ABNORMALITY REPORT -2023
Page 1 of 7
CPSU/Elect./M-103/10/2023
Date: 23.06.2023
Sub: Abnormality report for TG-1 tripped on Under frequency and GT unloaded
to FSNL (Reverse power relay operated) on 15.06.2023.
Date& Time of Event: On 15/06/23 at 17:04:08 hrs.
Effect on Plant: Maximum demand reached to 47.092 MVA (Contract demand
30.0 MVA).
Description of events:
 Before event, TG-1 was running @ at 11.0 MW (APR mode), GT was running
@ 25.0 MW (PS mode), import was @15.0 MW. Total plant load was @
51.0MW. TG-2 and Boiler-4 were under shutdown. Boiler-1,2 & 3 were
running.
 MRS 11 KV Bus-B Incomer feeder circuit breaker tripped on "HV CB Open"
contact sensed by REC 670 relay falsely.
 Hence, at 17:04:13:342 hrs. TG-1 isolated from grid (CCB open contact)
came as per scheme and APR to AFR change over took place successfully.
However, continuous hunting was observed in frequency and load; hence TG
manual lift control command given to 50% by process group.
 TG-1 Turbine tripped on under frequency stage-2 at 17:06:15:615 hrs.
 At 17:06:26:51 TG1 generator circuit breaker & field circuit breaker tripped
on Under voltage stage 2.
 MRS Bus-B became dead hence CPP 11 KV INC-1 tipped on u/v at
17:06:28:494 and Auto change over took place in CPP 11 KV swgr
successfully..
 No any change over took place in downstream of swgrs of CPP and CPSU.
 At 17:06:27.055, TK Fan-1 & 3 tripped on overload. Process tried to increase
load on GT to maintain import but GT load was continuously on decreasing
trend and at 17:10:32:064 GT tripped on reverse power stage-1 (FSNL) due
to TKE fan 1 & 3 tripped on O/L as per logic. Active power at time of tripping
registered : 2.05MW, Reactive power : 1.56 MVAR.
ABNORMALITY REPORT -2023
Page 2 of 7
 At 17:18:34:052 GT synchronized after clearance from process.
 At 18:15:54:563 TG#1 synchronized after clearance from process.
TG-1 & GT GPR Relay events:
Time Duration Event Setting
17:04:13:342 00:00:00.000
TG-1 isolated from
Grid_ON.
17:05:52:607 00:01:39.265 81-1 Picked up_ ON
17:05:53:753 00:01:40.411 81-1 Picked up_ Off
17:06:02:766 00:01:49.424 81-1 Picked up_ ON 48 HZ & 1 Sec.
17:06:04:828 00:01:51.486 81-2 Picked up_ ON
17:06:14:826 00:02:01.484 81-2 Trip_ ON 47.5 HZ &10Sec
17:06:15:615 00:02:02.273 86T Trip_ ON
17:06:21:791 00:02:08.449
27-1 Under voltage
V < picked up_ ON
87.3 % V
17:06:22:046 00:02:08.704
24-1 v/f> warning
stage_ ON
V/F -1.10 & 10
sec.
17:06:22:691 00:02:09.349
27-1 Under voltage
V < trip_ ON
17:06:23:052 00:02:09.710
27-2 Under voltage
V << Picked up_ ON
17:06:24.000
BFP-1 Tripped on
process from DCS
17:06:26:051 00:02:12.709
27-2 Under voltage
V << Trip_ ON
83.6 % & 3.09
sec.
17:06:26:051 00:02:12.709
27-2 Under voltage
V << Trip_ ON
83.6 % & 3.09
sec.
17:06:26:078 00:02:12.736 86 U1U2 optd_ ON
17:06:26:145 00:02:12.803
TG1_FLCB&EXCON_
OFF
17:06:26:190 00:02:12.848
TG1_52G1 Close_
OFF
17:06:27:055 00:02:13.713
TK fan-3 trip on
over load
GT DCS Event
ABNORMALITY REPORT -2023
Page 3 of 7
17:06:27:055 00:02:13.658
TK fan-1 trip on
over load
GT DCS Event
17:06:28:494
00:02:15.152 11kV IC-1 Tripped
on 27-1& BC Closed
53% @1000ms
