SlideShare a Scribd company logo
1 of 3
KENNETH THOMPSON
4862 W Elaine Drive, West Valley City, UT 84120 ♦ Mobile: (315) 527-1724♦
♦ Email: brotk2001@yahoo.com
Summary
 Over 13 years of pipefitting experience.
 Proven ability to follow instructions, specifications and blueprint readings.
 Familiar with Naviswork software and AutoCAD for piping software systems.
 Excellent knowledge of the principles, methods and techniques in the pipefitting trade.
 Profound knowledge of tools and equipment of the pipe and welding skill trade and safety practices.
 Deep knowledge of the occupational hazards and safety precautions of the trade.
 Strong ability to plan and perform work involving the installation, modification and repair of new and
existing piping systems.
Education/Certifications
OSHA 30 & OSHA 10 2015
NITC JOURNEYMAN/PIPEFITTER CERTIFICATION 2015
MSHA/OSHA CERTIFIED 2015
NCCER CERTIFIED PLUS JOURNEYMAN FITTER 2014
TWIC/ RSO 2010
UA LOCAL UNION 250 JOURNEYMAN/FITTER 2007
WELL SERVICES DRILLING SCHOOL (Floorman/Rostabaut) 1996
Professional Experience
7/2015 to Present: Lauren Engineering (Holly Refinery)-Wood Cross, UT
Journeyman Pipe Fitter
• Responsible for laying out and setting equipment for process pipe installation.
• Drawing isometrics for over a 100 client updates and progress.
3/2015 to 6/2015: Micron IM Flash-Lehi, UT
Journeyman Pipe Fitter
• Responsible for laying out and setting equipment for process pipe installation.
• Drawing isometrics for client updates and progress.
7/2014 to 3/2015: Brahma Group (CC & V Mine)–Cripple Creek, CO
Piping General Foreman
• Responsible for building piping packages and drawing as builds for RFI’s.
• Accountable for managing and issuing material and mechanical components to foreman and recording
progress of spools and supports being erected.
• Laid out full scale drawings of pipe systems, supports, and related equipment, following blueprints.
• Initiating hydro static test on all spools built on site and recording and tracking heat trace
footage on process piping.
9/2013 to 6/2014: Plant Performance Services (Tesoro Refinery) - Salt Lake City, UT
Journeyman Pipefitter & Material Coordinator
• Received Equipment and sort materials for VRU Expansion Project.
• Obtained equipment and categorized materials for the Crude Unit Expansion as well.
• Accountable for monitoring and storage of equipment and materials.
10/2012 to Present: Brahma Group (KUC-MAP) Magna, UT
Journeyman Pipefitter
• Laid out full scale drawings of pipe systems, supports, and related equipment, following blueprints.
• Layout cut and prepare pipe for isometric drawings issued for construction.
• Cut, threaded,and hammered pipe to specifications, using tools such as saws,cutting torches, and pipe
thread.
• Measured and marked pipes for cutting and threading.
• Laid out full scale drawings of pipe systems, supports, and related equipment, following
blueprints.
9/2012 to 10/2012: Fagan Inc. (KUC-MAP) Magna, UT
Journeyman Pipefitter
• Laid out full scale drawings of pipe systems, supports, and related equipment, following blueprints.
• Layout cut and prepare pipe for isometric drawings issued for construction.
• Cut, threaded,and hammered pipe to specifications, using tools such as saws,cutting torches, and pipe
thread.
• Measured and marked pipes for cutting and threading.
• Laid out full scale drawings of pipe systems, supports, and related equipment, following
blueprints.
11/2011 to 8/2012: P2S World (Tesoro Refinery) Kapolei, HI
Journeyman Pipefitter
 Laid out full scale drawings of pipe systems, supports, and related equipment, following blueprints.
 Layout cut and prepare pipe for isometric drawings issued for construction.
 Cut, threaded,and hammered pipe to specifications, using tools such as saws,cutting torches, and pipe
thread.
08/2011 to 10/2011: Fagan (Nack Power) Cushing, TX
Pipefitter
 Administered and laid out crews for installation of utility piping and process systems piping which
included chill water,condensate water,low pressure steam,compressed air and high pressure steam.
 Installation of piping and fabrications of supports for process pipe systems.
04/2011 to 08/2011: Aerotek (Leprino Foods) Greeley, CO
General Foreman
 Managed and laid out crews for installation of utility piping and process systems piping which will
include chill water,condensate water,low pressure steam,compressed air and high pressure steam.
 Installation of piping and fabrications of supports for process pipe systems.
03/2011 to 04/2011: Starcon Int’l (Conoco Phillips Turnaround) Concord, CA
Pipefitter
 Laid out full scale drawings of pipe systems, supports, and related equipment, following
blueprints.
 Layout cut and prepare pipe for isometric drawings issued for construction.
 Cut, threaded, and hammered pipe to specifications, using tools such as saws, cutting torches,
and pipe thread.
11/2010 to 02/2011: S & B Engineering Contractors (Shell Motiva) Port Arthur, TX
Pipefitter
 Laid out full scale drawings of pipe systems, supports, and related equipment, following
blueprints.
 Layout cut and prepare pipe for isometric drawings issued for construction.
 Cut, threaded, and hammered pipe to specifications, using tools such as saws, cutting torches,
and pipe thread.

