SlideShare a Scribd company logo
1 of 8
Download to read offline
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 867
ACHIEVING OPERATIONAL EXCELLENCE BY IMPLEMENTING AN
ERP (ENTERPRISE RESOURCE PLANNING) SYSTEM (A CASE STUDY
OF A LARGE SCALE INDUSTRY)
S.S. Kuber1
, Babasaheb P. Raut2
1
Professor, Department of Industrial & Production Engineering, Vishwakarma Institute of Technology, Pune
2
M. Tech. (Industrial Engg), Vishwakarma Institute of Technology, Pune
Abstract
The objective of this research paper is to study the benefits in terms of operational excellence after implementing of an ERP system in
a large scale industry (Filters Manufacturer). The study contains the functions from ‘Inventory’, ‘Procurement’, ‘Order Management’
& ‘Mobile Supply Chain’. Enterprise resource planning (ERP) software integrates key business and management processes within
and beyond a firm’s boundary. An ERP system has the potential to seamlessly integrate various processes and functions of an
organization, and generate a comprehensive picture of an entire company.
Traditional methods of doing the business are too slow for the industry which is trying to compete against electronic. The paper
highlights the benefits mainly in- i) Processing Time ii) Manpower Reduction iii) Reduction in Audit Frequency iv) Inventory
Traceability v) Availability of Data & Reporting Advantages vi) Month End Closures / Reconciliations & Year End Closure vii)
Operational Excellence & Productivity Improvements
Keywords- Enterprise Resource Planning, Operational Excellence
--------------------------------------------------------------------***-----------------------------------------------------------------
1. INTRODUCTION
The global market for enterprise resource planning (ERP) has
registered a significant growth in last two decades. The global
ERP market’s revenue were estimated $65 Billion plus in
2012. Early ERP systems implementer’s deployed modules
primarily addressed intra-firm activities in the finance,
logistics & human resource functions of the organizations. As
Intra-firm ERP implementations stabilized then company
targets to implement the modules which are inter-firm.
Because of expanding customer demand, ERP vendors
continue to add their product lines by offering ERP systems
that have more depth, complexity, and modular integrations.
ERP implementation results in improvement in operational
performance & enables firms to standardize, integrate, and
streamline their data and process flows. This also provides
critical information streams necessary for effective decision-
making.
In this study, we seek to advance this stream by implementing
an ERP system for a large scale filter manufacturing firm &
observe the operational performance at various stages. We
believe that our investigation of individual and systematic
ERP implementations can provide an improved picture of an
ERP system to the firm. Paper is organized in such a way that
in the first section it gives the objective & implementation
phases of an ERP system. Also before implementing an ERP
system, we had taken the data of the objectives respectively an
analyzed / compared after go live. We observed the readings
for 4 months after go live and mentioned the conclusions and
results in the second section of this paper. Also the graphs are
included wherever necessary in this paper on the basis of
collection of the data from the respective sites for the industry.
1.1 Objectives:
Improve operational excellence & productivity by-
1. Reduce Processing Time
2. Reduce Manpower
3. Reduction in Audit Frequency
4. Inventory Traceability
5. Availability of Data & Reporting Advantages
6. Month End Closures / Reconciliations & Year End
Closure
Objective of the company is to implement the Oracle e-
Business Suite Application (ERP Applications) to achieve the
above effect at various departments.
2. IMPLEMENTATION ETHODOLOGY
Various ERP uses their implementation methodologies while
implementing an ERP system. At ‘Filter Manufacturer’, AIMS
(Application Implementation Methodology) methodology has
been used. It mainly comprises steps as below-
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 868
1. Business Requirement Gathering
2. As Is Study
3. To Be Process
4. Configuration / Development
5. Testing
6. User Acceptance Testing (UAT)
7. Documentation
8. Training to Super Users & Users
9. Go Live
10. Infant Care
11. Post Implementation Support
Table 1 Departments & it’s some of the functions
Functions Department
Requisitions Purchasing
Request for Quotations Purchasing
Quotations Purchasing
Purchase Order Purchasing
PO Receipts Purchasing
Payments Accounts Payables
Sub-Inventory Transfers Inventory
Inter Organization Transfers Inventory
Issue Material to Assembly Inventory
Return Material from Assembly to Inventory Inventory
Return Material from Inventory to Supplier Purchasing
Cycle Counting Inventory
Physical Inventory Inventory
Min Max Planning Inventory
Material Requirement Planning MRP
Sales Orders Order Management
Sales Order Allocations Inventory
Picking Inventory
Packing Order Management
Shipping Order Management
3. AS IS STUDY OBSERVATIONS
As is study mainly contains the existing business process
study at corporate sites, manufacturing units, inventory
organizations, warehouses & service locations. In this
implementation functional consultants have prepared a
questionnaire to discuss & capture the as is processes in the
‘Filtration Business Unit’ with business super users.
Main process in this research paper has been highlighted and
summarized from ‘Inventory Management’, ‘Purchasing’ &
‘Order Management’ areas.
Processes- 1.Procurement- A decentralized procurement
process in a very traditional way without any software or
electronic way is being used. Due to the decentralized
purchasing lots of manpower is being used at various sites.
Also the same material at different sites being procured from
different suppliers hence there is no scope of discounts from
supplier or suppliers. For processing a single purchase order
there has to be a communication & lots of follow ups with
suppliers. Also for internal approval of a purchase order there
seems to be a process time of near about 1 day, as this is a
manual process. Initially requisitions are being raised on a
manual template. It gets approved by a supervisor & then it
reaches to the buyer. All the requisitions are processed
manually & for the items quotations are requested from
supplier. Once supplier sends the quotations, after analyzing
those are processed. Then the purchase order is raised against
the approved suppliers in a traditional way on the paper
format. Hence the processing time of a document is very high
& sometimes create an issue to get the material at the plant
hence shipments are delayed and customer gets dissatisfied.
2.Inventory- In inventory there are many processes being used
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 869
since from material receiving, inspection (acceptance &
rejection), material transfer from one Subinventory to another
Subinventory, from one organization to another organization,
material issue to line. Also company uses cycle counting,
physical inventory. There are two different inventory
organizations which has RAW Material, FGI sub inventories
respectively. Physical inventory currently is being arranged
twice every year as to count the physical inventory and
reconcile manually & make necessary adjustments at finance
side. This is a very crucial process as of now as inventory size
is big. Also inventory planning is one of the major processes
for every inventory management. Currently there is a legacy
system which is used for planning.
3.1 Functions & Head Counts
In as is study, we had a look on the existing functions & head
counts who are involved in day to day work. There are more
resources involved in day to day work & summarized it as
below-
Fig 1 Functions & Head Count
3.2 Audit Frequency
Audit frequency for all the departments is very high & it
consumes lots of time as manual work and papers needs to be
audited. Average frequency per site is 2.1 & 2.2.
Table 2 Audit Frequency
Audit For
Site1 Site2
Year
(2013) Frequency Frequency
Jan'13 2 2
Feb'13 3 2
Mar'13 2 2
Apr'13 2 3
May'13 2 2
Jun'13 2 2
Jul'13 2 2
Aug'13 2 3
Sep'13 2 2
Average 2.11 2.22
Audit in terms of checking random transactions / documents in
term of purchase orders, receipts, material transfers & material
receipt. Once we analyzed we came to know lots of documents
and cross questioning happens in the audits. And auditors
won’t get the desired inputs in terms of concrete reports etc.
Fig 2 Audit Frequency at Site1 & Site2
3.3 Inventory Traceability
Inventory traceability is a big challenge currently and every
time user needs big amount of time to find out a part in the
inventory. There are no default locations defined for a specific
part while receiving. Any part is getting anywhere stored.
There is a lot of scope to redesign the process of inventory
storage before implementing.
No of occurrences since Jan 2013 that users unable to trace the
item in inventory and reported to the immediate supervisor-
Table 3 Events Occurred Unable to Trace Inventory
Events Occurred Inventory Traceability
Site1 Site2
Year(2013) Events Events
Jan'13 21 16
Feb'13 16 13
Mar'13 4 8
Apr'13 19 14
May'13 14 19
Jun'13 15 11
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 870
Jul'13 5 23
Aug'13 20 17
Sep'13 18 19
Average 14.66 15.55
Similar analysis has been presented in a graphical way-
Fig 3 Unable to trace Inventory
3.4 Availability of Data & Reporting Advantages
In as is study, we found that there is no availability of data in a
concrete manner to represent to the management &
management cannot take the concrete decision. Hence it
includes lots of manpower and repetitive work to get out the
details from the documents and represent it to the
management. The similar data needs to be represented in
different analysis for the top management to decide the way
ahead. So this is also one of the crucial tasks for the business
to look into and super users struggle a lot to get the data in a
presentable manner.
3.5 Month End Closures & Year End Closures
For every organization it is very important that every month
all the accounting periods gets successfully closed to identify
the month on month revenue & profit, expense & assets &
publish it to the share markets on quarterly basis. So that
public can invest more in the company in the form of share. If
a company unable to provide the quarterly performance, then
public may fear there is some crisis going on and any delay in
this, public invest in another company.
Table 4 Month End Closure Time Taken
Month End Closure
Site1 Site2
Year(2013)
Time Taken
(Hrs)
Time Taken
(Hrs)
Jan'13 49 38
Feb'13 52 63
Mar'13 45 48
Apr'13 39 37
May'13 37 46
Jun'13 43 45
Jul'13 31 29
Aug'13 45 27
Sep'13 38 35
Average 42.11 40.88
Above table, shows figures time taken for site1 & site2
respectively. As compare to other organizations which uses
ERP software, the time taken for monthly closure is very high.
The similar has been presented in a graphical way as below-
Fig 4 Month End Closure
Similarly, yearend closure is very much important as the
