Position, Title and No Substation and Transmission Line Design Engineer
Name of Expert Raza Ali Saleem
Date of Birth 18/10/1981
CountryofCitizenship/ Residence Pakistan
Education:
 BachelorofScienceEngineering(ElectricalEngineering), University of Engineering& TechnologyPakistan
OtherTraining
 Transmission Line Design Course – Trans Africa Projects, South Africa
 PLS-CADD, PLS-POLE and PLS-TOWER Training - Trans Africa Projects, South Africa
 Transmission Line Planning, Design and Construction Training in Transfield Services New Zealand
 MS Project & Primavera Training in Pakistan & New Zealand
 Transmission Line HSE Training in New Zealand
 MS Office packages including MS Project, MS Excel; MS Word; Power Point Presentation
Employment Record:
Period Employer Country Activities Performed relevant to the
assignment
October
2013 to
Date
Employer:SMECInternational
Pty Limited
Position Held: Senior
Transmission Line Engineer,
Contact person:
Munesu Dizamuhupe
Functional Manager
Tel: +255 76 447 5322
Munesu.Dizamuhupe@smec.co
m
Tanzania/
Uganda/Rwanda
/Malawi
 Carryout Substation equipment design.
 Prepare the substation engineering
drawings,includingsingle line diagrams,
general layouts and cross sections.
 Preparation of substation bidding
documents.
 Participate in developing substation
commissioning guideline for the clients.
 Participate the witness of factory
acceptancetests,representingthe client.
 Carryout transmissionlinerouteplanning
and selection;
 Using PLS-CADD to perform design of
highvoltage transmissionlines,including
both electrical and physical aspects of
above ground and underground
installations;
 Preparation of transmission line bidding
documents.
 Overseeing construction, testing,
commissioning, and start-up of
completed projects;
 Coordinating aerial, topographical, and
other surveys requiredtoobtain pertinent
data for planning lines;
 Producing engineering documents,
CV of Raza Ali Saleem
Page 2 of 13
construction specification and
construction procedures for electrical
transmission lines projects;
 Producing detailed specifications for
major line equipment and hardware as
well as functional specifications for the
overall systems;
 Carryout detailed engineering
calculations to draw up construction
specifications, such as cable sag, pole
strength, and necessarygrounding;
 Preparing Tender Documentation for
substation and transmissionline projects,
including all technical schedules;
 Managing the tendering process
including tender supervision and tender
evaluation;
 Preparing any other assigned reports,
studies or analysis for project;
 Construction supervision and monitoring
to include the preparation of all relevant
reports.
May 2013
to
Septembe
r 2013
Employer: Al-Fozan Group
(AUVA), Saudi Arabia,
Position Held: Senior
Transmission Line Engineer
Contact person:
Fouad Tawfik
Manager Projects
Tel: +966 54 101 5679
fouad.tawfik@auva.com.sa
Saudi Arabia  Overview and optimization of designs,
drawings, cost estimates and technical
specifications.
 Preparation of Electrical procedures for
installation testing & commissioning.
 Contract Management.
 Preparing work plan & schedule in
coordination with civil works team,
electrical team, and mechanical team
and planning engineer.
 Coordinating Project designing with
Consultants, Client and Designer.
 Project Execution and monitoring site
activitiesincludinghiring and negotiating
with subcontractors.
 Monitoring work plan and assuring site
progress and coordinating billing.
April 2012
to April
2013
Employer: Transfield Services,
New Zealand
Position Held: Transmission
Line Engineer
Contact person:
Allen Graham
Depot Manager
Unit 17, 24 Railway Ave, South
Pacific Industrial Park Upper
Hutt, Wellington
Tel: +64 4 568 0957
allengr@transfieldservices.co
m
New Zealand  Routing& Profilingof TransmissionLines
 Prepare designs, drawings, cost
estimates and prepare technical
specifications.
 Preparation of Electrical procedures for
installation testing & commissioning.
 Contract Management.
 Preparing work plan & schedule in
coordination with civil works team,
electrical team, and mechanical team
and planning engineer.
 Coordinating Project designing with
Consultants, Client and Designer.
CV of Raza Ali Saleem
Page 3 of 13
 Project Execution and monitoring site
activitiesincludinghiring and negotiating
with subcontractors.
 Monitoring work plan and assuring site
progress and coordinating billing.
 Sourcingandcorresponding with foreign
equipment supplier and obtaining
proposals.
 Reporting and Documentation.
April 2009
to March
2012
Employer: AEL, Pakistan
Position Held: Director
(Projects),Power Transmission&
Distribution Projects
Contact person:
Ahmad Hassan Sheraz
Director (Operations)
143-CCA, 1st Floor, Commercial
Area, Phase-IV, DHA, Lahore –
Pakistan
Tel: +92 344 4973157
ahmad.sheraz@gmail.com
Pakistan  Monitoring Project Managers, Site
Execution Staff and third party
contractors/subcontractors
 Preparation of Electrical procedures for
installation test & commissioning.
 Organizing routine schedules.
 Making sure all electrical, mechanical
and civil works are fit for purpose.
 Liaising with and monitoring third party
contractors.
 Negotiating with suppliers and purchase
items at optimum cost.
 Attending meetings, writing reports and
giving presentations to managers and
clients.
 Client Relationship management.
June 2008
To Dec
2009
Employer: AEL, Pakistan
Position Held:ProjectManager,
PowerTransmission&
DistributionProjects
Contact person:
Ahmad Hassan Sheraz
Director (Operations)
143-CCA, 1st Floor, Commercial
Area, Phase-IV, DHA, Lahore –
Pakistan
Tel: +92 344 4973157
ahmad.sheraz@gmail.com
Pakistan  Submittingtechnicallyand commercially
sound bid in Competitive
Bidding/Tendering.
 Engineering & design of Transmission
Lines including specifications and
technical drawings.
 Contract Management.
 Routing& Profilingof TransmissionLines
 Prepare designs, drawings, cost
estimates and prepare technical
specifications.
 Monitoring Project Managers, Site
Execution Staff and third party
contractors/subcontractors
 Preparation of Electrical procedures for
installation test & commissioning.
 Organizing routine schedules.
 Making sure all electrical, mechanical
and civil works are fit for purpose.
 Liaising with and monitoring third party
contractors.
 Negotiating with suppliers and purchase
items at optimum cost.
 Attending meetings, writing reports and
giving presentations to managers and
CV of Raza Ali Saleem
Page 4 of 13
clients.
 Client Relationship management.
Dec 2003
To June
2008
Employer:AEL, Pakistan
Position Held:ProjectEngineer,
TransmissionLinesand
Substation
Contact person:
Ahmad Hassan Sheraz
Director (Operations)
143-CCA, 1st Floor, Commercial
Area, Phase-IV, DHA, Lahore –
Pakistan
Tel: +92 344 4973157
ahmad.sheraz@gmail.com
Pakistan  Routing & Profiling
 Engineering & design of Transmission
Line including specifications and
technical drawings.
 Prepare designs, drawings, cost
estimates and prepare technical
specifications.
 Preparation of Electrical procedures for
installation testing & commissioning.
 Organizing routine schedules.
 Making sure all electrical, mechanical
and civil works are fit for purpose.
 Liaising with and monitoring third party
contractors.
Membershipin Professional Associationsand Publications:
RegisteredEngineerofPakistan EngineeringCouncil
______________________________________________________________________
LanguageSkills:
Speaking Reading Writing
English Excellent Excellent Excellent
Urdu Excellent Excellent Excellent
______________________________________________________________________
Adequacy for the Assignment:
Detailed TasksAssigned on Consultant’s
Team of Experts:
Referenceto PriorWork/Assignments that Best Illustrates
Capability to Handle the Assigned Tasks
Activity 2: Review Of Design And
Preparation Of Bidding Documents
Task2.1: Reviewingexistingstudies –
feasibilitystudy, biddingdocument,Design
documentandproposeoncontract
packagingifneeded
Task2.2: Detailedsurvey for transmission
lineroute andRulindo substationReview
andupdate designworksand specifications
preparedby EARP
Task2.3: Technical AnalysesandSelection
of Optimum DistributionandTransmission
option(Linesand Substations);Engineering
Designs.
Task2.6: Preparationof Bid drawings,Bill
of Quantity andTechnical Schedules
Task2.7: Preparationof Technical Specs
Name of Assignment Or Project: Preparation of Substation
andTransmissionLineDesignsandBiddingDocuments for Lira-
Gulu-Nebbi-Arua 132kV transmission line and associated
substations Project.
Year: December 2014 – To date
Location: UGANDA
Client:UgandaElectricityTransmissionCompanyLtd (UETCL)
Main Project Features: This project, which is aimed at
extending Uganda power grid to northern Uganda. The project
consists of 132kV transmission line from Lira to Arua passing
through Gulu and Nebbi towns. The project also includes 4 x
132kV substations at Lira, Gulu, Nebbi and Arua towns. The
projectisaimedtostrengthenthenortherncircuit and eventually
connect it to Uganda grid. The project also consists of 2 x
distribution lines coming out of each Gulu, Nebbi and Arua
substations.
CV of Raza Ali Saleem
Page 5 of 13
andschedules
Task2.8: Preparationof Bid Documents
Task2.9: Preparationof trainingcourses
