IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE)
e-ISSN: 2278-1684,p-ISSN: 2320-334X, Volume 12, Issue 6 Ver. I (Nov. - Dec. 2015), PP 01-06
www.iosrjournals.org
DOI: 10.9790/1684-12610106 www.iosrjournals.org 1 | Page
Scheduling and Financial Analysis of a High Rise Building
E. Suresh kumar1
S.Krishnamoorthi2
1
Assistant Professor (Construction Engineering & Management), Department of Civil Engineering,
Dhanalakshmi Srinivasan Engineering College, Perambalur, Trichy, Tamil Nadu, India
2
Head of Department, Department of Civil Engineering, Kongu Engineering College, Perundurai, Erode, Tamil
Nadu, India
Abstract: Scheduling using MSP Software is a process which involves estimation, sequencing the activities,
resources allocation and timing. The construction scheduling is to complete the project in time and match the
resources with the allocated time. Scheduling using MSP Software gives good controlling and clear schedule to
a project. EV Analysis is a standard method of measuring a project’s progress at any given point of time,
forecasting its completion date, final cost and analysis variance in the schedule and budget of the project. This
project deals with scheduling using MSP and EV Analysis for a apartment building. Thereby process time and
cost overrun are avoided.
I. Introduction
Multi-storey buildings aim to increase the area of the building without increasing the area of the land
the building is built on, hence saving land and, in most cases, money(depending on material used and land
prices in the area, of course). Large scale industrialization and prohibitive land cost in India have resulted in a
vast expansion in the building programme stages has reached when multi-storey construction is becoming
essential and inevitable. Land use economy is achieved by construction of multi-storey buildings which results
in large building more concentrated on relatively small built up area. This makes available a large proportion of
open space for creating natural environments. This also ensures better day-lighting and greater airflow as well as
well as freedom from street noise. Living and working in such buildings provide panoramic view of the city.
One production scheduling and control technique which tries to surpass. The CPM difficulties for multi-storey
building scheduling are the Line of Balance (LOB) technique. The LOB technique was developed in the early
40’s into the manufacturing environment and adapted by researchers for using on construction industry in the
close as possible to the original scheduled by reviewing and reprogramming under changed condition in order to
adhere to the target time of completion
II. Scheduling & Financial Analysis
The project schedule is a calendar that links the tasks to be done with the resources that will do them.
Before a project schedule can be created, the project manager must have a Work Breakdown Structure (WBS),
an effort estimate for each task, and a resources list with availability for each resource.
A. Scope
A project manager’s time is better spent on working with the team to create a WBS and estimates than
on trying to build a project schedule without them. The project schedule is the core of the project plan. It is used
by the project manager to commit people to the project and show the organization how the work will be
performed.
Schedules are used to communicate final deadlines and, in some cases, to determine resource needs.
They are also used as a kind of checklist to make sure that every task necessary is performed. If a task is on the
schedule, the team is committed in doing it. In other words, the project schedule is the means by which the
project manager brings the team and the project under control.
B. Purpose of Scheduling
 Schedule is a reflection of the plan, but the plan must come first.
 It is the determination of the timing and sequence of operation in the project and their assembly to
given the overall completion time.
 The process of scheduling may uncover flaws in the plan, leading to revisions of the plan.
Scheduling and Financial Analysis of a High Rise Building
DOI: 10.9790/1684-12610106 www.iosrjournals.org 2 | Page
c. MS Project
Microsoft Project MSP is a project management software programme developed and sold by Microsoft
which is designed to assist project managers in developing plans, assigning resources to tasks, tracking progress,
managing budgets and analyzing workloads..
A planning engineer develops the most appropriate method and sequence of construction operations for
a particular project, in conjunction with the site manager. They plan and oversee the entire programme of work
and must anticipate a contract’s demands in terms of labour, materials, equipment and technical challenges. As
well as ensuring that construction is completed safety to high technical standard, the planning engineer is also
responsible for specifying the timing of the contract. This can be major responsibility when penalty clauses for
late completion are written into project contracts.
Typical work activities include:
 Selecting the appropriate techniques and sequence of events for a particular project.
 Presenting schedules of work, often with visual aids as bar charts and procedures diagrams.
 Monitoring progress throughout the construction process and comparing this with the
projected schedule of work.
D .Financial Analysis
EVA Analysis
Earned Value Analysis (EVA) is an industry standard method of measuring a project's progress at any
given point of time, forecasting its completion date and final cost, and analyzing variances in the schedule and
budget as the project proceeds. It compares the planned amount of work with what has actually been completed,
to determine if the cost, schedule, and work accomplished are progressing in accordance with the plan. As work
is completed, it is considered "earned".
1) Calculating Earning Value
Earned Value Management measures progress against a baseline. It involves calculating three key
values for each activity in the WBS:
a) The Planned Value (PV), (formerly known as the budgeted cost of work scheduled or BCWS)
b) The Actual Cost (AC), (formerly known as the actual cost of work performed or ACWP)
c) The Earned Value (EV), (formerly known as the budget cost of work performed or BCWP)
These three values are combined to determine at that point in time whether or not work is being
accomplished as planned. The most commonly used measures are the cost variance:
Cost Variance (CV) = EV - AC
Schedule Variance (SV) = EV - PV
These two values can be converted to efficiency indicators to reflect the cost and schedule performance
of the project. The most commonly used cost-efficiency indicator is the cost performance index (CPI). It is
calculated thus:
CPI = EV / AC
The sum of all individual EV budgets divided by the sum of all individual AC's is known as the
cumulative CPI, and is generally used to forecast the cost to complete a project.
The schedule performance index (SPI), calculated thus:
SPI = EV / PV
