International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1611
Improving Quality and Productivity in Switchgear Tank Welding
through Poka-Yoke and Waste Elimination in Robotic Welding Shop
Sanket Sancheti
Mechanical Engineering Department, DVVP College of Engineering, Ahmednagar, Maharashtra
Savitribai Phule Pune University
---------------------------------------------------------------------***----------------------------------------------------------------------
Abstract - Now a days manufacturing industries are
facing a greater competition in the market. Because of this,
they try to improve and increase both quality and
productivity continuously. One way to increase the
productivity is to increase the availability of existing
machines; Total productive maintenance aims to increase
the availability of existing equipment so no further capital
investment is needed. Availability of machines can be
increased by reducing the downtime or Breakdowns of the
machines. The main objective of this study is to find out the
major breakdowns causing production losses to the
company and to suggest counter measures by which these
problems can be reduced. Root cause analysis is conducted
to find the root cause of breakdowns and some parallel
improvement opportunities were also identified for
implementation so as to reduce the downtime.
Key Words: Switchgear, Welding, Fixture, Poka-Yoke,
Pareto Chart, ISMC Channel.
1. INTRODUCTION
Productivity improvement is one of the core strategies
towards manufacturing excellence and it is also necessary
to achieve good financial and operational performance. It
enhances customer satisfaction and reduce time and cost
to develop, produce and deliver products and service.
Productivity has a positive and significant relationship to
performance measurement for process utilization, process
output, product costs, and work-in-process inventory
levels and on-time delivery. Improvement can be in the
form of elimination, correction (repair) of ineffective
processing, simplifying the process, optimizing the system,
reducing variation.
Minimizing the number of defects is important to any
company since it influence their outputs and profits. The
aim of this paper is to study the implementation of
industrial engineering tools in a manufacturing of Switch
Gear part (tank) weighing about 100 kilogram. This study
starts with reading the standard operation procedures and
analysing the process flow to get the whole idea on how to
manufacture tank of switch gear. At the same time,
observations at the production line were made to identify
problem occurs in the production line. By using check
sheet, the defect data from each station were collected and
have been analysed using Pareto Chart. From the chart, it
is found that robotic welding workstation shows the
highest number of defects. Based on observation at the
welding workstation, the existing method used to weld the
tank was inappropriate because the operator need to take
new reference point for new tank. Then, by using cause
and effect diagram, the root cause of the problem was
identified and solutions to overcome the problem were
proposed.
1.1 Problem Statement
Previously, operation are performed as follows:
1. Loading of tank manually on welding workstation
2. Handling of tank done manually
3. Various operations like spot welding, stud
welding, tank handling, cleaning and inspection
are performed manually.
4. Welding problems like spatters, thermal patches
add the cost of cleaning. These increases the time
required for manufacturing.
1.2 Objective
 Increase Productivity of Welding Shop.
 Reduce Non Valued Activities.
 Handling of Switchgear Tank
 Cleaning of Tank
 Reduce Spatters during Stud Welding
 Reduce Warp edge of Sheet.
 Reduce effect of Thermal Stresses.
 Improve Quality of Product.
A fixture need to be designed in order to fulfil all
objectives.
1.3 Scope
Scope of above project is as follows:
1. By implementation of different Quality tools,
Quality and productivity of product can be
increased.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1612
2. Also, these Quality tools can be used to increase
efficiency and effectiveness of production.
3. Designing of fixture and Templates reduces the
Workmanship.
4. Automation of designed fixture and its integration
with PLC and SCADA system is possible.
1.4 Methodology
A productivity improvement technique is the methodology
chosen to carry out to increase the production of
switchgear tank manufacturing. A framework of the work
to be carried is given as follows:
 Analyse Manufacturing Processes Associated With
Given Workstation.
 Identify the problems at workstation.
 Identifying Possible NVA(Non Value Added
Activities)
 Prioritization Using Pareto Analysis.
 Design of holding Fixture & Templates.
