Project Highlights 
Upgrade of Jamal Abdul Nasser Street and Jahra Road 
September 2014
Introduction 
Introduction 
The Ministry of Public Works has employed the joint venture of Pace and Louis 
Berger to undertake the design and construction supervision of Jamal Abdul 
Nasser Street and Jahra Road Development projects – part of the Ministry’s 
strategic plans to develop roads and motorways in the State of Kuwait.
Introduction 
Jahra Road and Jamal Abdul Nasser Street 
Developement Project 
Client: 
The Ministry of Public Works 
Summary: 
The project aims to transform the existing roads into expressways that include 
80-120 km/h multi leveled highway designed in accordance to international 
standards, plus upgrading the existing service roads to provide additional traffic 
lanes with enhanced utilities infrastructure.
Jamal Abdul Nasser & Ghazali Road Interchange
Site Location
Site Location 
Jamal Abdul Nasser Street 
Kuwait City 
1st RR 
4th RR 
Shaab 
Sulaibikhat 
Jahra Road
Land use 
Educational 
Residential 
Hospitals 
Government Agencies 
Industrial/ 
Commercial
Extent of Project 
Jamal Abdul Nasser Street 
Jahra Road
Expected commuting traffic 
1st RR 
Causeway 
East-West commuting traffic 
Additional traffic from 
transversal roads 
Ghazali 
Road 602 
2nd RR 
4th RR 
Airport Road
Planning and Design 
Planning and Design 
Major Considerations: 
• Ensuring high design standards for road users. 
• Traffic model and traffic forecast. 
• Minimise land-take. 
• Maintaining existing accesses. 
• Minimise affect on existing utilities.
Planning and Design 
Project Objectives 
The Solutions: 
• Segregate through traffic from local 
• Grade separation at Interchanges 
• Improve road facilities and services 
• Improve road safety standards
Resulting Solutions 
Resulting Solutions 
Local Traffic Network- At Grade
Resulting Solutions 
Resulting Solutions 
Local Traffic Network- At Grade 
Main Line Through Traffic - Depressed
Resulting Solutions 
Resulting Solutions 
Local Traffic Network- At Grade 
Main Line Through Traffic - Depressed 
Main Line Through Traffic - At Grade
Resulting Solutions 
Resulting Solutions 
Local Traffic Network- At Grade 
Main Line Through Traffic - Depressed 
Main Line Through Traffic - At Grade 
Main Line Through Traffic - Elevated
Project Execution Packages 
Project Execution Packages 
The project is delivered in two packages: 
Package 1 (RA/166) Jahra Highway; Package 2 (RA/167) Jamal Abdul Nasser Highway. 
Each package required to be executed in 5 phases, due to: 
• Traffic diversions 
• Utility diversions 
• The installation of bridge segments 
1 
5 4 
Package 2: RA/167 
2 3 
Package 1: RA/166
Jahra Road and UN Roundabout Interchange
Jahra Road 
264.76 million KD 
At Grade Roads (upgraded): 
Length: 16.4 km 2-3 lanes 
Elevated Roads: 
Length: 17.7 km 2-3 lanes 
Depressed Roads: 
Length: 620 m 3 lanes 
Number of Interchanges: 
5 
Foot Bridges: 
10 
Roundabouts: 
6 
Data Sheet 
Jamal Abdul Nasser Street 
242.42 million KD 
At Grade Roads (upgraded): 
Length: 13.2 km 2-3 lanes 
Elevated Roads: 
Length: 18.6 km 2-3 lanes 
Depressed Roads: 
Length: 700 m 3 lanes 
Number of Interchanges: 
3 
Foot Bridges: 
8 
Roundabouts: 
9
Jahra Road 
Main contractor: 
The Arab Contractors 
Subcontractors: 
• Kuwait Bruckner Construction Co. (pilling works) 
• Edrasis Middle East (pilling works) 
• Sharaf Foundations (pilling works) 
• Khajah Group (waterproofing works) 
• Al-Ghanim Specialties Co. W.L.L (waterproofing 
works) 
• Al-Hajraf Company (asphalt works) 
• KCPC - Kuwait Company for Process Plant 
Construction & Contracting (asphalt works) 
• Al-Raya Al-Arabiya for General Trading & Contracting 
(road marking & signs) 
• Zaidan Company (pile cap framework) 
