SlideShare a Scribd company logo
1 of 8
Download to read offline
PACULBA DANIEL B.
Email Add: dhanielpaculba@gmail.com
Contact No;7802715552
JOURNEY MAN PIPEFITTER
PERSONAL DATA
City Address : 108B-4617 137 Ave.NW Edmonton AB T5A 3S8
Provincial Address : Lao Sta. Cruz Plaridel Misamis Occidental
Date of Birth : June 4, 1971
Place of Birth : Lao Sta. Cruz Plaridel Misamis Occidental
Height : 5’6”
Weight : 76 kls..
Religion : Roman Catholic
Civil Status : Married
Citizenship : Filipino
Sex : Male
Passport ; EB7385400
Seaman Book ; B0784992
EDUCATIONAL ATTAINMENT
Elementary : Sta. Cruz Elementary School
Plaridel Misamis Occidental
High School : Saint Nicholas High School
Plaridel Misamis Occidental
Vocational : None
Course : Bachelor of Science in Marine Engineering
Special Skills : Pipe Fitter/ welding,/ Structural, Rigger, Fabrication/foreman
TRAINING CERTIFICATE;
STEAMFITTER-PIPEFITTER/EFFECTIVE DATE APRIL 17TH ,ISSUE JUNE 2ND 2014
Technical Education and Skills ;National Certificate (NC)11 Pipefitting;;Certificate
NO. 11130502014207 May 20.2011
The Maritime Training Center; Basic Safety Training; Certificate No.BR05-370-09 May
20.2009
Southern Institute of Maritime; Proficiency in Survival Craft and Rescue Boats;
Certificate No.MPSC-105-10-8714 .May 24/27 /2010
Southern Institute of Maritime; Ship Security Awareness; Certificate No.MISPS-069-10-
5301.May 21.2010
Transnational Institute of Learning ; Shielded Metal Arc Welding (SMAW) NC 11 Certificate
No.023 June 21 to 02 July /2010
Basic Safety Training and Instruction; Certificate No.14-431251B July 13/2010
Certificate of Competency; Certificate No.09131100036084 Nov.20.2009
Ge0graphe Energy Ingenuity at Work. March 18.2010
John MC Gregor Marine weld Inc. Basic Lathe Machine .Course certificate
No.LM-1000202 October 19 to 23.2009
John MC Gregor Maritime weld Inc . Marine Fitter/ Welder .Certificate
No.SF-783209 October 09 2009
Incident and Injury-Free. Training Course. September 30 to November 16.2007
WORK HISTORY:
May.14,2013 to Present URS Flint Energy 100,2899 Broadmoor Boulevard
Sherwood Park,Alberta T8H 1B5
Position; Pipefitter
Job Description;
Check the drawing and location for preparation for all tool and materials fit-up welding
and alignment and installation of spool install of valve gasket bolt and support. for inspection
and erection preparation of work tool spool and materials check for ground level for fit-up
alignment and welding and prepared for erection of pipe. line checking and punch list bolt up
perpared for balance of materials installation of support fit-up alingment and handling of support
valave flange gasket botl ang install.and tightening and torquing.installed and cutting of pipe
valve bolt gasket and supports.
Feb.18.2012 to Jun 02,2013; Kcoi/ Enertech Company
Kazahgan -D-island Kazakhstan Offshore
Oil&Gas Experimental Project.
Position Field Engineer
Job Description;
Iso drawing lay –out marked with the position where the construction is going to take
action.Punch list in which should be indicated the punch items that we are going to close.
Materials list available material list with only the items that will be installed as per the
constructability dossier. Document will be given to the store signed by the person that will
collect the materials. Copy of the material available list should be always given in advance
to the material. Coordinator so to verify the real availability of the materials and take action.
Working for Mechanical Completion preparation of mechanical drawing and piping.
And checking for a checklist the drawing for mechanical flash gas compression and main power
generation emergency power oil separation .Working for PSA1-process support area1 and area
2 pau area process utility area and riser island. PSNM03A general arrangement VA-VJ-HN
name plate drawing details and hvac for mechanical completion confirm associated instrument
checklist complete.Check the correct filter element has been installed verify vessel and drain
valves.And fitting and connections complete as per drawing . Check the equipment details are
correct has been installed check tank and base are level foundation and grouting are correct.
Check all joints between dissimilar metals for galvanic corrosion potential .check the man way
is accessible. Confirm the strainer filter correct type in accordance with relevant specifications
strainer type single duplex.Check pipe work is aligned correctly and check that the damper is
installed and access is available to damper internals.
April /05.2011 /Feb,08/2012 Kent Eng’g & Constructors Kentz MEPC MALAYSIA)
SDN BHD Png Lng Project-EPC4,hides gas conditioning
Plant hides CHGCP&hides well pads
Client;CBI Clough Joint Venture C/ESSO Highland LTD.
Png Project Papua New Guinea Oil&Gas
Position ; Piping Foreman
Job Description;
Preparation tools &materials &install of piping at ground level and along the
Bracket line cut pipe to size copper tube and fixtures cut untruth and fix to plinthInstallation of
metal bracket and water test line and install hot/cold water lines.And equipment underneath
modules.Installation of wash hand basins toilets and pipe work drill timber for holes for drain
lines Install fire reel and lay water lines drilling and bolting of support for the 25mm dia.
