1.0 Introduction
2.0 Lighting proposal
2.1 Natural Daylighting
2.1.1
2.1.2
2.2 Artificial Daylighting
2.2.1
2.2.2
3.0 Acoustic Proposal
3.1 SPL (External Noise Calculation)
3.2 Reverberation Time
3.2.1 Audio Room
3.2.2 ICT Media Room
3.3 Sound reduction index/ Transmission Loss
3.3.1 Cafe
3.3.2 Meeting Room
2.0 LIGHTING PROPOSAL
2.1 Natural Daylighting
2.1.1 RECEPTION
----ZZ
Formula : Daylight Factor (DF) = (Ei / Eo) x 100%
Area of Space (m2) 200
Area of Curtain Wall (m2) (11x5)+(8.8x5)+(17x5)+(2.5x5) =137.02
Daylight Factor (%) (137.02 / 200) x 100%
= 68.51 % x 0.1
= 6.8 %
According to the standard requirement of daylight factor needed by reception of a
library, the 6.8 % result of daylight exceeds the standard general building reception of
2%. Hence, the curtain wall is layered by a steel perforated facade with growing
creeper plants to prevent glare discomforts of library users. However, a fair amount of
opening is designed to let natural light in to light up some reading spaces that require
critical amount of light.
Formula EEi = (DF x Eo) /100%
Given, Eo (unobstructed sky of Malaysia) 32000
EEi = (DF x Eo) / 100%
= (6.8 x 32000) / 100%
= 2176 lux
The standard required illuminance level for reception is 300 lux, which proves that the
calculation result of curtain wall design is over-sized and receives too much daylight.
Hence, some solutions are needed to overcome the issue mentioned.
2.1.1 READING AREA
Area of Space (m2) 69.6
Area of Curtain Wall (m2) 5.8 x 4 = 23.2
Daylight Factor (%) (23.2 / 69.6) x 100%
= 33.33 % x 0.1
= 3.33 %
The calculation result shows that the reading area receives sufficient daylight as it
surpassed the standard of 3%.
Formula EEi = (DF x Eo) /100%
Given, Eo (unobstructed sky of Malaysia) 32000
EEi = (DF x Eo) / 100%
= (3.33 x 32000) / 100%
= 1065.6 lux
The standard required illuminance level for reception is 300 lux, which proves that the
calculation result of curtain wall design is over-sized and receives too much daylight.
Hence, some solutions are needed to overcome the issue mentioned.
2.2 Artificial lighting
2.2.1 MEETING ROOM
Meeting room is a space that requires sufficient artificial lighting as it is
considered a workspace where users need a bright environment to stay
vision-clear and focused during meetings.
Lamp Type 3F FILIPPI 36578 LUCEQUADRO LED
Wattage 40W
Light Color Cool White
Luminous Flux 2900 lm
Color Temperature 3000 K
Color Rendering Index (CRI) 100
Dimension (m) Length (L) = 7.8
Width (W) = 3.7
Height of the ceiling = 3.5 m
Total floor area, A (m2) 7.8 X 3.7 = 28.86
Standard Illuminance Required
(lux) according to MS1525, E
300
Lumen of lighting fixtures, lm 2900
Height of luminaire (m) 3.2
Work level (m) 0.8
Mounting Height, Hm (m) 2.4
Assumption of reflective value Ceiling : 0.5 Wall : 0.5 Floor : 0.2
Room Index, RI (K)
= ( 7.8 x 3.7) / (7.8 + 3.7) x 2.4
= 28.86 / 27.6
= 1.05
Utilization Factor, UF 0.62
Maintenance Factor, MF 0.8
Lumen Calculation
= 300 lux x 7.8 x 3.7 / 2900 x 0.62 x 0.8
= 6
Number of luminaires across
= √ (7.8 x 6) / 3.7
= 3.6 (approximately 3)
= √ (7.8 / 3)
= 1.61 m
Number of luminaires along
= √ (3.7 x 6) / 7.8
= 1.68 (approximately 2)
= √ (3.7/ 2)
= 1.85 m
2.2.2 AUDIO ROOM
Audio room is a space that requires sufficient artificial lighting as it requires ambiance and
environment for the comfort of audiences. According to the calculation, 12 luminaries is
needed to achieve average of 300 lux within area 65m2 of the audio room. The well
distributed light fixtures will provide audiences with visual comfort.
Lamp Type 3F FILIPPI DODECA 220
Wattage 44W
Light Color Cool White
Luminous Flux 3200 lm
Color Temperature 3000 K
Color Rendering Index (CRI) 100
Dimension (m) Length (L) = 7
Width (W) = 9.3
Height of the ceiling = 3.5 m
Total floor area, A (m2) 7 x 9.3 = 65.1
Standard Illuminance Required
(lux) according to MS1525, E
100
Lumen of lighting fixtures, lm 3200
Height of luminaire (m) 3.2
Work level (m) 0.8
Mounting Height, Hm (m) 2.4
