Intelligent Urban Traffic Control System
(KKKA 6424)
Assignment no .1
Traffic Light Setting
Supervisor
Prof. Dr. Riza Atiq Abdullah OK Rehmat
Prepared by: Rasha salah ahmed P64799
Sarah hazim P65407
Fig (1) (The Study area)
Location of intersections
First Intersection
Phase Traffic volume Actual
flow
(pcu/hr)
saturation
flowper
lane
(pcu/hr)
saturation
flow
(pcu/hr)
Y=
flow/sat
uration
flow
Green
time split
Y / ∑y
(Y / ∑y)
*Geleft straight right
1 111 88 199 1800 3600 0.1 0.33 8
2 95 201 296 1800 3600 0.1 0.33 8
3 85 100 185 1800 3600 0.1 0.33 8
∑y=0.3 ∑=24
1. L(losttime)=3×(3+2)=15sec
2. Co=
(1.5 𝐿 +5
1−∑𝑌
=
1.5 15 +5
1−0.3
=39.28 takeCo=40sec
3. Effectivegreentime(Ge)=Co-L=40-15=25sec
(Multiplythisvalueingreentimesplit to getthefinalcolumn).
4. Totalgreentime=24sec
5. Cycletime=greentime+losttime
=24+15=39sec
Secondintersection
Phase Trafficvolume Actual
flow
(pcu/hr)
saturation
flowper
lane
(pcu/hr)
saturation
flow
(pcu/hr)
Y=
flow/sat
uration
flow
Green
timesplit
Y/∑y
(Y/∑y)
*Geleft straight right
1 80 328 184 592 1800 3600 0.16 0.31 16
2 84 140 98 322 1800 3600 0.1 0.19 10
3 148 252 160 560 1800 3600 0.16 0.31 16
4 64 92 120 276 1800 3600 0.1 0.19 10
∑y=0.52 ∑=52
1. L (lost time) =4× (3+2) =20 sec
2. Co=
(1.5 𝐿 +5
1−∑𝑌
=
1.5 20 +5
1−0.52
=72.9 take Co=73 sec
3. Effective green time (Ge) =Co-L =73-20=53 sec
(Multiply this value in green time split to get the final column).
4. Total green time=52 sec
5. Cycle time =green time + lost time
=52+20=72 sec
Thirdintersection
Phase Trafficvolume Actual
flow
(pcu/hr)
saturation
flowper
lane
(pcu/hr)
saturation
flow
(pcu/hr)
Y=
flow/sat
uration
flow
Green
time
split
Y/∑y
(Y/
∑y)
*Ge
left straight right
1 151 215 99 465 1800 3600 0.13 0.217 15
2 90 198 75 363 1800 3600 0.1 0.167 11
3 88 119 90 297 1800 3600 0.1 0.167 11
4 356 501 113 970 1800 3600 0.27 0.45 31
∑y=0.6 ∑=68
1. L (lost time) =4× (3+2) =20 sec
2. Co=
(1.5 𝐿 +5
1−∑𝑌
=
1.5 20 +5
1−0.6
=87.5 take Co=88 sec
3. Effective green time (Ge) =Co-L =88-20=68 sec
(Multiply this value in green time split to get the final column).
4. Total green time=68 sec
5. Cycle time =green time + lost time
=68+20=88 sec.
 To determine (offset time) T ideal from inter1 to 2:
T ideal=
𝐿
𝑆
− 𝑄 × ℎ + 𝑙𝑜𝑠𝑠 𝑡𝑖𝑚𝑒 Where:
L=450m
S=10m/sec
Q=14 cars
h=2sec
Loss time=2 sec. T ideal=15 sec.
 To determine (offset time) T ideal from inter 2 to 3:
L=650m
S=10m/sec
Q=12 cars
h=2 sec
Loss time=2 sec T ideal=39 sec
We choosethe maximum value ofC₀ = 88 and make recalculation for the greentime, and
the new results inthe table below:
Co=88 Ge=Co-L=88-20=68 sec
phase Intersection 1 Intersection 2 Intersection 3
GreenTime = (Y/∑
Y)*Ge
GreenTime = (Y/∑
Y)*Ge
GreenTime = (Y/∑
Y)*Ge
Q1 23 21 15
Q2 23 13 11
Q3 22 21 11
Q4 13 31
∑=68 ∑=68 ∑=68
So the new diagramwill be like the following:
Pictures from the study area
THANK YOU

