SlideShare a Scribd company logo
1 of 24
Download to read offline
1
CURRICULUM VITAE.
NAME; PIUS,
SURNAME; OKUKPE,
NATIONALITY; NIGERIAN,
STATE OF ORIGIN; DELTA
SEX; MALE
DATE OF BIRTH; 1st JANUARY 1966
MARITAL STATUS; MARRIED
RELIGION; CHRISTIAN
OCCUPATION; PIPE FITTER GENERAL FOREMAN
HOME ADDRESS; 20 OGBE STREET OFF IGBIAYE ST.
MARINE QUARTER WARRI
PHONE NUMBER; 08057494174 AND 08021134095
E-MAIL ADDRESS; payeh4real@gmail.com
SCHOOLS ATTENDED WITH DATES
Petroleum Training Institute, Effurun
Higher National Diploma (HND) on Welding and Fabrication 2001 - 2004
Ordinary National Diploma (OND) on Welding and Fabrication 1990-1991
General Welding Certificate 1986-1986
Secondary School Attended.
Aladja Grammar School Aladja 1978-1983
Primary School Attended
Ogedegbe Primary School Warri 1970-1976
2
PROFESSIONAL CERTIFICATION WITH DATES.
Radiographic film Interpretation (RFI) America Society of Non Destructive Testing
(ASNT) level 2. Trained by Gennaseret Resources Nigerian Limited September
2011.
Ultrasonic Testing (UT) American Society of Non Destructive Testing (ASNT) level
2. Trained by Gennasaret Resources Nigerian Limited September 2011.
Dye Penetrant Testing (PT) American Society of Non Destructive Testing (ASNT)
level 2. Trained by Gennasaret Resources Nigerian Limited September 2011.
Magnetic Particle Testing (MT) American Society of Non Destructive Testing
(ASNT) level 2 September 2011.
FROM AUGUST 2009 TO JULY 2012I HAVE BEEN TRAINED BY SOUTHERN GAS
CONSTRUCTOR LIMITED ON THE UNDER LISTED SAFETY COURSES.
Total Safety Task Instruction (TSTI) Practical.
Total Safety Task Observation (TSTO) Practical.
Confine Space Safety.
Crane and Rigging Safety.
Fall Protection Safety
Scaffold Safety
Fire Protection Safety
Hazard Identification
Basic Electrical Safety
Total Safety Task Instruction (TSTI) for Supervisors1 Hand Power Tool
Safety
First Aid Training
Excavation Safety
Basic Personnel Protective Equipment (PPE)
3
Lock Out Tag Out (LOTO)
Grating Removal Safety
Manual Material Handling
Ladder Safety
Incident and Injury Free Refresher Course
Bench and Angle Grinder Safety.
WORKING EXPERIENCE WITH DATES.
I have worked as a Pipe fitter, Pipe fitter Foreman, Pipe fitter General Foreman,
Pipe fitter Supervisor, QA,QC and Mechanical Supervisor.
August 2009 to July 2012.
Client; Chevron Nigerian Limited.
Project; Escravos Gas To Liquid EGTL. Escravos Delta State
Major Contractor; Southern Gas Constructor Nigerian Limited. SGC.
Sub-Contractor; Daewoo Engineering and construction
Local Content Contractor; Pi-Moff Resources Nigerian Limited.
Department; Mechanical.
Position; Pipe Fitter General Foreman (supervisor) with SGC Barge No 007874
Responsibilities.
Interpretation of General Arrangement Drawing (G.A)
Interpretation of Isometric drawing of spools to determine their accurate
orientations and co-ordinates.
Interpretation of piping and Instrument diagram (P. & I.D.)
Calculation of lateral coupling of pipe nipple, marked and cut to angles
with hand cutting torch to form elbows of any degree.
Calculation of orientation of various degree of isometric drawing of spools.
4
Threading of small diameter galvanized pipes to fit threaded Elbows
Valves, Tees to required dimension.
Lateral coupling of branch and run pipes of various diameter for
underground drainage piping system.
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Calculations of Lengths of pipe nipples and take-off for 30, 45, 60, 70, 90,
degree elbows, tees, reducers, flanges and valves to fit spools dimensions
during workshop and field fabrications.
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
torch from wrong designed spools.
Erecting of newly fabricated spools in the main Process Area, in unit 30B
train 1 & train 2, unit 20B, the two Boiler’s units, the two Slurry Hoppers,
unit 50H, unit 50A and hanging of pipe Supports for the spools.
Pressure testing of completed spools in accordance to specifications.
January 2008 to February 2009.
Client; Shell Petroleum Development Company Nigerian Limited,
Project; West Africa Gas Project WAGP Oben Gas Plant. Edo State,
Contractor; Lee Engineering Company Nigerian Limited,
Department; Mechanical,
Position; QA,QC/Mechanical Supervisor,
Responsibilities.
Prepare the project QA plan in connection with the project manager and
the QA manager in at had office.
Verify that the quality related activities are in accordance with applicable
code, specification and regulations
Ensuring recording updating and distribution of documents and
information i.e procedures, drawing plans, reports and certificate
5
Identify any deficiency, promote corrective actions and verify their
implementation.
Verify that contract quality requirement are specified to vendors and
subcontractors.
Ensuring the surveillance at subcontractor works.
Ensuring that measures are taken in order to identify and prevent
acceptance or defective materials
Ensuring collection of documentation and certificates related to materials
purchased by my company and their subcontractors.
Prepare QC plans for production phase and review quality plans issued by
subcontractors and vendors.
Ensuring the inspection and testing in compliance with established QC.
Plans
Ensuring the compliance of final documentation to be issued to client.
November 2006 to December 2007.
Client; Delta Steel Company Limited.
Project; Rehabilitation of Direct Reduction Plant, Repair of Strand Guide in Steel
Rolling Shop and Removal of Storage Hurdles in Rolling Mill Shop.
Contractor; Equilibrium Global Technical Services.
Position; Managing Director.
Responsibilities
Interpretation of General Arrangement Drawing (G.A)
Interpretations of welding symbols to fit the desired joint specifies by
drawing.
Coupling of Beams, Angle Iron, U Channels with hand cutting torch and
assembling them to specifications to form platforms for the plating of the
roof of the Direct Reduction Plant.
6
Pre-heating of distorted welded structures and spools with pre-heating
torch to accurate dimensions and shape to conform with specifications of
drawing.
Accurate cutting of pipes, plate and beams with hand cutting torch with
oxy-acetylene gas.
Cutting of pipes and plates with oxy-acetylene cutting machine (beveling
and automatic cutting machine for plate).
The use of Jack Hammer for the breaking of concrete to expose the base of
the beam of the Storage Hurdles for cutting.
Drilling of holes on the main frame of the Strand Guide for rollers that will
convey the billet from the melting pot.
Project Management of the entire cost of the project and being
responsible for the welfare of welders and others who worked in the
project.
September to October 2006.
Client; Acergy, Polaris Barge.
Project; Installation of 1800 Tonne J Lay in Port Genty Gabon (Offshore).
Contractor; Globestar Engineering Company Limited
Department; Mechanical.
Position; Pipe fitter.
Responsibilities.
Coupling of Beams, Angle Iron, U Channels with hand cutting torch and
assembling them to specifications to form platform for the base of the J
Lay
Gouging of beam structures with hand cutting torch from the deck of the
barge to create enough space for the J Lay.
Accurate cutting of pipes, plate and beams with hand cutting torch with
oxy-acetylene gas.
7
Cutting of pipes and plates with oxy-acetylene cutting machine (beveling
and automatic machine for plate).
Lateral coupling of branch and run pipes of various diameters to
strengthen the base of the J Lay.
November 2005 to June 2006.
Client; Chevron Nigeria Limited.
Project; Upgrade of Olero Flowstation. Escravos Field (Offshore) Delta State.
Contractor; Idmon Engineering Company Nigeria Limited.
Department; Mechanical
Position; Pipe fitter Supervisor.
Responsibilities
Interpretation of General Arrangement Drawing (G.A)
Interpretation of isometric drawing of spools to determine their accurate
orientations and co-ordinates.
Interpretation of piping and Instrument diagram (P. & I.D.)
Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,
reducers, flanges and valves to fit spools dimensions during field
fabrication and erection.
Designing of isometric drawing and fabricating them to conform to field
requirement and specifications.
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
torch from wrong spool designs.
Pressure testing of completed spools in accordance to specifications.
Internal trimming with hand cutting torch and grinding of unequal pipe
thickness and fittings to avoid excessive high low
8
Erecting of fabricated spools and hanging of pipe Support.
Threading of small diameter galvanized pipes to fit threaded Elbows
Valves, Tees to required dimension.
Pressure testing of completed spools in accordance to specifications.
March 2000 to September 2004.
Client; Elf
Project; Amenam-Kpono 1&2 Production Platform
Contractor; Globstar Engineering Company Limited, Warri Yard Delta State
Department; Mechanical.
Position; Pipe fitter.
Responsibilities.
Accurate cutting of beams, U channels, Angle iron in beam shop with Oxy-
acetylene hand cutting torch in preparation for beam erection to form
various levels of the platform.
Calculations of pipe nipples and take-off for 30, 45, 60, 70, 90, degree
elbows, tees, reducers, flanges and valves to fit spools dimensions during
spools fabrication in Pipe shop and field erection.
