How to Succeed at Grid Connections
Clean Energy Week - 25 July 2013
2
Advanced Technology (PMDD Full Converter preferred)
Understanding of the Connection Process
Recent Experience in Connections
To succeed at grid connections, you need:
Mortons Lane Wind Farm
3
“It was the PMG’s greater efficiency in part load operation that led GH to
conclude it was the superior generator for economic wind energy conversion”
-Garrad Hassan -
Trend Advantages
Full Power
Converter
Grid friendly
Greater control and operational flexibility
Better fault ride through capabilities
Enables the ability to satisfy future grid
codes and requirements
Direct Drive Eliminates gearbox failures
Eliminates gearbox energy losses
Less than half the number of components
required in the WTG
Permanent
Magnet
Generator
Eliminates slip rings and associated
maintenance
Eliminates secondary winding losses
Superior part-load efficiency as there are no
requirements for generator excitation
Reduction in size and mass of typical direct
drive generator
High power to weight ratio
Global Trend Away from Gearboxes and DFIG
AEMO analysed different turbine types and predicted the future mix of turbines
in the market.
AEMO outlined an optimistic scenario with a high proportion of full converter
turbines.
AEMO Network Predictions†
4†AEMO Wind Turbine Plant Capabilities Report – 2013 Wind Integration Studies – “type 3” and “type 4” changed to “DFIG” and “Full Converter”
“It is assumed that the largest NEM wind farms will be based on
[Full Converter] wind turbines, as these turbines have the
following characteristics:
 Typically have a higher nameplate rating compared to [DFIG] …
 Offer higher reliability and lower maintenance partly due to the
elimination of slip rings that exist in [DFIG] turbines …
 Eliminate or at least minimise the need for dynamic reactive support
equipment which tends to occupy a larger footprint as the wind farm
size increases.
 Have marginally higher efficiency at full load compared to [DFIG]
turbines, but significantly higher efficiency at partial load conditions.“
Static Capability
 Reactive Power Capability;
 Quality of Electricity Generated;
 Fault Current;
 Communication and Control Assessment.
Dynamic Studies
 Response to Frequency Disturbances;
 Fault Ride Through;
 Frequency Control;
 Impact on Network Capability;
 Voltage and Reactive Power Control.
Connection Process – Technology Assessment
5
Technology Needs in the NEM
6
Mortons Lane Gullen Range
 High Reactive Power Capability  
 Grid Flexibility  
 Advanced Fault Ride Through Capability  
 Park Level Voltage/Reactive Control  
 Active Power Control  
 PSS/E Models  
 Close Relationship with Grid Companies  
 Flexible Delivery Models  
 Innovation to Meet New Challenges  
7
Advanced Technology (PMDD Full Converter preferred)
Understanding of the Connection Process
Recent Experience in Connections
To succeed at grid connections, you need:
Gullen Range Wind Farm
Strength of network
 What System Stability challenges are present?
 Distribution or Transmission?
Connection assets delivery model
 BOOT, Monopoly provider, Competitive?
Political and structural focus
 Is the grid company being re-structured?
 Is there a greater political goal?
Experience
 Has the grid company dealt with these issues before?
 Are the staff familiar with the proposed technology?
Process Considerations for Each Grid Connection
8
Mortons Lane Gullen Range
 High Reactive Power Capability  
 Grid Flexibility  
 Advanced Fault Ride Through Capability  
 Park Level Voltage/Reactive Control  
 Active Power Control  
 PSS/E Models  
 
 
 