is often used with the CPI to forecast overall project completion estimates.
A negative schedule variance (SV) calculated at a given point in time means the project is behind
schedule, while a negative cost variance (CV) means the project is over budget.
III. Result and Discussion
A. Project Details
1) Name of the project : RESIDENTIAL BUILDING
2) Total area of
Construction : 15050sq.ft
3) Total saleable area : 21,500sq.ft
4) Grand total cost
Construction : Rs 10, 00, 00,000 /
5) No of floors : 6
6) Rate/sft : Rs 5000/
Scheduling and Financial Analysis of a High Rise Building
DOI: 10.9790/1684-12610106 www.iosrjournals.org 3 | Page
B. Budget of the Project
The cost incurred to complete the project is estimated as follows.
1) Grand Total:
Table I Cost Budget Of The Project
SI.NO Description Total cost
1) Building works Rs 9,36,16,772
2) External development
works
Rs 25,58,846
3) Architectural Features RS 38,24,382
Grand Total Rs 10,00,00,000
Total building area 15,050sq,ft
Rate/sft Rs 1993.35
C. Quantity of the Activity
1) Quantity of the foundation activity
 Total Site Area = 2000m2
 Total Building Area = 1400m2
 Total Footing Excavation = 438m3
 Total P.C.C Quantity = 64m3
 Total Footing Concrete = 2454m3
 Total Footing
Reinforcement = 23163kg
 Total Pedestal
Reinforcement = 2699kg
 Total Pedestal Concrete = 91m3
 Total ground slab =140m3
3) First floor to fifth floor
 Total column concrete =50m3
.
 Total column reinforcement =4002kg.
 Total slab concreting =1356m3
.
 Total slab
Reinforcement =14576kg.
 Total shuttering .=20487m2
4) Sixth floor
 Total column concrete =35m3
.
 Total column reinforcement =2654kg.
 Total slab concreting =1267m3
.
 Total slab reinforcement =10356kg.
 Total shuttering =13243m2
.
D. Economy in Construction Cost
The construction should be done as economically as possible by organizing labour, materials, transport,
supervision, etc., a well organized work cost less. All design and working drawings should be prepared in
advance, requirement of materials should be worked out and materials should be organized, collected and
stocked close to the site of work well in advance so that work is not held up for want of materials. The whole
construction shall be completed as quickly as possible so that the supervision cost may be minimum possible
Over-head costs should be kept as low as possible
1) Concrete:
Concrete is a homogeneous mix of cement, coarse aggregate, fine aggregate and water. The concrete
members will transfer the load from the building to the soil. Concrete can be prepared by two means Ready mix
concrete (RMS) and Standard mixing concrete (SMC). The SMC is cheaper when compared with RMC. But the
RMC will reduce the time and it will provide a uniform homogenous mix
Scheduling and Financial Analysis of a High Rise Building
DOI: 10.9790/1684-12610106 www.iosrjournals.org 4 | Page
2) Ground floor
 Total column concrete =53m3
.
 Total column
Reinforcement =4553kg.
 Total slab
Concreting =1540m3
.
 Total slab
Reinforcement =15750kg.
 Total shuttering =22487m2
Table Ii Cost For Concrete
Type of material Amount in Rs
concrete RMC 1,65,82,160/
SMC 88,93,980/
0
5000000
10000000
15000000
20000000
RMC SMC
Fig 1 Cost Comparison for Concrete
E. Scheduling Of the Structural Activities
Table Iii Schedule Of The Structural Activity
si.no Tasks Duration Predecessors
1 Mass Excavation 8 days -
2 Footing Excavation 8 days 2SS+11 days
3 P.C.C 11 days 3SS+11 days
4 Foundation - RCC 30 days 4SS+8 days
5 Column/Lift Wall
Upto G.F LVL
30 days 5SS+6 days
6 Ground Floor -
Beam/ Slab
37 days 6SS+5 days
7 Ground Floor
Column/Lift Wal
23 days 7SS+14 days
8 1st Floor -
Beam/Slab
30 days 8SS+21 days
9 1st Floor -
Column/Lift Wall
23 days 9SS+6 days
10 2nd Floor -
Beam/Slab
30 days 10SS+14 days
11 2nd Floor -
Column/Lift Wall
23 days 11SS+7 days
12 3rd Floor -
Beam/Slab
30 days 12SS+14 days
13 3rd Floor -
Column/Lift Wall
23 days 13SS+7 days
14 4th Floor -
Beam/Slab
30 days 14SS+14 days
15 4th Floor -
Column/Lift Wall
23 days 15SS+7 days
16 5th Floor -
Beam/Slab
30 days 16SS+14 days
17 5th Floor -
Column/Lift Wall
23 days 17SS+7 days
18 6th Floor -
Beam/Slab
30 days 18SS+14 days
Scheduling and Financial Analysis of a High Rise Building
DOI: 10.9790/1684-12610106 www.iosrjournals.org 5 | Page
19 6th Floor -
Column/Lift Wall
23 days 19SS+7 days
20 Terrace Floor 40 days 20SS+14 days
21 Above terrace
Column/Lift Wall
30 days 20 days
22 Slope
slab/OHT/M.R
Room
20 days 21 ays
F. Base Line Cost Report
This report shows the budget,baseline and actual cost of the structural activities, in this chart two bar
present in the cost. The bar represent the budget cost upto the baseline .The second bar shows remaining period
of the budget cost.
Fig 2:Base Line Cost Report
G. Cash Flow Report
Fig 3:Cash Flow Report
The above report shows how much amount spent in quarterly period of year in the project. Two type of
cost represent in the chart.
1. Budget cost
2. Cumulative cost
The sum of the budget cost is known as cumulative cost.
Scheduling and Financial Analysis of a High Rise Building
DOI: 10.9790/1684-12610106 www.iosrjournals.org 6 | Page
H. Earned Value Analysis Of The Structural Activity
Table 4-EV Analysis of activity.
Tasks no Actual cost
AC
in Rs/-
Earned value
EV
in Rs/-
Cost variance
(AC-EV)
in Rs/-
1 33,000.00 30,600.00 2,400.00
2 42,000.00 32,000.00 10,000.00
3 2,20,000.00 2,01,000.00 19,000.00
4 89,31,576.00 88,31,576.00 100000.00
5 5,80,900.00 5,60,900.00 20,000.00
6 57,65,678.00 59,90,750.00 2,25,072.00
7 24,30,524.00 24,20,216.00 10,308.00
8 59,11,850.00 59,09,936.00 1,914.00
9 9,21,436.00 9,20,416.00 1,020.00
IV. Conclusion
After complete the schedule and financial analysis of the building it has been observed that
1. there is more difference between budget cost and actual cost
2. the cost difference is due to the huge increase in the material’s price and the labour’s wages.
3. The time lag in construction activity due to the natural disturbances.
Acknowledgments
The author would like to thank the management of kongu Engineering College & Dhanalakshmi
Srinivasan Engineering college for providing the facilities to carry out this work.
References
[1] K.Ananthanarayanan, MPSS: Multiple Project Scheduling Software, journal of Nicmar,PP.19-28.
[2] K.K.Chitkara, Construction Project Management, Tata McGraw-Hill Publishing Company Limited, New Delhi, pp. 180-218.
[3] K.C.iyer, K.N.jha, Critical Factors Affecting Schedule Performance: Evidence from Indian Construction projects, Journal of
Construction Engineering and Management@ASCE,August, PP. 871-880.
[4] M.N.Khaled, Y.H.Mohamed, Developing a complexity measures for project schedule, Journal of Construction Engineering and
Management, June 2006, pp.554-561.
[5] M.N.Khaled, Y.H.Mohamed, Developing a complexity measures for project schedule, Journal of Construction Engineering and
Management, June 2006, pp.554-561.
[6] Mario, Work continuity constraints in project scheduling, Journal of Construction Engineering and
Management@ASCE,January2006, pp4-24.