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Calculation of lateral coupling of pipe nipple, marked and cut to angles with
hand cutting torch to form elbows of any degree.
Calculation of orientation of any degree of various isometric drawing of
spools.
Internal trimming with hand cutting torch and grinding of unequal pipe
thickness and fittings to avoid excessive high low in workshop fabrication.
Pre-heating of distorted welded structures and spools with pre-heating
torch to accurate dimensions and shape to conform with specifications of
drawing.
9
Bending of small diameter pipes with hydraulic pump to form elbow
(degree) of various angle to fabricate a complete spool.
Threading of small diameter galvanized pipes to fit threaded Elbows, Valves
and Tees to required dimension.
Cutting of spools and plates with oxy-acetylene cutting machine (beveling
and automatic machine for plate).
Erecting of fabricated spools in the newly constructed Production Platform
and hanging of pipe Support for spools.
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
torch from wrong spool design.
Pressure testing of completed spools in accordance to specifications.
January to October 1999.
Client; Shell Petroleum Development Company.
Project; Upgrade of Ogini flow station Ozoro, Delta State.
Contractor; Grammen Petroserve Engineering Company Limited
Department; Mechanical.
Position; Pipe fitter Foreman.
Responsibilities.
Interpretation of General Arrangement Drawing (G.A)
Interpretation of piping and Instrument diagram (P. & I.D.)
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Interpretation of isometric drawing of spools to determine their accurate
orientations and co-ordinates.
Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,
reducers, flanges and valves to fit spools dimensions for workshop and
field erection
10
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
torch from wrong spool designs.
Calculation of orientation of any degree of various isometric drawing of
spools.
Internal trimming with hand cutting torch and grinding of unequal pipe
thickness and fittings to avoid excessive high low during fabrication.
Erecting of fabricated spools in the flow station and hanging of pipe
Support.
Pressure testing of completed spools in accordance to specifications.
February 1997 to April 1998.
Client; Mobil
Project; Ekpe Production Platform and 165 meter Flare Bridge,
Contractor; Globestar Engineering Company Limited Warri Yard, Delta State.
Department; Mechanical
Position; Pipe fitter
Responsibilities;
Interpretation of drawing for spools to determine their accurate
orientations and co-ordinates.
Calculations of pipe nipples and take-off for 30, 45, 60, 70, 90, degree
elbows, tees, reducers, flanges and valves to fit spools dimensions in
workshop fabrication of spools during workshop fabrication and field
erection.
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
torch from wrong spool designs.
11
Interpretation of General Arrangement Drawing (G.A)
Internal trimming with hand cutting torch and grinding of unequal pipe
thickness and fittings to avoid excessive high low during spool fabrication
in pipe shop
Erecting of fabricated spools from pipe shop in the newly constructed
Production Platform and hanging of pipe Support for the spools.
Coupling of Beams, Angle Iron, U Channels with hand cutting torch and
assembling them to specifications to form platforms for various levels of
decks during the fabrication of the platform.
Pre-heating of distorted welded structures and spools with pre-heating
torch to accurate dimensions and shape to conform to drawing
specification.
Bending of small diameter pipes with hydraulic pump to form elbow
(degree) of various angle to fabricate a complete spool.
Threading of small diameter galvanized pipes to fit threaded Elbows
Valves, Tees to required dimension
Pressure testing of completed spools in accordance to specification
October to December 1996.
Client; Mobil
Project; Upgrade of Oso Production Platform.
Contractor; Dickson Nigeria Company Limited.
Department; Mechanical,
Position; Pipe fitter
Responsibilities;
Interpretation of isometric drawing of spools to determine their accurate
orientations and co-ordinates.
Tie in of 16 inches Riser delivery line lied by Polaris Badge ( Globestar
Offshore)
12
Designing of isometric drawing and fabricating them to conform to field
requirement and specifications.
Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,
reducers, flanges and valves to fit spools dimensions during erection.
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
torch from wrong spools designs
Interpretation of General Arrangement Drawing (G.A)
Calculation of orientation of various degrees of isometric drawing of
spools.
Erecting of completed fabricated spools from workshop and hanging of
pipe Support for spools.
Erecting of Riser spools of complicated bend to manifold skid.
Coupling of Beams, Angle Iron, U Channels with hand cutting torch and
assembling them to specifications to form platforms for extension.
Pressure testing of completed spools in accordance to specifications.
August to October 1996.
Client; Chevron Nigeria Limited
Project; Upgrade of Meren Water Injection Platform, Escravos Delta State
Offshore
Contractor; Dickson Nigeria Limited,
Department; Mechanical,
Position; Pipe fitter
Responsibilities;
Interpretation of General Arrangement Drawing (G.A)
13
Calculation of orientation of various degrees of isometric drawing of
spools.
Interpretation of drawing for spools to determine their accurate
orientations and co-ordinates.
Designing of isometric drawing and fabricating them to conform to field
requirement and specifications.
Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,
reducers, flanges and valves to fit spools dimensions.
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
torch from wrong designs.
Erecting of completed fabricated spools from workshop and hanging of
pipe Support for spools.
Erecting of Riser spools of complicated bend to manifold skid.
Coupling of Beams, Angle Iron, U Channels with hand cutting torch and
assembling them to specifications to form platforms
Pressure testing of completed spools in accordance to specifications.
June to July 1996.
Client; Mobil
Project; Repair of Boat Landing During Installation of Edoup Water Injection
Platform, Eket Cross River State Offshore
Contractor; Dickson Nigeria Limited,
Department; Mechanical,
Position; Pipe fitter,
Responsibilities;
14
Accurate cutting of spools, plate and beams with hand cutting torch using
oxy-acetylene gas.
Cutting of spools and plates with oxy-acetylene cutting machine (beveling
and automatic machine for plate).
Lateral coupling of branch and run pipes of various diameter e.g. 4 to 6,
inches, 8 to 10 inches
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
torch from damage area of the boat landing.
January to April 1996.
Client; Chevron in Zaire
Project; Upgrade of Two Production Platform and a One leg Jacket on wellhead in
Zaire
Contractor; Dickson Nigeria Limited,
Department; Mechanical,
Position; Pipe fitter,
Responsibilities;
Designing of isometric drawing and fabricating them to conform to field
requirement and specifications.
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
torch from wrong spool designs.
Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,
reducers, flanges and valves to fit spools dimensions.
Interpretations of welding symbols to fit the desired joint specifies by
drawing.
15
Calculation of orientation of various degrees of isometric drawing of
spools.
Threading of small diameter galvanized pipes to fit threaded Elbows
Valves, Tees to required dimension
Accurate cutting of spools, plate and beams with hand cutting torch with
oxy-acetylene gas.
Lateral coupling of branch and run pipes of various diameter e.g. 4 to 6,
inches, 8 to 10 inches as brackets for deck extensions.
Pressure testing of completed spools in accordance to specifications.
May to August 1995.
Client; Chevron Nigeria Limited
Project; Upgrade of Esan Production Platform Escrovos Deita State Offshore
Contractor; Dickson Nigeria Limited,
Department; Mechanical,
Position; Pipe fitter
Responsibilities;
Interpretation of isometric drawing of spools to determine their accurate
orientations and co-ordinates.
Designing of isometric drawing to conform to field requirement and
specifications.
Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,
reducers, flanges and valves to fit spools dimensions.
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
torch from wrong spool designs
Interpretation of General Arrangement Drawing (G.A)
16
Interpretation of piping and Instrument diagram (P. & I.D.)
Calculation of orientation of various degrees of isometric drawing of
spools.
Erecting of completed fabricated spools from workshop and hanging of
pipe Support.
Erecting of Riser spools of complicated bend to manifold skid.
Coupling of Beams, Angle Iron, U Channels with hand cutting torch and
assembling them to specifications to form platforms extension.
Pressure testing of completed spools in accordance to specifications.
March to May 1995.
Client; Chevron Nigeria Limited,
Project; Upgrade of Meren Production Platform, Escravos, Delta State,
Contractor; Dickson Nigeria Limited,
