Activity ID Activity Name Original
Duration
Early Start Early Finish Total
Float
0001-1 CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING0001-1 CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING381 01-Jul-15 08:00 AM 22-Sep-16 04:00 PM -1
0001-1.4 PROJECT MILESTONES0001-1.4 PROJECT MILESTONES 381 01-Jul-15 08:00 AM 22-Sep-16 04:00 PM -1
A1810 BEGINNING OF PROJECT CONSTRUCTION 0 01-Jul-15 08:00 AM 380
A1820 1ST FLOOR SLAB DONE 0 21-Dec-15 04:00 PM 232
A1830 2ND FLOOR SLAB DONE 0 08-Feb-16 04:00 PM 194
A1840 ROOF DECK SLAB DONE 0 05-May-16 04:00 PM 119
A1850 END OF PROJECT 0 22-Sep-16 04:00 PM -1
A1970 3RD FLOOR SLAB DONE 0 11-Apr-16 04:00 PM 140
0001-1.1 PRELIMINARY ACTIVITES0001-1.1 PRELIMINARY ACTIVITES 74 01-Jul-15 08:00 AM 24-Sep-15 04:00 PM 17
A1000 PROCESSING OF PERMITS 30 01-Jul-15 08:00 AM 08-Sep-15 04:00 PM -1
A1010 BAR CUTTING AND BENDING 30 21-Aug-15 08:00
AM
24-Sep-15 04:00 PM -1
A1020 FABRICATION OF FORMS 30 21-Aug-15 08:00
AM
24-Sep-15 04:00 PM 17
0001-1.2 PROCUREMENT OF MATERIALS0001-1.2 PROCUREMENT OF MATERIALS 134 03-Jul-15 08:00 AM 07-Dec-15 04:00 PM 164
A1030 PROCUREMENT OF REBARS, STEEL DECK AND FORMS 60 03-Jul-15 08:00 AM 10-Sep-15 04:00 PM -1
A1040 PROCUREMENT OF MASONRY MATERIALS 30 03-Aug-15 08:00
AM
05-Sep-15 04:00 PM 114
A1050 PROCUREMENT OF STEEL WORKS MATERIALS 15 30-Sep-15 08:00
AM
16-Oct-15 04:00 PM 124
A1060 PROCUREMENT AND DELIVERY OF TILES 30 03-Nov-15 08:00
AM
07-Dec-15 04:00 PM 164
A1070 PROCUREMENT OF MEP MATERIALS AND ACESSORIES 15 01-Sep-15 08:00
AM
17-Sep-15 04:00 PM 157
A1080 PROCUREMENT OF DOORS AND JAMBS 20 08-Sep-15 08:00
AM
30-Sep-15 04:00 PM 130
A1090 PROCUREMENT AND DELIVERY OF PAINT MATERIALS 30 01-Oct-15 08:00
AM
05-Nov-15 04:00 PM 181
0001-1.3 CONSTRUCTION0001-1.3 CONSTRUCTION 381 01-Jul-15 08:00 AM 22-Sep-16 04:00 PM -1
0001-1.3.1 GROUND FLOOR0001-1.3.1 GROUND FLOOR 247 01-Jul-15 08:00 AM 19-Apr-16 02:00 PM 133
0001-1.3.1.2 EARTHWORKS0001-1.3.1.2 EARTHWORKS 40 01-Jul-15 08:00 AM 15-Aug-15 04:00 PM 33
A1110 EXCAVATION 30 01-Jul-15 08:00 AM 04-Aug-15 04:00 PM 33
A1370 SITE CLEARING AND DEMOLITION 25 18-Jul-15 08:00 AM 15-Aug-15 04:00 PM 33
0001-1.3.1.1 STRUCTURAL WORKS0001-1.3.1.1 STRUCTURAL WORKS 76 25-Sep-15 08:00
AM
24-Dec-15 04:00 PM 154
A1120 INSTALLATION OF REBARS FOR FOOTINGS, TIE BEAMS AND COLUMNS 15 25-Sep-15 08:00
AM
12-Oct-15 04:00 PM -1
A1130 CONCRETING OF FOOTINGS AND TIE BEAMS 3 13-Oct-15 08:00
AM
15-Oct-15 04:00 PM -1
A1140 INSTALLATION OF FORMS AND SCAFFOLDINGS FOR COLUMNS 5 16-Oct-15 08:00
AM
21-Oct-15 04:00 PM -1
A1150 CONCRETING OF COLUMN 10 22-Oct-15 08:00
AM
03-Nov-15 04:00 PM -1
A1160 REMOVAL OF FORMS AND SCAFFOLDING FOR COLUMN,BEAMS AND SLAB AT GROUND FLOOR LEVEL3 06-Nov-15 08:00
AM
09-Nov-15 04:00 PM -1
A1170 BACKFILLING 14 10-Nov-15 08:00
AM
25-Nov-15 04:00 PM -1
A1180 PREPARATION OF GROUND SURFACE FOR GROUND SLAB 5 26-Nov-15 08:00
AM
01-Dec-15 04:00 PM -1
A1190 CONCRETING OF GROUND SLAB 2 02-Dec-15 08:00
AM
03-Dec-15 04:00 PM -1
A1460 CONTRUCTION OF STAIRS FROM GROUND FLOOR TO 1ST LEVEL 15 04-Dec-15 08:00
AM
24-Dec-15 04:00 PM 131
0001-1.3.1.3 ARCHITECTURAL WORKS0001-1.3.1.3 ARCHITECTURAL WORKS 136 09-Nov-15 08:00
AM
19-Apr-16 02:00 PM 133
A1200 MASONRY WORKS AT GROUND FLOOR LEVEL 45 07-Dec-15 08:00
AM
01-Feb-16 04:00 PM 27
A1210 INSTALLATION OF DOORS AND JAMBS AT GROUND FLOOR 15 04-Feb-16 08:00
AM
20-Feb-16 04:00 PM 27
A1220 INSTALLATION OF WINDOWS AND GATES 15 13-Feb-16 08:00
AM
01-Mar-16 04:00 PM 27
A1230 CARPENTRY WORKS AT GROUND FLOOR 20 25-Feb-16 08:00
AM
18-Mar-16 04:00 PM 27
A1240 CONTRUCTION OF LEDGE AT GROUND FLOOR 15 02-Mar-16 08:00
AM
18-Mar-16 04:00 PM 160
A1360 PAINTINGS AT GROUND FLOOR 30 09-Nov-15 08:00
AM
12-Dec-15 04:00 PM 164
A1250 TILE WORKS AT GROUND FLOOR 30 14-Mar-16 08:00
AM
19-Apr-16 02:00 PM 26
0001-1.3.1.4 MEP WORKS0001-1.3.1.4 MEP WORKS 113 18-Sep-15 08:00
AM
02-Feb-16 04:00 PM 195
A1260 MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE AT GROUND FLOOR5 18-Sep-15 08:00
AM
23-Sep-15 04:00 PM 157
A1270 MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS AT GROUND FLOOR5 21-Jan-16 08:00
AM
26-Jan-16 04:00 PM 195
A1280 CABLE PULLING AND FINISHES FOR ELECTRICAL AT GROUND FLOOR 2 24-Sep-15 08:00
AM
25-Sep-15 04:00 PM 281
A1290 LEAK TEST FOR DRAINAGE AT GROUND FLOOR 2 27-Jan-16 08:00
AM
28-Jan-16 04:00 PM 195
A1480 PRESSURE TEST FOR WATER SUPPLY LINES AT GROUND FLOOR 2 27-Jan-16 08:00
AM
28-Jan-16 04:00 PM 195
A1490 INSTALLATION OF PLUMBING ACCESSORIES AT GROUND FLOOR 4 29-Jan-16 08:00
AM
02-Feb-16 04:00 PM 195
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
2015 2016
22-Sep-16 04:00 PM, 0001-1 C
22-Sep-16 04:00 PM, 0001-1.4
BEGINNING OF PROJECT CONSTRUCTION, 01-Jul-15 08:00 AM
1ST FLOOR SLAB DONE,
2ND FLOOR SLAB DONE,
ROOF DECK SLAB DONE,
END OF PROJECT,
3RD FLOOR SLAB DONE,
24-Sep-15 04:00 PM, 0001-1.1 PRELIMINARY ACTIVITES
PROCESSING OF PERMITS
BAR CUTTING AND BENDING
FABRICATION OF FORMS
07-Dec-15 04:00 PM, 0001-1.2 PROCUREMENT OF MATERIALS
PROCUREMENT OF REBARS, STEEL DECK AND FORMS
PROCUREMENT OF MASONRY MATERIALS
PROCUREMENT OF STEEL WORKS MATERIALS
PROCUREMENT AND DELIVERY OF TILES
PROCUREMENT OF MEP MATERIALS AND ACESSORIES
PROCUREMENT OF DOORS AND JAMBS
PROCUREMENT AND DELIVERY OF PAINT MATERIALS
22-Sep-16 04:00 PM, 0001-1.3
19-Apr-16 02:00 PM, 0001-1.3.1 GROUND FLOOR
15-Aug-15 04:00 PM, 0001-1.3.1.2 EARTHWORKS
EXCAVATION
SITE CLEARING AND DEMOLITION
24-Dec-15 04:00 PM, 0001-1.3.1.1 STRUCTURAL WORKS
INSTALLATION OF REBARS FOR FOOTINGS, TIE BEAMS AND COLUMNS
CONCRETING OF FOOTINGS AND TIE BEAMS
INSTALLATION OF FORMS AND SCAFFOLDINGS FOR COLUMNS
CONCRETING OF COLUMN
REMOVAL OF FORMS AND SCAFFOLDING FOR COLUMN,BEAMS AND SLAB AT GROUND FLOOR LEVEL
BACKFILLING
PREPARATION OF GROUND SURFACE FOR GROUND SLAB
CONCRETING OF GROUND SLAB
CONTRUCTION OF STAIRS FROM GROUND FLOOR TO 1ST LEVEL
19-Apr-16 02:00 PM, 0001-1.3.1.3 ARCHITECTURAL WORKS
MASONRY WORKS AT GROUND FLOOR LEVEL
INSTALLATION OF DOORS AND JAMBS AT GROUND FLOOR
INSTALLATION OF WINDOWS AND GATES
CARPENTRY WORKS AT GROUND FLOOR
CONTRUCTION OF LEDGE AT GROUND FLOOR
PAINTINGS AT GROUND FLOOR
TILE WORKS AT GROUND FLOOR
02-Feb-16 04:00 PM, 0001-1.3.1.4 MEP WORKS
MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE AT GROUND FLOOR
MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS AT GROUND FLOOR
CABLE PULLING AND FINISHES FOR ELECTRICAL AT GROUND FLOOR
LEAK TEST FOR DRAINAGE AT GROUND FLOOR
PRESSURE TEST FOR WATER SUPPLY LINES AT GROUND FLOOR
INSTALLATION OF PLUMBING ACCESSORIES AT GROUND FLOOR
CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING
Baseline Programme ( Rev 02 )
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
summary
CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING
Baseline Programme ( Revision 02 )
Date Revision Checked Approved
07-Jun-15 Baseline Programme ( Rev 02 )
 
1of3
Activity ID Activity Name Original
Duration
Early Start Early Finish Total
Float
0001-1.3.2 1ST FLOOR LEVEL0001-1.3.2 1ST FLOOR LEVEL 174 04-Dec-15 08:00
AM
28-Jun-16 02:00 PM 73
0001-1.3.2.1 STRUCTURAL WORKS0001-1.3.2.1 STRUCTURAL WORKS 45 04-Dec-15 08:00
AM
29-Jan-16 04:00 PM 142
A1300 INSTALLATIONS OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLABS - 1ST FLOOR LEVEL7 04-Dec-15 08:00
AM
11-Dec-15 04:00 PM -1
A1310 INSTALLATIONS OF REBARS , STEEL DECK FOR BEAMS AND SLABS 1ST FLOOR LEVEL5 12-Dec-15 08:00
AM
17-Dec-15 04:00 PM -1
A1320 CONCRETING OF 1ST FLOOR BEAMS AND SLABS 1ST FLOOR LEVEL 3 18-Dec-15 08:00
AM
21-Dec-15 04:00 PM -1
A1330 INSTALLATION OF REBARS FOR COLUMNS 1ST FLOOR LEVEL 5 22-Dec-15 08:00
AM
29-Dec-15 04:00 PM 24
A1340 INSTALLATION OF FORMS AND SCAFFOLDINGS FOR COLUMNS 1ST FLOOR LEVEL5 22-Dec-15 08:00
AM
29-Dec-15 04:00 PM -1
A1350 CONCRETING OF COLUMNS 1ST FLOOR LEVEL 3 30-Dec-15 08:00
AM
04-Jan-16 04:00 PM -1
A1420 REMOVAL OF FORM FOR COLUMNS,BEAMS AND SLAB 1ST FLOOR 5 07-Jan-16 08:00
AM
12-Jan-16 04:00 PM -1
A1470 WATERPROOFING AND LEAK TESTING OF WET AREAS -1ST FLOOR 3 13-Jan-16 08:00
AM
15-Jan-16 04:00 PM 109
A1650 CONSTRUCTION OF STAIRS FROM 1ST TO 2ND FLOOR 15 13-Jan-16 08:00
AM
29-Jan-16 04:00 PM 142
0001-1.3.2.2 ARCHITECTURAL WORKS0001-1.3.2.2 ARCHITECTURAL WORKS 127 02-Feb-16 08:00
AM
28-Jun-16 02:00 PM 28
A1380 MASONRY WORKS 1ST FLOOR 45 02-Feb-16 08:00
AM
24-Mar-16 04:00 PM 50
A1390 INSTALLATION OF DOORS AND JAMBS 1ST FLOOR 15 25-Mar-16 08:00
AM
11-Apr-16 04:00 PM 65
A1400 INSTALLATION OF WINDOWS 1ST FLOOR 15 25-Mar-16 08:00
AM
11-Apr-16 04:00 PM 65
A1410 CARPENTRY WORKS 1ST FLOOR 20 25-Mar-16 08:00
AM
16-Apr-16 04:00 PM 60
A1430 TILE WORKS 1ST FLOOR 30 19-Apr-16 02:00
PM
24-May-16 02:00 PM 28
A1440 CONSTRUCTION OF LEDGE 1ST FLOOR 15 25-Mar-16 08:00
AM
11-Apr-16 04:00 PM 65
A1450 PAINTING WORKS 1ST FLOOR 30 24-May-16 02:00
PM
28-Jun-16 02:00 PM 28
0001-1.3.2.3 MEP WORKS0001-1.3.2.3 MEP WORKS 87 12-Dec-15 08:00
AM
26-Mar-16 04:00 PM 153
A1500 MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE 1ST FLOOR5 12-Dec-15 08:00
AM
17-Dec-15 04:00 PM 211
A1510 MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS 1ST FLOOR 5 14-Mar-16 08:00
AM
18-Mar-16 04:00 PM 136
A1520 CABLE PULLING AND FINISHES FOR ELECTRICAL 1ST FLOOR 2 19-Mar-16 08:00
AM
21-Mar-16 04:00 PM 136
A1530 LEAK TESTS FOR DRAINAGE 1ST FLOOR 3 19-Mar-16 08:00
AM
22-Mar-16 04:00 PM 153
A1540 PRESSURE TESTS FOR WATERLINE 1ST FLOOR 3 19-Mar-16 08:00
AM
22-Mar-16 04:00 PM 153
A1630 INSTALLATION OF PLUMBING ACCESSORIES 1ST FLOOR 4 23-Mar-16 08:00
AM
26-Mar-16 04:00 PM 153
0001-1.3.3 2ND FLOOR LEVEL0001-1.3.3 2ND FLOOR LEVEL 174 13-Jan-16 08:00
AM
02-Aug-16 02:00 PM 28
0001-1.3.3.1 STRUCTURAL WORKS0001-1.3.3.1 STRUCTURAL WORKS 60 13-Jan-16 08:00
AM
22-Mar-16 04:00 PM 112
A1550 INSTALLATIONS OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLABS 2ND FLOOR15 13-Jan-16 08:00
AM
29-Jan-16 04:00 PM -1
A1560 INSTALLATIONS OF REBARS, STEEL DECK FOR BEAMS AND SLABS 2ND FLOOR5 30-Jan-16 08:00
AM
04-Feb-16 04:00 PM -1
A1570 CONCRETING OF 2ND FLOOR BEAMS AND SLABS 2ND FLOOR 3 05-Feb-16 08:00
AM
08-Feb-16 04:00 PM -1
A1580 INSTALLATION OF FORMS AND SCAFFOLDINGS FOR 2ND FLOOR COLUMNS 2ND FLOOR5 11-Feb-16 08:00
AM
16-Feb-16 04:00 PM -1
A1590 CONCRETING OF 2ND FLOOR COLUMNS 2ND FLOOR 3 19-Feb-16 08:00
AM
22-Feb-16 04:00 PM -1
A1600 REMOVAL OF FORMS AND SCAFFOLDINGS COLUMN, BEAMS AND SLAB 2ND FLOOR5 25-Feb-16 08:00
AM
01-Mar-16 04:00 PM -1
A1610 CONSTRUCTION OF STAIRS 2ND TO 3RD FLOOR LEVEL 15 05-Mar-16 08:00
AM
22-Mar-16 04:00 PM 112
A1620 WATERPROOFING AND LEAK TESTING OF WET AREAS 2ND FLOOR 3 12-Feb-16 08:00
AM
15-Feb-16 04:00 PM 83
0001-1.3.3.2 ARCHITECTURAL WORKS0001-1.3.3.2 ARCHITECTURAL WORKS 138 24-Feb-16 08:00
AM
02-Aug-16 02:00 PM 28
A1700 MASONRY WORKS 2ND FLOOR 45 24-Feb-16 08:00
AM
15-Apr-16 04:00 PM 11
A1710 INSTALLATION OF DOORS AND JAMBS 2ND FLOOR 15 16-Apr-16 08:00 AM 03-May-16 04:00 PM 76
A1720 INSTALLATION OF WINDOWS 2ND FLOOR 15 16-Apr-16 08:00 AM 03-May-16 04:00 PM 76
A1730 CARPENTRY WORKS 2ND FLOOR 20 16-Apr-16 08:00 AM 09-May-16 04:00 PM 11
A1740 TILE WORKS 2ND FLOOR 30 10-May-16 08:00
AM
13-Jun-16 04:00 PM 11
A1750 CONSTRUCTION OF LEDGE 2ND FLOOR 15 10-May-16 08:00
AM
26-May-16 04:00 PM 56
A1760 PAINTING WORKS 2ND FLOOR 30 28-Jun-16 02:00
PM
02-Aug-16 02:00 PM 28
0001-1.3.3.3 MEP WORKS0001-1.3.3.3 MEP WORKS 73 19-Jan-16 08:00
AM
12-Apr-16 04:00 PM 119
A1870 MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE 2ND FLOOR5 19-Jan-16 08:00
AM
23-Jan-16 04:00 PM 185
A1880 MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS 2ND FLOOR 5 05-Apr-16 08:00 AM 09-Apr-16 04:00 PM 119
A1890 CABLE PULLING AND FINISHES FOR ELECTRICAL 2ND FLOOR 2 11-Apr-16 08:00 AM 12-Apr-16 04:00 PM 119
A1900 LEAK TESTS FOR DRAINAGE 2ND FLOOR 3 09-Feb-16 08:00
AM
11-Feb-16 04:00 PM 136
A1910 PRESSURE TESTS FOR WATERLINE 2ND FLOOR 3 09-Feb-16 08:00
AM
11-Feb-16 04:00 PM 136
A1920 INSTALLATION OF PLUMBING ACCESSORIES 2ND FLOOR 5 12-Feb-16 08:00
AM
17-Feb-16 04:00 PM 136
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
2015 2016
28-Jun-16 02:00 PM, 0001-1.3.2 1ST FLOOR LEVEL
29-Jan-16 04:00 PM, 0001-1.3.2.1 STRUCTURAL WORKS
INSTALLATIONS OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLABS - 1ST FLOOR LEVEL
INSTALLATIONS OF REBARS , STEEL DECK FOR BEAMS AND SLABS 1ST FLOOR LEVEL
CONCRETING OF 1ST FLOOR BEAMS AND SLABS 1ST FLOOR LEVEL
INSTALLATION OF REBARS FOR COLUMNS 1ST FLOOR LEVEL
INSTALLATION OF FORMS AND SCAFFOLDINGS FOR COLUMNS 1ST FLOOR LEVEL
CONCRETING OF COLUMNS 1ST FLOOR LEVEL
REMOVAL OF FORM FOR COLUMNS,BEAMS AND SLAB 1ST FLOOR
WATERPROOFING AND LEAK TESTING OF WET AREAS -1ST FLOOR
CONSTRUCTION OF STAIRS FROM 1ST TO 2ND FLOOR
28-Jun-16 02:00 PM, 0001-1.3.2.2 ARCHITECTURAL WO
MASONRY WORKS 1ST FLOOR
INSTALLATION OF DOORS AND JAMBS 1ST FLOOR
INSTALLATION OF WINDOWS 1ST FLOOR
CARPENTRY WORKS 1ST FLOOR
TILE WORKS 1ST FLOOR
CONSTRUCTION OF LEDGE 1ST FLOOR
PAINTING WORKS 1ST FLOOR
26-Mar-16 04:00 PM, 0001-1.3.2.3 MEP WORKS
MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE 1ST FLOOR
MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS 1ST FLOOR
CABLE PULLING AND FINISHES FOR ELECTRICAL 1ST FLOOR
LEAK TESTS FOR DRAINAGE 1ST FLOOR
PRESSURE TESTS FOR WATERLINE 1ST FLOOR
INSTALLATION OF PLUMBING ACCESSORIES 1ST FLOOR
02-Aug-16 02:00 PM, 0001-1.3.3 2ND FLOOR
22-Mar-16 04:00 PM, 0001-1.3.3.1 STRUCTURAL WORKS
INSTALLATIONS OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLABS 2ND FLOOR
INSTALLATIONS OF REBARS, STEEL DECK FOR BEAMS AND SLABS 2ND FLOOR
CONCRETING OF 2ND FLOOR BEAMS AND SLABS 2ND FLOOR
INSTALLATION OF FORMS AND SCAFFOLDINGS FOR 2ND FLOOR COLUMNS 2ND FLOOR
CONCRETING OF 2ND FLOOR COLUMNS 2ND FLOOR
REMOVAL OF FORMS AND SCAFFOLDINGS COLUMN, BEAMS AND SLAB 2ND FLOOR
CONSTRUCTION OF STAIRS 2ND TO 3RD FLOOR LEVEL
WATERPROOFING AND LEAK TESTING OF WET AREAS 2ND FLOOR
02-Aug-16 02:00 PM, 0001-1.3.3.2 ARCHITECT
MASONRY WORKS 2ND FLOOR
INSTALLATION OF DOORS AND JAMBS 2ND FLOOR
INSTALLATION OF WINDOWS 2ND FLOOR
CARPENTRY WORKS 2ND FLOOR
TILE WORKS 2ND FLOOR
CONSTRUCTION OF LEDGE 2ND FLOOR
PAINTING WORKS 2ND FLOOR
12-Apr-16 04:00 PM, 0001-1.3.3.3 MEP WORKS
MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE 2ND FLOOR
MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS 2ND FLOOR
CABLE PULLING AND FINISHES FOR ELECTRICAL 2ND FLOOR
LEAK TESTS FOR DRAINAGE 2ND FLOOR
PRESSURE TESTS FOR WATERLINE 2ND FLOOR
INSTALLATION OF PLUMBING ACCESSORIES 2ND FLOOR
CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING
Baseline Programme ( Rev 02 )
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
summary
CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING
Baseline Programme ( Revision 02 )
Date Revision Checked Approved
07-Jun-15 Baseline Programme ( Rev 02 )
 
2of3
Activity ID Activity Name Original
Duration
Early Start Early Finish Total
Float
0001-1.3.6 3RD FLOOR LEVEL0001-1.3.6 3RD FLOOR LEVEL 131 02-Mar-16 08:00
AM
01-Aug-16 04:00 PM 29
0001-1.3.6.1 STRUCTURAL WORKS0001-1.3.6.1 STRUCTURAL WORKS 60 02-Mar-16 08:00
AM
10-May-16 04:00 PM 70
A2350 INSTALLATIONS OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLABS 3RD FLOOR15 02-Mar-16 08:00
AM
18-Mar-16 04:00 PM -1
A2360 INSTALLATIONS OF REBARS, STEEL DECK FOR BEAMS AND SLABS 3RD FLOOR5 19-Mar-16 08:00
AM
24-Mar-16 04:00 PM -1
A2370 CONCRETING OF 3RD FLOOR BEAMS AND SLABS 3 25-Mar-16 08:00
AM
28-Mar-16 04:00 PM -1
A2380 INSTALLATION OF FORMS AND SCAFFOLDINGS FOR 3RD FLOOR COLUMNS5 31-Mar-16 08:00
AM
05-Apr-16 04:00 PM -1
A2390 CONCRETING OF 3RD FLOOR COLUMNS 3 08-Apr-16 08:00 AM 11-Apr-16 04:00 PM -1
A2400 REMOVAL OF FORMS AND SCAFFOLDINGS COLUMN, BEAMS AND SLAB- 3RD FLOOR5 14-Apr-16 08:00 AM 19-Apr-16 04:00 PM 26
A2410 CONSTRUCTION OF STAIRS 3RD TO ROOF DECK 15 23-Apr-16 08:00 AM 10-May-16 04:00 PM 70
A2420 WATERPROOFING AND LEAK TESTING OF WET AREAS - 3RD FLOOR 3 01-Apr-16 08:00 AM 04-Apr-16 04:00 PM 71
0001-1.3.6.2 ARCHITECTURAL WORKS0001-1.3.6.2 ARCHITECTURAL WORKS 95 13-Apr-16 08:00 AM 01-Aug-16 04:00 PM 29
A2430 MASONRY WORKS - 3RD FLOOR 45 13-Apr-16 08:00 AM 03-Jun-16 04:00 PM -1
A2440 INSTALLATION OF DOORS AND JAMBS - 3RD FLOOR 15 04-Jun-16 08:00
AM
21-Jun-16 04:00 PM 34
A2450 INSTALLATION OF WINDOWS - 3RD FLOOR 15 04-Jun-16 08:00
AM
21-Jun-16 04:00 PM 34
A2460 CARPENTRY WORKS - 3RD FLOOR 20 04-Jun-16 08:00
AM
27-Jun-16 04:00 PM -1
A2470 TILE WORKS - 3RD FLOOR 30 28-Jun-16 08:00
AM
01-Aug-16 04:00 PM -1
A2480 CONSTRUCTION OF LEDGE - 3RD FLOOR 15 28-Jun-16 08:00
AM
14-Jul-16 04:00 PM 29
A2490 PAINTING WORKS - 3RD FLOOR 30 28-Jun-16 08:00
AM
01-Aug-16 04:00 PM 29
0001-1.3.6.3 MEP WORKS0001-1.3.6.3 MEP WORKS 73 08-Mar-16 08:00
AM
31-May-16 04:00 PM 79
A2500 MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE - 3RD FLOOR5 08-Mar-16 08:00
AM
12-Mar-16 04:00 PM 145
A2510 MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS - 3RD FLOOR 5 24-May-16 08:00
AM
28-May-16 04:00 PM 79
A2520 CABLE PULLING AND FINISHES FOR ELECTRICAL - 3RD FLOOR 2 30-May-16 08:00
AM
31-May-16 04:00 PM 79
A2530 LEAK TESTS FOR DRAINAGE - 3RD FLOOR 3 29-Mar-16 08:00
AM
31-Mar-16 04:00 PM 99
A2540 PRESSURE TESTS FOR WATERLINE - 3RD FLOOR 3 29-Mar-16 08:00
AM
31-Mar-16 04:00 PM 99
A2550 INSTALLATION OF PLUMBING ACCESSORIES - 3RD FLOOR 5 01-Apr-16 08:00 AM 06-Apr-16 04:00 PM 99
0001-1.3.4 ROOF DECK LEVEL0001-1.3.4 ROOF DECK LEVEL 134 20-Apr-16 08:00 AM 22-Sep-16 04:00 PM -1
0001-1.3.4.1 STRUCTURAL WORKS0001-1.3.4.1 STRUCTURAL WORKS 22 20-Apr-16 08:00 AM 14-May-16 04:00 PM 96
A1770 INSTALLATION OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLAB - ROOF DECK LEVEL15 20-Apr-16 08:00 AM 06-May-16 04:00 PM 26
A1780 INSTALLATION OF REBARS FOR BEAMS AND SLABS - ROOF DECK LEVEL 5 26-Apr-16 08:00 AM 30-Apr-16 04:00 PM 26
A1790 CONCRETING OF ROOF DECK BEAMS AND SLABS - ROOF DECK LEVEL 3 03-May-16 08:00
AM
05-May-16 04:00 PM 26
A1800 REMOVAL OF FORMS AND SCAFFOLDINGS - ROOF DECK LEVEL 5 06-May-16 08:00
AM
11-May-16 04:00 PM 96
A1860 WATERPROOFING AND LEAK TEST OF ROOF DECK SLAB - ROOF DECK LEVEL3 12-May-16 08:00
AM
14-May-16 04:00 PM 96
0001-1.3.4.2 ARCHITECTURAL WORKS0001-1.3.4.2 ARCHITECTURAL WORKS 117 10-May-16 08:00
AM
22-Sep-16 04:00 PM -1
A1930 MASONRY WORKS 45 10-May-16 08:00
AM
30-Jun-16 04:00 PM 26
A1940 TILE WORKS 30 02-Aug-16 08:00
AM
05-Sep-16 04:00 PM -1
A1950 CONSTRUCTION OF LEDGE 15 15-Jul-16 08:00 AM 01-Aug-16 04:00 PM 29
A1960 PAINTING WORKS 15 06-Sep-16 08:00
AM
22-Sep-16 04:00 PM -1
0001-1.3.4.3 MEP0001-1.3.4.3 MEP 55 07-May-16 08:00
AM
09-Jul-16 04:00 PM 48
A1980 MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE 5 07-May-16 08:00
AM
12-May-16 04:00 PM 95
A1990 MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS 5 01-Jul-16 08:00 AM 06-Jul-16 04:00 PM 48
A2000 CABLE PULLING FOR MEP 3 07-Jul-16 08:00 AM 09-Jul-16 04:00 PM 48
A2010 LEAK TEST FOR DRAINAGE 3 07-Jul-16 08:00 AM 09-Jul-16 04:00 PM 48
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
2015 2016
01-Aug-16 04:00 PM, 0001-1.3.6 3RD FLOOR
10-May-16 04:00 PM, 0001-1.3.6.1 STRUCTURAL WORKS
INSTALLATIONS OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLABS 3RD FLOO
INSTALLATIONS OF REBARS, STEEL DECK FOR BEAMS AND SLABS 3RD FLOOR
CONCRETING OF 3RD FLOOR BEAMS AND SLABS
INSTALLATION OF FORMS AND SCAFFOLDINGS FOR 3RD FLOOR COLUMNS
CONCRETING OF 3RD FLOOR COLUMNS
REMOVAL OF FORMS AND SCAFFOLDINGS COLUMN, BEAMS AND SLAB- 3R
CONSTRUCTION OF STAIRS 3RD TO ROOF DECK
WATERPROOFING AND LEAK TESTING OF WET AREAS - 3RD FLOOR
01-Aug-16 04:00 PM, 0001-1.3.6.2 ARCHITECT
MASONRY WORKS - 3RD FLOOR
INSTALLATION OF DOORS AND JAMBS - 3RD FLOOR
INSTALLATION OF WINDOWS - 3RD FLOOR
CARPENTRY WORKS - 3RD FLOOR
TILE WORKS - 3RD FLOOR
CONSTRUCTION OF LEDGE - 3RD FLOOR
PAINTING WORKS - 3RD FLOOR
31-May-16 04:00 PM, 0001-1.3.6.3 MEP WORKS
MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE - 3RD FLOOR
MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS - 3RD F
CABLE PULLING AND FINISHES FOR ELECTRICAL - 3RD FLOO
LEAK TESTS FOR DRAINAGE - 3RD FLOOR
PRESSURE TESTS FOR WATERLINE - 3RD FLOOR
INSTALLATION OF PLUMBING ACCESSORIES - 3RD FLOOR
22-Sep-16 04:00 PM, 0001-1.3.
14-May-16 04:00 PM, 0001-1.3.4.1 STRUCTURAL WORKS
INSTALLATION OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLA
INSTALLATION OF REBARS FOR BEAMS AND SLABS - ROOF DECK LEVE
CONCRETING OF ROOF DECK BEAMS AND SLABS - ROOF DECK LEVE
REMOVAL OF FORMS AND SCAFFOLDINGS - ROOF DECK LEVEL
WATERPROOFING AND LEAK TEST OF ROOF DECK SLAB - ROOF D
22-Sep-16 04:00 PM, 0001-1.3.
MASONRY WORKS
TILE WORKS
CONSTRUCTION OF LEDGE
PAINTING WORKS
09-Jul-16 04:00 PM, 0001-1.3.4.3 MEP
MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE
MEP ROUGHINS INSTALLATIONS ON MASONRY WA
CABLE PULLING FOR MEP
LEAK TEST FOR DRAINAGE
CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING
Baseline Programme ( Rev 02 )
Actual Level of Effort
Actual Work
Remaining Work
Critical Remaining Work
Milestone
summary
CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING
Baseline Programme ( Revision 02 )
Date Revision Checked Approved
07-Jun-15 Baseline Programme ( Rev 02 )
 
3of3

More Related Content

Viewers also liked

Viewers also liked (9)

Certificate from TU Clausthal%2c Germany
Certificate from TU Clausthal%2c GermanyCertificate from TU Clausthal%2c Germany
Certificate from TU Clausthal%2c Germany
 
Stephen Health & Safety cert
Stephen Health & Safety certStephen Health & Safety cert
Stephen Health & Safety cert
 
Mi deporte favorito adriana
Mi deporte favorito adrianaMi deporte favorito adriana
Mi deporte favorito adriana
 
cert
certcert
cert
 
Pass Certificate ISC Exam
Pass Certificate ISC ExamPass Certificate ISC Exam
Pass Certificate ISC Exam
 
CV FORMAT 1 pramod-4
CV FORMAT 1 pramod-4CV FORMAT 1 pramod-4
CV FORMAT 1 pramod-4
 
AUTOCAD 3D
AUTOCAD 3DAUTOCAD 3D
AUTOCAD 3D
 
Art of Customer Service.
Art of Customer Service.Art of Customer Service.
Art of Customer Service.
 
Mba project reports
Mba project reportsMba project reports
Mba project reports
 

Similar to Leyet Colleges Schedule

CE 561 - Term Project on Primavera P6
CE 561 - Term Project on Primavera P6CE 561 - Term Project on Primavera P6
CE 561 - Term Project on Primavera P6Abhishek Singh
 
Bridge project
Bridge projectBridge project
Bridge projectVivek John
 
Zewail b4 base line schedule all buildings (detailed) completion 17 nov 2016
Zewail b4 base line schedule all buildings (detailed) completion 17 nov 2016Zewail b4 base line schedule all buildings (detailed) completion 17 nov 2016
Zewail b4 base line schedule all buildings (detailed) completion 17 nov 2016Ahmed Mehrem
 
Sample Project Monitoring-EVM Analysis
Sample Project Monitoring-EVM Analysis Sample Project Monitoring-EVM Analysis
Sample Project Monitoring-EVM Analysis Ayon Pal
 
Project Monitoring with EVM Analysis
Project Monitoring with EVM Analysis Project Monitoring with EVM Analysis
Project Monitoring with EVM Analysis ayonpal
 
MONTHLY REPORT_MARITIM PRIMA 1
MONTHLY REPORT_MARITIM PRIMA 1MONTHLY REPORT_MARITIM PRIMA 1
MONTHLY REPORT_MARITIM PRIMA 1Eko Untung
 
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdf
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdfT2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdf
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdfLeandroValdiviesoAnt
 
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...Rodger McKinley
 
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Allan Leyte
 
HSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activityHSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activityRoumik Mukherjee
 
Equipment Arrival Status.pptx
Equipment Arrival Status.pptxEquipment Arrival Status.pptx
Equipment Arrival Status.pptxMehmanNasibov1
 
REVIT_MEP_ADT17_PAL Portfolio
REVIT_MEP_ADT17_PAL PortfolioREVIT_MEP_ADT17_PAL Portfolio
REVIT_MEP_ADT17_PAL PortfolioPaul Little
 
38 Avenue Road- Rev 1, Detailed Programme
38 Avenue Road- Rev 1, Detailed Programme38 Avenue Road- Rev 1, Detailed Programme
38 Avenue Road- Rev 1, Detailed ProgrammeBeenish Ali
 
Sunshine_ W2 Dec'23_09.12.23.pptx
Sunshine_ W2 Dec'23_09.12.23.pptxSunshine_ W2 Dec'23_09.12.23.pptx
Sunshine_ W2 Dec'23_09.12.23.pptxabirsengupta9
 

Similar to Leyet Colleges Schedule (20)

CE 561 - Term Project on Primavera P6
CE 561 - Term Project on Primavera P6CE 561 - Term Project on Primavera P6
CE 561 - Term Project on Primavera P6
 
Bridge project
Bridge projectBridge project
Bridge project
 
01. P269 - Project Implementation Programme - Rev 00
01. P269 - Project Implementation Programme -  Rev 0001. P269 - Project Implementation Programme -  Rev 00
01. P269 - Project Implementation Programme - Rev 00
 
Zewail b4 base line schedule all buildings (detailed) completion 17 nov 2016
Zewail b4 base line schedule all buildings (detailed) completion 17 nov 2016Zewail b4 base line schedule all buildings (detailed) completion 17 nov 2016
Zewail b4 base line schedule all buildings (detailed) completion 17 nov 2016
 
Sample Project Monitoring-EVM Analysis
Sample Project Monitoring-EVM Analysis Sample Project Monitoring-EVM Analysis
Sample Project Monitoring-EVM Analysis
 
Project Monitoring with EVM Analysis
Project Monitoring with EVM Analysis Project Monitoring with EVM Analysis
Project Monitoring with EVM Analysis
 
2014-B36-D01
2014-B36-D012014-B36-D01
2014-B36-D01
 
IHH Healthcare Tender Programme.pdf
IHH Healthcare Tender Programme.pdfIHH Healthcare Tender Programme.pdf
IHH Healthcare Tender Programme.pdf
 
Weekly report no 19
Weekly report no 19Weekly report no 19
Weekly report no 19
 
MONTHLY REPORT_MARITIM PRIMA 1
MONTHLY REPORT_MARITIM PRIMA 1MONTHLY REPORT_MARITIM PRIMA 1
MONTHLY REPORT_MARITIM PRIMA 1
 
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdf
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdfT2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdf
T2_Programación de obras_Grupo7_ValdiviesoAntonFrancoJhayro.pdf
 
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
12FS-18WP ABTP - Bldg P Upgrades and Odour Control Project - 6 Week Look Ahea...
 
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
 
HSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activityHSM 2nd July Schedule -All activity
HSM 2nd July Schedule -All activity
 
Equipment Arrival Status.pptx
Equipment Arrival Status.pptxEquipment Arrival Status.pptx
Equipment Arrival Status.pptx
 
REVIT_MEP_ADT17_PAL Portfolio
REVIT_MEP_ADT17_PAL PortfolioREVIT_MEP_ADT17_PAL Portfolio
REVIT_MEP_ADT17_PAL Portfolio
 
38 Avenue Road- Rev 1, Detailed Programme
38 Avenue Road- Rev 1, Detailed Programme38 Avenue Road- Rev 1, Detailed Programme
38 Avenue Road- Rev 1, Detailed Programme
 
ARB JANADREA 25.01.16 UPDATE PM
ARB JANADREA 25.01.16 UPDATE  PMARB JANADREA 25.01.16 UPDATE  PM
ARB JANADREA 25.01.16 UPDATE PM
 
Project Schedule - Level IV Schedule
Project Schedule - Level IV ScheduleProject Schedule - Level IV Schedule
Project Schedule - Level IV Schedule
 
Sunshine_ W2 Dec'23_09.12.23.pptx
Sunshine_ W2 Dec'23_09.12.23.pptxSunshine_ W2 Dec'23_09.12.23.pptx
Sunshine_ W2 Dec'23_09.12.23.pptx
 

Leyet Colleges Schedule

  • 1. Activity ID Activity Name Original Duration Early Start Early Finish Total Float 0001-1 CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING0001-1 CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING381 01-Jul-15 08:00 AM 22-Sep-16 04:00 PM -1 0001-1.4 PROJECT MILESTONES0001-1.4 PROJECT MILESTONES 381 01-Jul-15 08:00 AM 22-Sep-16 04:00 PM -1 A1810 BEGINNING OF PROJECT CONSTRUCTION 0 01-Jul-15 08:00 AM 380 A1820 1ST FLOOR SLAB DONE 0 21-Dec-15 04:00 PM 232 A1830 2ND FLOOR SLAB DONE 0 08-Feb-16 04:00 PM 194 A1840 ROOF DECK SLAB DONE 0 05-May-16 04:00 PM 119 A1850 END OF PROJECT 0 22-Sep-16 04:00 PM -1 A1970 3RD FLOOR SLAB DONE 0 11-Apr-16 04:00 PM 140 0001-1.1 PRELIMINARY ACTIVITES0001-1.1 PRELIMINARY ACTIVITES 74 01-Jul-15 08:00 AM 24-Sep-15 04:00 PM 17 A1000 PROCESSING OF PERMITS 30 01-Jul-15 08:00 AM 08-Sep-15 04:00 PM -1 A1010 BAR CUTTING AND BENDING 30 21-Aug-15 08:00 AM 24-Sep-15 04:00 PM -1 A1020 FABRICATION OF FORMS 30 21-Aug-15 08:00 AM 24-Sep-15 04:00 PM 17 0001-1.2 PROCUREMENT OF MATERIALS0001-1.2 PROCUREMENT OF MATERIALS 134 03-Jul-15 08:00 AM 07-Dec-15 04:00 PM 164 A1030 PROCUREMENT OF REBARS, STEEL DECK AND FORMS 60 03-Jul-15 08:00 AM 10-Sep-15 04:00 PM -1 A1040 PROCUREMENT OF MASONRY MATERIALS 30 03-Aug-15 08:00 AM 05-Sep-15 04:00 PM 114 A1050 PROCUREMENT OF STEEL WORKS MATERIALS 15 30-Sep-15 08:00 AM 16-Oct-15 04:00 PM 124 A1060 PROCUREMENT AND DELIVERY OF TILES 30 03-Nov-15 08:00 AM 07-Dec-15 04:00 PM 164 A1070 PROCUREMENT OF MEP MATERIALS AND ACESSORIES 15 01-Sep-15 08:00 AM 17-Sep-15 04:00 PM 157 A1080 PROCUREMENT OF DOORS AND JAMBS 20 08-Sep-15 08:00 AM 30-Sep-15 04:00 PM 130 A1090 PROCUREMENT AND DELIVERY OF PAINT MATERIALS 30 01-Oct-15 08:00 AM 05-Nov-15 04:00 PM 181 0001-1.3 CONSTRUCTION0001-1.3 CONSTRUCTION 381 01-Jul-15 08:00 AM 22-Sep-16 04:00 PM -1 0001-1.3.1 GROUND FLOOR0001-1.3.1 GROUND FLOOR 247 01-Jul-15 08:00 AM 19-Apr-16 02:00 PM 133 0001-1.3.1.2 EARTHWORKS0001-1.3.1.2 EARTHWORKS 40 01-Jul-15 08:00 AM 15-Aug-15 04:00 PM 33 A1110 EXCAVATION 30 01-Jul-15 08:00 AM 04-Aug-15 04:00 PM 33 A1370 SITE CLEARING AND DEMOLITION 25 18-Jul-15 08:00 AM 15-Aug-15 04:00 PM 33 0001-1.3.1.1 STRUCTURAL WORKS0001-1.3.1.1 STRUCTURAL WORKS 76 25-Sep-15 08:00 AM 24-Dec-15 04:00 PM 154 A1120 INSTALLATION OF REBARS FOR FOOTINGS, TIE BEAMS AND COLUMNS 15 25-Sep-15 08:00 AM 12-Oct-15 04:00 PM -1 A1130 CONCRETING OF FOOTINGS AND TIE BEAMS 3 13-Oct-15 08:00 AM 15-Oct-15 04:00 PM -1 A1140 INSTALLATION OF FORMS AND SCAFFOLDINGS FOR COLUMNS 5 16-Oct-15 08:00 AM 21-Oct-15 04:00 PM -1 A1150 CONCRETING OF COLUMN 10 22-Oct-15 08:00 AM 03-Nov-15 04:00 PM -1 A1160 REMOVAL OF FORMS AND SCAFFOLDING FOR COLUMN,BEAMS AND SLAB AT GROUND FLOOR LEVEL3 06-Nov-15 08:00 AM 09-Nov-15 04:00 PM -1 A1170 BACKFILLING 14 10-Nov-15 08:00 AM 25-Nov-15 04:00 PM -1 A1180 PREPARATION OF GROUND SURFACE FOR GROUND SLAB 5 26-Nov-15 08:00 AM 01-Dec-15 04:00 PM -1 A1190 CONCRETING OF GROUND SLAB 2 02-Dec-15 08:00 AM 03-Dec-15 04:00 PM -1 A1460 CONTRUCTION OF STAIRS FROM GROUND FLOOR TO 1ST LEVEL 15 04-Dec-15 08:00 AM 24-Dec-15 04:00 PM 131 0001-1.3.1.3 ARCHITECTURAL WORKS0001-1.3.1.3 ARCHITECTURAL WORKS 136 09-Nov-15 08:00 AM 19-Apr-16 02:00 PM 133 A1200 MASONRY WORKS AT GROUND FLOOR LEVEL 45 07-Dec-15 08:00 AM 01-Feb-16 04:00 PM 27 A1210 INSTALLATION OF DOORS AND JAMBS AT GROUND FLOOR 15 04-Feb-16 08:00 AM 20-Feb-16 04:00 PM 27 A1220 INSTALLATION OF WINDOWS AND GATES 15 13-Feb-16 08:00 AM 01-Mar-16 04:00 PM 27 A1230 CARPENTRY WORKS AT GROUND FLOOR 20 25-Feb-16 08:00 AM 18-Mar-16 04:00 PM 27 A1240 CONTRUCTION OF LEDGE AT GROUND FLOOR 15 02-Mar-16 08:00 AM 18-Mar-16 04:00 PM 160 A1360 PAINTINGS AT GROUND FLOOR 30 09-Nov-15 08:00 AM 12-Dec-15 04:00 PM 164 A1250 TILE WORKS AT GROUND FLOOR 30 14-Mar-16 08:00 AM 19-Apr-16 02:00 PM 26 0001-1.3.1.4 MEP WORKS0001-1.3.1.4 MEP WORKS 113 18-Sep-15 08:00 AM 02-Feb-16 04:00 PM 195 A1260 MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE AT GROUND FLOOR5 18-Sep-15 08:00 AM 23-Sep-15 04:00 PM 157 A1270 MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS AT GROUND FLOOR5 21-Jan-16 08:00 AM 26-Jan-16 04:00 PM 195 A1280 CABLE PULLING AND FINISHES FOR ELECTRICAL AT GROUND FLOOR 2 24-Sep-15 08:00 AM 25-Sep-15 04:00 PM 281 A1290 LEAK TEST FOR DRAINAGE AT GROUND FLOOR 2 27-Jan-16 08:00 AM 28-Jan-16 04:00 PM 195 A1480 PRESSURE TEST FOR WATER SUPPLY LINES AT GROUND FLOOR 2 27-Jan-16 08:00 AM 28-Jan-16 04:00 PM 195 A1490 INSTALLATION OF PLUMBING ACCESSORIES AT GROUND FLOOR 4 29-Jan-16 08:00 AM 02-Feb-16 04:00 PM 195 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2015 2016 22-Sep-16 04:00 PM, 0001-1 C 22-Sep-16 04:00 PM, 0001-1.4 BEGINNING OF PROJECT CONSTRUCTION, 01-Jul-15 08:00 AM 1ST FLOOR SLAB DONE, 2ND FLOOR SLAB DONE, ROOF DECK SLAB DONE, END OF PROJECT, 3RD FLOOR SLAB DONE, 24-Sep-15 04:00 PM, 0001-1.1 PRELIMINARY ACTIVITES PROCESSING OF PERMITS BAR CUTTING AND BENDING FABRICATION OF FORMS 07-Dec-15 04:00 PM, 0001-1.2 PROCUREMENT OF MATERIALS PROCUREMENT OF REBARS, STEEL DECK AND FORMS PROCUREMENT OF MASONRY MATERIALS PROCUREMENT OF STEEL WORKS MATERIALS PROCUREMENT AND DELIVERY OF TILES PROCUREMENT OF MEP MATERIALS AND ACESSORIES PROCUREMENT OF DOORS AND JAMBS PROCUREMENT AND DELIVERY OF PAINT MATERIALS 22-Sep-16 04:00 PM, 0001-1.3 19-Apr-16 02:00 PM, 0001-1.3.1 GROUND FLOOR 15-Aug-15 04:00 PM, 0001-1.3.1.2 EARTHWORKS EXCAVATION SITE CLEARING AND DEMOLITION 24-Dec-15 04:00 PM, 0001-1.3.1.1 STRUCTURAL WORKS INSTALLATION OF REBARS FOR FOOTINGS, TIE BEAMS AND COLUMNS CONCRETING OF FOOTINGS AND TIE BEAMS INSTALLATION OF FORMS AND SCAFFOLDINGS FOR COLUMNS CONCRETING OF COLUMN REMOVAL OF FORMS AND SCAFFOLDING FOR COLUMN,BEAMS AND SLAB AT GROUND FLOOR LEVEL BACKFILLING PREPARATION OF GROUND SURFACE FOR GROUND SLAB CONCRETING OF GROUND SLAB CONTRUCTION OF STAIRS FROM GROUND FLOOR TO 1ST LEVEL 19-Apr-16 02:00 PM, 0001-1.3.1.3 ARCHITECTURAL WORKS MASONRY WORKS AT GROUND FLOOR LEVEL INSTALLATION OF DOORS AND JAMBS AT GROUND FLOOR INSTALLATION OF WINDOWS AND GATES CARPENTRY WORKS AT GROUND FLOOR CONTRUCTION OF LEDGE AT GROUND FLOOR PAINTINGS AT GROUND FLOOR TILE WORKS AT GROUND FLOOR 02-Feb-16 04:00 PM, 0001-1.3.1.4 MEP WORKS MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE AT GROUND FLOOR MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS AT GROUND FLOOR CABLE PULLING AND FINISHES FOR ELECTRICAL AT GROUND FLOOR LEAK TEST FOR DRAINAGE AT GROUND FLOOR PRESSURE TEST FOR WATER SUPPLY LINES AT GROUND FLOOR INSTALLATION OF PLUMBING ACCESSORIES AT GROUND FLOOR CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING Baseline Programme ( Rev 02 ) Actual Level of Effort Actual Work Remaining Work Critical Remaining Work Milestone summary CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING Baseline Programme ( Revision 02 ) Date Revision Checked Approved 07-Jun-15 Baseline Programme ( Rev 02 )   1of3
  • 2. Activity ID Activity Name Original Duration Early Start Early Finish Total Float 0001-1.3.2 1ST FLOOR LEVEL0001-1.3.2 1ST FLOOR LEVEL 174 04-Dec-15 08:00 AM 28-Jun-16 02:00 PM 73 0001-1.3.2.1 STRUCTURAL WORKS0001-1.3.2.1 STRUCTURAL WORKS 45 04-Dec-15 08:00 AM 29-Jan-16 04:00 PM 142 A1300 INSTALLATIONS OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLABS - 1ST FLOOR LEVEL7 04-Dec-15 08:00 AM 11-Dec-15 04:00 PM -1 A1310 INSTALLATIONS OF REBARS , STEEL DECK FOR BEAMS AND SLABS 1ST FLOOR LEVEL5 12-Dec-15 08:00 AM 17-Dec-15 04:00 PM -1 A1320 CONCRETING OF 1ST FLOOR BEAMS AND SLABS 1ST FLOOR LEVEL 3 18-Dec-15 08:00 AM 21-Dec-15 04:00 PM -1 A1330 INSTALLATION OF REBARS FOR COLUMNS 1ST FLOOR LEVEL 5 22-Dec-15 08:00 AM 29-Dec-15 04:00 PM 24 A1340 INSTALLATION OF FORMS AND SCAFFOLDINGS FOR COLUMNS 1ST FLOOR LEVEL5 22-Dec-15 08:00 AM 29-Dec-15 04:00 PM -1 A1350 CONCRETING OF COLUMNS 1ST FLOOR LEVEL 3 30-Dec-15 08:00 AM 04-Jan-16 04:00 PM -1 A1420 REMOVAL OF FORM FOR COLUMNS,BEAMS AND SLAB 1ST FLOOR 5 07-Jan-16 08:00 AM 12-Jan-16 04:00 PM -1 A1470 WATERPROOFING AND LEAK TESTING OF WET AREAS -1ST FLOOR 3 13-Jan-16 08:00 AM 15-Jan-16 04:00 PM 109 A1650 CONSTRUCTION OF STAIRS FROM 1ST TO 2ND FLOOR 15 13-Jan-16 08:00 AM 29-Jan-16 04:00 PM 142 0001-1.3.2.2 ARCHITECTURAL WORKS0001-1.3.2.2 ARCHITECTURAL WORKS 127 02-Feb-16 08:00 AM 28-Jun-16 02:00 PM 28 A1380 MASONRY WORKS 1ST FLOOR 45 02-Feb-16 08:00 AM 24-Mar-16 04:00 PM 50 A1390 INSTALLATION OF DOORS AND JAMBS 1ST FLOOR 15 25-Mar-16 08:00 AM 11-Apr-16 04:00 PM 65 A1400 INSTALLATION OF WINDOWS 1ST FLOOR 15 25-Mar-16 08:00 AM 11-Apr-16 04:00 PM 65 A1410 CARPENTRY WORKS 1ST FLOOR 20 25-Mar-16 08:00 AM 16-Apr-16 04:00 PM 60 A1430 TILE WORKS 1ST FLOOR 30 19-Apr-16 02:00 PM 24-May-16 02:00 PM 28 A1440 CONSTRUCTION OF LEDGE 1ST FLOOR 15 25-Mar-16 08:00 AM 11-Apr-16 04:00 PM 65 A1450 PAINTING WORKS 1ST FLOOR 30 24-May-16 02:00 PM 28-Jun-16 02:00 PM 28 0001-1.3.2.3 MEP WORKS0001-1.3.2.3 MEP WORKS 87 12-Dec-15 08:00 AM 26-Mar-16 04:00 PM 153 A1500 MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE 1ST FLOOR5 12-Dec-15 08:00 AM 17-Dec-15 04:00 PM 211 A1510 MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS 1ST FLOOR 5 14-Mar-16 08:00 AM 18-Mar-16 04:00 PM 136 A1520 CABLE PULLING AND FINISHES FOR ELECTRICAL 1ST FLOOR 2 19-Mar-16 08:00 AM 21-Mar-16 04:00 PM 136 A1530 LEAK TESTS FOR DRAINAGE 1ST FLOOR 3 19-Mar-16 08:00 AM 22-Mar-16 04:00 PM 153 A1540 PRESSURE TESTS FOR WATERLINE 1ST FLOOR 3 19-Mar-16 08:00 AM 22-Mar-16 04:00 PM 153 A1630 INSTALLATION OF PLUMBING ACCESSORIES 1ST FLOOR 4 23-Mar-16 08:00 AM 26-Mar-16 04:00 PM 153 0001-1.3.3 2ND FLOOR LEVEL0001-1.3.3 2ND FLOOR LEVEL 174 13-Jan-16 08:00 AM 02-Aug-16 02:00 PM 28 0001-1.3.3.1 STRUCTURAL WORKS0001-1.3.3.1 STRUCTURAL WORKS 60 13-Jan-16 08:00 AM 22-Mar-16 04:00 PM 112 A1550 INSTALLATIONS OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLABS 2ND FLOOR15 13-Jan-16 08:00 AM 29-Jan-16 04:00 PM -1 A1560 INSTALLATIONS OF REBARS, STEEL DECK FOR BEAMS AND SLABS 2ND FLOOR5 30-Jan-16 08:00 AM 04-Feb-16 04:00 PM -1 A1570 CONCRETING OF 2ND FLOOR BEAMS AND SLABS 2ND FLOOR 3 05-Feb-16 08:00 AM 08-Feb-16 04:00 PM -1 A1580 INSTALLATION OF FORMS AND SCAFFOLDINGS FOR 2ND FLOOR COLUMNS 2ND FLOOR5 11-Feb-16 08:00 AM 16-Feb-16 04:00 PM -1 A1590 CONCRETING OF 2ND FLOOR COLUMNS 2ND FLOOR 3 19-Feb-16 08:00 AM 22-Feb-16 04:00 PM -1 A1600 REMOVAL OF FORMS AND SCAFFOLDINGS COLUMN, BEAMS AND SLAB 2ND FLOOR5 25-Feb-16 08:00 AM 01-Mar-16 04:00 PM -1 A1610 CONSTRUCTION OF STAIRS 2ND TO 3RD FLOOR LEVEL 15 05-Mar-16 08:00 AM 22-Mar-16 04:00 PM 112 A1620 WATERPROOFING AND LEAK TESTING OF WET AREAS 2ND FLOOR 3 12-Feb-16 08:00 AM 15-Feb-16 04:00 PM 83 0001-1.3.3.2 ARCHITECTURAL WORKS0001-1.3.3.2 ARCHITECTURAL WORKS 138 24-Feb-16 08:00 AM 02-Aug-16 02:00 PM 28 A1700 MASONRY WORKS 2ND FLOOR 45 24-Feb-16 08:00 AM 15-Apr-16 04:00 PM 11 A1710 INSTALLATION OF DOORS AND JAMBS 2ND FLOOR 15 16-Apr-16 08:00 AM 03-May-16 04:00 PM 76 A1720 INSTALLATION OF WINDOWS 2ND FLOOR 15 16-Apr-16 08:00 AM 03-May-16 04:00 PM 76 A1730 CARPENTRY WORKS 2ND FLOOR 20 16-Apr-16 08:00 AM 09-May-16 04:00 PM 11 A1740 TILE WORKS 2ND FLOOR 30 10-May-16 08:00 AM 13-Jun-16 04:00 PM 11 A1750 CONSTRUCTION OF LEDGE 2ND FLOOR 15 10-May-16 08:00 AM 26-May-16 04:00 PM 56 A1760 PAINTING WORKS 2ND FLOOR 30 28-Jun-16 02:00 PM 02-Aug-16 02:00 PM 28 0001-1.3.3.3 MEP WORKS0001-1.3.3.3 MEP WORKS 73 19-Jan-16 08:00 AM 12-Apr-16 04:00 PM 119 A1870 MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE 2ND FLOOR5 19-Jan-16 08:00 AM 23-Jan-16 04:00 PM 185 A1880 MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS 2ND FLOOR 5 05-Apr-16 08:00 AM 09-Apr-16 04:00 PM 119 A1890 CABLE PULLING AND FINISHES FOR ELECTRICAL 2ND FLOOR 2 11-Apr-16 08:00 AM 12-Apr-16 04:00 PM 119 A1900 LEAK TESTS FOR DRAINAGE 2ND FLOOR 3 09-Feb-16 08:00 AM 11-Feb-16 04:00 PM 136 A1910 PRESSURE TESTS FOR WATERLINE 2ND FLOOR 3 09-Feb-16 08:00 AM 11-Feb-16 04:00 PM 136 A1920 INSTALLATION OF PLUMBING ACCESSORIES 2ND FLOOR 5 12-Feb-16 08:00 AM 17-Feb-16 04:00 PM 136 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2015 2016 28-Jun-16 02:00 PM, 0001-1.3.2 1ST FLOOR LEVEL 29-Jan-16 04:00 PM, 0001-1.3.2.1 STRUCTURAL WORKS INSTALLATIONS OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLABS - 1ST FLOOR LEVEL INSTALLATIONS OF REBARS , STEEL DECK FOR BEAMS AND SLABS 1ST FLOOR LEVEL CONCRETING OF 1ST FLOOR BEAMS AND SLABS 1ST FLOOR LEVEL INSTALLATION OF REBARS FOR COLUMNS 1ST FLOOR LEVEL INSTALLATION OF FORMS AND SCAFFOLDINGS FOR COLUMNS 1ST FLOOR LEVEL CONCRETING OF COLUMNS 1ST FLOOR LEVEL REMOVAL OF FORM FOR COLUMNS,BEAMS AND SLAB 1ST FLOOR WATERPROOFING AND LEAK TESTING OF WET AREAS -1ST FLOOR CONSTRUCTION OF STAIRS FROM 1ST TO 2ND FLOOR 28-Jun-16 02:00 PM, 0001-1.3.2.2 ARCHITECTURAL WO MASONRY WORKS 1ST FLOOR INSTALLATION OF DOORS AND JAMBS 1ST FLOOR INSTALLATION OF WINDOWS 1ST FLOOR CARPENTRY WORKS 1ST FLOOR TILE WORKS 1ST FLOOR CONSTRUCTION OF LEDGE 1ST FLOOR PAINTING WORKS 1ST FLOOR 26-Mar-16 04:00 PM, 0001-1.3.2.3 MEP WORKS MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE 1ST FLOOR MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS 1ST FLOOR CABLE PULLING AND FINISHES FOR ELECTRICAL 1ST FLOOR LEAK TESTS FOR DRAINAGE 1ST FLOOR PRESSURE TESTS FOR WATERLINE 1ST FLOOR INSTALLATION OF PLUMBING ACCESSORIES 1ST FLOOR 02-Aug-16 02:00 PM, 0001-1.3.3 2ND FLOOR 22-Mar-16 04:00 PM, 0001-1.3.3.1 STRUCTURAL WORKS INSTALLATIONS OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLABS 2ND FLOOR INSTALLATIONS OF REBARS, STEEL DECK FOR BEAMS AND SLABS 2ND FLOOR CONCRETING OF 2ND FLOOR BEAMS AND SLABS 2ND FLOOR INSTALLATION OF FORMS AND SCAFFOLDINGS FOR 2ND FLOOR COLUMNS 2ND FLOOR CONCRETING OF 2ND FLOOR COLUMNS 2ND FLOOR REMOVAL OF FORMS AND SCAFFOLDINGS COLUMN, BEAMS AND SLAB 2ND FLOOR CONSTRUCTION OF STAIRS 2ND TO 3RD FLOOR LEVEL WATERPROOFING AND LEAK TESTING OF WET AREAS 2ND FLOOR 02-Aug-16 02:00 PM, 0001-1.3.3.2 ARCHITECT MASONRY WORKS 2ND FLOOR INSTALLATION OF DOORS AND JAMBS 2ND FLOOR INSTALLATION OF WINDOWS 2ND FLOOR CARPENTRY WORKS 2ND FLOOR TILE WORKS 2ND FLOOR CONSTRUCTION OF LEDGE 2ND FLOOR PAINTING WORKS 2ND FLOOR 12-Apr-16 04:00 PM, 0001-1.3.3.3 MEP WORKS MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE 2ND FLOOR MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS 2ND FLOOR CABLE PULLING AND FINISHES FOR ELECTRICAL 2ND FLOOR LEAK TESTS FOR DRAINAGE 2ND FLOOR PRESSURE TESTS FOR WATERLINE 2ND FLOOR INSTALLATION OF PLUMBING ACCESSORIES 2ND FLOOR CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING Baseline Programme ( Rev 02 ) Actual Level of Effort Actual Work Remaining Work Critical Remaining Work Milestone summary CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING Baseline Programme ( Revision 02 ) Date Revision Checked Approved 07-Jun-15 Baseline Programme ( Rev 02 )   2of3