results for the financial year will be published by the
company. At year end closure, it is consolidated result for all
the months within that financial year.
4. TO BE PROCESS
This is the actual phase where we design the process map after
studying the existing process. This covers the documentation
part where we list down all the processes and create
workflows in a diagrammatical format. We have considered,
inventory processes, purchasing processes & order
management processes.
Prior to design any process, we need to make sure that the
Organization Structure is designed to suite the business. And
the data will flow from bottom to top in a successful manner
how business wants to be. Once the organization structure is
ready, then for individual module we need to make sure that it
is configured as per the business processes which are captured
in as is study.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 871
4.1 Procurement Processes
Fig 5 Procurement Cycle
We have considered the procurement lifecycle and as per it,
we have configured the necessary parameters for it in Oracle
e-Business Suite Application. These are mainly, Financial
Options, Purchasing Options, Receiving Parameters, Line
Types, Buyers, and also we developed some reports apart from
seeded for procurement department. Mainly we configured
‘Standard Purchase Order’, ‘Planned Purchase Order’,
’Blanket Purchase Agreement’,’ Contract Purchase
Agreement’. Below figure differences have been summarized
in between these purchase order types. Accordingly the
configuration for each purchase order has been defined in the
system. These setups are one time setups and not necessary to
change every time. If there is any change in business process
then accordingly the setups needs to be changed. Also
hierarchy has been defined. This hierarchy will help to
approve all the purchase related documents like purchase
orders. This hierarchy has been setup on the basis of position
and limits in terms of money for each position. Below table
shows the comparison in between the above mentioned
purchase order types in a summary –
Table 5 Comparison of Diff Types of POs
Comparison of Different Types of Purchase Order
Parameters SPO PPO BPA CPA
Terms and Conditions
Known Yes Yes Yes Yes
Goods and Services
Known Yes Yes Yes No
Pricing Known Yes Yes
May
Be No
Quantity Known Yes Yes No No
Deliver Schedule
Known Yes
May
Be No No
Account Distribution
Known Yes Yes No No
Can be Encumbered Yes Yes No No
Releases can be
Encumbered N/A Yes Yes No
4.2 Inventory Processes
This module is the key module & being referenced most of the
other modules. The basic setup structures for inventory
module are – Define key flex fields, work day calendar,
transaction types, source types, inventory accuracy methods,
inventory planning methods like Min Max Planning, Re-Order
Point Planning’, Cycle Counting, Physical Inventory and so
on. In inventory accuracy we have configured the items as per
the requirement in – Item Revision Control, Item Locator
Control, Item Serial Control, Item Lot Control. While
performing the transactions, if an item is under any one
control, you need to provide the extra information about it
while performing the transaction. Eg. If an item is serial
control, then while performing a transaction in the system,
user needs to provide item serial control. This captures each
and every transactions detail for reporting purpose.
Fig 6 Receipt to Issue Cycle
Also, few items has been put under min max planning method
as per the business requirement to order the economic order
quantity. Implementation team has developed the report like-
Inventory Valuation Report, Material Transaction Report,
Cycle Counting Listing Report, Physical Inventory
Adjustment Report etc..
4.3 Order Management Processes
In Order Management, we configure order line types, order
types, pricing, give the grants to the order processors.
According to the process, we have configured the order
management module as per the business requirement. Order
types configured as – Standard Order, Return Material
Authorization (RMA) Order i.e. nothing but the customer
returns and Drop Shipment. These three orders cover the
business requirement. Below figure shows ‘Order to Cash’
cycle.
Fig 7 Order to Cash Cycle
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 872
With the above mentioned module, we have configured the
‘Mobile Supply Chain Applications’, which again gives the
flexibility to perform the transactions anywhere in the plant
via a RFHHD (Radio Frequency Hand Held Device). User is
not required to note down the transactions and again perform
it via going back to his desktop. User can perform the
transactions from anywhere in the plant where the wireless
network is available. This covers most of the design and
configuration part in the implementation supply chain modules
for a filtration manufacturing industry.
4.4 Functional Testing, UAT & Documentation
This is one of the most important phases of any
implementation project life cycle. Implementation team and
testing team performs each and every test as per the business
processes mapped. If any test fails the results are collected and
according the objects needs to be fixed or the correction in
configuration of the setups needs to be performed. If testing is
done properly, after go live there will be no issues & less
impact on customer operations. First team has prepared a test
plan and a template, each business process has been
documented in the template for testing purpose. Also the
observations and findings have been incorporated in the
results column. Once implementation team tests all the
functional areas, business users needs to test it and it is called
as ‘User Acceptance Testing’. UAT confirms the user’s
acceptance according the business requirements and users or
super users give the confirmation & sign off the UAT phase.
In this project, UAT duration was around 20 days.
The documentation part, in any implementation plays an
important role. The time to time updating of the document is
useful to the implementation team members as well as
business.
4.5 Go Live
For every change there is a oppose, hence while going live
also most of the employee oppose the change. Go live is a
cutoff date to stop a legacy system transactions or manual
transactions and start capturing the transactions in the newly
live system. Go live means going live with the newly
implemented applications. Before go live there are so many
preparations like training users, data migrations or historical
data bringing in the new system. These are nothing the pre-
requisites for going live. After go live immediate application
support is known as ‘Infant Care’ & then post implementation
support. In post implementation support generally the
application related issues faced by users are addressed and
fixed by means of code fixes or work around. In next session
we are going to see the results and conclusions.
5. RESULTS AND CONCLUSIONS
ERP system represents a significant investment and major
source of operational performance improvement for firm.
After go live of an ERP system below are the improvements –
5.1 Functions and Head Counts:-
It has been observed that after implantation we see the head
counts has been decreased drastically. These resources are
being utilized in different roles and position now according to
their skills. In the graph we can see the respective areas and
it’s head count. In inventory it is 60, Order Management- 30,
Buyers– 23, Inventory supervisors- 21, Inventory Managers-
12, and Procurement Managers-5.
Fig 8 Functions and Head Count After
5.2 Audit Frequency
Audit frequency has been reduced quarterly once. As a single
database, auditors can access all the material transactions,
financial reports & compare with the help of system generated
reports. Hence work became very simple and accurate.
Fig 9 Audit Frequency After
We can see the audit frequency has been reduced to quarterly
once for a site.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 873
5.3 Inventory Traceability
After go live with ‘Mobile Application’ it has been observed
that zero occurrences to unable to trace the inventory.
Fig 10 Unable to Trace Inventory After
Radio frequency hand held device able to trace the inventory
once we enter the item details and inquiry it. How it works-
Fig 11 Inventory Traceability After
A hand held device reads the barcode and populate the details
in the field for processing the transaction. Hence accuracy in
the system is increased and productivity has been increased.
Similar way for tracing a part within an inventory, user needs
to navigate to the ‘Inquiry’ screen and enter the required
details of an item and search. System will show you the details
where the part was received and which location within an
inventory it has been placed.
5.4 Availability of Data & Reporting Advantage
With the single database, multiple site information is stored at
a place. Hence data availability for all sites and location is
available at one click. The custom reports have been
developed for the analysis of management and decision
making. The access of the respective reports has been given
the respective roles and positions. So that the data security is
maintained and particular information is only viewable to
respective person with that position.
5.5 Month End Closure & Year End Closure:-
Before implementation of an ERP system, average time for
month end closure was 48 & 40 hours for site 1 & 2
respectively. If we see the below
Fig 12 Month End Closure
If we see the graph, the time for month end closure has been
reduced drastically. This is possible due to an effective ERP
system.
6. CONCLUSIONS
ERP system has played a major role in improving each
process within the industry. Also it has given the more power
to all the users and super users. Also this study indicates that a
systematic ERP implementation contribute an operational
performance changes. It is important that managers focus
holistic integrations to derive maximum gains. Also, it
indicates performance improvement in each area where the
functions of ERP are being used. Hence as a consolidation we
see that operational performance and productivity has been
increased.
REFERENCES
[1] R.Panneerselvam, Production and Operations
Management,3rd ed. PHL Learning Pvt. Ltd
[2] Oracle Unversity, Oracle Inventory User Guide,Release
R12,Oracle University, USA
[3] Oracle University, Oracle Purchasing User Guide,
Release R12, Oracle Unviersity, USA.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 874
[4] Oracle University, Oracle Order Management User
Guide, Release R12, Oracle Unveristy, USA.
[5] Michael F., A Project Approach to Enterprise Resource
Planning Implementation, Internantional Journal of
Business Managmeent, Vol.7, No.10;May2012
[6] Severine Le Loarne, Working with ERP systems- Is big
brother back?, Science Direct, Computers in Industry
56 (2005) 523-528
[7] Shahneel Baray, Shafat Hameed, Analyzing the
Effectiveness of Implementing Enterprise Resource
Planning Systems in Priting Industry, European and
Mediterranean Conference on Information Systems
(EMCIS) 2006, July 6-7 2006, Costa Blanca, Alicante,
Spain