pipe.And pump out overflow tank repair leaks and fabricate drain lines for dryers and drill ang
hole for drain line. Installed water supply line for ice maker machine working underneath the
kitchen building fit- up for 25mm super pipe with male socket super pipe clip unfix clamp with
nut and bolt and pvc reducing bush copper flexible and elbow gate valve and pvc pipe
August 26.2010 /March.11.2011 United Holding/ Hail Lick Engineering PTL Ltd.
No.12 Teas Drive 1 Singapore 2263.
Potion Pipefitter
Job Description;
Study and analyses for fabrication and erection and structural pipe rack and piping and
support coordinates with engineer regarding to revisions and modification and discrepancy on
issued for fabrication drawing.fit up responsible for preparation of all fabrication piping fit-up
assembly responsible for checking materials as per specification and drawing. To be used for
fabrication as structural pipe support responsible for lay out cutting as per materials and plan
required in fabrication coordinates with pipefitter welder and 12’’asphalt line pipe supports and
pad shoes and guide and anchor are in process and Revising plan to re issue by mid of next
week. And attached advance copy of related isometric and all pipe support and steam tracer and
isometric drawing.
March 12. 2010./May 18.2010 Cape East phil./Conoco Phillip.
Oil&Gas Off Shore Shut Down Project
Bayun-dan East Timor
Position : Pipefitter
Job Description;
Preparation tools and materials and drawing and isometric drawing fit-up and
alignment of pipe and erection and assembly of structural pipe rack and erection of pipe and
valve fabrication and fit-up of concentric reducer and eccentric reducer and blind flange
alignment of pipe support and removing and installs of pipe and bolt flange alignment of flange
bolt and gasket and lay out and assembling of structural and erection.Measuring and preparing
pipe for fabrication and installation and bending steel and stainless steel pipe to given
dimensions fitting up flanges for welding.
May 16, 2008 / July 18. 2009 Goro Nickel Project / E.E.I Corporation
New Caledonia / Inco Australia
Position : Pipefitter
Job Description;
`Preparation all tools and materials this ARE # 260. 270. 255. 245. 275. Fit-up and
Erection fiber resins pipe and steel pipe and alignment and erection of storage tanks for process
solution chloride and steel pipe Blind flange and speed blind bolt gasket for testing for water
filling and water flushing check the man way overflow. Have specified gasket and blind flanges
all nozzles have gasket flange cover for water filling for protection only.Erection for another
work pipe and fit-up for connecting for storage bank 1, 2, 3, 4, and 5. For process solution
chloride and alignment and fit-up and erection 8” 6” 4” 2” 10” of pipe and installed for butterfly
valve gasket. blind flange and stud bolts and nuts and spools of pipe and support and alignment
checking the line and drawing and materials for a final inspection. GCT Recommended or
required skill includes physical strength and manual dexterity. reading and interpreting blueprints
and specifications making detailed sketches for pipe and equipment fabrication and installation
and cutting opening for pipe using various hand or power tools measuring cutting with blades
and torches threading grooving bending soldering brazing welding assembling mitering joining
and installing pipes valve and fittings.
August 10, 2007 to January 24, 2008 Washington Group International
Al Jabber Energy Services
Oil&gas Ras Laffan Industrial City State of Qatar
Position : Piping foreman/structural
Job Description;
Preparation of materials and handling of scabbing the top off foundations shim plate
fixing and pre assembly and erection of unity pipe rock. Preparation of tools and materials
hauling and fabrication base plate and lifting pad eye for erection module 1. 2 and 3 unloading
and pre assembly of pipe rack structure on wooden sleepers and erection grids and secure
each grid with wires to concrete blocks and chain black chain pullers erection of connecting
members and fit-up and alignment to utility line nitrogen line steam line and fabrication of pipe
support installation of valve and gasket bolt and support maybe be designated according to
type of system installed as a pipe fitter. Ammonia construction pipefitter fire-sprinkler system
construction pipefitter gas Pipe construction or type of piping used as pipefitter plastic pipe soft
copper and Construction may be designated airdrop fitter mine and quarry fright-air-brake
November 4, 2006 to July 27, 2007 Sonamet Lobeto Angola Africa
Off shore Project / Oil and Gas
Position : Pipefitter
Job Description;
Preparation of piping Initial structure for piping duplex pipe see drawing black is –GP
July 25, 2005 to July 25, 2006 Nasser Al Hajre Co. Ltd.
ORYX –GTL Project, RASLAFFAN
Industrial City State of Qatar
(Joint Venture of Qatar Petroleum and Sasol,
South Africa)Oil&Gas
Position : Pipefitter
Job Description;
Preparation for erection to all materials of acid into mixed bed polisher and a mixed
polisher b and fit-up 8” 10” 4” 2” 3” 1” 12” pipe for another line spent requirement line from
mixed bed polisher and acoustic line and water block desalinated water recycle and installation
