International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7277
TRAFFIC IMPACT ASSESSMENT IN VIJAYAWADA AT JUNCTION, COMMERICAL
AND INDUSTRIAL AREA
1MRS.KAJA SRI BINDU, 2VADLAPATLA NAVYA, 3VELLANKI JASWANTH, 4NIDDANA ASHOK
1Assistant Professor, 2Bachelor of Technology, 3Bachelor of Technology,4Bachelor of Technology
Department of Civil Engineering,
Dhanekula Institute of Engineering and Technology, Ganguru,
Vijayawada, Andhra Pradesh, India, 521139
Abstract – Vijayawada is a city in the southeast Indian state of Andhra Pradesh. The present project is on the traffic impact studies at
the Mall and Multiplex area in Benz circle, Industrial area in Autonagar and commercial area in 1-town Traffic Impact
Assessment(TIA) is a powerful tool for engineers and planners to determine the possible effects of a project on the transportation and
traffic system and also includes formulation of traffic management schemes and recommendation of infrastructure for possible
transportation and traffic problems that encountered during the construction and operation phases of projects .often it is appliedonlyto
the direct area and countermeasures for potential negative impacts are specific for the development.
The three main parameters of traffic are volume, speed and density. In the absence of effective planning and traffic management of the
city, the current road infrastructure cannot cater the future needs of the city. pedestrian and vehicle volumes have increasedsignificantly
in last decade due to the change of the economics of the middle-class families. Hence the results from present study are helpful in
estimating future traffic, controlling the traffic at intersection and also reducing the accident rate.
Key Words: Traffic Impact Assessment (TIA)
1.INTRODUCTION
A traffic impact study is a study which assesses the effect that a particular development has on the transportation network. A traffic
impact study is generally required by roads authorities to evaluate the impact of changeinthelanduse.Atrafficimpactstudyvariesin
complexity depending on the size of the development, the current and proposed landuseandthelocationofthedevelopment.Various
traffic engineering concepts and principles are applied whileconductinga trafficimpactassessment. Wehaveconductedtrafficimpact
study for various areas like mall & multiplex building, Commercial area and industry
The purpose of the study is to assess the impact of the Mall & Multiplex area - Trendset mall at Benz circle, Commercial area – 1-town
at Indrakeeladri, Industrial area – Autonagar under Krishna Dist. Andhra Pradesh state on the surrounding and adjacent
transportation network and to identify potential mitigation measures, which may be necessary to offset any impacts associated with
the use.
Objectives:
 Assess impact of traffic due to new development.
 Support subdivision of land applications.
 Prepare mitigation plans
 Development access and on-site circulation plans.
 Usage of modern techniques to analyze it.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7278
TRAFFIC IMPACT ANALYSIS:
Typically, a traffic operations analysis is conducted whenever a proposed development compromises the
existing design standards and therefore may causesafetyandoperationalproblemsintheimmediatevicinity
of the site. The analysis should be done for the entire system and not just the road or access point under
consideration.
TheTIAconsidersaShort-TermDevelopmentScenarioandaLong-Term DevelopmentScenariothatcomprise
the following:
Short Term Development Scenario:
Development scenario for the study area that is likely to be achieved within 1 to 5 years.
Long Term Development Scenario:
Development scenario for the study area that could possibly be achieved within 5to 10 years.
The remainder of the TIA analyses the possible traffic impact that development on thissitewillhaveontheroad
network and makes recommendations on the extent of access and road infrastructure upgrading required to
ensure that traffic congestion levels duringthe peak periods are kept within acceptable limits. In places where
road infrastructureupgradingisnotpossibleandcongestionlevelsareexpectedtobe unacceptablyhigh,theTIA
makesrecommendationsondevelopmentlimitations that should be imposed on the site.
LOCATION AND STUDYAREAS:
MALL & MULTIPLEX AREA:
Mall & Multiplex area considered here is Trendset mall located at M.G road, Vijayawada, Krishna Dist. Andhra
Pradesh. The study area is about 1km of radius from the mall. The site is strategically located & connected to Benz
Circle. The study site is strategically bounded by typical commercial, residential activities. It is well connected with
the arterial road system thus providing for excellent connectivity with thecity.
Fig 1(a): Study area shown on google maps
COMMERCIAL AREA
CommercialAreaconsideredhereis1-townlocatedatPrakasambarragenear Durgatempleroad,Vijayawada
Dist. Krishna. The study areais about 1km of radiusfromthe1-town.Thesiteisstrategicallylocated&connectedto
M.Groad, KaleshwararaoMarket road,KrishnaLankaroad,RailwayStationroad,Fly Over road. The study site is
situated at Vinayaka Temple cross Road. The study site is strategically bounded by typical commercial / semi-
residentialactivities.It is well connected with the arterial road system thus providing for excellent connectivity
with thecity.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7279
Fig 1(b): Study area shown on google maps
INDUSTRIAL AREA:
IndustrialareaconsideredhereisAutonagarlocatedatBandarroad,KrishnaDist. AndhraPradesh.Thestudyarea
isabout 1km ofradiusfromtheAutonagar. The site is strategically located and connected to Pantakaluva road,
Kanuru Road. The study site is strategically bounded by typical commercial, industrial, residential activities. It is
well connected with the arterial road system thus providingfor excellent connectivitywith the city.
Fig 1(c): Study area shown on google
DESCRIPTION OF THE SELECTEDAREAS:
MALL & MULTIPLEX
AREA Overview:
The Mall & Multiplex area considered here is Trendset mall it is situated on right side at 4-way junction on the
National Highway road. It is the biggest mall in the Vijayawada city. The study area that is considered here is about
1km radius from the junction.
Terrain:
The terrain proximate to and surrounding the site is generally classified as level. Existinglanduseandtraffic
controls in the vicinity.
The existing land use in the vicinity is configured with mixed activities comprising of residential and
commercialactivities.
COMMERCIAL
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7280
AREA Overview:
Commercialarea considered hereis1-townwhichis located at prakasam barrage near Durga temple road .Mostof the
business in the Vijayawada is done in this area. The study area that is consideredhereisabout1kmradiusfrom
