SlideShare a Scribd company logo
1 of 18
Download to read offline
c.v
Name : Sherif Yehia Abd Elhakeem.
Date of birth : 09 / 02 / 1976.
Address : 5 Elgalaa st . Elmansoura .Egypt.
E-Mail address : shrif_yehia@hotmail.com
Phone nos : +965 51122482 – In Kuwait.
Education : B.Sc Civil Engineering 1999.
University : El Mansoura University.
Marital Status : Married.
Military Service : Fulfilled.
Work History :-
- From 9/12/2000 to 07/06/2001 working for (Elnasr for civil works) -Sanitary drainage project.
- From 9/06/2001 to 31/10/2006 working for Elnasr general contracting (Hassan Mohamed Allam).(Bridges dept).
- From 4/11/2006 to 30/04/2008 (In State of Kuwait) working for Shaheen Al-Ghanim Co.( Bridges department ).
- From 1/05/2008 till now working for CANAR Trading & Contracting Co.( Post Tension department ).
Computer Skills: Sap 2000 , Autocad , Office , RCD.
Qualifications:Experiences &
1- Bridge’s Construction Manager, Experienced in challenging bridges.
2- Post tension specialist: Experienced in all post tensioning constructions (Bridges, Tanks, Cable stay works,
Buildings….).
3- Kuwait Representative for OVM China System (Post Tension- Bearings- Expansion Joints).
4- Kuwait Representative for NRS Norway (advanced bridge construction equipment).
15/ 10 / 1999 to 30 / 11 / 2000From
Performing My Military Service Duty
(AIR DEFENCE FORCES)
019/ 12 / 2000 to 7 / 6 / 20From
Working for “El Nasr for civil works”
Location: Dakahlya Governorate.
Sanitary Drainage Project in Dekernes center
In Egypt
Bridges department)–Elnasr general contracting (Hassan Mohamed AllamWorking for
9/ 6 / 2001 to 12 / 2 / 2002From
BridgeElmatar
Location : Damietta Governorate .
- International coastal road.
Contract Price : 65 million L.E.
OWNER : Ministry of Housing, Utilities and Urban Communities.
CONSULTANT : Reinforced Concrete Research Unit ( Ain Shams University)
Main Contractor : ( Elnasr general contracting -Hasan Mohamed Allam ).
Site Engineer.:Designation
Length of the bridge = 600 m , width of bridge = 28m
The bridge has 2- loops and 2- ramps
2- Deck Bridge 4-Box section Cast in Situ Post Tensioned Deck Bridge.
Composite section ( steel I-Beam + 25cm Concrete Slab ) Crossing over the Road , Canal and Drain .
From 13 / 2 / 2002 to 26 / 8 / 2002
Omm Dongol Bridge
Location : Damietta Governorate .
- International coastal road.
Contract Price : 45 million L.E.
OWNER : Ministry of Housing , Utilities and Urban Communities.
CONSULTANT : Reinforced Concrete Research Unit ( Ain Shams University)
Main Contractor : ( Elnasr general contracting -Hasan Mohamed Allam ).
Site Engineer.:Designation
Shallow (on grade) Bridge , Length of the bridge = 400 m , width of the bridge = 28m
2- Deck Bridge 4-Box section Cast in Situ Post Tensioned Deck Bridge.
Composite section ( steel I-Beam + 25cm Concrete Slab ) Crossing over Canal and Drain .
27 / 8 / 2002 to 19 / 10 / 2003From
Kafr Elbatekh Bridge
Location : Damietta Governorate.
- International coastal road.
Contract Price : 95 million L.E.
Owner : Ministry of Housing, Utilities & Urban Communities.
Consultant : Reinforced Concrete Research Unit (Ain Shams University).
Main Contractor : ( Elnasr general contracting -Hasan Mohamed Allam).
Designation: Site Engineer.
Length of bridge = 1300 m, width of bridge = 28m, The bridge has 2- loops and 2- ramps
2- Deck Bridge 4-Box section Cast in Situ Post Tensioned Deck Bridge.