List of Contractors 
• Al-Mohannad Gulf (concrete works) 
• M.C.C (pile cap/foundation works) 
• Alghurair Constructions (foundation works) 
• The Contractor Gen. Trad. & Cont. (utilities and 
services diversion) 
• Zalzala for Services & Contracting (landscaping & 
irrigation)
Main contractors - Joint Venture of: 
• Rizzani De Eccher - SPA-Italy 
• Obrascon Huarte Lain - SA-Spain 
• TREVI - SPA-Italy 
• Boodai Construction - Kuwait 
Subcontractors: 
• Furqan Kuwaiti Co. (Detours, Dismantling of Steel 
Bridges) 
• Salem Al Nisf (Electrical Works: Street Lighting) 
• Prime Group (Soft Landscaping) 
• Fugro Middle East (Test Piles by Osterberg Method) 
• Gulf International Co. (Third Party Inspection - Ductile 
Pipes) 
• Kadhema Scientific Consultancy (EPA Consultant) 
• Zalzalah Agricultural Services (Soft Landscaping) 
List of Contractors 
• Green Line Co (Sanitary Sewer Lines and Storm Water 
Drainage) 
• KCC (Electrical Works: Street Lighting) 
• Al-Raya Al Arabia (Detours) 
• Construction Management and Building CO. CMBC 
(Concrete Culverts & Galleries) 
• Canar Trading & Contracting Co. (Fresh & Brackish 
Water Lines) 
• Trak Al Wataniya Co. (Removal and Construction and 
Maintenace of External Walls) 
Jamal Abdul Nasser Street
List of Contractors 
• Khajah Specialites Company (Water Proofing Works) 
• Freyssinet Kuwait W.L.L (Stabilizied Earth Wall) 
• Ahmadiah Contracting & Trading (workmanship of 
Reinf Concrete Works in Trough and Gallery No-3) 
• Kuwait Network Electronic Technology Company 
(Section E5 - PTT works) 
• Egytech Cables - El Sewedy (High Tension Cables) 
• M/S Tony Gee and Partners LLP (Engineering Design 
Consultant) 
• M/S Fheid Ingenieros (Design Third Party) 
• Salem M Al Nisf Electrical Co (Low Voltage Cables) 
• M/S Al -Sager General Trading and Contracting 
(Removal of Gas Lines) 
• TENSACCIAI (Specialized Works - Bearings) 
• Cicon Co. (Steel Rebars Fabrication) 
• Jassim Transport & Stevedoring Co. W.L.L (Segment 
Transportation) 
• Arabi Company W.L.L (Pump Station Mechanical and 
Electrical Works Phase 1)
Concrete Precast Segment 
Concrete Precast Segment 
Fabrication Facilities in Doha Area 
RA/166 Area: 150,000 m2 RA/167 Area: 130,000 m2
Concrete Precast Segment 
Viaduct Erection via Overhead Launching Truss. 
It is the biggest viaduct project currently under 
construction in GCC (16,091 segments). 
Concrete Precast Segment
Construction of the Jahra Road
Construction of the Jamal Abdul Nasser Road
Execution Challenges 
1. Right of way limitations for construction 
2. Relocating the huge number of existing utilities 
3. The live traffic volume occupying the existing roads 
4. Coordinating with the various stakeholders 
Execution Challenges
Solutions 
1. Employing construction techniques that require minimum space 
2. Standarized detours to maintain ease of traffic flow and accessibility 
3. Avoidance of working in rush and peak hours 
4. Effective outreach and communication programs for all stakeholders and parties 
Solutions
Jahra Road 
70 % Completed 
77 % 
41 % 
63 % 
47 % 
36 % 
36 % 
51 % 
17 % 
6 % 
55 % 
50 % 
29 % 
70 % 
76 % 
8 % 
84 % 
73 % 
71 % 
66 % 
54 % 
35 % 
28 % 
84 % 
36 % 
96 % 
70 % 
Structures 
Piles (trough) 
Trough slab & walls 
Bridge Piles 
Bridge Pile Caps 
Piers & Abutment 
Diaphragms 
Seg. Prod. 
Seg. Erec. 
Utilities 
Storm Water Pipe 
Water Supply Pipe 
Sanitary Water Pipe 
LT HT Cables 
Detour Works 
Current Progress 
Jamal Abdul Nasser Street 
43 % Completed
Construction of the Jahra Road
Construction of the Jahra Road
Construction of the Jahra Road
Construction of the Jamal Abdul Nasser Street
Construction of the Jamal Abdul Nasser Street
Construction of the Jamal Abdul Nasser Street
Thank You