Department; Mechanical,
Position; Pipe fitter,
Responsibilities;
Designing of isometric drawing to conform to field requirement and
specifications.
Calculations of pipe nipples and take-off for 30, 45, 70, 90, degree elbows,
tees, reducers, flanges and valves to fit spools dimensions during erection
of spools.
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
torch from wrong spool designs
Calculation of orientation of various degrees of isometric drawing of
spools.
17
Erecting of newly fabricated spools from workshop and hanging of pipe
Support.
Erecting of Riser spools of complicated bend to the existing manifold of the
Platforms (Offshore)
Coupling of Beams, Angle Iron, U Channels with hand cutting torch and
assembling them to specifications to form platforms deck extension.
Pre-heating of distorted welded structures and spools with pre-heating
torch to accurate dimensions and shape to conform to specifications of
drawing.
Bending of small diameter pipes with hydraulic pump to form elbow
(degree) of various angle to fabricate a complete spool.
Pressure testing of completed spools in accordance to specifications.
October 1994 to January 1995.
Client; Chevron, Cabinda Angola.
Project; Modification of Alfa and Tsahala 5 Production Platform Cabinda Angola.
Contractor; Dickson Nigeria Limited,
Department; Mechanial,
Position; Pipe fitter,
Responsibilities;
Hot bolting of in-service line in preparation form shut down
Flushing of products from the lines and cutting of unwanted lines with cold
cutter to give way for new lines
Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,
reducers, flanges and valves to fit spools dimensions.
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
18
torch from wrong spool designs.
Calculation of orientation of various degrees of isometric drawing of spools.
Disconnecting of old manifold and extending of the manifold area to create
enough space for the new one.
Erecting of newly fabricated spools from workshop and hanging of pipe
Support.
Erecting of Riser spools of complicated bend to the existing manifold of the
Platforms (Offshore)
Coupling of Beams, Angle Iron, U Channels with hand cutting torch and
assembling them to specifications to form platforms for extension
Designing of isometric drawing and fabricating them to conform to field
requirement and specifications.
Pressure testing of completed spools in accordance to specifications.
March to May 1994.
Client; Chevron Nigeria Limited,
Project; Installation of four different One leg Platform on Wellhead around
Meren, Delta, Okha and Delta South Production Platform.
Contractor; Dickson Nigeria Limited,
Department; Mechanical,
Position; Pipe fitter,
Responsibilities;
Continues cutting and chamfering of the 48 inches pipe (the leg) with a
beveling machine and a preheating torch at the same time during piling of
the leg.
Fitting of the One leg Platform to the already piled leg with the Wellhead
at the center of the 48 inches pipe (leg)
Connecting of newly fabricated spools and hanging of pipe support.
19
January to March 1994.
Client; Texaco
Project; Installation of Water Injection Unit in Penninton Production Platform
Offshore River State.
Contractor; Dickson Nigeria Limited,
Department; Mechanical,
Position; Pipe fitter.
Responsibilities.
Interpretation of General Arrangement Drawing (G.A)
Interpretation of drawing for spools to determine their accurate
orientations and co-ordinates.
Designing of isometric drawing and fabricating them to conform to field
requirement and specifications.
Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,
reducers, flanges and valves to fit spools dimensions.
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
torch from wrong spool designs.
Erecting of fabricated spools and hanging of pipe Support
Connecting of Riser spools to the newly install manifold.
Pressure testing of completed spools in accordance to specifications.
July to December 1993.
Client; Chevron Nigeria Limited,
20
Project; Upgrade of Delta South Production Platform, Escravos, Delta State
Contractor; Dickson Nigeria Limited,
Department; Mechanical.
Position; Pipe fitter,
Responsibilities;
Hot bolting of in-service line in preparation form shut down
Flushing of products from the lines and cutting of unwanted lines with
cold cutter to give way for new lines
Disconnecting of old manifold and extending of the manifold area to
create enough space for the new one.
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
torch from wrong spool designs.
Calculation of orientation of various degrees of isometric drawing of
spools.
Designing of isometric drawing and fabricating them to conform to field
requirement and specifications.
Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,
reducers, flanges and valves to fit spools dimensions.
Erecting of fabricated spools and hanging of pipe Support.
Pressure testing of completed spools in accordance to specifications
March to June 1993.
Client; Chevron Nigeria Limited,
21
Project; Upgrade of Tapa Production Platform Escravos Delta State.
Contractor; Dickson Nigeria Limited.
Department; Mechanical,
Position; Pipe fitter
Responsibilities;
Hot bolting of in-service line in preparation form shut down
Flushing of products from the lines and cutting of unwanted lines with cold
cutter to give way for new lines
Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees,
reducers, flanges and valves to fit spools dimensions.
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
torch from wrong spool designs.
Calculation of orientation of various degrees of isometric drawing of spools.
Disconnecting of old manifold and extending of the manifold area to create
enough space for the new one.
Erecting of newly fabricated spools from workshop and hanging of pipe
Support.
Designing of isometric drawing and fabricating them to conform to field
requirement and specifications.
Pressure testing of completed spools in accordance to specification
January to December 1992.
Client; Elf
Project; Alfia Odudu Production Platform,
Contractor; Globstar Engineering Company Limited, Warri Yard Delta State
22
Department; Mechanical
Position; Pipe fitter
Responsibilities;
Calculations of pipe nipples and take-off for 30, 45, 60, 70, 90, degree
elbows, tees, reducers, flanges and valves to fit spools dimensions.
Interpretations of welding symbols to fit the desired joint design specifies
by drawing.
Calculation of lateral coupling of pipe nipples, marked and cut to angles
with hand cutting torch to form elbows of various degree.
Calculating of orientation of various degree of isometric drawing of spools.
Internal trimming with hand cutting torch and grinding of unequal pipe
thickness and fittings to avoid excessive high low in pipe shop.
Coupling of Beams, Angle Iron, U Channels with hand cutting torch and
assembling them to specifications to form platforms of various levels.
Pre-heating of distorted welded structures and spools with pre-heating
torch to accurate dimensions and shape to conform to specifications of
drawing.
Bending of small diameter pipes with hydraulic pump to form elbow
(degree) of various angle to fabricate a complete spool.
Threading of small diameter galvanized pipes to fit threaded Elbows
Valves, Tees to required dimension
Accurate cutting of pipe, plate and beams with hand cutting torch with
oxy-acetylene gas.
Cutting of spools and plates with oxy-acetylene cutting machine (beveling
and automatic machine for plate).
Erecting of fabricated spools in newly constructed Production Platform and
hanging of pipe Support for the spools.
Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
23
torch from wrong spool designs
Pressure testing of completed spools in accordance to specifications.
October 1990 to January 1991.
Client; Shell Petroleum Development Company Limited
Project; Rehabilitation of Storage Tanks Ogulagha Forcados Terminal Delta State
Contractor; Harbour-work Nigeria Limited,
Department; Mechanical,
Position; Industrial Attachment,
Responsibilities;
Accurate cutting of spools, plate and beams with hand cutting torch using
oxy-acetylene gas.
Cutting of spools and plates with oxy-acetylene cutting machine (beveling
and automatic machine for plate).
Post weld heat treatment PWHT of nozzles welded with flanges to the wall
of the Tanks for receiving and discharging of products.
February to April 1987.
Client; Nigerian National Petroleum Cooperation NNPC
Project; De-Bottlenecking Project Warri Refinery Ekpan Delta State,
Contractor; Snamprogetti
Department; Mechanical
Position; Pipe fitter.
Responsibilities;
Erecting of fabricated spools and hanging of pipe Support .
ASSOCIATIONS .
24
Member of the Nigerian National Fitters Association (NNFA)
Member of the Nigerian Institute of Welding (NIW)
Member of American Welding Society (AWS)
Member of America Society of Non-destructive Testing (ASNT)
OTHER INFORMATION
Computer Literate,
Pass SPDC – Survival Swimming Training
Holder of the Nigerian National Driver’ License
HOBBIES; Table tennis, Volley ball, Swimming and Reading.
REFEREES.
Fred Okoh,
Site Manager.
Pi-Moff Resourses Nig. Ltd.
Km 1 NPA Express way off Temile close
Ugbangwe. Warri Delta State.
REFEREES.
Chris Ozegbe,
Personnel Manager,
Globestar Engineering Company Nig Ltd
Warri. Delta State.

