ENGR:IQBAL KHAN
PROJECTS ENGINEER (ELECTRICAL)
Engr.Iqbaldurrani@gmail.com
Cell No: 00971-527553341 / 00923139545809
Skype ID: iqbalkhan302
CareerProfile
A competent Electrical Engineer having 6+ years extensive experience in the field of Electrical Projects
Installation, testing, Commissioning, Maintenance, power distribution, transmission, Transformers, Switchgears,
Machines, Designing ,Estimation, operation & Site execution etc.
I am currently looking for highly motivated and demanding job that will further enhance my knowledge and
management skills where I can add value to the system and grow with the organization..
ProfessionalExperience
Projects Engineer:( OHM Electromechanical L.L.C)Ajman (UAE). From 17 Sep2012 to
present.
Responsibilities:
 Follow up and carrying out inspection with local distribution authority for power connection of
buildings, villas and other industrial sectors.
 Installation and commissioning of Switch gears panels, Capacitor banks, MCC panels…
 Earthing System, RMUs (11KV ), Transformers, Generators and Feeder Pillars as per drawing and site
specification.
 Supervised and carried out 11KV Substation installation work and connection to LV Distribution panel.
 Supervision and handling of cable laying of underground HV and LV cables,
with proper Jointing, termination and glanding works.
 Interpret Electrical drawings and prepare Bill of material, Estimation.
 Preparation of electrical drawing(lighting, power layout) in AutoCAD, Load distribution schedules and
Single Line Diagrams (SLDs) for commercial, residential high rise building, villas and other industrials
sectors.
 Preparation of Budget
 Collection and study of shop drawings.
 Floating enquiries and obtain back-up quotations from suppliers for materials finalization.
 Obtaining approvals of drawings / material submittals from concerned authority / consultant.
 Manpower planning.
 Verification of materials received at site.
 Raising Purchase Requisitions as per specification / drawings
 Arrangement of material for use on site for smooth continuation of work.
 Attend regular coordination / progress meetings.
 Supervision of works at site, and progress of work
 Arrange/Schedule inspection of works by the Consultant at site upon raising of RFI
 Ensure compliance to handing over snags
 To hand over the marked up drawings as per site conditions to the drawing department
 Submission of As Built drawings.
 Technical meetings with Contractor and consultants.
 Managing projects from conception, pre-production through to completion
 Managing project budgets and keeping costs down.
 Responsible for the completion of all documentation.
 Producing Test Plans and reports
 Responsible for procurement.
 Dealing with Authorities.
 Monitored power distribution system features such as single-line diagrams and electrical equipment
layouts.
 Co-ordinate daily site inspections inclusive of preparation of weekly and daily notification, and
Inspection sheets.
 Follow up for invoices.
 Coordinating with other trades like Civil, Mechanical and Plumbing.
Key Projects Handled
 G+4P+15Typical Floors Residential Building, Consultant National Engineering Bureau, Main
Contractor Gulf Asia, Ajman UAE.
 G+7F Ajman Bank Head Quarter, Main contractor Gulf Asia, Consultant Alsanad, Ajman UAE.
 Ajman Complex 9 Buildings,G+4P+20 Typical Floors, Consultant Canadian ,Main Contractor Gulf Asia
Ajman UAE.
ElectricalEngineer:( Golden sun Electromechanical L.L.C)Dubai (UAE). 1 jan 2012 to
sep 2012.
Responsibilities
 Execution of project according to shop drawing.
 Load Calculation(From final distribution Board to Low voltage Panel)
 Material submittals, shop drawings, as build drawings,co-ordination drawing and builder works drawing
as per the contract,,, specifications.
 Ensuring that all information on drawings is conveyed to the workforce in a proper manner and details
produced where required.