  • 3. Activity ID Activity Name Original Duration Early Start Early Finish Total Float 0001-1.3.6 3RD FLOOR LEVEL0001-1.3.6 3RD FLOOR LEVEL 131 02-Mar-16 08:00 AM 01-Aug-16 04:00 PM 29 0001-1.3.6.1 STRUCTURAL WORKS0001-1.3.6.1 STRUCTURAL WORKS 60 02-Mar-16 08:00 AM 10-May-16 04:00 PM 70 A2350 INSTALLATIONS OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLABS 3RD FLOOR15 02-Mar-16 08:00 AM 18-Mar-16 04:00 PM -1 A2360 INSTALLATIONS OF REBARS, STEEL DECK FOR BEAMS AND SLABS 3RD FLOOR5 19-Mar-16 08:00 AM 24-Mar-16 04:00 PM -1 A2370 CONCRETING OF 3RD FLOOR BEAMS AND SLABS 3 25-Mar-16 08:00 AM 28-Mar-16 04:00 PM -1 A2380 INSTALLATION OF FORMS AND SCAFFOLDINGS FOR 3RD FLOOR COLUMNS5 31-Mar-16 08:00 AM 05-Apr-16 04:00 PM -1 A2390 CONCRETING OF 3RD FLOOR COLUMNS 3 08-Apr-16 08:00 AM 11-Apr-16 04:00 PM -1 A2400 REMOVAL OF FORMS AND SCAFFOLDINGS COLUMN, BEAMS AND SLAB- 3RD FLOOR5 14-Apr-16 08:00 AM 19-Apr-16 04:00 PM 26 A2410 CONSTRUCTION OF STAIRS 3RD TO ROOF DECK 15 23-Apr-16 08:00 AM 10-May-16 04:00 PM 70 A2420 WATERPROOFING AND LEAK TESTING OF WET AREAS - 3RD FLOOR 3 01-Apr-16 08:00 AM 04-Apr-16 04:00 PM 71 0001-1.3.6.2 ARCHITECTURAL WORKS0001-1.3.6.2 ARCHITECTURAL WORKS 95 13-Apr-16 08:00 AM 01-Aug-16 04:00 PM 29 A2430 MASONRY WORKS - 3RD FLOOR 45 13-Apr-16 08:00 AM 03-Jun-16 04:00 PM -1 A2440 INSTALLATION OF DOORS AND JAMBS - 3RD FLOOR 15 04-Jun-16 08:00 AM 21-Jun-16 04:00 PM 34 A2450 INSTALLATION OF WINDOWS - 3RD FLOOR 15 04-Jun-16 08:00 AM 21-Jun-16 04:00 PM 34 A2460 CARPENTRY WORKS - 3RD FLOOR 20 04-Jun-16 08:00 AM 27-Jun-16 04:00 PM -1 A2470 TILE WORKS - 3RD FLOOR 30 28-Jun-16 08:00 AM 01-Aug-16 04:00 PM -1 A2480 CONSTRUCTION OF LEDGE - 3RD FLOOR 15 28-Jun-16 08:00 AM 14-Jul-16 04:00 PM 29 A2490 PAINTING WORKS - 3RD FLOOR 30 28-Jun-16 08:00 AM 01-Aug-16 04:00 PM 29 0001-1.3.6.3 MEP WORKS0001-1.3.6.3 MEP WORKS 73 08-Mar-16 08:00 AM 31-May-16 04:00 PM 79 A2500 MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE - 3RD FLOOR5 08-Mar-16 08:00 AM 12-Mar-16 04:00 PM 145 A2510 MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS - 3RD FLOOR 5 24-May-16 08:00 AM 28-May-16 04:00 PM 79 A2520 CABLE PULLING AND FINISHES FOR ELECTRICAL - 3RD FLOOR 2 30-May-16 08:00 AM 31-May-16 04:00 PM 79 A2530 LEAK TESTS FOR DRAINAGE - 3RD FLOOR 3 29-Mar-16 08:00 AM 31-Mar-16 04:00 PM 99 A2540 PRESSURE TESTS FOR WATERLINE - 3RD FLOOR 3 29-Mar-16 08:00 AM 31-Mar-16 04:00 PM 99 A2550 INSTALLATION OF PLUMBING ACCESSORIES - 3RD FLOOR 5 01-Apr-16 08:00 AM 06-Apr-16 04:00 PM 99 0001-1.3.4 ROOF DECK LEVEL0001-1.3.4 ROOF DECK LEVEL 134 20-Apr-16 08:00 AM 22-Sep-16 04:00 PM -1 0001-1.3.4.1 STRUCTURAL WORKS0001-1.3.4.1 STRUCTURAL WORKS 22 20-Apr-16 08:00 AM 14-May-16 04:00 PM 96 A1770 INSTALLATION OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLAB - ROOF DECK LEVEL15 20-Apr-16 08:00 AM 06-May-16 04:00 PM 26 A1780 INSTALLATION OF REBARS FOR BEAMS AND SLABS - ROOF DECK LEVEL 5 26-Apr-16 08:00 AM 30-Apr-16 04:00 PM 26 A1790 CONCRETING OF ROOF DECK BEAMS AND SLABS - ROOF DECK LEVEL 3 03-May-16 08:00 AM 05-May-16 04:00 PM 26 A1800 REMOVAL OF FORMS AND SCAFFOLDINGS - ROOF DECK LEVEL 5 06-May-16 08:00 AM 11-May-16 04:00 PM 96 A1860 WATERPROOFING AND LEAK TEST OF ROOF DECK SLAB - ROOF DECK LEVEL3 12-May-16 08:00 AM 14-May-16 04:00 PM 96 0001-1.3.4.2 ARCHITECTURAL WORKS0001-1.3.4.2 ARCHITECTURAL WORKS 117 10-May-16 08:00 AM 22-Sep-16 04:00 PM -1 A1930 MASONRY WORKS 45 10-May-16 08:00 AM 30-Jun-16 04:00 PM 26 A1940 TILE WORKS 30 02-Aug-16 08:00 AM 05-Sep-16 04:00 PM -1 A1950 CONSTRUCTION OF LEDGE 15 15-Jul-16 08:00 AM 01-Aug-16 04:00 PM 29 A1960 PAINTING WORKS 15 06-Sep-16 08:00 AM 22-Sep-16 04:00 PM -1 0001-1.3.4.3 MEP0001-1.3.4.3 MEP 55 07-May-16 08:00 AM 09-Jul-16 04:00 PM 48 A1980 MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE 5 07-May-16 08:00 AM 12-May-16 04:00 PM 95 A1990 MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS 5 01-Jul-16 08:00 AM 06-Jul-16 04:00 PM 48 A2000 CABLE PULLING FOR MEP 3 07-Jul-16 08:00 AM 09-Jul-16 04:00 PM 48 A2010 LEAK TEST FOR DRAINAGE 3 07-Jul-16 08:00 AM 09-Jul-16 04:00 PM 48 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov 2015 2016 01-Aug-16 04:00 PM, 0001-1.3.6 3RD FLOOR 10-May-16 04:00 PM, 0001-1.3.6.1 STRUCTURAL WORKS INSTALLATIONS OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLABS 3RD FLOO INSTALLATIONS OF REBARS, STEEL DECK FOR BEAMS AND SLABS 3RD FLOOR CONCRETING OF 3RD FLOOR BEAMS AND SLABS INSTALLATION OF FORMS AND SCAFFOLDINGS FOR 3RD FLOOR COLUMNS CONCRETING OF 3RD FLOOR COLUMNS REMOVAL OF FORMS AND SCAFFOLDINGS COLUMN, BEAMS AND SLAB- 3R CONSTRUCTION OF STAIRS 3RD TO ROOF DECK WATERPROOFING AND LEAK TESTING OF WET AREAS - 3RD FLOOR 01-Aug-16 04:00 PM, 0001-1.3.6.2 ARCHITECT MASONRY WORKS - 3RD FLOOR INSTALLATION OF DOORS AND JAMBS - 3RD FLOOR INSTALLATION OF WINDOWS - 3RD FLOOR CARPENTRY WORKS - 3RD FLOOR TILE WORKS - 3RD FLOOR CONSTRUCTION OF LEDGE - 3RD FLOOR PAINTING WORKS - 3RD FLOOR 31-May-16 04:00 PM, 0001-1.3.6.3 MEP WORKS MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE - 3RD FLOOR MEP ROUGHINS INSTALLATIONS ON MASONRY WALLS - 3RD F CABLE PULLING AND FINISHES FOR ELECTRICAL - 3RD FLOO LEAK TESTS FOR DRAINAGE - 3RD FLOOR PRESSURE TESTS FOR WATERLINE - 3RD FLOOR INSTALLATION OF PLUMBING ACCESSORIES - 3RD FLOOR 22-Sep-16 04:00 PM, 0001-1.3. 14-May-16 04:00 PM, 0001-1.3.4.1 STRUCTURAL WORKS INSTALLATION OF FORMS AND SCAFFOLDINGS FOR BEAMS AND SLA INSTALLATION OF REBARS FOR BEAMS AND SLABS - ROOF DECK LEVE CONCRETING OF ROOF DECK BEAMS AND SLABS - ROOF DECK LEVE REMOVAL OF FORMS AND SCAFFOLDINGS - ROOF DECK LEVEL WATERPROOFING AND LEAK TEST OF ROOF DECK SLAB - ROOF D 22-Sep-16 04:00 PM, 0001-1.3. MASONRY WORKS TILE WORKS CONSTRUCTION OF LEDGE PAINTING WORKS 09-Jul-16 04:00 PM, 0001-1.3.4.3 MEP MEP ROUGHINS INSTALLATIONS ON STRUCTURAL CONCRETE MEP ROUGHINS INSTALLATIONS ON MASONRY WA CABLE PULLING FOR MEP LEAK TEST FOR DRAINAGE CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING Baseline Programme ( Rev 02 ) Actual Level of Effort Actual Work Remaining Work Critical Remaining Work Milestone summary CONSTRUCTION OF LEYTE COLLEGES SCHOOL BUILDING Baseline Programme ( Revision 02 ) Date Revision Checked Approved 07-Jun-15 Baseline Programme ( Rev 02 )   3of3