thejunction.
Terrain:
The terrain proximate to and surrounding the site is generally classified as level. Existing land use and traffic
controls in the vicinity.
The existing land use in the vicinity is configured with mixed activities comprising of residential and
commercialactivities.
INDUSTRIAL
AREA Overview:
Industrial area considered here is Autonagar area. In the area surrounding to it we can find most of the industries
situated in the Vijayawada. We have considered Autonagar junction. The study area that is considered here is about
1km radius from the junction.
Terrain:
The terrain proximate to and surrounding the site is generally classified as “level”. Existing land use
and traffic controls in the vicinity.
Theexistinglanduseinthevicinityisconfiguredwithmixedactivitiescomprising of some residential and
mostlycommercialactivities.
MINIMUMSTUDYAREA–IDENTIFICATIONOFAREAOFINFLUENCEOF
DEVELOPMENT:
MALL & MULTIPLEXAREA
The Minimum Study Area should include all critical site access points as well as signalized and unsignalized
intersections adjacent to the site. In the present study, theroads andintersections inthe zonefrom Trendset
mall, KrishnaDist. Andhra Pradesh are treated as the minimum study area. The influence areaof thesite is
shownin figure. 2(a)
Fig 2(a): Connectivity location map of the selected site showing on
google earth map
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7281
COMMERCIAL AREA
The Minimum Study Area should include all critical site access points as well as signalized and unsignalized
intersections adjacent to the site. In the present study, the roads and intersections in the zone from 1-town,
VijayawadaDist.
Krishnaaretreatedastheminimumstudyarea.Theinfluenceareaofthesiteis shownin figure 2(b).
Fig 2(b): Connectivity location map of the selected site showing on google earth map
INDUSTRIAL AREA
The Minimum Study Area should include all critical site access points as well as signalized and unsignalized
intersections adjacent to the site. In the present study, the roads and intersections in the zone from Autonagar,
KrishnaDist.
AndhraPradesharetreatedastheminimumstudyarea.Theinfluenceareaof the site is shown in figure. 2(c)
Fig 2(c): Connectivity location map of the selected site showing on google earth map
STUDY METHODOLOGY:
The study examined the existing conditions in the areas selected in terms of the existing road network and
available public transport, pedestrian and cycle infrastructure.Futurepublictransportprovisionandinfrastructure
improvements proposed in the vicinity of the development were reviewed
Trafficvolumecounts,delaystudiesareconductedattheselectedsiteareasand arecomparedwiththeprevious
yeardataoftrafficvolume.
Future value of the traffic can be estimated based on the collected data. Based on this collected data
modification for the existing roads are suggested to improvetheroadfacilitiesanddecreasethetrafficcongestion.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7282
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7283
EXISTING ROAD NETWORK
MALL & MULTIPLEX AREA
The selected area falls along Benz Circle connect to M.G Road, near Trendset Mall and to the right connected to NTR Circle.
Fig 3(a): Digitized map of the selected area showing road networks on Arc GIS and AUTOCAD at Mall & Multiplex
Area
1.Benz Circle Junction: It is 4-way Junction connecting Myneni hotel Center, Shoppers Stop and Ramesh Hospital Signals.
2: Myneni Signals Junction: It is a 4-way Junction connecting roads from Polyclinic road, NTR circle, Benz Circle.
3.NTR Circle Junction: It is a 5- way Junction connecting roads from Trendset Mall Pantakaluva Road, NH-65.
COMMERCIAL AREA
The selected area falls along 1-town Junction & connected Durga temple junction, Kaleshwara Rao market road, 1-Town,
Prakasam barrage road and Kaleshwara Rao Flyover Road
1-town Junction: It is a 4-way Junction connecting Gollapudi, Mangalagiri ang M.G road.
Kotikalapudi - Modepalli Road: It is a 3-Way Junction connecting 1-town and KrishnaLanka road and Prakasam Barrage
Road.
Kaleshwara Rao Market road Junction: It is a T-way Junction connecting Nehru Road and Lower Bridge Road
Lower Bridge road Junction: It is a 4-way Junction connecting Police control Room, 1-town, Kaleshwara Rao main road,
Railway station road.
Flyover road junction: it is a major road connecting to the railway station, bus station road and flyover
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7284
Fig 3(b): Digitized map of the selected area showing road networks on Arc GIS and AUTOCAD at Commercial Area.
INDUSTRIAL AREA
The selected area falls along Autonagar Junction & connected psc Bose junction and NTR marg junction
Fig 3(c): Digitized map of the selected area showing road networks on Arc GIS and AUTOCAD at Industrial Area.
1: Autonagar Junction: It is a 4- way junction connecting 3 major roads Bandar road, Pantakaluva Road, PSC road and 1
minor road.
2: PSC Junction: It is a T-Junction connecting Autonagar junction road, Major road and Bandar road.
3: NTR Marg Junction: It is a Y-Junction connecting Autonagar junction road, Kanuru Road and Ballem road.
SURVEYS ORGANISED:
Following were the surveys conducted for the traffic impact assessment of the selected areas.
 3-day 16 hour classified volume counts on all major intersections in the influence area:
 Speed studies during morning and evening peak and off-peak hours
 Headway studies
 Delay studies using Floating car technique
 Road side interviews
 Land use studies
 Road network inventory study
 Parking studies
BACKGROUND TRAFFIC VOLUMES:1MALL & MULTIPLEX AREA
Intersection traffic counts and Midblock Classified volume counts were carried out from 29-1-19to9-2-19duringthe
morning and evening peak and off- peak periods at all majorat-gradeintersectionsandmidblocksintheprojectinfluencearea.
3- day volume counts were conducted near Benz circle Junction, Myneni signal Junction and Ntr circle junction.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7285
These counts are an indication of the current background traffic levels on roads in the study area and are used as the
basis for the analysis of operational conditions at the critical intersections.
Table 1(a): Traffic flows in major sections around the study area (direction wise)
COMMERCIAL AREA
Intersection traffic counts and Midblock Classifiedvolume countswerecarriedoutfrom12-2-19to28-2-19duringthe
morning and evening peak and off- peak periods at all majorat-gradeintersectionsandmidblocksintheprojectinfluencearea.
3 -day volume counts were conducted the proposed site near 1-town junction, Kotikalapudi-modepalli road, Kaleshwara Rao
market road junction, Lower Bridge road junction and Flyover road junction.
These counts are an indication of the current background traffic levels on roads in the study area and basis for the
analysis of operational conditions at the critical intersections.
Table 1(b): Traffic flows in major sections around the study area
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7286
INDUSTRIAL AREA
Intersection traffic counts and Midblock Classified volume counts were carried out from 1-3-19to10-3-19duringthe
morning and evening peak and off -peak periods at all majorat-gradeintersectionsandmidblocksintheprojectinfluencearea.
3 -day volume counts were conducted the proposed site near Auto nagar Junction, Psc Bose road and NTR Marg Junction.
These counts are an indication of the current background traffic levels on roads in the study area and are used as the
basis for the analysis of operational conditions at the critical intersections.
Table 1(c): Traffic flows in major sections around the study area (direction wise)
COMPARISION OF EXISTINNG TRAFFIC WITH PREVIOUS STUDIES ON SELECTED AREAS:
The traffic studies conducted in 2017, 2018 and 2019 by Centre for Transportation Engineering, JNTU have been
compared and are shown in tables below.
MALL & MULTIPLEX AREA
Table 2(a): Comparison of existing traffic volume with previous studies at Mall & Multiplex area (Benz circle)
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7287
COMMERCIAL AREA
Table 2(b): Comparison of existing traffic volume with previous studies at Commercial area(1-Town)
INDUSTRIAL AREA
Table 2(c): Comparison of existing traffic volume with previous studies at Industrial area (Auto
Nagar)
INTERSECTION TRAFFIC VOLUMES:
The detailed data of intersection volume counts is enclosed in the Appendix
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7288
MALL & MULTIPLEX AREA
The directional and turning flows at each intersection in the project influence area are given in the following table.
Table 3(a): Traffic flows in Peak Hours near Junctions/Roads
COMMERCIAL AREA
The directional and turning flows at each intersection in the project influence area are given in the following table.
Table 3(b): Traffic flows in Peak Hours near Junctions/Roads
INDUSTRIAL AREA
S. No Direction/ Name of
the Road
No. of
vehicles in
pcu / hr
Peak Hour Peak
hour
volume
1. Autonagar Junction 2125 5:30-6:30PM 6825
pcu/hr
2. PSC Bose road
Junction
2800 9:00-
10:00pm
3. NTR marg Junction 1900 5:00-6:00pm
Table 3(c): Traffic flows in Peak Hours near Junctions/Roads
S. No Direction/ Name of
the Road
No. of vehicles in
pcu / hr
Peak Hour Peak hour
volume
1. Benz circle Junction 4800 8:00-9:00AM 11485
Pcu/hr
2. Myneni signals
junction
3125 8:00-9:00AM
3. NTR circle Junction 3560 6:00-7:00PM
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7289
CONCLUSION:
Traffic impact studies for the selected areas Mall & Multiplex area (Trendset mall), Commercial area(1-town) and Industrial
area (Autonagar) are conducted. The impact of the existing areas on the traffic is found out.Basedonthetrafficvolumestudies
we can design the roads geometrically, we can plan sidewalks, cross walks, and pedestrian signals we can also designthe road
intersections, plan signal timings and channelization by turning movement study. There is much Traffic congestion in the
selected areas. We have made few suggestions to reduce the traffic congestion. But in view of the future developments in the
influence area and traffic growth, warrants/recommendations as suggested above may be adopted.
WARRANTS RECOMMENDED IN THE PRESENT STUDY
Recommendations for site access and transportation improvements needed to maintain traffic flow to, from, within, and past
the site at an acceptable and safe level of service are given below. Improvements typically include roadway widening, turn
lanes, traffic signals, bicycle, pedestrian and transit amenities, safety measures, sight distance, and transportation demand
management strategies. Detailed improvements specifically associated with the development should be identified.
At Benz Circle Junction a road widening is required where the traffic congestion is taking place and if possible, traffic signals
should be placed or a fly over should be constructed on the National Highway road. Required road widening at the Nirmala
School Road. Time delay for the Traffic signal at the Benz Circle junction is too high due to which there is a lot of congestion in
between the vehicles and vehicular movements are too slow, so it is recommended to construct a flyoveronNational Highway
road. Required signals at junctions, ‘U’ turns and direction boards should be placed. Service road must be maintained withIRC
specification minimum lane width of 3.75 along with right off way. And suggested to maintainall theminorroadslanewidthof
3.5 minimum.
1. There is a congestion at the entry and exit points of the commercial complex. Hence an additional lane is recommended for
the circulation of the vehicles.
2. There is a requirement for the Parking areas near the 1-town, due to the lack of the parking areas the vehicles are being
parked on the road side which cause the traffic congestions.
3. Need for the development of junctions in the vicinity is identified.
4. There is a probable need for a new (or modified) traffic signal to control the Highway serving a proposed or existing
development(s).
5. Installation of traffic control signs and markings is recommended.
6. Addition of lanes is required after 2017 irrespective of the development on all the roads in the influence area.
7. Adjustment of cycle lengths at all the signals is necessary.
8. Introduction of additional signal phases for pedestrians is necessary at all junction and all other junctions in the influence
area.
9. The traffic congestion is occurring due to the Bus stops on the roads, there is a need for the shifting of the Bus stops to
appropriate locations.
10. There is also a need to develop a Dedicated bus lane (followed in many foreigncountries)todecreasethetraffic congestion.
REFERENCES
[1] Traffic Impact Assessment Practice in Indonesia.
[2] Impact of Traffic Congestion on Commercial Property Rental Values In
[3] Bauchi Metropolis.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072
© 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7290
[4] Traffic Impact Analysis for Chennai.
[5] Traffic Impact Analysis in Planned Urban Areas in Tanzania.
[6] Junction Improvement Planning and Design – A Case of White Field in Mahadevapura – Bangalore
[7] Traffic Volume Study at Ghatekesar Junction
[8] A case study of proposed hypermarket in skudai town of Malaysia
[9] Traffic Impact Assessment in South East Asian cities-A case study of Thailand
[10]Analysis of capacity volume study of selected Highway of Bangladesh
[11]Traffic Engineering and Transport Planning by Dr. L.R. Kadiyali.
[12]Highway and Traffic Engineering by Subhash C Saxena.
AUT
ON
A¬G
AR

