SlideShare a Scribd company logo
1 of 6
PERSONAL INFORMATION
Name: Troy Szulhinski
Address: 22 Tammy Road Moore Park Beach, Qld 4670
Phone:
Australia Mobile +0427465354
Cambodia +85570403464
Thailand +66948641420
Email: HYPERLINK "mailto:troy.szulhinski@yahoo.com" troy.szulhinski@yahoo.com
OBJECTIVE
I am an extremely motivated and dedicated individual and I am passionate about my job. I am always looking to
improve my skills. Having worked in the oil and gas and construction sector since my apprenticeship I have
accrued a wealth of knowledge about the industry I work in. I have a keen eye for detail and provide quality
workmanship for clients/employers; making me a trusted employee and an asset to any company I work for.
With health and safety always at the forefront of my mind, I ensure that not only my work but work carried out
by those around me is performed in a safe manner. I am presently seeking a new and challenging environment
that will allow me to further develop my skills and where I will be able to use my experience to assist others.
TRAINING AND CERTIFICATES
BOSIET/EURO (OPITO)
MSIC
Advanced First Aide
WPLF Certificate No: W0059707. Issued 24/01/2007
MNMPRD 169A - Operate Gantry Crane & Slinging Safety
Front End Loader Operator (Ticket no #V3015342)
MEM303998 Certificate 3 in Engineering (Fabrication Trade)
51411 Course - Fall Injury Prevention Systems for safely working at heights
51410 Course - Risk Management for Safe Work in a confined space
MNMG237A Work safety at heights
MNSAPER Confined space access/entry
4G coded welder- stick and wire
Operating loaders in a quarry (Cat 970, 966 Loaders)
High Risk Work Licenses
RII Excavator, Loader, Dump Truck
3G and 4G Pressure Plate Welding certification
SKILLS, ABILITIES AND DUTIES
Boilermaker on Fixed plant including Crushing Plant
Conveyor maintenance and rebuilds
Pipe Fitter on underwater pipe repairs
Water & Gas pipe building and fitting
Excavator Operation
Extensive experience managing and mentoring a multinational and multilingual team in a range of disciplines
Highly skilled and confident in all welding disciplines: tig, gmaw, flux caw,stick, oxy/acetylene
Setup butt welds on pipe of various diameters and schedules
Tig welding of 2 and 3 inch standard weight pipe to class
Modify existing pipe work to suit new piping requirements
Measuring up for new pipe work to be run
Fabrication and arc welding of pipe supports and gratings etc.
Hand torqueing of flanges and tee kay`s to manufacturers specification
Organisation and delegation of various work fronts for all work parties
Overseeing work tasks, guaranteeing work carried out safely and to highest possible standards
Supervision responsibilities (toolbox talks, shift handovers, time sheets etc)
Scheduling and planning of various work fronts
As built piping and drawing mark-ups
Ensuring work packs are correctly filled out and closed out
Weld mapping and traceability for QA/QC
Perform safety observations on various tasks
Recipient in charge (recipient of isolations on energised equipment)
Setup butt welds for 100% x-ray welding (Carbon, Ni-chrome, P11, P22, P91, S/S)
Pipe spooling from iso`s of various NB pipe (3/4” to 30”) and schedule to ASME B31.3 and B31.1
Fuel oil and turbine piping (2500lb pressure RTJ flanges)
Pipe cutting and bevelling using oxy-fuel and pneumatic cutting equipment
Dumpy levelling ensuring correct elevations from iso`s are maintained
Pipe bending using hydraulic pipe bending equipment
Screwed piping using threading machine 1/2” to 2” NB (3000# and 6000#) to ASME B31.3
Passed 4g weld test to AS 1554 (structural coding)
Structural steel fabrication, welding and modifications, pipe supports, chutes, etc.
Mechanical fitting on centrifugal and P.D pumps, flange alignment, pump and motor alignments,
Hydraulic torquing to ensure mechanical joint integrity (square drive and low profile)
Hydrostatic testing of pipe spools to ASME B31.3 and B31.1
EXPERIENCE
PipeFitter – Oil & Gas
Bechtel – Cutis Island Gladstone QLD
April 2013 - Current
Removal and installation of various valves of different diameter (ESDV, Choke, DB+B, NRV etc.)
Installation of pipe spools for various systems, including, flow lines, export, methanol, glycol etc.
Punch listing (using P&ID`s and Iso`s to determine whether work completed correctly to drawings)
Breaking containment on various systems
Use of Hi-Lo gauges
Set up butt welds on various diameters & schedules from pipe schedules 10 to extra strong ranging 25mm –
