Student Declaration on Submission
I confirm that all the work in this coursework is my own.
Student Signature.
Date.
03-03-17
General Feedback by Tutor
Fair work, tasks 1 & 2 are fine, update tasks 3 & 4 You can
optionally correct the merit tasks 5-7. See feedback comments
attached
Please return within 10 working days and remember to attach
your corrections to the bottom of this document, and don’t
change any of the original work
11/3/17
Sampled by IV: Sign
Date:
03-03-2017
Assessment grading instructions:
Tasks 1 to 4 are required for PASS (P) grade and must be
attempted
Tasks 5 to 7 are required for MERIT (M) grade
Tasks 8 is required for DISTINCTION (D) grade.
Work for Merit/Dist grades should also be supported by fully
referenced evidence
Tasks for Assessment 2 (2 of 2)
All answers must be your own worK
Note: Copy and paste these cover and task sheets to the front of
your written work as you must sign (electronic signature) and
date these in order to have your assessment marked and graded
Task 1 [P1]
The Maintenance Manager has asked you to review the planned
maintenance (PM) procedure for 2 pieces of equipment in the
factory. The 1st piece of equipment is a 50m conveyor used to
transport product in a cleanroom between process steps. The
conveyor also contains a number of elevators protected by
guarding. The 2nd piece of equipment is a mixing tank agitator
driven by an induction motor controlled by an inverter. The tank
is made of stainless steel and contains acidic chemicals when in
use.
As part of the review you will need, for each apparatus, to
explain and identify the hazards that exist when a planned
maintenance (PM) is being carried out. These are risks posed to
anyone in the area, not just the Technicians carrying out the
PM. In particular focus on electrical hazards
Task 2 [P2]
From the information in task 1 you must also specifically list
the control measures required to eliminate or manage the risks
to the Maintenance Technicians and others. In particular give a
detailed range of control measures to prevent/reduce the risk of
electric hazards
Task 3 [P3]
A quality and safety audit is to be carried out on all the
maintenance procedures in the factory. The Maintenance
manager has asked you with reference to at least 4 pieces of
safety legislation, regulations or standards,and how these might
apply to the PM activities described in task 1
Task 4
[P9]
From the audit you have been asked to draw a start/stop/retain
relay control circuit that could be used for the safe and
emergency operation of a 3-phase drilling machine and lathe in
the workshop that must include 2 emergency stop positions.Also
explain how the circuit would operate and what types of
commercial relays/contactors could you select.
Task 5
[M1]
The production manager also wants your help in deciding the
best type of motor system for controlling the speed of a new
automatic conveyor line. He has asked you to explain with the
aid of diagrams and research evidence, the operational features
system for an AC drive system with variable speed control.
Task 6
[M2]
As an alternative to the AC system in task 5, you have also been
asked to produce a circuit design that can control the speed and
direction of the conveyor using a DC motor drive system. With
reference to circuit layout drawings and research sources,
explain how it operates.
Task 7 [M3]
A new robot cell has been installed to operate along with the
conveyor system above. You have been asked to:
a) Describe with the aid of diagrams, the operation of a safety
relay system used on a robot cell. (400 words)
b) Explain how this system addresses the hazards and control
measures by also referencing relevant legislation, regulations or
standards. (400 words)
Task 8 [D2]
To ensure that the conveyor system is safe and complies with
legislation, compare the construction and operation of two
different types of stop/start/retain relay control circuits for
suitable for either the AC or DC system in task 5 or 6.
For example you may compare an electro-magnetic relay system
with an electronic logic system. Include appropriate drawings,
parts, truth tables and their advantages/disadvantages in your
explanation.
Task 1 [P1]
The Maintenance Manager has asked you to review the planned
maintenance (PM) procedure for 2 pieces of equipment in the
factory. The 1st piece of equipment is a 50m conveyor used to
transport product in a cleanroom between process steps. The
conveyor also contains a number of elevators protected by
guarding. The 2nd piece of equipment is a mixing tank agitator
driven by an induction motor controlled by an inverter. The tank
is made of stainless steel and contains acidic chemicals when in
use.
As part of the review you will need, for each apparatus, to
explain and identify the hazards that exist when a planned
maintenance (PM) is being carried out. These are risks posed to
anyone in the area, not just the Technicians carrying out the
PM. In particular focus on electrical hazards
Conveyor Comment by Geoff Tweed: 1 format could be better,
but ok
a) The common hazard is doing maintenance to a conveyor
connected to power, air or hydraulic that has not been locked
out, such as cut off valves not being closed, circuit breakers not
being pulled/gagged and power not being isolated or given time
to dissipate. As a result during working, a technician may
accidentally close the guards or activate a sensor. The program
running this conveyor may then start the conveyor. As a result
of this, it could cause injuries to not only the maintenance crew
but to people around the machinery.. If parts of the machinery
have been taken off for maintenance an electrical hazard could
potentially occur if cable looms or wiring becomes caught up in
the workings of the conveyer leading to not only injuries to
personnel but expensive and time consuming damage to the
equipment.
b) Maintenance operations without all covers and guards open.
This is a dangerous and poor maintenance practice because the
guards and covers are there to protect the technician and
personnel. If for example the conveyer is controlled by IR
sensor sytem the technician could inadvertently block the beam
which could then lead to the conveyer program commencing
resulting in injury.
c) Loading a stopped conveyor. This is to eliminate overheating
during starting. Overheating may lead to break down of
insulation of the machinery wiring. This will cause a short
circuit of power which may lead to a fire or electrical hazard.
d) Explosive Hazards. On a conveyer system this can occur this
can occur due to poor ventilation which does not remove or
filter the duct particles of the product being transported.
Respiratory damage will also effect those working in an
environment with poor ventilation.
e) Poorly laid out or insufficient emergency stops or cut off
switches.
f) Nip points. which can easily draw in clothing, tools, loose
hair, fingers or limbs, depending on the size, speed and power
of the conveyor.
g) Static electricity damage to components- Many caused by
mishandling and poorly stored equipment.
h) Faulty electrical equipment/ excessive extension leads.
Tank agitator
i) Never interchange the signals at the inverter. This is because
the inverter may respond differently and drive the agitator in
undesired way. This may cause even spillage of its acidic
contents that may cause harm to personnel around.
j) Never alter the terminals of the motor. This will make it run
in an opposite direction, if done without informing operators
spillage of dangerous load.
k) Never allow motor terminals to come into contact with the
acidic substance or water. As the two can conduct electricity.
This may result to a short circuit resulting in a fire hazard.
Task 2 [P2]
From the information in task 1 you must also specifically list
the control measures required to eliminate or manage the risks
to the Maintenance Technicians and others. In particular give a
detailed range of control measures to prevent/reduce the risk of
electric hazards
· Most importantly value of education, training, safe systems of
work, power lock-offs and effective supervision should not be
underestimated. Comment by Geoff Tweed: 2 ok, but should
have better linked to hazards in T1
· Positioning and selection of types of guards-It is highly likely
that fixed guards (ie those requiring the use of tools for their