Mortons Lane Gullen Range
 High Reactive Power Capability  
 Grid Flexibility  
 Advanced Fault Ride Through Capability  
 Park Level Voltage/Reactive Control  
 Active Power Control  
 PSS/E Models  
 Close Relationship with Grid Companies  
 Flexible Delivery Models  
 Innovation to Meet New Challenges  
Technology and Process Needs in the NEM
9
10
Advanced Technology (PMDD Full Converter preferred)
Understanding of the Connection Process
Recent Experience in Connections
To succeed at grid connections, you need:
Mortons Lane Wind Farm
Review of Current Projects
11
Mortons Lane Wind Farm
 First MW scale PMDD windfarm in NEM
 Located Western Victoria
 13 wind turbines
 GW82 1.5MW
 Total capacity 20.3 MW
 Connects to 66kV Powercor sub
 Energised in November 2012
 WTG Availability > 99% (Jan – Jun)
Review of Current Projects
12
 Located North West of Goulburn
 73 wind turbines
 56 x 2.5MW; 17 x 1.5MW
 Total capacity 165.5 MW
 Connects Transgrid 330kV line onsite
 Construction started in Q3 2012
 Energisation expected in Dec 2013
Gullen Range Wind Farm
 Goldwind has acted as both the
Owner and Turbine supplier
 Goldwind are better equipped to
assist Owners with grid connection
Goldwind’s Role
13
Owner
NSP
AEMO
WTG
Connection Requirements
14
Gullen Range Wind Farm
Major network connection area
– Largest NSW wind farm
– Transgrid not concerned about connecting
Goldwind technology at this location
– No additional reactive plant required
NEM Map
Connection Requirements
15
Mortons Lane Wind Farm
 Current Network Limit – 63 MW
 Oakland Hill – 63 MW
 Mortons Lane – 20.3 MW
 Network Operating non-firm
– Runback schemes
– Voltage Control coordination
 Lowest Short Circuit Ratio in the NEM
Powercor 66kV Network
 Transgrid new connection process
– First wind farm offerred connection in NSW
since 2011
– New connection process
– Change from Proponent BOOT to Transgrid
build
 Powercor Runback scheme
– First windfarm runback scheme of its kind
– First coordinated voltage/reactive control
 AEMO Scada based dispatch
– AEMO transferring dispatch signals directly via
Scada
 First MW Scale PMDD in the NEM
 First Chinese WTG manufacturer to
achieve western bank finance globally
A First Time for Everything
16
Gullen Range Connection Point – Under Construction
Engagement with grid companies
Engagement
17
Transgrid, Goldwind and Catcon/CPP – GRWF Ground Breaking Ceremony
Goldwind have significant modelling expertise
– Powerfactory model
– PSCAD model
– PSS/E model – Senergy assisted Goldwind to meet
AEMO Modelling Guidelines
Benchmarked against type tests
– Goldwind conducts LVRT testing in house with its own
testing kit
Grid Models being used on 6 continents
Grid Models
18
Mortons Lane Gullen Range
 High Reactive Power Capability  
 Grid Flexibility  
 Advanced Fault Ride Through Capability  
 Park Level Voltage/Reactive Control  
 Active Power Control  
 PSS/E Models  
 Close Relationship with Grid Companies  
 Flexible Delivery Models  
 Innovation to Meet New Challenges  
Mortons Lane Gullen Range
 High Reactive Power Capability  
 Grid Flexibility  
 Advanced Fault Ride Through Capability  
 Park Level Voltage/Reactive Control  
 Active Power Control  
 PSS/E Models  
 Close Relationship with Grid Companies  
 Flexible Delivery Models  
 Innovation to Meet New Challenges  
Recent Experience in the NEM
19
To be Successful at Grid Connection
Proponents need:
Advanced technology (PMDD Full Converter preferred)
Understanding of grid companies and their processes
Partners with recent experience
Conclusions
20
21
Questions
Mortons Lane Wind Farm

More Related Content

What's hot

Solar Energy Applications
Solar Energy ApplicationsSolar Energy Applications
Solar Energy ApplicationsAvish Thakral
 
Solar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantSolar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantAvish Thakral
 
Grid-connected PV system
Grid-connected PV systemGrid-connected PV system
Grid-connected PV systemRamesh Adhikari
 
RES & EC Unit 3 PPT - Solar Photovoltaic System and Design & Ocean Energy, Ti...
RES & EC Unit 3 PPT - Solar Photovoltaic System and Design & Ocean Energy, Ti...RES & EC Unit 3 PPT - Solar Photovoltaic System and Design & Ocean Energy, Ti...
RES & EC Unit 3 PPT - Solar Photovoltaic System and Design & Ocean Energy, Ti...ARAVIND U
 
A solar pv based multistage grid tie inverter
A solar pv based multistage grid tie inverterA solar pv based multistage grid tie inverter
A solar pv based multistage grid tie inverterAlexander Decker
 
SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1Murugappa Group
 
Hybrid Controller | Design 150KW PV with DG1:700KW
Hybrid  Controller | Design 150KW PV with DG1:700KWHybrid  Controller | Design 150KW PV with DG1:700KW
Hybrid Controller | Design 150KW PV with DG1:700KWEyad Adnan
 