andcoursecontentsfor relevant
stakeholders.
Task2.10: Prepareprojectbudgetand
constructioncostsestimatesforindividual
lots.
Task2.11: Preparationofdetailed technical
specification and tender
Activity 3: Tendering and Contracting
Process
Task3.1: SupportEARP in Bids invitation,
Pre-Bidmeetingandsite visits.
Task3.2: SupportEARP in attendingto
Bidder’squeries
Task3.3: Assist EARP in TenderOpening,
Bid Evaluationand preparationof
evaluationreports.
Activity5:FactoryAcceptanceTests
Task5.1: Participateon Identifying and
listingallequipmentthatrequireFactory
AcceptanceTests(FAT)
Task 5.2: Plan, Attend FAT and Prepare
FAT reports for the identified equipment.
Provide inputs on deliverable
Reports
Positions Held: Transmission Line and Distribution Design
Engineer, Technical Coordinator
Activities Performed:
 Technical Coordination with Client.
 Design Reports of Transmission Line, Distribution lines and
review of Substation based on IEC standards
 Transmission and distribution Line designs
 Making Technical Specifications and Data Schedules for
Transmissionline,DistributionlinesandSubstationplantand
equipment
 Making BoQs
 Making Bidding Documents for Client (both Vol –I and Vol –
II) in WB, AfDB etc formats
 Making Project Implementation Plans
 MonthlyProgress Reports
 Project Presentations and workshops
 Assisting Team Leader in dayto dayworks
Name of Assignment Or Project: Preparation of Substation
Designs, Bidding Documents, Bid evaluation, Verification of
contractor design and FAT for Rulindo and Gifurwe 132kV
Substations.
Year: Jan 2015 – To date
Location: Rwanda
Client: Rwanda ElectricityGroup (REG)
Main Project Features: The project is construction of new
132kVSubstationatRulindoandrehabilitation and expansion of
132kVSubstation at Gifurwe.
Positions Held: Substation Design Engineer
Activities Performed:
 Produceconceptual SubstationEquipment Layouts, General
arrangements and all PrimaryPlant Details.
 Produce PrimaryElectrical Plant Designs for the substations
(substationequipmentlayouts, generalarrangements and all
primaryplant details)
 Design Reports of Substation based on IEC standards
 Making Technical Specifications and Data Schedules for
Substation plant and equipment
 Making BoQs
 Making Bidding Documents for Client (both Vol –I and Vol –
II) in WB, AfDB etc formats
 Produced Project Cost Estimates and Implementation
Schedules
 Produced Detailed Technical specifications and Tender
documentation
 Taking part in Bid Evaluation
 FAT
 Contractor design verification
Name of Assignment Or Project: Preparation of Substation
CV of Raza Ali Saleem
Page 6 of 13
DesignsandBiddingDocuments for Various 132kVSubstations
in Malawi.
Year: Jan 2015 – To date
Location: Malawi
Client: ESCOM
Main Project Features: The project is construction of new
132kVSubstationrehabilitation and expansion of various 132kV
Substations in Malawi.
Positions Held: Substation Design Engineer
Activities Performed:
 Produceconceptual SubstationEquipment Layouts, General
arrangements and all PrimaryPlant Details.
 ProducePrimaryElectrical Plant Designs for the substations
(substationequipmentlayouts, generalarrangements and all
primaryplant details)
 Design Reports of Substation based on IEC standards
 Making Technical Specifications and Data Schedules for
Substation plant and equipment
 Making BoQs
 Making Bidding Documents for Client (both Vol –I and Vol –
II) in WB, AfDB etc formats
 Produced Project Cost Estimates and Implementation
Schedules
 Produced Detailed Technical specifications and Tender
documentation
Name of Assignment Or Project: Review and update of
Feasibility Studies, designs and Bidding Documents for the
Hoima–Kafu220kVtransmissionline andassociatedsubstations
Project.
Year: October 2013 – November 2014
Location: UGANDA
Client:UgandaElectricityTransmissionCompanyLtd (UETCL)
Main Project Features: The project consists of
400/220/132/33kV Substation at Kafu with one-and-half circuit
breakerscheme,constructionof220kVSubstation at hoima and
extension of 220kV substation at kinyara. The project also
includes220kVdoublecircuit,twinbundletransmission line from
Hoima-Kinyara-Kafu substation.
Positions Held: Transmission line and Substation Design
Engineer
Activities Performed:
 Technical Coordination with Client.
 DesignReportsof TransmissionLine andSubstations based
on IEC standards
 Produceconceptual SubstationEquipment Layouts, General
arrangements and all PrimaryPlant Details.
 ProducePrimaryElectrical Plant Designs for the substations
(substationequipmentlayouts, generalarrangements and all
CV of Raza Ali Saleem
Page 7 of 13
primaryplant details)
 Transmission designs
 Making Technical Specifications and Data Schedules for
Transmission line and Substation plant and equipment
 Making BoQs
 Making Bidding Documents for Client (both Vol –I and Vol –
II) in WB, AfDB etc formats
 Making Project Implementation Plans
 MonthlyProgress Reports
 Project Presentations and workshops
 Assisting Team Leader in dayto dayworks
Name of Assignment Or Project: Review and update of
Feasibility Studies, designs and Bidding Documents for the
Nkenda-Hoima 132kV transmission line and associated
substations Project.
Year: October 2013 – November 2014
Location: UGANDA
Client:Uganda ElectricityTransmissionCompanyLtd (UETCL)
Main Project Features: The project consists of 220/132/33kV
Substation at Hoima and Nkenda. The project also includes
220kVdoublecircuit,twinbundletransmission line from Hoima-
Nkenda substation passing through fort portal.
Positions Held: Transmission Line and Substation Design
Engineer
Activities Performed:
 Technical Coordination with Client.
 DesignReportsof TransmissionLine andSubstations based
on IEC standards
 Produceconceptual SubstationEquipment Layouts, General
arrangements and all PrimaryPlant Details.
 ProducePrimaryElectrical Plant Designs for the substations
(substationequipmentlayouts, generalarrangements and all
primaryplant details)
 Transmission designs
 Making Technical Specifications and Data Schedules for
Transmission line and Substation plant and equipment
 Making BoQs
 Making Bidding Documents for Client (both Vol –I and Vol –
II) in WB, AfDB etc formats
 Making Project Implementation Plans
 MonthlyProgress Reports
 Project Presentations and workshops
 Assisting Team Leader in dayto dayworks
Name of assignment or project: 132kVJizan Transmission
Line and Substations
Year: May2013 To September 2013
Location: Saudi Arabia
Client: Saudi Electricity Company (Saudi Arabia Electricity
CV of Raza Ali Saleem
Page 8 of 13
Department)
Main project features: The Design, Supply, Installation,
Testing & Commissioning 132kV Jizan Transmission Line and
substations Projects
Positions Held: Senior Transmission Line Specialist
Activities Performed:
 Overview of route plan
 Overview and optimization of designs, drawings, cost
estimates and technical specifications.
 Preparation of Electrical procedures for installation testing &
commissioning.
 Contract Management.
 Preparing work plan & schedule in coordination with civil
works team, electrical team, and mechanical team and
planning engineer.
 Coordinating Project designing with Consultants, Client and
Designer.
 Project Execution and monitoring site activities including
hiring and negotiating with subcontractors.
 Monitoring work plan and assuring site progress and
coordinating billing.
 Sourcingandcorresponding with foreign equipment supplier
and obtaining proposals.
 Reporting and Documentation.
Nameof assignmentorproject: Pole 3 and other associated
400kV& 110kVLines
Year: April 2012 To April 2013
Location: New Zealand
Client: TRANSPOWER(NewZealand ElectricityDepartment)
Main project features: The Design, Supply, Installation,
Testing & commissioning of 110kV and 400kV DC
Transmission Line Projects
Positions Held: Transmission Line Specialist
Activities Performed:
 Routing & Profiling of Transmission Lines
 Prepare designs, drawings, cost estimates and prepare
technical specifications.
 Preparation of Electrical procedures for installation testing &
commissioning.
 Contract Management.
 Preparing work plan & schedule in coordination with civil
works team, electrical team, and mechanical team and
planning engineer.
 Coordinating Project designing with Consultants, Client and
Designer.
 Project Execution and monitoring site activities including
hiring and negotiating with subcontractors.
 Monitoring work plan and assuring site progress and
coordinating billing.
 Sourcingandcorresponding with foreign equipment supplier
and obtaining proposals.
 Reporting and Documentation.
Name of assignment or project: Turnkey (EPC)
CV of Raza Ali Saleem
Page 9 of 13
Implementation of 132kV D/C Transmission Lines of Alipur &
Fatehpur with Siemens and civil works of substation.
Year: Feb 2011 to May2012
Location: Pakistan
Client: Multan Electricity and Power Company, Water and
Power Development Authority
Main project features: Design, Supply, Installation, and
Testing & Commissioning of 132kV Double Circuit, Bundle
Conductor Transmission Lines and extension of Alipur and
Fatehpur substation
Positions held: Director (Projects)
Activities performed:
 Submitting technically and commercially sound bid in
Competitive Bidding/Tendering.