More Related Content

What's hot

Highway designing calculations
Highway designing calculationsHighway designing calculations
Highway designing calculations
janaka ruwan
 
Highway design calculations (3)
Highway design calculations (3)Highway design calculations (3)
Highway design calculations (3)
janaka ruwan
 
Advanced Complex Analysis
Advanced Complex AnalysisAdvanced Complex Analysis
Advanced Complex Analysis
ambareen50
 
Episode 39 : Hopper Design
Episode 39 :  Hopper Design Episode 39 :  Hopper Design
Episode 39 : Hopper Design
SAJJAD KHUDHUR ABBAS
 
Ejercicio con funciones bessel
Ejercicio con funciones besselEjercicio con funciones bessel
Ejercicio con funciones bessel
JasminSeufert
 

What's hot (20)

report_1
report_1report_1
report_1
 
report_2_v2
report_2_v2report_2_v2
report_2_v2
 
Highway designing calculations
Highway designing calculationsHighway designing calculations
Highway designing calculations
 
William columna
William columnaWilliam columna
William columna
 
Highway design calculations (3)
Highway design calculations (3)Highway design calculations (3)
Highway design calculations (3)
 
Advanced Complex Analysis
Advanced Complex AnalysisAdvanced Complex Analysis
Advanced Complex Analysis
 
Episode 39 : Hopper Design
Episode 39 :  Hopper Design Episode 39 :  Hopper Design
Episode 39 : Hopper Design
 
Ejerciciooo3
Ejerciciooo3Ejerciciooo3
Ejerciciooo3
 
Webinar: Integrating timetabling and vehicle scheduling to analyze the trade-...
Webinar: Integrating timetabling and vehicle scheduling to analyze the trade-...Webinar: Integrating timetabling and vehicle scheduling to analyze the trade-...
Webinar: Integrating timetabling and vehicle scheduling to analyze the trade-...
 
Ejercicio con funciones bessel
Ejercicio con funciones besselEjercicio con funciones bessel
Ejercicio con funciones bessel
 
Near Surface Geoscience Conference 2014, Athens - Real-­time or full­‐precisi...
Near Surface Geoscience Conference 2014, Athens - Real-­time or full­‐precisi...Near Surface Geoscience Conference 2014, Athens - Real-­time or full­‐precisi...
Near Surface Geoscience Conference 2014, Athens - Real-­time or full­‐precisi...
 
Functions/Inequalities
Functions/InequalitiesFunctions/Inequalities
Functions/Inequalities
 
Near Surface Geoscience Conference 2015, Turin - A Spatial Velocity Analysis ...
Near Surface Geoscience Conference 2015, Turin - A Spatial Velocity Analysis ...Near Surface Geoscience Conference 2015, Turin - A Spatial Velocity Analysis ...
Near Surface Geoscience Conference 2015, Turin - A Spatial Velocity Analysis ...
 
Eee498 assignment
Eee498 assignmentEee498 assignment
Eee498 assignment
 
MF 10 Tuberías en paralelo y ramificadas
MF 10 Tuberías en paralelo y ramificadasMF 10 Tuberías en paralelo y ramificadas
MF 10 Tuberías en paralelo y ramificadas
 
Design report drive train
Design report drive train Design report drive train
Design report drive train
 
Car1
Car1Car1
Car1
 
Episode 50 : Simulation Problem Solution Approaches Convergence Techniques S...
Episode 50 :  Simulation Problem Solution Approaches Convergence Techniques S...Episode 50 :  Simulation Problem Solution Approaches Convergence Techniques S...
Episode 50 : Simulation Problem Solution Approaches Convergence Techniques S...
 
