Construction
Disputes
PREPARED BY
GAYATHRY SATHEESAN
Construction Disputes
• Construction disputes arise from environmental and
behavioral factors.
• There are many different causes of disputes in the
construction industry.
• Disputes waste money, therefore drain profits and destroy
the relationship and it takes energy away from projects.
• Construction delays, variations, efficiency issues and
exceeding cost can be some causes for the dispute to arise
in the project.
• Typically construction disputes occur between the owner
and the main contractor, subcontractors, sub-subcontractors
and design professionals.
• The main source of this problem is the lack of precision in
the contract description between involving parties.
• The construction industry has tried a different way to avoid
the disputes.
• Currently, construction industry uses Building Information
Modeling (BIM) or 3D modeling and it has significantly
minimized these kinds of disputes.
• The reasons for construction disputes are being a part of
construction life fall into four categories.
• Contract
• Finance
• Culture
• External Factors
Definition of Dispute
• Dispute is a misunderstanding between two parties, either
contractual or non- contractual.
• Dispute is unable to eliminate because the nature of the
construction is full risk.(Thomas 1995)
• Definition of the dispute may be circumscribed it may
inevitably involve resolution of other matters which may not
specifically have been raised into separate or discrete
disputes.
• The judicial development of the definition of dispute required
to give an adjudicator threshold jurisdiction has been
instrumental in encouraging the Parties to exchange views
and facts which support their case, but it can be a rather
blunt instrument for reducing dispute and far short of a pre-
adjudication protocol
• A dispute will not exist until a claim is asserted by one party
which is disputed by the other party.
Factors Affecting Construction
Disputes
1. Terms of the Contract
2. Technological Issues
3. Project Conditions
4. Parties Involved
5. Magnitude
6. Site Conditions
7. Degree of Bias
8. Third Party
9. Organizational Behavior
10. Culture
common causes of disputes
• Failure to properly administer the contract
• Poorly drafted or incomplete/unsubstantiated claims
• Employer/Contractor/Subcontractor failing to understand
and/or comply with its contractual obligation
• Errors and/or omissions in the contract document
• Incomplete design information or employer requirements.
Causes of Construction Dispute by
Clients
• Deficient management supervision
• Lowest price mentality in engagement of contractor
• Poor communication
• Discrepancies in contract documents
• Failure to appoint project manager
• Failure to respond in time
Causes of Construction Disputes by
Contractors
• Delay suspension of work
• Lack of understanding and agreement in contract
procurement
• Inadequate CPM scheduling and update requirement
• Failure to plan and execute the changes of works
• Reluctance to seek clarification
• Failure to understand and correctly bid or price the works
Causes of Construction Dispute by
the Consultants
• Failure to understand its responsibilities under the design
team contract
• Over design and understanding, the costs involved
• Incompleteness of drawing and specification
• Design and specification oversight and errors or omission
from specialists
• Variations due to design errors
• To request for information late information delivery and
cumbersome approach
Adjudication
• It is a process in which a neutral third party will give a decision
on a dispute.
• Construction and Regeneration Act 1996 states that parties to a
construction contract may refer their disputes to an adjudicator.
• Adjudication has become known as a ‘pay first, argue later’ way
for parties to resolve their disputes.
• A successful party to adjudication can apply to the Technology
and Construction Court to enforce an adjudicator’s decision.
• The decision of the adjudicator will be binding, unless or until it
is revised in arbitration or litigation.
• Benefits of Adjudication
• The adjudicator is a neutral person who is not involved in the
day to day running of the construction contract.
• Adjudication is a quick process, which is designed to ensure
that cash flow is maintained during the construction process.
• Although it is still possible to go to the Court, in most cases the
decision of the adjudicator decides the dispute.
• Adjudication is less expensive than court proceedings.
• Disadvantages of adjudication
• The dispute needs to have been aired between the parties
before adjudication can be commenced.
• The adjudicator’s powers are limited.