More Related Content

What's hot

Scheduling of a project
Scheduling of a projectScheduling of a project
Scheduling of a projectSailish Cephas
 
Construction project scheduling and quality control
Construction project scheduling and quality controlConstruction project scheduling and quality control
Construction project scheduling and quality controlmonishkumark
 
Project management chapter 9
Project management chapter 9Project management chapter 9
Project management chapter 9VancityInstitute
 
Summer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javedSummer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javedWaqar Ahmed
 
09 lecture project scheduling 1
09 lecture project scheduling 109 lecture project scheduling 1
09 lecture project scheduling 1Ahmad Basim Hamza
 
Line of balance in civil engineering
Line of balance in civil engineeringLine of balance in civil engineering
Line of balance in civil engineeringrathodjaydeep2
 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Akaresh Jose Kaviyil JY
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisAsif Sultan Razu
 
Meeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsMeeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsAcumen
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniquesShivangi Saini
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Schedulingakashpadole
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction managementXubitech
 
Program evaluation and review technique
Program evaluation and review techniqueProgram evaluation and review technique
Program evaluation and review techniqueGautam Chopra
 
Qimonda Pm Foils
Qimonda Pm FoilsQimonda Pm Foils
Qimonda Pm Foilstrahanr
 
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSPLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSHafiz JUNAID
 
Project management ppt @ bec doms
Project management ppt @ bec doms Project management ppt @ bec doms
Project management ppt @ bec doms Babasab Patil
 

What's hot (20)

Scheduling of a project
Scheduling of a projectScheduling of a project
Scheduling of a project
 
Construction project scheduling and quality control
Construction project scheduling and quality controlConstruction project scheduling and quality control
Construction project scheduling and quality control
 
Pert, cpm & gert
Pert, cpm & gertPert, cpm & gert
Pert, cpm & gert
 
Project management chapter 9
Project management chapter 9Project management chapter 9
Project management chapter 9
 
Summer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javedSummer Internship Report by waqar ahmed javed
Summer Internship Report by waqar ahmed javed
 
09 lecture project scheduling 1
09 lecture project scheduling 109 lecture project scheduling 1
09 lecture project scheduling 1
 
Line of balance in civil engineering
Line of balance in civil engineeringLine of balance in civil engineering
Line of balance in civil engineering
 
Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )Project Management Techniques ( CPM & PERT Techniques )
Project Management Techniques ( CPM & PERT Techniques )
 
Critical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network AnalysisCritical Path Method (CPM) & Network Analysis
Critical Path Method (CPM) & Network Analysis
 
Meeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance StandardsMeeting Project Schedule Compliance Standards
Meeting Project Schedule Compliance Standards
 
Project planning and scheduling techniques
Project planning and scheduling techniquesProject planning and scheduling techniques
Project planning and scheduling techniques
 
03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling03 Construction Project Planning and Scheduling
03 Construction Project Planning and Scheduling
 
Introduction to construction management
Introduction to construction managementIntroduction to construction management
Introduction to construction management
 
Project management - CPM & PERT
Project management   - CPM & PERTProject management   - CPM & PERT
Project management - CPM & PERT
 
Project Scheduling
Project SchedulingProject Scheduling
Project Scheduling
 
Program evaluation and review technique
Program evaluation and review techniqueProgram evaluation and review technique
Program evaluation and review technique
 
Qimonda Pm Foils
Qimonda Pm FoilsQimonda Pm Foils
Qimonda Pm Foils
 
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERSPLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
PLANNING AND SCHEDULING DONE BY A CIVIL ENGINEERS
 
S curves
S curvesS curves
S curves
 
Project management ppt @ bec doms
Project management ppt @ bec doms Project management ppt @ bec doms
Project management ppt @ bec doms
 