for to unit 126 Jug Water tank erection and fit-up and alignment installation for utility line
to bisulfate tank and air line 96% sulfur acid line ¾ to unit 129 caustic soda from unit 146
Preparation for another work tools drawing and handling and materials of Supply and spools belt
up to flange gasket blind flange valve for primary service in hiker line and mixed bed polisher a
face piping A and B and mixed bed polisher B interconnect to mixed bed polisher and a mixing
air blower line assembles and installs of valve of metal and nonmetals pipe tubes and fittings
including of iron steel copper and plastic connects pipes using threaded Caulked soldered brazed
fused or cemented joint and hand tools secures pipe to structure with brackets clamps and hanger
using hand tools and power tools installs and maintains hydraulic and pneumatic components
of machines and equipment such as pumps and cylinders using hand tools and maintains
refrigeration and air conditioning system and pumps meters pneumatic and hydraulic controls
and piping using hand tools and power tools and following specification and blueprint increases
pressure in pipe system and observes connected pressure gauge to test system for leak and weld
pipe support to structural steel members
November 20, 2004 / May 6, 2005 : DSEC Company Limited
Asa Loye, Iran
Oil&Gas &9th Olefins Cracker Plant Project
Position : Pipefitter
Job Description;
Preparation of tools and drawing and materials expedites the materials of the different
group for supporting materials and preparation . Checking the drawing for laying pipe for fit-up
or 36” 40” 60” 80” and 120” diameter CWR and CWS sea water line and fabrication of 10mm
plate as blind cover of the1270mm radius pipe fit- up tack and welding on the half –v-bel created
on the pipe and erection of pipe 80’’60’’ 36’’ 40’’and pipe laying and fit up and alignment.
January 29, 2003 / April 5, 2004 : EEI / ARCC Al Rushed Const. Corp.
AL KHOBAR KSA
Berri Gas Plant Project
Position : Pipefitter
Job Description
Preparation of tools for fabrication and grander drawing and materials preparation of
spools pipe and chain block for rig-up for erection for pipe spools and control air system for fit-
up and installed the valves and the correct gasket and also the bolts nuts erection the water line
of the boiler and rig-up hanging support for checking the line are complete support and valve.
flange .gasket and bolts inspection for QC. Preparation for another work expedites the materials
and checking to be sure that all line complete fittings are installed is correct including the bolt
and gasket fit-up and rig-up of steam supply flange valve for final bolting for inspection for
ARAMCO QC.
April 8, 2001 to December 22, 2002 : EEI / ARCC AL – Rushed Const. Corp.
Al Khobar KSA
Ghazlan Power Plant Project
Rastanura, KSA
Position Pipefitter
Job Description;
Checking the drawing and the complete materials and spools sling cable and chain block
for erections fit-up for steam line and installations of (lines) valves and fabrication fit-up and rig-
up of spools and elbow 90” 20” and handling support and valve flange gasket nut and bolts.
Erection the water wall of the boiler line installed the pipe steam drum. Steam tracing installation
and fabrication of support of exhaust system producing of all types of pipes boiler and spiral of
longitudinal for all lines and fit-up of heavy wall pipe and flange and valve “20” and installed
the pipe and support. Erection another work and fit-up of heavy wall pipe cold reheat line and
hot reheat line and steam line installed and erection the water line of the boiler installed the pipe
line of steam drum.
September 29, 1999 to March 20, 2000 EEI CORPORATION
MRT2 MITSUBISHI PROJECT
Quezon City Philippines
Position : Pipe Fitter
Job Description;
Assist for another work provides the packer plate activities include leveling and
elevation of packer plate also check the strength by testing and hammer Expedites the materials
of the different groups and cleaning of bolts and valve flange steam line and steam tracing
installation and fabrication of exhaust system and erection and installation of valve and erection
of air plant and nitrogen plant and horizontal and dummy pipe and support and erection of
structural I beam and alignment of member and bolting checking of materials.
July 15, 1994 – March 22, 1996 EEI CORPORATION
D.S.M.C Davao City
Darong Toril Davao City
Position : Pipe Fitter
Job Description;
Erection the water wall of the boiler installed the pipeline of steam drum steam tracing
installation and fabrication of exhaust system producing of all types of pipes boiler and spiral of
longitudinal for oil lines. Erection and fit-up of heavy wall pipe and valve and installed the pipe
and support. Prepared tools and materials for fit-up and erection of valve. For inspection and
erection.
November 26, 1997 to August 10, 1999 EEI CORPORATION
POWER PLANT PROJECT
Mau ban Quezon Province Philippines
Position : Pipe Fitter
Job Description;
Fit –up and fabrication of spools and erection of pipe and alignment
Installation of spools steam line and valve gasket bolt and support
Installed nitrogen line water line steam and erection