 Submits site daily reports, inspection requests, estimates and all applicable monitoring reports to Consultant
 Attending technical site meetings.
 Responsible for safety of Electrical group personal of the project and manage a team of electrician that
the project execution will be done according to technical, quality and safety requirements.
 Preparation of As built drawing.
 Estimation of electrical building materials.
 Selection of cables/bus bar according to load.
ElectricalEngineer :(Al HussamElectricalcontrol & Switchgearsystem)Sharjah
Fromjan 2011to Dec 2011.
Responsibilities:
 To design the LV (MDBs, SMDBs, Capacitor bank, ATS and Control Panels) as per consultant specification and
local authorities (SEWA, DEWA,and FEWA).
 Reviewing testing and commissioning procedure, operation and maintenance manuals, handling over
documents.
 Attending periodic meetings with the clients to discuss the work progress.
 Factory inspection and testing of switchgear as per consultant Inspection , commissioning and testing of ,LV
Panels , MDB’S, Capacitor Banks, SMDB’S and DB’S .
 Managing and interpreting customer requirements – advice the clients and ability to understand, anticipate and
exceed their needs.
 To prepare the submittal for consultant approval including the compliance statements based on the
Consultant Specification.
 To prepare the reply to consultant comments and to attend the meeting for clarification.
 To give the input to purchase department for materials ordering and release the drawings for production.
 Maintain a cordial and friendly relationship with clients, consultants and contractors.
 Estimation from Single line /load schedule.
 Estimation and Design of Control Panels.(Star Delta.DOL,)
VFD (Variable Frequency Drive) Programming for different motors.(Through PC SOFT software.)
Assistant ProjectEngineer:( Imperial Electrical Company Islamabad Pakistan)2 jan2010 to
Dec 2010.
Responsibilities:
 Execution of project for installation and commissioning of Generator sets with ATS panels for ufone
through their contractor M/s Huawei Technologies Pakistan (pvt) Ltd on their MSC sites in (North
region). .
 Managing installation, testing, commissioning and service of standby diesel generators sets on turnkey
basis in government organization i.e. Pakistan Telecommunication company Limited (PTCL).
 Installation of magnetic contactor and sort of relays.
 Setting different Alarms of generator...
 Attending Operators meeting.
 Logistics and material delivery at sites.
 Leading and managing teams to complete projects with in time frame.
 Customer relation management.
 Connections and terminations of power cables for generators supply.
 Supervision for Installation of power panels, MDB and SMDB.,
 Execution of Service project for ufone –Huawei prime sites North region, the job is related to planning of
preventive and corrective maintenance and follow up for implementation.
 Execution of Service project for World Call Peshawar region, the job is related to planning of preventive
and corrective maintenance and follow up for implementation.
 Follow up for invoices.
 Managing a technical staff which involved in PM and CM.
Academic Qualification
Degree University
B E (Electrical Engineering). CECOS University of Engineering and Technology.
Diploma of Associate Engineer(Electrical) Peshawar Institute of Technology.
CCCooommmpppuuuttteeerrr ssskkkiiillllllsss
 AUTO CAD
 MATLAB 
 PC SOFT (VFD software)
 Expert Estimation software.
 Microsoft Office (Word, Excel and Power Point).
 Computer Hardware & Software Installation.
 Systems: Windows (98/ME/2000.)
 Lab View.
 Good understanding of Internet tools.
Valid UAE driving license
 License no:162651
EEExxxtttrrraaa cccuuurrrrrreeecccuuulllaaarrr AAAccctttiiivvviiitttiiieeesss
 Reading books, Cricket.
 Keenuser of internet.
Personal Informations
Date of Birth: Novmber 10th, 1980.
Martial Status: Maried.
Languages: Proficient & Fluent in English, Urdu & Arabic etc
Present Address Sharjah (UAE)