Assumption of reflective value Ceiling : 0.5 Wall : 0.5 Floor : 0.2
Room Index, RI (K) = ( 7 x 9.3) / (7 + 9.3) x 2.4
= 65.1 / 39.12
= 1.66
Utilization Factor, UF 0.62
Maintenance Factor, MF 0.8
Lumen Calculation
= 300lux x 7 x 9.3 / 3200 x 0.62 x 0.8
= 15
Number of luminaires across
= √ (7 x 12) / 9.3
= 3
= √ (7.8 / 4)
= 1.6 m
Number of luminaires along
= √ (9.3 x 12) / 7
= 3.99 (approximately 4)
= √ (9.3/ 4)
= 1.52 m
3.0 ACOUSTIC PROPOSAL
3.1 SOUND PRESSURE LEVEL (External Noise Calculation)
PEAK HOUR
Main road SPL =10log (IA / Iref )
80dB =10log (IA / 1 x 10-12)
IA= antilog (80/10) x 1 x 10-12
IA= 1.0 x 10-4
5-foot way SPL= 10log (IA / Iref )
30dB =10log (IA / 1 x 10-12)
IA= antilog (30/10) x 1 x 10-12
IA= 1.0 x 10-9
Backlane SPL= 10log (IA / Iref )
70dB =10log (IA / 1 x 10-12)
IA= antilog (70/10) x 1 x 10-12
IA= 1.0 x 10-5
Total intensity = (1.0 x 10-4) + (1.0 x 10-9 ) + (1.0 x 10-5)
= 1.1 x 10-4
Combined SPL= 10log (IA / Iref )
= 10log ( 1.1 x 10-4 / 1 x 10-12)
= 80.41 dB
NON- PEAK HOUR
Main road SPL= 10log (IA / Iref )
70dB =10log (IA / 1 x 10-12)
IA= antilog (70/10) x 1 x 10-12
IA= 1.0 x 10-5
5-foot way SPL= 10log (IA / Iref )
30dB =10log (IA / 1 x 10-12)
IA= antilog (30/10) x 1 x 10-12
IA= 1.0 x 10-9
Backlane SPL= 10log (IA / Iref )
65dB =10log (IA / 1 x 10-12)
IA= antilog (65/10) x 1 x 10-12
IA= 3.16 x 10-6
Total intensity = (1.0 x 10-5) + (1.0 x 10-9) + (3.16 x 10-6)
= 1.32 x 10-5
Combined SPL= 10log (IA / Iref )
= 10log ( 1.32 x 10-5/ 1 x 10-12)
= 71.21 dB
3.2 REVERBERATION TIME
3.2.1 AUDIO ROOM
Area = 8m x 6.3m
= 50.4 m2
Volume = 50.4 m2 x 3.5m
= 176.4 m3
MATERIAL AREA
(m2)
ABSORPTION
COEFFICIENT, 2000 Hz
SOUND ABSORPTION,
Sa
Concrete wall 77 0.39 30.03
Gypsum board wall panel 38.5 0.4 15.4
Carpet flooring 50.4 0.6 30.24
Wooden door 5.0 0.44 2.2
Fabric seating 26 0.82 21.32
Human 30 0.5 15
TOTAL 114.19
RT= (0.16 x 176.4) / 114.19
= 0.24s
In comparison of the reverberation time result and its standard requirement, it shows
that the material used for the audio room does not meet the requirement of 0.4 to 0.6
seconds. The actual lower result of 0.24 seconds should be improved by increasing
the reverberation time through reducing some acoustical elements to achieve better
acoustics.
3.2.2 ICT MEDIA ROOM
Area = 13.5m x 6.2m
= 84 m2
Volume = 84 m2 x 4m
= 336 m3
MATERIAL AREA/ AMOUNT
(m2)
ABSORPTION
COEFFICIENT, 2000 Hz
SOUND ABSORPTION,
Sa
Glass window 13.2 0.07 0.924
Concrete wall 34.05 0.39 13.27
Concrete floor 84 0.39 32.76
Carpet flooring 84 0.6 50.4
Wood furniture 25 0.38 9.5
Human 20 0.5 10
TOTAL 116.85
RT= (0.16 x 336) / 116.85
= 0.46s
The calculation result of ICT room reverberation time does not meet the requirement of
the standard of 0.5 - 0.9 seconds. Hence, some of the absorption materials should be
removed in order to achieve human acoustical comfort.
3.3 SOUND REDUCTION INDEX
Sound transmits from cafe to reception and meeting room due to the noisier crowd in
the cafe. Hence, good noise isolation material should be used for cafe and meeting
room to prevent noise dispersion.
3.3.1 CAFE
Components Materials Area (m2) Sound Reduction Index
(SRI)
Wall Plywood panel 42 35
SRIplywood = 10log (1/T)
35 = 10log (1/T)
Antilog3.5 = (1/T)
Tplywood = 3.16 x 10-4
SRIoverall = 10log10 (1/TL)
= 10log10 (1/ 3.16 x 10-4)
= 35dB
3.3.1 MEETING ROOM
Components Materials Area (m2) Sound Reduction Index
(SRI)
Wall Concrete block 25.2 40
SRIconcrete = 10log (1/T)
40 = 10log (1/T)
Antilog4.0 = (1/T)
Tconcrete = 1 x 10-4
SRIoverall = 10log10 (1/TL)
= 10log10 (1/ 1 x 10-4)
= 40 dB
The average transmission loss of materials used for the cafe and meeting room shows
the degree of noise that can transmit and be blocked within a room.
Cafe (70 dB) - Tav of cafe (35 dB) = 35 dB (Reception)
Cafe (70 dB) - Tav of meeting room (40 dB) = 30 dB (Meeting room)
This proves that plywood panel wall used in cafe can filter 35dB of noise traveling out
from the cafe whereas the concrete block wall used in the meeting can absorb 40dB of
noise transmitting to the meeting room.