Questionnaire PSSP Program
Questionnaire PSSP ProgramQuestionnaire PSSP Program
Questionnaire PSSP ProgramAvish Thakral
 
LBS GES 2014 - Younicos - Philip Hiersemenzel
LBS GES 2014 - Younicos - Philip HiersemenzelLBS GES 2014 - Younicos - Philip Hiersemenzel
LBS GES 2014 - Younicos - Philip Hiersemenzelglobalenergysummit
 
PV Wind Hybrid Systems
PV Wind Hybrid SystemsPV Wind Hybrid Systems
PV Wind Hybrid SystemsSeminar Links
 
Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...
Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...
Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...Alberto Vázquez Garea
 
Grid connected rooftop solar power plant at silicon
Grid connected rooftop solar power plant at siliconGrid connected rooftop solar power plant at silicon
Grid connected rooftop solar power plant at siliconNavneet Das
 
Presentation on a grid connected Solar PV system
Presentation on a grid connected Solar PV systemPresentation on a grid connected Solar PV system
Presentation on a grid connected Solar PV systemashmomio
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, DesignVignesh Sekar
 
Solar Cold Storage Solution
Solar Cold Storage SolutionSolar Cold Storage Solution
Solar Cold Storage SolutionStatcon Energiaa
 
Mid term report on analysis of grid connected PV system
Mid term report on analysis of grid connected PV systemMid term report on analysis of grid connected PV system
Mid term report on analysis of grid connected PV systemRamesh Adhikari
 
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...Ashish Verma
 

What's hot (20)

Solar Training 20100208
Solar Training 20100208Solar Training 20100208
Solar Training 20100208
 
Solar Energy Applications
Solar Energy ApplicationsSolar Energy Applications
Solar Energy Applications
 
Jakson_report_Final
Jakson_report_FinalJakson_report_Final
Jakson_report_Final
 
Solar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid PlantSolar PV-D.G. Hybrid Plant
Solar PV-D.G. Hybrid Plant
 
47 iit powai_ppt
47 iit powai_ppt47 iit powai_ppt
47 iit powai_ppt
 
Grid-connected PV system
Grid-connected PV systemGrid-connected PV system
Grid-connected PV system
 
RES & EC Unit 3 PPT - Solar Photovoltaic System and Design & Ocean Energy, Ti...
RES & EC Unit 3 PPT - Solar Photovoltaic System and Design & Ocean Energy, Ti...RES & EC Unit 3 PPT - Solar Photovoltaic System and Design & Ocean Energy, Ti...
RES & EC Unit 3 PPT - Solar Photovoltaic System and Design & Ocean Energy, Ti...
 
A solar pv based multistage grid tie inverter
A solar pv based multistage grid tie inverterA solar pv based multistage grid tie inverter
A solar pv based multistage grid tie inverter
 
SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1SOLAR DESIGN -PREMKUMAR-1
SOLAR DESIGN -PREMKUMAR-1
 
Hybrid Controller | Design 150KW PV with DG1:700KW
Hybrid  Controller | Design 150KW PV with DG1:700KWHybrid  Controller | Design 150KW PV with DG1:700KW
Hybrid Controller | Design 150KW PV with DG1:700KW
 
Questionnaire PSSP Program
Questionnaire PSSP ProgramQuestionnaire PSSP Program
Questionnaire PSSP Program
 
LBS GES 2014 - Younicos - Philip Hiersemenzel
LBS GES 2014 - Younicos - Philip HiersemenzelLBS GES 2014 - Younicos - Philip Hiersemenzel
LBS GES 2014 - Younicos - Philip Hiersemenzel
 
PV Wind Hybrid Systems
PV Wind Hybrid SystemsPV Wind Hybrid Systems
PV Wind Hybrid Systems
 
Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...
Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...
Case study for CORAL BAY energy modelling for a WIND DIESEL and stabilization...
 