More Related Content

Similar to IRJET- Traffic Impact Assessment in Vijayawada at Junction, Commerical and Industrial Area

An investigation of the design implications for openings
An investigation of the design implications for openingsAn investigation of the design implications for openings
An investigation of the design implications for openingseSAT Publishing House
 
An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...eSAT Journals
 
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAAnalysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAIRJET Journal
 
Redesign of Gandhinagar Bus Terminal a Case Study
Redesign of Gandhinagar Bus Terminal a Case StudyRedesign of Gandhinagar Bus Terminal a Case Study
Redesign of Gandhinagar Bus Terminal a Case StudyIRJET Journal
 
APPRAISAL OF CONGESTION AND TACTICS TO COUNTER IT IN CENTRAL BUSINESS DISTRIC...
APPRAISAL OF CONGESTION AND TACTICS TO COUNTER IT IN CENTRAL BUSINESS DISTRIC...APPRAISAL OF CONGESTION AND TACTICS TO COUNTER IT IN CENTRAL BUSINESS DISTRIC...
APPRAISAL OF CONGESTION AND TACTICS TO COUNTER IT IN CENTRAL BUSINESS DISTRIC...IRJET Journal
 
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948IRJET Journal
 
IRJET- Review on Recent Traffic Signs in Lane Markings
IRJET- Review on Recent Traffic Signs in Lane MarkingsIRJET- Review on Recent Traffic Signs in Lane Markings
IRJET- Review on Recent Traffic Signs in Lane MarkingsIRJET Journal
 
IRJET- Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
IRJET-  	  Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.IRJET-  	  Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
IRJET- Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.IRJET Journal
 
Road Safety Audit: A Case Study for Wardha Road in Nagpur City
Road Safety Audit: A Case Study for Wardha Road in Nagpur CityRoad Safety Audit: A Case Study for Wardha Road in Nagpur City
Road Safety Audit: A Case Study for Wardha Road in Nagpur CityIJERA Editor
 
IRJET- Study of Automated Highway System
IRJET-  	  Study of Automated Highway SystemIRJET-  	  Study of Automated Highway System
IRJET- Study of Automated Highway SystemIRJET Journal
 
IRJET-Impact on Employment via Public Transit System
IRJET-Impact on Employment via Public Transit SystemIRJET-Impact on Employment via Public Transit System
IRJET-Impact on Employment via Public Transit SystemIRJET Journal
 
IRJET- Study on Transit Oriented Development
IRJET- Study on Transit Oriented DevelopmentIRJET- Study on Transit Oriented Development
IRJET- Study on Transit Oriented DevelopmentIRJET Journal
 
Sustainability in Highway Projects: A Concise Review
Sustainability in Highway Projects: A Concise ReviewSustainability in Highway Projects: A Concise Review
Sustainability in Highway Projects: A Concise ReviewIRJET Journal
 
IRJET- A Review Paper on Movable Divider and Cost Efficiency
IRJET-  	  A Review Paper on Movable Divider and Cost EfficiencyIRJET-  	  A Review Paper on Movable Divider and Cost Efficiency
IRJET- A Review Paper on Movable Divider and Cost EfficiencyIRJET Journal
 
IRJET- A Review Paper on Traffic Regulation at Highway Intersection
IRJET- A Review Paper on Traffic Regulation at Highway IntersectionIRJET- A Review Paper on Traffic Regulation at Highway Intersection
IRJET- A Review Paper on Traffic Regulation at Highway IntersectionIRJET Journal
 
DEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATION
DEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATIONDEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATION
DEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATIONIRJET Journal
 
IRJET- Traffic Congestion: Causes and Solutions Case Study: Hinjewadi, Pune
IRJET- Traffic Congestion: Causes and Solutions Case Study: Hinjewadi, PuneIRJET- Traffic Congestion: Causes and Solutions Case Study: Hinjewadi, Pune
IRJET- Traffic Congestion: Causes and Solutions Case Study: Hinjewadi, PuneIRJET Journal
 
IRJET- Traffic Management Studies in Avadi
IRJET- Traffic Management Studies in AvadiIRJET- Traffic Management Studies in Avadi
IRJET- Traffic Management Studies in AvadiIRJET Journal
 
IRJET- Construction of Flyover Bridge (Grade Separator) at Powai Naka on Maha...
IRJET- Construction of Flyover Bridge (Grade Separator) at Powai Naka on Maha...IRJET- Construction of Flyover Bridge (Grade Separator) at Powai Naka on Maha...
IRJET- Construction of Flyover Bridge (Grade Separator) at Powai Naka on Maha...IRJET Journal
 

Similar to IRJET- Traffic Impact Assessment in Vijayawada at Junction, Commerical and Industrial Area (20)

An investigation of the design implications for openings
An investigation of the design implications for openingsAn investigation of the design implications for openings
An investigation of the design implications for openings
 
An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...An investigation of the design implications for openings in a sub standard me...
An investigation of the design implications for openings in a sub standard me...
 
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRAAnalysis of Traffic Congestion Characteristics for M.G. Road, AGRA
Analysis of Traffic Congestion Characteristics for M.G. Road, AGRA
 
Redesign of Gandhinagar Bus Terminal a Case Study
Redesign of Gandhinagar Bus Terminal a Case StudyRedesign of Gandhinagar Bus Terminal a Case Study
Redesign of Gandhinagar Bus Terminal a Case Study
 
APPRAISAL OF CONGESTION AND TACTICS TO COUNTER IT IN CENTRAL BUSINESS DISTRIC...
APPRAISAL OF CONGESTION AND TACTICS TO COUNTER IT IN CENTRAL BUSINESS DISTRIC...APPRAISAL OF CONGESTION AND TACTICS TO COUNTER IT IN CENTRAL BUSINESS DISTRIC...
APPRAISAL OF CONGESTION AND TACTICS TO COUNTER IT IN CENTRAL BUSINESS DISTRIC...
 
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948
Road Safety Audit of Chamarajanagar to Haradanahalli District Forest - NH 948
 
IRJET- Review on Recent Traffic Signs in Lane Markings
IRJET- Review on Recent Traffic Signs in Lane MarkingsIRJET- Review on Recent Traffic Signs in Lane Markings
IRJET- Review on Recent Traffic Signs in Lane Markings
 
IRJET- Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
IRJET-  	  Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.IRJET-  	  Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
IRJET- Study on Vehicle Flow at Maraimalai Nagar Industrial Estate.
 
Road Safety Audit: A Case Study for Wardha Road in Nagpur City
Road Safety Audit: A Case Study for Wardha Road in Nagpur CityRoad Safety Audit: A Case Study for Wardha Road in Nagpur City
Road Safety Audit: A Case Study for Wardha Road in Nagpur City
 
IRJET- Study of Automated Highway System
IRJET-  	  Study of Automated Highway SystemIRJET-  	  Study of Automated Highway System
IRJET- Study of Automated Highway System
 
IRJET-Impact on Employment via Public Transit System
IRJET-Impact on Employment via Public Transit SystemIRJET-Impact on Employment via Public Transit System
IRJET-Impact on Employment via Public Transit System
 
IRJET- Study on Transit Oriented Development
IRJET- Study on Transit Oriented DevelopmentIRJET- Study on Transit Oriented Development
IRJET- Study on Transit Oriented Development
 
Sustainability in Highway Projects: A Concise Review
Sustainability in Highway Projects: A Concise ReviewSustainability in Highway Projects: A Concise Review
Sustainability in Highway Projects: A Concise Review
 
Introduction
IntroductionIntroduction
Introduction
 
IRJET- A Review Paper on Movable Divider and Cost Efficiency
IRJET-  	  A Review Paper on Movable Divider and Cost EfficiencyIRJET-  	  A Review Paper on Movable Divider and Cost Efficiency
IRJET- A Review Paper on Movable Divider and Cost Efficiency
 
IRJET- A Review Paper on Traffic Regulation at Highway Intersection
IRJET- A Review Paper on Traffic Regulation at Highway IntersectionIRJET- A Review Paper on Traffic Regulation at Highway Intersection
IRJET- A Review Paper on Traffic Regulation at Highway Intersection
 
DEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATION
DEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATIONDEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATION
DEVELOPING DIVERSE TRANSIT HUB FOR SURAT RAIL STATION
 
IRJET- Traffic Congestion: Causes and Solutions Case Study: Hinjewadi, Pune
IRJET- Traffic Congestion: Causes and Solutions Case Study: Hinjewadi, PuneIRJET- Traffic Congestion: Causes and Solutions Case Study: Hinjewadi, Pune
IRJET- Traffic Congestion: Causes and Solutions Case Study: Hinjewadi, Pune
 
IRJET- Traffic Management Studies in Avadi
IRJET- Traffic Management Studies in AvadiIRJET- Traffic Management Studies in Avadi
IRJET- Traffic Management Studies in Avadi
 
IRJET- Construction of Flyover Bridge (Grade Separator) at Powai Naka on Maha...
IRJET- Construction of Flyover Bridge (Grade Separator) at Powai Naka on Maha...IRJET- Construction of Flyover Bridge (Grade Separator) at Powai Naka on Maha...
IRJET- Construction of Flyover Bridge (Grade Separator) at Powai Naka on Maha...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2RajaP95
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 

Recently uploaded (20)

Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2HARMONY IN THE HUMAN BEING - Unit-II UHV-2
HARMONY IN THE HUMAN BEING - Unit-II UHV-2
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 

IRJET- Traffic Impact Assessment in Vijayawada at Junction, Commerical and Industrial Area

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7277 TRAFFIC IMPACT ASSESSMENT IN VIJAYAWADA AT JUNCTION, COMMERICAL AND INDUSTRIAL AREA 1MRS.KAJA SRI BINDU, 2VADLAPATLA NAVYA, 3VELLANKI JASWANTH, 4NIDDANA ASHOK 1Assistant Professor, 2Bachelor of Technology, 3Bachelor of Technology,4Bachelor of Technology Department of Civil Engineering, Dhanekula Institute of Engineering and Technology, Ganguru, Vijayawada, Andhra Pradesh, India, 521139 Abstract – Vijayawada is a city in the southeast Indian state of Andhra Pradesh. The present project is on the traffic impact studies at the Mall and Multiplex area in Benz circle, Industrial area in Autonagar and commercial area in 1-town Traffic Impact Assessment(TIA) is a powerful tool for engineers and planners to determine the possible effects of a project on the transportation and traffic system and also includes formulation of traffic management schemes and recommendation of infrastructure for possible transportation and traffic problems that encountered during the construction and operation phases of projects .often it is appliedonlyto the direct area and countermeasures for potential negative impacts are specific for the development. The three main parameters of traffic are volume, speed and density. In the absence of effective planning and traffic management of the city, the current road infrastructure cannot cater the future needs of the city. pedestrian and vehicle volumes have increasedsignificantly in last decade due to the change of the economics of the middle-class families. Hence the results from present study are helpful in estimating future traffic, controlling the traffic at intersection and also reducing the accident rate. Key Words: Traffic Impact Assessment (TIA) 1.INTRODUCTION A traffic impact study is a study which assesses the effect that a particular development has on the transportation network. A traffic impact study is generally required by roads authorities to evaluate the impact of changeinthelanduse.Atrafficimpactstudyvariesin complexity depending on the size of the development, the current and proposed landuseandthelocationofthedevelopment.Various traffic engineering concepts and principles are applied whileconductinga trafficimpactassessment. Wehaveconductedtrafficimpact study for various areas like mall & multiplex building, Commercial area and industry The purpose of the study is to assess the impact of the Mall & Multiplex area - Trendset mall at Benz circle, Commercial area – 1-town at Indrakeeladri, Industrial area – Autonagar under Krishna Dist. Andhra Pradesh state on the surrounding and adjacent transportation network and to identify potential mitigation measures, which may be necessary to offset any impacts associated with the use. Objectives:  Assess impact of traffic due to new development.  Support subdivision of land applications.  Prepare mitigation plans  Development access and on-site circulation plans.  Usage of modern techniques to analyze it.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7278 TRAFFIC IMPACT ANALYSIS: Typically, a traffic operations analysis is conducted whenever a proposed development compromises the existing design standards and therefore may causesafetyandoperationalproblemsintheimmediatevicinity of the site. The analysis should be done for the entire system and not just the road or access point under consideration. TheTIAconsidersaShort-TermDevelopmentScenarioandaLong-Term DevelopmentScenariothatcomprise the following: Short Term Development Scenario: Development scenario for the study area that is likely to be achieved within 1 to 5 years. Long Term Development Scenario: Development scenario for the study area that could possibly be achieved within 5to 10 years. The remainder of the TIA analyses the possible traffic impact that development on thissitewillhaveontheroad network and makes recommendations on the extent of access and road infrastructure upgrading required to ensure that traffic congestion levels duringthe peak periods are kept within acceptable limits. In places where road infrastructureupgradingisnotpossibleandcongestionlevelsareexpectedtobe unacceptablyhigh,theTIA makesrecommendationsondevelopmentlimitations that should be imposed on the site. LOCATION AND STUDYAREAS: MALL & MULTIPLEX AREA: Mall & Multiplex area considered here is Trendset mall located at M.G road, Vijayawada, Krishna Dist. Andhra Pradesh. The study area is about 1km of radius from the mall. The site is strategically located & connected to Benz Circle. The study site is strategically bounded by typical commercial, residential activities. It is well connected with the arterial road system thus providing for excellent connectivity with thecity. Fig 1(a): Study area shown on google maps COMMERCIAL AREA CommercialAreaconsideredhereis1-townlocatedatPrakasambarragenear Durgatempleroad,Vijayawada Dist. Krishna. The study areais about 1km of radiusfromthe1-town.Thesiteisstrategicallylocated&connectedto M.Groad, KaleshwararaoMarket road,KrishnaLankaroad,RailwayStationroad,Fly Over road. The study site is situated at Vinayaka Temple cross Road. The study site is strategically bounded by typical commercial / semi- residentialactivities.It is well connected with the arterial road system thus providing for excellent connectivity with thecity.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7279 Fig 1(b): Study area shown on google maps INDUSTRIAL AREA: IndustrialareaconsideredhereisAutonagarlocatedatBandarroad,KrishnaDist. AndhraPradesh.Thestudyarea isabout 1km ofradiusfromtheAutonagar. The site is strategically located and connected to Pantakaluva road, Kanuru Road. The study site is strategically bounded by typical commercial, industrial, residential activities. It is well connected with the arterial road system thus providingfor excellent connectivitywith the city. Fig 1(c): Study area shown on google DESCRIPTION OF THE SELECTEDAREAS: MALL & MULTIPLEX AREA Overview: The Mall & Multiplex area considered here is Trendset mall it is situated on right side at 4-way junction on the National Highway road. It is the biggest mall in the Vijayawada city. The study area that is considered here is about 1km radius from the junction. Terrain: The terrain proximate to and surrounding the site is generally classified as level. Existinglanduseandtraffic controls in the vicinity. The existing land use in the vicinity is configured with mixed activities comprising of residential and commercialactivities. COMMERCIAL
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7280 AREA Overview: Commercialarea considered hereis1-townwhichis located at prakasam barrage near Durga temple road .Mostof the business in the Vijayawada is done in this area. The study area that is consideredhereisabout1kmradiusfrom thejunction. Terrain: The terrain proximate to and surrounding the site is generally classified as level. Existing land use and traffic controls in the vicinity. The existing land use in the vicinity is configured with mixed activities comprising of residential and commercialactivities. INDUSTRIAL AREA Overview: Industrial area considered here is Autonagar area. In the area surrounding to it we can find most of the industries situated in the Vijayawada. We have considered Autonagar junction. The study area that is considered here is about 1km radius from the junction. Terrain: The terrain proximate to and surrounding the site is generally classified as “level”. Existing land use and traffic controls in the vicinity. Theexistinglanduseinthevicinityisconfiguredwithmixedactivitiescomprising of some residential and mostlycommercialactivities. MINIMUMSTUDYAREA–IDENTIFICATIONOFAREAOFINFLUENCEOF DEVELOPMENT: MALL & MULTIPLEXAREA The Minimum Study Area should include all critical site access points as well as signalized and unsignalized intersections adjacent to the site. In the present study, theroads andintersections inthe zonefrom Trendset mall, KrishnaDist. Andhra Pradesh are treated as the minimum study area. The influence areaof thesite is shownin figure. 2(a) Fig 2(a): Connectivity location map of the selected site showing on google earth map
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7281 COMMERCIAL AREA The Minimum Study Area should include all critical site access points as well as signalized and unsignalized intersections adjacent to the site. In the present study, the roads and intersections in the zone from 1-town, VijayawadaDist. Krishnaaretreatedastheminimumstudyarea.Theinfluenceareaofthesiteis shownin figure 2(b). Fig 2(b): Connectivity location map of the selected site showing on google earth map INDUSTRIAL AREA The Minimum Study Area should include all critical site access points as well as signalized and unsignalized intersections adjacent to the site. In the present study, the roads and intersections in the zone from Autonagar, KrishnaDist. AndhraPradesharetreatedastheminimumstudyarea.Theinfluenceareaof the site is shown in figure. 2(c) Fig 2(c): Connectivity location map of the selected site showing on google earth map STUDY METHODOLOGY: The study examined the existing conditions in the areas selected in terms of the existing road network and available public transport, pedestrian and cycle infrastructure.Futurepublictransportprovisionandinfrastructure improvements proposed in the vicinity of the development were reviewed Trafficvolumecounts,delaystudiesareconductedattheselectedsiteareasand arecomparedwiththeprevious yeardataoftrafficvolume. Future value of the traffic can be estimated based on the collected data. Based on this collected data modification for the existing roads are suggested to improvetheroadfacilitiesanddecreasethetrafficcongestion.
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 03 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7282
  • 7. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7283 EXISTING ROAD NETWORK MALL & MULTIPLEX AREA The selected area falls along Benz Circle connect to M.G Road, near Trendset Mall and to the right connected to NTR Circle. Fig 3(a): Digitized map of the selected area showing road networks on Arc GIS and AUTOCAD at Mall & Multiplex Area 1.Benz Circle Junction: It is 4-way Junction connecting Myneni hotel Center, Shoppers Stop and Ramesh Hospital Signals. 2: Myneni Signals Junction: It is a 4-way Junction connecting roads from Polyclinic road, NTR circle, Benz Circle. 3.NTR Circle Junction: It is a 5- way Junction connecting roads from Trendset Mall Pantakaluva Road, NH-65. COMMERCIAL AREA The selected area falls along 1-town Junction & connected Durga temple junction, Kaleshwara Rao market road, 1-Town, Prakasam barrage road and Kaleshwara Rao Flyover Road 1-town Junction: It is a 4-way Junction connecting Gollapudi, Mangalagiri ang M.G road. Kotikalapudi - Modepalli Road: It is a 3-Way Junction connecting 1-town and KrishnaLanka road and Prakasam Barrage Road. Kaleshwara Rao Market road Junction: It is a T-way Junction connecting Nehru Road and Lower Bridge Road Lower Bridge road Junction: It is a 4-way Junction connecting Police control Room, 1-town, Kaleshwara Rao main road, Railway station road. Flyover road junction: it is a major road connecting to the railway station, bus station road and flyover
  • 8. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7284 Fig 3(b): Digitized map of the selected area showing road networks on Arc GIS and AUTOCAD at Commercial Area. INDUSTRIAL AREA The selected area falls along Autonagar Junction & connected psc Bose junction and NTR marg junction Fig 3(c): Digitized map of the selected area showing road networks on Arc GIS and AUTOCAD at Industrial Area. 1: Autonagar Junction: It is a 4- way junction connecting 3 major roads Bandar road, Pantakaluva Road, PSC road and 1 minor road. 2: PSC Junction: It is a T-Junction connecting Autonagar junction road, Major road and Bandar road. 3: NTR Marg Junction: It is a Y-Junction connecting Autonagar junction road, Kanuru Road and Ballem road. SURVEYS ORGANISED: Following were the surveys conducted for the traffic impact assessment of the selected areas.  3-day 16 hour classified volume counts on all major intersections in the influence area:  Speed studies during morning and evening peak and off-peak hours  Headway studies  Delay studies using Floating car technique  Road side interviews  Land use studies  Road network inventory study  Parking studies BACKGROUND TRAFFIC VOLUMES:1MALL & MULTIPLEX AREA Intersection traffic counts and Midblock Classified volume counts were carried out from 29-1-19to9-2-19duringthe morning and evening peak and off- peak periods at all majorat-gradeintersectionsandmidblocksintheprojectinfluencearea. 3- day volume counts were conducted near Benz circle Junction, Myneni signal Junction and Ntr circle junction.
  • 9. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7285 These counts are an indication of the current background traffic levels on roads in the study area and are used as the basis for the analysis of operational conditions at the critical intersections. Table 1(a): Traffic flows in major sections around the study area (direction wise) COMMERCIAL AREA Intersection traffic counts and Midblock Classifiedvolume countswerecarriedoutfrom12-2-19to28-2-19duringthe morning and evening peak and off- peak periods at all majorat-gradeintersectionsandmidblocksintheprojectinfluencearea. 3 -day volume counts were conducted the proposed site near 1-town junction, Kotikalapudi-modepalli road, Kaleshwara Rao market road junction, Lower Bridge road junction and Flyover road junction. These counts are an indication of the current background traffic levels on roads in the study area and basis for the analysis of operational conditions at the critical intersections. Table 1(b): Traffic flows in major sections around the study area