More Related Content

What's hot

Paul's Resume 2016 r2
Paul's Resume 2016 r2Paul's Resume 2016 r2
Paul's Resume 2016 r2Paul Jennings
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Chandra ABS IV
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher
 
ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)Aravinth Jai
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Sangilimuthu Samiayyah
 
Peter Bartlett - Personal CV (March 2016)
Peter Bartlett - Personal CV (March 2016)Peter Bartlett - Personal CV (March 2016)
Peter Bartlett - Personal CV (March 2016)Bartlett (Perth)
 
QA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyQA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyAjith Puthoor
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015TREVOR KEMP
 
CV CANADA OCT 2016
CV CANADA OCT 2016CV CANADA OCT 2016
CV CANADA OCT 2016Shaun Fagan
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineerAhmed Hamdy
 
Caleb T Bentsen Resume
Caleb T Bentsen ResumeCaleb T Bentsen Resume
Caleb T Bentsen ResumeCaleb Bentsen
 
RIL DIAZ edited
RIL DIAZ editedRIL DIAZ edited
RIL DIAZ editedRil diaz
 

What's hot (20)

Paul's Resume 2016 r2
Paul's Resume 2016 r2Paul's Resume 2016 r2
Paul's Resume 2016 r2
 
C. Leon Resume 2015
C. Leon Resume 2015C. Leon Resume 2015
C. Leon Resume 2015
 
Copy of HARDENBERGH JOBS
Copy of HARDENBERGH JOBSCopy of HARDENBERGH JOBS
Copy of HARDENBERGH JOBS
 
Veerasekar api inspectorresume
Veerasekar api inspectorresumeVeerasekar api inspectorresume
Veerasekar api inspectorresume
 
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
Senior Inspection Engineer V.Chandrasekhar RESUME as on 01-12-2014
 
HARIDI CV2015
HARIDI CV2015HARIDI CV2015
HARIDI CV2015
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)ARAVINTH(CV Aramco Approved)
ARAVINTH(CV Aramco Approved)
 
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
Cv of qaqc, inspection engineer, welding, painting & coating inspector. s.san...
 