Similar to Scheduling and Financial Analysis of a High Rise Building

EJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdfEJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdfkripeshdubey1
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&tNishant Pandey
 
Planning and scheduling Techniques.ppt
Planning and scheduling  Techniques.pptPlanning and scheduling  Techniques.ppt
Planning and scheduling Techniques.pptDejeneTsegaye6
 
Construction project management
Construction project managementConstruction project management
Construction project managementsaif hasan
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsSHAZEBALIKHAN1
 
Project typed
Project typedProject typed
Project typedRahul
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTS.Vijaya Bhaskar
 
76 s201905
76 s20190576 s201905
76 s201905IJRAT
 
Time Cost Trade Off
Time Cost Trade OffTime Cost Trade Off
Time Cost Trade Offssuserfe1b72
 
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...IRJET Journal
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementIRJET Journal
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniquesguestc8140fe
 
1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.ppt1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.pptravi590686
 
1.1c Construction Planning.ppt
1.1c Construction Planning.ppt1.1c Construction Planning.ppt
1.1c Construction Planning.pptravi590686
 
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.pptTinotendaChivese
 
Project Implementation.pdf
Project Implementation.pdfProject Implementation.pdf
Project Implementation.pdfssuserc0e4e0
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET Journal
 
Traditional Management System.ppt
Traditional Management System.pptTraditional Management System.ppt
Traditional Management System.pptUtkarshDwivedi74
 

Similar to Scheduling and Financial Analysis of a High Rise Building (20)

EJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdfEJMCM_Volume 7_Issue 4_Pages 310-318.pdf
EJMCM_Volume 7_Issue 4_Pages 310-318.pdf
 
H1303055462
H1303055462H1303055462
H1303055462
 
Vocational training report l&t
Vocational training report l&tVocational training report l&t
Vocational training report l&t
 
Planning and scheduling Techniques.ppt
Planning and scheduling  Techniques.pptPlanning and scheduling  Techniques.ppt
Planning and scheduling Techniques.ppt
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Most Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management TermsMost Popular 20 Evergreen Project Management Terms
Most Popular 20 Evergreen Project Management Terms
 
Project typed
Project typedProject typed
Project typed
 
Project Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERTProject Management: NETWORK ANALYSIS - CPM and PERT
Project Management: NETWORK ANALYSIS - CPM and PERT
 
Chapter 3.pptx
Chapter 3.pptxChapter 3.pptx
Chapter 3.pptx
 
76 s201905
76 s20190576 s201905
76 s201905
 
Time Cost Trade Off
Time Cost Trade OffTime Cost Trade Off
Time Cost Trade Off
 
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
Cost Analysis of Road Construction Project by Earned Value Analysis using Pri...
 
Tracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value ManagementTracking a Typical Apartment Construction using Earned Value Management
Tracking a Typical Apartment Construction using Earned Value Management
 
Construction Project Managment Techniques
Construction Project Managment TechniquesConstruction Project Managment Techniques
Construction Project Managment Techniques
 
1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.ppt1.1b Construction (Project) Planning.ppt
1.1b Construction (Project) Planning.ppt
 
1.1c Construction Planning.ppt
1.1c Construction Planning.ppt1.1c Construction Planning.ppt
1.1c Construction Planning.ppt
 
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
45ef51191315a8630a639ff030b4cb67a3df6f49-1657701254277.ppt
 
Project Implementation.pdf
Project Implementation.pdfProject Implementation.pdf
Project Implementation.pdf
 
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
IRJET- Planning and Scheduling Multi- Storeyed Residential Building using Mic...
 
Traditional Management System.ppt
Traditional Management System.pptTraditional Management System.ppt
Traditional Management System.ppt
 

More from iosrjce

An Examination of Effectuation Dimension as Financing Practice of Small and M...
An Examination of Effectuation Dimension as Financing Practice of Small and M...An Examination of Effectuation Dimension as Financing Practice of Small and M...
An Examination of Effectuation Dimension as Financing Practice of Small and M...iosrjce
 
Does Goods and Services Tax (GST) Leads to Indian Economic Development?
Does Goods and Services Tax (GST) Leads to Indian Economic Development?Does Goods and Services Tax (GST) Leads to Indian Economic Development?
Does Goods and Services Tax (GST) Leads to Indian Economic Development?iosrjce
 
Childhood Factors that influence success in later life
Childhood Factors that influence success in later lifeChildhood Factors that influence success in later life
Childhood Factors that influence success in later lifeiosrjce
 
Emotional Intelligence and Work Performance Relationship: A Study on Sales Pe...
Emotional Intelligence and Work Performance Relationship: A Study on Sales Pe...Emotional Intelligence and Work Performance Relationship: A Study on Sales Pe...
Emotional Intelligence and Work Performance Relationship: A Study on Sales Pe...iosrjce
 
Customer’s Acceptance of Internet Banking in Dubai
Customer’s Acceptance of Internet Banking in DubaiCustomer’s Acceptance of Internet Banking in Dubai
Customer’s Acceptance of Internet Banking in Dubaiiosrjce
 
A Study of Employee Satisfaction relating to Job Security & Working Hours amo...
A Study of Employee Satisfaction relating to Job Security & Working Hours amo...A Study of Employee Satisfaction relating to Job Security & Working Hours amo...
A Study of Employee Satisfaction relating to Job Security & Working Hours amo...iosrjce
 
Consumer Perspectives on Brand Preference: A Choice Based Model Approach
Consumer Perspectives on Brand Preference: A Choice Based Model ApproachConsumer Perspectives on Brand Preference: A Choice Based Model Approach
Consumer Perspectives on Brand Preference: A Choice Based Model Approachiosrjce
 