More Related Content

Viewers also liked

Rate adaptive resource allocation in ofdma using bees algorithm
Rate adaptive resource allocation in ofdma using bees algorithmRate adaptive resource allocation in ofdma using bees algorithm
Rate adaptive resource allocation in ofdma using bees algorithmeSAT Publishing House
 
Comparison of flow analysis of a sudden and gradual change
Comparison of flow analysis of a sudden and gradual changeComparison of flow analysis of a sudden and gradual change
Comparison of flow analysis of a sudden and gradual changeeSAT Publishing House
 
Design and analysis of worm pair used in self locking system with development...
Design and analysis of worm pair used in self locking system with development...Design and analysis of worm pair used in self locking system with development...
Design and analysis of worm pair used in self locking system with development...eSAT Publishing House
 
Synthesis and morphology of silicon nanoparticles by
Synthesis and morphology of silicon nanoparticles bySynthesis and morphology of silicon nanoparticles by
Synthesis and morphology of silicon nanoparticles byeSAT Publishing House
 
Solar system as a radio telescope by the formation of virtual lenses above an...
Solar system as a radio telescope by the formation of virtual lenses above an...Solar system as a radio telescope by the formation of virtual lenses above an...
Solar system as a radio telescope by the formation of virtual lenses above an...eSAT Publishing House
 
Integration of artificial intelligence control to the unified power quality c...
Integration of artificial intelligence control to the unified power quality c...Integration of artificial intelligence control to the unified power quality c...
Integration of artificial intelligence control to the unified power quality c...eSAT Publishing House
 
Optimization of workload prediction based on map reduce frame work in a cloud...
Optimization of workload prediction based on map reduce frame work in a cloud...Optimization of workload prediction based on map reduce frame work in a cloud...
Optimization of workload prediction based on map reduce frame work in a cloud...eSAT Publishing House
 
Ber analysis of wi max in multipath fading channels
Ber analysis of wi max in multipath fading channelsBer analysis of wi max in multipath fading channels
Ber analysis of wi max in multipath fading channelseSAT Publishing House
 
Comparative analysis of singularities of 3 prs and 3-
Comparative analysis of singularities of 3 prs and 3-Comparative analysis of singularities of 3 prs and 3-
Comparative analysis of singularities of 3 prs and 3-eSAT Publishing House
 