More Related Content

What's hot

Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)Khalid Eltahir
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Electrical engineer resume kenneth shultz
Electrical engineer resume   kenneth shultzElectrical engineer resume   kenneth shultz
Electrical engineer resume kenneth shultzKenneth Michael Shultz
 
CV Raza_Ali_Saleem
CV Raza_Ali_SaleemCV Raza_Ali_Saleem
CV Raza_Ali_SaleemRaza Khan
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINHossam Fattah
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer ResumeAbdul Rahiman
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Mohammed Fazaluddin
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1abidullah ullah
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpSubhash +966535838322
 
Project engineer(cv)
Project engineer(cv)Project engineer(cv)
Project engineer(cv)Ammar naseem
 
Cv electrical engr. fathi
Cv electrical engr. fathiCv electrical engr. fathi
Cv electrical engr. fathiFathi Alsunni
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016Khadar Ali Shaik, P.Eng
 

What's hot (19)

project electrical engineer
project electrical engineerproject electrical engineer
project electrical engineer
 
CV Power Plant
CV Power PlantCV Power Plant
CV Power Plant
 
Electrical Engineer CV (2)
Electrical Engineer CV (2)Electrical Engineer CV (2)
Electrical Engineer CV (2)
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Electrical engineer resume kenneth shultz
Electrical engineer resume   kenneth shultzElectrical engineer resume   kenneth shultz
Electrical engineer resume kenneth shultz
 
CV Raza_Ali_Saleem
CV Raza_Ali_SaleemCV Raza_Ali_Saleem
CV Raza_Ali_Saleem
 
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDINSenior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
Senior MEP Engineer_Hossam Abdel Fattah TAG ELDIN
 
Electrical Engineer Resume
Electrical Engineer ResumeElectrical Engineer Resume
Electrical Engineer Resume
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
 
Electrical Engineer C.V
Electrical Engineer C.VElectrical Engineer C.V
Electrical Engineer C.V
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1
 
Tanaji Update new
Tanaji Update newTanaji Update new
Tanaji Update new
 
Resume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years ExpResume - Electrical Engineer (MEP) 9+ Years Exp
Resume - Electrical Engineer (MEP) 9+ Years Exp
 
Project engineer(cv)
Project engineer(cv)Project engineer(cv)
Project engineer(cv)
 
Cv electrical engr. fathi
Cv electrical engr. fathiCv electrical engr. fathi
Cv electrical engr. fathi
 
Electrical Engineer CV
Electrical Engineer CVElectrical Engineer CV
Electrical Engineer CV
 
Senior Electrical Engineer resume Jan 2016
Senior Electrical Engineer resume  Jan  2016Senior Electrical Engineer resume  Jan  2016
Senior Electrical Engineer resume Jan 2016
 
JKY CV.
JKY CV.JKY CV.
JKY CV.
 

Similar to Electrical Engineer with 6+ Years Experience

Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultantdilish pareed
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Akhtar
 
SK RABANI Electrical engg
SK RABANI  Electrical enggSK RABANI  Electrical engg
SK RABANI Electrical enggSEIKH RABANI
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANtanweer alam
 
Electrical technician
Electrical technicianElectrical technician
Electrical techniciantanweer alam
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) Tarun Kumar
 
NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)Nazeer Gaad
 
NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)Nazeer Gaad
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EEwaseem odeh
 
Hassan mohamed resume 2016 aug (1)
Hassan mohamed resume 2016 aug (1)Hassan mohamed resume 2016 aug (1)
Hassan mohamed resume 2016 aug (1)Hassan Mohamed
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resumebarun dutta
 

Similar to Electrical Engineer with 6+ Years Experience (20)

Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical      Engineer-construction,consultantDilish Pareed CV-Senior Electrical      Engineer-construction,consultant
Dilish Pareed CV-Senior Electrical Engineer-construction,consultant
 
Naveed Electrical Cv2
Naveed Electrical Cv2Naveed Electrical Cv2
Naveed Electrical Cv2
 
SK RABANI Electrical engg
SK RABANI  Electrical enggSK RABANI  Electrical engg
SK RABANI Electrical engg
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
Electrical technician
Electrical technicianElectrical technician
Electrical technician
 
Jayabalan cv
Jayabalan  cvJayabalan  cv
Jayabalan cv
 
HASSAN CV
HASSAN CVHASSAN CV
HASSAN CV
 
Maninder Kajal CV
Maninder Kajal CVManinder Kajal CV
Maninder Kajal CV
 
Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
 
Khalid cv (2)
Khalid cv (2)Khalid cv (2)
Khalid cv (2)
 
CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer) CV - Tarun (Electrical Engineer)
CV - Tarun (Electrical Engineer)
 
ilyas-MEP CV
ilyas-MEP CVilyas-MEP CV
ilyas-MEP CV
 
NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)
 
NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)NAZEER AHMED GAAD (1)(1)
NAZEER AHMED GAAD (1)(1)
 
ilyas_MEP new
ilyas_MEP newilyas_MEP new
ilyas_MEP new
 
CV - Waseem Odeh - EE
CV - Waseem Odeh - EECV - Waseem Odeh - EE
CV - Waseem Odeh - EE
 