17:10:22:066 00:06:08.724
GT_Reverse power
picked_up_ON
17:10:32:064 00:06:18.722
GT_Reverse power
trip_ON
-1.5% @ 10 secs
17:10:32:065 00:06:18.723
GT_86 G1 trip
relay_optd_ON
17:10:32:068 00:06:18.726
GT_86 G2 trip
relay_optd_ON
17:10:32:151 00:06:18.809 GT_52G1 Open_ON
17:12:02:000
00:07:48.658
TK fan#2 started
and clearance given
for Sync.
GT DCS Event
17:14:16:962 00:10:03.620
TG-1 isolated from
Grid_OFF.
17:18:34:052 00:14:20.710 GT_52G1 Close_ON GT Syncronised
17:40:14:231
00:36:00.889 11kV IC-1 MCO & BC
OFF
18:15:54:563 01:11:41.221
TG-1 _52G1
Close_ON
TG-1
Syncronised
Analysis:
 TG#1 came on AFR as per CCB open contact received from MRS as per
scheme. Hunting in frequency was observed and subsequently Turbine
tripped on 86T relay actuated from 81-2 (47.5 HZ &10Sec). Further
Generator CB & Field CB tripped on 27-2 (83.6 % & 3 sec.)
 Since MRS Bus –B was isolated from MT-02 and TG#1was the only
generation source available, after tripping of TG1 MRS Bus B got dead and
11kV I/C-1 of CPP that is from MRS Bus B got tripped on under voltage (27-
1, 53% @1000ms). A/C/O taken place successfully as per scheme.
 During frequency hunting, running TK Fan-1 & Fan-3 tripped on overload.
Both motors were on MRS Bus –B on which TG#1 was connected. Hence,
motors were tripped during frequency hunting. Due to unavailability of TK-
ABNORMALITY REPORT -2023
Page 4 of 7
1/ 2 & 3 GT unload command given after 15 sec by MARK-VI as per logic.
Auto start command of standby TK-2 was after 60secs from running fan trip,
as per logic in MARK VI.
 Refer Annexures for Trend view.
Remedial action:
 System worked as per scheme.
QEHSEn (ISO 14001, 45001, 9001 & 50001) related impact:
 Nil
Sr. EE(AAS)
Through:
SM(PLP)------->SM(BGS) ------->CM(KKB) ------->AGM(RPT)
BFP-1 tripped from DCS on process at 17:06:16.591 as per event list from REM620.
45
46
47
48
49
50
51
52
53
54
55
0
10
20
30
40
50
60
17:02:01
17:02:11
17:02:21
17:02:31
17:02:41
17:02:51
17:03:01
17:03:11
17:03:21
17:03:31
17:03:41
17:03:51
17:04:01
17:04:11
17:04:21
17:04:31
17:04:41
17:04:51
17:05:01
17:05:11
17:05:21
17:05:31
17:05:41
17:05:51
17:06:01
17:06:11
17:06:21
17:06:31
17:06:41
17:06:51
17:07:01
17:07:11
17:07:21
17:07:31
17:07:41
17:07:51
17:08:01
17:08:11
17:08:21
17:08:31
17:08:41
17:08:51
17:09:01
17:09:11
17:09:21
17:09:31
17:09:41
17:09:51
17:10:01
17:10:11
17:10:21
17:10:31
17:10:41
17:10:51
17:11:01
17:11:11
17:11:21
17:11:31
17:11:41
17:11:51
17:12:01
17:12:11
17:12:21
17:12:31
17:12:41
17:12:51
17:13:01
17:13:11
17:13:21
17:13:31
17:13:41
17:13:51
17:14:01
17:14:11
17:14:21
17:14:31
17:14:41
17:14:51
17:15:01
17:15:11
17:15:21
17:15:31
17:15:41
17:15:51
17:16:01
17:16:11
17:16:21
17:16:31
15/05/2023: TG1 Turbine tripped on 81-2 (47.5@10s) followed by GCB tripped on 27-2 (83.6%@3.09s)
GT trunloaded to FSNL by TK1 & TK3 tripping on overload.
Import Power GT Load TG#1 Load Total Load TG#1 Frequency
GT Unloaded To FSNL
CCB OPEN To TG#1,
TG1 changed to AFR
86T ON_due to 81-2
Turbine Tripped
TG-1 GCB Tripped on 27-2
ACO in CPP 11kv & MRS-B
o/g feeders
Annexure-A
Note: Refer secondary axis for TG#1 frequency trend