removal) or movable guards will be chosen, depending upon the
frequency with which access is required. For long conveyors, it
is often not practical to interlock every movable guard due to
the large numbers involved. In such situations, isolation
procedures, safe working practices and rope-operated
emergency stop controls have an important role to play.
· Maintenance pionts installed-such as fitting remote grease
points so that the conveyor can be lubricated without having to
remove guards, and belt alignment mechanisms that can be
operated from outside the guards. Guarding should also be
designed, so far as possible, such that routine cleaning and
clearing of spillages can take place without disturbing the
guarding - such as by incorporating rodding access points.
· Appropriate signs/ warning notices- during PM operations
appropriate signs should be displayed informing personnel not
to apply power or enter the work area.
· Adequate air filtration/ ventilation- This will prevent build up
of potentially explosive duct i.e coal particles.
· Physical circuit breaker and power switch gags on a shadow
board- this will prevent the system being left live and accidental
application of power. By using the shadow board to keep them
on it is an easy visual indication if they have not all been put in
place.
· Strict tool control system- again a shadow board system will
ensure that all tools are accounted for after maintenance has
been carried out. This will prevent tools being left in the
machinery potentially causing a short circuit.
· Tagging in system for personnel- During maintenance
technicians are to tag into the work area and tag out on
completion. Power is not to be applied nor is the machinery to
be in any other way operated whist personnel are tagged in.
This prevents potential hazards to technicians in the area.
· Dual control powering system- For example two buttons far
enough apart having to be pressed within 5 seconds of each
other for power to be applied. This removes the danger of
accidentally applying power and provides a second person to
ensure it is safe to apply power.
· Ant static wrist bands, rubber mats and correct storage for
components- This will reduce the risk of static electrical
damage.
· Pat testing for all electrical items- This will reduce the risk of
faulty electrical items entering or being used in the work area.
Task 3 [P3]
A quality and safety audit is to be carried out on all the
maintenance procedures in the factory. The Maintenance
manager has asked you with reference to at least 4 pieces of
safety legislation, regulations or standards,and how these might
apply to the PM activities described in task 1
It is important to ensure that a conveyor complies with the
relevant standard and code of practice but the question of CE
marking is a more difficult area. While there are some situations
where a conveyor will be supplied as a standalone machine -
and will therefore need to be CE marked - there are others
where the conveyor needs a certificate of Conformity so that it
can be incorporated within a larger machine that is then CE
marked as a whole. If in doubt, seek advice from suppliers,
consultants, or contact the HSE. Comment by Geoff Tweed:
3 need to see 4 pieces of legislation clearly linked to 4
hazards/control measures for the conveyor/tank - update
The goal is to ensure that the machinery is safe, so users should
undertake a risk assessment and install the necessary safeguards
to reduce the risks to an acceptable level.
Risk assessments should be carried out by qualified staff this
will usually be the health and safety executive.
In line with general good practice, the objective should be to
design-out hazards, rather than safeguarding them but, in
reality, this is unlikely to be feasible where conveyors are
already operating or have been purchased as off-the-shelf or
configured-to-order units.
Since 1998, users of conveyors have been legally obliged to
perform a PUWER assessment - which often reveals that
existing safeguards are inadequate and that additional measures
are needed. In addition, companies purchasing off-the-shelf,
configured-to-order or custom-built conveyors frequently have
to design and fit extra guarding. Elsewhere, companies are in a
slightly better position if they build new conveyors in-house
and are able to take safeguarding into account at the design
early stage.
The PUWER 98 Regulations (Provision and User of Work
Equipment Regulations, 1998) have already been mentioned, but
there are several other regulations, standards and codes of
practice that need to be considered. Three such examples are BS
EN 620: 2002, 'Continuous handling equipment and systems -
Safety and EMC requirements for fixed belt conveyors for bulk
materials', BS 4531: 1986, ' Specification for portable and
mobile troughed belt conveyors', and BS 7300: 1990, ' Code of
practice for safeguarding of the hazard points on troughed belt
conveyors.
Task 4
[P9]
From the audit you have been asked to draw a start/stop/retain
relay control circuit that could be used for the safe and
emergency operation of a 3-phase drilling machine and lathe in
the workshop that must include 2 emergency stop positions.Also
explain how the circuit would operate and what types of
commercial relays/contactors could you select.
Safety is a major concern in a good many motor-driven
applications. This is true in industrial applications where
motion starts when power is applied and especially true when
power is restored after an outage. In such cases, unwanted or
unexpected motion is a risk to life or limb. The most simple
solution to this problem is the simple, time-proven Run /Stop
Relay Circuit. Comment by Geoff Tweed: 4 good start, but
commercial relay system for the 3-ph machines is missing - add
With this control circuit, motion cannot commence (or restart)
without the operator’s specific pushbutton command.
The control circuit draws 9V from the dc supply. It is first
passed through fuse then first emergency switch. Then a stop
switch is placed in series with the first emergency switch. Then
there is the second emergency switch., activating either will
open the circuit and de-energise the relay . Then there is a start
push button. Its single action powers the coil of the relay.
Therefore, the contact will shift down. Its output is looped back
to provide a holding mechanism. Then the output is fed to the
bulb but which in this case represents three phase relay or
contactor coil. A Dc relay or electromagnetic relay would be
suitable for this application.
Task 5
[M1]
The production manager also wants your help in deciding the
best type of motor system for controlling the speed of a new
automatic conveyor line. He has asked you to explain with the
aid of diagrams and research evidence, the operational features
system for an AC drive system with variable speed control.
A three phase induction motor is best suited for this operation.
This is because it is self-starting and it uses frequency of the
supply to determine its speed. There should be in inverter
circuit. Power inversion should be controlled by controlling the
gate triggering so that frequency can be controlled.
The circuit above shows a single phase inverter. The
potentiometer used to vary frequency of the output waveform by
adjusting how the capacitor charges and discharges. This circuit
can be cascaded to generate a three phase inverter. Comment by
Geoff Tweed: 4a Not sure this is right as it appears to an
amplifier, and there is no ac input
In a drive above. First the supply voltages are converted to dc
voltages. Through the dc link, the inverter circuit receives dc
power. With the help of a stored program, it is inverted into a
desired variable frequency to be used by the motor Comment by
Geoff Tweed: Incomplete explanation of VSD and needs
supporting references
Task 6
[M2]
As an alternative to the AC system in task 5, you have also been
asked to produce a circuit design that can control the speed and
direction of the conveyor using a DC motor drive system. With
reference to circuit layout drawings and research sources,
explain how it operates.
This circuit will contain an emergency switch, start latching
button, potentiometer, double pole double throw switch and a
motor. They will be arranged as shown below. Comment by
Geoff Tweed: 6 Ok for very small motors, but I would like to