1250mm on carbon and stainless (P11 / P12)
Conducting tool box talks as work leader on many work scopes
Carrying out safety observations and conversations to ensure very high safety standards
Liaising with different work parties to carry out work scopes efficiently and safely
Handrail modifications and general plating duties
Demonstrating abilities of working with multiple international people with communicational difficulties .
Heavy Equipment Operator
Buffel Park Accommodation Village
Decmil Australia
December 2012 – March 2013
4 - 30 ton excavator operation
Trenching works for underground services/ batter construction/ drainage works/ stockpile management and
control/rock
breaking.
Pipe Fitter
Thiess Australia
April 2011 – December 2012
Worsley Power Station - Pipe fitter responsible for fitting of various schedule and diameter pipes
Modification of pipe spools to suit site
Reading and interpreting isometric and general arrangement drawings
Responsibility for a team constructing heavy duty, high pressure piping for steam and gas supply to power
station
Supervisor/leading hand for multinational team of up to twenty workers, responsible for coordinating work
schedules and ensuring quality control
Extensive experience managing working at heights construction and safety processes
Pipe Fitter
Monodelphous
May 2009 – April 2011
Henderson & Fremantle Port (Neptune) - Oil & gas Pipe fitter working interpreting and constructing heavy duty
high pressure pipe work from isometric drawings
Heavy Wall pipe work
Preparation of pipe ensuring HI-LO tolerances
Coordinating a team of workers and responsible for quality assurance and meeting productivity schedules
Hazardous substance/dangerous goods safety management experience
Coordination of emergency response protocols, including confined space works and emergency response
Breaking of flanges, including breaking containment
Reinstatement of new HP manifold to tie in with existing pipe spools
Inspection and cleaning of RTJ, RF, FF, flanges
Flange tagging and filling out of work packs
Use of air and hydraulic tools including cenga saws, drills, flange splitters, porta- powers
Use of hand tools to align flanges ready for torque and tensioning
Using P&ID`s as reference to spade and de-spade piping for leak testing of systems
Removal of old and installation of new carbon, CuNi and duplex steel pipe spools
Fixed Plant Maintenance Boilermaker
Macmahon Contractors, Newman, WA
April 2008 – May 2009
Maintenance and servicing of all plant and equipment
Repair Crusher Equipment, Conveyers
Rebuilding of Chutes and Wear Plates
Shut Down Maintenance
Quarry Loader Excavator
Local Mix Ltd, Open Cut Quarry, Vic.
December 2006 – April 2008
Acting supervisor for quarry team responsible for production, productivity, quality and efficiency schedules
Maintenance and servicing of all plant and equipment
Customer service
Operating Cat 980H, 970G loaders 330D Cat Excavators
Experience in the “Loadright” loader product weighing system.
Loading Road Train’s and 40t Dump Truck’s
Feeding Crusher and screen plant, floor clean up and stockpile maintenance
Conducting product sale and customer service
Buildings ramps to surveyor`s laser levels
Mixing up products to percentage and ensuring quality control
Digging and backfilling trenches as per drawings
Working to and managing workforce H.S.E. procedure
Fixed Plant Maintenance and Construction Boilermaker
Various Durations during
March 2004 – December 2006
Feather Rock Quarry, Vic
Monodelphous, Cape Lambert, WA
Workpac, Consolidated Minerals, Coolbina, WA
REFERENCES (Additional references and job history available upon request)
Shane Hausler - 0413 325 609
Geoff Brindley – 0428598027
Thiess Ltd. - Paul Burgess (Mechanical Supervisor) – 0487192214 - Cuzza711@hotmail.com
Monodelphous – Michael Banks – 0406620916 - banksm2810@gmail.com
LEADERSHIP ACTIVITIES
I have worked as a Charge Hand and Supervisor. At the peak of a recent major construction project I was
supervising 17 tradesman including pipefitters, mechanical fitters and welders. To add to that number I had to
organise crane crews, scaffolding crews, trades assistants and painters to ensure the tradesman could carry out
their work safely and to planned schedules. I also had to deliver pre-start talks, de-briefs, toolbox talks and
attend Supervisors meetings.
Troy Szulhinski
Page PAGE * MERGEFORMAT 2
CURRICULUM VITAE
Troy Szulhinski
Page PAGE * MERGEFORMAT 2
CURRICULUM VITAE

