BUILDING SCIENCE 2 ( ARC 3413)
Project 2 Integration with Design Studio 5
Brickfields Community Library
Final Report & Calculation
Name : Chuah Say Yin
ID: 0315301
Tutor: Mr. Siva
TABLE OF CONTENT
1.0 INTRODUCTION
2.0 LIGHTING
2.1 Daylight
2.1.1 Discussion Area
2.1.2 Adult/Student Study Area
2.2 Artificial Lighting
2.2.1 Library Main Collection
2.2.2 AV Room
2.3 PSALI
Meeting Room
3.0 ACOUSTICS
3.1 Reverberation Time. RT
3.1.1 AV Room
3.1.2 Meeting Room
3.2 Sound Reduction Index, SRI
3.3 Sound Pressure Level (Exterior Noise)
3.3.1 Front Façade, Jalan Sultan Abdul Samad (Peak Hour)
3.3.2 Back Alley , (Non-peak hour)
REFERENCES
1
2-3
4-5
6-8
9-11
12-14
15-16
17-18
19-20
21
22
23
1
1.0 INTRODUCTION
This project is an integration with the Architectural Design Studio 5 that requires one
to understand the lighting and acoustics performances inside the spaces.
The project involved is an urban infill community library, located at the Jalan Abdul
Samad, in Brickfields, Kuala Lumpur. Full glaze curtain wall and vertical aluminium louvres
are largely used for the facades so as to invite as much daylighting as possible while
providing sunshading to prevent to overheating and glare problems.
Besides, the external noise sources as well as the internal noise source are also
determined so as to select the proper building materials and arrange the spaces based
on their sound pressure level to ensure good acoustics performances in the building.
2
2.1DAYLIGHTING
DF, % Distribution
>6 Very bright with thermal & glare problem
3~6 Bright
1~3 Average
0~1 Dark
2.1.1 Discussion Area
The selected area is an open area discussion area, located at the 2nd floor, facing the front
façade on the southern east direction, as seen in the floor plan below. The façade is in full
height curtain wall to ensure a good lighting condition as well as vertical louvers on the
outside for sunshading purposes. Therefore, it allows view to the outside at the same time
able to capture natural day lighting for a comfortable discussion environment for the
people.
Figure 2.1.1: Second Floor Plan
(Discussion Area)
3
Daylight Factor Calculation
Floor Area (m2) 120m
Area of façade that exposed to sunlight 53.6
Area of skylight (m2) 0
Exposed Façade & Skylight Area to Floor
Area Ratio/ Daylight Factor, DF
(53.6+0)/120
=0.447
=44.67% x0.1
=4.467%
Natural Illumination Calculation
Natural Illumination Calculation
E external = 20 000 lux
DF= E internal/E external x 100
10 = E external /20000 x 100
E external = 10 x 20000 / 100
= 2000 lux
Conclusion
The Discussion Area has a daylight factor of 4.467% and natural illumination of 2000 lux.
This has provide a bright condition and natural lit space to the occupants that ensure a good
environment for discussions.
Illuminance Example
120,000 lux Brightest sunlight
110,000 lux Bright sunlight
20,000 lux Shade illuminated by entire clear blue
sky
1000-2000 lux Typical overcast day, midday
<200 lux Extreme of darkest storm clouds,
midday
400 lux Sunrise or sunset on clear day
(ambient illumination)
40 lux Fully overcast, sunset/sunrise
<1 lux Extreme of darkest storm clouds,
sunset/ rise
4
2.1.2 Adult/Student Study Area
Another space chosen is a study area for the adult and students, which is also located at the
second floor, and facing the rear elevation, of western south direction.
Figure 2.1.2 : Second Floor plan (Adult/ Student Study Area)
Daylight Factor Calculation
Floor Area (m2) 170m
Area of façade that exposed to sunlight 50.46m
Area of skylight (m2) 0
Exposed Façade & Skylight Area to Floor
Area Ratio/ Daylight Factor, DF
(50.46+0)/170
=0.2968
=29.68% x0.1
=2.968%
5
Natural Illumination Calculation
E external = 20 000 lux
DF= E internal/E external x 100
10 = E external /20000 x 100
E external = 10 x 20000 / 100
= 2000 lux
Conclusion
The Adult and Student Study room has a daylight factor of 2.968% and natural illumination
of 2000 lux and thus achieve the brightness as being average nearly bright. This has ensure
the study environment of the occupants to be sufficient of light and comfortable.
6
2.2 Artificial Lighting (Main collection of books)
2.2.1 Library Main Collection
According to MS1525, the minimum illuminance level required for a public reading room is
300lux.
Type of fixture LED Downlight
Type of light bulb
Product Brand & Code LEDVANCE DOWNLIGHT XL WT 830
Lumen 1200 lm
Nominal Voltage 240 V
Nominal Wattage 19.0 W
Rated Lamp Efficacy 86 lm/W
Colour Rendering Index, Ra >80
Life span 24000h
Energy Consumption 16 kWh/ 1000h
Figure 2.2.1 : First Floor Plan (Library
Main Collection)
7
Lumen Method Calculation
Location Library Main Collection
Dimension Length=11m
Width= 8.5m
Height of the ceiling = 3.3m
Floor Area (A) 93.5
Types of lighting fixture LED Downlight
Lumen of lighting fixture F(Lux) 1200 lm
Height of work level 0.8
Height of Luminaire (m) 4.1m
Mounting height (Hm) 4.1m -0.8m
= 3.3m
Reflection Factors Ceiling: (0.7)
Wall: (0.5)
Floor: (0.2)
Room Index / RI (K) 11 x8.5
(11x8.5 ) x 3.3
= 0.3
Utilisation Factor (UF) 0.5
Maintenance Factor (MF) 0.8
Standard Illuminance by
MS1525
300
Number of light required N =
𝐸 π‘₯ 𝐴
𝐹 π‘₯ π‘ˆπΉ π‘₯ 𝑀𝐹
N =
300 π‘₯ 93.5
(1200)π‘₯ 0.5 π‘₯ 0.8
N = 58.4
Hence, 58 lamps are required to be installed.
Spacing to Height Ratio(SHR)
SHR =
1
π»π‘š
x √
𝐴
𝑁
=
1
3.3
x √
93.5
58
= 0.38
SHR =
𝑆
3.3
= 0.38