see a system using transistors and thyristors for direction and
speed control with supporting references
Power from the battery is passed through and emergency switch.
It is then connected in series with the start button. An action of
this two will either turn the motor on or off. A potentiometer is
connected in series. This will be used to vary the speed of the
dc motor by varying the supply voltage. Then a double pole
double throw switch is connected in series to the circuit and
lastly, the motor. DPDT is used to change the direction of motor
rotation. And it is connected as above. When its selection
switch is in a certain position, it rotates as show by an arrow
above. When the position is changed, it will rotate as shown
below.
Task 7 [M3]
A new robot cell has been installed to operate along with the
conveyor system above. You have been asked to:
a) Describe with the aid of diagrams, the operation of a safety
relay system used on a robot cell. (400 words)
A safety relay has an electromagnetic coil. The coil is only
energized when powered. Once powered, it will act like a
normal magnet and attract anything metallic near it. Hence, it
will attract the contacts of the relay to close the circuit. When
any guards or emergency or stop button is pressed, its supply
power is cut, this will de-energize the electromagnetic coil.
Hence, it loses its magnetic effect, releasing the contacts. This
results to instant opening of the contacts of the relay
Comment by Geoff Tweed: 7a this does not answer the task
about a robot cell safety relay, please research and update
Comment by Geoff Tweed:
The circuit above show for an open control switch. This control
switch can be a stop switch, emergency switch and even a
sensor. When sensors are used for this purpose. They are
usually photo sensors. This sensors are placed around the
conveyor system entry point. They are manipulated to represent
a normally closed contacts. In this case, if a maintainer or other
personnel was to pass between the transmitter and the receiver
or the reflector plates, light is blocked and the beam is broken.
This will make the cause an open circuit and isolate flow of the
electrical power through the circuit. Since the relay will not
receive power, it will isolate the conveyor system from the
mains power and therefore stopping it. The emergency switches,
stop switches and other safety switches are also normally closed
and do function the same as explained above. This is shown by
the relay in the circuit above
When the control switches are closed, the relay shifts position
as shown above to close/complete the circuit.
During the construction of this, it is good to use a holding
circuit. This will enable restarting the conveyor belt once it has
been interrupted when in operation and reduce risk of accident.
If left the conveyor restarts itself once the emergency switch or
stop push button is released or when the safety guard or doors
are closed. But once a holding circuit is incorporated, it will
require an operator to safely restart it once it is safe and the
problem have been cleared. Hence, this is used to minimize any
accident associated with the conveyors. To incorporate a
holding circuit, the above circuit will be modified so as to
appear as the one shown in the diagram below.
When the start push button is pressed, the relay will be
powered. This will make the coil in the relay an electromagnet
and pull the contacts in a way that the contacts will become
closed. This will appear as shown in the diagram below.
When the stop push button is pressed, the coil of the relay will
be de-energized and release the contacts. Its diagram will
appear as the previous diagram.
b) Explain how this system addresses the hazards and control
measures by also referencing relevant legislation, regulations or
standards. (400 words)
According to Electrical control gear, this methods is used to
interface all safety signals to a control panel of a system. It can
be noticed that any action of any safety switch for example
emergency switch or gourd door switch will affect the supply
power to the coil. This will in turn isolate the machine from
power and make the machine safe for any intended operation.
This will make entry of restricted machine environment safety
and doing maintenance safe. This is achieved by either using a
PLC program or putting physically this safety switches in series
to one another so as to interrupt the flow of an electrical signal
in the control circuit. This power interrupt is then used to
isolate the conveyor power supply from the motor that runs the
conveyors. Relays and holding circuit become handy when
working in this circuits. Relays are used to interface the control
signal with the high voltage supply that powers the conveyors.
This is just done by just powering its coil in a controlled
manner so as to effect the closing of the contacts or opening of
the contacts. The holding circuit is incorporated in order to
eliminate the automatic switching on of the conveyor once the
problem that caused the breakdown has been cleared. This will
require an operator to manually restart it when he or she has
analysed that the situation is safe to restart it. Comment by
Geoff Tweed: Needs 4 pieces of legislation that relates to robot
cells - update Comment by Geoff Tweed: Ref?
Positioning of the safety control gears is an important
concideration. The safety switches and all other control
switches are placed in a very accessible manner and in a way
they can be easily be noticed by anyone. This ranges from the
way they are manufactured to the way that they have been
installed. . For example, colouring red colour to emergency
switch and stop switches while the start push button is coloured
green as a standard.
. In terms of positioning, they should be positioned at the
entrances to the confiscated areas of the machines. This is used
to ensure that the machine is isolated from the power supply in
any manner of entry in this confiscated area of the machine
either by switching it off or by opening the safety door of the
machine.
Again in this case it is relevent to quote legislation from puwer.
The regulations require that machinery provided for use at work
is:
Suitable for its intended use
Safe for use – including keeping it maintained in a safe
condition with regular inspections to ensure it is installed
correctly and that its level of safety doesn’t subsequently
decline
Used only by people who have received adequate training,
instruction and information
Accompanied by suitable health and safety measures, such as
protective controls and devices
Used in accordance with specific requirements – mobile work
equipment and power presses.
Regulation 18 deals with taking realistic and practical
allowances into account when choosing or specifying control
systems, and not increasing risk when the control system is
operating, either directly or indirectly, by impeding the
operation of other safety measures; not increasing risk if a
control system fails or loses its power supply.
This regulation states that every employer shall ensure, so far as
is reasonably practicable, that all control systems of work
equipment are safe, and are chosen making due allowance for
the failures, faults and constraints to be expected in the planned
circumstances of use.
Failure of any part of the control system or its power supply
should lead to a ‘fail-safe’ condition. Fail-safe can be more
correctly and realistically called ‘minimised failure to danger’
where the minimisation can actually be quantified as a
“probability of dangerous failure per hour”, or PFH. This should
not impede the operation of the ‘stop’ or ‘emergency stop’
controls. The greater the risk, the more resistant the control
system should be to the effects of failure. Bringing a machine to
a safe halt may achieve the objective. Halting a chemical
process, however, could create further hazards. Care should be
taken to fully assess the consequences of such events and
provide further protection, for example standby power plant or
diverting chemicals to a place of safety. It should always be
possible to recover to a safe condition.
[D2]
References
Www.wikipedia.org
Electronics for dummies-Dickon Ross BTEC Level 3
National Engineering Student Book- Ernie Cooke
http://www.hse.gov.uk/work-equipment-
machinery/puwer.htm
Revision 2 U18A2