 Engineering & design of Transmission Lines including
specifications and technical drawings.
 Contract Management.
 Routing & Profiling of Transmission Lines
 Prepare designs, drawings, cost estimates and prepare
technical specifications.
 Preparation of Electrical procedures for installation testing &
commissioning.
 Monitoring Project Managers, Site Execution Staff and third
party contractors/subcontractors
 Preparation of Electrical procedures for installation test &
commissioning.
 Organizing routine schedules.
 Making sure all electrical, mechanical and civil works are fit
for purpose.
 Liaising with and monitoring third partycontractors.
 Negotiating with suppliers and purchase items at optimum
cost.
 Attending meetings, writing reports and giving presentations
to managers and clients.
 Client Relationship management.
Name of assignment or project: Turnkey (EPC)
Implementation of 132kV D/C Transmission Lines of GEPCO
with Siemens and civil works of substation.
Year: Feb 2011 to May2012
Location: Pakistan
Client:GujranwalaElectricityand Power Company, Water and
Power Development Authority
Main project features: Turnkey implementation for Design,
Supply, Installation, Testing&Commissioning of 132kVDouble
Circuit,BundleConductorTransmissionLines and extension of
GEPCO substation
Positions held: Director (Projects)
Activities performed:
 Submitting technically and commercially sound bid in
Competitive Bidding/Tendering.
 Engineering & design of Transmission Lines including
specifications and technical drawings.
CV of Raza Ali Saleem
Page 10 of 13
 Contract Management.
 Routing & Profiling of Transmission Lines
 Prepare designs, drawings, cost estimates and prepare
technical specifications.
 Preparation of Electrical procedures for installation testing &
commissioning.
 Monitoring Project Managers, Site Execution Staff and third
party contractors/subcontractors
 Preparation of Electrical procedures for installation test &
commissioning.
 Organizing routine schedules.
 Making sure all electrical, mechanical and civil works are fit
for purpose.
 Liaising with and monitoring third partycontractors.
 Negotiating with suppliers and purchase items at optimum
cost.
 Attending meetings, writing reports and giving presentations
to managers and clients.
 Client Relationship management.
Name of assignment or project: Turnkey (EPC)
Implementation of 220kVD/C Bundle conductor Transmission
line from Ghazi Road Grid station to Kala Shah Kaku and
220kVSubstation at Ghazi Road Lahore.
Year: Aug 2009 to December 2011
Location: Pakistan
Client: NTDC, Water and Power Development Authority
Main project features: Turnkey (EPC) Implementation for
Design,Supply, Installation,Testing&Commissioningof 220kV
D/C BundleconductorTransmissionline from Ghazi Road Grid
station to Kala ShahKaku and 220kV Substationat Ghazi Road
Lahore.
Positions held: Director (Projects)
Activities performed:
 Submitting technically and commercially sound bid in
Competitive Bidding/Tendering.
 Engineering & design of Transmission Lines including
specifications and technical drawings.
 Contract Management.
 Routing & Profiling of Transmission Lines
 Prepare designs, drawings, cost estimates and prepare
technical specifications.
 Preparation of Electrical procedures for installation testing &
commissioning.
 Monitoring Project Managers, Site Execution Staff and third
party contractors/subcontractors
 Preparation of Electrical procedures for installation test &
commissioning.
 Organizing routine schedules.
 Making sure all electrical, mechanical and civil works are fit
for purpose.
 Liaising with and monitoring third partycontractors.
 Negotiating with suppliers and purchase items at optimum
cost.
CV of Raza Ali Saleem
Page 11 of 13
 Attending meetings, writing reports and giving presentations
to managers and clients.
 Client Relationship management.
Name of assignment or project: Turnkey (EPC)
Implementation 132kV D/C JHPP to Mari Grid Station
Transmission Line including river crossing & piling in flowing
river.
Year: June 2008 to December 2009
Location: Pakistan
Client: NTDC, Water and Power Development Authority
Main project features: Turnkey (EPC) Implementation for
Design,Supply, Installation,Testing&Commissioningof 132kV
D/C JHPP to MariGridStationTransmissionLine(implemented
on design of 220kV) including river crossing & piling in flowing
river.
Positions held: Project Manager
Activities performed:
 Submitting technically and commercially sound bid in
Competitive Bidding/Tendering.
 Engineering & design of Transmission Lines including
specifications and technical drawings.
 Contract Management.
 Routing & Profiling of Transmission Lines
 Prepare designs, drawings, cost estimates and prepare
technical specifications.
 Preparation of Electrical procedures for installation testing &
commissioning.
 Monitoring Project Managers, Site Execution Staff and third
party contractors/subcontractors
 Preparation of Electrical procedures for installation test &
commissioning.
 Organizing routine schedules.
 Making sure all electrical, mechanical and civil works are fit
for purpose.
 Liaising with and monitoring third partycontractors.
 Negotiating with suppliers and purchase items at optimum
cost.
 Attending meetings, writing reports and giving presentations
to managers and clients.
 Client Relationship management.
Nameof assignmentorproject: Civilworks,Erection,
Testing&Commissioningof220kVSubstationat Yousafwala.
Year: June 2008 to December 2009
Location: Pakistan
Client: NTDC, Water and Power Development Authority
Main projectfeatures: Civilworks, Erection,Testing&
Commissioningof220kVSubstation at Yousafwala.
Positions held: Project Manager
Activities performed:
 Submitting technically and commercially sound bid in
Competitive Bidding/Tendering.
 Engineering & design of Substation including specifications
CV of Raza Ali Saleem
Page 12 of 13
and technical drawings.
 Contract Management.
 Prepare designs, drawings, cost estimates and prepare
technical specifications.
 Preparation of Electrical procedures for installation testing &
commissioning.
 Monitoring Project Managers, Site Execution Staff and third
party contractors/subcontractors
 Preparation of Electrical procedures for installation test &
commissioning.
 Organizing routine schedules.
 Making sure all electrical, mechanical and civil works are fit
for purpose.
 Liaising with and monitoring third partycontractors.
 Negotiating with suppliers and purchase items at optimum
cost.
 Attending meetings, writing reports and giving presentations
to managers and clients.
 Client Relationship management.
Name of assignment or project: 132kV Sunder Industrial
Estate Substation
Year: August 2006 to December 2007
Location: Pakistan
Client: LESCO, Water and Power Development Authority
Main project features: Civil works, Erection, Testing &
Commissioning of 132kV Substation at Sunder Industrial
Estate.
Positions held: Project Engineer
Activities performed:
 Engineering & design of Substation including specifications
and technical drawings.
 Prepare designs, drawings, cost estimates and prepare
technical specifications.
 Preparation of Electrical procedures for installation testing &
commissioning.
 Preparation of Electrical procedures for installation test &
commissioning.
 Organizing routine schedules.
 Making sure all electrical, mechanical and civil works are fit
for purpose.
 Liaising with and monitoring third partycontractors.
Nameof assignmentorproject: 132kVGomalZam Dam
transmissionline
Year: December 2006 to June 2008
Location: Pakistan
Client: NTDC, Water and Power Development Authority
Main project features: Turnkey Implementation for Design,
Supply, and Civil works, Erection,Testing & Commissioning of
132kVSubstation at Sunder Industrial Estate.
Positions held: Project Engineer
Activities performed:
 Routing & Profiling
CV of Raza Ali Saleem
Page 13 of 13
 Engineering & design of Transmission Line including
specifications and technical drawings.
 Prepare designs, drawings, cost estimates and prepare
technical specifications.
 Preparation of Electrical procedures for installation testing &
commissioning.
 Preparation of Electrical procedures for installation test &
commissioning.
 Organizing routine schedules.
 Making sure all electrical, mechanical and civil works are fit
for purpose.
 Liaising with and monitoring third partycontractors.
Nameof assignment or project: Turnkey(EPC) Contract for
500kVGhazi Barotha transmission line
Year: December 2004 to December 2006
Location: Pakistan
Client: NTDC, Water and Power Development Authority
Main project features: Turnkey implementation for Design,
Supply, Civil works, Erection, Testing & Commissioning of
Quad Bundle, Double Circuit 500kV Ghazi Barotha
Transmission Line
Positions held: Project Engineer
Activities performed:
 Routing & Profiling
 Engineering & design of Transmission Line including
specifications and technical drawings.
 Prepare designs, drawings, cost estimates and prepare
technical specifications.
 Preparation of Electrical procedures for installation testing &
commissioning.
 Organizing routine schedules.
 Making sure all electrical, mechanical and civil works are fit
for purpose.
 Liaising with and monitoring third partycontractors.