More Related Content

What's hot (19)

Andy B Espada Resume (7)
Andy B  Espada Resume (7)Andy B  Espada Resume (7)
Andy B Espada Resume (7)
 
newCHris Resume
newCHris ResumenewCHris Resume
newCHris Resume
 
Lloyd Bathgate Updated Resume 2016
Lloyd Bathgate Updated Resume 2016Lloyd Bathgate Updated Resume 2016
Lloyd Bathgate Updated Resume 2016
 
Mikes Resume Bus&Admin HVACR
Mikes Resume Bus&Admin HVACRMikes Resume Bus&Admin HVACR
Mikes Resume Bus&Admin HVACR
 
Oberto Scotts resume 1
Oberto Scotts resume 1Oberto Scotts resume 1
Oberto Scotts resume 1
 
Muhammad Naveed Gohar.
Muhammad Naveed Gohar.Muhammad Naveed Gohar.
Muhammad Naveed Gohar.
 
Resume-Deepak
Resume-DeepakResume-Deepak
Resume-Deepak
 
CAWI resumee
CAWI resumeeCAWI resumee
CAWI resumee
 
John A resume
John A resumeJohn A resume
John A resume
 
CV .
CV .CV .
CV .
 
Tyreikie Jerrod Griffin
Tyreikie Jerrod GriffinTyreikie Jerrod Griffin
Tyreikie Jerrod Griffin
 
Construction using Precast technology
Construction using Precast technologyConstruction using Precast technology
Construction using Precast technology
 
Michael CV.
Michael CV.Michael CV.
Michael CV.
 
Noel C De Jesus_CV 30-12-15
Noel C  De Jesus_CV 30-12-15Noel C  De Jesus_CV 30-12-15
Noel C De Jesus_CV 30-12-15
 
Steven Lync1
Steven Lync1Steven Lync1
Steven Lync1
 
Chuck Shealy ud.resume
Chuck Shealy ud.resumeChuck Shealy ud.resume
Chuck Shealy ud.resume
 
Paul details 2014today
Paul details 2014todayPaul details 2014today
Paul details 2014today
 
Jeffrey Hash Resume
Jeffrey Hash ResumeJeffrey Hash Resume
Jeffrey Hash Resume
 
RESUME
RESUMERESUME
RESUME
 

Similar to Troy resume 2014 (20)

cv new
cv newcv new
cv new
 
Riaz Cv
Riaz CvRiaz Cv
Riaz Cv
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
resume piping
resume pipingresume piping
resume piping
 
ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)ResumeofKennethThompson09242015(LOCAL)
ResumeofKennethThompson09242015(LOCAL)
 
loizou[1] - Copy
loizou[1] - Copyloizou[1] - Copy
loizou[1] - Copy
 
loizou[1] - Copy
loizou[1] - Copyloizou[1] - Copy
loizou[1] - Copy
 
Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015Shahzad Mughal Resume Updated 2015
Shahzad Mughal Resume Updated 2015
 
CV - Prasath.V.R
CV - Prasath.V.RCV - Prasath.V.R
CV - Prasath.V.R
 
paramasivam resume
paramasivam resume paramasivam resume
paramasivam resume
 
CV Abd. Hadi Ahmad
CV Abd. Hadi AhmadCV Abd. Hadi Ahmad
CV Abd. Hadi Ahmad
 
Garry Hursts CV
Garry Hursts CVGarry Hursts CV
Garry Hursts CV
 
RESUME 2015 - Copy
RESUME 2015 - CopyRESUME 2015 - Copy
RESUME 2015 - Copy
 
Senthilnathan
SenthilnathanSenthilnathan
Senthilnathan
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
A SATTAR DC&WI CV-II
A SATTAR DC&WI CV-IIA SATTAR DC&WI CV-II
A SATTAR DC&WI CV-II
 
Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12
 
Pipe Work Design & Fabrication
Pipe Work Design & FabricationPipe Work Design & Fabrication
Pipe Work Design & Fabrication
 