Behaviour of mine waste as reinforced soil
Behaviour of mine waste as reinforced soilBehaviour of mine waste as reinforced soil
Behaviour of mine waste as reinforced soileSAT Publishing House
 
Mathematical model for an area source and the point
Mathematical model for an area source and the pointMathematical model for an area source and the point
Mathematical model for an area source and the pointeSAT Publishing House
 
On the (pseudo) capacitive performance of jack fruit seed carbon
On the (pseudo) capacitive performance of jack fruit seed carbonOn the (pseudo) capacitive performance of jack fruit seed carbon
On the (pseudo) capacitive performance of jack fruit seed carboneSAT Publishing House
 
Detection of chlorpyrifos pesticide in various water
Detection of chlorpyrifos pesticide in various waterDetection of chlorpyrifos pesticide in various water
Detection of chlorpyrifos pesticide in various watereSAT Publishing House
 
Gis in assessing topographical aspects of hilly regions
Gis in assessing topographical aspects of hilly regionsGis in assessing topographical aspects of hilly regions
Gis in assessing topographical aspects of hilly regionseSAT Publishing House
 
Lake sediment thickness estimation using ground penetrating radar
Lake sediment thickness estimation using ground penetrating radarLake sediment thickness estimation using ground penetrating radar
Lake sediment thickness estimation using ground penetrating radareSAT Publishing House
 
Diabetic maculopathy detection using fundus fluorescein angiogram images a ...
Diabetic maculopathy detection using fundus fluorescein angiogram images   a ...Diabetic maculopathy detection using fundus fluorescein angiogram images   a ...
Diabetic maculopathy detection using fundus fluorescein angiogram images a ...eSAT Publishing House
 
Cmos active pixel design using 0.6 μm image sensor
Cmos active pixel design using 0.6 μm image sensorCmos active pixel design using 0.6 μm image sensor
Cmos active pixel design using 0.6 μm image sensoreSAT Publishing House
 
Collectors innovation to increase performance solar
Collectors innovation to increase performance solarCollectors innovation to increase performance solar
Collectors innovation to increase performance solareSAT Publishing House
 
Biodiesel as a blended fuel in compression ignition
Biodiesel as a blended fuel in compression ignitionBiodiesel as a blended fuel in compression ignition
Biodiesel as a blended fuel in compression ignitioneSAT Publishing House
 
Secure and efficient handover authentication and detection of spoofing attack
Secure and efficient handover authentication and detection of spoofing attackSecure and efficient handover authentication and detection of spoofing attack
Secure and efficient handover authentication and detection of spoofing attackeSAT Publishing House
 

Viewers also liked (20)

Rate adaptive resource allocation in ofdma using bees algorithm
Rate adaptive resource allocation in ofdma using bees algorithmRate adaptive resource allocation in ofdma using bees algorithm
Rate adaptive resource allocation in ofdma using bees algorithm
 
Comparison of flow analysis of a sudden and gradual change
Comparison of flow analysis of a sudden and gradual changeComparison of flow analysis of a sudden and gradual change
Comparison of flow analysis of a sudden and gradual change
 
Design and analysis of worm pair used in self locking system with development...
Design and analysis of worm pair used in self locking system with development...Design and analysis of worm pair used in self locking system with development...
Design and analysis of worm pair used in self locking system with development...
 
Synthesis and morphology of silicon nanoparticles by
Synthesis and morphology of silicon nanoparticles bySynthesis and morphology of silicon nanoparticles by
Synthesis and morphology of silicon nanoparticles by
 
Solar system as a radio telescope by the formation of virtual lenses above an...
Solar system as a radio telescope by the formation of virtual lenses above an...Solar system as a radio telescope by the formation of virtual lenses above an...
Solar system as a radio telescope by the formation of virtual lenses above an...
 
Integration of artificial intelligence control to the unified power quality c...
Integration of artificial intelligence control to the unified power quality c...Integration of artificial intelligence control to the unified power quality c...
Integration of artificial intelligence control to the unified power quality c...
 
Optimization of workload prediction based on map reduce frame work in a cloud...
Optimization of workload prediction based on map reduce frame work in a cloud...Optimization of workload prediction based on map reduce frame work in a cloud...
Optimization of workload prediction based on map reduce frame work in a cloud...
 
Ber analysis of wi max in multipath fading channels
Ber analysis of wi max in multipath fading channelsBer analysis of wi max in multipath fading channels
Ber analysis of wi max in multipath fading channels
 
Comparative analysis of singularities of 3 prs and 3-
Comparative analysis of singularities of 3 prs and 3-Comparative analysis of singularities of 3 prs and 3-
Comparative analysis of singularities of 3 prs and 3-
 
Behaviour of mine waste as reinforced soil
Behaviour of mine waste as reinforced soilBehaviour of mine waste as reinforced soil
Behaviour of mine waste as reinforced soil
 
Mathematical model for an area source and the point
Mathematical model for an area source and the pointMathematical model for an area source and the point
Mathematical model for an area source and the point
 
On the (pseudo) capacitive performance of jack fruit seed carbon
On the (pseudo) capacitive performance of jack fruit seed carbonOn the (pseudo) capacitive performance of jack fruit seed carbon
On the (pseudo) capacitive performance of jack fruit seed carbon
 
Detection of chlorpyrifos pesticide in various water
Detection of chlorpyrifos pesticide in various waterDetection of chlorpyrifos pesticide in various water
Detection of chlorpyrifos pesticide in various water
 
Gis in assessing topographical aspects of hilly regions
Gis in assessing topographical aspects of hilly regionsGis in assessing topographical aspects of hilly regions
Gis in assessing topographical aspects of hilly regions
 
Lake sediment thickness estimation using ground penetrating radar
Lake sediment thickness estimation using ground penetrating radarLake sediment thickness estimation using ground penetrating radar
Lake sediment thickness estimation using ground penetrating radar
 
Diabetic maculopathy detection using fundus fluorescein angiogram images a ...
Diabetic maculopathy detection using fundus fluorescein angiogram images   a ...Diabetic maculopathy detection using fundus fluorescein angiogram images   a ...
Diabetic maculopathy detection using fundus fluorescein angiogram images a ...
 