Grid connected rooftop solar power plant at silicon
Grid connected rooftop solar power plant at siliconGrid connected rooftop solar power plant at silicon
Grid connected rooftop solar power plant at silicon
 
Presentation on a grid connected Solar PV system
Presentation on a grid connected Solar PV systemPresentation on a grid connected Solar PV system
Presentation on a grid connected Solar PV system
 
10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design10 MW Solar PV power Plant - CPM & PERT, Design
10 MW Solar PV power Plant - CPM & PERT, Design
 
Solar Cold Storage Solution
Solar Cold Storage SolutionSolar Cold Storage Solution
Solar Cold Storage Solution
 
Mid term report on analysis of grid connected PV system
Mid term report on analysis of grid connected PV systemMid term report on analysis of grid connected PV system
Mid term report on analysis of grid connected PV system
 
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...Solar power sector: Technology, BoS, Pre Feasbility and  phase of project dev...
Solar power sector: Technology, BoS, Pre Feasbility and phase of project dev...
 

Viewers also liked

A Pilot Study on the Feasibility and Efficacy of the Parents Under Pressure (...
A Pilot Study on the Feasibility and Efficacy of the Parents Under Pressure (...A Pilot Study on the Feasibility and Efficacy of the Parents Under Pressure (...
A Pilot Study on the Feasibility and Efficacy of the Parents Under Pressure (...BASPCAN
 
The Netherlands implementation paradox: Reflections on policies in Tackling CAN
The Netherlands implementation paradox: Reflections on policies in Tackling CANThe Netherlands implementation paradox: Reflections on policies in Tackling CAN
The Netherlands implementation paradox: Reflections on policies in Tackling CANBASPCAN
 
Coercive Control & Forced Marriage
Coercive Control & Forced MarriageCoercive Control & Forced Marriage
Coercive Control & Forced MarriageBASPCAN
 
Sex Offending Against Children: Understanding the Behavior of Victims and Off...
Sex Offending Against Children: Understanding the Behavior of Victims and Off...Sex Offending Against Children: Understanding the Behavior of Victims and Off...
Sex Offending Against Children: Understanding the Behavior of Victims and Off...BASPCAN
 
The PEACH Study: What Makes for Effective Prevention in Domestic Abuse for Ch...
The PEACH Study: What Makes for Effective Prevention in Domestic Abuse for Ch...The PEACH Study: What Makes for Effective Prevention in Domestic Abuse for Ch...
The PEACH Study: What Makes for Effective Prevention in Domestic Abuse for Ch...BASPCAN
 
Handle With Care: You Have My VA Report!
Handle With Care: You Have My VA Report!Handle With Care: You Have My VA Report!
Handle With Care: You Have My VA Report!Cigital
 
Livro engenharia da produção
Livro   engenharia da produçãoLivro   engenharia da produção
Livro engenharia da produçãoClaudinei Oliveira
 
Els cavalls
Els cavallsEls cavalls
Els cavallsaubaaa
 
INTERNET OF THINGS
INTERNET OF THINGSINTERNET OF THINGS
INTERNET OF THINGSSelamatriady
 
Sach luyen de toan 2014 p1 (thay hung)
Sach luyen de toan 2014 p1 (thay hung)Sach luyen de toan 2014 p1 (thay hung)
Sach luyen de toan 2014 p1 (thay hung)KyNang Toan
 
Living with Historical Childhood Sexual Abuse
Living with Historical Childhood Sexual AbuseLiving with Historical Childhood Sexual Abuse
Living with Historical Childhood Sexual AbuseBASPCAN
 
The Parents Under Pressure (PuP) Program
The Parents Under Pressure (PuP) ProgramThe Parents Under Pressure (PuP) Program
The Parents Under Pressure (PuP) ProgramBASPCAN
 
Don't give up the adoptee - The Research of Adoption Dissolution in Taiwan
Don't give up the adoptee - The Research of Adoption Dissolution in TaiwanDon't give up the adoptee - The Research of Adoption Dissolution in Taiwan
Don't give up the adoptee - The Research of Adoption Dissolution in TaiwanBASPCAN
 
Drag and Drop Slide Installation and Configuration
Drag and Drop Slide Installation and ConfigurationDrag and Drop Slide Installation and Configuration
Drag and Drop Slide Installation and ConfigurationCloud Analogy
 
Brain Behind, Body Forward
Brain Behind, Body ForwardBrain Behind, Body Forward
Brain Behind, Body ForwardBASPCAN
 

Viewers also liked (18)

Mamografia
MamografiaMamografia
Mamografia
 
A Pilot Study on the Feasibility and Efficacy of the Parents Under Pressure (...
A Pilot Study on the Feasibility and Efficacy of the Parents Under Pressure (...A Pilot Study on the Feasibility and Efficacy of the Parents Under Pressure (...
A Pilot Study on the Feasibility and Efficacy of the Parents Under Pressure (...
 