S = 3.3 x 0.38 = 1.2
Fittings layout by
approximately (m)
Fittings required on the ceiling with 18m long ,
11m / 1.254 = 8.8
β‰ˆ 9 rows
8
58/ 9rows= 6 columns of luminaire
Spacing along 8.5 space for 6 columns of luminaires,
8.5m /6= 1.4m
There will be 2 rows at both end, 1.4m/ 2= 0.7m
Lighting Layout
Conclusion
58 LED downlights are used to illuminate public reading area to achieve minimum of 300 lux
that stated in MS1525. With the sufficient level of illumination, the users can read inside the
space comfortably.
Figure 2.2.2 : Lighting Layout (Library
Main Collection)
9
2.2.2 AV Room
According to IES Standard Illumination level, the minimum illuminance level required for a
AV room is 100lux.
Type of fixture LED lights
Type of light bulb
Product Brand & Code PARATHOM PAR38 120 30Β° ADV 14 W/827 E27
Lumen 1000 lm
Input Voltage 120V
Nominal Voltage 220 V
Nominal Wattage 14.0 W
Colour Rendering Index, Ra >80
Life span 40000 h
Energy Consumption 16 kWh/ 1000h
Figure 2.2.2: Third Floor Plan (AV
Room)
10
Lumen Method Calculation
Location AV Room
Dimension Length=12.3m
Width= 7.5m
Height of the ceiling = 4 m
Floor Area (A) 92.25m
Types of lighting fixture LED lights
Lumen of lighting fixture F(Lux) 1000lm
Height of work level 0.8m
Height of Luminaire (m) 5m
Mounting height (Hm) 5m-0.8m
=4.2m
Reflection Factors Ceiling: (0.7)
Wall: (0.5)
Floor: (0.2)
Room Index / RI (K) 12.3 x 7.5
(12.3 x 7.5 ) x 4.2m
= 0.22
Utilisation Factor (UF) 0.5
Maintenance Factor (MF) 0.8
IES Standard Illumination level 100
Number of light required N =
𝐸 π‘₯ 𝐴
𝐹 π‘₯ π‘ˆπΉ π‘₯ 𝑀𝐹
N =
100π‘₯ 92.3
(1000)π‘₯ 0.5 π‘₯ 0.8
N = 23 lamps
Hence, 23 lamps are required to be installed.
Spacing to Height Ratio(SHR)
SHR =
1
π»π‘š
x √
𝐴
𝑁
=
1
4.2
x √
92.25
23
= 0.48
11
Lighting Layout
Conclusion
23 LED downlights are used to illuminate AV room to achieve minimum of 100 lux that
stated in to IES Standard Illumination level. Sufficient level of illumination allow visibilities of
the occupants.
SHR =
𝑆
4.2
= 0.48
S = 0.48 x 4.2 = 2.016
Fittings layout by approximately (m) Fittings required on the ceiling with 12.3m long ,
12.23m/ 2 = 6.1
β‰ˆ 6rows
23 / 6rows= 3.83 columns of luminaire
β‰ˆ 4 columns
Spacing along 7.5m space for 4 columns of
luminaires,
7.5m/4= 1.875m
There will be 2 rows at both end, 1.875m/ 2=
0.937m
Figure 2.2.3: Lighting Layout (AV
Room)
12
2.3 PSALI – Permanent Supplementary Artificial Lighting of Interiors
(Office)
Permanent Supplementary Artificial Lighting (PSALI) is essentially artificial lighting lit by
window on one side. PSALI compensates for the fall in illuminance as the distance from the
window increases and daylighting is not enough is lighting up the area. Hence, there are two
sets of switches, whereby one set is lighted up most of the time whereas the other set is
only switched on during the night as there are adequate amount daylighting.
According to MS1525, the minimum lighting level required for an office is 300 lux. Type of
luminaire used as showed below:
Type of fixture Tubular Fluorescent lamp
Type of light bulb
Product Brand & Code ST8V 8.9 W/830 600 mm EM
Lumen 1200 lm
Nominal Voltage 240 V
Nominal Wattage 8.90W
Colour Rendering Index, Ra >80
Life span 30000h
Energy Consumption 12 kWh/1000h
Figure 2.3.1: Third Floor Plan
(Meeting Room)
13
Lumen Method Calculation
Location Office
Dimension Length=9m
Width= 5.3m
Height of the ceiling = 3.3m
Floor Area (A) 47.7m
Types of lighting fixture Tubular Fluorescent Lamp
Lumen of lighting fixture F(Lux) 1200 lm
Height of work level 0.8
Height of Luminaire (m) 3.3m
Mounting height (Hm) 3.3m-0.8m
=2.5m
Reflection Factors Ceiling: (0.7)
Wall: (0.5)
Floor: (0.2)
Room Index / RI (K) 9m x 5.3m
(9x 5.3) x 2.5m
= 0.4
Utilisation Factor (UF) 0.5
Maintenance Factor (MF) 0.8
Standard Illuminance by
MS1525
300
Number of light required N =
𝐸 π‘₯ 𝐴
𝐹 π‘₯ π‘ˆπΉ π‘₯ 𝑀𝐹
N =
300 π‘₯47.7
(1200)π‘₯ 0.5 π‘₯ 0.8
N = 29.8
Hence, 30 lamps are required to be installed.
Spacing to Height Ratio(SHR)
SHR =
1
π»π‘š
x √
𝐴
𝑁
=
1
3.3
x √
47.7
30
= 0.38
SHR =
𝑆
3.3
= 0.38
S = 3.3 x 0.38 = 1.254
Fittings layout by
approximately (m)
Fittings required on the ceiling with 9m long ,
9m / 1.254 = 7.2
β‰ˆ 7 rows
14
30/ 7rows= 4.3 columns of luminaire
β‰ˆ 5 rows
Spacing along 5.3m space for 4 columns of luminaires,
5.3m /4= 1.06m
There will be 2 rows at both end, 1.06m/ 2= 0.5m
Lighting Layout
CONCLUSION
In conclusion, the meeting room is controlled by 2 set of switches. One set of the switches
are opened all the time for sufficient of lighting inside the room, whereas for the other set
of the switches, it can be turned off during daytime due to adequate natural daylighting
from one side of the window. Hence, this could save the amount of electrical energy. The
total number of light installed is 30 lamps for the use of both daytime and nightime.
Figure 2.3.2: Lighting Layout
(Meeting Room)
15
3.0 ACOUSTICS
3.1 Reverberation Time, RT
3.1.1 AV Room
i) Non-peak hour, 500 Hz
Space volume, V= 12.3 x 7.5 x 4 = 369 m3
Material absorption coefficient in 500 Hz at peak hour with 40 persons in the space
Building
Component
Material Area, S/m2
Absorption
Coefficient, a
Sound Absorption,
Sa
Wall Brickwall 98.4 0.03 0.952
Wall Acoustic tiles 60 0.72 43.2
Floor Carpet on
Concrete
92.25 0.14 12.92
Door Plywood 5.3 0.17 0.90
Ceiling Plaster Finish 92.25 0.02 1.845