 Solving problems by using following Quality
Management Tools:
 Root Cause Analysis , Pareto Charts
 Poka Yoke
 FMEA, DMAIC
2. SWITCHGEAR
In an electric power system, switchgear is the combination
of electrical disconnect switches, fuses or circuit breakers
used to control, protect and isolate electrical equipment.
Switchgear is used both to de-energize equipment to allow
work to be done and to clear faults downstream. This type
of equipment is directly linked to the reliability of the
electricity supply.
Fig 2.1: Switchgear
2.1 Functions
One of the basic functions of switchgear is protection,
which is interruption of short-circuit and overload fault
currents while maintaining service to unaffected circuits.
Switchgear also provides isolation of circuits from power
supplies. Switchgear is also used to enhance system
availability by allowing more than one source to feed a
load.
2.2 Productivity
The term productivity can be used to examine efficiency
and effectiveness of any activity conducted in an economy,
business, government or by individuals. For example,
learning or studying methods used by students that
include reading and/or writing the content of a topic and
revising the topic by saying out aloud or rewriting.
Efficiency, effectiveness and productivity can also be
evaluated for businesses in service sector. Productivity
however, is broadly evaluated mostly through service
volume, delivery processes and customer-perceived
quality in services offered. In the context of the real world,
productivity is mostly examined and evaluated with
reference to businesses or an economy. Accordingly, it is
essential to study productivity in order to:-
 Understand the processes of a business
 Control the business processes
 Continuously improve processes
 Assess performance of a business
 Determine a business ability to sustain in the long
run
In order to increase productivity, Monitor how much time
you spend on tasks, and prioritize important work.
Productivity can be reduced if you allocate time
inefficiently. Use programs such as Rescue Time to
increase productivity by tracking the time you spend on
specific applications.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1613
2.3 Quality
It is also defined as fitness for purpose. Quality is a
perceptual, conditional, and somewhat subjective attribute
and may be understood differently by different people.
Consumers may focus on the specification quality of a
product/service, or how it compares to competitors in the
marketplace. Producers might measure the conformance
quality, or degree to which the product/service was
produced correctly.
Support personnel may measure quality in the degree that
a product is reliable, maintainable, or sustainable. A
quality item (an item that has quality) has the ability to
perform satisfactorily in service and is suitable for its
intended purpose.
2.4 Poka Yoke
Poka-yoke is a Japanese term that means "mistake-
proofing" or “inadvertent error prevention”. The key word
in the second translation, often omitted, is "inadvertent".
There is no Poka Yoke solution that protects against an
operator’s sabotage, but sabotage is a rare behaviour
among people. A poka-yoke is any mechanism in a lean
manufacturing process that helps an equipment operator
avoid (yokeru) mistakes (poka). Its purpose is to eliminate
product defects by preventing, correcting, or drawing
attention to human errors as they occur. The concept was
formalised, and the term adopted, by Shigeo Shingo as part
of the Toyota Production System. It was originally
described as baka-yoke, but as this means "fool-proofing"
(or "idiot-proofing") the name was changed to the milder
poka-yoke.
2.4.1 History
The term poka-yoke was applied by Shigeo Shingo in the
1960s to industrial processes designed to prevent human
errors.[5] Shingo redesigned a process in which factory
workers, while assembling a small switch, would often
forget to insert the required spring under one of the
switch buttons. In the redesigned process, the worker
would perform the task in two steps, first preparing the
two required springs and placing them in a placeholder,
then inserting the springs from the placeholder into the
switch. When a spring remained in the placeholder, the
workers knew that they had forgotten to insert it and
could correct the mistake effortlessly.
Shingo distinguished between the concepts of inevitable
human mistakes and defects in the production. Defects
occur when the mistakes are allowed to reach the
customer. The aim of poka-yoke is to design the process so
that mistakes can be detected and corrected immediately,
eliminating defects at the source.
Fig 2.2: Application of Poka Yoke
2.4.2 Implementation of Poka Yoke
Shigeo Shingo recognized three types of poka-yoke for