More Related Content

What's hot

What's hot (16)

Karl j gabel resume
Karl j gabel resumeKarl j gabel resume
Karl j gabel resume
 
TKS Resume 2
TKS Resume 2TKS Resume 2
TKS Resume 2
 
Resume August 2015
Resume August 2015Resume August 2015
Resume August 2015
 
Ahmad Khusailat Cv
Ahmad Khusailat Cv Ahmad Khusailat Cv
Ahmad Khusailat Cv
 
1.arun das mep resume
1.arun das mep resume  1.arun das mep resume
1.arun das mep resume
 
Wenninger Resume Feb2018
Wenninger Resume Feb2018Wenninger Resume Feb2018
Wenninger Resume Feb2018
 
Resume - Christopher Neil, PE
Resume - Christopher Neil, PEResume - Christopher Neil, PE
Resume - Christopher Neil, PE
 
Cv english
Cv englishCv english
Cv english
 
C. Leon Resume 2015
C. Leon Resume 2015C. Leon Resume 2015
C. Leon Resume 2015
 
Riaz Cv
Riaz CvRiaz Cv
Riaz Cv
 
Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014Kobe Galloway2 _10-2014
Kobe Galloway2 _10-2014
 
MOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_EngrMOHAMMED AKBAR Sr MEP Mech_Engr
MOHAMMED AKBAR Sr MEP Mech_Engr
 
Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015
 
Yahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialistYahia Eisa- pipeline technical specialist
Yahia Eisa- pipeline technical specialist
 
KANU STEPHEN CHINAZA cv
KANU STEPHEN CHINAZA cvKANU STEPHEN CHINAZA cv
KANU STEPHEN CHINAZA cv
 
Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015Sathiyaprabhu Piping Stress Engineer CV 2015
Sathiyaprabhu Piping Stress Engineer CV 2015
 

Viewers also liked

Final sales document
Final sales documentFinal sales document
Final sales documentDeanna Nanni
 
Sentits i raó, presocràtics5
Sentits i raó, presocràtics5Sentits i raó, presocràtics5
Sentits i raó, presocràtics5Manuel Belda
 
Une boîte à outils pour les tests sous Java 8
Une boîte à outils pour les tests sous Java 8Une boîte à outils pour les tests sous Java 8
Une boîte à outils pour les tests sous Java 8aro_tech
 
Launch Your Startup Like a Boss
Launch Your Startup Like a BossLaunch Your Startup Like a Boss
Launch Your Startup Like a BossTallwave
 
Els debats fonamentals presocràtics3
Els debats fonamentals presocràtics3Els debats fonamentals presocràtics3
Els debats fonamentals presocràtics3Manuel Belda
 
Sp kapp storyboard_front_v.2.0_part
Sp kapp storyboard_front_v.2.0_partSp kapp storyboard_front_v.2.0_part
Sp kapp storyboard_front_v.2.0_partSeon Young Cho
 
CORE80 EPS 33 - Picasso
CORE80 EPS 33 - Picasso CORE80 EPS 33 - Picasso
CORE80 EPS 33 - Picasso A Victor Vargas
 