• Court proceedings are still required to enforce the adjudicator’s
decision if the “losing” party does not pay.
Expert Determination
• It is often used to resolve issues or disputes of a
specialist nature, such as construction, and is one of
the most informal systems of dispute resolution.
• It is often used when there is a valuation dispute.
• If an expert is to be used to determine the dispute, the
parties will agree this by contract and will agree that
the expert determination will be binding.
Benefits of Expert Determination
• It is an economic way of finally resolving valuation disputes.
• It is less expensive and a quicker and a less formal method of
dispute resolution.
Disadvantages of Expert
Determination
• The use of experts is much less tied to legal processes and
therefore it is more difficult to challenge the decision of an
expert.
• An expert’s report cannot generally be enforced without further
court or arbitration proceedings.
Litigation
• Whilst there are many methods of ADR, court proceedings are
still one of the most common forms of resolving disputes within
the construction industry.
• The Technology and Construction Court (TCC) is a specialist
court which deals with technology and construction disputes and
is governed not only by the Civil Procedure Rules but also by
the Technology and Construction Court Guide.
• A specialist TCC judge will deal with cases in the TCC.
Advantages of Litigation
• The claim process will be managed by a judge throughout.
• Complex issues can be dealt with.
• The parties will obtain a binding and enforceable decision.
Disadvantages of Litigation
• Only claims which are over the value of £250,000 can be dealt
with at the TCC.
• Any claims below this sum will be dealt with at the County
Court.
• It is often a slow process and it is most expensive .
• The proceedings will be in public and are therefore not
confidential, except in certain very limited circumstances.
• Mediation
Mediation
• Mediation is commonly used within the construction industry to
resolve disputes.
• The Technology and Construction Court Guide provides
guidance on the conduct of litigation within the construction
industry and states that the court should encourage parties to
use alternative dispute resolution (ADR), which in most cases,
will be mediation.
• The Pre-Action Protocol for Construction and Engineering
Disputes requires parties in dispute to meet, at least once
before litigation commences, to discuss whether some form of
ADR, such as mediation, would be a more appropriate means to
resolve the dispute.
Benefits of Mediation
• The mediator will be an independent person, who will not make
a decision, judge or advise, but will facilitate discussions
between the parties, with the aim of resolving the dispute.
• Mediators are generally highly experienced in the area of the
dispute, and may even by TCC judges.
• It can help maintain a business relationship.
• It is relatively quick, with mediations usually lasting 1-2 days.
• It is usually considerably less costly than litigation.
• Everything that happens in a mediation is confidential.
• A mediator will encourage the parties to find a solution to the
dispute which will suit both the parties’ needs.
Disadvantages of Mediation
• In some cases there may be a concern that, during mediation,
parties may disclose an important aspect of their argument or
commercial position, which (despite the confidential nature of
mediation) could benefit the other party if the matter went to
trial.
• If the parties do not come to an agreement, the dispute will
remain unresolved and the cost of mediation will have been
wasted.
Arbitration
• It is another alternative to litigation and is a process in
which the parties will agree to refer the dispute to a third
party, the arbitrator.
• Disputes are resolved on the basis of material facts,
documents and relevant principles of law.
• Arbitration is often used in the context of international
construction disputes, but can equally be used for pure
domestic disputes.
Benefits of Arbitration
• Like mediation, arbitration is a confidential process.
• Parties can agree on an arbitrator who has relevant
experience in the matter.
• Compared to court proceedings, it is a relatively quick
process.
• It is highly flexible compared to court proceedings.
Disadvantages of Arbitration
• It is the parties’ responsibility to bear the costs of both the
arbitrator and the venue where the arbitration is to take
place.
• There are limited powers of compulsion or sanction
available to the arbitrator if one party fails to comply with the
directions set by the arbitrator.
• There are limited appeal rights available during arbitration
and Costs can be similar to litigation at court.
Thank You

