ABNORMALITY REPORT OF BFP-2 (11KV, 1100kW, ANSALDO Make)
Page 1 of 4
CPP-CPSU/E/M-103/2023
Date: 13/01/2023
Sub: Abnormality report of BFP-2 tripped on “49 (MPTTL)” on dated
12/01/2023
Date & Time of Event: BFP-2 tripped at 03:52:05 Hrs. on 12/01/2023.
Effect on Plant:
 Nil
Description of events:
 Before event, BFP-2 was running for TG-1 and BFP-1 was on standby.
 At 03:46:56.204 thermal content exceed alarm came on BFP-2 relay.
 At 03:52:04.924 relay gave tripping command (86B-self reset) on 49
(Thermal O/L-MPTTR) and BFP-2 motor tripped. Subsequently, at
03:52:08.582 trip command from DCS operated.
 Process started BFP-2 again at 04:04:59.904, but at 04:41:07:340 BFP-2
tripped on trip command from DCS (front journal bearing temperature
high).
Relay events:
BFP-2 Tripped on “49- Thermal Overload”:
Date & Time Signal name Status Additional info Cumulative
Time
03:46:56:204 3Ith>M(1)
BLK_RESTART
True Thermal content
exceeded alarm.
0
03:46:56:204 MV(4) Q4 True Restart Inhibit 0
03:46:56:204 MV(4) Q5 False Restart Enable 0
03:51:33:379 3Ith>M(1)
ALARM
True 00:04:37.175
03:52:04:924 3Ith>M(1)
OPERATE
True 49- Thermal O/L
Operated
00:05:08.720
03:52:04:924 Master Trip(2)
TRIP
True 86B 00:05:08.720
03:52:04:924 MV(2) Q5 True 86B OPTD 00:05:08.720
ABNORMALITY REPORT OF BFP-2 (11KV, 1100kW, ANSALDO Make)
Page 2 of 4
03:52:04:924 MV(3) Q3 True 49_OPTD (TH
O/L)
00:05:08.720
03:52:04:987 MV(1) Q8 False BKR ON 00:05:08.783
03:52:04:992 MV(1) Q3 True BREAKER OFF 00:05:08.788
03:52:05:014 MV(3) Q3 False 49_OPTD (TH
O/L)
00:05:08.810
03:52:08:582 MV(1) Q6 True PR/B/W TEM
HIGH TRIP
00:05:12.378
03:52:10:532 MV(1) Q6 False PR/B/W TEM
HIGH TRIP
00:05:14.328
03:56:02:859 MV(4) Q5 RESTRT ENABLE 00:09:06.655
04:04:59:904 MV(1) Q8 True BKR ON 00:18:03.700
04:04:59:919 3I>(1) START L1,L2 00:18:03.715
04:04:59:927 3I(1)
HIGH_ALARM
True 00:18:03.723
04:04:59:927 3I(1)
HIGH_WARN
True 00:18:03.723
04:05:01:334 MV(2) Q2 False CLS/ON CMD FM
DCS
00:18:05.130
04:41:07:340 MV(2) Q3 True OFF/TRIP CMD
FM DCS
00:54:11.136
04:41:07:380 MV(1) Q6 True PR/B/W TEM
HIGH TRIP
00:54:11.176
04:41:07:401 I<->O CB(1)
POSITION
open CBXCBR1 switch
position
00:54:11.197
04:41:07:403 CBCM(1)
NO_OPR
22 Breaker Counter 00:54:11.199
04:41:07:403 MV(1) Q8 False BKR ON 00:54:11.199
04:41:07:405 MV(1) Q3 True BREAKER OFF 00:54:11.201
04:41:07:408 I<->O CB(1)
ENA_CLOSE
True 00:54:11.204
04:41:08:838 MV(2) Q3 False OFF/TRIP CMD
FM DCS
00:54:12.634
Analysis:
 BFP-2 tripped on thermal after running 05 minutes at 65A-78A. Motor
restart blocked by relay for 04 minutes as per relay thermal curve.
ABNORMALITY REPORT OF BFP-2 (11KV, 1100kW, ANSALDO Make)
Page 3 of 4
Oscillographic Record :
Attached in Annex-A, retrieved from REM-620 of BFP-2
Remedial action:
 Suggestion given for provision of tag/alarm for motor tripped on "Thermal
overload" at DCS for BFP motors vide suggestion No.: 14004 on dated
12/10/2022.
QEHSEn (ISO 14001, 45001, 9001 & 50001) related impact:
 Nil
REM620 - 1 - 12/01/2023 / 2:46:56.204 AM
13/01/2023 / 11:53:17 AM
SIGRA 4.59
02AE0049_2023_1_12_2_46_56_204.CFG
REM620
File path:
MPLPISO_OHSAS SERVER1 CPP_CPSU_FILE LISTM-103_TRIP REPORTS2023BFP-2 TRIPP ON MPTTRDR & EVENT02AE0049_2023_1_12_2_46_56_204.CFG
Start time: 12/01/2023 2:46:55.204 AM
Sample rate: 800 Hz
Value representation:primary