More Related Content

What's hot

resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineerKRISHNAMOORTHY A
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Upendra Kumar Yadav
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume Arun Das
 
CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)Mohd ismail
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)Khalid Eltahir
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMahesh Narayanan
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Mohammed Fazaluddin
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)jobby Thomas
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGpappu kumar
 
Land Surveyor cv Masood ( ls-ok - j16-1)
Land Surveyor cv Masood  ( ls-ok - j16-1)Land Surveyor cv Masood  ( ls-ok - j16-1)
Land Surveyor cv Masood ( ls-ok - j16-1)muhammadmasood75
 
Electrical Maintenance Technician
Electrical Maintenance TechnicianElectrical Maintenance Technician
Electrical Maintenance TechnicianMohammad Azim uddin
 
ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016RUKNUDDIN ALI
 
Hassan hunzai electrical engineer
Hassan hunzai electrical engineerHassan hunzai electrical engineer
Hassan hunzai electrical engineerHassan Hunzai
 

What's hot (20)

resume krishna electrical engineer
resume krishna electrical engineerresume krishna electrical engineer
resume krishna electrical engineer
 
Anish's CV
Anish's CV Anish's CV
Anish's CV
 
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
Graduate Electrical Engineer having 6.6 Years exprience in renewable energy &...
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)CV- electrical engineer-Ismail1 (2) (1)
CV- electrical engineer-Ismail1 (2) (1)
 
Khalid -cv_electrical_engineer (2)
Khalid  -cv_electrical_engineer (2)Khalid  -cv_electrical_engineer (2)
Khalid -cv_electrical_engineer (2)
 
MBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEERMBN CV-SENIOR ELECTRICAL ENGINEER
MBN CV-SENIOR ELECTRICAL ENGINEER
 
Cv electrical
Cv electricalCv electrical
Cv electrical
 
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
Bachelor's degree (electrical engineer(mep) 6 years of experience-mohammed fa...
 
