1. Email:
philljo_winston@yahoo.com
1
1 Joe Winston Phillip
OCCUPATIONAL RECORDS
Year From/
To Year
19th
March 2013 – Present
Company Name/ Job Title
Swiber Offshore ConstructionPte Ltd.
Job Title: Piling Technician/ Electrical Technician
Job/ Task Descriptions:
1. Hydrohammer operator for both above and under water
operation
2. Internal Lifting Tool (ILT) operator
3. Pipe Recovery Tool (PRT) operator
4. Leveling Tool Operation
5. Upending Frame Operation
6. Repair, maintenance and troubleshooting of all piling
equipment (Electrical, Mechanical and Hydraulic System)
7. Liaise with Barge Superintendence Barge crews and Client
on all Piling operation involve
8. Competent in all Piling equipment set up on Vessel
9. Prepare and liaise with HSE department on piling
operation JRA in each project.
Project Summary:
1. Project Name: Daman Development Project – Phase
1(Feb – April, 2016)
1. Company/ Client: ONGC
2. Contractor: SOC &Swiber Offshore India
3. Type of work: 3 x platform installation, C-24 RP,
C-24 P3 & C-24 P4
4. Location: India, Tapti – Daman block, 60km west
of Daman
2. Project Name: Petronas Floating LNG Project(Aug –
Sep 2015)
1. Company/ Client: Petronas / Technip
2. Contractor: Alam-Swiber / Equatorial
3. Type of work: Mooring System Installation
4. Location: Kumang Cluster 200km from Bintulu,
Sarawak, Malaysia
2. Email:
philljo_winston@yahoo.com
2
2 Joe Winston Phillip
3. Project Name: T&I of SK-316 NC3 structures project
(Mar – May, 2015)
1. Company/ Client: Petronas Carigali
2. Contractor: ALAM SWIBER OFFSHORE (M) /
TECHNIP GEOPRODUCTION
3. Type of work: Jacket installation (NC3-
CPP~underwater skirt piles, NC3-WHP)
4. Location: Bintulu, Sarawak
4. Project Name: South Mahakam Field Development
Project Phase 3 (Nov – Dec, 2014)
1. Company/ Client: TOTAL E&P INDONESIE
(TEPI)
2. Type of work: Jacket installation (tri-pod) JM1
3. Location: Offshore east Kalimantan 35Km SE of
Balikpapan
5. Project Name: PHE-ONWJ GG field new development
(July 2014)
1. Company/ Client: Pertamina
2. Type of work: Jacket Installation (GGA NUI
WHP)
3. Location: Cerebon, Indonesia
6. Project Name: Champion Waterflood project (Jun 2014)
1. Company/ Client: BSP
2. Type of work: Jacket Installation: CPAP-40, CPPP-
40 & CPWJ-41
3. Location: Brunei (Champion Field)
7. Project Name: Banuwati-K Gas Compressor Platform
Project (BWK) (March 2014)
1. Company/ Client: CNOOC SES Ltd / COOEC
2. Type of work: 4 Leg Jacket
3. Location: Java Sea Indonesia
8. Project Name: Naga &Pelikan (Oct 2013)
1. Company/ Client: Premier Oil Natuna Sea BV
2. Type of work: Jacket Installation – Skirt pile NWP
Tri-pod & PWP Tri-pod (Underwater piling
operation)
3. Location: Indonesia
3. Email:
philljo_winston@yahoo.com
3
3 Joe Winston Phillip
Nov 2011 – February 2013
9. Project Name: SisiNubi Phase 2B &Peciko 7B project
(August 2013)
1. Company/ Client: Total E&P Indonesia
2. Type of work: Jacket Installation (WPS2-
quadripod, WPN3-tri-pod& SWP-J-tri-pod)
3. Location: Indonesia, SisiNubi 2B field offshore
east Kalimantan
10. Project Name: Osprey Gas development project (Jun
2013)
1. Company/ Client: BSP
2. Type of work: Jacket Installation (OSWJ01 &
OSWJ02)
3. Location: Brunei Osprey Field Block-C
11. Project Name: Yadana Subsidence Project Campaign 1
(March 2013)
1. Company/ Client: TOTAL E&P Myanmar
2. Type of work: Jacket Installation (FP2 Tri-pod)
3. Location: Myanmar
Offshore Engineering Resources (OER) Pte Ltd.