More Related Content

What's hot

Contract - Construction Contracts and Specification
Contract - Construction Contracts and SpecificationContract - Construction Contracts and Specification
Contract - Construction Contracts and SpecificationMANNU KUMAR
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & EquipmentsGAURAV. H .TANDON
 
Construction project management
Construction project managementConstruction project management
Construction project managementSenthil Kannan
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Managementjohnkirth1898
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contractguestdb5e498
 
Presentation - Construction Contract Dispute Resolution
Presentation - Construction Contract Dispute ResolutionPresentation - Construction Contract Dispute Resolution
Presentation - Construction Contract Dispute ResolutionJustin DeMerchant
 
02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projectsakashpadole
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -artijagadish108
 
Site organization in Construction
Site organization in ConstructionSite organization in Construction
Site organization in ConstructionSamsonFemiAdesope
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selectionanojan kanagarathnam
 
2. construction disputes
2.  construction disputes2.  construction disputes
2. construction disputesCyrianAsidoy
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and ArbitrationJIT KUMAR GUPTA
 
Construction Contracts: Basics of Contracts and Contract Administration
Construction Contracts:  Basics of Contracts and Contract AdministrationConstruction Contracts:  Basics of Contracts and Contract Administration
Construction Contracts: Basics of Contracts and Contract AdministrationGerald R. (Jerry) Genge
 
Construction Material Management
Construction Material ManagementConstruction Material Management
Construction Material ManagementPriya Ramaraj
 
construction project planing
 construction project planing construction project planing
construction project planingSANJEEV Wazir
 

What's hot (20)

Contract - Construction Contracts and Specification
Contract - Construction Contracts and SpecificationContract - Construction Contracts and Specification
Contract - Construction Contracts and Specification
 
Construction Management & Equipments
Construction Management & EquipmentsConstruction Management & Equipments
Construction Management & Equipments
 
Construction project management
Construction project managementConstruction project management
Construction project management
 
Construction Project Management
Construction Project ManagementConstruction Project Management
Construction Project Management
 
Contracts and-tenders
Contracts and-tendersContracts and-tenders
Contracts and-tenders
 
Conditions Of Contract
Conditions Of ContractConditions Of Contract
Conditions Of Contract
 
Presentation - Construction Contract Dispute Resolution
Presentation - Construction Contract Dispute ResolutionPresentation - Construction Contract Dispute Resolution
Presentation - Construction Contract Dispute Resolution
 
TENDER DOCUMENT
TENDER DOCUMENTTENDER DOCUMENT
TENDER DOCUMENT
 
Construction contracts
Construction contractsConstruction contracts
Construction contracts
 
Contracts
ContractsContracts
Contracts
 
Types of contracts
Types of contractsTypes of contracts
Types of contracts
 
02 Construction Projects
02 Construction Projects02 Construction Projects
02 Construction Projects
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
 
Site organization in Construction
Site organization in ConstructionSite organization in Construction
Site organization in Construction
 
Pre qualification stages and tender selection
Pre qualification stages and tender selectionPre qualification stages and tender selection
Pre qualification stages and tender selection
 
2. construction disputes
2.  construction disputes2.  construction disputes
2. construction disputes
 
Contract and Arbitration
Contract and ArbitrationContract and Arbitration
Contract and Arbitration
 
Construction Contracts: Basics of Contracts and Contract Administration
Construction Contracts:  Basics of Contracts and Contract AdministrationConstruction Contracts:  Basics of Contracts and Contract Administration
Construction Contracts: Basics of Contracts and Contract Administration
 
Construction Material Management
Construction Material ManagementConstruction Material Management
Construction Material Management
 
construction project planing
 construction project planing construction project planing
construction project planing
 

Similar to Construction disputes

DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...
DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...
DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...Surya Bhai
 
Early Dispute Resolution in the Construction Industry
Early Dispute Resolution in the Construction IndustryEarly Dispute Resolution in the Construction Industry
Early Dispute Resolution in the Construction IndustryFrancis Ho
 
Lecture 2 - ADR vs Litigation.pdf
Lecture 2 - ADR vs Litigation.pdfLecture 2 - ADR vs Litigation.pdf
Lecture 2 - ADR vs Litigation.pdfjonathan539518
 
Top 5 Methods for Resolving UK Construction Disputes
Top 5 Methods for Resolving UK Construction DisputesTop 5 Methods for Resolving UK Construction Disputes
Top 5 Methods for Resolving UK Construction DisputesSarah Fox
 