Presentacion tlc bogota ingles
Presentacion tlc bogota ingles Presentacion tlc bogota ingles
Presentacion tlc bogota ingles ComunicacionesPDB
 
BlackBerry Enterprise of Things presentation - Gartner IT Expo
BlackBerry Enterprise of Things presentation - Gartner IT ExpoBlackBerry Enterprise of Things presentation - Gartner IT Expo
BlackBerry Enterprise of Things presentation - Gartner IT ExpoBlackBerry
 
Is it Time for a Rebrand?
Is it Time for a Rebrand?Is it Time for a Rebrand?
Is it Time for a Rebrand?Tallwave
 
Get Value from Your Data
Get Value from Your DataGet Value from Your Data
Get Value from Your DataDanilo Poccia
 
The App Economy - Jan Willem Lammers VMware
The App Economy - Jan Willem Lammers VMwareThe App Economy - Jan Willem Lammers VMware
The App Economy - Jan Willem Lammers VMwareIT Talent College
 
Astigmatism correction
Astigmatism correctionAstigmatism correction
Astigmatism correctionFarhana Islam
 
Presentatie kpn jasper snijder - lo ra alliance english pdf
Presentatie kpn   jasper snijder - lo ra alliance english pdfPresentatie kpn   jasper snijder - lo ra alliance english pdf
Presentatie kpn jasper snijder - lo ra alliance english pdfKPN IoT
 
Microsoft Project Online for Project Managers
Microsoft Project Online for Project ManagersMicrosoft Project Online for Project Managers
Microsoft Project Online for Project ManagersLeon Gallegos
 

Viewers also liked (17)

Final sales document
Final sales documentFinal sales document
Final sales document
 
Resume
ResumeResume
Resume
 
ChampagneSWFWMD_WBModel
ChampagneSWFWMD_WBModelChampagneSWFWMD_WBModel
ChampagneSWFWMD_WBModel
 
Sentits i raó, presocràtics5
Sentits i raó, presocràtics5Sentits i raó, presocràtics5
Sentits i raó, presocràtics5
 
Une boîte à outils pour les tests sous Java 8
Une boîte à outils pour les tests sous Java 8Une boîte à outils pour les tests sous Java 8
Une boîte à outils pour les tests sous Java 8
 
Launch Your Startup Like a Boss
Launch Your Startup Like a BossLaunch Your Startup Like a Boss
Launch Your Startup Like a Boss
 
Els debats fonamentals presocràtics3
Els debats fonamentals presocràtics3Els debats fonamentals presocràtics3
Els debats fonamentals presocràtics3
 
Sp kapp storyboard_front_v.2.0_part
Sp kapp storyboard_front_v.2.0_partSp kapp storyboard_front_v.2.0_part
Sp kapp storyboard_front_v.2.0_part
 
CORE80 EPS 33 - Picasso
CORE80 EPS 33 - Picasso CORE80 EPS 33 - Picasso
CORE80 EPS 33 - Picasso
 
Presentacion tlc bogota ingles
Presentacion tlc bogota ingles Presentacion tlc bogota ingles
Presentacion tlc bogota ingles
 
BlackBerry Enterprise of Things presentation - Gartner IT Expo
BlackBerry Enterprise of Things presentation - Gartner IT ExpoBlackBerry Enterprise of Things presentation - Gartner IT Expo
BlackBerry Enterprise of Things presentation - Gartner IT Expo
 
Is it Time for a Rebrand?
Is it Time for a Rebrand?Is it Time for a Rebrand?
Is it Time for a Rebrand?
 
Get Value from Your Data
Get Value from Your DataGet Value from Your Data
Get Value from Your Data
 
The App Economy - Jan Willem Lammers VMware
The App Economy - Jan Willem Lammers VMwareThe App Economy - Jan Willem Lammers VMware
The App Economy - Jan Willem Lammers VMware
 
Astigmatism correction
Astigmatism correctionAstigmatism correction
Astigmatism correction
 
Presentatie kpn jasper snijder - lo ra alliance english pdf
Presentatie kpn   jasper snijder - lo ra alliance english pdfPresentatie kpn   jasper snijder - lo ra alliance english pdf
Presentatie kpn jasper snijder - lo ra alliance english pdf
 
Microsoft Project Online for Project Managers
Microsoft Project Online for Project ManagersMicrosoft Project Online for Project Managers
Microsoft Project Online for Project Managers
 