More Related Content

What's hot

Final report
Final reportFinal report
Final reportShiko Foo
 
Building science ii project 2 (1)
Building science ii project 2  (1)Building science ii project 2  (1)
Building science ii project 2 (1)Aaron Chong Yu Ho
 
Preston bsci proj 2
Preston bsci proj 2Preston bsci proj 2
Preston bsci proj 2Preston Liew
 
Building Science 2 Final Project
Building Science 2 Final ProjectBuilding Science 2 Final Project
Building Science 2 Final ProjectKelvin Ng
 
Bscience project 2
Bscience project 2Bscience project 2
Bscience project 2ShiLikHong
 
Light analysis
Light analysisLight analysis
Light analysismrstore
 
Building science 2 final
Building science 2 finalBuilding science 2 final
Building science 2 finalKhoo Zer Kai
 
Light analysis
Light analysisLight analysis
Light analysismrstore
 
B science integration
B science integrationB science integration
B science integrationCarra Chin
 
Building Science Project 2
Building Science Project 2Building Science Project 2
Building Science Project 2zerospaces_
 
Audio noise reduction techniques
Audio  noise  reduction  techniquesAudio  noise  reduction  techniques
Audio noise reduction techniquesMeenakshi Singhvi
 
Panasonic projector DZ16K english
Panasonic projector DZ16K englishPanasonic projector DZ16K english
Panasonic projector DZ16K englishAV-PRO
 
Epson Entertainment
Epson EntertainmentEpson Entertainment
Epson Entertainmentjuliawilde
 
Image processing SaltPepper Noise
Image processing SaltPepper NoiseImage processing SaltPepper Noise
Image processing SaltPepper NoiseAnkush Srivastava
 

What's hot (17)

Final report
Final reportFinal report
Final report
 
Building science ii project 2 (1)
Building science ii project 2  (1)Building science ii project 2  (1)
Building science ii project 2 (1)
 
Preston bsci proj 2
Preston bsci proj 2Preston bsci proj 2
Preston bsci proj 2
 
Building Science 2 Final Project
Building Science 2 Final ProjectBuilding Science 2 Final Project
Building Science 2 Final Project
 
Bscience project 2
Bscience project 2Bscience project 2
Bscience project 2
 
Light analysis
Light analysisLight analysis
Light analysis
 
Nadia bsc2 p2
Nadia bsc2 p2Nadia bsc2 p2
Nadia bsc2 p2
 
Building science 2 final
Building science 2 finalBuilding science 2 final
Building science 2 final
 
Light analysis
Light analysisLight analysis
Light analysis
 
Project 2
Project 2Project 2
Project 2
 
B science integration
B science integrationB science integration
B science integration
 
Building Science Project 2
Building Science Project 2Building Science Project 2
Building Science Project 2
 
Audio noise reduction techniques
Audio  noise  reduction  techniquesAudio  noise  reduction  techniques
Audio noise reduction techniques
 
Panasonic projector DZ16K english
Panasonic projector DZ16K englishPanasonic projector DZ16K english
Panasonic projector DZ16K english
 
Epson Entertainment
Epson EntertainmentEpson Entertainment
Epson Entertainment
 
Epson
EpsonEpson
Epson
 
Image processing SaltPepper Noise
Image processing SaltPepper NoiseImage processing SaltPepper Noise
Image processing SaltPepper Noise
 