More Related Content

Similar to Student Declaration on Submission I confirm that all the work in.docx

Control room ( Advance Services )
Control room ( Advance Services ) Control room ( Advance Services )
Control room ( Advance Services ) Divyanshu Prakash
 
Electrical maintenance-1
Electrical maintenance-1Electrical maintenance-1
Electrical maintenance-1Vijay Raskar
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training ReportParas Pratap
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training ReportParas Pratap
 
Adil Field Instrument without apprentice Cv
Adil Field Instrument  without apprentice CvAdil Field Instrument  without apprentice Cv
Adil Field Instrument without apprentice CvMuhammad Adil
 
Joe_Winston_-_Occupational_Records.PDF
Joe_Winston_-_Occupational_Records.PDFJoe_Winston_-_Occupational_Records.PDF
Joe_Winston_-_Occupational_Records.PDFJoe Winston Phillip
 
MarkBarbour CV November 2015
MarkBarbour CV November 2015MarkBarbour CV November 2015
MarkBarbour CV November 2015Mark Barbour
 
loto.ppt
loto.pptloto.ppt
loto.pptmurrtex
 
Transformer asset management
Transformer asset managementTransformer asset management
Transformer asset managementMuthar Hussain
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docAtif767782
 
A Guide on Handling, storage and Preservation Do's and Don'ts in Force Measur...
A Guide on Handling, storage and Preservation Do's and Don'ts in Force Measur...A Guide on Handling, storage and Preservation Do's and Don'ts in Force Measur...
A Guide on Handling, storage and Preservation Do's and Don'ts in Force Measur...Tacuna Systems
 
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...IRJET Journal
 
IRJET- Smart Production Line Industry 4.0 - Leak Testing for Fuel Tank
IRJET-  	  Smart Production Line Industry 4.0 - Leak Testing for Fuel TankIRJET-  	  Smart Production Line Industry 4.0 - Leak Testing for Fuel Tank
IRJET- Smart Production Line Industry 4.0 - Leak Testing for Fuel TankIRJET Journal
 

Similar to Student Declaration on Submission I confirm that all the work in.docx (20)

076 circuit breaker install 1.0
076 circuit breaker install 1.0076 circuit breaker install 1.0
076 circuit breaker install 1.0
 
Control room ( Advance Services )
Control room ( Advance Services ) Control room ( Advance Services )
Control room ( Advance Services )
 
Electrical maintenance-1
Electrical maintenance-1Electrical maintenance-1
Electrical maintenance-1
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training Report
 
C&S Electric Summer Training Report
C&S Electric Summer Training ReportC&S Electric Summer Training Report
C&S Electric Summer Training Report
 
Mid Year Review
Mid Year ReviewMid Year Review
Mid Year Review
 
Adil Field Instrument without apprentice Cv
Adil Field Instrument  without apprentice CvAdil Field Instrument  without apprentice Cv
Adil Field Instrument without apprentice Cv
 
Joe_Winston_-_Occupational_Records.PDF
Joe_Winston_-_Occupational_Records.PDFJoe_Winston_-_Occupational_Records.PDF
Joe_Winston_-_Occupational_Records.PDF
 
Oil & Gas Maintenance Guide
Oil & Gas Maintenance GuideOil & Gas Maintenance Guide
Oil & Gas Maintenance Guide
 
MarkBarbour CV November 2015
MarkBarbour CV November 2015MarkBarbour CV November 2015
MarkBarbour CV November 2015
 
loto.ppt
loto.pptloto.ppt
loto.ppt
 
Transformer asset management
Transformer asset managementTransformer asset management
Transformer asset management
 
Job Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..docJob Safety Analyses For Energization of Substation..doc
Job Safety Analyses For Energization of Substation..doc
 
CV Nagashiva
CV Nagashiva CV Nagashiva
CV Nagashiva
 
A Guide on Handling, storage and Preservation Do's and Don'ts in Force Measur...
A Guide on Handling, storage and Preservation Do's and Don'ts in Force Measur...A Guide on Handling, storage and Preservation Do's and Don'ts in Force Measur...
A Guide on Handling, storage and Preservation Do's and Don'ts in Force Measur...
 
CV Electrical Technician
CV Electrical TechnicianCV Electrical Technician
CV Electrical Technician
 
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
A Review Comprehension: Guideline for Testing of HV, EHV and UHV Substation E...
 
CV Dewaharbabu
CV DewaharbabuCV Dewaharbabu
CV Dewaharbabu
 
4330903.pdf
4330903.pdf4330903.pdf
4330903.pdf
 
IRJET- Smart Production Line Industry 4.0 - Leak Testing for Fuel Tank
IRJET-  	  Smart Production Line Industry 4.0 - Leak Testing for Fuel TankIRJET-  	  Smart Production Line Industry 4.0 - Leak Testing for Fuel Tank
IRJET- Smart Production Line Industry 4.0 - Leak Testing for Fuel Tank
 

More from florriezhamphrey3065

IDEA requires IEP teams to notify parents of their rights and proced.docx
IDEA requires IEP teams to notify parents of their rights and proced.docxIDEA requires IEP teams to notify parents of their rights and proced.docx
IDEA requires IEP teams to notify parents of their rights and proced.docxflorriezhamphrey3065
 
ID Task ModeTask Name Duration Start Finish Predecesso.docx
ID Task ModeTask Name Duration Start Finish Predecesso.docxID Task ModeTask Name Duration Start Finish Predecesso.docx
ID Task ModeTask Name Duration Start Finish Predecesso.docxflorriezhamphrey3065
 
Id like for us to use our sociological imagination. C. Wright M.docx
Id like for us to use our sociological imagination. C. Wright M.docxId like for us to use our sociological imagination. C. Wright M.docx
Id like for us to use our sociological imagination. C. Wright M.docxflorriezhamphrey3065
 
IAHTopic  Whose work goes into space science How do different .docx
IAHTopic  Whose work goes into space science How do different .docxIAHTopic  Whose work goes into space science How do different .docx
IAHTopic  Whose work goes into space science How do different .docxflorriezhamphrey3065
 
I211 – Information Infrastructure IILecture 20TodayCGI.docx
I211 – Information Infrastructure IILecture 20TodayCGI.docxI211 – Information Infrastructure IILecture 20TodayCGI.docx
I211 – Information Infrastructure IILecture 20TodayCGI.docxflorriezhamphrey3065
 
I.Mulcahy’s qualifications1. As a Xerox board member, do yo.docx
I.Mulcahy’s qualifications1. As a Xerox board member, do yo.docxI.Mulcahy’s qualifications1. As a Xerox board member, do yo.docx
I.Mulcahy’s qualifications1. As a Xerox board member, do yo.docxflorriezhamphrey3065
 
I. Many of you may believe that you have never worked in project  ma.docx
I. Many of you may believe that you have never worked in project  ma.docxI. Many of you may believe that you have never worked in project  ma.docx
I. Many of you may believe that you have never worked in project  ma.docxflorriezhamphrey3065
 
i1) The culture you have selected and some general information a.docx
i1) The culture you have selected and some general information a.docxi1) The culture you have selected and some general information a.docx
i1) The culture you have selected and some general information a.docxflorriezhamphrey3065
 
I. Use Venn diagrams to test the validity of the following arguments.docx
I. Use Venn diagrams to test the validity of the following arguments.docxI. Use Venn diagrams to test the validity of the following arguments.docx
I. Use Venn diagrams to test the validity of the following arguments.docxflorriezhamphrey3065
 
I.Context and Situation AnalysisLiberia is a country div.docx
I.Context and Situation AnalysisLiberia is a country div.docxI.Context and Situation AnalysisLiberia is a country div.docx
I.Context and Situation AnalysisLiberia is a country div.docxflorriezhamphrey3065
 