More Related Content

What's hot

What's hot (20)

sung's resume
sung's resumesung's resume
sung's resume
 
Resume
ResumeResume
Resume
 
K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014
K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014
K.VIJAYAKUMAR CV FOR FIELD ENGINEER- PAINTING INSULATION FIREPROOFING04122014
 
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATIONRESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
RESUME OF QAQC INSPECTOR COATING/PAINTING AND INSULATION
 
Kenneth Blaxton resume
Kenneth Blaxton resumeKenneth Blaxton resume
Kenneth Blaxton resume
 
srini cv latest
srini cv latestsrini cv latest
srini cv latest
 
QC Supervisor Saji M
QC Supervisor Saji MQC Supervisor Saji M
QC Supervisor Saji M
 
MANAGER.QAQC(MECHANICAL)-1
MANAGER.QAQC(MECHANICAL)-1MANAGER.QAQC(MECHANICAL)-1
MANAGER.QAQC(MECHANICAL)-1
 
piping foreman resume
piping foreman resumepiping foreman resume
piping foreman resume
 
Peter Holt CV 12-05-2015
Peter Holt CV 12-05-2015Peter Holt CV 12-05-2015
Peter Holt CV 12-05-2015
 
senthilkumar CV
senthilkumar CVsenthilkumar CV
senthilkumar CV
 
kiruba new resume
kiruba new resumekiruba new resume
kiruba new resume
 
Resume welder
Resume welderResume welder
Resume welder
 
Brian_Resume_revise 3
Brian_Resume_revise 3Brian_Resume_revise 3
Brian_Resume_revise 3
 
PALANIIAPPAN CV (1)
PALANIIAPPAN CV (1)PALANIIAPPAN CV (1)
PALANIIAPPAN CV (1)
 
CAWI resumee
CAWI resumeeCAWI resumee
CAWI resumee
 
DEEPES - Copy (2)
DEEPES - Copy (2)DEEPES - Copy (2)
DEEPES - Copy (2)
 
RIL DIAZ edited
RIL DIAZ editedRIL DIAZ edited
RIL DIAZ edited
 
02Resume updated
02Resume updated02Resume updated
02Resume updated
 
NAIYAR CV 1st FEB 2015
NAIYAR CV 1st  FEB 2015NAIYAR CV 1st  FEB 2015
NAIYAR CV 1st FEB 2015
 

Similar to Pius Okukpe CV

Similar to Pius Okukpe CV (20)

Untitled document (1)
Untitled document (1)Untitled document (1)
Untitled document (1)
 
Siddharth_resume_Engg.
Siddharth_resume_Engg.Siddharth_resume_Engg.
Siddharth_resume_Engg.
 
