or a specific
group of users. As a result, other students who did not
have the required access permissions were unable to view
or access the uploaded papers and documents.
[3]The system lacked a resource management and time
tracking feature, which would have allowed for the
efficient allocation of resources and tracking of time spent
on tasks. This feature could have enabled users to assign
tasks to team members, track progress, and monitor the
utilization of resources such as staff, equipment, and
materials.
[4]To systematically identify, categorize, and evaluate the
various methods and predictors used in the planning and
assessment of requirements for project management.
3. PROPOSED SYSTEM
Our goal is to develop a comprehensive Review
Management System that offers a user-friendly and
efficient platform for students and guides to effectively
manage their projects. The system will streamline the
entire project management process, from the initial
creation of groups and the assignment of guides to the
final review and project submission.
To achieve this, the platform will enable groups to easily
track their progress, hold discussions about the project,
submit their work, and observe completed similar projects
for reference. Additionally, guides will be able to keep
accurate records of every group's progress, communicate
effectively with groups, review and evaluate projects, and
manage reports with ease.
The system will leverage cutting-edge technology and
robust features to ensure that all stakeholders can use the
platform conveniently and securely. Through a simple and
intuitive interface, users will be able to perform all
necessary tasks and monitor the status of their projects in
real time. Our aim is to create a dynamic and user-friendly
platform that helps students and guides achieve their
project management goals efficiently and effectively.
4. SYSTEM ARCHITECTURE
The proposed project review management system enables
three types of users, namely project coordinators, project
guides, and students, to access the website for performing
different tasks. The system initiates the selection of
project guides for specific domains based on faculty
preference, followed by a broadcast notice by the project
coordinator for project groups to submit reference
research papers related to the project topic. The system
requires the submission of three different reference
papers from distinct domains, which are then assigned to
the staff according to the domain preferences of the
guides, using paper distribution algorithms.
Fig: 1.1 System architecture
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 04 | Apr 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 117
Once the reference papers are available, the algorithm is
utilized to ensure the even distribution of groups to the
guides, ensuring consistency in the number of groups
assigned to each guide. After allocating the guide, the
project planning phase commences, requiring a proper
plan for scheduling and developing each task. The system
checks for the availability of resources and estimates the
development cost for the complete project. The
distribution of work among group members is another
crucial task to ensure proper planning, providing each
member with a clear idea of the assigned work.
The project execution phase follows the project planning
phase, where each member completes their assigned task
within the original timeline. In case of work remains
unfinished, the system reschedules the work, creating a
new timeline for the project. The project controls are
monitored, and reports are assessed from time to time to
ensure successful project completion. The final step
involves the repository and memory phase, where
different roles are assigned to group members, checking
all requirement issues.
The project review management system utilizes advanced
algorithms and resource planning techniques, providing a
seamless experience for project coordinators, project
guides, and students. The system ensures efficient project
execution and monitoring, enabling successful project
completion within the specified timeline and cost.
5. ALGORITHM
We have designed the algorithm which will be suitable for
the proposed system.
Steps:
1. Start
2. Int minNoOfPapers, maxNoOfPapers
3. Input numberOfGroup, numberOfGuide,
numberOfPapers, numberOfDomain
4. minNoOfPapers = (numberOfGroup /
numberOfGuide)*[(
numberOfPapers)mod(numberOfDomain)]
5. maxNoOfPapers = minNoOfPapers +
numberOfDomain - [(
numberOfPapers)mod(numberOfDomain)]
6. numberOfPapersOfParticularDomain =
(avgOfMinMax)/(numberOfDomainOfParticularGuide)
7. IF allocatedPapers < minNoOfPapers then enter in
list1
8. IF minNoOfPapers < allocatedPapers <
maxNoOfPapers then enter in list2
9. IF allocatedPapers = maxNoOfPapers enter in
list3
10. Repeat the above steps till list1 and list2 become
empty.
6. METHODOLOGY
The process of assessing and reviewing student projects
can be challenging, as it is typically done manually and can
result in inconsistent records, missing records, and
difficulty tracking projects. The criteria for these projects
include originality of the idea, project domain clarity, and
feasible solutions. To address these issues, a project
management system has been developed that stores