More Related Content

Similar to Abormality Report_TG Tripped

HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014
Kanai Banerjee
 
Report BQPS II- Saad Janjua
Report BQPS II- Saad JanjuaReport BQPS II- Saad Janjua
Report BQPS II- Saad Janjua
Saad Janjua
 

Similar to Abormality Report_TG Tripped (20)

HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014
 
Tarjeta para montacargas eléctricos ev1.pdf
Tarjeta para montacargas eléctricos ev1.pdfTarjeta para montacargas eléctricos ev1.pdf
Tarjeta para montacargas eléctricos ev1.pdf
 
DC Component of Fault Current
DC Component of Fault CurrentDC Component of Fault Current
DC Component of Fault Current
 
132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report 132 KV GSS NPH jodhpur treaning report
132 KV GSS NPH jodhpur treaning report
 
132kv-substation-settings_compress.pdf
132kv-substation-settings_compress.pdf132kv-substation-settings_compress.pdf
132kv-substation-settings_compress.pdf
 
Auto Control for Three Phase Induction Motor
Auto Control for Three Phase Induction MotorAuto Control for Three Phase Induction Motor
Auto Control for Three Phase Induction Motor
 
Report BQPS II- Saad Janjua
Report BQPS II- Saad JanjuaReport BQPS II- Saad Janjua
Report BQPS II- Saad Janjua
 
Fuzzy Based Analysis of Inverter Fed Micro Grid in Islanding Operation-Experi...
Fuzzy Based Analysis of Inverter Fed Micro Grid in Islanding Operation-Experi...Fuzzy Based Analysis of Inverter Fed Micro Grid in Islanding Operation-Experi...
Fuzzy Based Analysis of Inverter Fed Micro Grid in Islanding Operation-Experi...
 
MTA GENERATOR PROTECTION .PPT.pptx
MTA GENERATOR PROTECTION .PPT.pptxMTA GENERATOR PROTECTION .PPT.pptx
MTA GENERATOR PROTECTION .PPT.pptx
 
IRJET- MATLAB Simulation and Analysis of Back-Up Power Supply
IRJET- MATLAB Simulation and Analysis of Back-Up Power SupplyIRJET- MATLAB Simulation and Analysis of Back-Up Power Supply
IRJET- MATLAB Simulation and Analysis of Back-Up Power Supply
 
Electrical power engineering test (1)
Electrical power engineering test (1)Electrical power engineering test (1)
Electrical power engineering test (1)
 
Rav
RavRav
Rav
 
Electric fault at forsmark nuclear power plant
Electric fault at forsmark nuclear power plantElectric fault at forsmark nuclear power plant
Electric fault at forsmark nuclear power plant
 
ONGC Summer Training Report
ONGC Summer Training ReportONGC Summer Training Report
ONGC Summer Training Report
 
133 english correcc
133  english correcc133  english correcc
133 english correcc
 
19212757
1921275719212757
19212757
 
anti islanding technology(passive)
anti islanding technology(passive)anti islanding technology(passive)
anti islanding technology(passive)
 
Relay & Protection
Relay  & ProtectionRelay  & Protection
Relay & Protection
 
St3 1k va-3kva-ups-service-manual
St3 1k va-3kva-ups-service-manualSt3 1k va-3kva-ups-service-manual
St3 1k va-3kva-ups-service-manual
 