detecting and preventing errors in a mass production
system:
1. The contact method identifies product defects by
testing the product's shape, size, color, or other
physical attributes.
2. The fixed-value (or constant number) method
alerts the operator if a certain number of
movements are not made.
3. The motion-step (or sequence) method
determines whether the prescribed steps of the
process have been followed.
A methodic approach to build up poka-yoke
countermeasures has been proposed by the Applied
Problem Solving (APS) methodology, which consists of a
three-step analysis of the risks to be managed:
1. identification of the need
2. identification of possible mistakes
3. management of mistakes before satisfying the need
This approach can be used to emphasize the technical
aspect of finding effective solutions during brainstorming
sessions.
2.4.3 Benefits of Poka Yoke Implementation
A typical feature of Poka Yoke solutions is that they don’t
let an error in a process happen. But that is just one of
their advantages. Others include:
 Less time spent on training workers;
 Elimination of many operations related to quality
control.
 Unburdening of operators from repetitive
operations;
 Promotion of the work improvement-oriented
approach and actions;
 A reduced number of rejects;
 Immediate action when a problem occurs;
 100% built-in quality control.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1614
3. Implementation of Quality Tools
Fig 3.1 Product of workstation
3.1 Data Analysis
From above data collected, Various NVA’s associated with
given processes are:
Table 3.2: Percentage Time Required for Various
NVA’s
Graph 3.3: Pareto analysis of Associated NVA’s
4. Design of fixture
From above analysis, major problem associated with given
workstation is handling problem. So, designing of fixture
for handling switchgear tank will play crucial role in
eliminating these major problem and hence increase
productivity.
Fig 4.1: Basic Model of Fixture
47
6 4
12 13 10 8
Percentage time required for various
NVA's
3.1.1 Pareto Analysis:
SR
NO.
NON VALUE ADDED
ACTIVITY
PERCENTAGE
TIME
REQUIRED
1. Handling problem 47%
2. Scratches due to rough
Handling
6%
3. Warp edge problem due
to handling of tank by
belt and use of crane
4%
4. Inspection and testing 12%
5. Welding spatter problem 13%
6. Thermal patches 10%
7. Thermal stresses
problem it changes
dimensions between two
brackets
8%
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1615
4.1 Design of Column
Fig 4.2: Standard ISMC100 Channel
Standard ISMC100 channel is selected.
Dimensions: 100*50*5 mm,
Material: Mild Steel, Self-weight: 9.56kg
Weight of switchgear tank = 150kg
E = 210Gpa =210*10³ Mpa,
Syt=380 mpa
Compressive stress= Syt/2 =190 Mpa
Fig4.3: C/S of ISMC100 Column
I = 358.22*10³
Area=A= (100*50-90*45) = 950mm²
M=P*L=2000*1000=2*10^6 N-mm
4.1.1 Compressive stress
σc = = = 4.20 N/mm²
4.1.2 Bending stress
σ = =13.95 N/mm²
As the maximum stress is less than allowable
Hence, design is safe
4.1.3 Buckling Load
Pe=
As buckling load is greater than actual, design is safe.
4.2 Design of pin
Fig 4.4: Design of Pin
Material: EN8
Material specification:-
Yield stress= Syt =465 N/mm²
Hardness=201-255BHN
Compressive and tensile stress:
σt = σc = Syt/FOS=465/2=232.5 N/mm²
Shear stress τ=0.5*σt =0.5*232.5=116.25 N/mm²
4.2.1 Calculation of diameter using direct shear
τ =
116.25 =
d=4.68 ≈ 5mm
4.2.2 Dimension of pin in Torsion
Considering FOS = 6, τ = 38.34
τ =
T = 400*1000 = 400000 N.mm
38.34 =
d = 37.46 mm ≈ 40 mm
Taking higher dimension d = 40 mm
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072
© 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1616
Conclusions
As per above project work and fixture design, we can
conclude that
1. We can reduce efforts of workers by using fixture and
we can also neglect handling problem
2. Due to suitability in process, it reduces time required to
manufacture switchgear tank and hence production rate
increases
3. Overall result will be improvement in quality and
productivity of switchgear tank welding.
References
• A Review on use of Mistake Proofing (Poka Yoke)
Tool in Blow Moulding process by Patel Parikshit,
Vidya Nair, Patel Nikunj ISSN: 2319-7064
• Development, Fabrication and Analysis of fixture
by Kiran Valandi, M. Vijaykumar, Kishor Kumar S
ISSN:2319-8753
• Root Cause Analysis for Reducing Breakdowns in
a manufacturing Industry by Kiran M, Cijo
Mathew, Jacob Kuriakose ISSN: 2250-2459
• An application of pareto analysis and cause effect
diagram for minimization of defects in manual
casting process by Sim Hock Kheng, Sha’ri Mohd
Yosof ISSN: 2320-2092
• Development of TPM implementation plan in
switchgear & engineering company by Aniruddha
Joshi, Pritam Kadam ICME03-AM-32.
AUTHOR
Sanket Sanjay Sancheti
BE (Mechanical)
Diploma(Mechanical)