Peter Bartlett - Personal CV (March 2016)
Peter Bartlett - Personal CV (March 2016)Peter Bartlett - Personal CV (March 2016)
Peter Bartlett - Personal CV (March 2016)
 
res 2
res 2res 2
res 2
 
QA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - CopyQA- QC INSPECTOR AJITH CV - Copy
QA- QC INSPECTOR AJITH CV - Copy
 
CV 3
CV 3CV 3
CV 3
 
abc
abcabc
abc
 
Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015Trevor Kemp CV - January 2015
Trevor Kemp CV - January 2015
 
CV CANADA OCT 2016
CV CANADA OCT 2016CV CANADA OCT 2016
CV CANADA OCT 2016
 
(QA_QC Welding,piping engineer
(QA_QC  Welding,piping engineer(QA_QC  Welding,piping engineer
(QA_QC Welding,piping engineer
 
Caleb T Bentsen Resume
Caleb T Bentsen ResumeCaleb T Bentsen Resume
Caleb T Bentsen Resume
 
RIL DIAZ edited
RIL DIAZ editedRIL DIAZ edited
RIL DIAZ edited
 
Willden Residence
Willden ResidenceWillden Residence
Willden Residence
 

Similar to Untitled document (1)

Similar to Untitled document (1) (20)

ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)
 
Brent Golemiec resume march 2016
Brent Golemiec resume march 2016Brent Golemiec resume march 2016
Brent Golemiec resume march 2016
 
Matt 2014 resume
Matt 2014 resumeMatt 2014 resume
Matt 2014 resume
 
Babbu jakir resume
Babbu jakir resumeBabbu jakir resume
Babbu jakir resume
 
resume'
resume'resume'
resume'
 
resume piping
resume pipingresume piping
resume piping
 
Troy resume 2014
Troy resume 2014Troy resume 2014
Troy resume 2014
 
Troy resume 2014
Troy resume 2014Troy resume 2014
Troy resume 2014
 
chem resume
chem resumechem resume
chem resume
 
Resume 2022(1).pdf
Resume 2022(1).pdfResume 2022(1).pdf
Resume 2022(1).pdf
 
sung's resume
sung's resumesung's resume
sung's resume
 
Don's #2
Don's #2Don's #2
Don's #2
 
Piping Welding Engineer
Piping Welding EngineerPiping Welding Engineer
Piping Welding Engineer
 
SteveBowenResume1
SteveBowenResume1SteveBowenResume1
SteveBowenResume1
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMER
 
Pipe fabricator cv venkata ratna kumar yarrapragada
Pipe fabricator cv venkata ratna kumar yarrapragadaPipe fabricator cv venkata ratna kumar yarrapragada
Pipe fabricator cv venkata ratna kumar yarrapragada
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Jerry Ingalls Resume 06.27.16
Jerry Ingalls Resume 06.27.16Jerry Ingalls Resume 06.27.16
Jerry Ingalls Resume 06.27.16
 
Resume
ResumeResume
Resume
 
LINGAM
LINGAMLINGAM
LINGAM
 

Untitled document (1)