Marc stettler modelling of instantaneous vehicle emissions - dmug17
Marc stettler   modelling of instantaneous vehicle emissions - dmug17Marc stettler   modelling of instantaneous vehicle emissions - dmug17
Marc stettler modelling of instantaneous vehicle emissions - dmug17
 
Traffic Concepts (Transportation Engineering)
Traffic Concepts (Transportation Engineering)Traffic Concepts (Transportation Engineering)
Traffic Concepts (Transportation Engineering)
 

Similar to Slids of intellegent assignment

Question 1. a) (i)(4+i2).(1+i3)4(1+i3)+i2(1+i3)4+i12+i2-6.docx
Question 1.  a) (i)(4+i2).(1+i3)4(1+i3)+i2(1+i3)4+i12+i2-6.docxQuestion 1.  a) (i)(4+i2).(1+i3)4(1+i3)+i2(1+i3)4+i12+i2-6.docx
Question 1. a) (i)(4+i2).(1+i3)4(1+i3)+i2(1+i3)4+i12+i2-6.docx
IRESH3
 
vibration of machines and structures
vibration of machines and structuresvibration of machines and structures
vibration of machines and structures
Aniruddhsinh Barad
 
Solutions_Manual_to_accompany_Applied_Nu.pdf
Solutions_Manual_to_accompany_Applied_Nu.pdfSolutions_Manual_to_accompany_Applied_Nu.pdf
Solutions_Manual_to_accompany_Applied_Nu.pdf
WaleedHussain30
 

Similar to Slids of intellegent assignment (20)

Full Report.pdf
Full Report.pdfFull Report.pdf
Full Report.pdf
 
Sect5 4
Sect5 4Sect5 4
Sect5 4
 
Question 1. a) (i)(4+i2).(1+i3)4(1+i3)+i2(1+i3)4+i12+i2-6.docx
Question 1.  a) (i)(4+i2).(1+i3)4(1+i3)+i2(1+i3)4+i12+i2-6.docxQuestion 1.  a) (i)(4+i2).(1+i3)4(1+i3)+i2(1+i3)4+i12+i2-6.docx
Question 1. a) (i)(4+i2).(1+i3)4(1+i3)+i2(1+i3)4+i12+i2-6.docx
 
2016 CHE2163 Tutorial 5
2016 CHE2163 Tutorial 52016 CHE2163 Tutorial 5
2016 CHE2163 Tutorial 5
 
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
 
Queuing theory : Notes
Queuing theory : NotesQueuing theory : Notes
Queuing theory : Notes
 
Continuity and differentiation
Continuity and differentiationContinuity and differentiation
Continuity and differentiation
 
Ray : modeling dynamic systems
Ray : modeling dynamic systemsRay : modeling dynamic systems
Ray : modeling dynamic systems
 
002 ray modeling dynamic systems
002 ray modeling dynamic systems002 ray modeling dynamic systems
002 ray modeling dynamic systems
 
002 ray modeling dynamic systems
002 ray modeling dynamic systems002 ray modeling dynamic systems
002 ray modeling dynamic systems
 
Hydrologic analysis and design 4th edition mc cuen solutions manual
Hydrologic analysis and design 4th edition mc cuen solutions manualHydrologic analysis and design 4th edition mc cuen solutions manual
Hydrologic analysis and design 4th edition mc cuen solutions manual
 
Solutions manual for hydrologic analysis and design 4th edition by mc cuen ib...
Solutions manual for hydrologic analysis and design 4th edition by mc cuen ib...Solutions manual for hydrologic analysis and design 4th edition by mc cuen ib...
Solutions manual for hydrologic analysis and design 4th edition by mc cuen ib...
 
Chapter 8
Chapter 8Chapter 8
Chapter 8
 
51543 0131469657 ism-2
51543 0131469657 ism-251543 0131469657 ism-2
51543 0131469657 ism-2
 
Base excitation of dynamic systems
Base excitation of dynamic systemsBase excitation of dynamic systems
Base excitation of dynamic systems
 
vibration of machines and structures
vibration of machines and structuresvibration of machines and structures
vibration of machines and structures
 
solution manual of goldsmith wireless communication
solution manual of goldsmith wireless communicationsolution manual of goldsmith wireless communication
solution manual of goldsmith wireless communication
 
Solutions_Manual_to_accompany_Applied_Nu.pdf
Solutions_Manual_to_accompany_Applied_Nu.pdfSolutions_Manual_to_accompany_Applied_Nu.pdf
Solutions_Manual_to_accompany_Applied_Nu.pdf
 