F. CV
F. CVF. CV
F. CV
 
Hassan mohamed resume 2016 aug (1)
Hassan mohamed resume 2016 aug (1)Hassan mohamed resume 2016 aug (1)
Hassan mohamed resume 2016 aug (1)
 
Barun Dutta Resume
Barun Dutta ResumeBarun Dutta Resume
Barun Dutta Resume
 
CV _ Azhar Ansari
CV _ Azhar AnsariCV _ Azhar Ansari
CV _ Azhar Ansari
 

Recently uploaded

Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .Satyam Kumar
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and usesDevarapalliHaritha
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxvipinkmenon1
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxbritheesh05
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024hassan khalil
 

Recently uploaded (20)

young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Churning of Butter, Factors affecting .
Churning of Butter, Factors affecting  .Churning of Butter, Factors affecting  .
Churning of Butter, Factors affecting .
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
power system scada applications and uses
power system scada applications and usespower system scada applications and uses
power system scada applications and uses
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Introduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptxIntroduction to Microprocesso programming and interfacing.pptx
Introduction to Microprocesso programming and interfacing.pptx
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Artificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptxArtificial-Intelligence-in-Electronics (K).pptx
Artificial-Intelligence-in-Electronics (K).pptx
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024Architect Hassan Khalil Portfolio for 2024
Architect Hassan Khalil Portfolio for 2024
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 