More Related Content

What's hot

Overall equipment effectiveness of critical machines in manufacturing industries
Overall equipment effectiveness of critical machines in manufacturing industriesOverall equipment effectiveness of critical machines in manufacturing industries
Overall equipment effectiveness of critical machines in manufacturing industriesIAEME Publication
 
Electronic Batch Records
Electronic Batch RecordsElectronic Batch Records
Electronic Batch RecordsJason Corder
 
H0432045055
H0432045055H0432045055
H0432045055theijes
 
Maintainance engineering and management
Maintainance engineering and managementMaintainance engineering and management
Maintainance engineering and managementbahir dar university
 
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET Journal
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityCorey Vodvarka
 
Msil quality system audit sheet
Msil quality system audit sheetMsil quality system audit sheet
Msil quality system audit sheetAmit Mishra
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityJason Corder
 
IRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET Journal
 
Compressor Master Class
Compressor Master ClassCompressor Master Class
Compressor Master ClassMarcep Inc.
 
Achieving operational excellence by implementing an erp (enterprise resource ...
Achieving operational excellence by implementing an erp (enterprise resource ...Achieving operational excellence by implementing an erp (enterprise resource ...
Achieving operational excellence by implementing an erp (enterprise resource ...eSAT Publishing House
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining TimeIRJET Journal
 
To Improve Quality and Reduce Rejection Level through Quality Control
To Improve Quality and Reduce Rejection Level through Quality ControlTo Improve Quality and Reduce Rejection Level through Quality Control
To Improve Quality and Reduce Rejection Level through Quality Controlrahulmonikasharma
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET Journal
 

What's hot (20)

synopsis
synopsissynopsis
synopsis
 
Overall equipment effectiveness of critical machines in manufacturing industries
Overall equipment effectiveness of critical machines in manufacturing industriesOverall equipment effectiveness of critical machines in manufacturing industries
Overall equipment effectiveness of critical machines in manufacturing industries
 
RESUME_1
RESUME_1RESUME_1
RESUME_1
 
Internship report
Internship reportInternship report
Internship report
 
Electronic Batch Records
Electronic Batch RecordsElectronic Batch Records
Electronic Batch Records
 
Project
ProjectProject
Project
 
H0432045055
H0432045055H0432045055
H0432045055
 
Maintainance engineering and management
Maintainance engineering and managementMaintainance engineering and management
Maintainance engineering and management
 
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise BuildingIRJET- Investigation of Maintenance and Cost Control for High Rise Building
IRJET- Investigation of Maintenance and Cost Control for High Rise Building
 
The Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing ProductivityThe Critical KPI to Drive Manufacturing Productivity
The Critical KPI to Drive Manufacturing Productivity
 
Msil quality system audit sheet
Msil quality system audit sheetMsil quality system audit sheet
Msil quality system audit sheet
 
The Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing ProductivityThe Critical KPI to drive Manufacturing Productivity
The Critical KPI to drive Manufacturing Productivity
 
IRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in CompanyIRJET - 5S Method and its Implementation in Company
IRJET - 5S Method and its Implementation in Company
 
13 smed methodology_v2
13 smed methodology_v213 smed methodology_v2
13 smed methodology_v2
 
Compressor Master Class
Compressor Master ClassCompressor Master Class
Compressor Master Class
 
Achieving operational excellence by implementing an erp (enterprise resource ...
Achieving operational excellence by implementing an erp (enterprise resource ...Achieving operational excellence by implementing an erp (enterprise resource ...
Achieving operational excellence by implementing an erp (enterprise resource ...
 
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
IRJET-  	  Efficiency Enhancement by Reducing Production and Machining TimeIRJET-  	  Efficiency Enhancement by Reducing Production and Machining Time
IRJET- Efficiency Enhancement by Reducing Production and Machining Time
 
L.V.R latest Resume
L.V.R latest ResumeL.V.R latest Resume
L.V.R latest Resume
 
To Improve Quality and Reduce Rejection Level through Quality Control
To Improve Quality and Reduce Rejection Level through Quality ControlTo Improve Quality and Reduce Rejection Level through Quality Control
To Improve Quality and Reduce Rejection Level through Quality Control
 
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
IRJET- Reduction of Breakdown Hours Through Lean Technique in a High Volume L...
 

Similar to IRJET- Improving Quality and Productivity in Switchgear Tank Welding through Poka-Yoke and Waste Elimination in Robotic Welding Shop

IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET Journal
 
“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...IRJET Journal
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET Journal
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET Journal
 
IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...
IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...
IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...IRJET Journal
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET Journal
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) ConceptIRJET Journal
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTSUYASH TRIVEDI
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...IRJET Journal
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET Journal
 
IRJET- Development of Ejection System to Improve Productivity
IRJET-  	  Development of Ejection System to Improve ProductivityIRJET-  	  Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve ProductivityIRJET Journal
 
IRJET- Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve ProductivityIRJET- Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve ProductivityIRJET Journal
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryIRJET Journal
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...PERUMALSAMY M
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining CellIRJET Journal
 
IRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 HousingIRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 HousingIRJET Journal
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET Journal
 
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing ToolSheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing ToolIRJET Journal
 
Failure of tube reduced in split air conditioner
Failure of tube reduced in split air conditionerFailure of tube reduced in split air conditioner
Failure of tube reduced in split air conditionerprjpublications
 
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...IRJET Journal
 

Similar to IRJET- Improving Quality and Productivity in Switchgear Tank Welding through Poka-Yoke and Waste Elimination in Robotic Welding Shop (20)

IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...IRJET -  	  Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
IRJET - Invistigation and Implement of Six Sigma and Reduce Labour Cost a...
 
“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...“Development of automatic feeder system in cellular manufacturing to improve ...
“Development of automatic feeder system in cellular manufacturing to improve ...
 
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing IndustryIRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
IRJET- A Case Study Approach of Quality Tools in Manufacturing Industry
 
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...IRJET-  	  Productivity Improvement by Implementing Lean Manufacturing Tools ...
IRJET- Productivity Improvement by Implementing Lean Manufacturing Tools ...
 
IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...
IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...
IRJET- Interlooping Process of Diode Continuity Clamping Voltage Checking Mac...
 
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
IRJET- Deburring Methods for Elimination of Chips in the Internal Tubes of Fr...
 
IRJET- Single Minute Exchange of Dies (SMED) Concept
IRJET-  	  Single Minute Exchange of Dies (SMED) ConceptIRJET-  	  Single Minute Exchange of Dies (SMED) Concept
IRJET- Single Minute Exchange of Dies (SMED) Concept
 
INDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORTINDUSTRIAL TRAINING REPORT
INDUSTRIAL TRAINING REPORT
 
Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...Line Balancing and facility optimization of Machine Shop with Work Study and ...
Line Balancing and facility optimization of Machine Shop with Work Study and ...
 
IRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion StudyIRJET - Productivity Improvement by Time Study and Motion Study
IRJET - Productivity Improvement by Time Study and Motion Study
 
IRJET- Development of Ejection System to Improve Productivity
IRJET-  	  Development of Ejection System to Improve ProductivityIRJET-  	  Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve Productivity
 
IRJET- Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve ProductivityIRJET- Development of Ejection System to Improve Productivity
IRJET- Development of Ejection System to Improve Productivity
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump IndustryManufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry
 
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
Manufacturing Lead Time Reduction in Monoblock (SWJ) Pump Industry [irjet-v4 ...
 
IRJET- Enhance the Capacity of Outer Tube Machining Cell
IRJET-  	  Enhance the Capacity of Outer Tube Machining CellIRJET-  	  Enhance the Capacity of Outer Tube Machining Cell
IRJET- Enhance the Capacity of Outer Tube Machining Cell
 
IRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 HousingIRJET- Productivity Improvement Kaizen of XC-60 Housing
IRJET- Productivity Improvement Kaizen of XC-60 Housing
 
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
IRJET- A Case Study for Overall Equipment Effectiveness Improved in Manufactu...
 
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing ToolSheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
Sheet Metal Assembly Process Optimization Using Lean Manufacturing Tool
 
Failure of tube reduced in split air conditioner
Failure of tube reduced in split air conditionerFailure of tube reduced in split air conditioner
Failure of tube reduced in split air conditioner
 
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
PRODUCTIVITY IMPROVEMENT IN SPREADING (CUTTING) SECTION BY IMPLEMENTING PRE-D...
 

More from IRJET Journal

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...IRJET Journal
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTUREIRJET Journal
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...IRJET Journal
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsIRJET Journal
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...IRJET Journal
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...IRJET Journal
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...IRJET Journal
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...IRJET Journal
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASIRJET Journal
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...IRJET Journal
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProIRJET Journal
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...IRJET Journal
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemIRJET Journal
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesIRJET Journal
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web applicationIRJET Journal
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...IRJET Journal
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.IRJET Journal
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...IRJET Journal
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignIRJET Journal
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...IRJET Journal
 

More from IRJET Journal (20)

TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
TUNNELING IN HIMALAYAS WITH NATM METHOD: A SPECIAL REFERENCES TO SUNGAL TUNNE...
 
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURESTUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
STUDY THE EFFECT OF RESPONSE REDUCTION FACTOR ON RC FRAMED STRUCTURE
 
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
A COMPARATIVE ANALYSIS OF RCC ELEMENT OF SLAB WITH STARK STEEL (HYSD STEEL) A...
 
Effect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil CharacteristicsEffect of Camber and Angles of Attack on Airfoil Characteristics
Effect of Camber and Angles of Attack on Airfoil Characteristics
 
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
A Review on the Progress and Challenges of Aluminum-Based Metal Matrix Compos...
 
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
Dynamic Urban Transit Optimization: A Graph Neural Network Approach for Real-...
 
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
Structural Analysis and Design of Multi-Storey Symmetric and Asymmetric Shape...
 
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
A Review of “Seismic Response of RC Structures Having Plan and Vertical Irreg...
 
A REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADASA REVIEW ON MACHINE LEARNING IN ADAS
A REVIEW ON MACHINE LEARNING IN ADAS
 
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
Long Term Trend Analysis of Precipitation and Temperature for Asosa district,...
 
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD ProP.E.B. Framed Structure Design and Analysis Using STAAD Pro
P.E.B. Framed Structure Design and Analysis Using STAAD Pro
 
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
A Review on Innovative Fiber Integration for Enhanced Reinforcement of Concre...
 