Civil engineering practice (lec 5)
Civil engineering practice (lec 5)Civil engineering practice (lec 5)
Civil engineering practice (lec 5)Muhammad Khan
 
Construction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom MarketConstruction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom MarketFrancis Ho
 
PECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptxPECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptxIrfanAwan25
 
CONTRACT ADMINISTRATION Updated.pptx
CONTRACT ADMINISTRATION Updated.pptxCONTRACT ADMINISTRATION Updated.pptx
CONTRACT ADMINISTRATION Updated.pptxAditya Mane
 
Alternative Dispute Resolution methods Level III - B.Sc QS (Salford) March ...
Alternative  Dispute Resolution methods  Level III - B.Sc QS (Salford) March ...Alternative  Dispute Resolution methods  Level III - B.Sc QS (Salford) March ...
Alternative Dispute Resolution methods Level III - B.Sc QS (Salford) March ...TheGimhan123
 
Extra Work, Changes and Termination of the Contract
Extra Work, Changes and Termination of the ContractExtra Work, Changes and Termination of the Contract
Extra Work, Changes and Termination of the ContractSHKLaw
 
Unit V - Contracts.pptx
Unit V - Contracts.pptxUnit V - Contracts.pptx
Unit V - Contracts.pptxjairam131
 
Due Diligence on a submarine cable system
Due Diligence on a submarine cable systemDue Diligence on a submarine cable system
Due Diligence on a submarine cable systemMike Conradi
 
5 Ways To Make Litigation Cheaper
5 Ways To Make Litigation Cheaper5 Ways To Make Litigation Cheaper
5 Ways To Make Litigation Cheapern1ghtf4ll
 
Ditching Defect Drama: Keeping Construction Claims Objective
Ditching Defect Drama: Keeping Construction Claims ObjectiveDitching Defect Drama: Keeping Construction Claims Objective
Ditching Defect Drama: Keeping Construction Claims ObjectiveKipcon Inc.
 
Project dispute avoidance and mitigation through conciliation and arbitration
Project dispute avoidance and mitigation through conciliation and arbitrationProject dispute avoidance and mitigation through conciliation and arbitration
Project dispute avoidance and mitigation through conciliation and arbitration Dr K M SONI
 
NEWBIE LITIGATOR SCHOOL- PART II 2022 - ADR & Settlement
NEWBIE LITIGATOR SCHOOL- PART II 2022 - ADR & Settlement NEWBIE LITIGATOR SCHOOL- PART II 2022 - ADR & Settlement
NEWBIE LITIGATOR SCHOOL- PART II 2022 - ADR & Settlement Financial Poise
 

Similar to Construction disputes (20)

DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...
DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...
DISPUTE REVIEW BOARDS -REASONS-NEED-METHODS-RESPONSIBILITIES-PROCESFUNCTIONS-...
 
Early Dispute Resolution in the Construction Industry
Early Dispute Resolution in the Construction IndustryEarly Dispute Resolution in the Construction Industry
Early Dispute Resolution in the Construction Industry
 
Lecture 2 - ADR vs Litigation.pdf
Lecture 2 - ADR vs Litigation.pdfLecture 2 - ADR vs Litigation.pdf
Lecture 2 - ADR vs Litigation.pdf
 
Top 5 Methods for Resolving UK Construction Disputes
Top 5 Methods for Resolving UK Construction DisputesTop 5 Methods for Resolving UK Construction Disputes
Top 5 Methods for Resolving UK Construction Disputes
 
Civil engineering practice (lec 5)
Civil engineering practice (lec 5)Civil engineering practice (lec 5)
Civil engineering practice (lec 5)
 
Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]
 
Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]Chapter 4 [compatibility mode]
Chapter 4 [compatibility mode]
 
Construction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom MarketConstruction Dispute Resolution and Avoidance in a Boom Market
Construction Dispute Resolution and Avoidance in a Boom Market
 
PECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptxPECDisputeResolution25102018.pptx
PECDisputeResolution25102018.pptx
 
CONTRACT ADMINISTRATION Updated.pptx
CONTRACT ADMINISTRATION Updated.pptxCONTRACT ADMINISTRATION Updated.pptx
CONTRACT ADMINISTRATION Updated.pptx
 
Alternative Dispute Resolution methods Level III - B.Sc QS (Salford) March ...
Alternative  Dispute Resolution methods  Level III - B.Sc QS (Salford) March ...Alternative  Dispute Resolution methods  Level III - B.Sc QS (Salford) March ...
Alternative Dispute Resolution methods Level III - B.Sc QS (Salford) March ...
 