More Related Content

What's hot

Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open HouseCrosstown TO
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Crosstown TO
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation Crosstown TO
 
Jones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingJones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingVDOT Northern Virginia
 
Crosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown TO
 
Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Crosstown TO
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open houseCrosstown TO
 
8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015City Brandon
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open HouseCrosstown TO
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open HouseCrosstown TO
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house Crosstown TO
 
PS-1 SUMMARY NHAI
PS-1 SUMMARY NHAIPS-1 SUMMARY NHAI
PS-1 SUMMARY NHAIStudent
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2Crosstown TO
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck finalCrosstown TO
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Crosstown TO
 
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation VDOT Northern Virginia
 
Mount pleasant station open house
Mount pleasant station open house  Mount pleasant station open house
Mount pleasant station open house Crosstown TO
 

What's hot (20)

Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation Waterfront Transit Reset Public Meeting Presentation
Waterfront Transit Reset Public Meeting Presentation
 
Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open House
 
Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017Mount Dennis Station and EMSF Open House - March 2017
Mount Dennis Station and EMSF Open House - March 2017
 
Avenue station open house presentation
Avenue station open house presentation Avenue station open house presentation
Avenue station open house presentation
 
Jones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meetingJones Branch Connector "Pardon Our Dust" meeting
Jones Branch Connector "Pardon Our Dust" meeting
 
Crosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentationCrosstown business opportunties and info session presentation
Crosstown business opportunties and info session presentation
 
Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015Former Kodak Lands Update - November 19, 2015
Former Kodak Lands Update - November 19, 2015
 
Caledonia station open house
Caledonia station open houseCaledonia station open house
Caledonia station open house
 
2000_Charleston_cement
2000_Charleston_cement2000_Charleston_cement
2000_Charleston_cement
 
8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015
 
Eglinton Station Open House
Eglinton Station Open HouseEglinton Station Open House
Eglinton Station Open House
 
Mount Dennis Station Open House
Mount Dennis Station Open HouseMount Dennis Station Open House
Mount Dennis Station Open House
 
Leaside station open house
Leaside station open house Leaside station open house
Leaside station open house
 
PS-1 SUMMARY NHAI
PS-1 SUMMARY NHAIPS-1 SUMMARY NHAI
PS-1 SUMMARY NHAI
 
C.V.
C.V.C.V.
C.V.
 
Cedarvale station open house for website final2
Cedarvale station open house for website final2Cedarvale station open house for website final2
Cedarvale station open house for website final2
 
Chaplin slide deck final
Chaplin slide deck finalChaplin slide deck final
Chaplin slide deck final
 
Leaside Station Open House - March 2017
Leaside Station Open House - March 2017Leaside Station Open House - March 2017
Leaside Station Open House - March 2017
 
Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation Oct. 17, 2016 town hall meeting presentation
Oct. 17, 2016 town hall meeting presentation
 
Mount pleasant station open house
Mount pleasant station open house  Mount pleasant station open house
Mount pleasant station open house
 

Similar to 14.30 tarek shuaib, pace

King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentationguest2d44ee
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)Pablo Miguel Jurado
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsNoor Wali Khan
 
1915Canakkale Bridge
1915Canakkale Bridge1915Canakkale Bridge
1915Canakkale BridgeZeynepUla2
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)amr mahrous
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al ObaidyAli Alobaidy
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentationZiad el-Balbisi
 
Pipeline - MIT.ppt for pipeline engineering
Pipeline - MIT.ppt for pipeline engineeringPipeline - MIT.ppt for pipeline engineering
Pipeline - MIT.ppt for pipeline engineeringTauqueerAhmad17
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_AkhtarJavad Akhtar
 
06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultransConsultrans, S.A.
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Lasantha Perera
 

Similar to 14.30 tarek shuaib, pace (20)

Revised Resume MSR
Revised Resume MSRRevised Resume MSR
Revised Resume MSR
 
King Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 PresentationKing Abdullah Road 4 12 07 Presentation
King Abdullah Road 4 12 07 Presentation
 
CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016CV - Dsouza UPDATED 03-04-2016
CV - Dsouza UPDATED 03-04-2016
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
 
1915Canakkale Bridge
1915Canakkale Bridge1915Canakkale Bridge
1915Canakkale Bridge
 
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
CV_Amr Abdelhamid Mahrous (Update 20 Oct 2015)
 
Engineer and Project management CV 'Ali Al Obaidy
Engineer and Project management  CV 'Ali Al ObaidyEngineer and Project management  CV 'Ali Al Obaidy
Engineer and Project management CV 'Ali Al Obaidy
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
JUNDEE MAR TEJEDO
JUNDEE MAR TEJEDOJUNDEE MAR TEJEDO
JUNDEE MAR TEJEDO
 
Project Leaders presentation
Project Leaders  presentationProject Leaders  presentation
Project Leaders presentation
 
CV - Ahmed Mounir
CV - Ahmed MounirCV - Ahmed Mounir
CV - Ahmed Mounir
 
Mohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oilMohammad Ghayoor Khan CV oil
Mohammad Ghayoor Khan CV oil
 
Pipeline - MIT.ppt for pipeline engineering
Pipeline - MIT.ppt for pipeline engineeringPipeline - MIT.ppt for pipeline engineering
Pipeline - MIT.ppt for pipeline engineering
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar
 
ENGLISH
ENGLISH ENGLISH
ENGLISH
 
06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans06 presentation civil-engineering_consultrans
06 presentation civil-engineering_consultrans
 
cv1
cv1cv1
cv1
 
Rajib Ali CV (Final)
Rajib Ali CV (Final)Rajib Ali CV (Final)
Rajib Ali CV (Final)
 
Project Induction Program 11.02.2016
Project Induction Program 11.02.2016Project Induction Program 11.02.2016
Project Induction Program 11.02.2016
 

More from Ibrahim Al-Hudhaif

Total contract control for rail projects mounir boemond
Total contract control for rail projects   mounir boemondTotal contract control for rail projects   mounir boemond
Total contract control for rail projects mounir boemondIbrahim Al-Hudhaif
 
Understanding the digital commuter etienne chevreau
Understanding the digital commuter   etienne chevreauUnderstanding the digital commuter   etienne chevreau
Understanding the digital commuter etienne chevreauIbrahim Al-Hudhaif
 
Performance based contracts in railways ibraheem sheerah
Performance based contracts in railways   ibraheem sheerahPerformance based contracts in railways   ibraheem sheerah
Performance based contracts in railways ibraheem sheerahIbrahim Al-Hudhaif
 
Saudi arabia construction report feb. 2016
Saudi arabia construction report   feb. 2016Saudi arabia construction report   feb. 2016
Saudi arabia construction report feb. 2016Ibrahim Al-Hudhaif
 
Addressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsAddressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsIbrahim Al-Hudhaif
 
Business Case for Green Buildings
Business Case for Green Buildings Business Case for Green Buildings
Business Case for Green Buildings Ibrahim Al-Hudhaif
 
Energy Efficient Buildings Codes
Energy Efficient Buildings CodesEnergy Efficient Buildings Codes
Energy Efficient Buildings CodesIbrahim Al-Hudhaif
 
Excellence through collaboration – the delivery of sustainability in mega pr...
Excellence through collaboration  – the delivery of sustainability in mega pr...Excellence through collaboration  – the delivery of sustainability in mega pr...
Excellence through collaboration – the delivery of sustainability in mega pr...Ibrahim Al-Hudhaif
 
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views Ibrahim Al-Hudhaif
 
Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power Ibrahim Al-Hudhaif
 
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial CitiesCurrent and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial CitiesIbrahim Al-Hudhaif
 
Trimble Advanced Route Optimization Technology - QUANTM
Trimble Advanced Route Optimization  Technology - QUANTM Trimble Advanced Route Optimization  Technology - QUANTM
Trimble Advanced Route Optimization Technology - QUANTM Ibrahim Al-Hudhaif
 
Pioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYPioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYIbrahim Al-Hudhaif
 
Video analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - HitachiVideo analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - HitachiIbrahim Al-Hudhaif
 
Innovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramInnovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramIbrahim Al-Hudhaif
 
MENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative ShowcaseMENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative ShowcaseIbrahim Al-Hudhaif
 