General foreman cv of rakesh
General foreman cv of rakeshGeneral foreman cv of rakesh
General foreman cv of rakesh
 
E&I Engineer CV
E&I Engineer CVE&I Engineer CV
E&I Engineer CV
 
ELV Engineer... (2)
ELV Engineer... (2)ELV Engineer... (2)
ELV Engineer... (2)
 
Resume (S.Saravanan)
Resume (S.Saravanan)Resume (S.Saravanan)
Resume (S.Saravanan)
 
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERINGRESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
RESUME (ELECTRICAL & ELECTRONICS) ENGINEERING
 
Electrical Supervisor
Electrical SupervisorElectrical Supervisor
Electrical Supervisor
 
Land Surveyor cv Masood ( ls-ok - j16-1)
Land Surveyor cv Masood  ( ls-ok - j16-1)Land Surveyor cv Masood  ( ls-ok - j16-1)
Land Surveyor cv Masood ( ls-ok - j16-1)
 
ELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CVELECTRICAL ENGINEER CV
ELECTRICAL ENGINEER CV
 
Electrical Maintenance Technician
Electrical Maintenance TechnicianElectrical Maintenance Technician
Electrical Maintenance Technician
 
ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016ELECTRICAL FOREMAN CV 10042016
ELECTRICAL FOREMAN CV 10042016
 
Hassan hunzai electrical engineer
Hassan hunzai electrical engineerHassan hunzai electrical engineer
Hassan hunzai electrical engineer
 

Similar to CV Raza_Ali_Saleem

CV Arun_30-Jun-16
CV Arun_30-Jun-16CV Arun_30-Jun-16
CV Arun_30-Jun-16Arun R
 
SULTAN CV 2016 MAY
SULTAN CV 2016 MAYSULTAN CV 2016 MAY
SULTAN CV 2016 MAYsultan said
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana Muhammad Zahid
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana Muhammad Zahid
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5Ramiz Siddiq
 
Ghafran-Electrical Engineer final
Ghafran-Electrical Engineer finalGhafran-Electrical Engineer final
Ghafran-Electrical Engineer finalGhafran Tariq
 
Loganathan, senior level assignments.
Loganathan, senior level assignments.Loganathan, senior level assignments.
Loganathan, senior level assignments.Logan Veera
 
CV Engr Imran Brkat
CV Engr Imran BrkatCV Engr Imran Brkat
CV Engr Imran Brkatimran barkat
 
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)Aravind Sadasivan
 

Similar to CV Raza_Ali_Saleem (20)

CV Arun_30-Jun-16
CV Arun_30-Jun-16CV Arun_30-Jun-16
CV Arun_30-Jun-16
 
SULTAN CV 2016 MAY
SULTAN CV 2016 MAYSULTAN CV 2016 MAY
SULTAN CV 2016 MAY
 
my resume sankar 3
my resume sankar 3my resume sankar 3
my resume sankar 3
 
CV -Hassan Pervaiz -
CV -Hassan Pervaiz -CV -Hassan Pervaiz -
CV -Hassan Pervaiz -
 
Rana muhammad z ahid cv
Rana muhammad z ahid cvRana muhammad z ahid cv
Rana muhammad z ahid cv
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer
 
Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer Rana muhammad z ahid cv Fire Alarm Engineer
Rana muhammad z ahid cv Fire Alarm Engineer
 
Rana muhammad z ahid cv
Rana muhammad z ahid cvRana muhammad z ahid cv
Rana muhammad z ahid cv
 
CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5CV Ramiz Siddiq 6.5
CV Ramiz Siddiq 6.5
 
Tanveer Sr Planning Engineer
Tanveer Sr Planning EngineerTanveer Sr Planning Engineer
Tanveer Sr Planning Engineer
 
Ghafran-Electrical Engineer final
Ghafran-Electrical Engineer finalGhafran-Electrical Engineer final
Ghafran-Electrical Engineer final
 
Loganathan, senior level assignments.
Loganathan, senior level assignments.Loganathan, senior level assignments.
Loganathan, senior level assignments.
 
CV Engr Imran Brkat
CV Engr Imran BrkatCV Engr Imran Brkat
CV Engr Imran Brkat
 
Imran barkat.
Imran barkat.Imran barkat.
Imran barkat.
 
Pugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CVPugazhenthi Mathuramuthu CV
Pugazhenthi Mathuramuthu CV
 
CONSTRUCTION ENGINEER
CONSTRUCTION ENGINEERCONSTRUCTION ENGINEER
CONSTRUCTION ENGINEER
 
Resume 1
Resume 1Resume 1
Resume 1
 
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
BE Mechanical Engineering with Four Years Experience- Aravind Sadasivan Nair (1)
 