- Composite section (steel I-Beam + 25cm Concrete Slab) Crossing over the Road, Canal, Drain & Railway.
20 / 10 / 2003 to 16 / 2 / 2006From
Damietta Nile Bridge
(Crossing River Nile)
Location : Damietta Governorate .
- International coastal road.
Contract Price : 200 million L.E.
Owner : Ministry of Housing, Utilities & Urban Communities.
Consultant : Reinforced Concrete Research Unit (Ain Shams University).
Main Contractor : ( Elnasr general contracting -Hasan Mohamed Allam).
Designation: Site Engineer.
Length of bridge = 3,081 m, width of bridge = 28m, Length of the bridge over the river portion = 300 m .
Two navigation lanes with 75 m width, has 2- loops and 4- ramps.
Pile Caps been embedded under the River’s bed level, using Heavy Lifting Method “Pile cap sinking method”.
Flying self launching system (Movable Scaffolding System) for the Pre-stressed deck bridge over the River portion.
18 / 2 / 2006 to 31 / 10 / 2006From
)Nile(Crossing RivergeNile BridFowa
Project : ( Fowa - Elmahmodya bridge )
Location : ( Kafr Elshekh Governorate - Elbehera Governorate)
Joining the two Governorates by the International coastal road.
Contract Price : 60 million L.E.
Owner : Ministry of Transportation.
Consultant : Arab Consulting Engineer (Moharam - Bakhom).
Main Contractor : (Elnasr general contracting -Hasan Mohamed Allam).
Designation: Senior Bridge Engineer.
Length of bridge = 1500 m , width of bridge = 22m. , Length of the bridge over the river portion = 500 m.
Two navigation lanes, length of each = 50 m, the bridge has 2- loops and 2- ramps.
From 4 / 11 / 2006 to 30/04/2008
aitIn State of Kuw
Ghanim Co.( Bridges department ).-Working for Shaheen Al
Project : RA/125 Construction and Maintenance of Roads, Bridges ,Drainage and Sewer For Subiya Highway .
Location : ( El-Jahra Governorate - Subiya Highway )
- One third of mega Highway Project Joining Jahra governorate highway (6th
ring road) with Bubyan Island
(Phase No.2).
Contract Price : 24 million K.D.
Owner : Ministry of Public Works (MPW).
Consultant : Pan Arab Consulting Engineers (PACE).
Main Contractor : Shaheen Al-Ghanim Co for Roads and Bridges.
Designation: Senior Bridge Engineer.
24 km’ two lanes Highway including three interchanges each consists of two adjacent Bridges.
Length of each bridge = 150 m , width of bridge = 19.2 m
Each Bridge has two ramps, one loop (on grade work using Stabilized Earth Walls).
Single arched & double arched piers
Deck Slab : 20cm thick. Slab rested on Pre-cast, Pre-tensioned beams with 32m length.
now01 / 05 / 2008 tillFrom
In State of Kuwait
department )Post tensionCo.(CANAR Trading & ContractingWorking for
11/209to 30/08/ 20005/1From
1- CONTRACT NO. RA / 106 Construction, completion & maintenance of Roads , Bridges Drainage,
1–Package–pletion of First Ring Road, Jahra Gate RoundaboutSewer and Other Services for Com
Owner : Ministry of Public Works (MPW).
Consultant : Parsons Brinckerhoff International in association with Gulf Consult.
Main Contractor : AKTOR-COPRI JV.
Designation: Project Manager.
Scope of work:-
- (430 ton Strands) Post tensioned cast in situ box-section 9 Bridges. (OVM System)
3 flyover bridges (13 Units).
6 Shallow Bridges (6 Units).
present time.illt11/ 2010/1From
2- CONTRACT NO. RA / 166 - Construction, Completion and Maintenance of Roads,
.Overpasses, Sanitary and Storm water For AL JAHRA Road