Cmos active pixel design using 0.6 μm image sensor
Cmos active pixel design using 0.6 μm image sensorCmos active pixel design using 0.6 μm image sensor
Cmos active pixel design using 0.6 μm image sensor
 
Collectors innovation to increase performance solar
Collectors innovation to increase performance solarCollectors innovation to increase performance solar
Collectors innovation to increase performance solar
 
Biodiesel as a blended fuel in compression ignition
Biodiesel as a blended fuel in compression ignitionBiodiesel as a blended fuel in compression ignition
Biodiesel as a blended fuel in compression ignition
 
Secure and efficient handover authentication and detection of spoofing attack
Secure and efficient handover authentication and detection of spoofing attackSecure and efficient handover authentication and detection of spoofing attack
Secure and efficient handover authentication and detection of spoofing attack
 

Similar to Achieving operational excellence by implementing an erp (enterprise resource planning) system (a case study of a large scale industry)

Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodsProductivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodseSAT Journals
 
Productivity improvement in plant by using systematic layout planning (slp) ...
Productivity improvement in plant by using systematic layout planning (slp)  ...Productivity improvement in plant by using systematic layout planning (slp)  ...
Productivity improvement in plant by using systematic layout planning (slp) ...eSAT Publishing House
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction ProjectIRJET Journal
 
Modern Elicitation Process
Modern Elicitation ProcessModern Elicitation Process
Modern Elicitation ProcessRajon
 
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyProductivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyIRJET Journal
 
Value stream mapping a case study of automotive
Value stream mapping a case study of automotiveValue stream mapping a case study of automotive
Value stream mapping a case study of automotiveeSAT Publishing House
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mappingeSAT Journals
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET Journal
 
IRJET- Research Paper on Inventory Management System
IRJET-  	  Research Paper on Inventory Management SystemIRJET-  	  Research Paper on Inventory Management System
IRJET- Research Paper on Inventory Management SystemIRJET Journal
 
Synopsis on billing system
Synopsis on billing systemSynopsis on billing system
Synopsis on billing systemAlok Sharma
 
Designing the Process of Stores Management for Implementing ERP in Manufactur...
Designing the Process of Stores Management for Implementing ERP in Manufactur...Designing the Process of Stores Management for Implementing ERP in Manufactur...
Designing the Process of Stores Management for Implementing ERP in Manufactur...sushil Choudhary
 
Designing the Process of Stores Management for Implementing ERP in Manufactur...
Designing the Process of Stores Management for Implementing ERP in Manufactur...Designing the Process of Stores Management for Implementing ERP in Manufactur...
Designing the Process of Stores Management for Implementing ERP in Manufactur...Sushil kumar Choudhary
 
Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...ijtsrd
 
Research on simulation of banking system for measuring the productivity of th...
Research on simulation of banking system for measuring the productivity of th...Research on simulation of banking system for measuring the productivity of th...
Research on simulation of banking system for measuring the productivity of th...eSAT Journals
 
IRJET- Speech and Hearing
IRJET- Speech and HearingIRJET- Speech and Hearing
IRJET- Speech and HearingIRJET Journal
 
Design and fabrication of modular fixture for cmm inspection
Design and fabrication of modular fixture for cmm inspectionDesign and fabrication of modular fixture for cmm inspection
Design and fabrication of modular fixture for cmm inspectioneSAT Journals
 
Implementation of ‘5 s’ technique in a manufacturing organization a case s...
Implementation of ‘5 s’ technique in a manufacturing organization    a case s...Implementation of ‘5 s’ technique in a manufacturing organization    a case s...
Implementation of ‘5 s’ technique in a manufacturing organization a case s...eSAT Journals
 
Dams dynamic attendance management system
Dams dynamic attendance management systemDams dynamic attendance management system
Dams dynamic attendance management systemeSAT Journals
 

Similar to Achieving operational excellence by implementing an erp (enterprise resource planning) system (a case study of a large scale industry) (20)

Productivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methodsProductivity improvement through lean deployment & work study methods
Productivity improvement through lean deployment & work study methods
 
Productivity improvement in plant by using systematic layout planning (slp) ...
Productivity improvement in plant by using systematic layout planning (slp)  ...Productivity improvement in plant by using systematic layout planning (slp)  ...
Productivity improvement in plant by using systematic layout planning (slp) ...
 
IRJET- Application of Work Study in Construction Project
IRJET-  	  Application of Work Study in Construction ProjectIRJET-  	  Application of Work Study in Construction Project
IRJET- Application of Work Study in Construction Project
 
Modern Elicitation Process
Modern Elicitation ProcessModern Elicitation Process
Modern Elicitation Process
 
S430199101
S430199101S430199101
S430199101
 
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case StudyProductivity Improvement by Optimum Utilization of Plant Layout: A Case Study
Productivity Improvement by Optimum Utilization of Plant Layout: A Case Study
 
Value stream mapping a case study of automotive
Value stream mapping a case study of automotiveValue stream mapping a case study of automotive
Value stream mapping a case study of automotive
 
Value stream mapping
Value stream mappingValue stream mapping
Value stream mapping
 
IRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction ProjectsIRJET- Cost Control Methods used in Construction Projects
IRJET- Cost Control Methods used in Construction Projects
 
IRJET- Research Paper on Inventory Management System
IRJET-  	  Research Paper on Inventory Management SystemIRJET-  	  Research Paper on Inventory Management System
IRJET- Research Paper on Inventory Management System
 
Synopsis on billing system
Synopsis on billing systemSynopsis on billing system
Synopsis on billing system
 
ATHARVA FEST
ATHARVA FESTATHARVA FEST
ATHARVA FEST
 
Designing the Process of Stores Management for Implementing ERP in Manufactur...
Designing the Process of Stores Management for Implementing ERP in Manufactur...Designing the Process of Stores Management for Implementing ERP in Manufactur...
Designing the Process of Stores Management for Implementing ERP in Manufactur...
 
Designing the Process of Stores Management for Implementing ERP in Manufactur...
Designing the Process of Stores Management for Implementing ERP in Manufactur...Designing the Process of Stores Management for Implementing ERP in Manufactur...
Designing the Process of Stores Management for Implementing ERP in Manufactur...
 
Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...Application of Industrial Engineering to increase the productivity of an E-Ri...
Application of Industrial Engineering to increase the productivity of an E-Ri...
 
Research on simulation of banking system for measuring the productivity of th...
Research on simulation of banking system for measuring the productivity of th...Research on simulation of banking system for measuring the productivity of th...
Research on simulation of banking system for measuring the productivity of th...
 
IRJET- Speech and Hearing
IRJET- Speech and HearingIRJET- Speech and Hearing
IRJET- Speech and Hearing
 
Design and fabrication of modular fixture for cmm inspection
Design and fabrication of modular fixture for cmm inspectionDesign and fabrication of modular fixture for cmm inspection
Design and fabrication of modular fixture for cmm inspection
 
Implementation of ‘5 s’ technique in a manufacturing organization a case s...
Implementation of ‘5 s’ technique in a manufacturing organization    a case s...Implementation of ‘5 s’ technique in a manufacturing organization    a case s...
Implementation of ‘5 s’ technique in a manufacturing organization a case s...
 
Dams dynamic attendance management system
Dams dynamic attendance management systemDams dynamic attendance management system
Dams dynamic attendance management system
 

More from eSAT Publishing House

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnameSAT Publishing House
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...eSAT Publishing House
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnameSAT Publishing House
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...eSAT Publishing House
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaeSAT Publishing House
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingeSAT Publishing House
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...eSAT Publishing House
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...eSAT Publishing House
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...eSAT Publishing House
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a revieweSAT Publishing House
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...eSAT Publishing House
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard managementeSAT Publishing House
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallseSAT Publishing House
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...eSAT Publishing House
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...eSAT Publishing House
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaeSAT Publishing House
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structureseSAT Publishing House
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingseSAT Publishing House
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...eSAT Publishing House
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...eSAT Publishing House
 

More from eSAT Publishing House (20)

Likely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnamLikely impacts of hudhud on the environment of visakhapatnam
Likely impacts of hudhud on the environment of visakhapatnam
 
Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...Impact of flood disaster in a drought prone area – case study of alampur vill...
Impact of flood disaster in a drought prone area – case study of alampur vill...
 
Hudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnamHudhud cyclone – a severe disaster in visakhapatnam
Hudhud cyclone – a severe disaster in visakhapatnam
 
Groundwater investigation using geophysical methods a case study of pydibhim...
Groundwater investigation using geophysical methods  a case study of pydibhim...Groundwater investigation using geophysical methods  a case study of pydibhim...
Groundwater investigation using geophysical methods a case study of pydibhim...
 
Flood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, indiaFlood related disasters concerned to urban flooding in bangalore, india
Flood related disasters concerned to urban flooding in bangalore, india
 
Enhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity buildingEnhancing post disaster recovery by optimal infrastructure capacity building
Enhancing post disaster recovery by optimal infrastructure capacity building
 
Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...Effect of lintel and lintel band on the global performance of reinforced conc...
Effect of lintel and lintel band on the global performance of reinforced conc...
 
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
Wind damage to trees in the gitam university campus at visakhapatnam by cyclo...
 
Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...Wind damage to buildings, infrastrucuture and landscape elements along the be...
Wind damage to buildings, infrastrucuture and landscape elements along the be...
 
Shear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a reviewShear strength of rc deep beam panels – a review
Shear strength of rc deep beam panels – a review
 
Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...Role of voluntary teams of professional engineers in dissater management – ex...
Role of voluntary teams of professional engineers in dissater management – ex...
 
Risk analysis and environmental hazard management
Risk analysis and environmental hazard managementRisk analysis and environmental hazard management
Risk analysis and environmental hazard management
 
Review study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear wallsReview study on performance of seismically tested repaired shear walls
Review study on performance of seismically tested repaired shear walls
 
Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...Monitoring and assessment of air quality with reference to dust particles (pm...
Monitoring and assessment of air quality with reference to dust particles (pm...
 
Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...Low cost wireless sensor networks and smartphone applications for disaster ma...
Low cost wireless sensor networks and smartphone applications for disaster ma...
 
Coastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of indiaCoastal zones – seismic vulnerability an analysis from east coast of india
Coastal zones – seismic vulnerability an analysis from east coast of india
 
Can fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structuresCan fracture mechanics predict damage due disaster of structures
Can fracture mechanics predict damage due disaster of structures
 
Assessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildingsAssessment of seismic susceptibility of rc buildings
Assessment of seismic susceptibility of rc buildings
 
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
A geophysical insight of earthquake occurred on 21 st may 2014 off paradip, b...
 
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
Effect of hudhud cyclone on the development of visakhapatnam as smart and gre...
 

Recently uploaded

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 

Recently uploaded (20)

UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur EscortsRussian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
Russian Call Girls in Nagpur Grishma Call 7001035870 Meet With Nagpur Escorts
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service NashikCall Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
Call Girls Service Nashik Vaishnavi 7001305949 Independent Escort Service Nashik
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 

Achieving operational excellence by implementing an erp (enterprise resource planning) system (a case study of a large scale industry)