Resume 1
Resume 1Resume 1
Resume 1
 
Asif CV
Asif CVAsif CV
Asif CV
 

CV Raza_Ali_Saleem

  • 1. CV of Raza Ali Saleem Page 1 of 13 Curriculum Vitae (CV) Position, Title and No Substation and Transmission Line Design Engineer Name of Expert Raza Ali Saleem Date of Birth 18/10/1981 CountryofCitizenship/ Residence Pakistan Education:  BachelorofScienceEngineering(ElectricalEngineering), University of Engineering& TechnologyPakistan OtherTraining  Transmission Line Design Course – Trans Africa Projects, South Africa  PLS-CADD, PLS-POLE and PLS-TOWER Training - Trans Africa Projects, South Africa  Transmission Line Planning, Design and Construction Training in Transfield Services New Zealand  MS Project & Primavera Training in Pakistan & New Zealand  Transmission Line HSE Training in New Zealand  MS Office packages including MS Project, MS Excel; MS Word; Power Point Presentation Employment Record: Period Employer Country Activities Performed relevant to the assignment October 2013 to Date Employer:SMECInternational Pty Limited Position Held: Senior Transmission Line Engineer, Contact person: Munesu Dizamuhupe Functional Manager Tel: +255 76 447 5322 Munesu.Dizamuhupe@smec.co m Tanzania/ Uganda/Rwanda /Malawi  Carryout Substation equipment design.  Prepare the substation engineering drawings,includingsingle line diagrams, general layouts and cross sections.  Preparation of substation bidding documents.  Participate in developing substation commissioning guideline for the clients.  Participate the witness of factory acceptancetests,representingthe client.  Carryout transmissionlinerouteplanning and selection;  Using PLS-CADD to perform design of highvoltage transmissionlines,including both electrical and physical aspects of above ground and underground installations;  Preparation of transmission line bidding documents.  Overseeing construction, testing, commissioning, and start-up of completed projects;  Coordinating aerial, topographical, and other surveys requiredtoobtain pertinent data for planning lines;  Producing engineering documents,
  • 2. CV of Raza Ali Saleem Page 2 of 13 construction specification and construction procedures for electrical transmission lines projects;  Producing detailed specifications for major line equipment and hardware as well as functional specifications for the overall systems;  Carryout detailed engineering calculations to draw up construction specifications, such as cable sag, pole strength, and necessarygrounding;  Preparing Tender Documentation for substation and transmissionline projects, including all technical schedules;  Managing the tendering process including tender supervision and tender evaluation;  Preparing any other assigned reports, studies or analysis for project;  Construction supervision and monitoring to include the preparation of all relevant reports. May 2013 to Septembe r 2013 Employer: Al-Fozan Group (AUVA), Saudi Arabia, Position Held: Senior Transmission Line Engineer Contact person: Fouad Tawfik Manager Projects Tel: +966 54 101 5679 fouad.tawfik@auva.com.sa Saudi Arabia  Overview and optimization of designs, drawings, cost estimates and technical specifications.  Preparation of Electrical procedures for installation testing & commissioning.  Contract Management.  Preparing work plan & schedule in coordination with civil works team, electrical team, and mechanical team and planning engineer.  Coordinating Project designing with Consultants, Client and Designer.  Project Execution and monitoring site activitiesincludinghiring and negotiating with subcontractors.  Monitoring work plan and assuring site progress and coordinating billing. April 2012 to April 2013 Employer: Transfield Services, New Zealand Position Held: Transmission Line Engineer Contact person: Allen Graham Depot Manager Unit 17, 24 Railway Ave, South Pacific Industrial Park Upper Hutt, Wellington Tel: +64 4 568 0957 allengr@transfieldservices.co m New Zealand  Routing& Profilingof TransmissionLines  Prepare designs, drawings, cost estimates and prepare technical specifications.  Preparation of Electrical procedures for installation testing & commissioning.  Contract Management.  Preparing work plan & schedule in coordination with civil works team, electrical team, and mechanical team and planning engineer.  Coordinating Project designing with Consultants, Client and Designer.
  • 3. CV of Raza Ali Saleem Page 3 of 13  Project Execution and monitoring site activitiesincludinghiring and negotiating with subcontractors.  Monitoring work plan and assuring site progress and coordinating billing.  Sourcingandcorresponding with foreign equipment supplier and obtaining proposals.  Reporting and Documentation. April 2009 to March 2012 Employer: AEL, Pakistan Position Held: Director (Projects),Power Transmission& Distribution Projects Contact person: Ahmad Hassan Sheraz Director (Operations) 143-CCA, 1st Floor, Commercial Area, Phase-IV, DHA, Lahore – Pakistan Tel: +92 344 4973157 ahmad.sheraz@gmail.com Pakistan  Monitoring Project Managers, Site Execution Staff and third party contractors/subcontractors  Preparation of Electrical procedures for installation test & commissioning.  Organizing routine schedules.  Making sure all electrical, mechanical and civil works are fit for purpose.  Liaising with and monitoring third party contractors.  Negotiating with suppliers and purchase items at optimum cost.  Attending meetings, writing reports and giving presentations to managers and clients.  Client Relationship management. June 2008 To Dec 2009 Employer: AEL, Pakistan Position Held:ProjectManager, PowerTransmission& DistributionProjects Contact person: Ahmad Hassan Sheraz Director (Operations) 143-CCA, 1st Floor, Commercial Area, Phase-IV, DHA, Lahore – Pakistan Tel: +92 344 4973157 ahmad.sheraz@gmail.com Pakistan  Submittingtechnicallyand commercially sound bid in Competitive Bidding/Tendering.  Engineering & design of Transmission Lines including specifications and technical drawings.  Contract Management.  Routing& Profilingof TransmissionLines  Prepare designs, drawings, cost estimates and prepare technical specifications.  Monitoring Project Managers, Site Execution Staff and third party contractors/subcontractors  Preparation of Electrical procedures for installation test & commissioning.  Organizing routine schedules.  Making sure all electrical, mechanical and civil works are fit for purpose.  Liaising with and monitoring third party contractors.  Negotiating with suppliers and purchase items at optimum cost.  Attending meetings, writing reports and giving presentations to managers and
  • 4. CV of Raza Ali Saleem Page 4 of 13 clients.  Client Relationship management. Dec 2003 To June 2008 Employer:AEL, Pakistan Position Held:ProjectEngineer, TransmissionLinesand Substation Contact person: Ahmad Hassan Sheraz Director (Operations) 143-CCA, 1st Floor, Commercial Area, Phase-IV, DHA, Lahore – Pakistan Tel: +92 344 4973157 ahmad.sheraz@gmail.com Pakistan  Routing & Profiling  Engineering & design of Transmission Line including specifications and technical drawings.  Prepare designs, drawings, cost estimates and prepare technical specifications.  Preparation of Electrical procedures for installation testing & commissioning.  Organizing routine schedules.  Making sure all electrical, mechanical and civil works are fit for purpose.  Liaising with and monitoring third party contractors. Membershipin Professional Associationsand Publications: RegisteredEngineerofPakistan EngineeringCouncil ______________________________________________________________________ LanguageSkills: Speaking Reading Writing English Excellent Excellent Excellent Urdu Excellent Excellent Excellent ______________________________________________________________________ Adequacy for the Assignment: Detailed TasksAssigned on Consultant’s Team of Experts: Referenceto PriorWork/Assignments that Best Illustrates Capability to Handle the Assigned Tasks Activity 2: Review Of Design And Preparation Of Bidding Documents Task2.1: Reviewingexistingstudies – feasibilitystudy, biddingdocument,Design documentandproposeoncontract packagingifneeded Task2.2: Detailedsurvey for transmission lineroute andRulindo substationReview andupdate designworksand specifications preparedby EARP Task2.3: Technical AnalysesandSelection of Optimum DistributionandTransmission option(Linesand Substations);Engineering Designs. Task2.6: Preparationof Bid drawings,Bill of Quantity andTechnical Schedules Task2.7: Preparationof Technical Specs Name of Assignment Or Project: Preparation of Substation andTransmissionLineDesignsandBiddingDocuments for Lira- Gulu-Nebbi-Arua 132kV transmission line and associated substations Project. Year: December 2014 – To date Location: UGANDA Client:UgandaElectricityTransmissionCompanyLtd (UETCL) Main Project Features: This project, which is aimed at extending Uganda power grid to northern Uganda. The project consists of 132kV transmission line from Lira to Arua passing through Gulu and Nebbi towns. The project also includes 4 x 132kV substations at Lira, Gulu, Nebbi and Arua towns. The projectisaimedtostrengthenthenortherncircuit and eventually connect it to Uganda grid. The project also consists of 2 x distribution lines coming out of each Gulu, Nebbi and Arua substations.