Oman Rail - in-country value strategic approach
Oman Rail -  in-country value strategic approachOman Rail -  in-country value strategic approach
Oman Rail - in-country value strategic approachIbrahim Al-Hudhaif
 
Regional Integrated Supply Chain Strategy for Rail
Regional Integrated Supply Chain  Strategy for Rail Regional Integrated Supply Chain  Strategy for Rail
Regional Integrated Supply Chain Strategy for Rail Ibrahim Al-Hudhaif
 

More from Ibrahim Al-Hudhaif (20)

Total contract control for rail projects mounir boemond
Total contract control for rail projects   mounir boemondTotal contract control for rail projects   mounir boemond
Total contract control for rail projects mounir boemond
 
Understanding the digital commuter etienne chevreau
Understanding the digital commuter   etienne chevreauUnderstanding the digital commuter   etienne chevreau
Understanding the digital commuter etienne chevreau
 
Performance based contracts in railways ibraheem sheerah
Performance based contracts in railways   ibraheem sheerahPerformance based contracts in railways   ibraheem sheerah
Performance based contracts in railways ibraheem sheerah
 
Saudi arabia construction report feb. 2016
Saudi arabia construction report   feb. 2016Saudi arabia construction report   feb. 2016
Saudi arabia construction report feb. 2016
 
Addressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega ProjectsAddressing the challenges of delivering Mega Projects
Addressing the challenges of delivering Mega Projects
 
Business Case for Green Buildings
Business Case for Green Buildings Business Case for Green Buildings
Business Case for Green Buildings
 
Energy Efficient Buildings Codes
Energy Efficient Buildings CodesEnergy Efficient Buildings Codes
Energy Efficient Buildings Codes
 
Excellence through collaboration – the delivery of sustainability in mega pr...
Excellence through collaboration  – the delivery of sustainability in mega pr...Excellence through collaboration  – the delivery of sustainability in mega pr...
Excellence through collaboration – the delivery of sustainability in mega pr...
 
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views Saudi Arabia’s Sustainable Construction Limitations:  The Experts’ Views
Saudi Arabia’s Sustainable Construction Limitations: The Experts’ Views
 
Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power Energy Efficiency and its Transformative Power
Energy Efficiency and its Transformative Power
 
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial CitiesCurrent and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
Current and future Mega Projects in Jubail and Ras Al-Khair Industrial Cities
 
Saudi Talent in Mega Projects
Saudi Talent in Mega ProjectsSaudi Talent in Mega Projects
Saudi Talent in Mega Projects
 
Trimble Advanced Route Optimization Technology - QUANTM
Trimble Advanced Route Optimization  Technology - QUANTM Trimble Advanced Route Optimization  Technology - QUANTM
Trimble Advanced Route Optimization Technology - QUANTM
 
Pioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EYPioneer Innovation Showcase - EY
Pioneer Innovation Showcase - EY
 
Video analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - HitachiVideo analytics for public safety solutions - Hitachi
Video analytics for public safety solutions - Hitachi
 
Innovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise OptramInnovation Showcase – Bentley’s AssetWise Optram
Innovation Showcase – Bentley’s AssetWise Optram
 
MENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative ShowcaseMENA Rail Pioneer Innovative Showcase
MENA Rail Pioneer Innovative Showcase
 
Oman Rail - in-country value strategic approach
Oman Rail -  in-country value strategic approachOman Rail -  in-country value strategic approach
Oman Rail - in-country value strategic approach
 
Regional Integrated Supply Chain Strategy for Rail
Regional Integrated Supply Chain  Strategy for Rail Regional Integrated Supply Chain  Strategy for Rail
Regional Integrated Supply Chain Strategy for Rail
 
Kuwait PPP Transport Projects
Kuwait PPP Transport ProjectsKuwait PPP Transport Projects
Kuwait PPP Transport Projects
 

Recently uploaded

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction managementMariconPadriquez1
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...VICTOR MAESTRE RAMIREZ
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionDr.Costas Sachpazis
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfme23b1001
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfROCENODodongVILLACER
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 

Recently uploaded (20)

Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
computer application and construction management
computer application and construction managementcomputer application and construction management
computer application and construction management
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...Software and Systems Engineering Standards: Verification and Validation of Sy...
Software and Systems Engineering Standards: Verification and Validation of Sy...
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective IntroductionSachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
Sachpazis Costas: Geotechnical Engineering: A student's Perspective Introduction
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Electronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdfElectronically Controlled suspensions system .pdf
Electronically Controlled suspensions system .pdf
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Risk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdfRisk Assessment For Installation of Drainage Pipes.pdf
Risk Assessment For Installation of Drainage Pipes.pdf
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 

14.30 tarek shuaib, pace

  • 1. Project Highlights Upgrade of Jamal Abdul Nasser Street and Jahra Road September 2014
  • 2. Introduction Introduction The Ministry of Public Works has employed the joint venture of Pace and Louis Berger to undertake the design and construction supervision of Jamal Abdul Nasser Street and Jahra Road Development projects – part of the Ministry’s strategic plans to develop roads and motorways in the State of Kuwait.
  • 3. Introduction Jahra Road and Jamal Abdul Nasser Street Developement Project Client: The Ministry of Public Works Summary: The project aims to transform the existing roads into expressways that include 80-120 km/h multi leveled highway designed in accordance to international standards, plus upgrading the existing service roads to provide additional traffic lanes with enhanced utilities infrastructure.
  • 4. Jamal Abdul Nasser & Ghazali Road Interchange
  • 6. Site Location Jamal Abdul Nasser Street Kuwait City 1st RR 4th RR Shaab Sulaibikhat Jahra Road
  • 7. Land use Educational Residential Hospitals Government Agencies Industrial/ Commercial
  • 8. Extent of Project Jamal Abdul Nasser Street Jahra Road
  • 9. Expected commuting traffic 1st RR Causeway East-West commuting traffic Additional traffic from transversal roads Ghazali Road 602 2nd RR 4th RR Airport Road
  • 10. Planning and Design Planning and Design Major Considerations: • Ensuring high design standards for road users. • Traffic model and traffic forecast. • Minimise land-take. • Maintaining existing accesses. • Minimise affect on existing utilities.
  • 11. Planning and Design Project Objectives The Solutions: • Segregate through traffic from local • Grade separation at Interchanges • Improve road facilities and services • Improve road safety standards
  • 12. Resulting Solutions Resulting Solutions Local Traffic Network- At Grade
  • 13. Resulting Solutions Resulting Solutions Local Traffic Network- At Grade Main Line Through Traffic - Depressed
  • 14. Resulting Solutions Resulting Solutions Local Traffic Network- At Grade Main Line Through Traffic - Depressed Main Line Through Traffic - At Grade
  • 15. Resulting Solutions Resulting Solutions Local Traffic Network- At Grade Main Line Through Traffic - Depressed Main Line Through Traffic - At Grade Main Line Through Traffic - Elevated
  • 16. Project Execution Packages Project Execution Packages The project is delivered in two packages: Package 1 (RA/166) Jahra Highway; Package 2 (RA/167) Jamal Abdul Nasser Highway. Each package required to be executed in 5 phases, due to: • Traffic diversions • Utility diversions • The installation of bridge segments 1 5 4 Package 2: RA/167 2 3 Package 1: RA/166
  • 17. Jahra Road and UN Roundabout Interchange
  • 18. Jahra Road 264.76 million KD At Grade Roads (upgraded): Length: 16.4 km 2-3 lanes Elevated Roads: Length: 17.7 km 2-3 lanes Depressed Roads: Length: 620 m 3 lanes Number of Interchanges: 5 Foot Bridges: 10 Roundabouts: 6 Data Sheet Jamal Abdul Nasser Street 242.42 million KD At Grade Roads (upgraded): Length: 13.2 km 2-3 lanes Elevated Roads: Length: 18.6 km 2-3 lanes Depressed Roads: Length: 700 m 3 lanes Number of Interchanges: 3 Foot Bridges: 8 Roundabouts: 9