I. Defining Facta. Value free” packets of information; Ex 5’10.docx
I. Defining Facta. Value free” packets of information; Ex 5’10.docxI. Defining Facta. Value free” packets of information; Ex 5’10.docx
I. Defining Facta. Value free” packets of information; Ex 5’10.docxflorriezhamphrey3065
 
I  only need 100 words minimum response for the following several pa.docx
I  only need 100 words minimum response for the following several pa.docxI  only need 100 words minimum response for the following several pa.docx
I  only need 100 words minimum response for the following several pa.docxflorriezhamphrey3065
 
I. PurposeThe purpose of this experiential learning activity.docx
I. PurposeThe purpose of this experiential learning activity.docxI. PurposeThe purpose of this experiential learning activity.docx
I. PurposeThe purpose of this experiential learning activity.docxflorriezhamphrey3065
 
I would sooner believe that two Yankee professors lied, than th.docx
I would sooner believe that two Yankee professors lied, than th.docxI would sooner believe that two Yankee professors lied, than th.docx
I would sooner believe that two Yankee professors lied, than th.docxflorriezhamphrey3065
 
I wrote my paper and my feed back was- This is supposed to be a prof.docx
I wrote my paper and my feed back was- This is supposed to be a prof.docxI wrote my paper and my feed back was- This is supposed to be a prof.docx
I wrote my paper and my feed back was- This is supposed to be a prof.docxflorriezhamphrey3065
 
I would like to discuss my experience developing and implementing .docx
I would like to discuss my experience developing and implementing .docxI would like to discuss my experience developing and implementing .docx
I would like to discuss my experience developing and implementing .docxflorriezhamphrey3065
 
I would do it myself, but I have been taking care of my sick child. .docx
I would do it myself, but I have been taking care of my sick child. .docxI would do it myself, but I have been taking care of my sick child. .docx
I would do it myself, but I have been taking care of my sick child. .docxflorriezhamphrey3065
 
I would have to identify the character Desiree.  I chose Desiree for.docx
I would have to identify the character Desiree.  I chose Desiree for.docxI would have to identify the character Desiree.  I chose Desiree for.docx
I would have to identify the character Desiree.  I chose Desiree for.docxflorriezhamphrey3065
 
I would appreciate your help on this!Prepare a version of Final .docx
I would appreciate your help on this!Prepare a version of Final .docxI would appreciate your help on this!Prepare a version of Final .docx
I would appreciate your help on this!Prepare a version of Final .docxflorriezhamphrey3065
 
I will give you an example of the outline paper from my teacherI.docx
I will give you an example of the outline paper from my teacherI.docxI will give you an example of the outline paper from my teacherI.docx
I will give you an example of the outline paper from my teacherI.docxflorriezhamphrey3065
 

More from florriezhamphrey3065 (20)

IDEA requires IEP teams to notify parents of their rights and proced.docx
IDEA requires IEP teams to notify parents of their rights and proced.docxIDEA requires IEP teams to notify parents of their rights and proced.docx
IDEA requires IEP teams to notify parents of their rights and proced.docx
 
ID Task ModeTask Name Duration Start Finish Predecesso.docx
ID Task ModeTask Name Duration Start Finish Predecesso.docxID Task ModeTask Name Duration Start Finish Predecesso.docx
ID Task ModeTask Name Duration Start Finish Predecesso.docx
 
Id like for us to use our sociological imagination. C. Wright M.docx
Id like for us to use our sociological imagination. C. Wright M.docxId like for us to use our sociological imagination. C. Wright M.docx
Id like for us to use our sociological imagination. C. Wright M.docx
 
IAHTopic  Whose work goes into space science How do different .docx
IAHTopic  Whose work goes into space science How do different .docxIAHTopic  Whose work goes into space science How do different .docx
IAHTopic  Whose work goes into space science How do different .docx
 
I211 – Information Infrastructure IILecture 20TodayCGI.docx
I211 – Information Infrastructure IILecture 20TodayCGI.docxI211 – Information Infrastructure IILecture 20TodayCGI.docx
I211 – Information Infrastructure IILecture 20TodayCGI.docx
 
I.Mulcahy’s qualifications1. As a Xerox board member, do yo.docx
I.Mulcahy’s qualifications1. As a Xerox board member, do yo.docxI.Mulcahy’s qualifications1. As a Xerox board member, do yo.docx
I.Mulcahy’s qualifications1. As a Xerox board member, do yo.docx
 
I. Many of you may believe that you have never worked in project  ma.docx
I. Many of you may believe that you have never worked in project  ma.docxI. Many of you may believe that you have never worked in project  ma.docx
I. Many of you may believe that you have never worked in project  ma.docx
 
i1) The culture you have selected and some general information a.docx
i1) The culture you have selected and some general information a.docxi1) The culture you have selected and some general information a.docx
i1) The culture you have selected and some general information a.docx
 
I. Use Venn diagrams to test the validity of the following arguments.docx
I. Use Venn diagrams to test the validity of the following arguments.docxI. Use Venn diagrams to test the validity of the following arguments.docx
I. Use Venn diagrams to test the validity of the following arguments.docx
 
I.Context and Situation AnalysisLiberia is a country div.docx
I.Context and Situation AnalysisLiberia is a country div.docxI.Context and Situation AnalysisLiberia is a country div.docx
I.Context and Situation AnalysisLiberia is a country div.docx
 
I. Defining Facta. Value free” packets of information; Ex 5’10.docx
I. Defining Facta. Value free” packets of information; Ex 5’10.docxI. Defining Facta. Value free” packets of information; Ex 5’10.docx
I. Defining Facta. Value free” packets of information; Ex 5’10.docx
 
I  only need 100 words minimum response for the following several pa.docx
I  only need 100 words minimum response for the following several pa.docxI  only need 100 words minimum response for the following several pa.docx
I  only need 100 words minimum response for the following several pa.docx
 
I. PurposeThe purpose of this experiential learning activity.docx
I. PurposeThe purpose of this experiential learning activity.docxI. PurposeThe purpose of this experiential learning activity.docx
I. PurposeThe purpose of this experiential learning activity.docx
 
I would sooner believe that two Yankee professors lied, than th.docx
I would sooner believe that two Yankee professors lied, than th.docxI would sooner believe that two Yankee professors lied, than th.docx
I would sooner believe that two Yankee professors lied, than th.docx
 
I wrote my paper and my feed back was- This is supposed to be a prof.docx
I wrote my paper and my feed back was- This is supposed to be a prof.docxI wrote my paper and my feed back was- This is supposed to be a prof.docx
I wrote my paper and my feed back was- This is supposed to be a prof.docx
 
I would like to discuss my experience developing and implementing .docx
I would like to discuss my experience developing and implementing .docxI would like to discuss my experience developing and implementing .docx
I would like to discuss my experience developing and implementing .docx
 
I would do it myself, but I have been taking care of my sick child. .docx
I would do it myself, but I have been taking care of my sick child. .docxI would do it myself, but I have been taking care of my sick child. .docx
I would do it myself, but I have been taking care of my sick child. .docx
 