Record type: COMTRADE
ANNEXURE-A
REM620 - 2 - 12/01/2023 / 2:46:56.204 AM
13/01/2023 / 11:53:18 AM
SIGRA 4.59
02AE0049_2023_1_12_2_46_56_204.CFG
Time in ms Measuring Signal Instantaneous R.M.S.
Cursor 1: -553.3 K1:IL1 A -75.265 A 65.768 A
Cursor 2: 266.1 K1:IL2 B 6.2482 A 65.245 A
C2 - C1 819.4 K1:IL2 B - K1:IL1 A 81.5132 A -0.523 A
Trigger
12/01/2023
2:46:56.204 AM
t/s
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
K1:IL1 A/ A
0
20
40
t/s
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
K1:IL2 B/ A
0
20
40
t/s
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
K1:IL3 C/ A
0
20
40
DR-1
REM620 - 3 - 12/01/2023 / 2:46:56.204 AM
13/01/2023 / 11:53:18 AM
SIGRA 4.59
02AE0049_2023_1_12_2_46_56_204.CFG
t/s
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
AUTO CLS CMD _DCS
BRKR IN SERVICE
BRKR ON
RESTRT INHIBIT
RESTRT ENABLE
49_BLK_RESTRT
REM620 - 1 - 12/01/2023 / 2:51:33.379 AM
13/01/2023 / 11:50:39 AM
SIGRA 4.59
02AE0050_2023_1_12_2_51_33_379.CFG
REM620
File path:
MPLPISO_OHSAS SERVER1 CPP_CPSU_FILE LISTM-103_TRIP REPORTS2023BFP-2 TRIPP ON MPTTRDR & EVENT02AE0050_2023_1_12_2_51_33_379.CFG
Start time: 12/01/2023 2:51:32.379 AM
Sample rate: 800 Hz
Value representation:primary
Record type: COMTRADE
REM620 - 2 - 12/01/2023 / 2:51:33.379 AM
13/01/2023 / 11:50:40 AM
SIGRA 4.59
02AE0050_2023_1_12_2_51_33_379.CFG
Time in ms Measuring Signal Instantaneous R.M.S.
Cursor 1: -0.0 K1:IL1 A -18.457 A 77.011 A
Cursor 2: -629.5 K1:IL1 A -10.220 A 76.873 A
C2 - C1 -629.5 K1:IL1 A - K1:IL1 A 8.237 A -0.138 A
Trigger
12/01/2023
2:51:33.379 AM
t/s
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
K1:IL1 A/ A
0
25
50
t/s
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
K1:IL2 B/ A
0
25
50
t/s
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
K1:IL3 C/ A
0
25
50
DR-2
REM620 - 3 - 12/01/2023 / 2:51:33.379 AM
13/01/2023 / 11:50:40 AM
SIGRA 4.59
02AE0050_2023_1_12_2_51_33_379.CFG
t/s
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
SPRING CHRGED
BRKR IN SERVICE
BRKR ON
RESTRT INHIBIT
49_BLK_RESTRT
49_ALARM
REM620 - 1 - 12/01/2023 / 2:52:04.924 AM
13/01/2023 / 11:48:30 AM
SIGRA 4.59
02AE0051_2023_1_12_2_52_4_924.CFG
REM620
File path:
MPLPISO_OHSAS SERVER1 CPP_CPSU_FILE LISTM-103_TRIP REPORTS2023BFP-2 TRIPP ON MPTTRDR & EVENT02AE0051_2023_1_12_2_52_4_924.CFG
Start time: 12/01/2023 2:52:03.924 AM
Sample rate: 800 Hz
Value representation:primary
Record type: COMTRADE
REM620 - 2 - 12/01/2023 / 2:52:04.924 AM
13/01/2023 / 11:48:31 AM
SIGRA 4.59
02AE0051_2023_1_12_2_52_4_924.CFG
Time in ms Measuring Signal Instantaneous R.M.S.
Cursor 1: -1000.0 K1:IL1 A -104.30 A 26.074 A
Cursor 2: 0.0 K1:IL1 A -109.28 A 77.244 A
C2 - C1 1000.0 K1:IL1 A - K1:IL1 A -4.98 A 51.170 A
Trigger
12/01/2023
2:52:04.924 AM
t/s
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
K1:IL1 A/ A
0
25
50
t/s
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
K1:IL2 B/ A
0
25
50
t/s
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
K1:IL3 C/ A
0
25
50
DR-3
REM620 - 3 - 12/01/2023 / 2:52:04.924 AM
13/01/2023 / 11:48:31 AM
SIGRA 4.59
02AE0051_2023_1_12_2_52_4_924.CFG
t/s
-0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8
DCS I/L FOR MANUAL ST
SPRING CHRGED
BRKR IN SERVICE
BRKR OFF
BRKR ON
RESTRT INHIBIT
49_OPERATE
49_BLK_RESTRT
49_ALARM
46_START