Emergency generator sizing and motor starting analysis
Emergency generator sizing and motor starting analysisEmergency generator sizing and motor starting analysis
Emergency generator sizing and motor starting analysis
 

Recently uploaded

Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
BalamuruganV28
 
Microkernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemMicrokernel in Operating System | Operating System
Microkernel in Operating System | Operating System
Sampad Kar
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
Kamal Acharya
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
Madan Karki
 

Recently uploaded (20)

Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas SachpazisSeismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
Seismic Hazard Assessment Software in Python by Prof. Dr. Costas Sachpazis
 
Final DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manualFinal DBMS Manual (2).pdf final lab manual
Final DBMS Manual (2).pdf final lab manual
 
Online book store management system project.pdf
Online book store management system project.pdfOnline book store management system project.pdf
Online book store management system project.pdf
 
Supermarket billing system project report..pdf
Supermarket billing system project report..pdfSupermarket billing system project report..pdf
Supermarket billing system project report..pdf
 
Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...
Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...
Vip ℂall Girls Karkardooma Phone No 9999965857 High Profile ℂall Girl Delhi N...
 
Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1Research Methodolgy & Intellectual Property Rights Series 1
Research Methodolgy & Intellectual Property Rights Series 1
 
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptxSLIDESHARE PPT-DECISION MAKING METHODS.pptx
SLIDESHARE PPT-DECISION MAKING METHODS.pptx
 
Theory for How to calculation capacitor bank
Theory for How to calculation capacitor bankTheory for How to calculation capacitor bank
Theory for How to calculation capacitor bank
 
Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2Research Methodolgy & Intellectual Property Rights Series 2
Research Methodolgy & Intellectual Property Rights Series 2
 
Piping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdfPiping and instrumentation diagram p.pdf
Piping and instrumentation diagram p.pdf
 
Artificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian ReasoningArtificial Intelligence Bayesian Reasoning
Artificial Intelligence Bayesian Reasoning
 
Lesson no16 application of Induction Generator in Wind.ppsx
Lesson no16 application of Induction Generator in Wind.ppsxLesson no16 application of Induction Generator in Wind.ppsx
Lesson no16 application of Induction Generator in Wind.ppsx
 
Microkernel in Operating System | Operating System
Microkernel in Operating System | Operating SystemMicrokernel in Operating System | Operating System
Microkernel in Operating System | Operating System
 
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
NEWLETTER FRANCE HELICES/ SDS SURFACE DRIVES - MAY 2024
 
Interfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdfInterfacing Analog to Digital Data Converters ee3404.pdf
Interfacing Analog to Digital Data Converters ee3404.pdf
 
Online crime reporting system project.pdf
Online crime reporting system project.pdfOnline crime reporting system project.pdf
Online crime reporting system project.pdf
 
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdfALCOHOL PRODUCTION- Beer Brewing Process.pdf
ALCOHOL PRODUCTION- Beer Brewing Process.pdf
 
Introduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and ApplicationsIntroduction to Heat Exchangers: Principle, Types and Applications
Introduction to Heat Exchangers: Principle, Types and Applications
 
Raashid final report on Embedded Systems
Raashid final report on Embedded SystemsRaashid final report on Embedded Systems
Raashid final report on Embedded Systems
 
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdflitvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
litvinenko_Henry_Intrusion_Hong-Kong_2024.pdf
 

Abormality Report_TG Tripped

  • 1. ABNORMALITY REPORT -2023 Page 1 of 7 CPSU/Elect./M-103/10/2023 Date: 23.06.2023 Sub: Abnormality report for TG-1 tripped on Under frequency and GT unloaded to FSNL (Reverse power relay operated) on 15.06.2023. Date& Time of Event: On 15/06/23 at 17:04:08 hrs. Effect on Plant: Maximum demand reached to 47.092 MVA (Contract demand 30.0 MVA). Description of events:  Before event, TG-1 was running @ at 11.0 MW (APR mode), GT was running @ 25.0 MW (PS mode), import was @15.0 MW. Total plant load was @ 51.0MW. TG-2 and Boiler-4 were under shutdown. Boiler-1,2 & 3 were running.  MRS 11 KV Bus-B Incomer feeder circuit breaker tripped on "HV CB Open" contact sensed by REC 670 relay falsely.  Hence, at 17:04:13:342 hrs. TG-1 isolated from grid (CCB open contact) came as per scheme and APR to AFR change over took place successfully. However, continuous hunting was observed in frequency and load; hence TG manual lift control command given to 50% by process group.  TG-1 Turbine tripped on under frequency stage-2 at 17:06:15:615 hrs.  At 17:06:26:51 TG1 generator circuit breaker & field circuit breaker tripped on Under voltage stage 2.  MRS Bus-B became dead hence CPP 11 KV INC-1 tipped on u/v at 17:06:28:494 and Auto change over took place in CPP 11 KV swgr successfully..  No any change over took place in downstream of swgrs of CPP and CPSU.  At 17:06:27.055, TK Fan-1 & 3 tripped on overload. Process tried to increase load on GT to maintain import but GT load was continuously on decreasing trend and at 17:10:32:064 GT tripped on reverse power stage-1 (FSNL) due to TKE fan 1 & 3 tripped on O/L as per logic. Active power at time of tripping registered : 2.05MW, Reactive power : 1.56 MVAR.
  • 2. ABNORMALITY REPORT -2023 Page 2 of 7  At 17:18:34:052 GT synchronized after clearance from process.  At 18:15:54:563 TG#1 synchronized after clearance from process. TG-1 & GT GPR Relay events: Time Duration Event Setting 17:04:13:342 00:00:00.000 TG-1 isolated from Grid_ON. 17:05:52:607 00:01:39.265 81-1 Picked up_ ON 17:05:53:753 00:01:40.411 81-1 Picked up_ Off 17:06:02:766 00:01:49.424 81-1 Picked up_ ON 48 HZ & 1 Sec. 17:06:04:828 00:01:51.486 81-2 Picked up_ ON 17:06:14:826 00:02:01.484 81-2 Trip_ ON 47.5 HZ &10Sec 17:06:15:615 00:02:02.273 86T Trip_ ON 17:06:21:791 00:02:08.449 27-1 Under voltage V < picked up_ ON 87.3 % V 17:06:22:046 00:02:08.704 24-1 v/f> warning stage_ ON V/F -1.10 & 10 sec. 17:06:22:691 00:02:09.349 27-1 Under voltage V < trip_ ON 17:06:23:052 00:02:09.710 27-2 Under voltage V << Picked up_ ON 17:06:24.000 BFP-1 Tripped on process from DCS 17:06:26:051 00:02:12.709 27-2 Under voltage V << Trip_ ON 83.6 % & 3.09 sec. 17:06:26:051 00:02:12.709 27-2 Under voltage V << Trip_ ON 83.6 % & 3.09 sec. 17:06:26:078 00:02:12.736 86 U1U2 optd_ ON 17:06:26:145 00:02:12.803 TG1_FLCB&EXCON_ OFF 17:06:26:190 00:02:12.848 TG1_52G1 Close_ OFF 17:06:27:055 00:02:13.713 TK fan-3 trip on over load GT DCS Event