LINGAM
LINGAMLINGAM
LINGAM
 
MANAGER.QAQC(MECHANICAL)
MANAGER.QAQC(MECHANICAL)MANAGER.QAQC(MECHANICAL)
MANAGER.QAQC(MECHANICAL)
 
Elpidio Gomez Cert Welder
Elpidio Gomez Cert WelderElpidio Gomez Cert Welder
Elpidio Gomez Cert Welder
 
CV_Balaji 2016
CV_Balaji 2016CV_Balaji 2016
CV_Balaji 2016
 
Ruben+Dela+Pena_Resume_4
Ruben+Dela+Pena_Resume_4Ruben+Dela+Pena_Resume_4
Ruben+Dela+Pena_Resume_4
 
PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME  PIPING SUPERVISOR RESUME
PIPING SUPERVISOR RESUME
 
CV CANADA OCT 2016
CV CANADA OCT 2016CV CANADA OCT 2016
CV CANADA OCT 2016
 
Sathish_CV Quality Control Engineer
Sathish_CV Quality Control EngineerSathish_CV Quality Control Engineer
Sathish_CV Quality Control Engineer
 
Piping & Pipeline Designer
Piping & Pipeline DesignerPiping & Pipeline Designer
Piping & Pipeline Designer
 
Mohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-WeldingMohammad Taher_QA-QC Piping-Welding
Mohammad Taher_QA-QC Piping-Welding
 
Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)Resume_Nitin Lonkar (1)
Resume_Nitin Lonkar (1)
 
Vijay Anand Cv-2016
Vijay Anand Cv-2016Vijay Anand Cv-2016
Vijay Anand Cv-2016
 
CV CANADA JULY 2016
CV CANADA JULY 2016CV CANADA JULY 2016
CV CANADA JULY 2016
 
Pipe fabricator cv venkata ratna kumar yarrapragada
Pipe fabricator cv venkata ratna kumar yarrapragadaPipe fabricator cv venkata ratna kumar yarrapragada
Pipe fabricator cv venkata ratna kumar yarrapragada
 
Rajeshwaran - Resume
Rajeshwaran - ResumeRajeshwaran - Resume
Rajeshwaran - Resume
 
Gudekar Mitesh Dilipbhai
Gudekar Mitesh DilipbhaiGudekar Mitesh Dilipbhai
Gudekar Mitesh Dilipbhai
 
R.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.docR.muthukumar piping design engineer.doc
R.muthukumar piping design engineer.doc
 
Michael CV.
Michael CV.Michael CV.
Michael CV.
 