The Netherlands implementation paradox: Reflections on policies in Tackling CAN
The Netherlands implementation paradox: Reflections on policies in Tackling CANThe Netherlands implementation paradox: Reflections on policies in Tackling CAN
The Netherlands implementation paradox: Reflections on policies in Tackling CAN
 
Coercive Control & Forced Marriage
Coercive Control & Forced MarriageCoercive Control & Forced Marriage
Coercive Control & Forced Marriage
 
Sex Offending Against Children: Understanding the Behavior of Victims and Off...
Sex Offending Against Children: Understanding the Behavior of Victims and Off...Sex Offending Against Children: Understanding the Behavior of Victims and Off...
Sex Offending Against Children: Understanding the Behavior of Victims and Off...
 
The PEACH Study: What Makes for Effective Prevention in Domestic Abuse for Ch...
The PEACH Study: What Makes for Effective Prevention in Domestic Abuse for Ch...The PEACH Study: What Makes for Effective Prevention in Domestic Abuse for Ch...
The PEACH Study: What Makes for Effective Prevention in Domestic Abuse for Ch...
 
Q4
Q4Q4
Q4
 
Handle With Care: You Have My VA Report!
Handle With Care: You Have My VA Report!Handle With Care: You Have My VA Report!
Handle With Care: You Have My VA Report!
 
Livro engenharia da produção
Livro   engenharia da produçãoLivro   engenharia da produção
Livro engenharia da produção
 
Els cavalls
Els cavallsEls cavalls
Els cavalls
 
INTERNET OF THINGS
INTERNET OF THINGSINTERNET OF THINGS
INTERNET OF THINGS
 
Sach luyen de toan 2014 p1 (thay hung)
Sach luyen de toan 2014 p1 (thay hung)Sach luyen de toan 2014 p1 (thay hung)
Sach luyen de toan 2014 p1 (thay hung)
 
Observer
ObserverObserver
Observer
 
Living with Historical Childhood Sexual Abuse
Living with Historical Childhood Sexual AbuseLiving with Historical Childhood Sexual Abuse
Living with Historical Childhood Sexual Abuse
 
The Parents Under Pressure (PuP) Program
The Parents Under Pressure (PuP) ProgramThe Parents Under Pressure (PuP) Program
The Parents Under Pressure (PuP) Program
 
Don't give up the adoptee - The Research of Adoption Dissolution in Taiwan
Don't give up the adoptee - The Research of Adoption Dissolution in TaiwanDon't give up the adoptee - The Research of Adoption Dissolution in Taiwan
Don't give up the adoptee - The Research of Adoption Dissolution in Taiwan
 
Drag and Drop Slide Installation and Configuration
Drag and Drop Slide Installation and ConfigurationDrag and Drop Slide Installation and Configuration
Drag and Drop Slide Installation and Configuration
 
Brain Behind, Body Forward
Brain Behind, Body ForwardBrain Behind, Body Forward
Brain Behind, Body Forward
 

Similar to Steven-Nethery-Technical-Sales-Manager-Goldwind-Australia

Best practices for Solar and Wind power system case studies
Best practices for Solar and Wind power system case studiesBest practices for Solar and Wind power system case studies
Best practices for Solar and Wind power system case studiesLeonardo ENERGY
 
Utility Microgrids: Why robust control solutions are critical to advanced mic...
Utility Microgrids: Why robust control solutions are critical to advanced mic...Utility Microgrids: Why robust control solutions are critical to advanced mic...
Utility Microgrids: Why robust control solutions are critical to advanced mic...Jim Dodenhoff
 
The merits of integrating renewables with smarter grid carimet
The merits of integrating renewables with smarter grid   carimetThe merits of integrating renewables with smarter grid   carimet
The merits of integrating renewables with smarter grid carimetRick Case, PMP, P.E.
 