Similar to ResumeofKennethThompson09242015(LOCAL)

Andy B Espada Resume (7)
Andy B  Espada Resume (7)Andy B  Espada Resume (7)
Andy B Espada Resume (7)Andy Espada
 
Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12Michael Rhame
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resumeAbhinav Rawat
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERHabeeb Omer
 
Pipe Work Design & Fabrication
Pipe Work Design & FabricationPipe Work Design & Fabrication
Pipe Work Design & FabricationpetroEDGE
 
SteveBowenResume1
SteveBowenResume1SteveBowenResume1
SteveBowenResume1Steve Bowen
 
WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1William Brown
 
Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015JOHANNES JACOBUS PEENS
 
Anna DeRose catano resume updated.docx rev1
Anna DeRose catano resume updated.docx rev1Anna DeRose catano resume updated.docx rev1
Anna DeRose catano resume updated.docx rev1anna catano
 
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Dr Orhan Degermenci
 

Similar to ResumeofKennethThompson09242015(LOCAL) (20)

Andy B Espada Resume (7)
Andy B  Espada Resume (7)Andy B  Espada Resume (7)
Andy B Espada Resume (7)
 
Untitled document (1)
Untitled document (1)Untitled document (1)
Untitled document (1)
 
Lory Francis Navor - CV
Lory Francis Navor - CVLory Francis Navor - CV
Lory Francis Navor - CV
 
Babbu jakir resume
Babbu jakir resumeBabbu jakir resume
Babbu jakir resume
 
Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12Michael Rhame RESUME 12-12
Michael Rhame RESUME 12-12
 
Nailesh Patel CV
Nailesh Patel CVNailesh Patel CV
Nailesh Patel CV
 
Troy resume 2014
Troy resume 2014Troy resume 2014
Troy resume 2014
 
Troy resume 2014
Troy resume 2014Troy resume 2014
Troy resume 2014
 
Houle resume
Houle resume Houle resume
Houle resume
 
abhinav rawat resume
abhinav rawat resumeabhinav rawat resume
abhinav rawat resume
 
MEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMERMEP ENGINEER CV HABEEB OMER
MEP ENGINEER CV HABEEB OMER
 
CV-NKN-09.05.16
CV-NKN-09.05.16CV-NKN-09.05.16
CV-NKN-09.05.16
 
Pipe Work Design & Fabrication
Pipe Work Design & FabricationPipe Work Design & Fabrication
Pipe Work Design & Fabrication
 
SteveBowenResume1
SteveBowenResume1SteveBowenResume1
SteveBowenResume1
 
WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1WILLIAM MICHAEL BROWN R-1
WILLIAM MICHAEL BROWN R-1
 
Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015Johannes Jacobus(Kiewiet) Peens cv 2015
Johannes Jacobus(Kiewiet) Peens cv 2015
 
resume piping
resume pipingresume piping
resume piping
 
Anna DeRose catano resume updated.docx rev1
Anna DeRose catano resume updated.docx rev1Anna DeRose catano resume updated.docx rev1
Anna DeRose catano resume updated.docx rev1
 
Michael CV.
Michael CV.Michael CV.
Michael CV.
 
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
Lead Pipeline Engineer (with 25+ years of relevant job experience in FEED, EP...
 

ResumeofKennethThompson09242015(LOCAL)