Furniture Fabric chair 45 0.80 36
People
[Peak]
- 20 0.88 17.6
Total Absorption, A 113.417
Table 2.2.1:
Reverberation Time, RT = (0.16 x V) /A
= (0.16 x 369) / 113.94
= 0.52s
The reverberation time for the AV room at 500Hz during non-peak hours is 0.52s and this has
achieve the standard of an AC room which requires reverberation of 1s. This ensures the
acoustic quality of the room during non-peak hour.
16
ii) Peak hour, 2000 Hz
Material Absorption Coefficient at 2000Hz, Peak Hour with 20 persons in the space.
Building
Component
Material Area, S/m2
Absorption
Coefficient, a
Sound Absorption,
Sa
Wall Brickwall 98.4 0.05 4.92
Wall Acoustic tiles 60 0.88 52.8
Floor Carpet on
Concrete
92.25 0.60 55.35
Door Plywood 5.3 0.10 0.53
Ceiling Plaster Finish 92.25 0.04 3.69
Furniture Fabric chair 45 0.82 36.9
People
[Peak]
- 45 0.93 41.85
Total Absorption, A 196.12
Reverberation Time, RT = (0.16 x V) /A
= (0.16 x 369 ) / 196.12
= 0.30s
The reverberation time for the AV room during peak hours of 2000 Hz is 0.3s. This has
indicated that the space has met adequate level of reverberation time even during the peak
hours.
17
3.1.2 Meeting Room
i) Non-peak hour, 500 Hz
Space volume, V= 3.6m x 4.7m x 4m = 67.68 m3
Material absorption coefficient in 500 Hz at non-peak hour with 4 persons in the space
Building
Component
Material Area, S/m2
Absorption
Coefficient, a
Sound Absorption,
Sa
Wall Brickwall 33.2 0.03 0.996
Floor Carpet on
concrete
16.92 0.14 2.369
Wall Full Glazed
Curtain Wall
14.4 0.04 0.576
Sliding Door Glass 5.3 0.17 0.90
Ceiling Plaster Finish 16.92 0.02 0.34
Furniture Fabric chair 10 0.80 8
People [Non-
Peak]
- 4 0.88 3.52
Total Absorption, A 16.701
Reverberation Time, RT = (0.16 x V) /A
= (0.16 x 67.68) /16.701
= 0.648s
The reverberation time for the meeting room at 500Hz during non-peak hours is 0.648s and
this has achieve the standard of a meeting room which requires reverberation of 1s. This
shows that the acoustic quality of the room is up to its standard.
18
ii) Peak hour, 2000 Hz
Material Absorption Coefficient at 2000Hz, Peak Hour with 10 persons in the space.
Building
Component
Material Area, S/m2
Absorption
Coefficient, a
Sound Absorption,
Sa
Wall Brickwall 33.2 0.05 1.66
Floor Carpet on
Concrete
16.92 0.60 10.152
Wall Full Glazed
Curtain Wall
14.4 0.02 0.288
Sliding door Glass 5.3 0.07 0.37
Ceiling Plaster Finish 16.92 0.04 0.68
Furniture Fabric chair 10 0.82 8.2
People
[Peak]
- 10 0.93 9.3
Total Absorption, A 30.65
Reverberation Time, RT = (0.16 x V) /A
= (0.16 x 67.68 ) / 30.65
= 0.35s
The reverberation time for the meeting room during peak hours of 2000 Hz is 0.35s. This has
indicated that the space has met adequate level of reverberation time of 1s even during the
peak hours.
19
3.2 SOUND REDUCTION INDEX (AV Room)
Building
Element
Materials Surface Areas
(m2)
SRI (dB) Transmission
Coefficient
Wall Bricks 124 44 2.51 x 10-3
Door Plywood 4.2 31 7.943 x 10-4
Transmission coefficient of materials
a) Brickwall
SRI Brickwall = 10log10
1
T Brickwall
44 = 10log10
1
T Brickwall
102.6 =
1
T Brickwall
T Brickwall = 2.51 x 10-3
b) Door 2– Plywood
SRI plywood = 10log10
1
T plywood
31 = 10log10
1
T plywood
103.1 =
1
T plywood
T plywood = 7.943 x 10-4
20
Average Transmission Coefficient of Materials
Tav = (124 x 2.51 x 10-3) + (4.2x 7.943 x 10-4)/ (124+4.2)
= 2.453 x 10-3
SRI overall = 10log10
1
T av
= 10log10
1
2.453 x 10βˆ’3
= 26.1 dB
60dB – 26.1 dB = 33.9dB
Noise Criteria, Environmental Perception
Conclusion
The overall transmission loss of AV room is 26.1 dB. Assume that the sound pressure level
in the multifunctional room is approximately 60dB, the sound transmitted to the AV room is
33.9 dB. According to the noise criteria environment perception, it is listed under the quiet
range of NC-25 to NC-35. Thus, it could be considered ideal for AV Room which requires a
quieter environment for speech and learning.
21
3.3 Sound Pressure Level, SPL (External Noise)
3.3.1 Front Façade, Jalan Sultan Abdul Samad (Peak Hour)
i) Highest reading: 80dB
Use the formula, L = 10log10 (I/Io),
80 = 10log10 (I/ 1x10-12)
I = (108) (1x10-12)
= 1x 10-4
ii) Lowest reading: 63dB
Use the formula, L = 10log10 (I/Io),
63 = 10log10 (I/ 1x10-12)
I = (106.3) (1x10-12)
= 2x 10-6
Total Intensities, I = (1x 10-4) + (2x 10-6)
= 1.02x 10-4
Using the formula Combined SPL
= 10log10 (p2/po
2), where po = 1x10-12
Combined SPL = 10log10 [(1.02x 10-4) Γ· (1x10-12)]
= 80.08 dB
22
3.3.2 Back Alley , (Non-peak hour)
i) Highest reading: 57dB
Use the formula, L = 10log10 (I/Io),
57 = 10log10 (I/ 1x10-12)
I = (105.7) (1x10-12)
= 5x10-7
ii) Lowest reading: 50dB
Use the formula, L = 10log10 (I/Io),
50 = 10log10 (I/ 1x10-12)
I = (105) (1x10-12)
= 1x10-7
Total Intensities, I = (5x10-7) + (1x10-7)
= 6x 10-7
Using the formula Combined SPL
= 10log10 (p2/po
2), where po = 1x10-12
Combined SPL = 10log10 [(6x 10-7) Γ· (1x10-12)]
= 57.78dB
As a result, the average sound pressure level during Peak Hour and Non-peak Hour are
80.08dB and 57.78dB at front elevation and rear elevation respectively.
23
REFERENCES
1. Long, M. (2006). Architectural acoustics. Amsterdam: Elsevier/Academic Press.
2. Karlen, M. & Benya, J. (2004). Lighting design basics. Hoboken, New Jersy: John Wiley &
Sons, Inc.
3. Stein, Benjamin & Reynolds, John S.2000. Mechanical and Electrical Equipment for
buildings. New York. John Wiley