projects year-wise, allowing professors to easily search
and compare them with previous projects. Students can
also search and take snippets from previous projects to
improve their own. This system aims to improve the
management of student projects and make the process
more efficient.
Project reviews are an essential part of project
management, but the traditional approach can be
cumbersome and time-consuming. The Project Review
Management System (PRMS) has been developed to
streamline the review process and automate data
collection and analysis. This web-based platform enables
real-time reporting and collaboration, simplifying the
review process and providing project managers with a
comprehensive view of project performance. The PRMS is
designed to address the challenges associated with
traditional project reviews, which often involve meetings,
documentation reviews, and data analysis, leading to
delays and inefficiencies. With the help of the PRMS, the
project review process can be made more efficient and
effective, improving project management and ensuring
that project goals are met.
6.1 Phase -1: Orientation
The initial paper selection and domain selection processes
will take place in this phase. Here, the project coordinator
will oversee the papers submitted by each group, assign
them to the guides for approval or rejection, and then
carry out the guide allocation process.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 10 Issue: 04 | Apr 2023 www.irjet.net p-ISSN: 2395-0072
© 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 118
6.2 Phase -2: Title Finalization
Groups submit project topics and abstracts, and after
extensive discussion about the topics, including prior
work, current needs, and future scope, a topic is chosen.
6.3 Phase -3: Literature Review / Survey
The topic and its domain are thoroughly and properly
researched. This begins with a literature review, which
should be done to gain a deeper understanding of the
issue.
6.4 Phase -4: Problem statement submission
The problem statement is created by the group after they
have a thorough understanding of the current system and
its shortcomings. The issue or challenge that the project
seeks to address is outlined in this problem statement. It
gives a precise and succinct explanation of the issue, its
history, and its importance.
6.5 Phase -5: Proposed System
A well-prepared system should be proposed after a
thorough analysis of the current system. An explanation of
a proposed system's goal, functionality, features, and
implementation strategy could be included. The suggested
system might also have a budget, a development schedule,
and a testing and deployment strategy.
6.6 Phase -6: List of algorithms
The groups should decide on or prepare the algorithms
needed for the project, and then list them accordingly.
6.7 Phase -7: Implementation
The project's implementation ought to get going. Both
parties (groups and guides) will be able to easily track the
work completed if a progress timeline is maintained for
efficient work progress. Software engineering principles
can be used to implement this.
6.8 Phase -8: Final Report
The groups should publish their work on paper and
complete the project's implementation and testing.
7. FUTURE ASPECTS
Project managers and stakeholders will welcome the
PRMS, or Project Review Management System, as it is a
system created to streamline the project review process,
save time and effort, and offer insightful information about
project performance.
A well-managed system for project review management is
what the proposed system aims to provide. By adding
features like team-building, project templates, competitive
events, report generation, email, and mobile integration
for real-time notifications, as well as by expanding the
user base, it will be further improved in the future.
8. CONCLUSION
With PRMS, Project managers can quickly identify
problem areas and take corrective action thanks to the
automated data collection and analysis modules, which
enable real-time metrics and insights into project
performance. The system's user-friendly, intuitive, and
effective design, complemented by a contemporary
interface, will undoubtedly be valued.
Overall, the PRMS will show itself to be a trustworthy and
efficient solution for managing projects, offering the best
user experience and insightful data on project
performance. Any organization seeking to increase the
efficiency and effectiveness of project management will
find the system to be a valuable asset because of its
simplicity of use, extensive reporting capabilities, and
automated data collection and analysis.
REFERENCES
[1] Z. Yan, G. Wei, L. Dongdong, N. Lei, and Y. Mengran,
“University Research Project Management System based
on Cloud Platform,” 2020 International Conference on Big
Data and Informatization Education (ICBDIE), 2020.
[2] A. Anand, U. Sharma, and D. Kumar, “Information
retrieval in computing model,” 2019 International
Conference on Intelligent Computing and Control Systems
(ICCS), 2019.
[3] “Plan projects from start to finish.,” monday.com.
[Online].Available: https://monday.com/project-
management. [Accessed: 12-Aug-2022].
[4] P. Li, “Jira 8 essentials: Effective issue management
and project tracking with the latest jira features,” Jira
Software.