  • 19. Jahra Road Main contractor: The Arab Contractors Subcontractors: • Kuwait Bruckner Construction Co. (pilling works) • Edrasis Middle East (pilling works) • Sharaf Foundations (pilling works) • Khajah Group (waterproofing works) • Al-Ghanim Specialties Co. W.L.L (waterproofing works) • Al-Hajraf Company (asphalt works) • KCPC - Kuwait Company for Process Plant Construction & Contracting (asphalt works) • Al-Raya Al-Arabiya for General Trading & Contracting (road marking & signs) • Zaidan Company (pile cap framework) List of Contractors • Al-Mohannad Gulf (concrete works) • M.C.C (pile cap/foundation works) • Alghurair Constructions (foundation works) • The Contractor Gen. Trad. & Cont. (utilities and services diversion) • Zalzala for Services & Contracting (landscaping & irrigation)
  • 20. Main contractors - Joint Venture of: • Rizzani De Eccher - SPA-Italy • Obrascon Huarte Lain - SA-Spain • TREVI - SPA-Italy • Boodai Construction - Kuwait Subcontractors: • Furqan Kuwaiti Co. (Detours, Dismantling of Steel Bridges) • Salem Al Nisf (Electrical Works: Street Lighting) • Prime Group (Soft Landscaping) • Fugro Middle East (Test Piles by Osterberg Method) • Gulf International Co. (Third Party Inspection - Ductile Pipes) • Kadhema Scientific Consultancy (EPA Consultant) • Zalzalah Agricultural Services (Soft Landscaping) List of Contractors • Green Line Co (Sanitary Sewer Lines and Storm Water Drainage) • KCC (Electrical Works: Street Lighting) • Al-Raya Al Arabia (Detours) • Construction Management and Building CO. CMBC (Concrete Culverts & Galleries) • Canar Trading & Contracting Co. (Fresh & Brackish Water Lines) • Trak Al Wataniya Co. (Removal and Construction and Maintenace of External Walls) Jamal Abdul Nasser Street
  • 21. List of Contractors • Khajah Specialites Company (Water Proofing Works) • Freyssinet Kuwait W.L.L (Stabilizied Earth Wall) • Ahmadiah Contracting & Trading (workmanship of Reinf Concrete Works in Trough and Gallery No-3) • Kuwait Network Electronic Technology Company (Section E5 - PTT works) • Egytech Cables - El Sewedy (High Tension Cables) • M/S Tony Gee and Partners LLP (Engineering Design Consultant) • M/S Fheid Ingenieros (Design Third Party) • Salem M Al Nisf Electrical Co (Low Voltage Cables) • M/S Al -Sager General Trading and Contracting (Removal of Gas Lines) • TENSACCIAI (Specialized Works - Bearings) • Cicon Co. (Steel Rebars Fabrication) • Jassim Transport & Stevedoring Co. W.L.L (Segment Transportation) • Arabi Company W.L.L (Pump Station Mechanical and Electrical Works Phase 1)
  • 22. Concrete Precast Segment Concrete Precast Segment Fabrication Facilities in Doha Area RA/166 Area: 150,000 m2 RA/167 Area: 130,000 m2
  • 23. Concrete Precast Segment Viaduct Erection via Overhead Launching Truss. It is the biggest viaduct project currently under construction in GCC (16,091 segments). Concrete Precast Segment
  • 24. Construction of the Jahra Road
  • 25. Construction of the Jamal Abdul Nasser Road
  • 26. Execution Challenges 1. Right of way limitations for construction 2. Relocating the huge number of existing utilities 3. The live traffic volume occupying the existing roads 4. Coordinating with the various stakeholders Execution Challenges
  • 27. Solutions 1. Employing construction techniques that require minimum space 2. Standarized detours to maintain ease of traffic flow and accessibility 3. Avoidance of working in rush and peak hours 4. Effective outreach and communication programs for all stakeholders and parties Solutions
  • 28. Jahra Road 70 % Completed 77 % 41 % 63 % 47 % 36 % 36 % 51 % 17 % 6 % 55 % 50 % 29 % 70 % 76 % 8 % 84 % 73 % 71 % 66 % 54 % 35 % 28 % 84 % 36 % 96 % 70 % Structures Piles (trough) Trough slab & walls Bridge Piles Bridge Pile Caps Piers & Abutment Diaphragms Seg. Prod. Seg. Erec. Utilities Storm Water Pipe Water Supply Pipe Sanitary Water Pipe LT HT Cables Detour Works Current Progress Jamal Abdul Nasser Street 43 % Completed
  • 29. Construction of the Jahra Road
  • 30. Construction of the Jahra Road
  • 31. Construction of the Jahra Road
  • 32. Construction of the Jamal Abdul Nasser Street
  • 33. Construction of the Jamal Abdul Nasser Street
  • 34. Construction of the Jamal Abdul Nasser Street