I would have to identify the character Desiree.  I chose Desiree for.docx
I would have to identify the character Desiree.  I chose Desiree for.docxI would have to identify the character Desiree.  I chose Desiree for.docx
I would have to identify the character Desiree.  I chose Desiree for.docx
 
I would appreciate your help on this!Prepare a version of Final .docx
I would appreciate your help on this!Prepare a version of Final .docxI would appreciate your help on this!Prepare a version of Final .docx
I would appreciate your help on this!Prepare a version of Final .docx
 
I will give you an example of the outline paper from my teacherI.docx
I will give you an example of the outline paper from my teacherI.docxI will give you an example of the outline paper from my teacherI.docx
I will give you an example of the outline paper from my teacherI.docx
 

Recently uploaded

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersChitralekhaTherkar
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docxPoojaSen20
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application ) Sakshi Ghasle
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting DataJhengPantaleon
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxRoyAbrique
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 

Recently uploaded (20)

Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Micromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of PowdersMicromeritics - Fundamental and Derived Properties of Powders
Micromeritics - Fundamental and Derived Properties of Powders
 
MENTAL STATUS EXAMINATION format.docx
MENTAL     STATUS EXAMINATION format.docxMENTAL     STATUS EXAMINATION format.docx
MENTAL STATUS EXAMINATION format.docx
 
Hybridoma Technology ( Production , Purification , and Application )
Hybridoma Technology  ( Production , Purification , and Application  ) Hybridoma Technology  ( Production , Purification , and Application  )
Hybridoma Technology ( Production , Purification , and Application )
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data_Math 4-Q4 Week 5.pptx Steps in Collecting Data
_Math 4-Q4 Week 5.pptx Steps in Collecting Data
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptxContemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
Contemporary philippine arts from the regions_PPT_Module_12 [Autosaved] (1).pptx
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 