More Related Content

Similar to Project Review Management System Streamlines Process

Issues of Embedded System Component Based Development in Mesh Networks
Issues of Embedded System  Component Based Development in Mesh NetworksIssues of Embedded System  Component Based Development in Mesh Networks
Issues of Embedded System Component Based Development in Mesh NetworksIRJET Journal
 
D0365030036
D0365030036D0365030036
D0365030036theijes
 
IRJET- Web based Project Management Systems for Small to Midsize Business...
IRJET-  	  Web based Project Management Systems for Small to Midsize Business...IRJET-  	  Web based Project Management Systems for Small to Midsize Business...
IRJET- Web based Project Management Systems for Small to Midsize Business...IRJET Journal
 
SPRING BOOT BASED TASK HANDLER.pptx
SPRING BOOT BASED TASK HANDLER.pptxSPRING BOOT BASED TASK HANDLER.pptx
SPRING BOOT BASED TASK HANDLER.pptxSWETHAABIRAMIM
 
Student University Network
Student University NetworkStudent University Network
Student University NetworkIRJET Journal
 
DESIGN PATTERNS IN THE WORKFLOW IMPLEMENTATION OF MARINE RESEARCH GENERAL INF...
DESIGN PATTERNS IN THE WORKFLOW IMPLEMENTATION OF MARINE RESEARCH GENERAL INF...DESIGN PATTERNS IN THE WORKFLOW IMPLEMENTATION OF MARINE RESEARCH GENERAL INF...
DESIGN PATTERNS IN THE WORKFLOW IMPLEMENTATION OF MARINE RESEARCH GENERAL INF...AM Publications
 
Web Based School Administration System
Web Based School Administration SystemWeb Based School Administration System
Web Based School Administration SystemIRJET Journal
 
A SURVEY ON ACCURACY OF REQUIREMENT TRACEABILITY LINKS DURING SOFTWARE DEVELO...
A SURVEY ON ACCURACY OF REQUIREMENT TRACEABILITY LINKS DURING SOFTWARE DEVELO...A SURVEY ON ACCURACY OF REQUIREMENT TRACEABILITY LINKS DURING SOFTWARE DEVELO...
A SURVEY ON ACCURACY OF REQUIREMENT TRACEABILITY LINKS DURING SOFTWARE DEVELO...ijiert bestjournal
 
Attendance management system project report.
Attendance management system project report.Attendance management system project report.
Attendance management system project report.Manoj Kumar
 
Alumni Management System – Web Application
Alumni Management System – Web ApplicationAlumni Management System – Web Application
Alumni Management System – Web ApplicationIRJET Journal
 
Alumni Management System -Web Application
Alumni Management System -Web ApplicationAlumni Management System -Web Application
Alumni Management System -Web ApplicationMandy Brown
 
Online Exam Management System
Online Exam Management SystemOnline Exam Management System
Online Exam Management SystemIRJET Journal
 
How To Build a Dynamic Civil Project Management System Using Java
How To Build a Dynamic Civil Project Management System Using JavaHow To Build a Dynamic Civil Project Management System Using Java
How To Build a Dynamic Civil Project Management System Using JavaInexture Solutions
 
Task Mode Task Name DurationStart Time Finish1Set .docx
Task Mode Task Name DurationStart Time Finish1Set .docxTask Mode Task Name DurationStart Time Finish1Set .docx
Task Mode Task Name DurationStart Time Finish1Set .docxjosies1
 
A Web-Based Project Management System
A Web-Based Project Management SystemA Web-Based Project Management System
A Web-Based Project Management SystemLori Moore
 
A Survey on Design of Online Judge System
A Survey on Design of Online Judge SystemA Survey on Design of Online Judge System
A Survey on Design of Online Judge SystemIRJET Journal
 
DESQA a Software Quality Assurance Framework
DESQA a Software Quality Assurance FrameworkDESQA a Software Quality Assurance Framework
DESQA a Software Quality Assurance FrameworkIJERA Editor
 
Online Exam Management System(OEMS)
Online Exam Management System(OEMS)Online Exam Management System(OEMS)
Online Exam Management System(OEMS)PUST
 