Similar to BUILDING SCIENCE II INDIVIDUAL REPORT

B Science Report Project 2
B Science Report Project 2B Science Report Project 2
B Science Report Project 2J-Sern Phua
 
CALCULATIONS - Integration with Studio 5
CALCULATIONS - Integration with Studio 5CALCULATIONS - Integration with Studio 5
CALCULATIONS - Integration with Studio 5nadiacbass
 
B science project 2
B science project 2B science project 2
B science project 2Elaine Bong
 
Bscience report
Bscience reportBscience report
Bscience reportkerneng
 
Building Science 2
Building Science 2Building Science 2
Building Science 2Gertrude Lee
 
Building Science II
Building Science IIBuilding Science II
Building Science IIVansC
 
Bs calculation
Bs calculationBs calculation
Bs calculationong93
 
TCC Building Science 2 Project 2 Calculation Report
TCC Building Science 2 Project 2 Calculation ReportTCC Building Science 2 Project 2 Calculation Report
TCC Building Science 2 Project 2 Calculation ReportQing Cheng
 
Bscience 2-project-2
Bscience 2-project-2Bscience 2-project-2
Bscience 2-project-2Megan Chung
 
Final building science report
Final building  science reportFinal building  science report
Final building science reportSiew John Loong
 
Project 2 Building Science
Project 2 Building ScienceProject 2 Building Science
Project 2 Building ScienceClement Seong
 
Building Science 2 Project 2 Integration project
Building Science 2 Project 2 Integration projectBuilding Science 2 Project 2 Integration project
Building Science 2 Project 2 Integration projectTan Jaden
 
Final report project 2 GYN integration
Final report project 2 GYN integrationFinal report project 2 GYN integration
Final report project 2 GYN integrationCrysmond Goh
 
Light Analysis of Building Science II
Light Analysis of Building Science IILight Analysis of Building Science II
Light Analysis of Building Science IIjernjack
 
INTEGRATION TO C.LIBRARY
INTEGRATION TO C.LIBRARY INTEGRATION TO C.LIBRARY
INTEGRATION TO C.LIBRARY Devinchi
 
CALCULATIONS ON LIGHTING DESIGN
CALCULATIONS ON LIGHTING DESIGNCALCULATIONS ON LIGHTING DESIGN
CALCULATIONS ON LIGHTING DESIGNCarmen Chan
 
Final report bsc 2
Final report bsc 2Final report bsc 2
Final report bsc 2Wm Chia
 

Similar to BUILDING SCIENCE II INDIVIDUAL REPORT (20)

B Science Report Project 2
B Science Report Project 2B Science Report Project 2
B Science Report Project 2
 
CALCULATIONS - Integration with Studio 5
CALCULATIONS - Integration with Studio 5CALCULATIONS - Integration with Studio 5
CALCULATIONS - Integration with Studio 5
 
Final report
Final reportFinal report
Final report
 
B science project 2
B science project 2B science project 2
B science project 2
 
Lighting proposal
Lighting  proposalLighting  proposal
Lighting proposal
 
Bscience report
Bscience reportBscience report
Bscience report
 
Building Science 2
Building Science 2Building Science 2
Building Science 2
 
Building Science II
Building Science IIBuilding Science II
Building Science II
 
Bs calculation
Bs calculationBs calculation
Bs calculation
 
TCC Building Science 2 Project 2 Calculation Report
TCC Building Science 2 Project 2 Calculation ReportTCC Building Science 2 Project 2 Calculation Report
TCC Building Science 2 Project 2 Calculation Report
 
Bscience 2-project-2
Bscience 2-project-2Bscience 2-project-2
Bscience 2-project-2
 
Final building science report
Final building  science reportFinal building  science report
Final building science report
 
Project 2 Building Science
Project 2 Building ScienceProject 2 Building Science
Project 2 Building Science
 
Building Science 2 Project 2 Integration project
Building Science 2 Project 2 Integration projectBuilding Science 2 Project 2 Integration project
Building Science 2 Project 2 Integration project
 
Final report project 2 GYN integration
Final report project 2 GYN integrationFinal report project 2 GYN integration
Final report project 2 GYN integration
 
Light Analysis of Building Science II
Light Analysis of Building Science IILight Analysis of Building Science II
Light Analysis of Building Science II
 