More Related Content

What's hot

Building science ii project 2 (1)
Building science ii project 2  (1)Building science ii project 2  (1)
Building science ii project 2 (1)Aaron Chong Yu Ho
Β 
BUILDING SCIENCE 2 PROJECT 2 REPORT
BUILDING SCIENCE 2 PROJECT 2 REPORTBUILDING SCIENCE 2 PROJECT 2 REPORT
BUILDING SCIENCE 2 PROJECT 2 REPORTYvonne Chin
Β 
Final report
Final reportFinal report
Final reportShiko Foo
Β 
Building Science Project 2
Building Science Project 2Building Science Project 2
Building Science Project 2xinhuaee123
Β 
Building Science 2 Project 2 Integration project
Building Science 2 Project 2 Integration projectBuilding Science 2 Project 2 Integration project
Building Science 2 Project 2 Integration projectTan Jaden
Β 
Bscience project 2
Bscience project 2Bscience project 2
Bscience project 2ShiLikHong
Β 
Building Science 2 Final Project
Building Science 2 Final ProjectBuilding Science 2 Final Project
Building Science 2 Final ProjectKelvin Ng
Β 
Lighting proposal
Lighting  proposalLighting  proposal
Lighting proposalBaddy Peigun
Β 
Building science project 2
Building science project 2 Building science project 2
Building science project 2 chongyih2
Β 
Calculation
CalculationCalculation
Calculationaidaarosdi
Β 
Building science 2 final
Building science 2 finalBuilding science 2 final
Building science 2 finalKhoo Zer Kai
Β 
Panasonic projector DZ16K english
Panasonic projector DZ16K englishPanasonic projector DZ16K english
Panasonic projector DZ16K englishAV-PRO
Β 
A4 report
A4 reportA4 report
A4 reportSarah Esa
Β 
Building science 2 final report
Building science 2 final reportBuilding science 2 final report
Building science 2 final reportAlfred Tan
Β 
Building Science 2 Final Project Report
Building Science 2 Final Project ReportBuilding Science 2 Final Project Report
Building Science 2 Final Project ReportKohSungJie
Β 
Building science-2-report
Building science-2-reportBuilding science-2-report
Building science-2-reportdeadmk
Β 

What's hot (20)

Building science ii project 2 (1)
Building science ii project 2  (1)Building science ii project 2  (1)
Building science ii project 2 (1)
Β 
BUILDING SCIENCE 2 PROJECT 2 REPORT
BUILDING SCIENCE 2 PROJECT 2 REPORTBUILDING SCIENCE 2 PROJECT 2 REPORT
BUILDING SCIENCE 2 PROJECT 2 REPORT
Β 
abcde
abcdeabcde
abcde
Β 
Final report
Final reportFinal report
Final report
Β 
Building Science Project 2
Building Science Project 2Building Science Project 2
Building Science Project 2
Β 
Building Science 2 Project 2 Integration project
Building Science 2 Project 2 Integration projectBuilding Science 2 Project 2 Integration project
Building Science 2 Project 2 Integration project
Β 
Bscience project 2
Bscience project 2Bscience project 2
Bscience project 2
Β 
Building Science 2 Final Project
Building Science 2 Final ProjectBuilding Science 2 Final Project
Building Science 2 Final Project
Β 
Lighting proposal
Lighting  proposalLighting  proposal
Lighting proposal
Β 
Final report
Final reportFinal report
Final report
Β 
Building science project 2
Building science project 2 Building science project 2
Building science project 2
Β 
Calculation
CalculationCalculation
Calculation
Β 
Project 2
Project 2Project 2
Project 2
Β 
Building science 2 final
Building science 2 finalBuilding science 2 final
Building science 2 final
Β 
CALCULATION
CALCULATIONCALCULATION
CALCULATION
Β 
Panasonic projector DZ16K english
Panasonic projector DZ16K englishPanasonic projector DZ16K english
Panasonic projector DZ16K english
Β 
A4 report
A4 reportA4 report
A4 report
Β 
Building science 2 final report
Building science 2 final reportBuilding science 2 final report
Building science 2 final report
Β 
Building Science 2 Final Project Report
Building Science 2 Final Project ReportBuilding Science 2 Final Project Report
Building Science 2 Final Project Report
Β 
Building science-2-report
Building science-2-reportBuilding science-2-report
Building science-2-report
Β 

Similar to Building Science 2

Building science 2
Building science 2Building science 2
Building science 2Eunice Chan
Β 
Bs calculation
Bs calculationBs calculation
Bs calculationong93
Β 
Project 2 Building Science
Project 2 Building ScienceProject 2 Building Science
Project 2 Building ScienceClement Seong
Β 
Bb science project 2
Bb science project 2Bb science project 2
Bb science project 2Pinkie95
Β 
Final report project 2 GYN integration
Final report project 2 GYN integrationFinal report project 2 GYN integration
Final report project 2 GYN integrationCrysmond Goh
Β 
Building Science 2
Building Science 2Building Science 2
Building Science 2Gertrude Lee
Β 
Building science 2 project 2 light integration
Building science 2 project 2 light integrationBuilding science 2 project 2 light integration
Building science 2 project 2 light integrationMuatasimahBillah
Β 
Bscience 2-project-2
Bscience 2-project-2Bscience 2-project-2
Bscience 2-project-2Megan Chung
Β 
Final building science report
Final building  science reportFinal building  science report
Final building science reportSiew John Loong
Β 
B Science Report Project 2
B Science Report Project 2B Science Report Project 2
B Science Report Project 2J-Sern Phua
Β 
Building Science Project 2
Building Science Project 2Building Science Project 2
Building Science Project 2zerospaces_
Β 
Day lighting 2
Day lighting 2Day lighting 2
Day lighting 2Kaizer Ooi
Β 
Bscience report
Bscience reportBscience report
Bscience reportkerneng
Β 
Building Science PSALI report
Building Science PSALI reportBuilding Science PSALI report
Building Science PSALI reportSheau Hui Tan
Β 
Building science 2
Building science 2Building science 2
Building science 2Chenyi Teo
Β 
Building Science 2 Report
Building Science 2 ReportBuilding Science 2 Report
Building Science 2 Reportleejanicee
Β 
Building Science II Project 2: Report
Building Science II Project 2: ReportBuilding Science II Project 2: Report
Building Science II Project 2: ReportOng Shi Hui
Β 
Bsc 2 project 2 report
Bsc 2 project 2 reportBsc 2 project 2 report
Bsc 2 project 2 reportKC Wong
Β 
Building Science II: Lighting Integration Report
Building Science II: Lighting Integration ReportBuilding Science II: Lighting Integration Report
Building Science II: Lighting Integration ReportEe Dong Chen
Β 

Similar to Building Science 2 (20)