Eclipse Code Monitoring Utility
Eclipse Code Monitoring UtilityEclipse Code Monitoring Utility
Eclipse Code Monitoring UtilityIRJET Journal
 

Similar to Project Review Management System Streamlines Process (20)

Issues of Embedded System Component Based Development in Mesh Networks
Issues of Embedded System  Component Based Development in Mesh NetworksIssues of Embedded System  Component Based Development in Mesh Networks
Issues of Embedded System Component Based Development in Mesh Networks
 
D0365030036
D0365030036D0365030036
D0365030036
 
IRJET- Web based Project Management Systems for Small to Midsize Business...
IRJET-  	  Web based Project Management Systems for Small to Midsize Business...IRJET-  	  Web based Project Management Systems for Small to Midsize Business...
IRJET- Web based Project Management Systems for Small to Midsize Business...
 
SPRING BOOT BASED TASK HANDLER.pptx
SPRING BOOT BASED TASK HANDLER.pptxSPRING BOOT BASED TASK HANDLER.pptx
SPRING BOOT BASED TASK HANDLER.pptx
 
Student University Network
Student University NetworkStudent University Network
Student University Network
 
DESIGN PATTERNS IN THE WORKFLOW IMPLEMENTATION OF MARINE RESEARCH GENERAL INF...
DESIGN PATTERNS IN THE WORKFLOW IMPLEMENTATION OF MARINE RESEARCH GENERAL INF...DESIGN PATTERNS IN THE WORKFLOW IMPLEMENTATION OF MARINE RESEARCH GENERAL INF...
DESIGN PATTERNS IN THE WORKFLOW IMPLEMENTATION OF MARINE RESEARCH GENERAL INF...
 
Web Based School Administration System
Web Based School Administration SystemWeb Based School Administration System
Web Based School Administration System
 
A SURVEY ON ACCURACY OF REQUIREMENT TRACEABILITY LINKS DURING SOFTWARE DEVELO...
A SURVEY ON ACCURACY OF REQUIREMENT TRACEABILITY LINKS DURING SOFTWARE DEVELO...A SURVEY ON ACCURACY OF REQUIREMENT TRACEABILITY LINKS DURING SOFTWARE DEVELO...
A SURVEY ON ACCURACY OF REQUIREMENT TRACEABILITY LINKS DURING SOFTWARE DEVELO...
 
Attendance management system project report.
Attendance management system project report.Attendance management system project report.
Attendance management system project report.
 
Alumni Management System – Web Application
Alumni Management System – Web ApplicationAlumni Management System – Web Application
Alumni Management System – Web Application
 
Alumni Management System -Web Application
Alumni Management System -Web ApplicationAlumni Management System -Web Application
Alumni Management System -Web Application
 
Online Exam Management System
Online Exam Management SystemOnline Exam Management System
Online Exam Management System
 
How To Build a Dynamic Civil Project Management System Using Java
How To Build a Dynamic Civil Project Management System Using JavaHow To Build a Dynamic Civil Project Management System Using Java
How To Build a Dynamic Civil Project Management System Using Java
 
Task Mode Task Name DurationStart Time Finish1Set .docx
Task Mode Task Name DurationStart Time Finish1Set .docxTask Mode Task Name DurationStart Time Finish1Set .docx
Task Mode Task Name DurationStart Time Finish1Set .docx
 
A Web-Based Project Management System
A Web-Based Project Management SystemA Web-Based Project Management System
A Web-Based Project Management System
 
Web Testing
Web TestingWeb Testing
Web Testing
 
A Survey on Design of Online Judge System
A Survey on Design of Online Judge SystemA Survey on Design of Online Judge System
A Survey on Design of Online Judge System
 
DESQA a Software Quality Assurance Framework
DESQA a Software Quality Assurance FrameworkDESQA a Software Quality Assurance Framework
DESQA a Software Quality Assurance Framework
 
Online Exam Management System(OEMS)
Online Exam Management System(OEMS)Online Exam Management System(OEMS)
Online Exam Management System(OEMS)
 
Eclipse Code Monitoring Utility
Eclipse Code Monitoring UtilityEclipse Code Monitoring Utility
Eclipse Code Monitoring Utility
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...Call girls in Ahmedabad High profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 