Resume 2015 .doc 2
Resume 2015 .doc 2Resume 2015 .doc 2
Resume 2015 .doc 2
 

Troy resume 2014

  • 1. PERSONAL INFORMATION Name: Troy Szulhinski Address: 22 Tammy Road Moore Park Beach, Qld 4670 Phone: Australia Mobile +0427465354 Cambodia +85570403464 Thailand +66948641420 Email: HYPERLINK "mailto:troy.szulhinski@yahoo.com" troy.szulhinski@yahoo.com OBJECTIVE I am an extremely motivated and dedicated individual and I am passionate about my job. I am always looking to improve my skills. Having worked in the oil and gas and construction sector since my apprenticeship I have accrued a wealth of knowledge about the industry I work in. I have a keen eye for detail and provide quality workmanship for clients/employers; making me a trusted employee and an asset to any company I work for. With health and safety always at the forefront of my mind, I ensure that not only my work but work carried out by those around me is performed in a safe manner. I am presently seeking a new and challenging environment that will allow me to further develop my skills and where I will be able to use my experience to assist others. TRAINING AND CERTIFICATES BOSIET/EURO (OPITO) MSIC Advanced First Aide WPLF Certificate No: W0059707. Issued 24/01/2007 MNMPRD 169A - Operate Gantry Crane & Slinging Safety Front End Loader Operator (Ticket no #V3015342) MEM303998 Certificate 3 in Engineering (Fabrication Trade) 51411 Course - Fall Injury Prevention Systems for safely working at heights 51410 Course - Risk Management for Safe Work in a confined space MNMG237A Work safety at heights MNSAPER Confined space access/entry 4G coded welder- stick and wire Operating loaders in a quarry (Cat 970, 966 Loaders) High Risk Work Licenses RII Excavator, Loader, Dump Truck 3G and 4G Pressure Plate Welding certification SKILLS, ABILITIES AND DUTIES Boilermaker on Fixed plant including Crushing Plant Conveyor maintenance and rebuilds Pipe Fitter on underwater pipe repairs Water & Gas pipe building and fitting Excavator Operation Extensive experience managing and mentoring a multinational and multilingual team in a range of disciplines Highly skilled and confident in all welding disciplines: tig, gmaw, flux caw,stick, oxy/acetylene Setup butt welds on pipe of various diameters and schedules Tig welding of 2 and 3 inch standard weight pipe to class Modify existing pipe work to suit new piping requirements Measuring up for new pipe work to be run Fabrication and arc welding of pipe supports and gratings etc. Hand torqueing of flanges and tee kay`s to manufacturers specification Organisation and delegation of various work fronts for all work parties Overseeing work tasks, guaranteeing work carried out safely and to highest possible standards Supervision responsibilities (toolbox talks, shift handovers, time sheets etc) Scheduling and planning of various work fronts As built piping and drawing mark-ups Ensuring work packs are correctly filled out and closed out Weld mapping and traceability for QA/QC Perform safety observations on various tasks Recipient in charge (recipient of isolations on energised equipment) Setup butt welds for 100% x-ray welding (Carbon, Ni-chrome, P11, P22, P91, S/S) Pipe spooling from iso`s of various NB pipe (3/4” to 30”) and schedule to ASME B31.3 and B31.1
  • 2. Fuel oil and turbine piping (2500lb pressure RTJ flanges) Pipe cutting and bevelling using oxy-fuel and pneumatic cutting equipment Dumpy levelling ensuring correct elevations from iso`s are maintained Pipe bending using hydraulic pipe bending equipment Screwed piping using threading machine 1/2” to 2” NB (3000# and 6000#) to ASME B31.3 Passed 4g weld test to AS 1554 (structural coding) Structural steel fabrication, welding and modifications, pipe supports, chutes, etc. Mechanical fitting on centrifugal and P.D pumps, flange alignment, pump and motor alignments, Hydraulic torquing to ensure mechanical joint integrity (square drive and low profile) Hydrostatic testing of pipe spools to ASME B31.3 and B31.1 EXPERIENCE PipeFitter – Oil & Gas Bechtel – Cutis Island Gladstone QLD April 2013 - Current Removal and installation of various valves of different diameter (ESDV, Choke, DB+B, NRV etc.) Installation of pipe spools for various systems, including, flow lines, export, methanol, glycol etc. Punch listing (using P&ID`s and Iso`s to determine whether work completed correctly to drawings) Breaking containment on various systems Use of Hi-Lo gauges Set up butt welds on various diameters & schedules from pipe schedules 