Building science 2
Building science 2Building science 2
Building science 2
Β 
Bs calculation
Bs calculationBs calculation
Bs calculation
Β 
Project 2 Building Science
Project 2 Building ScienceProject 2 Building Science
Project 2 Building Science
Β 
Bb science project 2
Bb science project 2Bb science project 2
Bb science project 2
Β 
Final report project 2 GYN integration
Final report project 2 GYN integrationFinal report project 2 GYN integration
Final report project 2 GYN integration
Β 
Building Science 2
Building Science 2Building Science 2
Building Science 2
Β 
Building science 2 project 2 light integration
Building science 2 project 2 light integrationBuilding science 2 project 2 light integration
Building science 2 project 2 light integration
Β 
Bscience 2-project-2
Bscience 2-project-2Bscience 2-project-2
Bscience 2-project-2
Β 
Final building science report
Final building  science reportFinal building  science report
Final building science report
Β 
B Science Report Project 2
B Science Report Project 2B Science Report Project 2
B Science Report Project 2
Β 
Building Science Project 2
Building Science Project 2Building Science Project 2
Building Science Project 2
Β 
Day lighting 2
Day lighting 2Day lighting 2
Day lighting 2
Β 
Bscience report
Bscience reportBscience report
Bscience report
Β 
Building Science PSALI report
Building Science PSALI reportBuilding Science PSALI report
Building Science PSALI report
Β 
Building science 2
Building science 2Building science 2
Building science 2
Β 
Building Science 2 Report
Building Science 2 ReportBuilding Science 2 Report
Building Science 2 Report
Β 
Building Science II Project 2: Report
Building Science II Project 2: ReportBuilding Science II Project 2: Report
Building Science II Project 2: Report
Β 
Bsc 2 project 2 report
Bsc 2 project 2 reportBsc 2 project 2 report
Bsc 2 project 2 report
Β 
Bscience
BscienceBscience
Bscience
Β 
Building Science II: Lighting Integration Report
Building Science II: Lighting Integration ReportBuilding Science II: Lighting Integration Report
Building Science II: Lighting Integration Report
Β 

More from Chuah Say Yin

cognitive mapping
cognitive mapping cognitive mapping
cognitive mapping Chuah Say Yin
Β 
Individual report (final)
Individual report (final)Individual report (final)
Individual report (final)Chuah Say Yin
Β 
EXTENSION OF A R.C BUNGALOW
EXTENSION OF A R.C BUNGALOWEXTENSION OF A R.C BUNGALOW
EXTENSION OF A R.C BUNGALOWChuah Say Yin
Β 
EXTENSION OF A R.C BUNGALOW
EXTENSION OF A R.C BUNGALOWEXTENSION OF A R.C BUNGALOW
EXTENSION OF A R.C BUNGALOWChuah Say Yin
Β 
Group final report
Group final reportGroup final report
Group final reportChuah Say Yin
Β 
BUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGEBUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGEChuah Say Yin
Β 

More from Chuah Say Yin (7)

Final report
Final reportFinal report
Final report
Β 
cognitive mapping
cognitive mapping cognitive mapping
cognitive mapping
Β 
Individual report (final)
Individual report (final)Individual report (final)
Individual report (final)
Β 
EXTENSION OF A R.C BUNGALOW
EXTENSION OF A R.C BUNGALOWEXTENSION OF A R.C BUNGALOW
EXTENSION OF A R.C BUNGALOW
Β 
EXTENSION OF A R.C BUNGALOW
EXTENSION OF A R.C BUNGALOWEXTENSION OF A R.C BUNGALOW
EXTENSION OF A R.C BUNGALOW
Β 
Group final report
Group final reportGroup final report
Group final report
Β 
BUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGEBUILDING STRUCTURE FETTUCINE BRIDGE
BUILDING STRUCTURE FETTUCINE BRIDGE
Β 

Recently uploaded

ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...JhezDiaz1
Β 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxAvyJaneVismanos
Β 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
Β 
call girls in Kamla Market (DELHI) πŸ” >ΰΌ’9953330565πŸ” genuine Escort Service πŸ”βœ”οΈβœ”οΈ
call girls in Kamla Market (DELHI) πŸ” >ΰΌ’9953330565πŸ” genuine Escort Service πŸ”βœ”οΈβœ”οΈcall girls in Kamla Market (DELHI) πŸ” >ΰΌ’9953330565πŸ” genuine Escort Service πŸ”βœ”οΈβœ”οΈ
call girls in Kamla Market (DELHI) πŸ” >ΰΌ’9953330565πŸ” genuine Escort Service πŸ”βœ”οΈβœ”οΈ9953056974 Low Rate Call Girls In Saket, Delhi NCR
Β 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxJiesonDelaCerna
Β 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)Dr. Mazin Mohamed alkathiri
Β 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
Β 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
Β 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementmkooblal
Β 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
Β 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
Β 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxpboyjonauth
Β 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentInMediaRes1
Β 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.arsicmarija21
Β 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
Β 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfSumit Tiwari
Β 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPCeline George
Β 

Recently uploaded (20)

ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
ENGLISH 7_Q4_LESSON 2_ Employing a Variety of Strategies for Effective Interp...
Β 
Final demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptxFinal demo Grade 9 for demo Plan dessert.pptx
Final demo Grade 9 for demo Plan dessert.pptx
Β 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
Β 
call girls in Kamla Market (DELHI) πŸ” >ΰΌ’9953330565πŸ” genuine Escort Service πŸ”βœ”οΈβœ”οΈ
call girls in Kamla Market (DELHI) πŸ” >ΰΌ’9953330565πŸ” genuine Escort Service πŸ”βœ”οΈβœ”οΈcall girls in Kamla Market (DELHI) πŸ” >ΰΌ’9953330565πŸ” genuine Escort Service πŸ”βœ”οΈβœ”οΈ
call girls in Kamla Market (DELHI) πŸ” >ΰΌ’9953330565πŸ” genuine Escort Service πŸ”βœ”οΈβœ”οΈ
Β 
Model Call Girl in Tilak Nagar Delhi reach out to us at πŸ”9953056974πŸ”
Model Call Girl in Tilak Nagar Delhi reach out to us at πŸ”9953056974πŸ”Model Call Girl in Tilak Nagar Delhi reach out to us at πŸ”9953056974πŸ”
Model Call Girl in Tilak Nagar Delhi reach out to us at πŸ”9953056974πŸ”
Β 
CELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptxCELL CYCLE Division Science 8 quarter IV.pptx
CELL CYCLE Division Science 8 quarter IV.pptx
Β 
ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)ESSENTIAL of (CS/IT/IS) class 06 (database)
ESSENTIAL of (CS/IT/IS) class 06 (database)
Β 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
Β 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
Β 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
Β 
Hierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of managementHierarchy of management that covers different levels of management
Hierarchy of management that covers different levels of management
Β 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
Β 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
Β 
Introduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptxIntroduction to AI in Higher Education_draft.pptx
Introduction to AI in Higher Education_draft.pptx
Β 
Model Call Girl in Bikash Puri Delhi reach out to us at πŸ”9953056974πŸ”
Model Call Girl in Bikash Puri  Delhi reach out to us at πŸ”9953056974πŸ”Model Call Girl in Bikash Puri  Delhi reach out to us at πŸ”9953056974πŸ”
Model Call Girl in Bikash Puri Delhi reach out to us at πŸ”9953056974πŸ”
Β 
Meghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media ComponentMeghan Sutherland In Media Res Media Component
Meghan Sutherland In Media Res Media Component
Β 
AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.AmericanHighSchoolsprezentacijaoskolama.
AmericanHighSchoolsprezentacijaoskolama.
Β 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
Β 
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdfEnzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Enzyme, Pharmaceutical Aids, Miscellaneous Last Part of Chapter no 5th.pdf
Β 
What is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERPWhat is Model Inheritance in Odoo 17 ERP
What is Model Inheritance in Odoo 17 ERP
Β 