Solutions manual for engineering mechanics dynamics 13th edition by hibbeler
Solutions manual for engineering mechanics dynamics 13th edition by hibbelerSolutions manual for engineering mechanics dynamics 13th edition by hibbeler
Solutions manual for engineering mechanics dynamics 13th edition by hibbeler
 
Resposta cap-1-halliday-8-edição
Resposta cap-1-halliday-8-ediçãoResposta cap-1-halliday-8-edição
Resposta cap-1-halliday-8-edição
 

More from engrasha (6)

ITS development in Kajang city
ITS development in Kajang cityITS development in Kajang city
ITS development in Kajang city
 
Development plane of urban transportation in Malaysia
Development plane of urban transportation in MalaysiaDevelopment plane of urban transportation in Malaysia
Development plane of urban transportation in Malaysia
 
Kajang sustainable development (1)
Kajang sustainable development (1)Kajang sustainable development (1)
Kajang sustainable development (1)
 
Sustainable urban trans. in hannover
Sustainable urban trans. in hannoverSustainable urban trans. in hannover
Sustainable urban trans. in hannover
 
My home town rasha salah ahmed p64799
My home town rasha salah ahmed p64799My home town rasha salah ahmed p64799
My home town rasha salah ahmed p64799
 
My home town rasha salah ahmed p64799
My home town rasha salah ahmed p64799My home town rasha salah ahmed p64799
My home town rasha salah ahmed p64799
 

Recently uploaded

Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
seri bangash
 

Recently uploaded (20)

Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)Special Purpose Vehicle (Purpose, Formation & examples)
Special Purpose Vehicle (Purpose, Formation & examples)
 
Toyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & TransformationsToyota Kata Coaching for Agile Teams & Transformations
Toyota Kata Coaching for Agile Teams & Transformations
 
Unveiling Gemini: Traits and Personality of the Twins
Unveiling Gemini: Traits and Personality of the TwinsUnveiling Gemini: Traits and Personality of the Twins
Unveiling Gemini: Traits and Personality of the Twins
 
The Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdfThe Inspiring Personality To Watch In 2024.pdf
The Inspiring Personality To Watch In 2024.pdf
 
LinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptxLinkedIn Masterclass Techweek 2024 v4.1.pptx
LinkedIn Masterclass Techweek 2024 v4.1.pptx
 
PitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for StartupsPitchBook’s Guide to VC Funding for Startups
PitchBook’s Guide to VC Funding for Startups
 
Creative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team PresentationsCreative Ideas for Interactive Team Presentations
Creative Ideas for Interactive Team Presentations
 
Elevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO ServicesElevate Your Online Presence with SEO Services
Elevate Your Online Presence with SEO Services
 
Sedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement CriteriaSedex Members Ethical Trade Audit (SMETA) Measurement Criteria
Sedex Members Ethical Trade Audit (SMETA) Measurement Criteria
 
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
Unleash Data Power with EnFuse Solutions' Comprehensive Data Management Servi...
 
Event Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybridEvent Report - IBM Think 2024 - It is all about AI and hybrid
Event Report - IBM Think 2024 - It is all about AI and hybrid
 
TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024TriStar Gold Corporate Presentation May 2024
TriStar Gold Corporate Presentation May 2024
 
Stages of Startup Funding - An Explainer
Stages of Startup Funding - An ExplainerStages of Startup Funding - An Explainer
Stages of Startup Funding - An Explainer
 
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptxBlinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
Blinkit: Revolutionizing the On-Demand Grocery Delivery Service.pptx
 
Copyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to KnowCopyright: What Creators and Users of Art Need to Know
Copyright: What Creators and Users of Art Need to Know
 
Hyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings releaseHyundai capital 2024 1q Earnings release
Hyundai capital 2024 1q Earnings release
 
Constitution of Company Article of Association
Constitution of Company Article of AssociationConstitution of Company Article of Association
Constitution of Company Article of Association
 
Pitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deckPitch Deck Teardown: Terra One's $7.5m Seed deck
Pitch Deck Teardown: Terra One's $7.5m Seed deck
 
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdfبروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
بروفايل شركة ميار الخليج للاستشارات الهندسية.pdf
 
The Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdfThe Truth About Dinesh Bafna's Situation.pdf
The Truth About Dinesh Bafna's Situation.pdf
 