Electrical Engineer with 6+ Years Experience

  • 1. ENGR:IQBAL KHAN PROJECTS ENGINEER (ELECTRICAL) Engr.Iqbaldurrani@gmail.com Cell No: 00971-527553341 / 00923139545809 Skype ID: iqbalkhan302 CareerProfile A competent Electrical Engineer having 6+ years extensive experience in the field of Electrical Projects Installation, testing, Commissioning, Maintenance, power distribution, transmission, Transformers, Switchgears, Machines, Designing ,Estimation, operation & Site execution etc. I am currently looking for highly motivated and demanding job that will further enhance my knowledge and management skills where I can add value to the system and grow with the organization.. ProfessionalExperience Projects Engineer:( OHM Electromechanical L.L.C)Ajman (UAE). From 17 Sep2012 to present. Responsibilities:  Follow up and carrying out inspection with local distribution authority for power connection of buildings, villas and other industrial sectors.  Installation and commissioning of Switch gears panels, Capacitor banks, MCC panels…  Earthing System, RMUs (11KV ), Transformers, Generators and Feeder Pillars as per drawing and site specification.  Supervised and carried out 11KV Substation installation work and connection to LV Distribution panel.  Supervision and handling of cable laying of underground HV and LV cables, with proper Jointing, termination and glanding works.  Interpret Electrical drawings and prepare Bill of material, Estimation.  Preparation of electrical drawing(lighting, power layout) in AutoCAD, Load distribution schedules and Single Line Diagrams (SLDs) for commercial, residential high rise building, villas and other industrials sectors.  Preparation of Budget  Collection and study of shop drawings.  Floating enquiries and obtain back-up quotations from suppliers for materials finalization.  Obtaining approvals of drawings / material submittals from concerned authority / consultant.  Manpower planning.  Verification of materials received at site.  Raising Purchase Requisitions as per specification / drawings  Arrangement of material for use on site for smooth continuation of work.  Attend regular coordination / progress meetings.  Supervision of works at site, and progress of work  Arrange/Schedule inspection of works by the Consultant at site upon raising of RFI  Ensure compliance to handing over snags  To hand over the marked up drawings as per site conditions to the drawing department  Submission of As Built drawings.  Technical meetings with Contractor and consultants.  Managing projects from conception, pre-production through to completion  Managing project budgets and keeping costs down.  Responsible for the completion of all documentation.
  • 2.  Producing Test Plans and reports  Responsible for procurement.  Dealing with Authorities.  Monitored power distribution system features such as single-line diagrams and electrical equipment layouts.  Co-ordinate daily site inspections inclusive of preparation of weekly and daily notification, and Inspection sheets.  Follow up for invoices.  Coordinating with other trades like Civil, Mechanical and Plumbing. Key Projects Handled  G+4P+15Typical Floors Residential Building, Consultant National Engineering Bureau, Main Contractor Gulf Asia, Ajman UAE.  G+7F Ajman Bank Head Quarter, Main contractor Gulf Asia, Consultant Alsanad, Ajman UAE.  Ajman Complex 9 Buildings,G+4P+20 Typical Floors, Consultant Canadian ,Main Contractor Gulf Asia Ajman UAE. ElectricalEngineer:( Golden sun Electromechanical L.L.C)Dubai (UAE). 1 jan 2012 to sep 2012. Responsibilities  Execution of project according to shop drawing.  Load Calculation(From final distribution Board to Low voltage Panel)  Material submittals, shop drawings, as build drawings,co-ordination drawing and builder works drawing as per the contract,,, specifications.  Ensuring that all information on drawings is conveyed to the workforce in a proper manner and details produced where required.  Submits site daily reports, inspection requests, estimates and all applicable monitoring reports to Consultant  Attending technical site meetings.  Responsible for safety of Electrical group personal of the project and manage a team of electrician that the project execution will be done according to technical, quality and safety requirements.  Preparation of As built drawing.  Estimation of electrical building materials.  Selection of cables/bus bar according to load. ElectricalEngineer :(Al HussamElectricalcontrol & Switchgearsystem)Sharjah Fromjan 2011to Dec 2011. Responsibilities:  To design the LV (MDBs, SMDBs, Capacitor bank, ATS and Control Panels) as per consultant specification and local authorities (SEWA, DEWA,and FEWA).  Reviewing testing and commissioning procedure, operation and maintenance manuals, handling over documents.  Attending periodic meetings with the clients to discuss the work progress.
  • 3.  Factory inspection and testing of switchgear as per consultant Inspection , commissioning and testing of ,LV Panels , MDB’S, Capacitor Banks, SMDB’S and DB’S .  Managing and interpreting customer requirements – advice the clients and ability to understand, anticipate and exceed their needs.  To prepare the submittal for consultant approval including the compliance statements based on the Consultant Specification.  To prepare the reply to consultant comments and to attend the meeting for clarification.  To give the input to purchase department for materials ordering and release the drawings for production.  Maintain a cordial and friendly relationship with clients, consultants and contractors.  Estimation from Single line /load schedule.  Estimation and Design of Control Panels.(Star Delta.DOL,) VFD (Variable Frequency Drive) Programming for different motors.(Through PC SOFT software.) Assistant ProjectEngineer:( Imperial Electrical Company Islamabad Pakistan)2 jan2010 to Dec 2010. Responsibilities:  Execution of project for installation and commissioning of Generator sets with ATS panels for ufone through their contractor M/s Huawei Technologies Pakistan (pvt) Ltd on their MSC sites in (North region). .  Managing installation, testing, commissioning and service of standby diesel generators sets on turnkey basis in government organization i.e. Pakistan Telecommunication company Limited (PTCL).  Installation of magnetic contactor and sort of relays.  Setting different Alarms of generator...  Attending Operators meeting.  Logistics and material delivery at sites.  Leading and managing teams to complete projects with in time frame.  Customer relation management.  Connections and terminations of power cables for generators supply.  Supervision for Installation of power panels, MDB and SMDB.,  Execution of Service project for ufone –Huawei prime sites North region, the job is related to planning of preventive and corrective maintenance and follow up for implementation.  Execution of Service project for World Call Peshawar region, the job is related to planning of preventive and corrective maintenance and follow up for implementation.  Follow up for invoices.  Managing a technical staff which involved in PM and CM. Academic Qualification Degree University B E (Electrical Engineering). CECOS University of Engineering and Technology. Diploma of Associate Engineer(Electrical) Peshawar Institute of Technology.
  • 4. CCCooommmpppuuuttteeerrr ssskkkiiillllllsss  AUTO CAD  MATLAB   PC SOFT (VFD software)  Expert Estimation software.  Microsoft Office (Word, Excel and Power Point).  Computer Hardware & Software Installation.  Systems: Windows (98/ME/2000.)  Lab View.  Good understanding of Internet tools. Valid UAE driving license  License no:162651 EEExxxtttrrraaa cccuuurrrrrreeecccuuulllaaarrr AAAccctttiiivvviiitttiiieeesss  Reading books, Cricket.  Keenuser of internet. Personal Informations Date of Birth: Novmber 10th, 1980. Martial Status: Maried. Languages: Proficient & Fluent in English, Urdu & Arabic etc Present Address Sharjah (UAE)