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 867 ACHIEVING OPERATIONAL EXCELLENCE BY IMPLEMENTING AN ERP (ENTERPRISE RESOURCE PLANNING) SYSTEM (A CASE STUDY OF A LARGE SCALE INDUSTRY) S.S. Kuber1 , Babasaheb P. Raut2 1 Professor, Department of Industrial & Production Engineering, Vishwakarma Institute of Technology, Pune 2 M. Tech. (Industrial Engg), Vishwakarma Institute of Technology, Pune Abstract The objective of this research paper is to study the benefits in terms of operational excellence after implementing of an ERP system in a large scale industry (Filters Manufacturer). The study contains the functions from ‘Inventory’, ‘Procurement’, ‘Order Management’ & ‘Mobile Supply Chain’. Enterprise resource planning (ERP) software integrates key business and management processes within and beyond a firm’s boundary. An ERP system has the potential to seamlessly integrate various processes and functions of an organization, and generate a comprehensive picture of an entire company. Traditional methods of doing the business are too slow for the industry which is trying to compete against electronic. The paper highlights the benefits mainly in- i) Processing Time ii) Manpower Reduction iii) Reduction in Audit Frequency iv) Inventory Traceability v) Availability of Data & Reporting Advantages vi) Month End Closures / Reconciliations & Year End Closure vii) Operational Excellence & Productivity Improvements Keywords- Enterprise Resource Planning, Operational Excellence --------------------------------------------------------------------***----------------------------------------------------------------- 1. INTRODUCTION The global market for enterprise resource planning (ERP) has registered a significant growth in last two decades. The global ERP market’s revenue were estimated $65 Billion plus in 2012. Early ERP systems implementer’s deployed modules primarily addressed intra-firm activities in the finance, logistics & human resource functions of the organizations. As Intra-firm ERP implementations stabilized then company targets to implement the modules which are inter-firm. Because of expanding customer demand, ERP vendors continue to add their product lines by offering ERP systems that have more depth, complexity, and modular integrations. ERP implementation results in improvement in operational performance & enables firms to standardize, integrate, and streamline their data and process flows. This also provides critical information streams necessary for effective decision- making. In this study, we seek to advance this stream by implementing an ERP system for a large scale filter manufacturing firm & observe the operational performance at various stages. We believe that our investigation of individual and systematic ERP implementations can provide an improved picture of an ERP system to the firm. Paper is organized in such a way that in the first section it gives the objective & implementation phases of an ERP system. Also before implementing an ERP system, we had taken the data of the objectives respectively an analyzed / compared after go live. We observed the readings for 4 months after go live and mentioned the conclusions and results in the second section of this paper. Also the graphs are included wherever necessary in this paper on the basis of collection of the data from the respective sites for the industry. 1.1 Objectives: Improve operational excellence & productivity by- 1. Reduce Processing Time 2. Reduce Manpower 3. Reduction in Audit Frequency 4. Inventory Traceability 5. Availability of Data & Reporting Advantages 6. Month End Closures / Reconciliations & Year End Closure Objective of the company is to implement the Oracle e- Business Suite Application (ERP Applications) to achieve the above effect at various departments. 2. IMPLEMENTATION ETHODOLOGY Various ERP uses their implementation methodologies while implementing an ERP system. At ‘Filter Manufacturer’, AIMS (Application Implementation Methodology) methodology has been used. It mainly comprises steps as below-
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 868 1. Business Requirement Gathering 2. As Is Study 3. To Be Process 4. Configuration / Development 5. Testing 6. User Acceptance Testing (UAT) 7. Documentation 8. Training to Super Users & Users 9. Go Live 10. Infant Care 11. Post Implementation Support Table 1 Departments & it’s some of the functions Functions Department Requisitions Purchasing Request for Quotations Purchasing Quotations Purchasing Purchase Order Purchasing PO Receipts Purchasing Payments Accounts Payables Sub-Inventory Transfers Inventory Inter Organization Transfers Inventory Issue Material to Assembly Inventory Return Material from Assembly to Inventory Inventory Return Material from Inventory to Supplier Purchasing Cycle Counting Inventory Physical Inventory Inventory Min Max Planning Inventory Material Requirement Planning MRP Sales Orders Order Management Sales Order Allocations Inventory Picking Inventory Packing Order Management Shipping Order Management 3. AS IS STUDY OBSERVATIONS As is study mainly contains the existing business process study at corporate sites, manufacturing units, inventory organizations, warehouses & service locations. In this implementation functional consultants have prepared a questionnaire to discuss & capture the as is processes in the ‘Filtration Business Unit’ with business super users. Main process in this research paper has been highlighted and summarized from ‘Inventory Management’, ‘Purchasing’ & ‘Order Management’ areas. Processes- 1.Procurement- A decentralized procurement process in a very traditional way without any software or electronic way is being used. Due to the decentralized purchasing lots of manpower is being used at various sites. Also the same material at different sites being procured from different suppliers hence there is no scope of discounts from supplier or suppliers. For processing a single purchase order there has to be a communication & lots of follow ups with suppliers. Also for internal approval of a purchase order there seems to be a process time of near about 1 day, as this is a manual process. Initially requisitions are being raised on a manual template. It gets approved by a supervisor & then it reaches to the buyer. All the requisitions are processed manually & for the items quotations are requested from supplier. Once supplier sends the quotations, after analyzing those are processed. Then the purchase order is raised against the approved suppliers in a traditional way on the paper format. Hence the processing time of a document is very high & sometimes create an issue to get the material at the plant hence shipments are delayed and customer gets dissatisfied. 2.Inventory- In inventory there are many processes being used
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 869 since from material receiving, inspection (acceptance & rejection), material transfer from one Subinventory to another Subinventory, from one organization to another organization, material issue to line. Also company uses cycle counting, physical inventory. There are two different inventory organizations which has RAW Material, FGI sub inventories respectively. Physical inventory currently is being arranged twice every year as to count the physical inventory and reconcile manually & make necessary adjustments at finance side. This is a very crucial process as of now as inventory size is big. Also inventory planning is one of the major processes for every inventory management. Currently there is a legacy system which is used for planning. 3.1 Functions & Head Counts In as is study, we had a look on the existing functions & head counts who are involved in day to day work. There are more resources involved in day to day work & summarized it as below- Fig 1 Functions & Head Count 3.2 Audit Frequency Audit frequency for all the departments is very high & it consumes lots of time as manual work and papers needs to be audited. Average frequency per site is 2.1 & 2.2. Table 2 Audit Frequency Audit For Site1 Site2 Year (2013) Frequency Frequency Jan'13 2 2 Feb'13 3 2 Mar'13 2 2 Apr'13 2 3 May'13 2 2 Jun'13 2 2 Jul'13 2 2 Aug'13 2 3 Sep'13 2 2 Average 2.11 2.22 Audit in terms of checking random transactions / documents in term of purchase orders, receipts, material transfers & material receipt. Once we analyzed we came to know lots of documents and cross questioning happens in the audits. And auditors won’t get the desired inputs in terms of concrete reports etc. Fig 2 Audit Frequency at Site1 & Site2 3.3 Inventory Traceability Inventory traceability is a big challenge currently and every time user needs big amount of time to find out a part in the inventory. There are no default locations defined for a specific part while receiving. Any part is getting anywhere stored. There is a lot of scope to redesign the process of inventory storage before implementing. No of occurrences since Jan 2013 that users unable to trace the item in inventory and reported to the immediate supervisor- Table 3 Events Occurred Unable to Trace Inventory Events Occurred Inventory Traceability Site1 Site2 Year(2013) Events Events Jan'13 21 16 Feb'13 16 13 Mar'13 4 8 Apr'13 19 14 May'13 14 19 Jun'13 15 11
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 870 Jul'13 5 23 Aug'13 20 17 Sep'13 18 19 Average 14.66 15.55 Similar analysis has been presented in a graphical way- Fig 3 Unable to trace Inventory 3.4 Availability of Data & Reporting Advantages In as is study, we found that there is no availability of data in a concrete manner to represent to the management & management cannot take the concrete decision. Hence it includes lots of manpower and repetitive work to get out the details from the documents and represent it to the management. The similar data needs to be represented in different analysis for the top management to decide the way ahead. So this is also one of the crucial tasks for the business to look into and super users struggle a lot to get the data in a presentable manner. 3.5 Month End Closures & Year End Closures For every organization it is very important that every month all the accounting periods gets successfully closed to identify the month on month revenue & profit, expense & assets & publish it to the share markets on quarterly basis. So that public can invest more in the company in the form of share. If a company unable to provide the quarterly performance, then public may fear there is some crisis going on and any delay in this, public invest in another company. Table 4 Month End Closure Time Taken Month End Closure Site1 Site2 Year(2013) Time Taken (Hrs) Time Taken (Hrs) Jan'13 49 38 Feb'13 52 63 Mar'13 45 48 Apr'13 39 37 May'13 37 46 Jun'13 43 45 Jul'13 31 29 Aug'13 45 27 Sep'13 38 35 Average 42.11 40.88 Above table, shows figures time taken for site1 & site2 respectively. As compare to other organizations which uses ERP software, the time taken for monthly closure is very high. The similar has been presented in a graphical way as below- Fig 4 Month End Closure Similarly, yearend closure is very much important as the results for the financial year will be published by the company. At year end closure, it is consolidated result for all the months within that financial year. 4. TO BE PROCESS This is the actual phase where we design the process map after studying the existing process. This covers the documentation part where we list down all the processes and create workflows in a diagrammatical format. We have considered, inventory processes, purchasing processes & order management processes. Prior to design any process, we need to make sure that the Organization Structure is designed to suite the business. And the data will flow from bottom to top in a successful manner how business wants to be. Once the organization structure is ready, then for individual module we need to make sure that it is configured as per the business processes which are captured in as is study.
