Similar to Fernando Hermoza - ATC- AIR TRAFFIC CONTROL WORKSHOP - PANEL 1: Global regulation in Latin America and regional interoperability challenges (20)
2. Content
ü Background
ü ICAO ATM/PBN activities
ü ATC infrastructure & PBN in SPJC
ü ATFM & CDM in SPJC
ü Flow & capacity management
ü Next in SPJC
ü Conclusions
3. Background
International Jorge Chavez Airport
Lima – SPJC
Privatized in 2001
ü 69.500 operations (T/L)
ü 4.2 Mlls. passengers
Comparing year 1997: 0 % growth:
ü 68.500 operations (T/L)
ü 4 Mlls passengers
5. ICAO ATM/PBN activities
• SAM/IG since 2006: Assist States
to deploy GANP initiatives
– Promote PBN & ATFM
implementation.
– CO2 Savings.
• Beginning of USOAP audits in
Region.
6. ATC infrastructure & PBN in SPJC
2012
• Some improvements in
TMA Lima airspace,
applying RNAV SID/STAR
routes.
• New tailored RNP
procedures
2013
• ATC systems fully
implemented: new SSR
and ATC Control Center in
Lima
• PROESA / PERU
7. ATFM & CDM in SPJC
2013 (December)
“Declaration of Bogota” issued by SAM States
2014
• Organization of the FMP in Lima ACC.
• Runway & apron capacity calculations in
SPJC.
• Diagnose made by CAA and ANSP.
Presentation in ACC meeting (Airport
Consultative Committee - IATA).
In brief: they decided
to work together
8. Findings:
• Declared RWY 15 capacity,
35 aircraft per hour
(CGNA – BRAZIL method)
• (The first) traffic forecast:
find out demand
Leaded to:
• Traffic management
initiatives (TMI).
• Balancing
demand/capacity