Survey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare SystemSurvey Paper on Cloud-Based Secured Healthcare System
Survey Paper on Cloud-Based Secured Healthcare System
 
Review on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridgesReview on studies and research on widening of existing concrete bridges
Review on studies and research on widening of existing concrete bridges
 
React based fullstack edtech web application
React based fullstack edtech web applicationReact based fullstack edtech web application
React based fullstack edtech web application
 
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
A Comprehensive Review of Integrating IoT and Blockchain Technologies in the ...
 
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
A REVIEW ON THE PERFORMANCE OF COCONUT FIBRE REINFORCED CONCRETE.
 
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
Optimizing Business Management Process Workflows: The Dynamic Influence of Mi...
 
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic DesignMultistoried and Multi Bay Steel Building Frame by using Seismic Design
Multistoried and Multi Bay Steel Building Frame by using Seismic Design
 
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
Cost Optimization of Construction Using Plastic Waste as a Sustainable Constr...
 

Recently uploaded

Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacingjaychoudhary37
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 

Recently uploaded (20)

Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
🔝9953056974🔝!!-YOUNG call girls in Rajendra Nagar Escort rvice Shot 2000 nigh...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
microprocessor 8085 and its interfacing
microprocessor 8085  and its interfacingmicroprocessor 8085  and its interfacing
microprocessor 8085 and its interfacing
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 

IRJET- Improving Quality and Productivity in Switchgear Tank Welding through Poka-Yoke and Waste Elimination in Robotic Welding Shop