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 871 4.1 Procurement Processes Fig 5 Procurement Cycle We have considered the procurement lifecycle and as per it, we have configured the necessary parameters for it in Oracle e-Business Suite Application. These are mainly, Financial Options, Purchasing Options, Receiving Parameters, Line Types, Buyers, and also we developed some reports apart from seeded for procurement department. Mainly we configured ‘Standard Purchase Order’, ‘Planned Purchase Order’, ’Blanket Purchase Agreement’,’ Contract Purchase Agreement’. Below figure differences have been summarized in between these purchase order types. Accordingly the configuration for each purchase order has been defined in the system. These setups are one time setups and not necessary to change every time. If there is any change in business process then accordingly the setups needs to be changed. Also hierarchy has been defined. This hierarchy will help to approve all the purchase related documents like purchase orders. This hierarchy has been setup on the basis of position and limits in terms of money for each position. Below table shows the comparison in between the above mentioned purchase order types in a summary – Table 5 Comparison of Diff Types of POs Comparison of Different Types of Purchase Order Parameters SPO PPO BPA CPA Terms and Conditions Known Yes Yes Yes Yes Goods and Services Known Yes Yes Yes No Pricing Known Yes Yes May Be No Quantity Known Yes Yes No No Deliver Schedule Known Yes May Be No No Account Distribution Known Yes Yes No No Can be Encumbered Yes Yes No No Releases can be Encumbered N/A Yes Yes No 4.2 Inventory Processes This module is the key module & being referenced most of the other modules. The basic setup structures for inventory module are – Define key flex fields, work day calendar, transaction types, source types, inventory accuracy methods, inventory planning methods like Min Max Planning, Re-Order Point Planning’, Cycle Counting, Physical Inventory and so on. In inventory accuracy we have configured the items as per the requirement in – Item Revision Control, Item Locator Control, Item Serial Control, Item Lot Control. While performing the transactions, if an item is under any one control, you need to provide the extra information about it while performing the transaction. Eg. If an item is serial control, then while performing a transaction in the system, user needs to provide item serial control. This captures each and every transactions detail for reporting purpose. Fig 6 Receipt to Issue Cycle Also, few items has been put under min max planning method as per the business requirement to order the economic order quantity. Implementation team has developed the report like- Inventory Valuation Report, Material Transaction Report, Cycle Counting Listing Report, Physical Inventory Adjustment Report etc.. 4.3 Order Management Processes In Order Management, we configure order line types, order types, pricing, give the grants to the order processors. According to the process, we have configured the order management module as per the business requirement. Order types configured as – Standard Order, Return Material Authorization (RMA) Order i.e. nothing but the customer returns and Drop Shipment. These three orders cover the business requirement. Below figure shows ‘Order to Cash’ cycle. Fig 7 Order to Cash Cycle
  • 6. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 872 With the above mentioned module, we have configured the ‘Mobile Supply Chain Applications’, which again gives the flexibility to perform the transactions anywhere in the plant via a RFHHD (Radio Frequency Hand Held Device). User is not required to note down the transactions and again perform it via going back to his desktop. User can perform the transactions from anywhere in the plant where the wireless network is available. This covers most of the design and configuration part in the implementation supply chain modules for a filtration manufacturing industry. 4.4 Functional Testing, UAT & Documentation This is one of the most important phases of any implementation project life cycle. Implementation team and testing team performs each and every test as per the business processes mapped. If any test fails the results are collected and according the objects needs to be fixed or the correction in configuration of the setups needs to be performed. If testing is done properly, after go live there will be no issues & less impact on customer operations. First team has prepared a test plan and a template, each business process has been documented in the template for testing purpose. Also the observations and findings have been incorporated in the results column. Once implementation team tests all the functional areas, business users needs to test it and it is called as ‘User Acceptance Testing’. UAT confirms the user’s acceptance according the business requirements and users or super users give the confirmation & sign off the UAT phase. In this project, UAT duration was around 20 days. The documentation part, in any implementation plays an important role. The time to time updating of the document is useful to the implementation team members as well as business. 4.5 Go Live For every change there is a oppose, hence while going live also most of the employee oppose the change. Go live is a cutoff date to stop a legacy system transactions or manual transactions and start capturing the transactions in the newly live system. Go live means going live with the newly implemented applications. Before go live there are so many preparations like training users, data migrations or historical data bringing in the new system. These are nothing the pre- requisites for going live. After go live immediate application support is known as ‘Infant Care’ & then post implementation support. In post implementation support generally the application related issues faced by users are addressed and fixed by means of code fixes or work around. In next session we are going to see the results and conclusions. 5. RESULTS AND CONCLUSIONS ERP system represents a significant investment and major source of operational performance improvement for firm. After go live of an ERP system below are the improvements – 5.1 Functions and Head Counts:- It has been observed that after implantation we see the head counts has been decreased drastically. These resources are being utilized in different roles and position now according to their skills. In the graph we can see the respective areas and it’s head count. In inventory it is 60, Order Management- 30, Buyers– 23, Inventory supervisors- 21, Inventory Managers- 12, and Procurement Managers-5. Fig 8 Functions and Head Count After 5.2 Audit Frequency Audit frequency has been reduced quarterly once. As a single database, auditors can access all the material transactions, financial reports & compare with the help of system generated reports. Hence work became very simple and accurate. Fig 9 Audit Frequency After We can see the audit frequency has been reduced to quarterly once for a site.
  • 7. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 873 5.3 Inventory Traceability After go live with ‘Mobile Application’ it has been observed that zero occurrences to unable to trace the inventory. Fig 10 Unable to Trace Inventory After Radio frequency hand held device able to trace the inventory once we enter the item details and inquiry it. How it works- Fig 11 Inventory Traceability After A hand held device reads the barcode and populate the details in the field for processing the transaction. Hence accuracy in the system is increased and productivity has been increased. Similar way for tracing a part within an inventory, user needs to navigate to the ‘Inquiry’ screen and enter the required details of an item and search. System will show you the details where the part was received and which location within an inventory it has been placed. 5.4 Availability of Data & Reporting Advantage With the single database, multiple site information is stored at a place. Hence data availability for all sites and location is available at one click. The custom reports have been developed for the analysis of management and decision making. The access of the respective reports has been given the respective roles and positions. So that the data security is maintained and particular information is only viewable to respective person with that position. 5.5 Month End Closure & Year End Closure:- Before implementation of an ERP system, average time for month end closure was 48 & 40 hours for site 1 & 2 respectively. If we see the below Fig 12 Month End Closure If we see the graph, the time for month end closure has been reduced drastically. This is possible due to an effective ERP system. 6. CONCLUSIONS ERP system has played a major role in improving each process within the industry. Also it has given the more power to all the users and super users. Also this study indicates that a systematic ERP implementation contribute an operational performance changes. It is important that managers focus holistic integrations to derive maximum gains. Also, it indicates performance improvement in each area where the functions of ERP are being used. Hence as a consolidation we see that operational performance and productivity has been increased. REFERENCES [1] R.Panneerselvam, Production and Operations Management,3rd ed. PHL Learning Pvt. Ltd [2] Oracle Unversity, Oracle Inventory User Guide,Release R12,Oracle University, USA [3] Oracle University, Oracle Purchasing User Guide, Release R12, Oracle Unviersity, USA.
  • 8. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 03 Issue: 04 | Apr-2014, Available @ http://www.ijret.org 874 [4] Oracle University, Oracle Order Management User Guide, Release R12, Oracle Unveristy, USA. [5] Michael F., A Project Approach to Enterprise Resource Planning Implementation, Internantional Journal of Business Managmeent, Vol.7, No.10;May2012 [6] Severine Le Loarne, Working with ERP systems- Is big brother back?, Science Direct, Computers in Industry 56 (2005) 523-528 [7] Shahneel Baray, Shafat Hameed, Analyzing the Effectiveness of Implementing Enterprise Resource Planning Systems in Priting Industry, European and Mediterranean Conference on Information Systems (EMCIS) 2006, July 6-7 2006, Costa Blanca, Alicante, Spain