POWER ELECTRONIC IN POWER SYSTEM KELAS.pptx
POWER ELECTRONIC IN POWER SYSTEM KELAS.pptxPOWER ELECTRONIC IN POWER SYSTEM KELAS.pptx
POWER ELECTRONIC IN POWER SYSTEM KELAS.pptxmasterunedo
 
Operational ANM Schmes in the UK and America
Operational ANM Schmes in the UK and AmericaOperational ANM Schmes in the UK and America
Operational ANM Schmes in the UK and AmericaSmarter Grid Solutions
 
Distributed generation & power quality unit 5
Distributed generation & power quality unit 5Distributed generation & power quality unit 5
Distributed generation & power quality unit 5hariyenireddy1
 
Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...
Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...
Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...gulie
 
Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...
Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...
Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...Wajdi Bellil
 
High Voltage Power Electronics Technologies for Integrating Renewable Resourc...
High Voltage Power Electronics Technologies for Integrating Renewable Resourc...High Voltage Power Electronics Technologies for Integrating Renewable Resourc...
High Voltage Power Electronics Technologies for Integrating Renewable Resourc...Power System Operation
 
Integrating Photovoltaic Systems in Power System.pdf
Integrating Photovoltaic Systems in Power System.pdfIntegrating Photovoltaic Systems in Power System.pdf
Integrating Photovoltaic Systems in Power System.pdfHeangsokleap1
 
IRJET- Performance Evaluation of Micro Grid
IRJET- Performance Evaluation of Micro GridIRJET- Performance Evaluation of Micro Grid
IRJET- Performance Evaluation of Micro GridIRJET Journal
 
energy dispatch using virtual power plant
energy dispatch using virtual power plantenergy dispatch using virtual power plant
energy dispatch using virtual power plantGAUTAMKUMAR868
 
Development of wind and solar based ac microgrid with power quality improveme...
Development of wind and solar based ac microgrid with power quality improveme...Development of wind and solar based ac microgrid with power quality improveme...
Development of wind and solar based ac microgrid with power quality improveme...Asoka Technologies
 
2013 IEEE Eee m.tech 2013 titles with abstracts
2013 IEEE Eee m.tech 2013 titles with abstracts2013 IEEE Eee m.tech 2013 titles with abstracts
2013 IEEE Eee m.tech 2013 titles with abstractsVision Solutions
 

Similar to Steven-Nethery-Technical-Sales-Manager-Goldwind-Australia (20)

IPA Power Scotland Conference
IPA Power Scotland ConferenceIPA Power Scotland Conference
IPA Power Scotland Conference
 
Best practices for Solar and Wind power system case studies
Best practices for Solar and Wind power system case studiesBest practices for Solar and Wind power system case studies
Best practices for Solar and Wind power system case studies
 
2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...
2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...
2014 PV Distribution System Modeling Workshop: Pro-active, high penetration P...
 
Utility Microgrids: Why robust control solutions are critical to advanced mic...
Utility Microgrids: Why robust control solutions are critical to advanced mic...Utility Microgrids: Why robust control solutions are critical to advanced mic...
Utility Microgrids: Why robust control solutions are critical to advanced mic...
 
The merits of integrating renewables with smarter grid carimet
The merits of integrating renewables with smarter grid   carimetThe merits of integrating renewables with smarter grid   carimet
The merits of integrating renewables with smarter grid carimet
 
Jm3417081729
Jm3417081729Jm3417081729
Jm3417081729
 
POWER ELECTRONIC IN POWER SYSTEM KELAS.pptx
POWER ELECTRONIC IN POWER SYSTEM KELAS.pptxPOWER ELECTRONIC IN POWER SYSTEM KELAS.pptx
POWER ELECTRONIC IN POWER SYSTEM KELAS.pptx
 
Operational ANM Schmes in the UK and America
Operational ANM Schmes in the UK and AmericaOperational ANM Schmes in the UK and America
Operational ANM Schmes in the UK and America
 
Distributed generation & power quality unit 5
Distributed generation & power quality unit 5Distributed generation & power quality unit 5
Distributed generation & power quality unit 5
 
Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...
Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...
Fall11_4_13GezaJoos_IntegrationAndInterconnectionOfDistributedEnergyResources...
 
Securing Australia's Energy Future: The Challenge - Simon Gamble, Hydro Tasmania
Securing Australia's Energy Future: The Challenge - Simon Gamble, Hydro TasmaniaSecuring Australia's Energy Future: The Challenge - Simon Gamble, Hydro Tasmania
Securing Australia's Energy Future: The Challenge - Simon Gamble, Hydro Tasmania
 
Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...
Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...
Frequency Regulation of Grid Connected Solar PV System Using Battery Storage ...
 