INTEGRATION TO C.LIBRARY
INTEGRATION TO C.LIBRARY INTEGRATION TO C.LIBRARY
INTEGRATION TO C.LIBRARY
 
CALCULATIONS ON LIGHTING DESIGN
CALCULATIONS ON LIGHTING DESIGNCALCULATIONS ON LIGHTING DESIGN
CALCULATIONS ON LIGHTING DESIGN
 
abcde
abcdeabcde
abcde
 
Final report bsc 2
Final report bsc 2Final report bsc 2
Final report bsc 2
 

More from Claire Zhuangg

BUILDING SCIENCE II REPORT
BUILDING SCIENCE II REPORTBUILDING SCIENCE II REPORT
BUILDING SCIENCE II REPORTClaire Zhuangg
 
BUILDING SERVICES final
BUILDING SERVICES finalBUILDING SERVICES final
BUILDING SERVICES finalClaire Zhuangg
 
Site analysis-lembah-bujang
Site analysis-lembah-bujangSite analysis-lembah-bujang
Site analysis-lembah-bujangClaire Zhuangg
 
Istana Bandar Jugrah Ornament & minerate Details
Istana Bandar Jugrah Ornament & minerate DetailsIstana Bandar Jugrah Ornament & minerate Details
Istana Bandar Jugrah Ornament & minerate DetailsClaire Zhuangg
 
Istana Bandar Jugrah Window Details
Istana Bandar Jugrah Window Details Istana Bandar Jugrah Window Details
Istana Bandar Jugrah Window Details Claire Zhuangg
 
Istana Bandar Jugrah Door Details
Istana Bandar Jugrah Door DetailsIstana Bandar Jugrah Door Details
Istana Bandar Jugrah Door DetailsClaire Zhuangg
 
Istana Bandar Jugrah Sections
Istana Bandar Jugrah SectionsIstana Bandar Jugrah Sections
Istana Bandar Jugrah SectionsClaire Zhuangg
 
Istana Bandar Jugrah Elevations
Istana Bandar Jugrah ElevationsIstana Bandar Jugrah Elevations
Istana Bandar Jugrah ElevationsClaire Zhuangg
 
Istana Bandar Jugrah Plans
Istana Bandar Jugrah PlansIstana Bandar Jugrah Plans
Istana Bandar Jugrah PlansClaire Zhuangg
 

More from Claire Zhuangg (10)

CCDS Theory component
CCDS Theory componentCCDS Theory component
CCDS Theory component
 
BUILDING SCIENCE II REPORT
BUILDING SCIENCE II REPORTBUILDING SCIENCE II REPORT
BUILDING SCIENCE II REPORT
 
BUILDING SERVICES final
BUILDING SERVICES finalBUILDING SERVICES final
BUILDING SERVICES final
 
Site analysis-lembah-bujang
Site analysis-lembah-bujangSite analysis-lembah-bujang
Site analysis-lembah-bujang
 
Istana Bandar Jugrah Ornament & minerate Details
Istana Bandar Jugrah Ornament & minerate DetailsIstana Bandar Jugrah Ornament & minerate Details
Istana Bandar Jugrah Ornament & minerate Details
 
Istana Bandar Jugrah Window Details
Istana Bandar Jugrah Window Details Istana Bandar Jugrah Window Details
Istana Bandar Jugrah Window Details
 
Istana Bandar Jugrah Door Details
Istana Bandar Jugrah Door DetailsIstana Bandar Jugrah Door Details
Istana Bandar Jugrah Door Details
 
Istana Bandar Jugrah Sections
Istana Bandar Jugrah SectionsIstana Bandar Jugrah Sections
Istana Bandar Jugrah Sections
 
Istana Bandar Jugrah Elevations
Istana Bandar Jugrah ElevationsIstana Bandar Jugrah Elevations
Istana Bandar Jugrah Elevations
 
Istana Bandar Jugrah Plans
Istana Bandar Jugrah PlansIstana Bandar Jugrah Plans
Istana Bandar Jugrah Plans
 

Recently uploaded

Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024thyngster
 
RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998YohFuh
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPramod Kumar Srivastava
 
vip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Book
vip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Bookvip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Book
vip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Bookmanojkuma9823
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts ServiceSapana Sha
 
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...Suhani Kapoor
 
Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfLars Albertsson
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptxthyngster
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...dajasot375
 
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxEmmanuel Dauda
 
ASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel CanterASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel Cantervoginip
 
How we prevented account sharing with MFA
How we prevented account sharing with MFAHow we prevented account sharing with MFA
How we prevented account sharing with MFAAndrei Kaleshka
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfSocial Samosa
 
Brighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data StorytellingBrighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data StorytellingNeil Barnes
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsappssapnasaifi408
 
INTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTDINTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTDRafezzaman
 
Dubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls DubaiDubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls Dubaihf8803863
 

Recently uploaded (20)

Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
Consent & Privacy Signals on Google *Pixels* - MeasureCamp Amsterdam 2024
 
RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998RA-11058_IRR-COMPRESS Do 198 series of 1998
RA-11058_IRR-COMPRESS Do 198 series of 1998
 
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptxPKS-TGC-1084-630 - Stage 1 Proposal.pptx
PKS-TGC-1084-630 - Stage 1 Proposal.pptx
 
vip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Book
vip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Bookvip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Book
vip Sarai Rohilla Call Girls 9999965857 Call or WhatsApp Now Book
 
Call Girls In Mahipalpur O9654467111 Escorts Service
Call Girls In Mahipalpur O9654467111  Escorts ServiceCall Girls In Mahipalpur O9654467111  Escorts Service
Call Girls In Mahipalpur O9654467111 Escorts Service
 
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
VIP High Class Call Girls Jamshedpur Anushka 8250192130 Independent Escort Se...
 
Industrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdfIndustrialised data - the key to AI success.pdf
Industrialised data - the key to AI success.pdf
 
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptxEMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM  TRACKING WITH GOOGLE ANALYTICS.pptx
EMERCE - 2024 - AMSTERDAM - CROSS-PLATFORM TRACKING WITH GOOGLE ANALYTICS.pptx
 
E-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptxE-Commerce Order PredictionShraddha Kamble.pptx
E-Commerce Order PredictionShraddha Kamble.pptx
 
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
Indian Call Girls in Abu Dhabi O5286O24O8 Call Girls in Abu Dhabi By Independ...
 
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲中央昆士兰大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
Customer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptxCustomer Service Analytics - Make Sense of All Your Data.pptx
Customer Service Analytics - Make Sense of All Your Data.pptx
 
ASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel CanterASML's Taxonomy Adventure by Daniel Canter
ASML's Taxonomy Adventure by Daniel Canter
 
How we prevented account sharing with MFA
How we prevented account sharing with MFAHow we prevented account sharing with MFA
How we prevented account sharing with MFA
 
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdfKantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
Kantar AI Summit- Under Embargo till Wednesday, 24th April 2024, 4 PM, IST.pdf
 
Brighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data StorytellingBrighton SEO | April 2024 | Data Storytelling
Brighton SEO | April 2024 | Data Storytelling
 
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /WhatsappsBeautiful Sapna Vip  Call Girls Hauz Khas 9711199012 Call /Whatsapps
Beautiful Sapna Vip Call Girls Hauz Khas 9711199012 Call /Whatsapps
 
INTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTDINTERNSHIP ON PURBASHA COMPOSITE TEX LTD
INTERNSHIP ON PURBASHA COMPOSITE TEX LTD
 
Dubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls DubaiDubai Call Girls Wifey O52&786472 Call Girls Dubai
Dubai Call Girls Wifey O52&786472 Call Girls Dubai
 
Call Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort ServiceCall Girls in Saket 99530🔝 56974 Escort Service
Call Girls in Saket 99530🔝 56974 Escort Service
 