Pius Okukpe CV

  • 1. 1 CURRICULUM VITAE. NAME; PIUS, SURNAME; OKUKPE, NATIONALITY; NIGERIAN, STATE OF ORIGIN; DELTA SEX; MALE DATE OF BIRTH; 1st JANUARY 1966 MARITAL STATUS; MARRIED RELIGION; CHRISTIAN OCCUPATION; PIPE FITTER GENERAL FOREMAN HOME ADDRESS; 20 OGBE STREET OFF IGBIAYE ST. MARINE QUARTER WARRI PHONE NUMBER; 08057494174 AND 08021134095 E-MAIL ADDRESS; payeh4real@gmail.com SCHOOLS ATTENDED WITH DATES Petroleum Training Institute, Effurun Higher National Diploma (HND) on Welding and Fabrication 2001 - 2004 Ordinary National Diploma (OND) on Welding and Fabrication 1990-1991 General Welding Certificate 1986-1986 Secondary School Attended. Aladja Grammar School Aladja 1978-1983 Primary School Attended Ogedegbe Primary School Warri 1970-1976
  • 2. 2 PROFESSIONAL CERTIFICATION WITH DATES. Radiographic film Interpretation (RFI) America Society of Non Destructive Testing (ASNT) level 2. Trained by Gennaseret Resources Nigerian Limited September 2011. Ultrasonic Testing (UT) American Society of Non Destructive Testing (ASNT) level 2. Trained by Gennasaret Resources Nigerian Limited September 2011. Dye Penetrant Testing (PT) American Society of Non Destructive Testing (ASNT) level 2. Trained by Gennasaret Resources Nigerian Limited September 2011. Magnetic Particle Testing (MT) American Society of Non Destructive Testing (ASNT) level 2 September 2011. FROM AUGUST 2009 TO JULY 2012I HAVE BEEN TRAINED BY SOUTHERN GAS CONSTRUCTOR LIMITED ON THE UNDER LISTED SAFETY COURSES. Total Safety Task Instruction (TSTI) Practical. Total Safety Task Observation (TSTO) Practical. Confine Space Safety. Crane and Rigging Safety. Fall Protection Safety Scaffold Safety Fire Protection Safety Hazard Identification Basic Electrical Safety Total Safety Task Instruction (TSTI) for Supervisors1 Hand Power Tool Safety First Aid Training Excavation Safety Basic Personnel Protective Equipment (PPE)
  • 3. 3 Lock Out Tag Out (LOTO) Grating Removal Safety Manual Material Handling Ladder Safety Incident and Injury Free Refresher Course Bench and Angle Grinder Safety. WORKING EXPERIENCE WITH DATES. I have worked as a Pipe fitter, Pipe fitter Foreman, Pipe fitter General Foreman, Pipe fitter Supervisor, QA,QC and Mechanical Supervisor. August 2009 to July 2012. Client; Chevron Nigerian Limited. Project; Escravos Gas To Liquid EGTL. Escravos Delta State Major Contractor; Southern Gas Constructor Nigerian Limited. SGC. Sub-Contractor; Daewoo Engineering and construction Local Content Contractor; Pi-Moff Resources Nigerian Limited. Department; Mechanical. Position; Pipe Fitter General Foreman (supervisor) with SGC Barge No 007874 Responsibilities. Interpretation of General Arrangement Drawing (G.A) Interpretation of Isometric drawing of spools to determine their accurate orientations and co-ordinates. Interpretation of piping and Instrument diagram (P. & I.D.) Calculation of lateral coupling of pipe nipple, marked and cut to angles with hand cutting torch to form elbows of any degree. Calculation of orientation of various degree of isometric drawing of spools.
  • 4. 4 Threading of small diameter galvanized pipes to fit threaded Elbows Valves, Tees to required dimension. Lateral coupling of branch and run pipes of various diameter for underground drainage piping system. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Calculations of Lengths of pipe nipples and take-off for 30, 45, 60, 70, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions during workshop and field fabrications. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from wrong designed spools. Erecting of newly fabricated spools in the main Process Area, in unit 30B train 1 & train 2, unit 20B, the two Boiler’s units, the two Slurry Hoppers, unit 50H, unit 50A and hanging of pipe Supports for the spools. Pressure testing of completed spools in accordance to specifications. January 2008 to February 2009. Client; Shell Petroleum Development Company Nigerian Limited, Project; West Africa Gas Project WAGP Oben Gas Plant. Edo State, Contractor; Lee Engineering Company Nigerian Limited, Department; Mechanical, Position; QA,QC/Mechanical Supervisor, Responsibilities. Prepare the project QA plan in connection with the project manager and the QA manager in at had office. Verify that the quality related activities are in accordance with applicable code, specification and regulations Ensuring recording updating and distribution of documents and information i.e procedures, drawing plans, reports and certificate
  • 5. 5 Identify any deficiency, promote corrective actions and verify their implementation. Verify that contract quality requirement are specified to vendors and subcontractors. Ensuring the surveillance at subcontractor works. Ensuring that measures are taken in order to identify and prevent acceptance or defective materials Ensuring collection of documentation and certificates related to materials purchased by my company and their subcontractors. Prepare QC plans for production phase and review quality plans issued by subcontractors and vendors. Ensuring the inspection and testing in compliance with established QC. Plans Ensuring the compliance of final documentation to be issued to client. November 2006 to December 2007. Client; Delta Steel Company Limited. Project; Rehabilitation of Direct Reduction Plant, Repair of Strand Guide in Steel Rolling Shop and Removal of Storage Hurdles in Rolling Mill Shop. Contractor; Equilibrium Global Technical Services. Position; Managing Director. Responsibilities Interpretation of General Arrangement Drawing (G.A) Interpretations of welding symbols to fit the desired joint specifies by drawing. Coupling of Beams, Angle Iron, U Channels with hand cutting torch and assembling them to specifications to form platforms for the plating of the roof of the Direct Reduction Plant.
  • 6. 6 Pre-heating of distorted welded structures and spools with pre-heating torch to accurate dimensions and shape to conform with specifications of drawing. Accurate cutting of pipes, plate and beams with hand cutting torch with oxy-acetylene gas. Cutting of pipes and plates with oxy-acetylene cutting machine (beveling and automatic cutting machine for plate). The use of Jack Hammer for the breaking of concrete to expose the base of the beam of the Storage Hurdles for cutting. Drilling of holes on the main frame of the Strand Guide for rollers that will convey the billet from the melting pot. Project Management of the entire cost of the project and being responsible for the welfare of welders and others who worked in the project. September to October 2006. Client; Acergy, Polaris Barge. Project; Installation of 1800 Tonne J Lay in Port Genty Gabon (Offshore). Contractor; Globestar Engineering Company Limited Department; Mechanical. Position; Pipe fitter. Responsibilities. Coupling of Beams, Angle Iron, U Channels with hand cutting torch and assembling them to specifications to form platform for the base of the J Lay Gouging of beam structures with hand cutting torch from the deck of the barge to create enough space for the J Lay. Accurate cutting of pipes, plate and beams with hand cutting torch with oxy-acetylene gas.
  • 7. 7 Cutting of pipes and plates with oxy-acetylene cutting machine (beveling and automatic machine for plate). Lateral coupling of branch and run pipes of various diameters to strengthen the base of the J Lay. November 2005 to June 2006. Client; Chevron Nigeria Limited. Project; Upgrade of Olero Flowstation. Escravos Field (Offshore) Delta State. Contractor; Idmon Engineering Company Nigeria Limited. Department; Mechanical Position; Pipe fitter Supervisor. Responsibilities Interpretation of General Arrangement Drawing (G.A) Interpretation of isometric drawing of spools to determine their accurate orientations and co-ordinates. Interpretation of piping and Instrument diagram (P. & I.D.) Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions during field fabrication and erection. Designing of isometric drawing and fabricating them to conform to field requirement and specifications. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from wrong spool designs. Pressure testing of completed spools in accordance to specifications. Internal trimming with hand cutting torch and grinding of unequal pipe thickness and fittings to avoid excessive high low
  • 8. 8 Erecting of fabricated spools and hanging of pipe Support. Threading of small diameter galvanized pipes to fit threaded Elbows Valves, Tees to required dimension. Pressure testing of completed spools in accordance to specifications. March 2000 to September 2004. Client; Elf Project; Amenam-Kpono 1&2 Production Platform Contractor; Globstar Engineering Company Limited, Warri Yard Delta State Department; Mechanical. Position; Pipe fitter. Responsibilities. Accurate cutting of beams, U channels, Angle iron in beam shop with Oxy- acetylene hand cutting torch in preparation for beam erection to form various levels of the platform. Calculations of pipe nipples and take-off for 30, 45, 60, 70, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions during spools fabrication in Pipe shop and field erection. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Calculation of lateral coupling of pipe nipple, marked and cut to angles with hand cutting torch to form elbows of any degree. Calculation of orientation of any degree of various isometric drawing of spools. Internal trimming with hand cutting torch and grinding of unequal pipe thickness and fittings to avoid excessive high low in workshop fabrication. Pre-heating of distorted welded structures and spools with pre-heating torch to accurate dimensions and shape to conform with specifications of drawing.
  • 9. 9 Bending of small diameter pipes with hydraulic pump to form elbow (degree) of various angle to fabricate a complete spool. Threading of small diameter galvanized pipes to fit threaded Elbows, Valves and Tees to required dimension. Cutting of spools and plates with oxy-acetylene cutting machine (beveling and automatic machine for plate). Erecting of fabricated spools in the newly constructed Production Platform and hanging of pipe Support for spools. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from wrong spool design. Pressure testing of completed spools in accordance to specifications. January to October 1999. Client; Shell Petroleum Development Company. Project; Upgrade of Ogini flow station Ozoro, Delta State. Contractor; Grammen Petroserve Engineering Company Limited Department; Mechanical. Position; Pipe fitter Foreman. Responsibilities. Interpretation of General Arrangement Drawing (G.A) Interpretation of piping and Instrument diagram (P. & I.D.) Interpretations of welding symbols to fit the desired joint design specifies by drawing. Interpretation of isometric drawing of spools to determine their accurate orientations and co-ordinates. Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions for workshop and field erection
  • 10. 10 Interpretations of welding symbols to fit the desired joint design specifies by drawing. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from wrong spool designs. Calculation of orientation of any degree of various isometric drawing of spools. Internal trimming with hand cutting torch and grinding of unequal pipe thickness and fittings to avoid excessive high low during fabrication. Erecting of fabricated spools in the flow station and hanging of pipe Support. Pressure testing of completed spools in accordance to specifications. February 1997 to April 1998. Client; Mobil Project; Ekpe Production Platform and 165 meter Flare Bridge, Contractor; Globestar Engineering Company Limited Warri Yard, Delta State. Department; Mechanical Position; Pipe fitter Responsibilities; Interpretation of drawing for spools to determine their accurate orientations and co-ordinates. Calculations of pipe nipples and take-off for 30, 45, 60, 70, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions in workshop fabrication of spools during workshop fabrication and field erection. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from wrong spool designs.
  • 11. 11 Interpretation of General Arrangement Drawing (G.A) Internal trimming with hand cutting torch and grinding of unequal pipe thickness and fittings to avoid excessive high low during spool fabrication in pipe shop Erecting of fabricated spools from pipe shop in the newly constructed Production Platform and hanging of pipe Support for the spools. Coupling of Beams, Angle Iron, U Channels with hand cutting torch and assembling them to specifications to form platforms for various levels of decks during the fabrication of the platform. Pre-heating of distorted welded structures and spools with pre-heating torch to accurate dimensions and shape to conform to drawing specification. Bending of small diameter pipes with hydraulic pump to form elbow (degree) of various angle to fabricate a complete spool. Threading of small diameter galvanized pipes to fit threaded Elbows Valves, Tees to required dimension Pressure testing of completed spools in accordance to specification October to December 1996. Client; Mobil Project; Upgrade of Oso Production Platform. Contractor; Dickson Nigeria Company Limited. Department; Mechanical, Position; Pipe fitter Responsibilities; Interpretation of isometric drawing of spools to determine their accurate orientations and co-ordinates. Tie in of 16 inches Riser delivery line lied by Polaris Badge ( Globestar Offshore)
  • 12. 12 Designing of isometric drawing and fabricating them to conform to field requirement and specifications. Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions during erection. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from wrong spools designs Interpretation of General Arrangement Drawing (G.A) Calculation of orientation of various degrees of isometric drawing of spools. Erecting of completed fabricated spools from workshop and hanging of pipe Support for spools. Erecting of Riser spools of complicated bend to manifold skid. Coupling of Beams, Angle Iron, U Channels with hand cutting torch and assembling them to specifications to form platforms for extension. Pressure testing of completed spools in accordance to specifications. August to October 1996. Client; Chevron Nigeria Limited Project; Upgrade of Meren Water Injection Platform, Escravos Delta State Offshore Contractor; Dickson Nigeria Limited, Department; Mechanical, Position; Pipe fitter Responsibilities; Interpretation of General Arrangement Drawing (G.A)
  • 13. 13 Calculation of orientation of various degrees of isometric drawing of spools. Interpretation of drawing for spools to determine their accurate orientations and co-ordinates. Designing of isometric drawing and fabricating them to conform to field requirement and specifications. Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from wrong designs. Erecting of completed fabricated spools from workshop and hanging of pipe Support for spools. Erecting of Riser spools of complicated bend to manifold skid. Coupling of Beams, Angle Iron, U Channels with hand cutting torch and assembling them to specifications to form platforms Pressure testing of completed spools in accordance to specifications. June to July 1996. Client; Mobil Project; Repair of Boat Landing During Installation of Edoup Water Injection Platform, Eket Cross River State Offshore Contractor; Dickson Nigeria Limited, Department; Mechanical, Position; Pipe fitter, Responsibilities;
  • 14. 14 Accurate cutting of spools, plate and beams with hand cutting torch using oxy-acetylene gas. Cutting of spools and plates with oxy-acetylene cutting machine (beveling and automatic machine for plate). Lateral coupling of branch and run pipes of various diameter e.g. 4 to 6, inches, 8 to 10 inches Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from damage area of the boat landing. January to April 1996. Client; Chevron in Zaire Project; Upgrade of Two Production Platform and a One leg Jacket on wellhead in Zaire Contractor; Dickson Nigeria Limited, Department; Mechanical, Position; Pipe fitter, Responsibilities; Designing of isometric drawing and fabricating them to conform to field requirement and specifications. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from wrong spool designs. Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions. Interpretations of welding symbols to fit the desired joint specifies by drawing.
  • 15. 15 Calculation of orientation of various degrees of isometric drawing of spools. Threading of small diameter galvanized pipes to fit threaded Elbows Valves, Tees to required dimension Accurate cutting of spools, plate and beams with hand cutting torch with oxy-acetylene gas. Lateral coupling of branch and run pipes of various diameter e.g. 4 to 6, inches, 8 to 10 inches as brackets for deck extensions. Pressure testing of completed spools in accordance to specifications. May to August 1995. Client; Chevron Nigeria Limited Project; Upgrade of Esan Production Platform Escrovos Deita State Offshore Contractor; Dickson Nigeria Limited, Department; Mechanical, Position; Pipe fitter Responsibilities; Interpretation of isometric drawing of spools to determine their accurate orientations and co-ordinates. Designing of isometric drawing to conform to field requirement and specifications. Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from wrong spool designs Interpretation of General Arrangement Drawing (G.A)
  • 16. 16 Interpretation of piping and Instrument diagram (P. & I.D.) Calculation of orientation of various degrees of isometric drawing of spools. Erecting of completed fabricated spools from workshop and hanging of pipe Support. Erecting of Riser spools of complicated bend to manifold skid. Coupling of Beams, Angle Iron, U Channels with hand cutting torch and assembling them to specifications to form platforms extension. Pressure testing of completed spools in accordance to specifications. March to May 1995. Client; Chevron Nigeria Limited, Project; Upgrade of Meren Production Platform, Escravos, Delta State, Contractor; Dickson Nigeria Limited, Department; Mechanical, Position; Pipe fitter, Responsibilities; Designing of isometric drawing to conform to field requirement and specifications. Calculations of pipe nipples and take-off for 30, 45, 70, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions during erection of spools. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from wrong spool designs Calculation of orientation of various degrees of isometric drawing of spools.
  • 17. 17 Erecting of newly fabricated spools from workshop and hanging of pipe Support. Erecting of Riser spools of complicated bend to the existing manifold of the Platforms (Offshore) Coupling of Beams, Angle Iron, U Channels with hand cutting torch and assembling them to specifications to form platforms deck extension. Pre-heating of distorted welded structures and spools with pre-heating torch to accurate dimensions and shape to conform to specifications of drawing. Bending of small diameter pipes with hydraulic pump to form elbow (degree) of various angle to fabricate a complete spool. Pressure testing of completed spools in accordance to specifications. October 1994 to January 1995. Client; Chevron, Cabinda Angola. Project; Modification of Alfa and Tsahala 5 Production Platform Cabinda Angola. Contractor; Dickson Nigeria Limited, Department; Mechanial, Position; Pipe fitter, Responsibilities; Hot bolting of in-service line in preparation form shut down Flushing of products from the lines and cutting of unwanted lines with cold cutter to give way for new lines Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
  • 18. 18 torch from wrong spool designs. Calculation of orientation of various degrees of isometric drawing of spools. Disconnecting of old manifold and extending of the manifold area to create enough space for the new one. Erecting of newly fabricated spools from workshop and hanging of pipe Support. Erecting of Riser spools of complicated bend to the existing manifold of the Platforms (Offshore) Coupling of Beams, Angle Iron, U Channels with hand cutting torch and assembling them to specifications to form platforms for extension Designing of isometric drawing and fabricating them to conform to field requirement and specifications. Pressure testing of completed spools in accordance to specifications. March to May 1994. Client; Chevron Nigeria Limited, Project; Installation of four different One leg Platform on Wellhead around Meren, Delta, Okha and Delta South Production Platform. Contractor; Dickson Nigeria Limited, Department; Mechanical, Position; Pipe fitter, Responsibilities; Continues cutting and chamfering of the 48 inches pipe (the leg) with a beveling machine and a preheating torch at the same time during piling of the leg. Fitting of the One leg Platform to the already piled leg with the Wellhead at the center of the 48 inches pipe (leg) Connecting of newly fabricated spools and hanging of pipe support.
  • 19. 19 January to March 1994. Client; Texaco Project; Installation of Water Injection Unit in Penninton Production Platform Offshore River State. Contractor; Dickson Nigeria Limited, Department; Mechanical, Position; Pipe fitter. Responsibilities. Interpretation of General Arrangement Drawing (G.A) Interpretation of drawing for spools to determine their accurate orientations and co-ordinates. Designing of isometric drawing and fabricating them to conform to field requirement and specifications. Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from wrong spool designs. Erecting of fabricated spools and hanging of pipe Support Connecting of Riser spools to the newly install manifold. Pressure testing of completed spools in accordance to specifications. July to December 1993. Client; Chevron Nigeria Limited,
  • 20. 20 Project; Upgrade of Delta South Production Platform, Escravos, Delta State Contractor; Dickson Nigeria Limited, Department; Mechanical. Position; Pipe fitter, Responsibilities; Hot bolting of in-service line in preparation form shut down Flushing of products from the lines and cutting of unwanted lines with cold cutter to give way for new lines Disconnecting of old manifold and extending of the manifold area to create enough space for the new one. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from wrong spool designs. Calculation of orientation of various degrees of isometric drawing of spools. Designing of isometric drawing and fabricating them to conform to field requirement and specifications. Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions. Erecting of fabricated spools and hanging of pipe Support. Pressure testing of completed spools in accordance to specifications March to June 1993. Client; Chevron Nigeria Limited,
  • 21. 21 Project; Upgrade of Tapa Production Platform Escravos Delta State. Contractor; Dickson Nigeria Limited. Department; Mechanical, Position; Pipe fitter Responsibilities; Hot bolting of in-service line in preparation form shut down Flushing of products from the lines and cutting of unwanted lines with cold cutter to give way for new lines Calculations of pipe nipples and take-off for 45, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting torch from wrong spool designs. Calculation of orientation of various degrees of isometric drawing of spools. Disconnecting of old manifold and extending of the manifold area to create enough space for the new one. Erecting of newly fabricated spools from workshop and hanging of pipe Support. Designing of isometric drawing and fabricating them to conform to field requirement and specifications. Pressure testing of completed spools in accordance to specification January to December 1992. Client; Elf Project; Alfia Odudu Production Platform, Contractor; Globstar Engineering Company Limited, Warri Yard Delta State
  • 22. 22 Department; Mechanical Position; Pipe fitter Responsibilities; Calculations of pipe nipples and take-off for 30, 45, 60, 70, 90, degree elbows, tees, reducers, flanges and valves to fit spools dimensions. Interpretations of welding symbols to fit the desired joint design specifies by drawing. Calculation of lateral coupling of pipe nipples, marked and cut to angles with hand cutting torch to form elbows of various degree. Calculating of orientation of various degree of isometric drawing of spools. Internal trimming with hand cutting torch and grinding of unequal pipe thickness and fittings to avoid excessive high low in pipe shop. Coupling of Beams, Angle Iron, U Channels with hand cutting torch and assembling them to specifications to form platforms of various levels. Pre-heating of distorted welded structures and spools with pre-heating torch to accurate dimensions and shape to conform to specifications of drawing. Bending of small diameter pipes with hydraulic pump to form elbow (degree) of various angle to fabricate a complete spool. Threading of small diameter galvanized pipes to fit threaded Elbows Valves, Tees to required dimension Accurate cutting of pipe, plate and beams with hand cutting torch with oxy-acetylene gas. Cutting of spools and plates with oxy-acetylene cutting machine (beveling and automatic machine for plate). Erecting of fabricated spools in newly constructed Production Platform and hanging of pipe Support for the spools. Salvaging of pipe fittings such as elbows, tees flanges with hand cutting
  • 23. 23 torch from wrong spool designs Pressure testing of completed spools in accordance to specifications. October 1990 to January 1991. Client; Shell Petroleum Development Company Limited Project; Rehabilitation of Storage Tanks Ogulagha Forcados Terminal Delta State Contractor; Harbour-work Nigeria Limited, Department; Mechanical, Position; Industrial Attachment, Responsibilities; Accurate cutting of spools, plate and beams with hand cutting torch using oxy-acetylene gas. Cutting of spools and plates with oxy-acetylene cutting machine (beveling and automatic machine for plate). Post weld heat treatment PWHT of nozzles welded with flanges to the wall of the Tanks for receiving and discharging of products. February to April 1987. Client; Nigerian National Petroleum Cooperation NNPC Project; De-Bottlenecking Project Warri Refinery Ekpan Delta State, Contractor; Snamprogetti Department; Mechanical Position; Pipe fitter. Responsibilities; Erecting of fabricated spools and hanging of pipe Support . ASSOCIATIONS .
  • 24. 24 Member of the Nigerian National Fitters Association (NNFA) Member of the Nigerian Institute of Welding (NIW) Member of American Welding Society (AWS) Member of America Society of Non-destructive Testing (ASNT) OTHER INFORMATION Computer Literate, Pass SPDC – Survival Swimming Training Holder of the Nigerian National Driver’ License HOBBIES; Table tennis, Volley ball, Swimming and Reading. REFEREES. Fred Okoh, Site Manager. Pi-Moff Resourses Nig. Ltd. Km 1 NPA Express way off Temile close Ugbangwe. Warri Delta State. REFEREES. Chris Ozegbe, Personnel Manager, Globestar Engineering Company Nig Ltd Warri. Delta State.