Distributed Generation
Distributed Generation Distributed Generation
Distributed Generation
 
High Voltage Power Electronics Technologies for Integrating Renewable Resourc...
High Voltage Power Electronics Technologies for Integrating Renewable Resourc...High Voltage Power Electronics Technologies for Integrating Renewable Resourc...
High Voltage Power Electronics Technologies for Integrating Renewable Resourc...
 
Integrating Photovoltaic Systems in Power System.pdf
Integrating Photovoltaic Systems in Power System.pdfIntegrating Photovoltaic Systems in Power System.pdf
Integrating Photovoltaic Systems in Power System.pdf
 
IRJET- Performance Evaluation of Micro Grid
IRJET- Performance Evaluation of Micro GridIRJET- Performance Evaluation of Micro Grid
IRJET- Performance Evaluation of Micro Grid
 
energy dispatch using virtual power plant
energy dispatch using virtual power plantenergy dispatch using virtual power plant
energy dispatch using virtual power plant
 
Development of wind and solar based ac microgrid with power quality improveme...
Development of wind and solar based ac microgrid with power quality improveme...Development of wind and solar based ac microgrid with power quality improveme...
Development of wind and solar based ac microgrid with power quality improveme...
 
2013 IEEE Eee m.tech 2013 titles with abstracts
2013 IEEE Eee m.tech 2013 titles with abstracts2013 IEEE Eee m.tech 2013 titles with abstracts
2013 IEEE Eee m.tech 2013 titles with abstracts
 