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1611 Improving Quality and Productivity in Switchgear Tank Welding through Poka-Yoke and Waste Elimination in Robotic Welding Shop Sanket Sancheti Mechanical Engineering Department, DVVP College of Engineering, Ahmednagar, Maharashtra Savitribai Phule Pune University ---------------------------------------------------------------------***---------------------------------------------------------------------- Abstract - Now a days manufacturing industries are facing a greater competition in the market. Because of this, they try to improve and increase both quality and productivity continuously. One way to increase the productivity is to increase the availability of existing machines; Total productive maintenance aims to increase the availability of existing equipment so no further capital investment is needed. Availability of machines can be increased by reducing the downtime or Breakdowns of the machines. The main objective of this study is to find out the major breakdowns causing production losses to the company and to suggest counter measures by which these problems can be reduced. Root cause analysis is conducted to find the root cause of breakdowns and some parallel improvement opportunities were also identified for implementation so as to reduce the downtime. Key Words: Switchgear, Welding, Fixture, Poka-Yoke, Pareto Chart, ISMC Channel. 1. INTRODUCTION Productivity improvement is one of the core strategies towards manufacturing excellence and it is also necessary to achieve good financial and operational performance. It enhances customer satisfaction and reduce time and cost to develop, produce and deliver products and service. Productivity has a positive and significant relationship to performance measurement for process utilization, process output, product costs, and work-in-process inventory levels and on-time delivery. Improvement can be in the form of elimination, correction (repair) of ineffective processing, simplifying the process, optimizing the system, reducing variation. Minimizing the number of defects is important to any company since it influence their outputs and profits. The aim of this paper is to study the implementation of industrial engineering tools in a manufacturing of Switch Gear part (tank) weighing about 100 kilogram. This study starts with reading the standard operation procedures and analysing the process flow to get the whole idea on how to manufacture tank of switch gear. At the same time, observations at the production line were made to identify problem occurs in the production line. By using check sheet, the defect data from each station were collected and have been analysed using Pareto Chart. From the chart, it is found that robotic welding workstation shows the highest number of defects. Based on observation at the welding workstation, the existing method used to weld the tank was inappropriate because the operator need to take new reference point for new tank. Then, by using cause and effect diagram, the root cause of the problem was identified and solutions to overcome the problem were proposed. 1.1 Problem Statement Previously, operation are performed as follows: 1. Loading of tank manually on welding workstation 2. Handling of tank done manually 3. Various operations like spot welding, stud welding, tank handling, cleaning and inspection are performed manually. 4. Welding problems like spatters, thermal patches add the cost of cleaning. These increases the time required for manufacturing. 1.2 Objective  Increase Productivity of Welding Shop.  Reduce Non Valued Activities.  Handling of Switchgear Tank  Cleaning of Tank  Reduce Spatters during Stud Welding  Reduce Warp edge of Sheet.  Reduce effect of Thermal Stresses.  Improve Quality of Product. A fixture need to be designed in order to fulfil all objectives. 1.3 Scope Scope of above project is as follows: 1. By implementation of different Quality tools, Quality and productivity of product can be increased.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1612 2. Also, these Quality tools can be used to increase efficiency and effectiveness of production. 3. Designing of fixture and Templates reduces the Workmanship. 4. Automation of designed fixture and its integration with PLC and SCADA system is possible. 1.4 Methodology A productivity improvement technique is the methodology chosen to carry out to increase the production of switchgear tank manufacturing. A framework of the work to be carried is given as follows:  Analyse Manufacturing Processes Associated With Given Workstation.  Identify the problems at workstation.  Identifying Possible NVA(Non Value Added Activities)  Prioritization Using Pareto Analysis.  Design of holding Fixture & Templates.  Solving problems by using following Quality Management Tools:  Root Cause Analysis , Pareto Charts  Poka Yoke  FMEA, DMAIC 2. SWITCHGEAR In an electric power system, switchgear is the combination of electrical disconnect switches, fuses or circuit breakers used to control, protect and isolate electrical equipment. Switchgear is used both to de-energize equipment to allow work to be done and to clear faults downstream. This type of equipment is directly linked to the reliability of the electricity supply. Fig 2.1: Switchgear 2.1 Functions One of the basic functions of switchgear is protection, which is interruption of short-circuit and overload fault currents while maintaining service to unaffected circuits. Switchgear also provides isolation of circuits from power supplies. Switchgear is also used to enhance system availability by allowing more than one source to feed a load. 2.2 Productivity The term productivity can be used to examine efficiency and effectiveness of any activity conducted in an economy, business, government or by individuals. For example, learning or studying methods used by students that include reading and/or writing the content of a topic and revising the topic by saying out aloud or rewriting. Efficiency, effectiveness and productivity can also be evaluated for businesses in service sector. Productivity however, is broadly evaluated mostly through service volume, delivery processes and customer-perceived quality in services offered. In the context of the real world, productivity is mostly examined and evaluated with reference to businesses or an economy. Accordingly, it is essential to study productivity in order to:-  Understand the processes of a business  Control the business processes  Continuously improve processes  Assess performance of a business  Determine a business ability to sustain in the long run In order to increase productivity, Monitor how much time you spend on tasks, and prioritize important work. Productivity can be reduced if you allocate time inefficiently. Use programs such as Rescue Time to increase productivity by tracking the time you spend on specific applications.