Owner : Ministry of Public Works (MPW).
Consultant : Louis Berger Group, Inc. JV with PACE.
Main Contractor : Arab Contractors Co.
.Construction Manager:Designation
Scope of work:-
- (16,500.000 ton Strands) Post tensioned Pre-cast Balanced Cantilever Segmental Bridge.
OVM System JV with DSI (for External Post tension).
- Piers : Internal Post Tension (Transverse and Vertical).
- (CIS) Diaphragms: Internal transverse post tension.
-(PCY) Segments : Internal longitudinal Post Tension, plus vertical PT Bars in certain segments.
-Erection : Internal and External post tension.
Bridge length (including loops & Ramps) = 21 Km’
Canar Post Tension Projects (was running Parallel to above two projects):
Designation : Post Tension Projects Manager
Revamp of Effluent Treatment Facilities (REFTF) at MAA/MAB & SHU Refineries.-3
.
Owner : Kuwait National Petroleum Company (KNPC).
Consultant : Paramount Limited.
Main Contractor : Ahmadiah Contracting & Trading Co.
Designation: Project Manager.
Scope of work:-
- (165 ton Strands) Post tensioned 12 Circular Ground Tanks + 2 Square sand filter (Slab+walls).
.Construction & Maintenance of The Stadium and Indoor Facilities at Shuwaikh Campus-4
“Stay Cable Stadium”
Designation: Project Manager.
Owner : Public Authority for Applied Education and Training, Kuwait.
Consultant : The Associated Engineering Partnership.
Main Contractor : Bayan National Trading Co.
Scope of work:-
- Design Verification, Supply & Installation of Tension Stay Cables for the stadium steel frames.
Study, Design, Improvement, Construction, Operation & Maintenance of-5
.126-Irrigation Network & Lines of Al Abdally Farms Contract No.SE
Designation: Project Manager.
Owner : Ministry of Public Works.
Consultant : Consultant HSS.
Main Contractor : Canar Trading & Contracting Co.
Scope of work:-
- (250 ton strands) Design ,Supply & Apply post tensioning to foundation and slabs of the water tank.
:Private Sector
.aza Hoteltension of Crown PlEx-6
Scope of work:-
- (115 ton Strands) Post tensioned cast in situ Beams (5 floors) with free area 36 x 100 m2.
7- Construction of Zina Mall in Shewaikh.
Scope of work:-
(450 ton Strands) Post tensioned cast in situ 33,000m2 slabs in 3 floors hyper mall in Shewaikh.
Construction of Zain Studio in Sabhan-8
Scope of work:-
(45 ton Strands) Post tensioned ribbed slabs for Movie studio in Sabhan ,20 x 40 free area.
a Mall in MergabQebl-Construction of El-9
Scope of work:-
(45 ton Strands) Post tensioned cast in situ 5,000m2 slabs in 5 floors mall in Mergab.
Construction of Menus Restaurant Mall in Abo Halefa.-10
Scope of work:-
(110 ton Strands) Post tensioned cast in situ 11,000m2 slabs in 4 floors mall in Abo Halefa
present time.illt41/ 208/1From
CONTRACT NO. RA / 248(A)
Design, Build and Maintenance of Elevated U-Turns Along Al Nawaseeb Road.
Owner : Ministry of Public Works (MPW).
Consultant : Dar Al Dowailah Engineering Consultants Construction Managers.
Main Contractor : Consolidated Contractors Co “ CCC”.
Designation: Construction Manager.
4 Elevated U-turns Bridges, Cast in situ, Continuous slab with traffic opening during construction.
Length of each bridge = 110 m , width of bridge = 9.5 m
Each Bridge has two ramps, Mechanical Stabilized Earth Walls using Tensar System for about 2,400 m’
Deck Bridge : Post tensioned Box Girders.
C.V.
C.V.
C.V.
C.V.
C.V.
C.V.
C.V.
C.V.
C.V.
C.V.
C.V.