Recently uploaded (20)

Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
High Profile Call Girls Dahisar Arpita 9907093804 Independent Escort Service ...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 

Project Review Management System Streamlines Process

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 04 | Apr 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 115 Project Review Management System Neha Aadke1, Pratika Chavan2, Vighnesh Ganji3, Nikhil Gupta4 , Asst. Prof. Priyanka Bhilare5 1B.E. Computer Science, Rajiv Gandhi Institute of Technology, Mumbai University, Maharashtra, India 2B.E. Computer Science, Rajiv Gandhi Institute of Technology, Mumbai University, Maharashtra, India 3B.E. Computer Science, Rajiv Gandhi Institute of Technology, Mumbai University, Maharashtra, India 4B.E. Computer Science, Rajiv Gandhi Institute of Technology, Mumbai University, Maharashtra, India 5Assistant Professor, Dept. of Computer Science Engineering, Rajiv Gandhi Institute of Technology, Mumbai University, Maharashtra, India ---------------------------------------------------------------------***--------------------------------------------------------------------- Abstract - Project reviews play a crucial role in effective project management by facilitating progress evaluation, identifying improvement opportunities, and ensuring alignment with project objectives. However, conducting project reviews can be a challenging and time-consuming process, requiring coordination among multiple stakeholders and data sources. To tackle these challenges, we propose the Project Review Management System (PRMS), a web-based platform designed to streamline the project review process, automate data collection and analysis, and enable real-time reporting and collaboration. Our system employs cutting-edge technology and robust features to simplify the project review process and provide users with an intuitive interface for easy navigation. This paper outlines the design, development, and evaluation of the PRMS, including its key features and functionalities. We also discuss the potential impact of the system on project management and provide evidence-based recommendations for its implementation. The PRMS has the potential to revolutionize the project review process, improving efficiency, reducing errors, and enhancing collaboration among stakeholders. By automating data collection and analysis, our system reduces the burden on project managers, enabling them to focus on critical decision-making and action planning. 1. INTRODUCTION Project reviews play a vital role in project management, as they enable project managers to evaluate the progress made towards achieving project goals, identify any issues, and take corrective actions to ensure project success. However, the conventional approach to conducting project reviews can be tedious, time-consuming, and error-prone, involving multiple stakeholders and documentation reviews. To overcome these challenges, we have developed the Project Review Management System (PRMS), a cutting- edge web-based platform that streamlines the project review process, automates data collection and analysis, and facilitates real-time reporting and collaboration. The PRMS offers a user-friendly interface that simplifies the review process, making it faster and more efficient, and enables project managers and stakeholders to get a comprehensive view of project performance. The PRMS offers a range of advanced features, including a centralized database that stores project-related data, automated data collection and analysis tools, customizable dashboards and reports, and collaboration tools that enable stakeholders to work together in real time. These features enable project managers to monitor project progress and performance in real-time, identify issues as they arise, and take corrective actions promptly to ensure project success. The PRMS also offers a range of benefits to project managers and stakeholders, including increased transparency and accountability, reduced costs and delays, improved decision-making, and enhanced communication and collaboration. With the PRMS, project managers can ensure that their projects are on track, identify any issues early on, and take corrective actions promptly to ensure project success. 2. LITERATURE SURVEY 2.1 Existing system [1]The user's information needs can be met through a search query, which serves as an input to a search box. The query is then processed by the search system, which retrieves relevant information based on the query's content. [2]To design and develop a comprehensive system that encompasses all aspects of project review in a university setting. This system effectively addresses challenges related to declaration review, and process management of research projects, and enhances project management efficiency, thereby reducing the workload of project management personnel.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 04 | Apr 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 116 [3]We aim to develop and deploy a web-based project management software solution with accompanying mobile applications, featuring a robust integration with Geographic Information Systems (GIS) technology for enhanced functionality and effectiveness. [4]An evaluation of current software projects reveals that researchers are inclined to propose frameworks for application development and strategies for incorporating these frameworks into project workflows, with the aim of advancing this field. 