Sgcp13laguna
Sgcp13lagunaSgcp13laguna
Sgcp13laguna
 

Steven-Nethery-Technical-Sales-Manager-Goldwind-Australia

  • 1. How to Succeed at Grid Connections Clean Energy Week - 25 July 2013
  • 2. 2 Advanced Technology (PMDD Full Converter preferred) Understanding of the Connection Process Recent Experience in Connections To succeed at grid connections, you need: Mortons Lane Wind Farm
  • 3. 3 “It was the PMG’s greater efficiency in part load operation that led GH to conclude it was the superior generator for economic wind energy conversion” -Garrad Hassan - Trend Advantages Full Power Converter Grid friendly Greater control and operational flexibility Better fault ride through capabilities Enables the ability to satisfy future grid codes and requirements Direct Drive Eliminates gearbox failures Eliminates gearbox energy losses Less than half the number of components required in the WTG Permanent Magnet Generator Eliminates slip rings and associated maintenance Eliminates secondary winding losses Superior part-load efficiency as there are no requirements for generator excitation Reduction in size and mass of typical direct drive generator High power to weight ratio Global Trend Away from Gearboxes and DFIG
  • 4. AEMO analysed different turbine types and predicted the future mix of turbines in the market. AEMO outlined an optimistic scenario with a high proportion of full converter turbines. AEMO Network Predictions† 4†AEMO Wind Turbine Plant Capabilities Report – 2013 Wind Integration Studies – “type 3” and “type 4” changed to “DFIG” and “Full Converter” “It is assumed that the largest NEM wind farms will be based on [Full Converter] wind turbines, as these turbines have the following characteristics:  Typically have a higher nameplate rating compared to [DFIG] …  Offer higher reliability and lower maintenance partly due to the elimination of slip rings that exist in [DFIG] turbines …  Eliminate or at least minimise the need for dynamic reactive support equipment which tends to occupy a larger footprint as the wind farm size increases.  Have marginally higher efficiency at full load compared to [DFIG] turbines, but significantly higher efficiency at partial load conditions.“
  • 5. Static Capability  Reactive Power Capability;  Quality of Electricity Generated;  Fault Current;  Communication and Control Assessment. Dynamic Studies  Response to Frequency Disturbances;  Fault Ride Through;  Frequency Control;  Impact on Network Capability;  Voltage and Reactive Power Control. Connection Process – Technology Assessment 5
  • 6. Technology Needs in the NEM 6 Mortons Lane Gullen Range  High Reactive Power Capability    Grid Flexibility    Advanced Fault Ride Through Capability    Park Level Voltage/Reactive Control    Active Power Control    PSS/E Models    Close Relationship with Grid Companies    Flexible Delivery Models    Innovation to Meet New Challenges  
  • 7. 7 Advanced Technology (PMDD Full Converter preferred) Understanding of the Connection Process Recent Experience in Connections To succeed at grid connections, you need: Gullen Range Wind Farm
  • 8. Strength of network  What System Stability challenges are present?  Distribution or Transmission? Connection assets delivery model  BOOT, Monopoly provider, Competitive? Political and structural focus  Is the grid company being re-structured?  Is there a greater political goal? Experience  Has the grid company dealt with these issues before?  Are the staff familiar with the proposed technology? Process Considerations for Each Grid Connection 8
  • 9. Mortons Lane Gullen Range  High Reactive Power Capability    Grid Flexibility    Advanced Fault Ride Through Capability    Park Level Voltage/Reactive Control    Active Power Control    PSS/E Models         Mortons Lane Gullen Range  High Reactive Power Capability    Grid Flexibility    Advanced Fault Ride Through Capability    Park Level Voltage/Reactive Control    Active Power Control    PSS/E Models    Close Relationship with Grid Companies    Flexible Delivery Models    Innovation to Meet New Challenges   Technology and Process Needs in the NEM 9
  • 10. 10 Advanced Technology (PMDD Full Converter preferred) Understanding of the Connection Process Recent Experience in Connections To succeed at grid connections, you need: Mortons Lane Wind Farm
  • 11. Review of Current Projects 11 Mortons Lane Wind Farm  First MW scale PMDD windfarm in NEM  Located Western Victoria  13 wind turbines  GW82 1.5MW  Total capacity 20.3 MW  Connects to 66kV Powercor sub  Energised in November 2012  WTG Availability > 99% (Jan – Jun)
  • 12. Review of Current Projects 12  Located North West of Goulburn  73 wind turbines  56 x 2.5MW; 17 x 1.5MW  Total capacity 165.5 MW  Connects Transgrid 330kV line onsite  Construction started in Q3 2012  Energisation expected in Dec 2013 Gullen Range Wind Farm
  • 13.  Goldwind has acted as both the Owner and Turbine supplier  Goldwind are better equipped to assist Owners with grid connection Goldwind’s Role 13 Owner NSP AEMO WTG
  • 14. Connection Requirements 14 Gullen Range Wind Farm Major network connection area – Largest NSW wind farm – Transgrid not concerned about connecting Goldwind technology at this location – No additional reactive plant required NEM Map
  • 15. Connection Requirements 15 Mortons Lane Wind Farm  Current Network Limit – 63 MW  Oakland Hill – 63 MW  Mortons Lane – 20.3 MW  Network Operating non-firm – Runback schemes – Voltage Control coordination  Lowest Short Circuit Ratio in the NEM Powercor 66kV Network
  • 16.  Transgrid new connection process – First wind farm offerred connection in NSW since 2011 – New connection process – Change from Proponent BOOT to Transgrid build  Powercor Runback scheme – First windfarm runback scheme of its kind – First coordinated voltage/reactive control  AEMO Scada based dispatch – AEMO transferring dispatch signals directly via Scada  First MW Scale PMDD in the NEM  First Chinese WTG manufacturer to achieve western bank finance globally A First Time for Everything 16 Gullen Range Connection Point – Under Construction
  • 17. Engagement with grid companies Engagement 17 Transgrid, Goldwind and Catcon/CPP – GRWF Ground Breaking Ceremony
  • 18. Goldwind have significant modelling expertise – Powerfactory model – PSCAD model – PSS/E model – Senergy assisted Goldwind to meet AEMO Modelling Guidelines Benchmarked against type tests – Goldwind conducts LVRT testing in house with its own testing kit Grid Models being used on 6 continents Grid Models 18
  • 19. Mortons Lane Gullen Range  High Reactive Power Capability    Grid Flexibility    Advanced Fault Ride Through Capability    Park Level Voltage/Reactive Control    Active Power Control    PSS/E Models    Close Relationship with Grid Companies    Flexible Delivery Models    Innovation to Meet New Challenges   Mortons Lane Gullen Range  High Reactive Power Capability    Grid Flexibility    Advanced Fault Ride Through Capability    Park Level Voltage/Reactive Control    Active Power Control    PSS/E Models    Close Relationship with Grid Companies    Flexible Delivery Models    Innovation to Meet New Challenges   Recent Experience in the NEM 19
  • 20. To be Successful at Grid Connection Proponents need: Advanced technology (PMDD Full Converter preferred) Understanding of grid companies and their processes Partners with recent experience Conclusions 20