Building Science 2

  • 1. BUILDING SCIENCE 2 ( ARC 3413) Project 2 Integration with Design Studio 5 Brickfields Community Library Final Report & Calculation Name : Chuah Say Yin ID: 0315301 Tutor: Mr. Siva
  • 2. TABLE OF CONTENT 1.0 INTRODUCTION 2.0 LIGHTING 2.1 Daylight 2.1.1 Discussion Area 2.1.2 Adult/Student Study Area 2.2 Artificial Lighting 2.2.1 Library Main Collection 2.2.2 AV Room 2.3 PSALI Meeting Room 3.0 ACOUSTICS 3.1 Reverberation Time. RT 3.1.1 AV Room 3.1.2 Meeting Room 3.2 Sound Reduction Index, SRI 3.3 Sound Pressure Level (Exterior Noise) 3.3.1 Front FaΓ§ade, Jalan Sultan Abdul Samad (Peak Hour) 3.3.2 Back Alley , (Non-peak hour) REFERENCES 1 2-3 4-5 6-8 9-11 12-14 15-16 17-18 19-20 21 22 23
  • 3. 1 1.0 INTRODUCTION This project is an integration with the Architectural Design Studio 5 that requires one to understand the lighting and acoustics performances inside the spaces. The project involved is an urban infill community library, located at the Jalan Abdul Samad, in Brickfields, Kuala Lumpur. Full glaze curtain wall and vertical aluminium louvres are largely used for the facades so as to invite as much daylighting as possible while providing sunshading to prevent to overheating and glare problems. Besides, the external noise sources as well as the internal noise source are also determined so as to select the proper building materials and arrange the spaces based on their sound pressure level to ensure good acoustics performances in the building.
  • 4. 2 2.1DAYLIGHTING DF, % Distribution >6 Very bright with thermal & glare problem 3~6 Bright 1~3 Average 0~1 Dark 2.1.1 Discussion Area The selected area is an open area discussion area, located at the 2nd floor, facing the front faΓ§ade on the southern east direction, as seen in the floor plan below. The faΓ§ade is in full height curtain wall to ensure a good lighting condition as well as vertical louvers on the outside for sunshading purposes. Therefore, it allows view to the outside at the same time able to capture natural day lighting for a comfortable discussion environment for the people. Figure 2.1.1: Second Floor Plan (Discussion Area)
  • 5. 3 Daylight Factor Calculation Floor Area (m2) 120m Area of faΓ§ade that exposed to sunlight 53.6 Area of skylight (m2) 0 Exposed FaΓ§ade & Skylight Area to Floor Area Ratio/ Daylight Factor, DF (53.6+0)/120 =0.447 =44.67% x0.1 =4.467% Natural Illumination Calculation Natural Illumination Calculation E external = 20 000 lux DF= E internal/E external x 100 10 = E external /20000 x 100 E external = 10 x 20000 / 100 = 2000 lux Conclusion The Discussion Area has a daylight factor of 4.467% and natural illumination of 2000 lux. This has provide a bright condition and natural lit space to the occupants that ensure a good environment for discussions. Illuminance Example 120,000 lux Brightest sunlight 110,000 lux Bright sunlight 20,000 lux Shade illuminated by entire clear blue sky 1000-2000 lux Typical overcast day, midday <200 lux Extreme of darkest storm clouds, midday 400 lux Sunrise or sunset on clear day (ambient illumination) 40 lux Fully overcast, sunset/sunrise <1 lux Extreme of darkest storm clouds, sunset/ rise
  • 6. 4 2.1.2 Adult/Student Study Area Another space chosen is a study area for the adult and students, which is also located at the second floor, and facing the rear elevation, of western south direction. Figure 2.1.2 : Second Floor plan (Adult/ Student Study Area) Daylight Factor Calculation Floor Area (m2) 170m Area of faΓ§ade that exposed to sunlight 50.46m Area of skylight (m2) 0 Exposed FaΓ§ade & Skylight Area to Floor Area Ratio/ Daylight Factor, DF (50.46+0)/170 =0.2968 =29.68% x0.1 =2.968%
  • 7. 5 Natural Illumination Calculation E external = 20 000 lux DF= E internal/E external x 100 10 = E external /20000 x 100 E external = 10 x 20000 / 100 = 2000 lux Conclusion The Adult and Student Study room has a daylight factor of 2.968% and natural illumination of 2000 lux and thus achieve the brightness as being average nearly bright. This has ensure the study environment of the occupants to be sufficient of light and comfortable.
  • 8. 6 2.2 Artificial Lighting (Main collection of books) 2.2.1 Library Main Collection According to MS1525, the minimum illuminance level required for a public reading room is 300lux. Type of fixture LED Downlight Type of light bulb Product Brand & Code LEDVANCE DOWNLIGHT XL WT 830 Lumen 1200 lm Nominal Voltage 240 V Nominal Wattage 19.0 W Rated Lamp Efficacy 86 lm/W Colour Rendering Index, Ra >80 Life span 24000h Energy Consumption 16 kWh/ 1000h Figure 2.2.1 : First Floor Plan (Library Main Collection)
  • 9. 7 Lumen Method Calculation Location Library Main Collection Dimension Length=11m Width= 8.5m Height of the ceiling = 3.3m Floor Area (A) 93.5 Types of lighting fixture LED Downlight Lumen of lighting fixture F(Lux) 1200 lm Height of work level 0.8 Height of Luminaire (m) 4.1m Mounting height (Hm) 4.1m -0.8m = 3.3m Reflection Factors Ceiling: (0.7) Wall: (0.5) Floor: (0.2) Room Index / RI (K) 11 x8.5 (11x8.5 ) x 3.3 = 0.3 Utilisation Factor (UF) 0.5 Maintenance Factor (MF) 0.8 Standard Illuminance by MS1525 300 Number of light required N = 𝐸 π‘₯ 𝐴 𝐹 π‘₯ π‘ˆπΉ π‘₯ 𝑀𝐹 N = 300 π‘₯ 93.5 (1200)π‘₯ 0.5 π‘₯ 0.8 N = 58.4 Hence, 58 lamps are required to be installed. Spacing to Height Ratio(SHR) SHR = 1 π»π‘š x √ 𝐴 𝑁 = 1 3.3 x √ 93.5 58 = 0.38 SHR = 𝑆 3.3 = 0.38 S = 3.3 x 0.38 = 1.2 Fittings layout by approximately (m) Fittings required on the ceiling with 18m long , 11m / 1.254 = 8.8 β‰ˆ 9 rows