Student`S Approach towards Social Network Sites
Student`S Approach towards Social Network SitesStudent`S Approach towards Social Network Sites
Student`S Approach towards Social Network Sitesiosrjce
 
Broadcast Management in Nigeria: The systems approach as an imperative
Broadcast Management in Nigeria: The systems approach as an imperativeBroadcast Management in Nigeria: The systems approach as an imperative
Broadcast Management in Nigeria: The systems approach as an imperativeiosrjce
 
A Study on Retailer’s Perception on Soya Products with Special Reference to T...
A Study on Retailer’s Perception on Soya Products with Special Reference to T...A Study on Retailer’s Perception on Soya Products with Special Reference to T...
A Study on Retailer’s Perception on Soya Products with Special Reference to T...iosrjce
 
A Study Factors Influence on Organisation Citizenship Behaviour in Corporate ...
A Study Factors Influence on Organisation Citizenship Behaviour in Corporate ...A Study Factors Influence on Organisation Citizenship Behaviour in Corporate ...
A Study Factors Influence on Organisation Citizenship Behaviour in Corporate ...iosrjce
 
Consumers’ Behaviour on Sony Xperia: A Case Study on Bangladesh
Consumers’ Behaviour on Sony Xperia: A Case Study on BangladeshConsumers’ Behaviour on Sony Xperia: A Case Study on Bangladesh
Consumers’ Behaviour on Sony Xperia: A Case Study on Bangladeshiosrjce
 
Design of a Balanced Scorecard on Nonprofit Organizations (Study on Yayasan P...
Design of a Balanced Scorecard on Nonprofit Organizations (Study on Yayasan P...Design of a Balanced Scorecard on Nonprofit Organizations (Study on Yayasan P...
Design of a Balanced Scorecard on Nonprofit Organizations (Study on Yayasan P...iosrjce
 
Public Sector Reforms and Outsourcing Services in Nigeria: An Empirical Evalu...
Public Sector Reforms and Outsourcing Services in Nigeria: An Empirical Evalu...Public Sector Reforms and Outsourcing Services in Nigeria: An Empirical Evalu...
Public Sector Reforms and Outsourcing Services in Nigeria: An Empirical Evalu...iosrjce
 
Media Innovations and its Impact on Brand awareness & Consideration
Media Innovations and its Impact on Brand awareness & ConsiderationMedia Innovations and its Impact on Brand awareness & Consideration
Media Innovations and its Impact on Brand awareness & Considerationiosrjce
 
Customer experience in supermarkets and hypermarkets – A comparative study
Customer experience in supermarkets and hypermarkets – A comparative studyCustomer experience in supermarkets and hypermarkets – A comparative study
Customer experience in supermarkets and hypermarkets – A comparative studyiosrjce
 
Social Media and Small Businesses: A Combinational Strategic Approach under t...
Social Media and Small Businesses: A Combinational Strategic Approach under t...Social Media and Small Businesses: A Combinational Strategic Approach under t...
Social Media and Small Businesses: A Combinational Strategic Approach under t...iosrjce
 
Secretarial Performance and the Gender Question (A Study of Selected Tertiary...
Secretarial Performance and the Gender Question (A Study of Selected Tertiary...Secretarial Performance and the Gender Question (A Study of Selected Tertiary...
Secretarial Performance and the Gender Question (A Study of Selected Tertiary...iosrjce
 
Implementation of Quality Management principles at Zimbabwe Open University (...
Implementation of Quality Management principles at Zimbabwe Open University (...Implementation of Quality Management principles at Zimbabwe Open University (...
Implementation of Quality Management principles at Zimbabwe Open University (...iosrjce
 
Organizational Conflicts Management In Selected Organizaions In Lagos State, ...
Organizational Conflicts Management In Selected Organizaions In Lagos State, ...Organizational Conflicts Management In Selected Organizaions In Lagos State, ...
Organizational Conflicts Management In Selected Organizaions In Lagos State, ...iosrjce
 

More from iosrjce (20)

An Examination of Effectuation Dimension as Financing Practice of Small and M...
An Examination of Effectuation Dimension as Financing Practice of Small and M...An Examination of Effectuation Dimension as Financing Practice of Small and M...
An Examination of Effectuation Dimension as Financing Practice of Small and M...
 
Does Goods and Services Tax (GST) Leads to Indian Economic Development?
Does Goods and Services Tax (GST) Leads to Indian Economic Development?Does Goods and Services Tax (GST) Leads to Indian Economic Development?
Does Goods and Services Tax (GST) Leads to Indian Economic Development?
 
Childhood Factors that influence success in later life
Childhood Factors that influence success in later lifeChildhood Factors that influence success in later life
Childhood Factors that influence success in later life
 
Emotional Intelligence and Work Performance Relationship: A Study on Sales Pe...
Emotional Intelligence and Work Performance Relationship: A Study on Sales Pe...Emotional Intelligence and Work Performance Relationship: A Study on Sales Pe...
Emotional Intelligence and Work Performance Relationship: A Study on Sales Pe...
 
Customer’s Acceptance of Internet Banking in Dubai
Customer’s Acceptance of Internet Banking in DubaiCustomer’s Acceptance of Internet Banking in Dubai
Customer’s Acceptance of Internet Banking in Dubai
 
A Study of Employee Satisfaction relating to Job Security & Working Hours amo...
A Study of Employee Satisfaction relating to Job Security & Working Hours amo...A Study of Employee Satisfaction relating to Job Security & Working Hours amo...
A Study of Employee Satisfaction relating to Job Security & Working Hours amo...
 