  • 5. CV of Raza Ali Saleem Page 5 of 13 andschedules Task2.8: Preparationof Bid Documents Task2.9: Preparationof trainingcourses andcoursecontentsfor relevant stakeholders. Task2.10: Prepareprojectbudgetand constructioncostsestimatesforindividual lots. Task2.11: Preparationofdetailed technical specification and tender Activity 3: Tendering and Contracting Process Task3.1: SupportEARP in Bids invitation, Pre-Bidmeetingandsite visits. Task3.2: SupportEARP in attendingto Bidder’squeries Task3.3: Assist EARP in TenderOpening, Bid Evaluationand preparationof evaluationreports. Activity5:FactoryAcceptanceTests Task5.1: Participateon Identifying and listingallequipmentthatrequireFactory AcceptanceTests(FAT) Task 5.2: Plan, Attend FAT and Prepare FAT reports for the identified equipment. Provide inputs on deliverable Reports Positions Held: Transmission Line and Distribution Design Engineer, Technical Coordinator Activities Performed:  Technical Coordination with Client.  Design Reports of Transmission Line, Distribution lines and review of Substation based on IEC standards  Transmission and distribution Line designs  Making Technical Specifications and Data Schedules for Transmissionline,DistributionlinesandSubstationplantand equipment  Making BoQs  Making Bidding Documents for Client (both Vol –I and Vol – II) in WB, AfDB etc formats  Making Project Implementation Plans  MonthlyProgress Reports  Project Presentations and workshops  Assisting Team Leader in dayto dayworks Name of Assignment Or Project: Preparation of Substation Designs, Bidding Documents, Bid evaluation, Verification of contractor design and FAT for Rulindo and Gifurwe 132kV Substations. Year: Jan 2015 – To date Location: Rwanda Client: Rwanda ElectricityGroup (REG) Main Project Features: The project is construction of new 132kVSubstationatRulindoandrehabilitation and expansion of 132kVSubstation at Gifurwe. Positions Held: Substation Design Engineer Activities Performed:  Produceconceptual SubstationEquipment Layouts, General arrangements and all PrimaryPlant Details.  Produce PrimaryElectrical Plant Designs for the substations (substationequipmentlayouts, generalarrangements and all primaryplant details)  Design Reports of Substation based on IEC standards  Making Technical Specifications and Data Schedules for Substation plant and equipment  Making BoQs  Making Bidding Documents for Client (both Vol –I and Vol – II) in WB, AfDB etc formats  Produced Project Cost Estimates and Implementation Schedules  Produced Detailed Technical specifications and Tender documentation  Taking part in Bid Evaluation  FAT  Contractor design verification Name of Assignment Or Project: Preparation of Substation
  • 6. CV of Raza Ali Saleem Page 6 of 13 DesignsandBiddingDocuments for Various 132kVSubstations in Malawi. Year: Jan 2015 – To date Location: Malawi Client: ESCOM Main Project Features: The project is construction of new 132kVSubstationrehabilitation and expansion of various 132kV Substations in Malawi. Positions Held: Substation Design Engineer Activities Performed:  Produceconceptual SubstationEquipment Layouts, General arrangements and all PrimaryPlant Details.  ProducePrimaryElectrical Plant Designs for the substations (substationequipmentlayouts, generalarrangements and all primaryplant details)  Design Reports of Substation based on IEC standards  Making Technical Specifications and Data Schedules for Substation plant and equipment  Making BoQs  Making Bidding Documents for Client (both Vol –I and Vol – II) in WB, AfDB etc formats  Produced Project Cost Estimates and Implementation Schedules  Produced Detailed Technical specifications and Tender documentation Name of Assignment Or Project: Review and update of Feasibility Studies, designs and Bidding Documents for the Hoima–Kafu220kVtransmissionline andassociatedsubstations Project. Year: October 2013 – November 2014 Location: UGANDA Client:UgandaElectricityTransmissionCompanyLtd (UETCL) Main Project Features: The project consists of 400/220/132/33kV Substation at Kafu with one-and-half circuit breakerscheme,constructionof220kVSubstation at hoima and extension of 220kV substation at kinyara. The project also includes220kVdoublecircuit,twinbundletransmission line from Hoima-Kinyara-Kafu substation. Positions Held: Transmission line and Substation Design Engineer Activities Performed:  Technical Coordination with Client.  DesignReportsof TransmissionLine andSubstations based on IEC standards  Produceconceptual SubstationEquipment Layouts, General arrangements and all PrimaryPlant Details.  ProducePrimaryElectrical Plant Designs for the substations (substationequipmentlayouts, generalarrangements and all
  • 7. CV of Raza Ali Saleem Page 7 of 13 primaryplant details)  Transmission designs  Making Technical Specifications and Data Schedules for Transmission line and Substation plant and equipment  Making BoQs  Making Bidding Documents for Client (both Vol –I and Vol – II) in WB, AfDB etc formats  Making Project Implementation Plans  MonthlyProgress Reports  Project Presentations and workshops  Assisting Team Leader in dayto dayworks Name of Assignment Or Project: Review and update of Feasibility Studies, designs and Bidding Documents for the Nkenda-Hoima 132kV transmission line and associated substations Project. Year: October 2013 – November 2014 Location: UGANDA Client:Uganda ElectricityTransmissionCompanyLtd (UETCL) Main Project Features: The project consists of 220/132/33kV Substation at Hoima and Nkenda. The project also includes 220kVdoublecircuit,twinbundletransmission line from Hoima- Nkenda substation passing through fort portal. Positions Held: Transmission Line and Substation Design Engineer Activities Performed:  Technical Coordination with Client.  DesignReportsof TransmissionLine andSubstations based on IEC standards  Produceconceptual SubstationEquipment Layouts, General arrangements and all PrimaryPlant Details.  ProducePrimaryElectrical Plant Designs for the substations (substationequipmentlayouts, generalarrangements and all primaryplant details)  Transmission designs  Making Technical Specifications and Data Schedules for Transmission line and Substation plant and equipment  Making BoQs  Making Bidding Documents for Client (both Vol –I and Vol – II) in WB, AfDB etc formats  Making Project Implementation Plans  MonthlyProgress Reports  Project Presentations and workshops  Assisting Team Leader in dayto dayworks Name of assignment or project: 132kVJizan Transmission Line and Substations Year: May2013 To September 2013 Location: Saudi Arabia Client: Saudi Electricity Company (Saudi Arabia Electricity
  • 8. CV of Raza Ali Saleem Page 8 of 13 Department) Main project features: The Design, Supply, Installation, Testing & Commissioning 132kV Jizan Transmission Line and substations Projects Positions Held: Senior Transmission Line Specialist Activities Performed:  Overview of route plan  Overview and optimization of designs, drawings, cost estimates and technical specifications.  Preparation of Electrical procedures for installation testing & commissioning.  Contract Management.  Preparing work plan & schedule in coordination with civil works team, electrical team, and mechanical team and planning engineer.  Coordinating Project designing with Consultants, Client and Designer.  Project Execution and monitoring site activities including hiring and negotiating with subcontractors.  Monitoring work plan and assuring site progress and coordinating billing.  Sourcingandcorresponding with foreign equipment supplier and obtaining proposals.  Reporting and Documentation. Nameof assignmentorproject: Pole 3 and other associated 400kV& 110kVLines Year: April 2012 To April 2013 Location: New Zealand Client: TRANSPOWER(NewZealand ElectricityDepartment) Main project features: The Design, Supply, Installation, Testing & commissioning of 110kV and 400kV DC Transmission Line Projects Positions Held: Transmission Line Specialist Activities Performed:  Routing & Profiling of Transmission Lines  Prepare designs, drawings, cost estimates and prepare technical specifications.  Preparation of Electrical procedures for installation testing & commissioning.  Contract Management.  Preparing work plan & schedule in coordination with civil works team, electrical team, and mechanical team and planning engineer.  Coordinating Project designing with Consultants, Client and Designer.  Project Execution and monitoring site activities including hiring and negotiating with subcontractors.  Monitoring work plan and assuring site progress and coordinating billing.  Sourcingandcorresponding with foreign equipment supplier and obtaining proposals.  Reporting and Documentation. Name of assignment or project: Turnkey (EPC)