  • 1. PACULBA DANIEL B. Email Add: dhanielpaculba@gmail.com Contact No;7802715552 JOURNEY MAN PIPEFITTER PERSONAL DATA City Address : 108B-4617 137 Ave.NW Edmonton AB T5A 3S8 Provincial Address : Lao Sta. Cruz Plaridel Misamis Occidental Date of Birth : June 4, 1971 Place of Birth : Lao Sta. Cruz Plaridel Misamis Occidental Height : 5’6” Weight : 76 kls.. Religion : Roman Catholic Civil Status : Married Citizenship : Filipino Sex : Male Passport ; EB7385400 Seaman Book ; B0784992 EDUCATIONAL ATTAINMENT Elementary : Sta. Cruz Elementary School Plaridel Misamis Occidental High School : Saint Nicholas High School Plaridel Misamis Occidental Vocational : None Course : Bachelor of Science in Marine Engineering Special Skills : Pipe Fitter/ welding,/ Structural, Rigger, Fabrication/foreman TRAINING CERTIFICATE; STEAMFITTER-PIPEFITTER/EFFECTIVE DATE APRIL 17TH ,ISSUE JUNE 2ND 2014 Technical Education and Skills ;National Certificate (NC)11 Pipefitting;;Certificate NO. 11130502014207 May 20.2011 The Maritime Training Center; Basic Safety Training; Certificate No.BR05-370-09 May 20.2009 Southern Institute of Maritime; Proficiency in Survival Craft and Rescue Boats; Certificate No.MPSC-105-10-8714 .May 24/27 /2010 Southern Institute of Maritime; Ship Security Awareness; Certificate No.MISPS-069-10- 5301.May 21.2010 Transnational Institute of Learning ; Shielded Metal Arc Welding (SMAW) NC 11 Certificate No.023 June 21 to 02 July /2010 Basic Safety Training and Instruction; Certificate No.14-431251B July 13/2010 Certificate of Competency; Certificate No.09131100036084 Nov.20.2009 Ge0graphe Energy Ingenuity at Work. March 18.2010 John MC Gregor Marine weld Inc. Basic Lathe Machine .Course certificate
  • 2. No.LM-1000202 October 19 to 23.2009 John MC Gregor Maritime weld Inc . Marine Fitter/ Welder .Certificate No.SF-783209 October 09 2009 Incident and Injury-Free. Training Course. September 30 to November 16.2007 WORK HISTORY: May.14,2013 to Present URS Flint Energy 100,2899 Broadmoor Boulevard Sherwood Park,Alberta T8H 1B5 Position; Pipefitter Job Description; Check the drawing and location for preparation for all tool and materials fit-up welding and alignment and installation of spool install of valve gasket bolt and support. for inspection and erection preparation of work tool spool and materials check for ground level for fit-up alignment and welding and prepared for erection of pipe. line checking and punch list bolt up perpared for balance of materials installation of support fit-up alingment and handling of support valave flange gasket botl ang install.and tightening and torquing.installed and cutting of pipe valve bolt gasket and supports. Feb.18.2012 to Jun 02,2013; Kcoi/ Enertech Company Kazahgan -D-island Kazakhstan Offshore Oil&Gas Experimental Project. Position Field Engineer Job Description; Iso drawing lay –out marked with the position where the construction is going to take action.Punch list in which should be indicated the punch items that we are going to close. Materials list available material list with only the items that will be installed as per the constructability dossier. Document will be given to the store signed by the person that will collect the materials. Copy of the material available list should be always given in advance to the material. Coordinator so to verify the real availability of the materials and take action. Working for Mechanical Completion preparation of mechanical drawing and piping. And checking for a checklist the drawing for mechanical flash gas compression and main power generation emergency power oil separation .Working for PSA1-process support area1 and area 2 pau area process utility area and riser island. PSNM03A general arrangement VA-VJ-HN name plate drawing details and hvac for mechanical completion confirm associated instrument checklist complete.Check the correct filter element has been installed verify vessel and drain valves.And fitting and connections complete as per drawing . Check the equipment details are correct has been installed check tank and base are level foundation and grouting are correct.
  • 3. Check all joints between dissimilar metals for galvanic corrosion potential .check the man way is accessible. Confirm the strainer filter correct type in accordance with relevant specifications strainer type single duplex.Check pipe work is aligned correctly and check that the damper is installed and access is available to damper internals. April /05.2011 /Feb,08/2012 Kent Eng’g & Constructors Kentz MEPC MALAYSIA) SDN BHD Png Lng Project-EPC4,hides gas conditioning Plant hides CHGCP&hides well pads Client;CBI Clough Joint Venture C/ESSO Highland LTD. Png Project Papua New Guinea Oil&Gas Position ; Piping Foreman Job Description; Preparation tools &materials &install of piping at ground level and along the Bracket line cut pipe to size copper tube and fixtures cut untruth and fix to plinthInstallation of metal bracket and water test line and install hot/cold water lines.And equipment underneath modules.Installation of wash hand basins toilets and pipe work drill timber for holes for drain lines Install fire reel and lay water lines drilling and bolting of support for the 25mm dia. pipe.And pump out