More Related Content

Similar to Abnormality Reposrt_BFP2 _120123.pdf

RTG19_CircuitDiagram_REVB (2).pdf
RTG19_CircuitDiagram_REVB (2).pdfRTG19_CircuitDiagram_REVB (2).pdf
RTG19_CircuitDiagram_REVB (2).pdf
JrMerlinCabato2
 

Similar to Abnormality Reposrt_BFP2 _120123.pdf (20)

Protection settings calculation
Protection settings calculationProtection settings calculation
Protection settings calculation
 
RELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdfRELAY ETTING CALCULATION REV-A (DG-298).pdf
RELAY ETTING CALCULATION REV-A (DG-298).pdf
 
EL300B CATERPILLAR EXCAVATOR PARTS CATALOG MANUAL SN 3FJ
EL300B CATERPILLAR EXCAVATOR PARTS CATALOG MANUAL SN 3FJEL300B CATERPILLAR EXCAVATOR PARTS CATALOG MANUAL SN 3FJ
EL300B CATERPILLAR EXCAVATOR PARTS CATALOG MANUAL SN 3FJ
 
ABB Flame Proof motors catalogue
ABB Flame Proof motors catalogueABB Flame Proof motors catalogue
ABB Flame Proof motors catalogue
 
Infra control systems price list and catalogue 1
Infra control systems price list and catalogue 1Infra control systems price list and catalogue 1
Infra control systems price list and catalogue 1
 
EL300 CATERPILLAR EXCAVATOR PARTS CATALOG MANUAL 4NF
EL300 CATERPILLAR EXCAVATOR PARTS CATALOG MANUAL 4NFEL300 CATERPILLAR EXCAVATOR PARTS CATALOG MANUAL 4NF
EL300 CATERPILLAR EXCAVATOR PARTS CATALOG MANUAL 4NF
 
Notam
NotamNotam
Notam
 
PM Performamnec report- Jan'23.pptx
PM Performamnec report- Jan'23.pptxPM Performamnec report- Jan'23.pptx
PM Performamnec report- Jan'23.pptx
 
Cataloge schneider acb masterpact
Cataloge schneider acb masterpactCataloge schneider acb masterpact
Cataloge schneider acb masterpact
 
Cataloge schneider acb masterpact
Cataloge schneider acb masterpactCataloge schneider acb masterpact
Cataloge schneider acb masterpact
 
RTG19_CircuitDiagram_REVB (2).pdf
RTG19_CircuitDiagram_REVB (2).pdfRTG19_CircuitDiagram_REVB (2).pdf
RTG19_CircuitDiagram_REVB (2).pdf
 
Appron feeder common ckt-diagram
Appron feeder common ckt-diagramAppron feeder common ckt-diagram
Appron feeder common ckt-diagram
 
132kv-substation-settings_compress.pdf
132kv-substation-settings_compress.pdf132kv-substation-settings_compress.pdf
132kv-substation-settings_compress.pdf
 
QSFP28-100G-SR4-T01#111001.pdf
QSFP28-100G-SR4-T01#111001.pdfQSFP28-100G-SR4-T01#111001.pdf
QSFP28-100G-SR4-T01#111001.pdf
 
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdfqsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
 
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdfqsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
qsfp28-100g-sr4-850nm-100m-optical-transceiver-111001.pdf
 
Rav
RavRav
Rav
 
INTERFACING.ppt
INTERFACING.pptINTERFACING.ppt
INTERFACING.ppt
 
289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOAD
289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOAD289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOAD
289D3 CATERPILLAR COMPACT TRACK LOADER SERVICE REPAIR MANUAL LA9 PDF DOWNLOAD
 
10Gb/s DWDM XFP Transceiver Hot Pluggable, Duplex LC, +3.3V & +5V, 100GHz ITU...
10Gb/s DWDM XFP Transceiver Hot Pluggable, Duplex LC, +3.3V & +5V, 100GHz ITU...10Gb/s DWDM XFP Transceiver Hot Pluggable, Duplex LC, +3.3V & +5V, 100GHz ITU...
10Gb/s DWDM XFP Transceiver Hot Pluggable, Duplex LC, +3.3V & +5V, 100GHz ITU...
 

Recently uploaded

ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
Madan Karki
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
Kamal Acharya
 

Recently uploaded (20)

Quiz application system project report..pdf
Quiz application system project report..pdfQuiz application system project report..pdf
Quiz application system project report..pdf
 
"United Nations Park" Site Visit Report.
"United Nations Park" Site  Visit Report."United Nations Park" Site  Visit Report.
"United Nations Park" Site Visit Report.
 
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
The battle for RAG, explore the pros and cons of using KnowledgeGraphs and Ve...
 
Supermarket billing system project report..pdf
Supermarket billing system project report..pdfSupermarket billing system project report..pdf
Supermarket billing system project report..pdf
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
 
Lesson no16 application of Induction Generator in Wind.ppsx
Lesson no16 application of Induction Generator in Wind.ppsxLesson no16 application of Induction Generator in Wind.ppsx
Lesson no16 application of Induction Generator in Wind.ppsx
 
Lab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docxLab Manual Arduino UNO Microcontrollar.docx
Lab Manual Arduino UNO Microcontrollar.docx
 
BORESCOPE INSPECTION for engins CFM56.pdf
BORESCOPE INSPECTION for engins CFM56.pdfBORESCOPE INSPECTION for engins CFM56.pdf
BORESCOPE INSPECTION for engins CFM56.pdf
 
Multivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptxMultivibrator and its types defination and usges.pptx
Multivibrator and its types defination and usges.pptx
 
Piping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfPiping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdf
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 
AI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdfAI in Healthcare Innovative use cases and applications.pdf
AI in Healthcare Innovative use cases and applications.pdf
 
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdfInvolute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
Involute of a circle,Square, pentagon,HexagonInvolute_Engineering Drawing.pdf
 
Geometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdfGeometric constructions Engineering Drawing.pdf
Geometric constructions Engineering Drawing.pdf
 
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...Software Engineering - Modelling Concepts + Class Modelling + Building the An...
Software Engineering - Modelling Concepts + Class Modelling + Building the An...
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
 
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
Module-III Varried Flow.pptx GVF Definition, Water Surface Profile Dynamic Eq...
 
Artificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian ReasoningArtificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian Reasoning
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
Insurance management system project report.pdf
Insurance management system project report.pdfInsurance management system project report.pdf
Insurance management system project report.pdf
 