Arbitration notes
Arbitration notesArbitration notes
Arbitration notes
 
Litigation 2
Litigation 2Litigation 2
Litigation 2
 
Extra Work, Changes and Termination of the Contract
Extra Work, Changes and Termination of the ContractExtra Work, Changes and Termination of the Contract
Extra Work, Changes and Termination of the Contract
 
Unit V - Contracts.pptx
Unit V - Contracts.pptxUnit V - Contracts.pptx
Unit V - Contracts.pptx
 
Due Diligence on a submarine cable system
Due Diligence on a submarine cable systemDue Diligence on a submarine cable system
Due Diligence on a submarine cable system
 
5 Ways To Make Litigation Cheaper
5 Ways To Make Litigation Cheaper5 Ways To Make Litigation Cheaper
5 Ways To Make Litigation Cheaper
 
Ditching Defect Drama: Keeping Construction Claims Objective
Ditching Defect Drama: Keeping Construction Claims ObjectiveDitching Defect Drama: Keeping Construction Claims Objective
Ditching Defect Drama: Keeping Construction Claims Objective
 
Project dispute avoidance and mitigation through conciliation and arbitration
Project dispute avoidance and mitigation through conciliation and arbitrationProject dispute avoidance and mitigation through conciliation and arbitration
Project dispute avoidance and mitigation through conciliation and arbitration
 
NEWBIE LITIGATOR SCHOOL- PART II 2022 - ADR & Settlement
NEWBIE LITIGATOR SCHOOL- PART II 2022 - ADR & Settlement NEWBIE LITIGATOR SCHOOL- PART II 2022 - ADR & Settlement
NEWBIE LITIGATOR SCHOOL- PART II 2022 - ADR & Settlement
 

More from gayathrysatheesan1 (20)

Tourist places in ooti
Tourist places in ootiTourist places in ooti
Tourist places in ooti
 
Railways for urban transportation
Railways for urban transportationRailways for urban transportation
Railways for urban transportation
 
BENEFITS OF PLANING
BENEFITS OF PLANINGBENEFITS OF PLANING
BENEFITS OF PLANING
 
National capital region
National capital regionNational capital region
National capital region
 
CONCENTRIC ZONE MODEL THEORY
CONCENTRIC ZONE MODEL THEORYCONCENTRIC ZONE MODEL THEORY
CONCENTRIC ZONE MODEL THEORY
 
Tourist places in banglore
Tourist places in bangloreTourist places in banglore
Tourist places in banglore
 
Transit oriented development
Transit oriented developmentTransit oriented development
Transit oriented development
 
Kochi city as an organism
Kochi city as an organismKochi city as an organism
Kochi city as an organism
 
Garden city
Garden cityGarden city
Garden city
 
SUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPTSUB DIVISION PRACTICE AND METRO REGION CONCEPT
SUB DIVISION PRACTICE AND METRO REGION CONCEPT
 
Town development plan
Town development planTown development plan
Town development plan
 
Space standards for facility areas and utilites
Space standards for facility areas and utilitesSpace standards for facility areas and utilites
Space standards for facility areas and utilites
 
Precincts
PrecinctsPrecincts
Precincts
 
Multiple nuclei theory
Multiple nuclei theoryMultiple nuclei theory
Multiple nuclei theory
 
Classification of cost
Classification of costClassification of cost
Classification of cost
 
Roof and roof coverings
Roof and roof coveringsRoof and roof coverings
Roof and roof coverings
 
Zoning
ZoningZoning
Zoning
 
Scaffolding and formwork ppt
Scaffolding and  formwork pptScaffolding and  formwork ppt
Scaffolding and formwork ppt
 