overflow tank repair leaks and fabricate drain lines for dryers and drill ang hole for drain line. Installed water supply line for ice maker machine working underneath the kitchen building fit- up for 25mm super pipe with male socket super pipe clip unfix clamp with nut and bolt and pvc reducing bush copper flexible and elbow gate valve and pvc pipe August 26.2010 /March.11.2011 United Holding/ Hail Lick Engineering PTL Ltd. No.12 Teas Drive 1 Singapore 2263. Potion Pipefitter Job Description; Study and analyses for fabrication and erection and structural pipe rack and piping and support coordinates with engineer regarding to revisions and modification and discrepancy on issued for fabrication drawing.fit up responsible for preparation of all fabrication piping fit-up assembly responsible for checking materials as per specification and drawing. To be used for fabrication as structural pipe support responsible for lay out cutting as per materials and plan required in fabrication coordinates with pipefitter welder and 12’’asphalt line pipe supports and pad shoes and guide and anchor are in process and Revising plan to re issue by mid of next week. And attached advance copy of related isometric and all pipe support and steam tracer and isometric drawing.
  • 4. March 12. 2010./May 18.2010 Cape East phil./Conoco Phillip. Oil&Gas Off Shore Shut Down Project Bayun-dan East Timor Position : Pipefitter Job Description; Preparation tools and materials and drawing and isometric drawing fit-up and alignment of pipe and erection and assembly of structural pipe rack and erection of pipe and valve fabrication and fit-up of concentric reducer and eccentric reducer and blind flange alignment of pipe support and removing and installs of pipe and bolt flange alignment of flange bolt and gasket and lay out and assembling of structural and erection.Measuring and preparing pipe for fabrication and installation and bending steel and stainless steel pipe to given dimensions fitting up flanges for welding. May 16, 2008 / July 18. 2009 Goro Nickel Project / E.E.I Corporation New Caledonia / Inco Australia Position : Pipefitter Job Description; `Preparation all tools and materials this ARE # 260. 270. 255. 245. 275. Fit-up and Erection fiber resins pipe and steel pipe and alignment and erection of storage tanks for process solution chloride and steel pipe Blind flange and speed blind bolt gasket for testing for water filling and water flushing check the man way overflow. Have specified gasket and blind flanges all nozzles have gasket flange cover for water filling for protection only.Erection for another work pipe and fit-up for connecting for storage bank 1, 2, 3, 4, and 5. For process solution chloride and alignment and fit-up and erection 8” 6” 4” 2” 10” of pipe and installed for butterfly valve gasket. blind flange and stud bolts and nuts and spools of pipe and support and alignment checking the line and drawing and materials for a final inspection. GCT Recommended or required skill includes physical strength and manual dexterity. reading and interpreting blueprints and specifications making detailed sketches for pipe and equipment fabrication and installation and cutting opening for pipe using various hand or power tools measuring cutting with blades and torches threading grooving bending soldering brazing welding assembling mitering joining and installing pipes valve and fittings. August 10, 2007 to January 24, 2008 Washington Group International Al Jabber Energy Services Oil&gas Ras Laffan Industrial City State of Qatar Position : Piping foreman/structural
  • 5. Job Description; Preparation of materials and handling of scabbing the top off foundations shim plate fixing and pre assembly and erection of unity pipe rock. Preparation of tools and materials hauling and fabrication base plate and lifting pad eye for erection module 1. 2 and 3 unloading and pre assembly of pipe rack structure on wooden sleepers and erection grids and secure each grid with wires to concrete blocks and chain black chain pullers erection of connecting members and fit-up and alignment to utility line nitrogen line steam line and fabrication of pipe support installation of valve and gasket bolt and support maybe be designated according to type of system installed as a pipe fitter. Ammonia construction pipefitter fire-sprinkler system construction pipefitter gas Pipe construction or type of piping used as pipefitter plastic pipe soft copper and Construction may be designated airdrop fitter mine and quarry fright-air-brake November 4, 2006 to July 27, 2007 Sonamet Lobeto Angola Africa Off shore Project / Oil and Gas Position : Pipefitter Job Description; Preparation of piping Initial structure for piping duplex pipe see drawing black is –GP July 25, 2005 to July 25, 2006 Nasser Al Hajre Co. Ltd. ORYX –GTL Project, RASLAFFAN Industrial City State of Qatar (Joint Venture of Qatar Petroleum and Sasol, South Africa)Oil&Gas Position : Pipefitter Job Description; Preparation for erection to all materials of acid into mixed bed polisher and a mixed polisher b and fit-up 8” 10” 4” 2” 3” 1” 12” pipe for another line spent requirement line from mixed bed polisher and acoustic line and water block desalinated water recycle and installation for to unit 126 Jug Water tank erection and fit-up and alignment installation for utility line to bisulfate tank and air line 96% sulfur acid line ¾ to unit 129 caustic soda from unit 146 Preparation for another work tools drawing and handling and materials of Supply and spools belt up to flange gasket blind flange valve for primary service in hiker line and mixed bed polisher a face piping A and B and mixed bed polisher B interconnect to mixed bed polisher and a mixing air blower line assembles and installs of valve of metal and nonmetals pipe tubes and fittings including of iron steel copper and plastic connects pipes using threaded Caulked soldered brazed fused or cemented joint and hand tools secures pipe to structure with brackets clamps and hanger