BUILDING SCIENCE II INDIVIDUAL REPORT

  • 1. BUILDING SCIENCE 2 (ARC 3414) PROJECT 2: INTEGRATION OF BUILDING SCIENCE WITH DESIGN STUDIO 5 NAME: ZHUANG ZHI JIE ID: 0314224 TUTOR: MR EDWIN CHAN
  • 2. TABLE OF CONTENT 1.0 Introduction 2.0 Lighting proposal 2.1 Natural Daylighting 2.1.1 2.1.2 2.2 Artificial Daylighting 2.2.1 2.2.2 3.0 Acoustic Proposal 3.1 SPL (External Noise Calculation) 3.2 Reverberation Time 3.2.1 Audio Room 3.2.2 ICT Media Room 3.3 Sound reduction index/ Transmission Loss 3.3.1 Cafe 3.3.2 Meeting Room
  • 3. 2.0 LIGHTING PROPOSAL 2.1 Natural Daylighting 2.1.1 RECEPTION ----ZZ
  • 4. Formula : Daylight Factor (DF) = (Ei / Eo) x 100% Area of Space (m2) 200 Area of Curtain Wall (m2) (11x5)+(8.8x5)+(17x5)+(2.5x5) =137.02 Daylight Factor (%) (137.02 / 200) x 100% = 68.51 % x 0.1 = 6.8 % According to the standard requirement of daylight factor needed by reception of a library, the 6.8 % result of daylight exceeds the standard general building reception of 2%. Hence, the curtain wall is layered by a steel perforated facade with growing creeper plants to prevent glare discomforts of library users. However, a fair amount of opening is designed to let natural light in to light up some reading spaces that require critical amount of light. Formula EEi = (DF x Eo) /100% Given, Eo (unobstructed sky of Malaysia) 32000 EEi = (DF x Eo) / 100% = (6.8 x 32000) / 100% = 2176 lux The standard required illuminance level for reception is 300 lux, which proves that the calculation result of curtain wall design is over-sized and receives too much daylight. Hence, some solutions are needed to overcome the issue mentioned.
  • 6. Area of Space (m2) 69.6 Area of Curtain Wall (m2) 5.8 x 4 = 23.2 Daylight Factor (%) (23.2 / 69.6) x 100% = 33.33 % x 0.1 = 3.33 % The calculation result shows that the reading area receives sufficient daylight as it surpassed the standard of 3%. Formula EEi = (DF x Eo) /100% Given, Eo (unobstructed sky of Malaysia) 32000 EEi = (DF x Eo) / 100% = (3.33 x 32000) / 100% = 1065.6 lux The standard required illuminance level for reception is 300 lux, which proves that the calculation result of curtain wall design is over-sized and receives too much daylight. Hence, some solutions are needed to overcome the issue mentioned.
  • 7. 2.2 Artificial lighting 2.2.1 MEETING ROOM Meeting room is a space that requires sufficient artificial lighting as it is considered a workspace where users need a bright environment to stay vision-clear and focused during meetings.
  • 8.
  • 9. Lamp Type 3F FILIPPI 36578 LUCEQUADRO LED Wattage 40W Light Color Cool White Luminous Flux 2900 lm Color Temperature 3000 K Color Rendering Index (CRI) 100 Dimension (m) Length (L) = 7.8 Width (W) = 3.7 Height of the ceiling = 3.5 m Total floor area, A (m2) 7.8 X 3.7 = 28.86 Standard Illuminance Required (lux) according to MS1525, E 300 Lumen of lighting fixtures, lm 2900 Height of luminaire (m) 3.2 Work level (m) 0.8 Mounting Height, Hm (m) 2.4 Assumption of reflective value Ceiling : 0.5 Wall : 0.5 Floor : 0.2 Room Index, RI (K) = ( 7.8 x 3.7) / (7.8 + 3.7) x 2.4 = 28.86 / 27.6 = 1.05 Utilization Factor, UF 0.62 Maintenance Factor, MF 0.8
  • 10. Lumen Calculation = 300 lux x 7.8 x 3.7 / 2900 x 0.62 x 0.8 = 6 Number of luminaires across = √ (7.8 x 6) / 3.7 = 3.6 (approximately 3) = √ (7.8 / 3) = 1.61 m Number of luminaires along = √ (3.7 x 6) / 7.8 = 1.68 (approximately 2) = √ (3.7/ 2) = 1.85 m 2.2.2 AUDIO ROOM
  • 11. Audio room is a space that requires sufficient artificial lighting as it requires ambiance and environment for the comfort of audiences. According to the calculation, 12 luminaries is needed to achieve average of 300 lux within area 65m2 of the audio room. The well distributed light fixtures will provide audiences with visual comfort.
  • 12. Lamp Type 3F FILIPPI DODECA 220 Wattage 44W Light Color Cool White Luminous Flux 3200 lm Color Temperature 3000 K Color Rendering Index (CRI) 100 Dimension (m) Length (L) = 7 Width (W) = 9.3 Height of the ceiling = 3.5 m Total floor area, A (m2) 7 x 9.3 = 65.1 Standard Illuminance Required (lux) according to MS1525, E 100 Lumen of lighting fixtures, lm 3200 Height of luminaire (m) 3.2 Work level (m) 0.8 Mounting Height, Hm (m) 2.4 Assumption of reflective value Ceiling : 0.5 Wall : 0.5 Floor : 0.2 Room Index, RI (K) = ( 7 x 9.3) / (7 + 9.3) x 2.4 = 65.1 / 39.12 = 1.66 Utilization Factor, UF 0.62 Maintenance Factor, MF 0.8
  • 13. Lumen Calculation = 300lux x 7 x 9.3 / 3200 x 0.62 x 0.8 = 15 Number of luminaires across = √ (7 x 12) / 9.3 = 3 = √ (7.8 / 4) = 1.6 m Number of luminaires along = √ (9.3 x 12) / 7 = 3.99 (approximately 4) = √ (9.3/ 4) = 1.52 m
  • 14. 3.0 ACOUSTIC PROPOSAL 3.1 SOUND PRESSURE LEVEL (External Noise Calculation) PEAK HOUR Main road SPL =10log (IA / Iref ) 80dB =10log (IA / 1 x 10-12) IA= antilog (80/10) x 1 x 10-12 IA= 1.0 x 10-4 5-foot way SPL= 10log (IA / Iref ) 30dB =10log (IA / 1 x 10-12) IA= antilog (30/10) x 1 x 10-12 IA= 1.0 x 10-9 Backlane SPL= 10log (IA / Iref ) 70dB =10log (IA / 1 x 10-12) IA= antilog (70/10) x 1 x 10-12 IA= 1.0 x 10-5 Total intensity = (1.0 x 10-4) + (1.0 x 10-9 ) + (1.0 x 10-5) = 1.1 x 10-4 Combined SPL= 10log (IA / Iref ) = 10log ( 1.1 x 10-4 / 1 x 10-12) = 80.41 dB
  • 15. NON- PEAK HOUR Main road SPL= 10log (IA / Iref ) 70dB =10log (IA / 1 x 10-12) IA= antilog (70/10) x 1 x 10-12 IA= 1.0 x 10-5 5-foot way SPL= 10log (IA / Iref ) 30dB =10log (IA / 1 x 10-12) IA= antilog (30/10) x 1 x 10-12 IA= 1.0 x 10-9 Backlane SPL= 10log (IA / Iref ) 65dB =10log (IA / 1 x 10-12) IA= antilog (65/10) x 1 x 10-12 IA= 3.16 x 10-6 Total intensity = (1.0 x 10-5) + (1.0 x 10-9) + (3.16 x 10-6) = 1.32 x 10-5 Combined SPL= 10log (IA / Iref ) = 10log ( 1.32 x 10-5/ 1 x 10-12) = 71.21 dB
  • 16. 3.2 REVERBERATION TIME 3.2.1 AUDIO ROOM Area = 8m x 6.3m = 50.4 m2 Volume = 50.4 m2 x 3.5m = 176.4 m3
  • 17. MATERIAL AREA (m2) ABSORPTION COEFFICIENT, 2000 Hz SOUND ABSORPTION, Sa Concrete wall 77 0.39 30.03 Gypsum board wall panel 38.5 0.4 15.4 Carpet flooring 50.4 0.6 30.24 Wooden door 5.0 0.44 2.2 Fabric seating 26 0.82 21.32 Human 30 0.5 15 TOTAL 114.19 RT= (0.16 x 176.4) / 114.19 = 0.24s In comparison of the reverberation time result and its standard requirement, it shows that the material used for the audio room does not meet the requirement of 0.4 to 0.6 seconds. The actual lower result of 0.24 seconds should be improved by increasing the reverberation time through reducing some acoustical elements to achieve better acoustics.
  • 18. 3.2.2 ICT MEDIA ROOM Area = 13.5m x 6.2m = 84 m2 Volume = 84 m2 x 4m = 336 m3
  • 19. MATERIAL AREA/ AMOUNT (m2) ABSORPTION COEFFICIENT, 2000 Hz SOUND ABSORPTION, Sa Glass window 13.2 0.07 0.924 Concrete wall 34.05 0.39 13.27 Concrete floor 84 0.39 32.76 Carpet flooring 84 0.6 50.4 Wood furniture 25 0.38 9.5 Human 20 0.5 10 TOTAL 116.85 RT= (0.16 x 336) / 116.85 = 0.46s The calculation result of ICT room reverberation time does not meet the requirement of the standard of 0.5 - 0.9 seconds. Hence, some of the absorption materials should be removed in order to achieve human acoustical comfort.
  • 20. 3.3 SOUND REDUCTION INDEX Sound transmits from cafe to reception and meeting room due to the noisier crowd in the cafe. Hence, good noise isolation material should be used for cafe and meeting room to prevent noise dispersion.
  • 21. 3.3.1 CAFE Components Materials Area (m2) Sound Reduction Index (SRI) Wall Plywood panel 42 35 SRIplywood = 10log (1/T) 35 = 10log (1/T) Antilog3.5 = (1/T) Tplywood = 3.16 x 10-4 SRIoverall = 10log10 (1/TL) = 10log10 (1/ 3.16 x 10-4) = 35dB 3.3.1 MEETING ROOM Components Materials Area (m2) Sound Reduction Index (SRI) Wall Concrete block 25.2 40 SRIconcrete = 10log (1/T) 40 = 10log (1/T) Antilog4.0 = (1/T) Tconcrete = 1 x 10-4 SRIoverall = 10log10 (1/TL) = 10log10 (1/ 1 x 10-4) = 40 dB
  • 22. The average transmission loss of materials used for the cafe and meeting room shows the degree of noise that can transmit and be blocked within a room. Cafe (70 dB) - Tav of cafe (35 dB) = 35 dB (Reception) Cafe (70 dB) - Tav of meeting room (40 dB) = 30 dB (Meeting room) This proves that plywood panel wall used in cafe can filter 35dB of noise traveling out from the cafe whereas the concrete block wall used in the meeting can absorb 40dB of noise transmitting to the meeting room.