More Related Content

What's hot

Summer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman NigamSummer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman NigamRaju kumar Gautam
 
Deepak_CV_05-04-16_des
Deepak_CV_05-04-16_desDeepak_CV_05-04-16_des
Deepak_CV_05-04-16_desDeepak Jotawar
 
lmrc presentation
lmrc presentationlmrc presentation
lmrc presentationATUL SHUKLA
 
Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan  Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan Ibrahim hamdan
 
Report on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaReport on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaNarayan Gupta
 
EASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTEASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTATUL SHUKLA
 
Summer traning report
Summer traning reportSummer traning report
Summer traning reportAmit Raj
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segmentsAxay Sharma
 
Substantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectSubstantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectFairfax County
 
Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open HouseCrosstown TO
 
Foad zahedi cv-en
Foad zahedi cv-enFoad zahedi cv-en
Foad zahedi cv-enFoad Zahedi
 
Jorge palma dossier 2016 (1)
Jorge palma dossier 2016 (1)Jorge palma dossier 2016 (1)
Jorge palma dossier 2016 (1)Jorge C. Palma
 
8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015City Brandon
 

What's hot (20)

Summer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman NigamSummer Training Report =Bihar Rajya pul Nirman Nigam
Summer Training Report =Bihar Rajya pul Nirman Nigam
 
Deepak_CV_05-04-16_des
Deepak_CV_05-04-16_desDeepak_CV_05-04-16_des
Deepak_CV_05-04-16_des
 
lmrc presentation
lmrc presentationlmrc presentation
lmrc presentation
 
Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan  Snr. civil eng. ibrahim hamdan
Snr. civil eng. ibrahim hamdan
 
Spun pile
Spun pileSpun pile
Spun pile
 
Report on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL PatnaReport on Industrial training at BRPNNL Patna
Report on Industrial training at BRPNNL Patna
 
EASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORTEASTERN PERIPHERAL EXPRESSWAY REPORT
EASTERN PERIPHERAL EXPRESSWAY REPORT
 
Summer traning report
Summer traning reportSummer traning report
Summer traning report
 
Metro rail segments
Metro rail segmentsMetro rail segments
Metro rail segments
 
AGC Presentation_Final_12.6.11(2)
AGC Presentation_Final_12.6.11(2)AGC Presentation_Final_12.6.11(2)
AGC Presentation_Final_12.6.11(2)
 
Presentation1
Presentation1Presentation1
Presentation1
 
updated cv of Kamran
updated cv of Kamranupdated cv of Kamran
updated cv of Kamran
 
Substantial Completion: Lorton Road Project
Substantial Completion: Lorton Road ProjectSubstantial Completion: Lorton Road Project
Substantial Completion: Lorton Road Project
 
Laird Station Open House
Laird Station Open HouseLaird Station Open House
Laird Station Open House
 
Foad zahedi cv-en
Foad zahedi cv-enFoad zahedi cv-en
Foad zahedi cv-en
 
Think Outside The Box
Think Outside The BoxThink Outside The Box
Think Outside The Box
 
Jorge palma dossier 2016 (1)
Jorge palma dossier 2016 (1)Jorge palma dossier 2016 (1)
Jorge palma dossier 2016 (1)
 
VENKAT RESUME
VENKAT RESUME VENKAT RESUME
VENKAT RESUME
 
Paquette, Jason 2016 CV
Paquette, Jason 2016 CVPaquette, Jason 2016 CV
Paquette, Jason 2016 CV
 
8th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 20158th Street Bridge Community Information Session November 19th, 2015
8th Street Bridge Community Information Session November 19th, 2015
 

Similar to C.V.

101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_AkhtarJavad Akhtar
 
curriculum vitae with a photo
curriculum vitae with a photocurriculum vitae with a photo
curriculum vitae with a photoTaysser Ahmed
 
Amended CV of Eng. Ibrahim A.A. march 2015
Amended CV of Eng. Ibrahim A.A.   march 2015Amended CV of Eng. Ibrahim A.A.   march 2015
Amended CV of Eng. Ibrahim A.A. march 2015Ibrahim Consultant
 
Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 AHMED afifi
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationShuBham RaNa
 
Bandra+worli+sea+link
Bandra+worli+sea+linkBandra+worli+sea+link
Bandra+worli+sea+linkASHOK KUMAR
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)Hassan Halhoul
 
Wael Portofolio___Dec_2016 REDUCED
Wael Portofolio___Dec_2016 REDUCEDWael Portofolio___Dec_2016 REDUCED
Wael Portofolio___Dec_2016 REDUCEDwael elbana
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMIshant Gautam.
 

Similar to C.V. (20)

Ahmd Mahmoud c.v
Ahmd Mahmoud c.vAhmd Mahmoud c.v
Ahmd Mahmoud c.v
 
Moshtak CV 2016 Pic
Moshtak CV 2016  PicMoshtak CV 2016  Pic
Moshtak CV 2016 Pic
 
101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar101024 Mafraq_Presentation_Javad_Akhtar
101024 Mafraq_Presentation_Javad_Akhtar
 
Muhammad_Aslam_CV
Muhammad_Aslam_CVMuhammad_Aslam_CV
Muhammad_Aslam_CV
 
curriculum vitae with a photo
curriculum vitae with a photocurriculum vitae with a photo
curriculum vitae with a photo
 
Amended CV of Eng. Ibrahim A.A. march 2015
Amended CV of Eng. Ibrahim A.A.   march 2015Amended CV of Eng. Ibrahim A.A.   march 2015
Amended CV of Eng. Ibrahim A.A. march 2015
 
Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015 Ahmed Afifi-CV july 2015
Ahmed Afifi-CV july 2015
 
CV_Oscar_Bandeira
CV_Oscar_BandeiraCV_Oscar_Bandeira
CV_Oscar_Bandeira
 
C.V
C.VC.V
C.V
 
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship PresentationLarsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
Larsen and Toubro (Lucknow Metro Project) Summer Internship Presentation
 
14.30 tarek shuaib, pace
14.30 tarek shuaib, pace14.30 tarek shuaib, pace
14.30 tarek shuaib, pace
 
Abd El-Rahman Wakeb CV
Abd El-Rahman Wakeb CVAbd El-Rahman Wakeb CV
Abd El-Rahman Wakeb CV
 
Bandra+worli+sea+link
Bandra+worli+sea+linkBandra+worli+sea+link
Bandra+worli+sea+link
 
CSC-PMBP
CSC-PMBPCSC-PMBP
CSC-PMBP
 
Revised Resume MSR
Revised Resume MSRRevised Resume MSR
Revised Resume MSR
 
1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)1-HASSAN HALHOUL's CV 2016-(1)
1-HASSAN HALHOUL's CV 2016-(1)
 
Wael Portofolio___Dec_2016 REDUCED
Wael Portofolio___Dec_2016 REDUCEDWael Portofolio___Dec_2016 REDUCED
Wael Portofolio___Dec_2016 REDUCED
 
CV_Rizeq 2016
CV_Rizeq 2016CV_Rizeq 2016
CV_Rizeq 2016
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAMNhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
Nhpc training report civil engineerimg_bit_mesra_ISHANT GAUTAM
 

C.V.