  • 6. using hand tools and power tools installs and maintains hydraulic and pneumatic components of machines and equipment such as pumps and cylinders using hand tools and maintains refrigeration and air conditioning system and pumps meters pneumatic and hydraulic controls and piping using hand tools and power tools and following specification and blueprint increases pressure in pipe system and observes connected pressure gauge to test system for leak and weld pipe support to structural steel members November 20, 2004 / May 6, 2005 : DSEC Company Limited Asa Loye, Iran Oil&Gas &9th Olefins Cracker Plant Project Position : Pipefitter Job Description; Preparation of tools and drawing and materials expedites the materials of the different group for supporting materials and preparation . Checking the drawing for laying pipe for fit-up or 36” 40” 60” 80” and 120” diameter CWR and CWS sea water line and fabrication of 10mm plate as blind cover of the1270mm radius pipe fit- up tack and welding on the half –v-bel created on the pipe and erection of pipe 80’’60’’ 36’’ 40’’and pipe laying and fit up and alignment. January 29, 2003 / April 5, 2004 : EEI / ARCC Al Rushed Const. Corp. AL KHOBAR KSA Berri Gas Plant Project Position : Pipefitter Job Description Preparation of tools for fabrication and grander drawing and materials preparation of spools pipe and chain block for rig-up for erection for pipe spools and control air system for fit- up and installed the valves and the correct gasket and also the bolts nuts erection the water line of the boiler and rig-up hanging support for checking the line are complete support and valve. flange .gasket and bolts inspection for QC. Preparation for another work expedites the materials and checking to be sure that all line complete fittings are installed is correct including the bolt and gasket fit-up and rig-up of steam supply flange valve for final bolting for inspection for ARAMCO QC. April 8, 2001 to December 22, 2002 : EEI / ARCC AL – Rushed Const. Corp. Al Khobar KSA Ghazlan Power Plant Project Rastanura, KSA
  • 7. Position Pipefitter Job Description; Checking the drawing and the complete materials and spools sling cable and chain block for erections fit-up for steam line and installations of (lines) valves and fabrication fit-up and rig- up of spools and elbow 90” 20” and handling support and valve flange gasket nut and bolts. Erection the water wall of the boiler line installed the pipe steam drum. Steam tracing installation and fabrication of support of exhaust system producing of all types of pipes boiler and spiral of longitudinal for all lines and fit-up of heavy wall pipe and flange and valve “20” and installed the pipe and support. Erection another work and fit-up of heavy wall pipe cold reheat line and hot reheat line and steam line installed and erection the water line of the boiler installed the pipe line of steam drum. September 29, 1999 to March 20, 2000 EEI CORPORATION MRT2 MITSUBISHI PROJECT Quezon City Philippines Position : Pipe Fitter Job Description; Assist for another work provides the packer plate activities include leveling and elevation of packer plate also check the strength by testing and hammer Expedites the materials of the different groups and cleaning of bolts and valve flange steam line and steam tracing installation and fabrication of exhaust system and erection and installation of valve and erection of air plant and nitrogen plant and horizontal and dummy pipe and support and erection of structural I beam and alignment of member and bolting checking of materials. July 15, 1994 – March 22, 1996 EEI CORPORATION D.S.M.C Davao City Darong Toril Davao City Position : Pipe Fitter Job Description; Erection the water wall of the boiler installed the pipeline of steam drum steam tracing installation and fabrication of exhaust system producing of all types of pipes boiler and spiral of longitudinal for oil lines. Erection and fit-up of heavy wall pipe and valve and installed the pipe and support. Prepared tools and materials for fit-up and erection of valve. For inspection and erection.
  • 8. November 26, 1997 to August 10, 1999 EEI CORPORATION POWER PLANT PROJECT Mau ban Quezon Province Philippines Position : Pipe Fitter Job Description; Fit –up and fabrication of spools and erection of pipe and alignment Installation of spools steam line and valve gasket bolt and support Installed nitrogen line water line steam and erection