Job Title: Electrician
Job / Task Description:
1. Carrying out Preventive, Breakdown and Major overhaul
maintenance of all electrical equipment such as:
Low / high voltage electric motors,
Main Switch Board,
Main Engine room/ Generator,
Purification room,
Anchor Winch system,
Pump room,
Air compressor system,
Tensioner system (REMACUT),
AR Winch (SAS) system,
Chiller system,
Engine control room (ECR),
Pipe lay switch board,
Main air condition room, Air handling units, split
units,
4. Email:
philljo_winston@yahoo.com
4
4 Joe Winston Phillip
10th
, Feb 2011 – 13th
, Oct
2011
Water Maker
Welding Equipment
Crawler/ Deck crane and Forklift
Waste system
Fire Fighting system,
Communication system,
All lightings system
All accommodation areas related equipment’s
2. Carry out work order as per IMS system
3. As a support group on equipment set-up and
equipmenttroubleshooting/ repair during project in place.
4. Assign on monitoring and troubleshoot 3000 Ton Crane on
related electrical/ electronic failure.
5. Assign as Tensioner Operator during pipeline project.
Subsidiary Activities :
Performs other related following duties delegated by Swiber OER
such as:
1. Participate in group safety meeting.
2. Participate in Emergency Team / Medical Team as
assigned.
3. Ensure compliance with the company HSE regulations,
procedures and standards.
Project summary:
4. Pipeline project
5. Jacket Installations
6. Riser Hook-up
Faber Medi – Served Sdn Bhd.
Job Title: Electrical Supervisor/ Chargeman
Job/ Task Description:
1. To cover the maintenance activities of Power Generation
and Distribution system of entire Hospital Buildings.
2. To liaise with the Electrical Supervisor / Senior Electrical
Technician on the concerned complex for carrying out the
Preventive, Breakdown and Shutdown maintenance for all
Electrical Equipment.
3. To carry out routine checks and arising system (riser)
operational problems.
4. Trouble shooting of Electrical equipment such as LV/HV,
Transformers, Gen-set, Motor Operated Valves, Rectifiers,
Battery Banks, MSB/ Circuit Breakers, Lighting
distribution, AHU, production HEPA system, Chiller ,and
5. Email:
philljo_winston@yahoo.com
5
5 Joe Winston Phillip
14th
,Sept 2009 – 1st
, Feb
2011
Air compressor etc.
5. To carry out related duties such as preparing standardized
report forms for Preventive / Breakdown / Shutdown
maintenance works.
6. Co-ordinate with other departments or Wards for
Troubleshooting, Pre-Commissioning and commissioning
of electrical equipment.
7. Ensures availability of most commonly used spare parts,
arranging stores, maintaining records of all items and
reports to Senior Electrical Technician / Electrical
Supervisor in case of shortage of any materials.
8. Liaise and deal with Vendor or Contractor for any
equipment installation, maintenance and inspections.
9. To maintain Good housekeeping of work sites.
Hitachi Global Storage Technologies (14th
September 2009)
Job Title: Senior Technician/Chargeman
Job Descriptions:
1. To cover all the maintenance activities Power Generation
and Distribution.
2. Liaise with the Electrical Technical on the concerned
complex for carrying out the Preventive, Breakdown and
Shutdown maintenance for all Electrical Equipment.
3. Liaise with Vendor/ contractor on equipment maintenance
or upgrading.
4. To carry out routine checks and arising system operational
problems.
5. Trouble shooting of Electrical equipment such as LV/HV,
Transformers, Gen-sets, Motor Operated Valves,
Rectifiers, Fire Fighting Systems, Battery Banks, Main
Switch Board (MSB), Lighting distribution, AHU,
production HEPA system, Chiller ,and Air
compressorsystem etc.
6. To carry out related duties such as preparing standardized
report forms for Preventive / Work Order / Shutdown
maintenance works.
7. Co-ordinate with other departments for Troubleshooting,
Pre-Commissioning and commissioning of electrical
equipment.
8. Ensures availability of most commonly used spare parts,
arranging stores, maintaining records of all items and
reports
9. To maintain Good housekeeping of work sites.
6. Email:
philljo_winston@yahoo.com
6
6 Joe Winston Phillip
2004– March, 2008
1999 – 2004
WD Media (Malaysia) Sdn (Formerly known as Komag USA
(M) Sdn)
11th
January 1999 – 27th
March 2008
Job Title: Equipment Technician Specialist
Job Descriptions:
1. Manage and coordinate equipment spare-parts inventory
2. Machine/ equipment troubleshooting
3. Moderate knowledge in PLC programming and
troubleshooting
4. Liaised or deal with Vendor/ Contractors on new
equipment upgrading
5. New machine set-up and upgrading
6. Involved on machine improvement project
7. To maintain production Yield output by introduce new
improvement plan.
8. Prepare daily routine report and proper hand-over
information on machine or equipment condition and
performance
9. Updating and compilation of PM checklist base on
ISO9002 standard.
10. Production sustaining by being sensitive with equipment’s
performance
Job Title: Manufacturing Technician
1. Machine/ Equipment operator
2. Conduct training on new trainee on how to operate
machines/ equipment’s and it operation.
3. Trainer and Equipment certifier
4. Upgradedto Laboratory and Process Technician