Student Declaration on Submission I confirm that all the work in.docx

  • 1. Student Declaration on Submission I confirm that all the work in this coursework is my own. Student Signature. Date. 03-03-17 General Feedback by Tutor Fair work, tasks 1 & 2 are fine, update tasks 3 & 4 You can optionally correct the merit tasks 5-7. See feedback comments attached Please return within 10 working days and remember to attach your corrections to the bottom of this document, and don’t change any of the original work 11/3/17 Sampled by IV: Sign Date: 03-03-2017
  • 2. Assessment grading instructions: Tasks 1 to 4 are required for PASS (P) grade and must be attempted Tasks 5 to 7 are required for MERIT (M) grade Tasks 8 is required for DISTINCTION (D) grade. Work for Merit/Dist grades should also be supported by fully referenced evidence Tasks for Assessment 2 (2 of 2) All answers must be your own worK Note: Copy and paste these cover and task sheets to the front of your written work as you must sign (electronic signature) and date these in order to have your assessment marked and graded Task 1 [P1] The Maintenance Manager has asked you to review the planned maintenance (PM) procedure for 2 pieces of equipment in the factory. The 1st piece of equipment is a 50m conveyor used to transport product in a cleanroom between process steps. The conveyor also contains a number of elevators protected by guarding. The 2nd piece of equipment is a mixing tank agitator driven by an induction motor controlled by an inverter. The tank is made of stainless steel and contains acidic chemicals when in use. As part of the review you will need, for each apparatus, to explain and identify the hazards that exist when a planned maintenance (PM) is being carried out. These are risks posed to anyone in the area, not just the Technicians carrying out the PM. In particular focus on electrical hazards Task 2 [P2]
  • 3. From the information in task 1 you must also specifically list the control measures required to eliminate or manage the risks to the Maintenance Technicians and others. In particular give a detailed range of control measures to prevent/reduce the risk of electric hazards Task 3 [P3] A quality and safety audit is to be carried out on all the maintenance procedures in the factory. The Maintenance manager has asked you with reference to at least 4 pieces of safety legislation, regulations or standards,and how these might apply to the PM activities described in task 1 Task 4 [P9] From the audit you have been asked to draw a start/stop/retain relay control circuit that could be used for the safe and emergency operation of a 3-phase drilling machine and lathe in the workshop that must include 2 emergency stop positions.Also explain how the circuit would operate and what types of commercial relays/contactors could you select. Task 5 [M1] The production manager also wants your help in deciding the best type of motor system for controlling the speed of a new automatic conveyor line. He has asked you to explain with the aid of diagrams and research evidence, the operational features system for an AC drive system with variable speed control.
  • 4. Task 6 [M2] As an alternative to the AC system in task 5, you have also been asked to produce a circuit design that can control the speed and direction of the conveyor using a DC motor drive system. With reference to circuit layout drawings and research sources, explain how it operates. Task 7 [M3] A new robot cell has been installed to operate along with the conveyor system above. You have been asked to: a) Describe with the aid of diagrams, the operation of a safety relay system used on a robot cell. (400 words) b) Explain how this system addresses the hazards and control measures by also referencing relevant legislation, regulations or standards. (400 words) Task 8 [D2] To ensure that the conveyor system is safe and complies with legislation, compare the construction and operation of two different types of stop/start/retain relay control circuits for suitable for either the AC or DC system in task 5 or 6. For example you may compare an electro-magnetic relay system with an electronic logic system. Include appropriate drawings, parts, truth tables and their advantages/disadvantages in your explanation.
  • 5. Task 1 [P1] The Maintenance Manager has asked you to review the planned maintenance (PM) procedure for 2 pieces of equipment in the factory. The 1st piece of equipment is a 50m conveyor used to transport product in a cleanroom between process steps. The conveyor also contains a number of elevators protected by guarding. The 2nd piece of equipment is a mixing tank agitator driven by an induction motor controlled by an inverter. The tank is made of stainless steel and contains acidic chemicals when in use. As part of the review you will need, for each apparatus, to explain and identify the hazards that exist when a planned maintenance (PM) is being carried out. These are risks posed to anyone in the area, not just the Technicians carrying out the PM. In particular focus on electrical hazards Conveyor Comment by Geoff Tweed: 1 format could be better, but ok a) The common hazard is doing maintenance to a conveyor connected to power, air or hydraulic that has not been locked out, such as cut off valves not being closed, circuit breakers not being pulled/gagged and power not being isolated or given time
  • 6. to dissipate. As a result during working, a technician may accidentally close the guards or activate a sensor. The program running this conveyor may then start the conveyor. As a result of this, it could cause injuries to not only the maintenance crew but to people around the machinery.. If parts of the machinery have been taken off for maintenance an electrical hazard could potentially occur if cable looms or wiring becomes caught up in the workings of the conveyer leading to not only injuries to personnel but expensive and time consuming damage to the equipment. b) Maintenance operations without all covers and guards open. This is a dangerous and poor maintenance practice because the guards and covers are there to protect the technician and personnel. If for example the conveyer is controlled by IR sensor sytem the technician could inadvertently block the beam which could then lead to the conveyer program commencing resulting in injury. c) Loading a stopped conveyor. This is to eliminate overheating during starting. Overheating may lead to break down of insulation of the machinery wiring. This will cause a short circuit of power which may lead to a fire or electrical hazard. d) Explosive Hazards. On a conveyer system this can occur this can occur due to poor ventilation which does not remove or filter the duct particles of the product being transported. Respiratory damage will also effect those working in an environment with poor ventilation. e) Poorly laid out or insufficient emergency stops or cut off switches. f) Nip points. which can easily draw in clothing, tools, loose hair, fingers or limbs, depending on the size, speed and power of the conveyor. g) Static electricity damage to components- Many caused by mishandling and poorly stored equipment. h) Faulty electrical equipment/ excessive extension leads. Tank agitator
  • 7. i) Never interchange the signals at the inverter. This is because the inverter may respond differently and drive the agitator in undesired way. This may cause even spillage of its acidic contents that may cause harm to personnel around. j) Never alter the terminals of the motor. This will make it run in an opposite direction, if done without informing operators spillage of dangerous load. k) Never allow motor terminals to come into contact with the acidic substance or water. As the two can conduct electricity. This may result to a short circuit resulting in a fire hazard. Task 2 [P2] From the information in task 1 you must also specifically list the control measures required to eliminate or manage the risks to the Maintenance Technicians and others. In particular give a detailed range of control measures to prevent/reduce the risk of electric hazards · Most importantly value of education, training, safe systems of work, power lock-offs and effective supervision should not be underestimated. Comment by Geoff Tweed: 2 ok, but should have better linked to hazards in T1 · Positioning and selection of types of guards-It is highly likely that fixed guards (ie those requiring the use of tools for their removal) or movable guards will be chosen, depending upon the frequency with which access is required. For long conveyors, it is often not practical to interlock every movable guard due to the large numbers involved. In such situations, isolation procedures, safe working practices and rope-operated emergency stop controls have an important role to play. · Maintenance pionts installed-such as fitting remote grease points so that the conveyor can be lubricated without having to remove guards, and belt alignment mechanisms that can be operated from outside the guards. Guarding should also be
  • 8. designed, so far as possible, such that routine cleaning and clearing of spillages can take place without disturbing the guarding - such as by incorporating rodding access points. · Appropriate signs/ warning notices- during PM operations appropriate signs should be displayed informing personnel not to apply power or enter the work area. · Adequate air filtration/ ventilation- This will prevent build up of potentially explosive duct i.e coal particles. · Physical circuit breaker and power switch gags on a shadow board- this will prevent the system being left live and accidental application of power. By using the shadow board to keep them on it is an easy visual indication if they have not all been put in place. · Strict tool control system- again a shadow board system will ensure that all tools are accounted for after maintenance has been carried out. This will prevent tools being left in the machinery potentially causing a short circuit. · Tagging in system for personnel- During maintenance technicians are to tag into the work area and tag out on completion. Power is not to be applied nor is the machinery to be in any other way operated whist personnel are tagged in. This prevents potential hazards to technicians in the area. · Dual control powering system- For example two buttons far enough apart having to be pressed within 5 seconds of each other for power to be applied. This removes the danger of accidentally applying power and provides a second person to ensure it is safe to apply power. · Ant static wrist bands, rubber mats and correct storage for components- This will reduce the risk of static electrical damage. · Pat testing for all electrical items- This will reduce the risk of faulty electrical items entering or being used in the work area. Task 3 [P3]
  • 9. A quality and safety audit is to be carried out on all the maintenance procedures in the factory. The Maintenance manager has asked you with reference to at least 4 pieces of safety legislation, regulations or standards,and how these might apply to the PM activities described in task 1 It is important to ensure that a conveyor complies with the relevant standard and code of practice but the question of CE marking is a more difficult area. While there are some situations where a conveyor will be supplied as a standalone machine - and will therefore need to be CE marked - there are others where the conveyor needs a certificate of Conformity so that it can be incorporated within a larger machine that is then CE marked as a whole. If in doubt, seek advice from suppliers, consultants, or contact the HSE. Comment by Geoff Tweed: 3 need to see 4 pieces of legislation clearly linked to 4 hazards/control measures for the conveyor/tank - update The goal is to ensure that the machinery is safe, so users should undertake a risk assessment and install the necessary safeguards to reduce the risks to an acceptable level. Risk assessments should be carried out by qualified staff this will usually be the health and safety executive. In line with general good practice, the objective should be to design-out hazards, rather than safeguarding them but, in reality, this is unlikely to be feasible where conveyors are already operating or have been purchased as off-the-shelf or configured-to-order units. Since 1998, users of conveyors have been legally obliged to perform a PUWER assessment - which often reveals that existing safeguards are inadequate and that additional measures are needed. In addition, companies purchasing off-the-shelf, configured-to-order or custom-built conveyors frequently have to design and fit extra guarding. Elsewhere, companies are in a
  • 10. slightly better position if they build new conveyors in-house and are able to take safeguarding into account at the design early stage. The PUWER 98 Regulations (Provision and User of Work Equipment Regulations, 1998) have already been mentioned, but there are several other regulations, standards and codes of practice that need to be considered. Three such examples are BS EN 620: 2002, 'Continuous handling equipment and systems - Safety and EMC requirements for fixed belt conveyors for bulk materials', BS 4531: 1986, ' Specification for portable and mobile troughed belt conveyors', and BS 7300: 1990, ' Code of practice for safeguarding of the hazard points on troughed belt conveyors. Task 4 [P9] From the audit you have been asked to draw a start/stop/retain relay control circuit that could be used for the safe and emergency operation of a 3-phase drilling machine and lathe in the workshop that must include 2 emergency stop positions.Also explain how the circuit would operate and what types of commercial relays/contactors could you select. Safety is a major concern in a good many motor-driven applications. This is true in industrial applications where motion starts when power is applied and especially true when power is restored after an outage. In such cases, unwanted or unexpected motion is a risk to life or limb. The most simple solution to this problem is the simple, time-proven Run /Stop Relay Circuit. Comment by Geoff Tweed: 4 good start, but commercial relay system for the 3-ph machines is missing - add
  • 11. With this control circuit, motion cannot commence (or restart) without the operator’s specific pushbutton command. The control circuit draws 9V from the dc supply. It is first passed through fuse then first emergency switch. Then a stop switch is placed in series with the first emergency switch. Then there is the second emergency switch., activating either will open the circuit and de-energise the relay . Then there is a start push button. Its single action powers the coil of the relay. Therefore, the contact will shift down. Its output is looped back to provide a holding mechanism. Then the output is fed to the bulb but which in this case represents three phase relay or contactor coil. A Dc relay or electromagnetic relay would be suitable for this application. Task 5 [M1] The production manager also wants your help in deciding the best type of motor system for controlling the speed of a new automatic conveyor line. He has asked you to explain with the aid of diagrams and research evidence, the operational features system for an AC drive system with variable speed control. A three phase induction motor is best suited for this operation. This is because it is self-starting and it uses frequency of the supply to determine its speed. There should be in inverter circuit. Power inversion should be controlled by controlling the gate triggering so that frequency can be controlled. The circuit above shows a single phase inverter. The potentiometer used to vary frequency of the output waveform by adjusting how the capacitor charges and discharges. This circuit can be cascaded to generate a three phase inverter. Comment by Geoff Tweed: 4a Not sure this is right as it appears to an amplifier, and there is no ac input In a drive above. First the supply voltages are converted to dc
  • 12. voltages. Through the dc link, the inverter circuit receives dc power. With the help of a stored program, it is inverted into a desired variable frequency to be used by the motor Comment by Geoff Tweed: Incomplete explanation of VSD and needs supporting references Task 6 [M2] As an alternative to the AC system in task 5, you have also been asked to produce a circuit design that can control the speed and direction of the conveyor using a DC motor drive system. With reference to circuit layout drawings and research sources, explain how it operates. This circuit will contain an emergency switch, start latching button, potentiometer, double pole double throw switch and a motor. They will be arranged as shown below. Comment by Geoff Tweed: 6 Ok for very small motors, but I would like to see a system using transistors and thyristors for direction and speed control with supporting references Power from the battery is passed through and emergency switch. It is then connected in series with the start button. An action of this two will either turn the motor on or off. A potentiometer is connected in series. This will be used to vary the speed of the dc motor by varying the supply voltage. Then a double pole double throw switch is connected in series to the circuit and lastly, the motor. DPDT is used to change the direction of motor rotation. And it is connected as above. When its selection switch is in a certain position, it rotates as show by an arrow above. When the position is changed, it will rotate as shown below.
  • 13. Task 7 [M3] A new robot cell has been installed to operate along with the conveyor system above. You have been asked to: a) Describe with the aid of diagrams, the operation of a safety relay system used on a robot cell. (400 words) A safety relay has an electromagnetic coil. The coil is only energized when powered. Once powered, it will act like a normal magnet and attract anything metallic near it. Hence, it will attract the contacts of the relay to close the circuit. When any guards or emergency or stop button is pressed, its supply power is cut, this will de-energize the electromagnetic coil. Hence, it loses its magnetic effect, releasing the contacts. This results to instant opening of the contacts of the relay Comment by Geoff Tweed: 7a this does not answer the task about a robot cell safety relay, please research and update Comment by Geoff Tweed: The circuit above show for an open control switch. This control switch can be a stop switch, emergency switch and even a sensor. When sensors are used for this purpose. They are usually photo sensors. This sensors are placed around the conveyor system entry point. They are manipulated to represent a normally closed contacts. In this case, if a maintainer or other personnel was to pass between the transmitter and the receiver or the reflector plates, light is blocked and the beam is broken. This will make the cause an open circuit and isolate flow of the electrical power through the circuit. Since the relay will not receive power, it will isolate the conveyor system from the mains power and therefore stopping it. The emergency switches, stop switches and other safety switches are also normally closed and do function the same as explained above. This is shown by the relay in the circuit above
  • 14. When the control switches are closed, the relay shifts position as shown above to close/complete the circuit. During the construction of this, it is good to use a holding circuit. This will enable restarting the conveyor belt once it has been interrupted when in operation and reduce risk of accident. If left the conveyor restarts itself once the emergency switch or stop push button is released or when the safety guard or doors are closed. But once a holding circuit is incorporated, it will require an operator to safely restart it once it is safe and the problem have been cleared. Hence, this is used to minimize any accident associated with the conveyors. To incorporate a holding circuit, the above circuit will be modified so as to appear as the one shown in the diagram below. When the start push button is pressed, the relay will be powered. This will make the coil in the relay an electromagnet and pull the contacts in a way that the contacts will become closed. This will appear as shown in the diagram below. When the stop push button is pressed, the coil of the relay will be de-energized and release the contacts. Its diagram will appear as the previous diagram. b) Explain how this system addresses the hazards and control measures by also referencing relevant legislation, regulations or standards. (400 words) According to Electrical control gear, this methods is used to interface all safety signals to a control panel of a system. It can be noticed that any action of any safety switch for example emergency switch or gourd door switch will affect the supply power to the coil. This will in turn isolate the machine from power and make the machine safe for any intended operation. This will make entry of restricted machine environment safety and doing maintenance safe. This is achieved by either using a
  • 15. PLC program or putting physically this safety switches in series to one another so as to interrupt the flow of an electrical signal in the control circuit. This power interrupt is then used to isolate the conveyor power supply from the motor that runs the conveyors. Relays and holding circuit become handy when working in this circuits. Relays are used to interface the control signal with the high voltage supply that powers the conveyors. This is just done by just powering its coil in a controlled manner so as to effect the closing of the contacts or opening of the contacts. The holding circuit is incorporated in order to eliminate the automatic switching on of the conveyor once the problem that caused the breakdown has been cleared. This will require an operator to manually restart it when he or she has analysed that the situation is safe to restart it. Comment by Geoff Tweed: Needs 4 pieces of legislation that relates to robot cells - update Comment by Geoff Tweed: Ref? Positioning of the safety control gears is an important concideration. The safety switches and all other control switches are placed in a very accessible manner and in a way they can be easily be noticed by anyone. This ranges from the way they are manufactured to the way that they have been installed. . For example, colouring red colour to emergency switch and stop switches while the start push button is coloured green as a standard. . In terms of positioning, they should be positioned at the entrances to the confiscated areas of the machines. This is used to ensure that the machine is isolated from the power supply in any manner of entry in this confiscated area of the machine either by switching it off or by opening the safety door of the machine. Again in this case it is relevent to quote legislation from puwer. The regulations require that machinery provided for use at work is: Suitable for its intended use Safe for use – including keeping it maintained in a safe condition with regular inspections to ensure it is installed
  • 16. correctly and that its level of safety doesn’t subsequently decline Used only by people who have received adequate training, instruction and information Accompanied by suitable health and safety measures, such as protective controls and devices Used in accordance with specific requirements – mobile work equipment and power presses. Regulation 18 deals with taking realistic and practical allowances into account when choosing or specifying control systems, and not increasing risk when the control system is operating, either directly or indirectly, by impeding the operation of other safety measures; not increasing risk if a control system fails or loses its power supply. This regulation states that every employer shall ensure, so far as is reasonably practicable, that all control systems of work equipment are safe, and are chosen making due allowance for the failures, faults and constraints to be expected in the planned circumstances of use. Failure of any part of the control system or its power supply should lead to a ‘fail-safe’ condition. Fail-safe can be more correctly and realistically called ‘minimised failure to danger’ where the minimisation can actually be quantified as a “probability of dangerous failure per hour”, or PFH. This should not impede the operation of the ‘stop’ or ‘emergency stop’ controls. The greater the risk, the more resistant the control system should be to the effects of failure. Bringing a machine to a safe halt may achieve the objective. Halting a chemical process, however, could create further hazards. Care should be taken to fully assess the consequences of such events and provide further protection, for example standby power plant or diverting chemicals to a place of safety. It should always be possible to recover to a safe condition. [D2]
  • 17. References Www.wikipedia.org Electronics for dummies-Dickon Ross BTEC Level 3 National Engineering Student Book- Ernie Cooke http://www.hse.gov.uk/work-equipment- machinery/puwer.htm Revision 2 U18A2