  • 1. c.v Name : Sherif Yehia Abd Elhakeem. Date of birth : 09 / 02 / 1976. Address : 5 Elgalaa st . Elmansoura .Egypt. E-Mail address : shrif_yehia@hotmail.com Phone nos : +965 51122482 – In Kuwait. Education : B.Sc Civil Engineering 1999. University : El Mansoura University. Marital Status : Married. Military Service : Fulfilled. Work History :- - From 9/12/2000 to 07/06/2001 working for (Elnasr for civil works) -Sanitary drainage project. - From 9/06/2001 to 31/10/2006 working for Elnasr general contracting (Hassan Mohamed Allam).(Bridges dept). - From 4/11/2006 to 30/04/2008 (In State of Kuwait) working for Shaheen Al-Ghanim Co.( Bridges department ). - From 1/05/2008 till now working for CANAR Trading & Contracting Co.( Post Tension department ). Computer Skills: Sap 2000 , Autocad , Office , RCD. Qualifications:Experiences & 1- Bridge’s Construction Manager, Experienced in challenging bridges. 2- Post tension specialist: Experienced in all post tensioning constructions (Bridges, Tanks, Cable stay works, Buildings….). 3- Kuwait Representative for OVM China System (Post Tension- Bearings- Expansion Joints). 4- Kuwait Representative for NRS Norway (advanced bridge construction equipment).
  • 2. 15/ 10 / 1999 to 30 / 11 / 2000From Performing My Military Service Duty (AIR DEFENCE FORCES) 019/ 12 / 2000 to 7 / 6 / 20From Working for “El Nasr for civil works” Location: Dakahlya Governorate. Sanitary Drainage Project in Dekernes center In Egypt Bridges department)–Elnasr general contracting (Hassan Mohamed AllamWorking for 9/ 6 / 2001 to 12 / 2 / 2002From BridgeElmatar Location : Damietta Governorate . - International coastal road. Contract Price : 65 million L.E. OWNER : Ministry of Housing, Utilities and Urban Communities. CONSULTANT : Reinforced Concrete Research Unit ( Ain Shams University) Main Contractor : ( Elnasr general contracting -Hasan Mohamed Allam ). Site Engineer.:Designation Length of the bridge = 600 m , width of bridge = 28m The bridge has 2- loops and 2- ramps 2- Deck Bridge 4-Box section Cast in Situ Post Tensioned Deck Bridge. Composite section ( steel I-Beam + 25cm Concrete Slab ) Crossing over the Road , Canal and Drain . From 13 / 2 / 2002 to 26 / 8 / 2002 Omm Dongol Bridge Location : Damietta Governorate . - International coastal road. Contract Price : 45 million L.E. OWNER : Ministry of Housing , Utilities and Urban Communities. CONSULTANT : Reinforced Concrete Research Unit ( Ain Shams University) Main Contractor : ( Elnasr general contracting -Hasan Mohamed Allam ). Site Engineer.:Designation Shallow (on grade) Bridge , Length of the bridge = 400 m , width of the bridge = 28m 2- Deck Bridge 4-Box section Cast in Situ Post Tensioned Deck Bridge. Composite section ( steel I-Beam + 25cm Concrete Slab ) Crossing over Canal and Drain .
  • 3. 27 / 8 / 2002 to 19 / 10 / 2003From Kafr Elbatekh Bridge Location : Damietta Governorate. - International coastal road. Contract Price : 95 million L.E. Owner : Ministry of Housing, Utilities & Urban Communities. Consultant : Reinforced Concrete Research Unit (Ain Shams University). Main Contractor : ( Elnasr general contracting -Hasan Mohamed Allam). Designation: Site Engineer. Length of bridge = 1300 m, width of bridge = 28m, The bridge has 2- loops and 2- ramps 2- Deck Bridge 4-Box section Cast in Situ Post Tensioned Deck Bridge. - Composite section (steel I-Beam + 25cm Concrete Slab) Crossing over the Road, Canal, Drain & Railway. 20 / 10 / 2003 to 16 / 2 / 2006From Damietta Nile Bridge (Crossing River Nile) Location : Damietta Governorate . - International coastal road. Contract Price : 200 million L.E. Owner : Ministry of Housing, Utilities & Urban Communities. Consultant : Reinforced Concrete Research Unit (Ain Shams University). Main Contractor : ( Elnasr general contracting -Hasan Mohamed Allam). Designation: Site Engineer. Length of bridge = 3,081 m, width of bridge = 28m, Length of the bridge over the river portion = 300 m . Two navigation lanes with 75 m width, has 2- loops and 4- ramps. Pile Caps been embedded under the River’s bed level, using Heavy Lifting Method “Pile cap sinking method”. Flying self launching system (Movable Scaffolding System) for the Pre-stressed deck bridge over the River portion. 18 / 2 / 2006 to 31 / 10 / 2006From )Nile(Crossing RivergeNile BridFowa Project : ( Fowa - Elmahmodya bridge ) Location : ( Kafr Elshekh Governorate - Elbehera Governorate) Joining the two Governorates by the International coastal road. Contract Price : 60 million L.E. Owner : Ministry of Transportation. Consultant : Arab Consulting Engineer (Moharam - Bakhom). Main Contractor : (Elnasr general contracting -Hasan Mohamed Allam).