Abnormality Reposrt_BFP2 _120123.pdf

  • 1. ABNORMALITY REPORT OF BFP-2 (11KV, 1100kW, ANSALDO Make) Page 1 of 4 CPP-CPSU/E/M-103/2023 Date: 13/01/2023 Sub: Abnormality report of BFP-2 tripped on “49 (MPTTL)” on dated 12/01/2023 Date & Time of Event: BFP-2 tripped at 03:52:05 Hrs. on 12/01/2023. Effect on Plant:  Nil Description of events:  Before event, BFP-2 was running for TG-1 and BFP-1 was on standby.  At 03:46:56.204 thermal content exceed alarm came on BFP-2 relay.  At 03:52:04.924 relay gave tripping command (86B-self reset) on 49 (Thermal O/L-MPTTR) and BFP-2 motor tripped. Subsequently, at 03:52:08.582 trip command from DCS operated.  Process started BFP-2 again at 04:04:59.904, but at 04:41:07:340 BFP-2 tripped on trip command from DCS (front journal bearing temperature high). Relay events: BFP-2 Tripped on “49- Thermal Overload”: Date & Time Signal name Status Additional info Cumulative Time 03:46:56:204 3Ith>M(1) BLK_RESTART True Thermal content exceeded alarm. 0 03:46:56:204 MV(4) Q4 True Restart Inhibit 0 03:46:56:204 MV(4) Q5 False Restart Enable 0 03:51:33:379 3Ith>M(1) ALARM True 00:04:37.175 03:52:04:924 3Ith>M(1) OPERATE True 49- Thermal O/L Operated 00:05:08.720 03:52:04:924 Master Trip(2) TRIP True 86B 00:05:08.720 03:52:04:924 MV(2) Q5 True 86B OPTD 00:05:08.720
  • 2. ABNORMALITY REPORT OF BFP-2 (11KV, 1100kW, ANSALDO Make) Page 2 of 4 03:52:04:924 MV(3) Q3 True 49_OPTD (TH O/L) 00:05:08.720 03:52:04:987 MV(1) Q8 False BKR ON 00:05:08.783 03:52:04:992 MV(1) Q3 True BREAKER OFF 00:05:08.788 03:52:05:014 MV(3) Q3 False 49_OPTD (TH O/L) 00:05:08.810 03:52:08:582 MV(1) Q6 True PR/B/W TEM HIGH TRIP 00:05:12.378 03:52:10:532 MV(1) Q6 False PR/B/W TEM HIGH TRIP 00:05:14.328 03:56:02:859 MV(4) Q5 RESTRT ENABLE 00:09:06.655 04:04:59:904 MV(1) Q8 True BKR ON 00:18:03.700 04:04:59:919 3I>(1) START L1,L2 00:18:03.715 04:04:59:927 3I(1) HIGH_ALARM True 00:18:03.723 04:04:59:927 3I(1) HIGH_WARN True 00:18:03.723 04:05:01:334 MV(2) Q2 False CLS/ON CMD FM DCS 00:18:05.130 04:41:07:340 MV(2) Q3 True OFF/TRIP CMD FM DCS 00:54:11.136 04:41:07:380 MV(1) Q6 True PR/B/W TEM HIGH TRIP 00:54:11.176 04:41:07:401 I<->O CB(1) POSITION open CBXCBR1 switch position 00:54:11.197 04:41:07:403 CBCM(1) NO_OPR 22 Breaker Counter 00:54:11.199 04:41:07:403 MV(1) Q8 False BKR ON 00:54:11.199 04:41:07:405 MV(1) Q3 True BREAKER OFF 00:54:11.201 04:41:07:408 I<->O CB(1) ENA_CLOSE True 00:54:11.204 04:41:08:838 MV(2) Q3 False OFF/TRIP CMD FM DCS 00:54:12.634 Analysis:  BFP-2 tripped on thermal after running 05 minutes at 65A-78A. Motor restart blocked by relay for 04 minutes as per relay thermal curve.
  • 3. ABNORMALITY REPORT OF BFP-2 (11KV, 1100kW, ANSALDO Make) Page 3 of 4 Oscillographic Record : Attached in Annex-A, retrieved from REM-620 of BFP-2 Remedial action:  Suggestion given for provision of tag/alarm for motor tripped on "Thermal overload" at DCS for BFP motors vide suggestion No.: 14004 on dated 12/10/2022. QEHSEn (ISO 14001, 45001, 9001 & 50001) related impact:  Nil
  • 4. REM620 - 1 - 12/01/2023 / 2:46:56.204 AM 13/01/2023 / 11:53:17 AM SIGRA 4.59 02AE0049_2023_1_12_2_46_56_204.CFG REM620 File path: MPLPISO_OHSAS SERVER1 CPP_CPSU_FILE LISTM-103_TRIP REPORTS2023BFP-2 TRIPP ON MPTTRDR & EVENT02AE0049_2023_1_12_2_46_56_204.CFG Start time: 12/01/2023 2:46:55.204 AM Sample rate: 800 Hz Value representation:primary Record type: COMTRADE ANNEXURE-A