Slids of intellegent assignment

  • 1. Intelligent Urban Traffic Control System (KKKA 6424) Assignment no .1 Traffic Light Setting Supervisor Prof. Dr. Riza Atiq Abdullah OK Rehmat Prepared by: Rasha salah ahmed P64799 Sarah hazim P65407
  • 2. Fig (1) (The Study area) Location of intersections
  • 3.
  • 4. First Intersection Phase Traffic volume Actual flow (pcu/hr) saturation flowper lane (pcu/hr) saturation flow (pcu/hr) Y= flow/sat uration flow Green time split Y / ∑y (Y / ∑y) *Geleft straight right 1 111 88 199 1800 3600 0.1 0.33 8 2 95 201 296 1800 3600 0.1 0.33 8 3 85 100 185 1800 3600 0.1 0.33 8 ∑y=0.3 ∑=24
  • 5. 1. L(losttime)=3×(3+2)=15sec 2. Co= (1.5 𝐿 +5 1−∑𝑌 = 1.5 15 +5 1−0.3 =39.28 takeCo=40sec 3. Effectivegreentime(Ge)=Co-L=40-15=25sec (Multiplythisvalueingreentimesplit to getthefinalcolumn). 4. Totalgreentime=24sec 5. Cycletime=greentime+losttime =24+15=39sec
  • 6. Secondintersection Phase Trafficvolume Actual flow (pcu/hr) saturation flowper lane (pcu/hr) saturation flow (pcu/hr) Y= flow/sat uration flow Green timesplit Y/∑y (Y/∑y) *Geleft straight right 1 80 328 184 592 1800 3600 0.16 0.31 16 2 84 140 98 322 1800 3600 0.1 0.19 10 3 148 252 160 560 1800 3600 0.16 0.31 16 4 64 92 120 276 1800 3600 0.1 0.19 10 ∑y=0.52 ∑=52
  • 7. 1. L (lost time) =4× (3+2) =20 sec 2. Co= (1.5 𝐿 +5 1−∑𝑌 = 1.5 20 +5 1−0.52 =72.9 take Co=73 sec 3. Effective green time (Ge) =Co-L =73-20=53 sec (Multiply this value in green time split to get the final column). 4. Total green time=52 sec 5. Cycle time =green time + lost time =52+20=72 sec
  • 8. Thirdintersection Phase Trafficvolume Actual flow (pcu/hr) saturation flowper lane (pcu/hr) saturation flow (pcu/hr) Y= flow/sat uration flow Green time split Y/∑y (Y/ ∑y) *Ge left straight right 1 151 215 99 465 1800 3600 0.13 0.217 15 2 90 198 75 363 1800 3600 0.1 0.167 11 3 88 119 90 297 1800 3600 0.1 0.167 11 4 356 501 113 970 1800 3600 0.27 0.45 31 ∑y=0.6 ∑=68
  • 9. 1. L (lost time) =4× (3+2) =20 sec 2. Co= (1.5 𝐿 +5 1−∑𝑌 = 1.5 20 +5 1−0.6 =87.5 take Co=88 sec 3. Effective green time (Ge) =Co-L =88-20=68 sec (Multiply this value in green time split to get the final column). 4. Total green time=68 sec 5. Cycle time =green time + lost time =68+20=88 sec.  To determine (offset time) T ideal from inter1 to 2: T ideal= 𝐿 𝑆 − 𝑄 × ℎ + 𝑙𝑜𝑠𝑠 𝑡𝑖𝑚𝑒 Where: L=450m S=10m/sec Q=14 cars h=2sec Loss time=2 sec. T ideal=15 sec.  To determine (offset time) T ideal from inter 2 to 3: L=650m S=10m/sec Q=12 cars h=2 sec Loss time=2 sec T ideal=39 sec
  • 10.
  • 11. We choosethe maximum value ofC₀ = 88 and make recalculation for the greentime, and the new results inthe table below: Co=88 Ge=Co-L=88-20=68 sec phase Intersection 1 Intersection 2 Intersection 3 GreenTime = (Y/∑ Y)*Ge GreenTime = (Y/∑ Y)*Ge GreenTime = (Y/∑ Y)*Ge Q1 23 21 15 Q2 23 13 11 Q3 22 21 11 Q4 13 31 ∑=68 ∑=68 ∑=68 So the new diagramwill be like the following: