Quantity based Earned Value Management analysis can be done by minimum inputs and maximum monitoring aspect with conventional software. Please review and share your valuable comments.
1. By Ayon PalProject : Sample Project AP
Architect :
Consultant :
Subject : Area Statement
Sl No Description Unit Area Floor Slab Area
1.00 Area Statement
1.01 Basement Sqm 4625.00
1.02 Ground/ stilt Sqm 4428.00 4450.00
1.03 First Sqm 4408.00 4400.00
1.04 Second Sqm 4342.00 4300.00
1.05 Third Sqm 3568.00 4350.00
1.08 Terrace Sqm 358.00 3500.00
TOTAL AREA Sqm 21729.00 21000.00
TOTAL AREA Sft 233890.96 225960.00
2. By Ayon PalID Task Name Duration Start Finish Predecessors
1 Project AP 133 days Mon 6/1/15 Wed 12/2/15
2 Mobilization 7 days Mon 6/1/15 Tue 6/9/15
3 Foundation & Basement 95 days Tue 6/9/15 Mon 10/19/15
4 Mass Excavation 32 days Tue 6/9/15 Wed 7/22/15 2SS+6 days
5 Footing Excavation 24 days Mon 6/29/15 Thu 7/30/15 4FF+6 days
6 Footing PCC 15 days Wed 7/15/15 Tue 8/4/15 5FF+3 days
7 Footing Reinf 15 days Mon 7/20/15 Fri 8/7/15 6SS+3 days
8 Footing Shuttering 18 days Tue 7/21/15 Thu 8/13/15 7SS+1 day
9 Footing Concrete 16 days Fri 7/24/15 Fri 8/14/15 8SS+3 days
10 R Wall PCC 15 days Mon 7/20/15 Fri 8/7/15 5FF+6 days
11 R Wall Raft Reinforcement 16 days Tue 7/21/15 Tue 8/11/15 10SS+1 day
12 R Wall Raft RCC 18 days Thu 7/23/15 Mon 8/17/15 11SS+2 days
13 R Wall Reinforcement 18 days Tue 7/28/15 Thu 8/20/15 12SS+3 days
14 R Wall Shuttering 25 days Wed 7/29/15 Tue 9/1/15 13SS+1 day
15 R Wall RCC 30 days Thu 8/6/15 Wed 9/16/15 14SS+6 days
16 Footing Backfilling 25 days Tue 8/4/15 Mon 9/7/15 9SS+7 days
17 Grade Slab PCC 17 days Thu 8/13/15 Fri 9/4/15 16SS+7 days
18 Grade Slab 20 days Tue 9/22/15 Mon 10/19/15 29FF+20 days
19 Backfilling outside R Wall 25 days Thu 8/27/15 Wed 9/30/15 15SS+15 days
20 Ground Floor Slab 37 days Fri 7/31/15 Mon 9/21/15
21 Column Reinforcement 13 days Fri 7/31/15 Tue 8/18/15 9SS+5 days
22 Column 1st Lift Shuttering 18 days Tue 8/4/15 Thu 8/27/15 21SS+2 days
23 Column 1st Lift RCC 15 days Wed 8/5/15 Tue 8/25/15 22SS+1 day
24 Column 2nd Lift Shuttering 18 days Thu 8/6/15 Mon 8/31/15 23SS+1 day
25 Column 2nd Lift RCC 20 days Fri 8/7/15 Thu 9/3/15 24SS+1 day
26 Slab Staging 21 days Tue 8/11/15 Tue 9/8/15 25SS+2 days,17FF+1 day
27 Slab Shuttering 23 days Thu 8/13/15 Mon 9/14/15 26SS+2 days
28 Slab Reinforcement 25 days Mon 8/17/15 Fri 9/18/15 27SS+2 days
29 Slab Concrete 16 days Mon 8/31/15 Mon 9/21/15 28FF+1 day,15FF+1 day
30 First Floor Slab 27 days Wed 9/2/15 Thu 10/8/15
31 Column Reinforcement 15 days Wed 9/2/15 Tue 9/22/15 29SS+2 days
32 Column Shuttering 16 days Fri 9/4/15 Fri 9/25/15 31SS+2 days
33 Column RCC 17 days Mon 9/7/15 Tue 9/29/15 32SS+1 day
34 Slab Staging 17 days Tue 9/8/15 Wed 9/30/15 33SS+1 day
35 Slab Shuttering 20 days Wed 9/9/15 Tue 10/6/15 34SS+1 day
36 Slab Reinforcement 19 days Fri 9/11/15 Wed 10/7/15 35SS+2 days
37 Slab Concrete 16 days Thu 9/17/15 Thu 10/8/15 36FF+1 day
38 Second Floor Slab 27 days Mon 9/21/15 Tue 10/27/15
39 Column Reinforcement 15 days Mon 9/21/15 Fri 10/9/15 37SS+2 days
40 Column Shuttering 16 days Wed 9/23/15 Wed 10/14/15 39SS+2 days
41 Column RCC 17 days Thu 9/24/15 Fri 10/16/15 40SS+1 day
42 Slab Staging 17 days Fri 9/25/15 Mon 10/19/15 41SS+1 day
43 Slab Shuttering 20 days Mon 9/28/15 Fri 10/23/15 42SS+1 day
44 Slab Reinforcement 19 days Wed 9/30/15 Mon 10/26/15 43SS+2 days
45 Slab Concrete 16 days Tue 10/6/15 Tue 10/27/15 44FF+1 day
46 Third Floor Slab 27 days Thu 10/8/15 Fri 11/13/15
47 Column Reinforcement 15 days Thu 10/8/15 Wed 10/28/15 45SS+2 days
48 Column Shuttering 16 days Mon 10/12/15 Mon 11/2/15 47SS+2 days
49 Column RCC 17 days Tue 10/13/15 Wed 11/4/15 48SS+1 day
50 Slab Staging 17 days Wed 10/14/15 Thu 11/5/15 49SS+1 day
51 Slab Shuttering 20 days Thu 10/15/15 Wed 11/11/15 50SS+1 day
52 Slab Reinforcement 19 days Mon 10/19/15 Thu 11/12/15 51SS+2 days
53 Slab Concrete 16 days Fri 10/23/15 Fri 11/13/15 52FF+1 day
54 Terrace Floor Slab 27 days Tue 10/27/15 Wed 12/2/15
55 Column Reinforcement 15 days Tue 10/27/15 Mon 11/16/15 53SS+2 days
56 Column Shuttering 16 days Thu 10/29/15 Thu 11/19/15 55SS+2 days
57 Column RCC 17 days Fri 10/30/15 Mon 11/23/15 56SS+1 day
58 Slab Staging 17 days Mon 11/2/15 Tue 11/24/15 57SS+1 day
59 Slab Shuttering 20 days Tue 11/3/15 Mon 11/30/15 58SS+1 day
60 Slab Reinforcement 19 days Thu 11/5/15 Tue 12/1/15 59SS+2 days
61 Slab Concrete 16 days Wed 11/11/15 Wed 12/2/15 60FF+1 day
6/1 6/9
6/9 7/22
6/29 7/30
7/15 8/4
7/20 8/7
7/21 8/13
7/24 8/14
7/20 8/7
7/21 8/11
7/23 8/17
7/28 8/20
7/29 9/1
8/6 9/16
8/4 9/7
8/13 9/4
9/22 10/19
8/27 9/30
7/31 8/18
8/4 8/27
8/5 8/25
8/6 8/31
8/7 9/3
8/11 9/8
8/13 9/14
8/17 9/18
8/31 9/21
9/2 9/22
9/4 9/25
9/7 9/29
9/8 9/30
9/9 10/6
9/11 10/7
9/17 10/8
9/21 10/9
9/23 10/14
9/24 10/16
9/25 10/19
9/28 10/23
9/30 10/26
10/6 10/27
10/8 10/28
10/12 11/2
10/13 11/4
10/14 11/5
10/15 11/11
10/19 11/12
10/23 11/13
10/27 11/16
10/29 11/19
10/30 11/23
11/2 11/24
11/3 11/30
11/5 12/1
11/11 12/2
17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 6
Jun '15 Jul '15 Aug '15 Sep '15 Oct '15 Nov '15 Dec '15
Sample Project for EVM Analysis
Page 1
3. By Ayon PalBOQ for Sample Project AP BOQ for Sample Project AP BOQ for Sample Project AP
Description Unit Qty Description Unit Qty Description Unit Qty
Excavation M25 Grade
General Mass Excavation Beams Core Walls at all levels
Ground Cum 50 Basement Sqm 575
Upto 3.00m depth Cum 16500 First Cum 125 Ground Sqm 275
Second Cum 125 First Sqm 325
Footing Excavation Cum 3000 Third Cum 135 Second Sqm 325
Terrace Cum 135 Third Sqm 325
Providing sand filling Cum 1260 Above terrace Cum 30 Terrace Sqm 350
Concrete Slabs Beams
Ground Cum 1000 Ground Sqm 300
Providing and laying Plum concrete 1: 5: 10.
Cum 200
First
Cum 1000
First
Sqm 900
Second Cum 1000 Second Sqm 900
Providing and laying P.C.C. 1:4:8 Cum 50 Third Cum 1000 Third Sqm 1050
Terrace Cum 800 Terrace Sqm 1050
Providing and laying P.C.C. 1:3:6 Cum 1000 Above terrace Cum 75 Above Terrace Sqm 300
Ready Mix Concrete Footings for columns, core walls, Retaining walls
Cum 2100
Staircase at all levels and heights
Sqm 1200
Column Concreting Grade slab 150/200th Cum 650 Lintels Sqm 150
M35 Grade
Basement Cum 200 Retaining walls Cum 300 Retaining wall Sqm 3000
Ground Cum 175
First
Cum 200
Staircase at all floors & heights
Cum 175
RCC Ledges,Parapets,Fins,Brackets at all
levels Sqm 1000
M30 Grade Lintels Cum 10 Chejjas/Lofts/ platforms Sqm 250
Second Cum 200
Third Cum 175 Chejjas/Lofts/ platforms Cum 5 Sump tank,Storm water sump
Above terrace Cum 60 Bottom slab Sqm 20
Mullions at all levels
Cum 10
RCC Ledges,Parapets,Fins,Brackets at all levels
Cum 5
Walls
Sqm 500
Top slab Sqm 100
Drop panels of specified grade Sump tank,Storm water sump
M35 Grade Bottom slab Cum 30 Over head tanks
Ground Cum 225 Walls Cum 45 Bottom slab Sqm 70
First Cum 200 Top slab Cum 20 Walls Sqm 120
Second Cum 180 Top slab Sqm 70
OH Tanks
M30 Grade Bottom slab Cum 15 Ramp Beam Sqm 180
Third Cum 180 top slab Cum 10
terrace Cum 180 Ramp Slab Sqm 360
walls Cum 20
Core walls Ramp Beam Cum 50 Footings & Retaining wall raft Sqm 2800
M30 Grade Ramp Slab Cum 90
Basement Cum 58 Grade slab 150 / 200th Sqm 50
Ground Cum 33 Form Work
First Cum 33 Slabs
Columns at all levels Ground Sqm 4400
M25 Grade Basement Sqm 1050 First Sqm 4650
Second Cum 33 Ground Sqm 900 Second Sqm 4750
Third Cum 33 First Sqm 950 Third Sqm 4750
Terrace Cum 35 Second Sqm 950 Terrace Sqm 3600
Third Sqm 950 Above Terrace Sqm 450
Terrace Sqm 400
Mullions at all levels Sqm 150 Steel
Fe 415 MT 1275
7. By Ayon PalSample Project AP
Pivot Table
Day Wise CUM Qty Bifurcation
ITEM
Data M Exca F Exca Backfill PCC Foot Shut Foot M25 Wall Shut Wall M25 Col Shut Staging Slab Shutt M25 M30 M35 Reinf Grade M25 (blank) Grand Total
Sum of 1-Jun-15
Sum of 2-Jun-15
Sum of 4-Jun-15
Sum of 3-Jun-15
Sum of 5-Jun-15
Sum of 6-Jun-15
Sum of 7-Jun-15 501.90 501.90
Sum of 8-Jun-15 501.90 501.90
Sum of 9-Jun-15 501.90 501.90
Sum of 10-Jun-15 501.90 501.90
Sum of 11-Jun-15 501.90 501.90
Sum of 12-Jun-15 501.90 501.90
Sum of 13-Jun-15 501.90 501.90
Sum of 14-Jun-15 501.90 501.90
Sum of 15-Jun-15 501.90 501.90
Sum of 16-Jun-15 501.90 501.90
Sum of 17-Jun-15 501.90 501.90
Sum of 18-Jun-15 501.90 501.90
Sum of 19-Jun-15 501.90 501.90
Sum of 20-Jun-15 501.90 501.90
Sum of 21-Jun-15 501.90 501.90
Sum of 22-Jun-15 501.90 164.95 666.85
Sum of 23-Jun-15 501.90 164.95 666.85
Sum of 24-Jun-15 501.90 164.95 666.85
Sum of 25-Jun-15 501.90 164.95 666.85
Sum of 26-Jun-15 501.90 164.95 666.85
Sum of 27-Jun-15 501.90 164.95 666.85
Sum of 28-Jun-15 501.90 164.95 666.85
Sum of 29-Jun-15 501.90 164.95 666.85
Sum of 30-Jun-15 501.90 164.95 666.85
Sum of 1-Jul-15 501.90 164.95 666.85
Sum of 2-Jul-15 501.90 164.95 666.85
Sum of 3-Jul-15 501.90 164.95 666.85
Sum of 4-Jul-15 501.90 164.95 16.57 683.42Sum of 4-Jul-15 501.90 164.95 16.57 683.42
Sum of 5-Jul-15 501.90 164.95 16.57 683.42
Sum of 6-Jul-15 501.90 164.95 16.57 683.42
Sum of 7-Jul-15 501.90 164.95 19.22 6.30 692.37
Sum of 8-Jul-15 501.90 164.95 19.22 154.84 7.05 847.96
Sum of 9-Jul-15 501.90 164.95 19.22 154.84 7.05 847.96
Sum of 10-Jul-15 164.95 19.22 154.84 11.03 7.05 357.09
Sum of 11-Jul-15 164.95 19.22 154.84 129.78 7.05 475.84
Sum of 12-Jul-15 164.95 19.22 154.84 129.78 7.05 475.84
Sum of 13-Jul-15 164.95 19.22 154.84 129.78 8.59 477.38
Sum of 15-Jul-15 164.95 19.22 154.84 129.78 116.50 8.59 593.88
Sum of 14-Jul-15 164.95 19.22 154.84 129.78 116.50 8.59 593.88
Sum of 16-Jul-15 19.22 154.84 129.78 116.50 15.09 435.43
Sum of 17-Jul-15 19.22 154.84 129.78 116.50 15.09 435.43
Sum of 18-Jul-15 15.51 19.22 154.84 129.78 116.50 65.07 15.09 516.01
Sum of 19-Jul-15 15.51 2.65 154.84 129.78 116.50 65.07 2.54 8.89 15.09 510.87
Sum of 20-Jul-15 15.51 2.65 154.84 129.78 116.50 9.70 86.57 2.54 8.89 15.09 542.07
Sum of 21-Jul-15 15.51 2.65 154.84 129.78 116.50 9.70 86.57 3.41 11.78 15.09 545.83
Sum of 22-Jul-15 15.51 154.84 129.78 116.50 9.70 86.57 3.41 11.78 8.79 536.88
Sum of 23-Jul-15 15.51 154.84 129.78 116.50 9.70 86.57 202.30 3.41 11.78 8.79 739.18
Sum of 24-Jul-15 15.51 154.84 129.78 116.50 9.70 86.57 202.30 3.41 11.78 8.04 738.43
Sum of 25-Jul-15 15.51 25.92 154.84 129.78 116.50 9.70 86.57 202.30 197.55 3.41 11.78 8.04 961.90
Sum of 26-Jul-15 15.51 25.92 129.78 116.50 9.70 86.57 202.30 197.55 3.41 11.78 8.04 807.06
Sum of 27-Jul-15 15.51 25.92 11.03 116.50 9.70 86.57 202.30 197.55 3.41 11.78 8.04 688.31
Sum of 28-Jul-15 15.51 25.92 116.50 9.70 86.57 202.30 197.55 3.41 11.78 14.01 683.25
Sum of 29-Jul-15 15.51 25.92 116.50 9.70 86.57 202.30 197.55 3.41 11.78 7.51 676.75
Sum of 30-Jul-15 15.51 25.92 116.50 9.70 86.57 202.30 197.55 3.41 11.78 7.51 676.75
Sum of 31-Jul-15 15.51 25.92 116.50 9.70 86.57 202.30 197.55 3.41 11.78 5.97 675.21
Sum of 1-Aug-15 15.51 25.92 116.50 9.70 86.57 202.30 197.55 3.41 11.78 5.97 675.21
Sum of 2-Aug-15 15.51 25.92 116.50 9.70 86.57 202.30 197.55 3.41 11.78 5.97 675.21
8. By Ayon PalSample Project AP
Pivot Table
Day Wise CUM Qty Bifurcation
ITEM
Data M Exca F Exca Backfill PCC Foot Shut Foot M25 Wall Shut Wall M25 Col Shut Staging Slab Shutt M25 M30 M35 Reinf Grade M25 (blank) Grand Total
Sum of 3-Aug-15 15.51 25.92 116.50 9.70 86.57 202.30 197.55 3.41 11.78 5.97 675.21
Sum of 4-Aug-15 15.51 25.92 116.50 9.70 86.57 202.30 197.55 0.87 2.89 5.97 663.78
Sum of 5-Aug-15 49.74 25.92 116.50 9.70 86.57 202.30 197.55 0.87 2.89 5.97 698.01
Sum of 6-Aug-15 49.74 25.92 116.50 9.70 21.50 202.30 197.55 0.87 2.89 5.97 632.94
Sum of 7-Aug-15 49.74 25.92 116.50 9.70 21.50 202.30 197.55 65.28 0.87 16.88 5.97 712.21
Sum of 8-Aug-15 49.74 25.92 116.50 9.70 202.30 197.55 65.28 0.87 16.88 5.97 690.71
Sum of 9-Aug-15 49.74 25.92 9.70 202.30 197.55 65.28 0.87 16.88 10.62 578.86
Sum of 10-Aug-15 49.74 25.92 9.70 202.30 197.55 65.28 0.87 16.88 10.62 578.86
Sum of 11-Aug-15 49.74 25.92 9.70 73.06 202.30 197.55 65.28 13.99 10.62 648.16
Sum of 12-Aug-15 49.74 9.70 73.06 202.30 197.55 65.28 1.93 24.23 10.62 634.41
Sum of 13-Aug-15 34.23 9.70 73.06 448.15 197.55 65.28 1.93 24.23 10.62 864.75
Sum of 14-Aug-15 34.23 9.70 73.06 245.85 470.28 65.28 1.93 24.23 10.62 935.18
Sum of 15-Aug-15 34.23 9.70 73.06 245.85 470.28 65.28 1.93 24.23 10.62 935.18
Sum of 16-Aug-15 34.23 9.70 73.06 245.85 470.28 65.28 1.93 24.23 18.71 943.27
Sum of 17-Aug-15 34.23 9.70 73.06 245.85 470.28 65.28 1.93 24.23 18.71 943.27
Sum of 18-Aug-15 34.23 9.70 73.06 245.85 272.73 65.28 1.93 24.23 18.71 745.72
Sum of 19-Aug-15 34.23 9.70 73.06 245.85 272.73 65.28 1.93 24.23 18.71 745.72
Sum of 20-Aug-15 34.23 73.06 245.85 272.73 135.05 1.93 36.63 18.71 818.19
Sum of 21-Aug-15 34.23 73.06 245.85 272.73 135.05 1.93 36.63 18.71 818.19
Sum of 22-Aug-15 34.23 73.06 245.85 272.73 135.05 1.93 36.63 18.04 817.52
Sum of 23-Aug-15 34.23 73.06 245.85 272.73 69.77 1.93 22.64 18.04 32.23 770.48
Sum of 24-Aug-15 34.23 151.72 245.85 272.73 69.77 1.93 22.64 13.39 32.23 844.49
Sum of 25-Aug-15 34.23 151.72 245.85 272.73 69.77 3.86 34.35 13.39 32.23 858.13
Sum of 26-Aug-15 34.23 151.72 497.56 272.73 69.77 3.86 34.35 13.39 32.23 1109.84
Sum of 27-Aug-15 34.23 78.66 497.56 553.48 69.77 3.86 34.35 13.39 32.23 1317.53
Sum of 28-Aug-15 34.23 78.66 497.56 553.48 69.77 3.86 34.35 13.39 32.23 1317.53
Sum of 29-Aug-15 34.23 78.66 497.56 553.48 69.77 1.93 24.11 21.49 32.23 1313.46
Sum of 30-Aug-15 78.66 251.71 553.48 69.77 1.93 24.11 21.49 32.23 1033.38
Sum of 31-Aug-15 78.66 251.71 553.48 69.77 1.93 24.11 21.49 32.23 1033.38
Sum of 1-Sep-15 78.66 251.71 553.48 69.77 1.93 24.11 21.49 32.23 1033.38
Sum of 2-Sep-15 78.66 251.71 553.48 139.72 1.93 35.30 21.49 32.23 1114.52
Sum of 3-Sep-15 78.66 251.71 280.75 139.72 1.93 35.30 21.49 32.23 841.79
Sum of 4-Sep-15 78.66 251.71 280.75 139.72 1.93 35.30 18.37 32.23 838.67
Sum of 5-Sep-15 78.66 251.71 280.75 69.95 1.93 22.90 18.37 32.23 756.50Sum of 5-Sep-15 78.66 251.71 280.75 69.95 1.93 22.90 18.37 32.23 756.50
Sum of 6-Sep-15 157.73 251.71 280.75 69.95 1.93 22.90 13.07 32.23 830.27
Sum of 7-Sep-15 157.73 251.71 280.75 71.87 13.55 22.90 13.07 32.23 843.81
Sum of 8-Sep-15 157.73 503.42 280.75 71.87 13.55 22.90 13.07 32.23 1095.52
Sum of 9-Sep-15 79.07 503.42 560.27 71.87 13.55 22.90 13.07 32.23 1296.38
Sum of 10-Sep-15 79.07 503.42 560.27 71.87 13.55 22.90 13.07 32.23 1296.38
Sum of 11-Sep-15 79.07 503.42 560.27 71.87 11.62 11.19 20.92 32.23 1290.59
Sum of 12-Sep-15 79.07 251.71 560.27 71.87 11.62 11.19 20.92 1006.65
Sum of 13-Sep-15 79.07 251.71 560.27 71.87 11.62 11.19 20.92 1006.65
Sum of 14-Sep-15 79.07 251.71 560.27 71.87 11.62 11.19 20.92 1006.65
Sum of 15-Sep-15 79.07 251.71 560.27 139.80 22.39 11.19 20.92 1085.35
Sum of 16-Sep-15 79.07 251.71 279.52 139.80 22.39 11.19 20.92 804.60
Sum of 17-Sep-15 79.07 251.71 279.52 139.80 22.39 11.19 17.15 800.83
Sum of 18-Sep-15 79.07 251.71 279.52 69.85 22.39 17.15 719.69
Sum of 19-Sep-15 155.19 251.71 279.52 69.85 22.39 12.18 790.84
Sum of 20-Sep-15 155.19 251.71 279.52 71.71 32.25 12.18 802.56
Sum of 21-Sep-15 155.19 251.71 279.52 71.71 32.25 12.18 802.56
Sum of 22-Sep-15 76.12 462.44 279.52 71.71 32.25 12.18 934.22
Sum of 23-Sep-15 76.12 462.44 510.58 71.71 32.25 12.18 1165.28
Sum of 24-Sep-15 76.12 462.44 510.58 69.79 20.63 12.18 1151.74
Sum of 25-Sep-15 76.12 210.73 510.58 69.79 20.63 19.24 907.09
Sum of 26-Sep-15 76.12 210.73 510.58 69.79 20.63 19.24 907.09
Sum of 27-Sep-15 76.12 210.73 510.58 69.79 20.63 19.24 907.09
Sum of 28-Sep-15 76.12 210.73 510.58 69.79 20.63 19.24 907.09
Sum of 29-Sep-15 76.12 210.73 510.58 127.92 31.82 19.24 976.41
Sum of 30-Sep-15 76.12 210.73 231.06 127.92 31.82 19.24 696.89
Sum of 1-Oct-15 76.12 210.73 231.06 127.92 31.82 11.39 689.04
Sum of 2-Oct-15 76.12 210.73 231.06 59.99 21.05 11.39 610.34
Sum of 3-Oct-15 76.12 210.73 231.06 59.99 21.05 7.06 606.01
Sum of 4-Oct-15 76.12 210.73 231.06 59.99 21.05 7.06 606.01
9. By Ayon PalSample Project AP
Pivot Table
Day Wise CUM Qty Bifurcation
ITEM
Data M Exca F Exca Backfill PCC Foot Shut Foot M25 Wall Shut Wall M25 Col Shut Staging Slab Shutt M25 M30 M35 Reinf Grade M25 (blank) Grand Total
Sum of 5-Oct-15 76.12 210.73 231.06 59.99 21.05 7.06 606.01
Sum of 6-Oct-15 210.73 231.06 59.99 21.05 7.06 529.89
Sum of 7-Oct-15 210.73 231.06 59.99 21.05 7.06 529.89
Sum of 8-Oct-15 210.73 231.06 58.13 11.19 7.06 518.17
Sum of 9-Oct-15 231.06 58.13 11.19 7.06 307.44
Sum of 10-Oct-15 231.06 58.13 11.19 7.06 307.44
Sum of 11-Oct-15 231.06 58.13 11.19 7.06 307.44
Sum of 12-Oct-15 231.06 58.13 11.19 7.06 307.44
Sum of 13-Oct-15 58.13 11.19 7.06 76.38
Sum of 14-Oct-15 58.13 11.19 69.32
Sum of 15-Oct-15
16562.70 3958.80 1259.01 754.86 2787.12 2098.54 3029.00 300.70 6631.51 20770.60 26301.92 5431.01 861.68 1177.36 1259.80 644.60