  • 10. 8 58/ 9rows= 6 columns of luminaire Spacing along 8.5 space for 6 columns of luminaires, 8.5m /6= 1.4m There will be 2 rows at both end, 1.4m/ 2= 0.7m Lighting Layout Conclusion 58 LED downlights are used to illuminate public reading area to achieve minimum of 300 lux that stated in MS1525. With the sufficient level of illumination, the users can read inside the space comfortably. Figure 2.2.2 : Lighting Layout (Library Main Collection)
  • 11. 9 2.2.2 AV Room According to IES Standard Illumination level, the minimum illuminance level required for a AV room is 100lux. Type of fixture LED lights Type of light bulb Product Brand & Code PARATHOM PAR38 120 30Β° ADV 14 W/827 E27 Lumen 1000 lm Input Voltage 120V Nominal Voltage 220 V Nominal Wattage 14.0 W Colour Rendering Index, Ra >80 Life span 40000 h Energy Consumption 16 kWh/ 1000h Figure 2.2.2: Third Floor Plan (AV Room)
  • 12. 10 Lumen Method Calculation Location AV Room Dimension Length=12.3m Width= 7.5m Height of the ceiling = 4 m Floor Area (A) 92.25m Types of lighting fixture LED lights Lumen of lighting fixture F(Lux) 1000lm Height of work level 0.8m Height of Luminaire (m) 5m Mounting height (Hm) 5m-0.8m =4.2m Reflection Factors Ceiling: (0.7) Wall: (0.5) Floor: (0.2) Room Index / RI (K) 12.3 x 7.5 (12.3 x 7.5 ) x 4.2m = 0.22 Utilisation Factor (UF) 0.5 Maintenance Factor (MF) 0.8 IES Standard Illumination level 100 Number of light required N = 𝐸 π‘₯ 𝐴 𝐹 π‘₯ π‘ˆπΉ π‘₯ 𝑀𝐹 N = 100π‘₯ 92.3 (1000)π‘₯ 0.5 π‘₯ 0.8 N = 23 lamps Hence, 23 lamps are required to be installed. Spacing to Height Ratio(SHR) SHR = 1 π»π‘š x √ 𝐴 𝑁 = 1 4.2 x √ 92.25 23 = 0.48
  • 13. 11 Lighting Layout Conclusion 23 LED downlights are used to illuminate AV room to achieve minimum of 100 lux that stated in to IES Standard Illumination level. Sufficient level of illumination allow visibilities of the occupants. SHR = 𝑆 4.2 = 0.48 S = 0.48 x 4.2 = 2.016 Fittings layout by approximately (m) Fittings required on the ceiling with 12.3m long , 12.23m/ 2 = 6.1 β‰ˆ 6rows 23 / 6rows= 3.83 columns of luminaire β‰ˆ 4 columns Spacing along 7.5m space for 4 columns of luminaires, 7.5m/4= 1.875m There will be 2 rows at both end, 1.875m/ 2= 0.937m Figure 2.2.3: Lighting Layout (AV Room)
  • 14. 12 2.3 PSALI – Permanent Supplementary Artificial Lighting of Interiors (Office) Permanent Supplementary Artificial Lighting (PSALI) is essentially artificial lighting lit by window on one side. PSALI compensates for the fall in illuminance as the distance from the window increases and daylighting is not enough is lighting up the area. Hence, there are two sets of switches, whereby one set is lighted up most of the time whereas the other set is only switched on during the night as there are adequate amount daylighting. According to MS1525, the minimum lighting level required for an office is 300 lux. Type of luminaire used as showed below: Type of fixture Tubular Fluorescent lamp Type of light bulb Product Brand & Code ST8V 8.9 W/830 600 mm EM Lumen 1200 lm Nominal Voltage 240 V Nominal Wattage 8.90W Colour Rendering Index, Ra >80 Life span 30000h Energy Consumption 12 kWh/1000h Figure 2.3.1: Third Floor Plan (Meeting Room)
  • 15. 13 Lumen Method Calculation Location Office Dimension Length=9m Width= 5.3m Height of the ceiling = 3.3m Floor Area (A) 47.7m Types of lighting fixture Tubular Fluorescent Lamp Lumen of lighting fixture F(Lux) 1200 lm Height of work level 0.8 Height of Luminaire (m) 3.3m Mounting height (Hm) 3.3m-0.8m =2.5m Reflection Factors Ceiling: (0.7) Wall: (0.5) Floor: (0.2) Room Index / RI (K) 9m x 5.3m (9x 5.3) x 2.5m = 0.4 Utilisation Factor (UF) 0.5 Maintenance Factor (MF) 0.8 Standard Illuminance by MS1525 300 Number of light required N = 𝐸 π‘₯ 𝐴 𝐹 π‘₯ π‘ˆπΉ π‘₯ 𝑀𝐹 N = 300 π‘₯47.7 (1200)π‘₯ 0.5 π‘₯ 0.8 N = 29.8 Hence, 30 lamps are required to be installed. Spacing to Height Ratio(SHR) SHR = 1 π»π‘š x √ 𝐴 𝑁 = 1 3.3 x √ 47.7 30 = 0.38 SHR = 𝑆 3.3 = 0.38 S = 3.3 x 0.38 = 1.254 Fittings layout by approximately (m) Fittings required on the ceiling with 9m long , 9m / 1.254 = 7.2 β‰ˆ 7 rows
  • 16. 14 30/ 7rows= 4.3 columns of luminaire β‰ˆ 5 rows Spacing along 5.3m space for 4 columns of luminaires, 5.3m /4= 1.06m There will be 2 rows at both end, 1.06m/ 2= 0.5m Lighting Layout CONCLUSION In conclusion, the meeting room is controlled by 2 set of switches. One set of the switches are opened all the time for sufficient of lighting inside the room, whereas for the other set of the switches, it can be turned off during daytime due to adequate natural daylighting from one side of the window. Hence, this could save the amount of electrical energy. The total number of light installed is 30 lamps for the use of both daytime and nightime. Figure 2.3.2: Lighting Layout (Meeting Room)
  • 17. 15 3.0 ACOUSTICS 3.1 Reverberation Time, RT 3.1.1 AV Room i) Non-peak hour, 500 Hz Space volume, V= 12.3 x 7.5 x 4 = 369 m3 Material absorption coefficient in 500 Hz at peak hour with 40 persons in the space Building Component Material Area, S/m2 Absorption Coefficient, a Sound Absorption, Sa Wall Brickwall 98.4 0.03 0.952 Wall Acoustic tiles 60 0.72 43.2 Floor Carpet on Concrete 92.25 0.14 12.92 Door Plywood 5.3 0.17 0.90 Ceiling Plaster Finish 92.25 0.02 1.845 Furniture Fabric chair 45 0.80 36 People [Peak] - 20 0.88 17.6 Total Absorption, A 113.417 Table 2.2.1: Reverberation Time, RT = (0.16 x V) /A = (0.16 x 369) / 113.94 = 0.52s The reverberation time for the AV room at 500Hz during non-peak hours is 0.52s and this has achieve the standard of an AC room which requires reverberation of 1s. This ensures the acoustic quality of the room during non-peak hour.