  • 1. KENNETH THOMPSON 4862 W Elaine Drive, West Valley City, UT 84120 ♦ Mobile: (315) 527-1724♦ ♦ Email: brotk2001@yahoo.com Summary  Over 13 years of pipefitting experience.  Proven ability to follow instructions, specifications and blueprint readings.  Familiar with Naviswork software and AutoCAD for piping software systems.  Excellent knowledge of the principles, methods and techniques in the pipefitting trade.  Profound knowledge of tools and equipment of the pipe and welding skill trade and safety practices.  Deep knowledge of the occupational hazards and safety precautions of the trade.  Strong ability to plan and perform work involving the installation, modification and repair of new and existing piping systems. Education/Certifications OSHA 30 & OSHA 10 2015 NITC JOURNEYMAN/PIPEFITTER CERTIFICATION 2015 MSHA/OSHA CERTIFIED 2015 NCCER CERTIFIED PLUS JOURNEYMAN FITTER 2014 TWIC/ RSO 2010 UA LOCAL UNION 250 JOURNEYMAN/FITTER 2007 WELL SERVICES DRILLING SCHOOL (Floorman/Rostabaut) 1996 Professional Experience 7/2015 to Present: Lauren Engineering (Holly Refinery)-Wood Cross, UT Journeyman Pipe Fitter • Responsible for laying out and setting equipment for process pipe installation. • Drawing isometrics for over a 100 client updates and progress. 3/2015 to 6/2015: Micron IM Flash-Lehi, UT Journeyman Pipe Fitter • Responsible for laying out and setting equipment for process pipe installation. • Drawing isometrics for client updates and progress. 7/2014 to 3/2015: Brahma Group (CC & V Mine)–Cripple Creek, CO Piping General Foreman • Responsible for building piping packages and drawing as builds for RFI’s. • Accountable for managing and issuing material and mechanical components to foreman and recording progress of spools and supports being erected. • Laid out full scale drawings of pipe systems, supports, and related equipment, following blueprints. • Initiating hydro static test on all spools built on site and recording and tracking heat trace footage on process piping. 9/2013 to 6/2014: Plant Performance Services (Tesoro Refinery) - Salt Lake City, UT Journeyman Pipefitter & Material Coordinator
  • 2. • Received Equipment and sort materials for VRU Expansion Project. • Obtained equipment and categorized materials for the Crude Unit Expansion as well. • Accountable for monitoring and storage of equipment and materials. 10/2012 to Present: Brahma Group (KUC-MAP) Magna, UT Journeyman Pipefitter • Laid out full scale drawings of pipe systems, supports, and related equipment, following blueprints. • Layout cut and prepare pipe for isometric drawings issued for construction. • Cut, threaded,and hammered pipe to specifications, using tools such as saws,cutting torches, and pipe thread. • Measured and marked pipes for cutting and threading. • Laid out full scale drawings of pipe systems, supports, and related equipment, following blueprints. 9/2012 to 10/2012: Fagan Inc. (KUC-MAP) Magna, UT Journeyman Pipefitter • Laid out full scale drawings of pipe systems, supports, and related equipment, following blueprints. • Layout cut and prepare pipe for isometric drawings issued for construction. • Cut, threaded,and hammered pipe to specifications, using tools such as saws,cutting torches, and pipe thread. • Measured and marked pipes for cutting and threading. • Laid out full scale drawings of pipe systems, supports, and related equipment, following blueprints. 11/2011 to 8/2012: P2S World (Tesoro Refinery) Kapolei, HI Journeyman Pipefitter  Laid out full scale drawings of pipe systems, supports, and related equipment, following blueprints.  Layout cut and prepare pipe for isometric drawings issued for construction.  Cut, threaded,and hammered pipe to specifications, using tools such as saws,cutting torches, and pipe thread. 08/2011 to 10/2011: Fagan (Nack Power) Cushing, TX Pipefitter  Administered and laid out crews for installation of utility piping and process systems piping which included chill water,condensate water,low pressure steam,compressed air and high pressure steam.  Installation of piping and fabrications of supports for process pipe systems. 04/2011 to 08/2011: Aerotek (Leprino Foods) Greeley, CO General Foreman  Managed and laid out crews for installation of utility piping and process systems piping which will include chill water,condensate water,low pressure steam,compressed air and high pressure steam.  Installation of piping and fabrications of supports for process pipe systems. 03/2011 to 04/2011: Starcon Int’l (Conoco Phillips Turnaround) Concord, CA Pipefitter  Laid out full scale drawings of pipe systems, supports, and related equipment, following blueprints.  Layout cut and prepare pipe for isometric drawings issued for construction.
  • 3.  Cut, threaded, and hammered pipe to specifications, using tools such as saws, cutting torches, and pipe thread. 11/2010 to 02/2011: S & B Engineering Contractors (Shell Motiva) Port Arthur, TX Pipefitter  Laid out full scale drawings of pipe systems, supports, and related equipment, following blueprints.  Layout cut and prepare pipe for isometric drawings issued for construction.  Cut, threaded, and hammered pipe to specifications, using tools such as saws, cutting torches, and pipe thread.