Consumer Perspectives on Brand Preference: A Choice Based Model Approach
Consumer Perspectives on Brand Preference: A Choice Based Model ApproachConsumer Perspectives on Brand Preference: A Choice Based Model Approach
Consumer Perspectives on Brand Preference: A Choice Based Model Approach
 
Student`S Approach towards Social Network Sites
Student`S Approach towards Social Network SitesStudent`S Approach towards Social Network Sites
Student`S Approach towards Social Network Sites
 
Broadcast Management in Nigeria: The systems approach as an imperative
Broadcast Management in Nigeria: The systems approach as an imperativeBroadcast Management in Nigeria: The systems approach as an imperative
Broadcast Management in Nigeria: The systems approach as an imperative
 
A Study on Retailer’s Perception on Soya Products with Special Reference to T...
A Study on Retailer’s Perception on Soya Products with Special Reference to T...A Study on Retailer’s Perception on Soya Products with Special Reference to T...
A Study on Retailer’s Perception on Soya Products with Special Reference to T...
 
A Study Factors Influence on Organisation Citizenship Behaviour in Corporate ...
A Study Factors Influence on Organisation Citizenship Behaviour in Corporate ...A Study Factors Influence on Organisation Citizenship Behaviour in Corporate ...
A Study Factors Influence on Organisation Citizenship Behaviour in Corporate ...
 
Consumers’ Behaviour on Sony Xperia: A Case Study on Bangladesh
Consumers’ Behaviour on Sony Xperia: A Case Study on BangladeshConsumers’ Behaviour on Sony Xperia: A Case Study on Bangladesh
Consumers’ Behaviour on Sony Xperia: A Case Study on Bangladesh
 
Design of a Balanced Scorecard on Nonprofit Organizations (Study on Yayasan P...
Design of a Balanced Scorecard on Nonprofit Organizations (Study on Yayasan P...Design of a Balanced Scorecard on Nonprofit Organizations (Study on Yayasan P...
Design of a Balanced Scorecard on Nonprofit Organizations (Study on Yayasan P...
 
Public Sector Reforms and Outsourcing Services in Nigeria: An Empirical Evalu...
Public Sector Reforms and Outsourcing Services in Nigeria: An Empirical Evalu...Public Sector Reforms and Outsourcing Services in Nigeria: An Empirical Evalu...
Public Sector Reforms and Outsourcing Services in Nigeria: An Empirical Evalu...
 
Media Innovations and its Impact on Brand awareness & Consideration
Media Innovations and its Impact on Brand awareness & ConsiderationMedia Innovations and its Impact on Brand awareness & Consideration
Media Innovations and its Impact on Brand awareness & Consideration
 
Customer experience in supermarkets and hypermarkets – A comparative study
Customer experience in supermarkets and hypermarkets – A comparative studyCustomer experience in supermarkets and hypermarkets – A comparative study
Customer experience in supermarkets and hypermarkets – A comparative study
 
Social Media and Small Businesses: A Combinational Strategic Approach under t...
Social Media and Small Businesses: A Combinational Strategic Approach under t...Social Media and Small Businesses: A Combinational Strategic Approach under t...
Social Media and Small Businesses: A Combinational Strategic Approach under t...
 
Secretarial Performance and the Gender Question (A Study of Selected Tertiary...
Secretarial Performance and the Gender Question (A Study of Selected Tertiary...Secretarial Performance and the Gender Question (A Study of Selected Tertiary...
Secretarial Performance and the Gender Question (A Study of Selected Tertiary...
 
Implementation of Quality Management principles at Zimbabwe Open University (...
Implementation of Quality Management principles at Zimbabwe Open University (...Implementation of Quality Management principles at Zimbabwe Open University (...
Implementation of Quality Management principles at Zimbabwe Open University (...
 
Organizational Conflicts Management In Selected Organizaions In Lagos State, ...
Organizational Conflicts Management In Selected Organizaions In Lagos State, ...Organizational Conflicts Management In Selected Organizaions In Lagos State, ...
Organizational Conflicts Management In Selected Organizaions In Lagos State, ...
 

Recently uploaded

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Christo Ananth
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...ranjana rawat
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 

Recently uploaded (20)

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
Call for Papers - African Journal of Biological Sciences, E-ISSN: 2663-2187, ...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
(TARA) Talegaon Dabhade Call Girls Just Call 7001035870 [ Cash on Delivery ] ...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 