2.2 Drawbacks [1]This model was experiencing issues with retrieval due to the presence of several bugs. These bugs were impacting the accuracy and completeness of search results by causing errors in the model's algorithms, data structures, or input data. As a result, the retrieval process was unable to function correctly and was returning incomplete, inaccurate, or irrelevant information. [2]The papers and documents that were uploaded were not accessible to other students due to an access control limitation. The system may have been designed to restrict access to only the user who uploaded the files or a specific group of users. As a result, other students who did not have the required access permissions were unable to view or access the uploaded papers and documents. [3]The system lacked a resource management and time tracking feature, which would have allowed for the efficient allocation of resources and tracking of time spent on tasks. This feature could have enabled users to assign tasks to team members, track progress, and monitor the utilization of resources such as staff, equipment, and materials. [4]To systematically identify, categorize, and evaluate the various methods and predictors used in the planning and assessment of requirements for project management. 3. PROPOSED SYSTEM Our goal is to develop a comprehensive Review Management System that offers a user-friendly and efficient platform for students and guides to effectively manage their projects. The system will streamline the entire project management process, from the initial creation of groups and the assignment of guides to the final review and project submission. To achieve this, the platform will enable groups to easily track their progress, hold discussions about the project, submit their work, and observe completed similar projects for reference. Additionally, guides will be able to keep accurate records of every group's progress, communicate effectively with groups, review and evaluate projects, and manage reports with ease. The system will leverage cutting-edge technology and robust features to ensure that all stakeholders can use the platform conveniently and securely. Through a simple and intuitive interface, users will be able to perform all necessary tasks and monitor the status of their projects in real time. Our aim is to create a dynamic and user-friendly platform that helps students and guides achieve their project management goals efficiently and effectively. 4. SYSTEM ARCHITECTURE The proposed project review management system enables three types of users, namely project coordinators, project guides, and students, to access the website for performing different tasks. The system initiates the selection of project guides for specific domains based on faculty preference, followed by a broadcast notice by the project coordinator for project groups to submit reference research papers related to the project topic. The system requires the submission of three different reference papers from distinct domains, which are then assigned to the staff according to the domain preferences of the guides, using paper distribution algorithms. Fig: 1.1 System architecture
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 04 | Apr 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 117 Once the reference papers are available, the algorithm is utilized to ensure the even distribution of groups to the guides, ensuring consistency in the number of groups assigned to each guide. After allocating the guide, the project planning phase commences, requiring a proper plan for scheduling and developing each task. The system checks for the availability of resources and estimates the development cost for the complete project. The distribution of work among group members is another crucial task to ensure proper planning, providing each member with a clear idea of the assigned work. The project execution phase follows the project planning phase, where each member completes their assigned task within the original timeline. In case of work remains unfinished, the system reschedules the work, creating a new timeline for the project. The project controls are monitored, and reports are assessed from time to time to ensure successful project completion. The final step involves the repository and memory phase, where different roles are assigned to group members, checking all requirement issues. The project review management system utilizes advanced algorithms and resource planning techniques, providing a seamless experience for project coordinators, project guides, and students. The system ensures efficient project execution and monitoring, enabling successful project completion within the specified timeline and cost. 5. ALGORITHM We have designed the algorithm which will be suitable for the proposed system. Steps: 1. Start 2. Int minNoOfPapers, maxNoOfPapers 3. Input numberOfGroup, numberOfGuide, numberOfPapers, numberOfDomain 4. minNoOfPapers = (numberOfGroup / numberOfGuide)*[( numberOfPapers)mod(numberOfDomain)] 5. maxNoOfPapers = minNoOfPapers + numberOfDomain - [( numberOfPapers)mod(numberOfDomain)] 6. numberOfPapersOfParticularDomain = (avgOfMinMax)/(numberOfDomainOfParticularGuide) 7. IF allocatedPapers < minNoOfPapers then enter in list1 8. IF minNoOfPapers < allocatedPapers < maxNoOfPapers then enter in list2 9. IF allocatedPapers = maxNoOfPapers enter in list3 10. Repeat the above steps till list1 and list2 become empty. 