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1613 2.3 Quality It is also defined as fitness for purpose. Quality is a perceptual, conditional, and somewhat subjective attribute and may be understood differently by different people. Consumers may focus on the specification quality of a product/service, or how it compares to competitors in the marketplace. Producers might measure the conformance quality, or degree to which the product/service was produced correctly. Support personnel may measure quality in the degree that a product is reliable, maintainable, or sustainable. A quality item (an item that has quality) has the ability to perform satisfactorily in service and is suitable for its intended purpose. 2.4 Poka Yoke Poka-yoke is a Japanese term that means "mistake- proofing" or “inadvertent error prevention”. The key word in the second translation, often omitted, is "inadvertent". There is no Poka Yoke solution that protects against an operator’s sabotage, but sabotage is a rare behaviour among people. A poka-yoke is any mechanism in a lean manufacturing process that helps an equipment operator avoid (yokeru) mistakes (poka). Its purpose is to eliminate product defects by preventing, correcting, or drawing attention to human errors as they occur. The concept was formalised, and the term adopted, by Shigeo Shingo as part of the Toyota Production System. It was originally described as baka-yoke, but as this means "fool-proofing" (or "idiot-proofing") the name was changed to the milder poka-yoke. 2.4.1 History The term poka-yoke was applied by Shigeo Shingo in the 1960s to industrial processes designed to prevent human errors.[5] Shingo redesigned a process in which factory workers, while assembling a small switch, would often forget to insert the required spring under one of the switch buttons. In the redesigned process, the worker would perform the task in two steps, first preparing the two required springs and placing them in a placeholder, then inserting the springs from the placeholder into the switch. When a spring remained in the placeholder, the workers knew that they had forgotten to insert it and could correct the mistake effortlessly. Shingo distinguished between the concepts of inevitable human mistakes and defects in the production. Defects occur when the mistakes are allowed to reach the customer. The aim of poka-yoke is to design the process so that mistakes can be detected and corrected immediately, eliminating defects at the source. Fig 2.2: Application of Poka Yoke 2.4.2 Implementation of Poka Yoke Shigeo Shingo recognized three types of poka-yoke for detecting and preventing errors in a mass production system: 1. The contact method identifies product defects by testing the product's shape, size, color, or other physical attributes. 2. The fixed-value (or constant number) method alerts the operator if a certain number of movements are not made. 3. The motion-step (or sequence) method determines whether the prescribed steps of the process have been followed. A methodic approach to build up poka-yoke countermeasures has been proposed by the Applied Problem Solving (APS) methodology, which consists of a three-step analysis of the risks to be managed: 1. identification of the need 2. identification of possible mistakes 3. management of mistakes before satisfying the need This approach can be used to emphasize the technical aspect of finding effective solutions during brainstorming sessions. 2.4.3 Benefits of Poka Yoke Implementation A typical feature of Poka Yoke solutions is that they don’t let an error in a process happen. But that is just one of their advantages. Others include:  Less time spent on training workers;  Elimination of many operations related to quality control.  Unburdening of operators from repetitive operations;  Promotion of the work improvement-oriented approach and actions;  A reduced number of rejects;  Immediate action when a problem occurs;  100% built-in quality control.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1614 3. Implementation of Quality Tools Fig 3.1 Product of workstation 3.1 Data Analysis From above data collected, Various NVA’s associated with given processes are: Table 3.2: Percentage Time Required for Various NVA’s Graph 3.3: Pareto analysis of Associated NVA’s 4. Design of fixture From above analysis, major problem associated with given workstation is handling problem. So, designing of fixture for handling switchgear tank will play crucial role in eliminating these major problem and hence increase productivity. Fig 4.1: Basic Model of Fixture 47 6 4 12 13 10 8 Percentage time required for various NVA's 3.1.1 Pareto Analysis: SR NO. NON VALUE ADDED ACTIVITY PERCENTAGE TIME REQUIRED 1. Handling problem 47% 2. Scratches due to rough Handling 6% 3. Warp edge problem due to handling of tank by belt and use of crane 4% 4. Inspection and testing 12% 5. Welding spatter problem 13% 6. Thermal patches 10% 7. Thermal stresses problem it changes dimensions between two brackets 8%
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1615 4.1 Design of Column Fig 4.2: Standard ISMC100 Channel Standard ISMC100 channel is selected. Dimensions: 100*50*5 mm, Material: Mild Steel, Self-weight: 9.56kg Weight of switchgear tank = 150kg E = 210Gpa =210*10³ Mpa, Syt=380 mpa Compressive stress= Syt/2 =190 Mpa Fig4.3: C/S of ISMC100 Column I = 358.22*10³ Area=A= (100*50-90*45) = 950mm² M=P*L=2000*1000=2*10^6 N-mm 4.1.1 Compressive stress σc = = = 4.20 N/mm² 4.1.2 Bending stress σ = =13.95 N/mm² As the maximum stress is less than allowable Hence, design is safe 4.1.3 Buckling Load Pe= As buckling load is greater than actual, design is safe. 4.2 Design of pin Fig 4.4: Design of Pin Material: EN8 Material specification:- Yield stress= Syt =465 N/mm² Hardness=201-255BHN Compressive and tensile stress: σt = σc = Syt/FOS=465/2=232.5 N/mm² Shear stress τ=0.5*σt =0.5*232.5=116.25 N/mm² 4.2.1 Calculation of diameter using direct shear τ = 116.25 = d=4.68 ≈ 5mm 4.2.2 Dimension of pin in Torsion Considering FOS = 6, τ = 38.34 τ = T = 400*1000 = 400000 N.mm 38.34 = d = 37.46 mm ≈ 40 mm Taking higher dimension d = 40 mm
  • 6. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 05 Issue: 12 | Dec 2018 www.irjet.net p-ISSN: 2395-0072 © 2018, IRJET | Impact Factor value: 7.211 | ISO 9001:2008 Certified Journal | Page 1616 Conclusions As per above project work and fixture design, we can conclude that 1. We can reduce efforts of workers by using fixture and we can also neglect handling problem 2. Due to suitability in process, it reduces time required to manufacture switchgear tank and hence production rate increases 3. Overall result will be improvement in quality and productivity of switchgear tank welding. References • A Review on use of Mistake Proofing (Poka Yoke) Tool in Blow Moulding process by Patel Parikshit, Vidya Nair, Patel Nikunj ISSN: 2319-7064 • Development, Fabrication and Analysis of fixture by Kiran Valandi, M. Vijaykumar, Kishor Kumar S ISSN:2319-8753 • Root Cause Analysis for Reducing Breakdowns in a manufacturing Industry by Kiran M, Cijo Mathew, Jacob Kuriakose ISSN: 2250-2459 • An application of pareto analysis and cause effect diagram for minimization of defects in manual casting process by Sim Hock Kheng, Sha’ri Mohd Yosof ISSN: 2320-2092 • Development of TPM implementation plan in switchgear & engineering company by Aniruddha Joshi, Pritam Kadam ICME03-AM-32. AUTHOR Sanket Sanjay Sancheti BE (Mechanical) Diploma(Mechanical)