Scheduling and Financial Analysis of a High Rise Building

  • 1. IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-ISSN: 2278-1684,p-ISSN: 2320-334X, Volume 12, Issue 6 Ver. I (Nov. - Dec. 2015), PP 01-06 www.iosrjournals.org DOI: 10.9790/1684-12610106 www.iosrjournals.org 1 | Page Scheduling and Financial Analysis of a High Rise Building E. Suresh kumar1 S.Krishnamoorthi2 1 Assistant Professor (Construction Engineering & Management), Department of Civil Engineering, Dhanalakshmi Srinivasan Engineering College, Perambalur, Trichy, Tamil Nadu, India 2 Head of Department, Department of Civil Engineering, Kongu Engineering College, Perundurai, Erode, Tamil Nadu, India Abstract: Scheduling using MSP Software is a process which involves estimation, sequencing the activities, resources allocation and timing. The construction scheduling is to complete the project in time and match the resources with the allocated time. Scheduling using MSP Software gives good controlling and clear schedule to a project. EV Analysis is a standard method of measuring a project’s progress at any given point of time, forecasting its completion date, final cost and analysis variance in the schedule and budget of the project. This project deals with scheduling using MSP and EV Analysis for a apartment building. Thereby process time and cost overrun are avoided. I. Introduction Multi-storey buildings aim to increase the area of the building without increasing the area of the land the building is built on, hence saving land and, in most cases, money(depending on material used and land prices in the area, of course). Large scale industrialization and prohibitive land cost in India have resulted in a vast expansion in the building programme stages has reached when multi-storey construction is becoming essential and inevitable. Land use economy is achieved by construction of multi-storey buildings which results in large building more concentrated on relatively small built up area. This makes available a large proportion of open space for creating natural environments. This also ensures better day-lighting and greater airflow as well as well as freedom from street noise. Living and working in such buildings provide panoramic view of the city. One production scheduling and control technique which tries to surpass. The CPM difficulties for multi-storey building scheduling are the Line of Balance (LOB) technique. The LOB technique was developed in the early 40’s into the manufacturing environment and adapted by researchers for using on construction industry in the close as possible to the original scheduled by reviewing and reprogramming under changed condition in order to adhere to the target time of completion II. Scheduling & Financial Analysis The project schedule is a calendar that links the tasks to be done with the resources that will do them. Before a project schedule can be created, the project manager must have a Work Breakdown Structure (WBS), an effort estimate for each task, and a resources list with availability for each resource. A. Scope A project manager’s time is better spent on working with the team to create a WBS and estimates than on trying to build a project schedule without them. The project schedule is the core of the project plan. It is used by the project manager to commit people to the project and show the organization how the work will be performed. Schedules are used to communicate final deadlines and, in some cases, to determine resource needs. They are also used as a kind of checklist to make sure that every task necessary is performed. If a task is on the schedule, the team is committed in doing it. In other words, the project schedule is the means by which the project manager brings the team and the project under control. B. Purpose of Scheduling  Schedule is a reflection of the plan, but the plan must come first.  It is the determination of the timing and sequence of operation in the project and their assembly to given the overall completion time.  The process of scheduling may uncover flaws in the plan, leading to revisions of the plan.
  • 2. Scheduling and Financial Analysis of a High Rise Building DOI: 10.9790/1684-12610106 www.iosrjournals.org 2 | Page c. MS Project Microsoft Project MSP is a project management software programme developed and sold by Microsoft which is designed to assist project managers in developing plans, assigning resources to tasks, tracking progress, managing budgets and analyzing workloads.. A planning engineer develops the most appropriate method and sequence of construction operations for a particular project, in conjunction with the site manager. They plan and oversee the entire programme of work and must anticipate a contract’s demands in terms of labour, materials, equipment and technical challenges. As well as ensuring that construction is completed safety to high technical standard, the planning engineer is also responsible for specifying the timing of the contract. This can be major responsibility when penalty clauses for late completion are written into project contracts. Typical work activities include:  Selecting the appropriate techniques and sequence of events for a particular project.  Presenting schedules of work, often with visual aids as bar charts and procedures diagrams.  Monitoring progress throughout the construction process and comparing this with the projected schedule of work. D .Financial Analysis EVA Analysis Earned Value Analysis (EVA) is an industry standard method of measuring a project's progress at any given point of time, forecasting its completion date and final cost, and analyzing variances in the schedule and budget as the project proceeds. It compares the planned amount of work with what has actually been completed, to determine if the cost, schedule, and work accomplished are progressing in accordance with the plan. As work is completed, it is considered "earned". 1) Calculating Earning Value Earned Value Management measures progress against a baseline. It involves calculating three key values for each activity in the WBS: a) The Planned Value (PV), (formerly known as the budgeted cost of work scheduled or BCWS) b) The Actual Cost (AC), (formerly known as the actual cost of work performed or ACWP) c) The Earned Value (EV), (formerly known as the budget cost of work performed or BCWP) These three values are combined to determine at that point in time whether or not work is being accomplished as planned. The most commonly used measures are the cost variance: Cost Variance (CV) = EV - AC Schedule Variance (SV) = EV - PV These two values can be converted to efficiency indicators to reflect the cost and schedule performance of the project. The most commonly used cost-efficiency indicator is the cost performance index (CPI). It is calculated thus: CPI = EV / AC The sum of all individual EV budgets divided by the sum of all individual AC's is known as the cumulative CPI, and is generally used to forecast the cost to complete a project. The schedule performance index (SPI), calculated thus: SPI = EV / PV is often used with the CPI to forecast overall project completion estimates. A negative schedule variance (SV) calculated at a given point in time means the project is behind schedule, while a negative cost variance (CV) means the project is over budget. III. Result and Discussion A. Project Details 1) Name of the project : RESIDENTIAL BUILDING 2) Total area of Construction : 15050sq.ft 3) Total saleable area : 21,500sq.ft 4) Grand total cost Construction : Rs 10, 00, 00,000 / 5) No of floors : 6 6) Rate/sft : Rs 5000/
  • 3. Scheduling and Financial Analysis of a High Rise Building DOI: 10.9790/1684-12610106 www.iosrjournals.org 3 | Page B. Budget of the Project The cost incurred to complete the project is estimated as follows. 1) Grand Total: Table I Cost Budget Of The Project SI.NO Description Total cost 1) Building works Rs 9,36,16,772 2) External development works Rs 25,58,846 3) Architectural Features RS 38,24,382 Grand Total Rs 10,00,00,000 Total building area 15,050sq,ft Rate/sft Rs 1993.35 C. Quantity of the Activity 1) Quantity of the foundation activity  Total Site Area = 2000m2  Total Building Area = 1400m2  Total Footing Excavation = 438m3  Total P.C.C Quantity = 64m3  Total Footing Concrete = 2454m3  Total Footing Reinforcement = 23163kg  Total Pedestal Reinforcement = 2699kg  Total Pedestal Concrete = 91m3  Total ground slab =140m3 3) First floor to fifth floor  Total column concrete =50m3 .  Total column reinforcement =4002kg.  Total slab concreting =1356m3 .  Total slab Reinforcement =14576kg.  Total shuttering .=20487m2 4) Sixth floor  Total column concrete =35m3 .  Total column reinforcement =2654kg.  Total slab concreting =1267m3 .  Total slab reinforcement =10356kg.  Total shuttering =13243m2 . D. Economy in Construction Cost The construction should be done as economically as possible by organizing labour, materials, transport, supervision, etc., a well organized work cost less. All design and working drawings should be prepared in advance, requirement of materials should be worked out and materials should be organized, collected and stocked close to the site of work well in advance so that work is not held up for want of materials. The whole construction shall be completed as quickly as possible so that the supervision cost may be minimum possible Over-head costs should be kept as low as possible 1) Concrete: Concrete is a homogeneous mix of cement, coarse aggregate, fine aggregate and water. The concrete members will transfer the load from the building to the soil. Concrete can be prepared by two means Ready mix concrete (RMS) and Standard mixing concrete (SMC). The SMC is cheaper when compared with RMC. But the RMC will reduce the time and it will provide a uniform homogenous mix
  • 4. Scheduling and Financial Analysis of a High Rise Building DOI: 10.9790/1684-12610106 www.iosrjournals.org 4 | Page 2) Ground floor  Total column concrete =53m3 .  Total column Reinforcement =4553kg.  Total slab Concreting =1540m3 .  Total slab Reinforcement =15750kg.  Total shuttering =22487m2 Table Ii Cost For Concrete Type of material Amount in Rs concrete RMC 1,65,82,160/ SMC 88,93,980/ 0 5000000 10000000 15000000 20000000 RMC SMC Fig 1 Cost Comparison for Concrete E. Scheduling Of the Structural Activities Table Iii Schedule Of The Structural Activity si.no Tasks Duration Predecessors 1 Mass Excavation 8 days - 2 Footing Excavation 8 days 2SS+11 days 3 P.C.C 11 days 3SS+11 days 4 Foundation - RCC 30 days 4SS+8 days 5 Column/Lift Wall Upto G.F LVL 30 days 5SS+6 days 6 Ground Floor - Beam/ Slab 37 days 6SS+5 days 7 Ground Floor Column/Lift Wal 23 days 7SS+14 days 8 1st Floor - Beam/Slab 30 days 8SS+21 days 9 1st Floor - Column/Lift Wall 23 days 9SS+6 days 10 2nd Floor - Beam/Slab 30 days 10SS+14 days 11 2nd Floor - Column/Lift Wall 23 days 11SS+7 days 12 3rd Floor - Beam/Slab 30 days 12SS+14 days 13 3rd Floor - Column/Lift Wall 23 days 13SS+7 days 14 4th Floor - Beam/Slab 30 days 14SS+14 days 15 4th Floor - Column/Lift Wall 23 days 15SS+7 days 16 5th Floor - Beam/Slab 30 days 16SS+14 days 17 5th Floor - Column/Lift Wall 23 days 17SS+7 days 18 6th Floor - Beam/Slab 30 days 18SS+14 days
  • 5. Scheduling and Financial Analysis of a High Rise Building DOI: 10.9790/1684-12610106 www.iosrjournals.org 5 | Page 19 6th Floor - Column/Lift Wall 23 days 19SS+7 days 20 Terrace Floor 40 days 20SS+14 days 21 Above terrace Column/Lift Wall 30 days 20 days 22 Slope slab/OHT/M.R Room 20 days 21 ays F. Base Line Cost Report This report shows the budget,baseline and actual cost of the structural activities, in this chart two bar present in the cost. The bar represent the budget cost upto the baseline .The second bar shows remaining period of the budget cost. Fig 2:Base Line Cost Report G. Cash Flow Report Fig 3:Cash Flow Report The above report shows how much amount spent in quarterly period of year in the project. Two type of cost represent in the chart. 1. Budget cost 2. Cumulative cost The sum of the budget cost is known as cumulative cost.
  • 6. Scheduling and Financial Analysis of a High Rise Building DOI: 10.9790/1684-12610106 www.iosrjournals.org 6 | Page H. Earned Value Analysis Of The Structural Activity Table 4-EV Analysis of activity. Tasks no Actual cost AC in Rs/- Earned value EV in Rs/- Cost variance (AC-EV) in Rs/- 1 33,000.00 30,600.00 2,400.00 2 42,000.00 32,000.00 10,000.00 3 2,20,000.00 2,01,000.00 19,000.00 4 89,31,576.00 88,31,576.00 100000.00 5 5,80,900.00 5,60,900.00 20,000.00 6 57,65,678.00 59,90,750.00 2,25,072.00 7 24,30,524.00 24,20,216.00 10,308.00 8 59,11,850.00 59,09,936.00 1,914.00 9 9,21,436.00 9,20,416.00 1,020.00 IV. Conclusion After complete the schedule and financial analysis of the building it has been observed that 1. there is more difference between budget cost and actual cost 2. the cost difference is due to the huge increase in the material’s price and the labour’s wages. 3. The time lag in construction activity due to the natural disturbances. Acknowledgments The author would like to thank the management of kongu Engineering College & Dhanalakshmi Srinivasan Engineering college for providing the facilities to carry out this work. References [1] K.Ananthanarayanan, MPSS: Multiple Project Scheduling Software, journal of Nicmar,PP.19-28. [2] K.K.Chitkara, Construction Project Management, Tata McGraw-Hill Publishing Company Limited, New Delhi, pp. 180-218. [3] K.C.iyer, K.N.jha, Critical Factors Affecting Schedule Performance: Evidence from Indian Construction projects, Journal of Construction Engineering and Management@ASCE,August, PP. 871-880. [4] M.N.Khaled, Y.H.Mohamed, Developing a complexity measures for project schedule, Journal of Construction Engineering and Management, June 2006, pp.554-561. [5] M.N.Khaled, Y.H.Mohamed, Developing a complexity measures for project schedule, Journal of Construction Engineering and Management, June 2006, pp.554-561. [6] Mario, Work continuity constraints in project scheduling, Journal of Construction Engineering and Management@ASCE,January2006, pp4-24.