  • 5. REM620 - 2 - 12/01/2023 / 2:46:56.204 AM 13/01/2023 / 11:53:18 AM SIGRA 4.59 02AE0049_2023_1_12_2_46_56_204.CFG Time in ms Measuring Signal Instantaneous R.M.S. Cursor 1: -553.3 K1:IL1 A -75.265 A 65.768 A Cursor 2: 266.1 K1:IL2 B 6.2482 A 65.245 A C2 - C1 819.4 K1:IL2 B - K1:IL1 A 81.5132 A -0.523 A Trigger 12/01/2023 2:46:56.204 AM t/s -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 K1:IL1 A/ A 0 20 40 t/s -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 K1:IL2 B/ A 0 20 40 t/s -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 K1:IL3 C/ A 0 20 40 DR-1
  • 6. REM620 - 3 - 12/01/2023 / 2:46:56.204 AM 13/01/2023 / 11:53:18 AM SIGRA 4.59 02AE0049_2023_1_12_2_46_56_204.CFG t/s -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 AUTO CLS CMD _DCS BRKR IN SERVICE BRKR ON RESTRT INHIBIT RESTRT ENABLE 49_BLK_RESTRT
  • 7. REM620 - 1 - 12/01/2023 / 2:51:33.379 AM 13/01/2023 / 11:50:39 AM SIGRA 4.59 02AE0050_2023_1_12_2_51_33_379.CFG REM620 File path: MPLPISO_OHSAS SERVER1 CPP_CPSU_FILE LISTM-103_TRIP REPORTS2023BFP-2 TRIPP ON MPTTRDR & EVENT02AE0050_2023_1_12_2_51_33_379.CFG Start time: 12/01/2023 2:51:32.379 AM Sample rate: 800 Hz Value representation:primary Record type: COMTRADE
  • 8. REM620 - 2 - 12/01/2023 / 2:51:33.379 AM 13/01/2023 / 11:50:40 AM SIGRA 4.59 02AE0050_2023_1_12_2_51_33_379.CFG Time in ms Measuring Signal Instantaneous R.M.S. Cursor 1: -0.0 K1:IL1 A -18.457 A 77.011 A Cursor 2: -629.5 K1:IL1 A -10.220 A 76.873 A C2 - C1 -629.5 K1:IL1 A - K1:IL1 A 8.237 A -0.138 A Trigger 12/01/2023 2:51:33.379 AM t/s -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 K1:IL1 A/ A 0 25 50 t/s -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 K1:IL2 B/ A 0 25 50 t/s -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 K1:IL3 C/ A 0 25 50 DR-2
  • 9. REM620 - 3 - 12/01/2023 / 2:51:33.379 AM 13/01/2023 / 11:50:40 AM SIGRA 4.59 02AE0050_2023_1_12_2_51_33_379.CFG t/s -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 SPRING CHRGED BRKR IN SERVICE BRKR ON RESTRT INHIBIT 49_BLK_RESTRT 49_ALARM
  • 10. REM620 - 1 - 12/01/2023 / 2:52:04.924 AM 13/01/2023 / 11:48:30 AM SIGRA 4.59 02AE0051_2023_1_12_2_52_4_924.CFG REM620 File path: MPLPISO_OHSAS SERVER1 CPP_CPSU_FILE LISTM-103_TRIP REPORTS2023BFP-2 TRIPP ON MPTTRDR & EVENT02AE0051_2023_1_12_2_52_4_924.CFG Start time: 12/01/2023 2:52:03.924 AM Sample rate: 800 Hz Value representation:primary Record type: COMTRADE
  • 11. REM620 - 2 - 12/01/2023 / 2:52:04.924 AM 13/01/2023 / 11:48:31 AM SIGRA 4.59 02AE0051_2023_1_12_2_52_4_924.CFG Time in ms Measuring Signal Instantaneous R.M.S. Cursor 1: -1000.0 K1:IL1 A -104.30 A 26.074 A Cursor 2: 0.0 K1:IL1 A -109.28 A 77.244 A C2 - C1 1000.0 K1:IL1 A - K1:IL1 A -4.98 A 51.170 A Trigger 12/01/2023 2:52:04.924 AM t/s -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 K1:IL1 A/ A 0 25 50 t/s -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 K1:IL2 B/ A 0 25 50 t/s -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 K1:IL3 C/ A 0 25 50 DR-3
  • 12. REM620 - 3 - 12/01/2023 / 2:52:04.924 AM 13/01/2023 / 11:48:31 AM SIGRA 4.59 02AE0051_2023_1_12_2_52_4_924.CFG t/s -0.8 -0.6 -0.4 -0.2 0.0 0.2 0.4 0.6 0.8 DCS I/L FOR MANUAL ST SPRING CHRGED BRKR IN SERVICE BRKR OFF BRKR ON RESTRT INHIBIT 49_OPERATE 49_BLK_RESTRT 49_ALARM 46_START