10 to extra strong ranging 25mm – 1250mm on carbon and stainless (P11 / P12) Conducting tool box talks as work leader on many work scopes Carrying out safety observations and conversations to ensure very high safety standards Liaising with different work parties to carry out work scopes efficiently and safely Handrail modifications and general plating duties Demonstrating abilities of working with multiple international people with communicational difficulties . Heavy Equipment Operator Buffel Park Accommodation Village Decmil Australia December 2012 – March 2013 4 - 30 ton excavator operation Trenching works for underground services/ batter construction/ drainage works/ stockpile management and control/rock breaking. Pipe Fitter Thiess Australia April 2011 – December 2012
  • 3. Worsley Power Station - Pipe fitter responsible for fitting of various schedule and diameter pipes Modification of pipe spools to suit site Reading and interpreting isometric and general arrangement drawings Responsibility for a team constructing heavy duty, high pressure piping for steam and gas supply to power station Supervisor/leading hand for multinational team of up to twenty workers, responsible for coordinating work schedules and ensuring quality control Extensive experience managing working at heights construction and safety processes Pipe Fitter Monodelphous May 2009 – April 2011 Henderson & Fremantle Port (Neptune) - Oil & gas Pipe fitter working interpreting and constructing heavy duty high pressure pipe work from isometric drawings Heavy Wall pipe work Preparation of pipe ensuring HI-LO tolerances Coordinating a team of workers and responsible for quality assurance and meeting productivity schedules Hazardous substance/dangerous goods safety management experience Coordination of emergency response protocols, including confined space works and emergency response Breaking of flanges, including breaking containment Reinstatement of new HP manifold to tie in with existing pipe spools Inspection and cleaning of RTJ, RF, FF, flanges Flange tagging and filling out of work packs Use of air and hydraulic tools including cenga saws, drills, flange splitters, porta- powers Use of hand tools to align flanges ready for torque and tensioning Using P&ID`s as reference to spade and de-spade piping for leak testing of systems Removal of old and installation of new carbon, CuNi and duplex steel pipe spools Fixed Plant Maintenance Boilermaker Macmahon Contractors, Newman, WA April 2008 – May 2009 Maintenance and servicing of all plant and equipment Repair Crusher Equipment, Conveyers Rebuilding of Chutes and Wear Plates Shut Down Maintenance Quarry Loader Excavator Local Mix Ltd, Open Cut Quarry, Vic. December 2006 – April 2008 Acting supervisor for quarry team responsible for production, productivity, quality and efficiency schedules Maintenance and servicing of all plant and equipment Customer service Operating Cat 980H, 970G loaders 330D Cat Excavators Experience in the “Loadright” loader product weighing system. Loading Road Train’s and 40t Dump Truck’s Feeding Crusher and screen plant, floor clean up and stockpile maintenance Conducting product sale and customer service
  • 4. Buildings ramps to surveyor`s laser levels Mixing up products to percentage and ensuring quality control Digging and backfilling trenches as per drawings Working to and managing workforce H.S.E. procedure Fixed Plant Maintenance and Construction Boilermaker Various Durations during March 2004 – December 2006 Feather Rock Quarry, Vic Monodelphous, Cape Lambert, WA Workpac, Consolidated Minerals, Coolbina, WA REFERENCES (Additional references and job history available upon request) Shane Hausler - 0413 325 609 Geoff Brindley – 0428598027 Thiess Ltd. - Paul Burgess (Mechanical Supervisor) – 0487192214 - Cuzza711@hotmail.com Monodelphous – Michael Banks – 0406620916 - banksm2810@gmail.com LEADERSHIP ACTIVITIES I have worked as a Charge Hand and Supervisor. At the peak of a recent major construction project I was supervising 17 tradesman including pipefitters, mechanical fitters and welders. To add to that number I had to organise crane crews, scaffolding crews, trades assistants and painters to ensure the tradesman could carry out their work safely and to planned schedules. I also had to deliver pre-start talks, de-briefs, toolbox talks and attend Supervisors meetings.
  • 5. Troy Szulhinski Page PAGE * MERGEFORMAT 2 CURRICULUM VITAE
  • 6. Troy Szulhinski Page PAGE * MERGEFORMAT 2 CURRICULUM VITAE