6. METHODOLOGY The process of assessing and reviewing student projects can be challenging, as it is typically done manually and can result in inconsistent records, missing records, and difficulty tracking projects. The criteria for these projects include originality of the idea, project domain clarity, and feasible solutions. To address these issues, a project management system has been developed that stores projects year-wise, allowing professors to easily search and compare them with previous projects. Students can also search and take snippets from previous projects to improve their own. This system aims to improve the management of student projects and make the process more efficient. Project reviews are an essential part of project management, but the traditional approach can be cumbersome and time-consuming. The Project Review Management System (PRMS) has been developed to streamline the review process and automate data collection and analysis. This web-based platform enables real-time reporting and collaboration, simplifying the review process and providing project managers with a comprehensive view of project performance. The PRMS is designed to address the challenges associated with traditional project reviews, which often involve meetings, documentation reviews, and data analysis, leading to delays and inefficiencies. With the help of the PRMS, the project review process can be made more efficient and effective, improving project management and ensuring that project goals are met. 6.1 Phase -1: Orientation The initial paper selection and domain selection processes will take place in this phase. Here, the project coordinator will oversee the papers submitted by each group, assign them to the guides for approval or rejection, and then carry out the guide allocation process.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 10 Issue: 04 | Apr 2023 www.irjet.net p-ISSN: 2395-0072 © 2023, IRJET | Impact Factor value: 8.226 | ISO 9001:2008 Certified Journal | Page 118 6.2 Phase -2: Title Finalization Groups submit project topics and abstracts, and after extensive discussion about the topics, including prior work, current needs, and future scope, a topic is chosen. 6.3 Phase -3: Literature Review / Survey The topic and its domain are thoroughly and properly researched. This begins with a literature review, which should be done to gain a deeper understanding of the issue. 6.4 Phase -4: Problem statement submission The problem statement is created by the group after they have a thorough understanding of the current system and its shortcomings. The issue or challenge that the project seeks to address is outlined in this problem statement. It gives a precise and succinct explanation of the issue, its history, and its importance. 6.5 Phase -5: Proposed System A well-prepared system should be proposed after a thorough analysis of the current system. An explanation of a proposed system's goal, functionality, features, and implementation strategy could be included. The suggested system might also have a budget, a development schedule, and a testing and deployment strategy. 6.6 Phase -6: List of algorithms The groups should decide on or prepare the algorithms needed for the project, and then list them accordingly. 6.7 Phase -7: Implementation The project's implementation ought to get going. Both parties (groups and guides) will be able to easily track the work completed if a progress timeline is maintained for efficient work progress. Software engineering principles can be used to implement this. 6.8 Phase -8: Final Report The groups should publish their work on paper and complete the project's implementation and testing. 7. FUTURE ASPECTS Project managers and stakeholders will welcome the PRMS, or Project Review Management System, as it is a system created to streamline the project review process, save time and effort, and offer insightful information about project performance. A well-managed system for project review management is what the proposed system aims to provide. By adding features like team-building, project templates, competitive events, report generation, email, and mobile integration for real-time notifications, as well as by expanding the user base, it will be further improved in the future. 8. CONCLUSION With PRMS, Project managers can quickly identify problem areas and take corrective action thanks to the automated data collection and analysis modules, which enable real-time metrics and insights into project performance. The system's user-friendly, intuitive, and effective design, complemented by a contemporary interface, will undoubtedly be valued. Overall, the PRMS will show itself to be a trustworthy and efficient solution for managing projects, offering the best user experience and insightful data on project performance. Any organization seeking to increase the efficiency and effectiveness of project management will find the system to be a valuable asset because of its simplicity of use, extensive reporting capabilities, and automated data collection and analysis. REFERENCES [1] Z. Yan, G. Wei, L. Dongdong, N. Lei, and Y. Mengran, “University Research Project Management System based on Cloud Platform,” 2020 International Conference on Big Data and Informatization Education (ICBDIE), 2020. [2] A. Anand, U. Sharma, and D. Kumar, “Information retrieval in computing model,” 2019 International Conference on Intelligent Computing and Control Systems (ICCS), 2019. [3] “Plan projects from start to finish.,” monday.com. [Online].Available: https://monday.com/project- management. [Accessed: 12-Aug-2022]. [4] P. Li, “Jira 8 essentials: Effective issue management and project tracking with the latest jira features,” Jira Software.