  • 18. 16 ii) Peak hour, 2000 Hz Material Absorption Coefficient at 2000Hz, Peak Hour with 20 persons in the space. Building Component Material Area, S/m2 Absorption Coefficient, a Sound Absorption, Sa Wall Brickwall 98.4 0.05 4.92 Wall Acoustic tiles 60 0.88 52.8 Floor Carpet on Concrete 92.25 0.60 55.35 Door Plywood 5.3 0.10 0.53 Ceiling Plaster Finish 92.25 0.04 3.69 Furniture Fabric chair 45 0.82 36.9 People [Peak] - 45 0.93 41.85 Total Absorption, A 196.12 Reverberation Time, RT = (0.16 x V) /A = (0.16 x 369 ) / 196.12 = 0.30s The reverberation time for the AV room during peak hours of 2000 Hz is 0.3s. This has indicated that the space has met adequate level of reverberation time even during the peak hours.
  • 19. 17 3.1.2 Meeting Room i) Non-peak hour, 500 Hz Space volume, V= 3.6m x 4.7m x 4m = 67.68 m3 Material absorption coefficient in 500 Hz at non-peak hour with 4 persons in the space Building Component Material Area, S/m2 Absorption Coefficient, a Sound Absorption, Sa Wall Brickwall 33.2 0.03 0.996 Floor Carpet on concrete 16.92 0.14 2.369 Wall Full Glazed Curtain Wall 14.4 0.04 0.576 Sliding Door Glass 5.3 0.17 0.90 Ceiling Plaster Finish 16.92 0.02 0.34 Furniture Fabric chair 10 0.80 8 People [Non- Peak] - 4 0.88 3.52 Total Absorption, A 16.701 Reverberation Time, RT = (0.16 x V) /A = (0.16 x 67.68) /16.701 = 0.648s The reverberation time for the meeting room at 500Hz during non-peak hours is 0.648s and this has achieve the standard of a meeting room which requires reverberation of 1s. This shows that the acoustic quality of the room is up to its standard.
  • 20. 18 ii) Peak hour, 2000 Hz Material Absorption Coefficient at 2000Hz, Peak Hour with 10 persons in the space. Building Component Material Area, S/m2 Absorption Coefficient, a Sound Absorption, Sa Wall Brickwall 33.2 0.05 1.66 Floor Carpet on Concrete 16.92 0.60 10.152 Wall Full Glazed Curtain Wall 14.4 0.02 0.288 Sliding door Glass 5.3 0.07 0.37 Ceiling Plaster Finish 16.92 0.04 0.68 Furniture Fabric chair 10 0.82 8.2 People [Peak] - 10 0.93 9.3 Total Absorption, A 30.65 Reverberation Time, RT = (0.16 x V) /A = (0.16 x 67.68 ) / 30.65 = 0.35s The reverberation time for the meeting room during peak hours of 2000 Hz is 0.35s. This has indicated that the space has met adequate level of reverberation time of 1s even during the peak hours.
  • 21. 19 3.2 SOUND REDUCTION INDEX (AV Room) Building Element Materials Surface Areas (m2) SRI (dB) Transmission Coefficient Wall Bricks 124 44 2.51 x 10-3 Door Plywood 4.2 31 7.943 x 10-4 Transmission coefficient of materials a) Brickwall SRI Brickwall = 10log10 1 T Brickwall 44 = 10log10 1 T Brickwall 102.6 = 1 T Brickwall T Brickwall = 2.51 x 10-3 b) Door 2– Plywood SRI plywood = 10log10 1 T plywood 31 = 10log10 1 T plywood 103.1 = 1 T plywood T plywood = 7.943 x 10-4
  • 22. 20 Average Transmission Coefficient of Materials Tav = (124 x 2.51 x 10-3) + (4.2x 7.943 x 10-4)/ (124+4.2) = 2.453 x 10-3 SRI overall = 10log10 1 T av = 10log10 1 2.453 x 10βˆ’3 = 26.1 dB 60dB – 26.1 dB = 33.9dB Noise Criteria, Environmental Perception Conclusion The overall transmission loss of AV room is 26.1 dB. Assume that the sound pressure level in the multifunctional room is approximately 60dB, the sound transmitted to the AV room is 33.9 dB. According to the noise criteria environment perception, it is listed under the quiet range of NC-25 to NC-35. Thus, it could be considered ideal for AV Room which requires a quieter environment for speech and learning.
  • 23. 21 3.3 Sound Pressure Level, SPL (External Noise) 3.3.1 Front FaΓ§ade, Jalan Sultan Abdul Samad (Peak Hour) i) Highest reading: 80dB Use the formula, L = 10log10 (I/Io), 80 = 10log10 (I/ 1x10-12) I = (108) (1x10-12) = 1x 10-4 ii) Lowest reading: 63dB Use the formula, L = 10log10 (I/Io), 63 = 10log10 (I/ 1x10-12) I = (106.3) (1x10-12) = 2x 10-6 Total Intensities, I = (1x 10-4) + (2x 10-6) = 1.02x 10-4 Using the formula Combined SPL = 10log10 (p2/po 2), where po = 1x10-12 Combined SPL = 10log10 [(1.02x 10-4) Γ· (1x10-12)] = 80.08 dB
  • 24. 22 3.3.2 Back Alley , (Non-peak hour) i) Highest reading: 57dB Use the formula, L = 10log10 (I/Io), 57 = 10log10 (I/ 1x10-12) I = (105.7) (1x10-12) = 5x10-7 ii) Lowest reading: 50dB Use the formula, L = 10log10 (I/Io), 50 = 10log10 (I/ 1x10-12) I = (105) (1x10-12) = 1x10-7 Total Intensities, I = (5x10-7) + (1x10-7) = 6x 10-7 Using the formula Combined SPL = 10log10 (p2/po 2), where po = 1x10-12 Combined SPL = 10log10 [(6x 10-7) Γ· (1x10-12)] = 57.78dB As a result, the average sound pressure level during Peak Hour and Non-peak Hour are 80.08dB and 57.78dB at front elevation and rear elevation respectively.
  • 25. 23 REFERENCES 1. Long, M. (2006). Architectural acoustics. Amsterdam: Elsevier/Academic Press. 2. Karlen, M. & Benya, J. (2004). Lighting design basics. Hoboken, New Jersy: John Wiley & Sons, Inc. 3. Stein, Benjamin & Reynolds, John S.2000. Mechanical and Electrical Equipment for buildings. New York. John Wiley