Regional problems and their solutions ppt
Regional problems and their solutions pptRegional problems and their solutions ppt
Regional problems and their solutions ppt
 
Presentation skills ppt
Presentation skills pptPresentation skills ppt
Presentation skills ppt
 

Recently uploaded

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).pptssuser5c9d4b1
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZTE
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 

Recently uploaded (20)

247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
247267395-1-Symmetric-and-distributed-shared-memory-architectures-ppt (1).ppt
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
ZXCTN 5804 / ZTE PTN / ZTE POTN / ZTE 5804 PTN / ZTE POTN 5804 ( 100/200 GE Z...
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 

Construction disputes

  • 2. Construction Disputes • Construction disputes arise from environmental and behavioral factors. • There are many different causes of disputes in the construction industry. • Disputes waste money, therefore drain profits and destroy the relationship and it takes energy away from projects.
  • 3. • Construction delays, variations, efficiency issues and exceeding cost can be some causes for the dispute to arise in the project. • Typically construction disputes occur between the owner and the main contractor, subcontractors, sub-subcontractors and design professionals. • The main source of this problem is the lack of precision in the contract description between involving parties. • The construction industry has tried a different way to avoid the disputes.
  • 4. • Currently, construction industry uses Building Information Modeling (BIM) or 3D modeling and it has significantly minimized these kinds of disputes. • The reasons for construction disputes are being a part of construction life fall into four categories. • Contract • Finance • Culture • External Factors
  • 5. Definition of Dispute • Dispute is a misunderstanding between two parties, either contractual or non- contractual. • Dispute is unable to eliminate because the nature of the construction is full risk.(Thomas 1995) • Definition of the dispute may be circumscribed it may inevitably involve resolution of other matters which may not specifically have been raised into separate or discrete disputes.
  • 6. • The judicial development of the definition of dispute required to give an adjudicator threshold jurisdiction has been instrumental in encouraging the Parties to exchange views and facts which support their case, but it can be a rather blunt instrument for reducing dispute and far short of a pre- adjudication protocol • A dispute will not exist until a claim is asserted by one party which is disputed by the other party.
  • 7. Factors Affecting Construction Disputes 1. Terms of the Contract 2. Technological Issues 3. Project Conditions 4. Parties Involved 5. Magnitude 6. Site Conditions 7. Degree of Bias 8. Third Party 9. Organizational Behavior 10. Culture
  • 8. common causes of disputes • Failure to properly administer the contract • Poorly drafted or incomplete/unsubstantiated claims • Employer/Contractor/Subcontractor failing to understand and/or comply with its contractual obligation • Errors and/or omissions in the contract document • Incomplete design information or employer requirements.
  • 9. Causes of Construction Dispute by Clients • Deficient management supervision • Lowest price mentality in engagement of contractor • Poor communication • Discrepancies in contract documents • Failure to appoint project manager • Failure to respond in time
  • 10. Causes of Construction Disputes by Contractors • Delay suspension of work • Lack of understanding and agreement in contract procurement • Inadequate CPM scheduling and update requirement • Failure to plan and execute the changes of works • Reluctance to seek clarification • Failure to understand and correctly bid or price the works
  • 11. Causes of Construction Dispute by the Consultants • Failure to understand its responsibilities under the design team contract • Over design and understanding, the costs involved • Incompleteness of drawing and specification • Design and specification oversight and errors or omission from specialists • Variations due to design errors • To request for information late information delivery and cumbersome approach
  • 12. Adjudication • It is a process in which a neutral third party will give a decision on a dispute. • Construction and Regeneration Act 1996 states that parties to a construction contract may refer their disputes to an adjudicator. • Adjudication has become known as a ‘pay first, argue later’ way for parties to resolve their disputes. • A successful party to adjudication can apply to the Technology and Construction Court to enforce an adjudicator’s decision.
  • 13. • The decision of the adjudicator will be binding, unless or until it is revised in arbitration or litigation. • Benefits of Adjudication • The adjudicator is a neutral person who is not involved in the day to day running of the construction contract. • Adjudication is a quick process, which is designed to ensure that cash flow is maintained during the construction process. • Although it is still possible to go to the Court, in most cases the decision of the adjudicator decides the dispute.
  • 14. • Adjudication is less expensive than court proceedings. • Disadvantages of adjudication • The dispute needs to have been aired between the parties before adjudication can be commenced. • The adjudicator’s powers are limited. • Court proceedings are still required to enforce the adjudicator’s decision if the “losing” party does not pay.
  • 15. Expert Determination • It is often used to resolve issues or disputes of a specialist nature, such as construction, and is one of the most informal systems of dispute resolution. • It is often used when there is a valuation dispute. • If an expert is to be used to determine the dispute, the parties will agree this by contract and will agree that the expert determination will be binding.
  • 16. Benefits of Expert Determination • It is an economic way of finally resolving valuation disputes. • It is less expensive and a quicker and a less formal method of dispute resolution.
  • 17. Disadvantages of Expert Determination • The use of experts is much less tied to legal processes and therefore it is more difficult to challenge the decision of an expert. • An expert’s report cannot generally be enforced without further court or arbitration proceedings.
  • 18. Litigation • Whilst there are many methods of ADR, court proceedings are still one of the most common forms of resolving disputes within the construction industry. • The Technology and Construction Court (TCC) is a specialist court which deals with technology and construction disputes and is governed not only by the Civil Procedure Rules but also by the Technology and Construction Court Guide. • A specialist TCC judge will deal with cases in the TCC.
  • 19. Advantages of Litigation • The claim process will be managed by a judge throughout. • Complex issues can be dealt with. • The parties will obtain a binding and enforceable decision.
  • 20. Disadvantages of Litigation • Only claims which are over the value of £250,000 can be dealt with at the TCC. • Any claims below this sum will be dealt with at the County Court. • It is often a slow process and it is most expensive . • The proceedings will be in public and are therefore not confidential, except in certain very limited circumstances. • Mediation
  • 21. Mediation • Mediation is commonly used within the construction industry to resolve disputes. • The Technology and Construction Court Guide provides guidance on the conduct of litigation within the construction industry and states that the court should encourage parties to use alternative dispute resolution (ADR), which in most cases, will be mediation.
  • 22. • The Pre-Action Protocol for Construction and Engineering Disputes requires parties in dispute to meet, at least once before litigation commences, to discuss whether some form of ADR, such as mediation, would be a more appropriate means to resolve the dispute.
  • 23. Benefits of Mediation • The mediator will be an independent person, who will not make a decision, judge or advise, but will facilitate discussions between the parties, with the aim of resolving the dispute. • Mediators are generally highly experienced in the area of the dispute, and may even by TCC judges. • It can help maintain a business relationship. • It is relatively quick, with mediations usually lasting 1-2 days.
  • 24. • It is usually considerably less costly than litigation. • Everything that happens in a mediation is confidential. • A mediator will encourage the parties to find a solution to the dispute which will suit both the parties’ needs.
  • 25. Disadvantages of Mediation • In some cases there may be a concern that, during mediation, parties may disclose an important aspect of their argument or commercial position, which (despite the confidential nature of mediation) could benefit the other party if the matter went to trial. • If the parties do not come to an agreement, the dispute will remain unresolved and the cost of mediation will have been wasted.
  • 26. Arbitration • It is another alternative to litigation and is a process in which the parties will agree to refer the dispute to a third party, the arbitrator. • Disputes are resolved on the basis of material facts, documents and relevant principles of law. • Arbitration is often used in the context of international construction disputes, but can equally be used for pure domestic disputes.
  • 27. Benefits of Arbitration • Like mediation, arbitration is a confidential process. • Parties can agree on an arbitrator who has relevant experience in the matter. • Compared to court proceedings, it is a relatively quick process. • It is highly flexible compared to court proceedings.
  • 28. Disadvantages of Arbitration • It is the parties’ responsibility to bear the costs of both the arbitrator and the venue where the arbitration is to take place. • There are limited powers of compulsion or sanction available to the arbitrator if one party fails to comply with the directions set by the arbitrator. • There are limited appeal rights available during arbitration and Costs can be similar to litigation at court.