  • 9. CV of Raza Ali Saleem Page 9 of 13 Implementation of 132kV D/C Transmission Lines of Alipur & Fatehpur with Siemens and civil works of substation. Year: Feb 2011 to May2012 Location: Pakistan Client: Multan Electricity and Power Company, Water and Power Development Authority Main project features: Design, Supply, Installation, and Testing & Commissioning of 132kV Double Circuit, Bundle Conductor Transmission Lines and extension of Alipur and Fatehpur substation Positions held: Director (Projects) Activities performed:  Submitting technically and commercially sound bid in Competitive Bidding/Tendering.  Engineering & design of Transmission Lines including specifications and technical drawings.  Contract Management.  Routing & Profiling of Transmission Lines  Prepare designs, drawings, cost estimates and prepare technical specifications.  Preparation of Electrical procedures for installation testing & commissioning.  Monitoring Project Managers, Site Execution Staff and third party contractors/subcontractors  Preparation of Electrical procedures for installation test & commissioning.  Organizing routine schedules.  Making sure all electrical, mechanical and civil works are fit for purpose.  Liaising with and monitoring third partycontractors.  Negotiating with suppliers and purchase items at optimum cost.  Attending meetings, writing reports and giving presentations to managers and clients.  Client Relationship management. Name of assignment or project: Turnkey (EPC) Implementation of 132kV D/C Transmission Lines of GEPCO with Siemens and civil works of substation. Year: Feb 2011 to May2012 Location: Pakistan Client:GujranwalaElectricityand Power Company, Water and Power Development Authority Main project features: Turnkey implementation for Design, Supply, Installation, Testing&Commissioning of 132kVDouble Circuit,BundleConductorTransmissionLines and extension of GEPCO substation Positions held: Director (Projects) Activities performed:  Submitting technically and commercially sound bid in Competitive Bidding/Tendering.  Engineering & design of Transmission Lines including specifications and technical drawings.
  • 10. CV of Raza Ali Saleem Page 10 of 13  Contract Management.  Routing & Profiling of Transmission Lines  Prepare designs, drawings, cost estimates and prepare technical specifications.  Preparation of Electrical procedures for installation testing & commissioning.  Monitoring Project Managers, Site Execution Staff and third party contractors/subcontractors  Preparation of Electrical procedures for installation test & commissioning.  Organizing routine schedules.  Making sure all electrical, mechanical and civil works are fit for purpose.  Liaising with and monitoring third partycontractors.  Negotiating with suppliers and purchase items at optimum cost.  Attending meetings, writing reports and giving presentations to managers and clients.  Client Relationship management. Name of assignment or project: Turnkey (EPC) Implementation of 220kVD/C Bundle conductor Transmission line from Ghazi Road Grid station to Kala Shah Kaku and 220kVSubstation at Ghazi Road Lahore. Year: Aug 2009 to December 2011 Location: Pakistan Client: NTDC, Water and Power Development Authority Main project features: Turnkey (EPC) Implementation for Design,Supply, Installation,Testing&Commissioningof 220kV D/C BundleconductorTransmissionline from Ghazi Road Grid station to Kala ShahKaku and 220kV Substationat Ghazi Road Lahore. Positions held: Director (Projects) Activities performed:  Submitting technically and commercially sound bid in Competitive Bidding/Tendering.  Engineering & design of Transmission Lines including specifications and technical drawings.  Contract Management.  Routing & Profiling of Transmission Lines  Prepare designs, drawings, cost estimates and prepare technical specifications.  Preparation of Electrical procedures for installation testing & commissioning.  Monitoring Project Managers, Site Execution Staff and third party contractors/subcontractors  Preparation of Electrical procedures for installation test & commissioning.  Organizing routine schedules.  Making sure all electrical, mechanical and civil works are fit for purpose.  Liaising with and monitoring third partycontractors.  Negotiating with suppliers and purchase items at optimum cost.
  • 11. CV of Raza Ali Saleem Page 11 of 13  Attending meetings, writing reports and giving presentations to managers and clients.  Client Relationship management. Name of assignment or project: Turnkey (EPC) Implementation 132kV D/C JHPP to Mari Grid Station Transmission Line including river crossing & piling in flowing river. Year: June 2008 to December 2009 Location: Pakistan Client: NTDC, Water and Power Development Authority Main project features: Turnkey (EPC) Implementation for Design,Supply, Installation,Testing&Commissioningof 132kV D/C JHPP to MariGridStationTransmissionLine(implemented on design of 220kV) including river crossing & piling in flowing river. Positions held: Project Manager Activities performed:  Submitting technically and commercially sound bid in Competitive Bidding/Tendering.  Engineering & design of Transmission Lines including specifications and technical drawings.  Contract Management.  Routing & Profiling of Transmission Lines  Prepare designs, drawings, cost estimates and prepare technical specifications.  Preparation of Electrical procedures for installation testing & commissioning.  Monitoring Project Managers, Site Execution Staff and third party contractors/subcontractors  Preparation of Electrical procedures for installation test & commissioning.  Organizing routine schedules.  Making sure all electrical, mechanical and civil works are fit for purpose.  Liaising with and monitoring third partycontractors.  Negotiating with suppliers and purchase items at optimum cost.  Attending meetings, writing reports and giving presentations to managers and clients.  Client Relationship management. Nameof assignmentorproject: Civilworks,Erection, Testing&Commissioningof220kVSubstationat Yousafwala. Year: June 2008 to December 2009 Location: Pakistan Client: NTDC, Water and Power Development Authority Main projectfeatures: Civilworks, Erection,Testing& Commissioningof220kVSubstation at Yousafwala. Positions held: Project Manager Activities performed:  Submitting technically and commercially sound bid in Competitive Bidding/Tendering.  Engineering & design of Substation including specifications
  • 12. CV of Raza Ali Saleem Page 12 of 13 and technical drawings.  Contract Management.  Prepare designs, drawings, cost estimates and prepare technical specifications.  Preparation of Electrical procedures for installation testing & commissioning.  Monitoring Project Managers, Site Execution Staff and third party contractors/subcontractors  Preparation of Electrical procedures for installation test & commissioning.  Organizing routine schedules.  Making sure all electrical, mechanical and civil works are fit for purpose.  Liaising with and monitoring third partycontractors.  Negotiating with suppliers and purchase items at optimum cost.  Attending meetings, writing reports and giving presentations to managers and clients.  Client Relationship management. Name of assignment or project: 132kV Sunder Industrial Estate Substation Year: August 2006 to December 2007 Location: Pakistan Client: LESCO, Water and Power Development Authority Main project features: Civil works, Erection, Testing & Commissioning of 132kV Substation at Sunder Industrial Estate. Positions held: Project Engineer Activities performed:  Engineering & design of Substation including specifications and technical drawings.  Prepare designs, drawings, cost estimates and prepare technical specifications.  Preparation of Electrical procedures for installation testing & commissioning.  Preparation of Electrical procedures for installation test & commissioning.  Organizing routine schedules.  Making sure all electrical, mechanical and civil works are fit for purpose.  Liaising with and monitoring third partycontractors. Nameof assignmentorproject: 132kVGomalZam Dam transmissionline Year: December 2006 to June 2008 Location: Pakistan Client: NTDC, Water and Power Development Authority Main project features: Turnkey Implementation for Design, Supply, and Civil works, Erection,Testing & Commissioning of 132kVSubstation at Sunder Industrial Estate. Positions held: Project Engineer Activities performed:  Routing & Profiling
  • 13. CV of Raza Ali Saleem Page 13 of 13  Engineering & design of Transmission Line including specifications and technical drawings.  Prepare designs, drawings, cost estimates and prepare technical specifications.  Preparation of Electrical procedures for installation testing & commissioning.  Preparation of Electrical procedures for installation test & commissioning.  Organizing routine schedules.  Making sure all electrical, mechanical and civil works are fit for purpose.  Liaising with and monitoring third partycontractors. Nameof assignment or project: Turnkey(EPC) Contract for 500kVGhazi Barotha transmission line Year: December 2004 to December 2006 Location: Pakistan Client: NTDC, Water and Power Development Authority Main project features: Turnkey implementation for Design, Supply, Civil works, Erection, Testing & Commissioning of Quad Bundle, Double Circuit 500kV Ghazi Barotha Transmission Line Positions held: Project Engineer Activities performed:  Routing & Profiling  Engineering & design of Transmission Line including specifications and technical drawings.  Prepare designs, drawings, cost estimates and prepare technical specifications.  Preparation of Electrical procedures for installation testing & commissioning.  Organizing routine schedules.  Making sure all electrical, mechanical and civil works are fit for purpose.  Liaising with and monitoring third partycontractors.