  • 10. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7286 INDUSTRIAL AREA Intersection traffic counts and Midblock Classified volume counts were carried out from 1-3-19to10-3-19duringthe morning and evening peak and off -peak periods at all majorat-gradeintersectionsandmidblocksintheprojectinfluencearea. 3 -day volume counts were conducted the proposed site near Auto nagar Junction, Psc Bose road and NTR Marg Junction. These counts are an indication of the current background traffic levels on roads in the study area and are used as the basis for the analysis of operational conditions at the critical intersections. Table 1(c): Traffic flows in major sections around the study area (direction wise) COMPARISION OF EXISTINNG TRAFFIC WITH PREVIOUS STUDIES ON SELECTED AREAS: The traffic studies conducted in 2017, 2018 and 2019 by Centre for Transportation Engineering, JNTU have been compared and are shown in tables below. MALL & MULTIPLEX AREA Table 2(a): Comparison of existing traffic volume with previous studies at Mall & Multiplex area (Benz circle)
  • 11. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7287 COMMERCIAL AREA Table 2(b): Comparison of existing traffic volume with previous studies at Commercial area(1-Town) INDUSTRIAL AREA Table 2(c): Comparison of existing traffic volume with previous studies at Industrial area (Auto Nagar) INTERSECTION TRAFFIC VOLUMES: The detailed data of intersection volume counts is enclosed in the Appendix
  • 12. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7288 MALL & MULTIPLEX AREA The directional and turning flows at each intersection in the project influence area are given in the following table. Table 3(a): Traffic flows in Peak Hours near Junctions/Roads COMMERCIAL AREA The directional and turning flows at each intersection in the project influence area are given in the following table. Table 3(b): Traffic flows in Peak Hours near Junctions/Roads INDUSTRIAL AREA S. No Direction/ Name of the Road No. of vehicles in pcu / hr Peak Hour Peak hour volume 1. Autonagar Junction 2125 5:30-6:30PM 6825 pcu/hr 2. PSC Bose road Junction 2800 9:00- 10:00pm 3. NTR marg Junction 1900 5:00-6:00pm Table 3(c): Traffic flows in Peak Hours near Junctions/Roads S. No Direction/ Name of the Road No. of vehicles in pcu / hr Peak Hour Peak hour volume 1. Benz circle Junction 4800 8:00-9:00AM 11485 Pcu/hr 2. Myneni signals junction 3125 8:00-9:00AM 3. NTR circle Junction 3560 6:00-7:00PM
  • 13. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7289 CONCLUSION: Traffic impact studies for the selected areas Mall & Multiplex area (Trendset mall), Commercial area(1-town) and Industrial area (Autonagar) are conducted. The impact of the existing areas on the traffic is found out.Basedonthetrafficvolumestudies we can design the roads geometrically, we can plan sidewalks, cross walks, and pedestrian signals we can also designthe road intersections, plan signal timings and channelization by turning movement study. There is much Traffic congestion in the selected areas. We have made few suggestions to reduce the traffic congestion. But in view of the future developments in the influence area and traffic growth, warrants/recommendations as suggested above may be adopted. WARRANTS RECOMMENDED IN THE PRESENT STUDY Recommendations for site access and transportation improvements needed to maintain traffic flow to, from, within, and past the site at an acceptable and safe level of service are given below. Improvements typically include roadway widening, turn lanes, traffic signals, bicycle, pedestrian and transit amenities, safety measures, sight distance, and transportation demand management strategies. Detailed improvements specifically associated with the development should be identified. At Benz Circle Junction a road widening is required where the traffic congestion is taking place and if possible, traffic signals should be placed or a fly over should be constructed on the National Highway road. Required road widening at the Nirmala School Road. Time delay for the Traffic signal at the Benz Circle junction is too high due to which there is a lot of congestion in between the vehicles and vehicular movements are too slow, so it is recommended to construct a flyoveronNational Highway road. Required signals at junctions, ‘U’ turns and direction boards should be placed. Service road must be maintained withIRC specification minimum lane width of 3.75 along with right off way. And suggested to maintainall theminorroadslanewidthof 3.5 minimum. 1. There is a congestion at the entry and exit points of the commercial complex. Hence an additional lane is recommended for the circulation of the vehicles. 2. There is a requirement for the Parking areas near the 1-town, due to the lack of the parking areas the vehicles are being parked on the road side which cause the traffic congestions. 3. Need for the development of junctions in the vicinity is identified. 4. There is a probable need for a new (or modified) traffic signal to control the Highway serving a proposed or existing development(s). 5. Installation of traffic control signs and markings is recommended. 6. Addition of lanes is required after 2017 irrespective of the development on all the roads in the influence area. 7. Adjustment of cycle lengths at all the signals is necessary. 8. Introduction of additional signal phases for pedestrians is necessary at all junction and all other junctions in the influence area. 9. The traffic congestion is occurring due to the Bus stops on the roads, there is a need for the shifting of the Bus stops to appropriate locations. 10. There is also a need to develop a Dedicated bus lane (followed in many foreigncountries)todecreasethetraffic congestion. REFERENCES [1] Traffic Impact Assessment Practice in Indonesia. [2] Impact of Traffic Congestion on Commercial Property Rental Values In [3] Bauchi Metropolis.
  • 14. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 06 Issue: 3 | Mar 2019 www.irjet.net p-ISSN: 2395-0072 © 2019, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 7290 [4] Traffic Impact Analysis for Chennai. [5] Traffic Impact Analysis in Planned Urban Areas in Tanzania. [6] Junction Improvement Planning and Design – A Case of White Field in Mahadevapura – Bangalore [7] Traffic Volume Study at Ghatekesar Junction [8] A case study of proposed hypermarket in skudai town of Malaysia [9] Traffic Impact Assessment in South East Asian cities-A case study of Thailand [10]Analysis of capacity volume study of selected Highway of Bangladesh [11]Traffic Engineering and Transport Planning by Dr. L.R. Kadiyali. [12]Highway and Traffic Engineering by Subhash C Saxena. AUT ON A¬G AR