  • 3. ABNORMALITY REPORT -2023 Page 3 of 7 17:06:27:055 00:02:13.658 TK fan-1 trip on over load GT DCS Event 17:06:28:494 00:02:15.152 11kV IC-1 Tripped on 27-1& BC Closed 53% @1000ms 17:10:22:066 00:06:08.724 GT_Reverse power picked_up_ON 17:10:32:064 00:06:18.722 GT_Reverse power trip_ON -1.5% @ 10 secs 17:10:32:065 00:06:18.723 GT_86 G1 trip relay_optd_ON 17:10:32:068 00:06:18.726 GT_86 G2 trip relay_optd_ON 17:10:32:151 00:06:18.809 GT_52G1 Open_ON 17:12:02:000 00:07:48.658 TK fan#2 started and clearance given for Sync. GT DCS Event 17:14:16:962 00:10:03.620 TG-1 isolated from Grid_OFF. 17:18:34:052 00:14:20.710 GT_52G1 Close_ON GT Syncronised 17:40:14:231 00:36:00.889 11kV IC-1 MCO & BC OFF 18:15:54:563 01:11:41.221 TG-1 _52G1 Close_ON TG-1 Syncronised Analysis:  TG#1 came on AFR as per CCB open contact received from MRS as per scheme. Hunting in frequency was observed and subsequently Turbine tripped on 86T relay actuated from 81-2 (47.5 HZ &10Sec). Further Generator CB & Field CB tripped on 27-2 (83.6 % & 3 sec.)  Since MRS Bus –B was isolated from MT-02 and TG#1was the only generation source available, after tripping of TG1 MRS Bus B got dead and 11kV I/C-1 of CPP that is from MRS Bus B got tripped on under voltage (27- 1, 53% @1000ms). A/C/O taken place successfully as per scheme.  During frequency hunting, running TK Fan-1 & Fan-3 tripped on overload. Both motors were on MRS Bus –B on which TG#1 was connected. Hence, motors were tripped during frequency hunting. Due to unavailability of TK-
  • 4. ABNORMALITY REPORT -2023 Page 4 of 7 1/ 2 & 3 GT unload command given after 15 sec by MARK-VI as per logic. Auto start command of standby TK-2 was after 60secs from running fan trip, as per logic in MARK VI.  Refer Annexures for Trend view. Remedial action:  System worked as per scheme. QEHSEn (ISO 14001, 45001, 9001 & 50001) related impact:  Nil Sr. EE(AAS) Through: SM(PLP)------->SM(BGS) ------->CM(KKB) ------->AGM(RPT) BFP-1 tripped from DCS on process at 17:06:16.591 as per event list from REM620.
  • 5. 45 46 47 48 49 50 51 52 53 54 55 0 10 20 30 40 50 60 17:02:01 17:02:11 17:02:21 17:02:31 17:02:41 17:02:51 17:03:01 17:03:11 17:03:21 17:03:31 17:03:41 17:03:51 17:04:01 17:04:11 17:04:21 17:04:31 17:04:41 17:04:51 17:05:01 17:05:11 17:05:21 17:05:31 17:05:41 17:05:51 17:06:01 17:06:11 17:06:21 17:06:31 17:06:41 17:06:51 17:07:01 17:07:11 17:07:21 17:07:31 17:07:41 17:07:51 17:08:01 17:08:11 17:08:21 17:08:31 17:08:41 17:08:51 17:09:01 17:09:11 17:09:21 17:09:31 17:09:41 17:09:51 17:10:01 17:10:11 17:10:21 17:10:31 17:10:41 17:10:51 17:11:01 17:11:11 17:11:21 17:11:31 17:11:41 17:11:51 17:12:01 17:12:11 17:12:21 17:12:31 17:12:41 17:12:51 17:13:01 17:13:11 17:13:21 17:13:31 17:13:41 17:13:51 17:14:01 17:14:11 17:14:21 17:14:31 17:14:41 17:14:51 17:15:01 17:15:11 17:15:21 17:15:31 17:15:41 17:15:51 17:16:01 17:16:11 17:16:21 17:16:31 15/05/2023: TG1 Turbine tripped on 81-2 (47.5@10s) followed by GCB tripped on 27-2 (83.6%@3.09s) GT trunloaded to FSNL by TK1 & TK3 tripping on overload. Import Power GT Load TG#1 Load Total Load TG#1 Frequency GT Unloaded To FSNL CCB OPEN To TG#1, TG1 changed to AFR 86T ON_due to 81-2 Turbine Tripped TG-1 GCB Tripped on 27-2 ACO in CPP 11kv & MRS-B o/g feeders Annexure-A Note: Refer secondary axis for TG#1 frequency trend