  • 4. Designation: Senior Bridge Engineer. Length of bridge = 1500 m , width of bridge = 22m. , Length of the bridge over the river portion = 500 m. Two navigation lanes, length of each = 50 m, the bridge has 2- loops and 2- ramps. From 4 / 11 / 2006 to 30/04/2008 aitIn State of Kuw Ghanim Co.( Bridges department ).-Working for Shaheen Al Project : RA/125 Construction and Maintenance of Roads, Bridges ,Drainage and Sewer For Subiya Highway . Location : ( El-Jahra Governorate - Subiya Highway ) - One third of mega Highway Project Joining Jahra governorate highway (6th ring road) with Bubyan Island (Phase No.2). Contract Price : 24 million K.D. Owner : Ministry of Public Works (MPW). Consultant : Pan Arab Consulting Engineers (PACE). Main Contractor : Shaheen Al-Ghanim Co for Roads and Bridges. Designation: Senior Bridge Engineer. 24 km’ two lanes Highway including three interchanges each consists of two adjacent Bridges. Length of each bridge = 150 m , width of bridge = 19.2 m Each Bridge has two ramps, one loop (on grade work using Stabilized Earth Walls). Single arched & double arched piers Deck Slab : 20cm thick. Slab rested on Pre-cast, Pre-tensioned beams with 32m length. now01 / 05 / 2008 tillFrom In State of Kuwait department )Post tensionCo.(CANAR Trading & ContractingWorking for 11/209to 30/08/ 20005/1From 1- CONTRACT NO. RA / 106 Construction, completion & maintenance of Roads , Bridges Drainage, 1–Package–pletion of First Ring Road, Jahra Gate RoundaboutSewer and Other Services for Com Owner : Ministry of Public Works (MPW). Consultant : Parsons Brinckerhoff International in association with Gulf Consult. Main Contractor : AKTOR-COPRI JV. Designation: Project Manager.
  • 5. Scope of work:- - (430 ton Strands) Post tensioned cast in situ box-section 9 Bridges. (OVM System) 3 flyover bridges (13 Units). 6 Shallow Bridges (6 Units). present time.illt11/ 2010/1From 2- CONTRACT NO. RA / 166 - Construction, Completion and Maintenance of Roads, .Overpasses, Sanitary and Storm water For AL JAHRA Road Owner : Ministry of Public Works (MPW). Consultant : Louis Berger Group, Inc. JV with PACE. Main Contractor : Arab Contractors Co. .Construction Manager:Designation Scope of work:- - (16,500.000 ton Strands) Post tensioned Pre-cast Balanced Cantilever Segmental Bridge. OVM System JV with DSI (for External Post tension). - Piers : Internal Post Tension (Transverse and Vertical). - (CIS) Diaphragms: Internal transverse post tension. -(PCY) Segments : Internal longitudinal Post Tension, plus vertical PT Bars in certain segments. -Erection : Internal and External post tension. Bridge length (including loops & Ramps) = 21 Km’ Canar Post Tension Projects (was running Parallel to above two projects): Designation : Post Tension Projects Manager Revamp of Effluent Treatment Facilities (REFTF) at MAA/MAB & SHU Refineries.-3 . Owner : Kuwait National Petroleum Company (KNPC). Consultant : Paramount Limited. Main Contractor : Ahmadiah Contracting & Trading Co. Designation: Project Manager. Scope of work:- - (165 ton Strands) Post tensioned 12 Circular Ground Tanks + 2 Square sand filter (Slab+walls).
  • 6. .Construction & Maintenance of The Stadium and Indoor Facilities at Shuwaikh Campus-4 “Stay Cable Stadium” Designation: Project Manager. Owner : Public Authority for Applied Education and Training, Kuwait. Consultant : The Associated Engineering Partnership. Main Contractor : Bayan National Trading Co. Scope of work:- - Design Verification, Supply & Installation of Tension Stay Cables for the stadium steel frames. Study, Design, Improvement, Construction, Operation & Maintenance of-5 .126-Irrigation Network & Lines of Al Abdally Farms Contract No.SE Designation: Project Manager. Owner : Ministry of Public Works. Consultant : Consultant HSS. Main Contractor : Canar Trading & Contracting Co. Scope of work:- - (250 ton strands) Design ,Supply & Apply post tensioning to foundation and slabs of the water tank. :Private Sector .aza Hoteltension of Crown PlEx-6 Scope of work:- - (115 ton Strands) Post tensioned cast in situ Beams (5 floors) with free area 36 x 100 m2. 7- Construction of Zina Mall in Shewaikh. Scope of work:- (450 ton Strands) Post tensioned cast in situ 33,000m2 slabs in 3 floors hyper mall in Shewaikh. Construction of Zain Studio in Sabhan-8 Scope of work:- (45 ton Strands) Post tensioned ribbed slabs for Movie studio in Sabhan ,20 x 40 free area. a Mall in MergabQebl-Construction of El-9 Scope of work:- (45 ton Strands) Post tensioned cast in situ 5,000m2 slabs in 5 floors mall in Mergab. Construction of Menus Restaurant Mall in Abo Halefa.-10 Scope of work:- (110 ton Strands) Post tensioned cast in situ 11,000m2 slabs in 4 floors mall in Abo Halefa
  • 7. present time.illt41/ 208/1From CONTRACT NO. RA / 248(A) Design, Build and Maintenance of Elevated U-Turns Along Al Nawaseeb Road. Owner : Ministry of Public Works (MPW). Consultant : Dar Al Dowailah Engineering Consultants Construction Managers. Main Contractor : Consolidated Contractors Co “ CCC”. Designation: Construction Manager. 4 Elevated U-turns Bridges, Cast in situ, Continuous slab with traffic opening during construction. Length of each bridge = 110 m , width of bridge = 9.5 m Each Bridge has two ramps, Mechanical Stabilized Earth Walls using Tensar System for about 2,400 m’ Deck Bridge : Post tensioned Box Girders.