This CV summarizes the professional experience of Raza Ali Saleem as a transmission line and substation design engineer. It lists his educational background in electrical engineering and various technical trainings. It then details his employment history from 2003 to present, where he has worked on transmission line and substation design projects in Pakistan, Saudi Arabia, New Zealand, Tanzania, Uganda, Rwanda, and Malawi. His responsibilities have included transmission line and substation design, preparation of bidding documents, construction supervision, and factory acceptance testing.