Team Performance
        Improvement: Special
           Challenges and
            Opportunities
       Aaron U. Bolin, Ph.D., CPT
        Patricia F. Butler, M.A.,
          & Mark Steele, M.A.
      U.S. Navy Human Performance Center


44th Annual Convention of the International Society
          for Performance Improvement
                    Dallas, Texas
                     April 2006
Agenda

• Background Brief
  - Definitions
  - Special Challenges and Opportunities
  - Hybrid model adapted for the analysis of teams
• Case Study Applications
  - Seabees
  - Navy Music
• Evaluations
Defining a Team

• A distinguishable set of two or more people who
  interact dynamically, interdependently, and
  adaptively toward a common and valued goal-
  objective-mission, who have each been assigned
  specific roles or functions to perform

        • Salas, Dickinson, Converse & Tannenbaum (1992)
Team as an Emergent System

• Configural: every piece matters
  - CAT <> CAP
• Emergent value > process loss by design
  - C + A + T = CAT
• Focus on the big rocks
  - The number of variables that impact team
    performance is virtually infinite. However, only a
    dozen or so factors make an appreciable difference.
The Promise of Teams

• Teams
  -   drive big performance gains
  -   tackle larger and more complex tasks
  -   specialization and divide labor
  -   self-manage tasks
  -   are more satisfying for the employees
Team Performance Paradox

• Teams with
  - average players often perform better than teams
    composed of star players
  - scarce resources often perform better than teams
    with abundant resources
  - higher incentives often have lower performance
  - the same number of people often perform worse
    than individuals
  - counterproductive sub-cultures create division and
    dissatisfaction
Special Challenges and Opportunities

• Challenges            • Opportunities
  - Levels of Measurement   - Cascading Performance

  - Culture and Norms       - Culture and Norms

  - Process Loss            - Process Gain

  - Team Life Cycle         - Mental Model
                              Development
Levels of Measurement

• Individual, Team, Organization
  - Different variables, different relationships
• Mapping aggregate business goals to
  individual performance is what HPI is all about
  - Slippage across levels is common
• Interventions must target appropriate level
  - Higher levels of analysis have farther reaching
    solutions
  - Higher level of analysis have higher potential for
    payback
Team Metrics Systems Should Be

-   Team/Unit Focused – org. group is the unit of analysis
-   Hierarchical – relevant to all levels of the organization
-   Expandable – drill down to specific areas of concern
-   Standardized – common set of measures across units
-   Interrelated – both leading and lagging indicators
-   Weighted – some measures are more important
-   Meaningful – must predict important outcomes
-   Vision Directed – contain a ‘should be’ element
-   Objective – hard measures rather than ‘gut feel’
Culture and Norms

• All performance takes place in a social setting
  - When the social situation is structured so that goals
    are interdependent, teams often emerge
• Counterproductive norms are common
  - Safety climate
  - Shunning rate-busters
  - Discrimination
• Sub-cultures may develop within teams
Potential Process Loss
                         Play #1: The Pick and Roll

        Call            Dribble                                 no
                                                     Covered?                    Shoot
GUARD




        Play          Around Pick

                                                        yes


                                                       Pass




               Set        Move to      Guard       yes Catch                no
                                                                Covered?         Shoot
               Pick      Open Spot    Covered?         Pass


                                         no                           yes

                                       Position
                                     for Rebound                     Pass
Individual Performance Requirements

• Guard                 • Forward
  -   Call plays          -   Set picks
  -   Dribble             -   Move to open positions
  -   Make decisions      -   Make decisions
  -   Pass                -   Position for rebound
  -   Shoot               -   Catch
                          -   Pass
                          -   Shoot
Team Performance Requirements
TEAM COMPETENCIES
                      Team                                                  Collective
                     cohesion                                               orientation

 Knowledge of                   Collective
                                                         Inter-positional                 Knowledge
teammates’ task                  efficacy                  knowledge                      about signs
  expectations
                                                                                           of stress

                                             Belief in the                                     Knowledge
Knowledge of                                importance of                                       about the
  teammates’                                  teamwork                                        components of
 performance
                                                                                                teamwork
characteristics




                  Team-Specific                                       Team-Generic
Team Lifecycle Performance Curve

              200
              180
              160
              140
Performance




              120
              100
               80
               60
               40
               20
                0
                                     Time
Gilbert’s Behavioral Engineering

                Information   Instrumentation   Motivation

Environmental      Data         Instruments     Incentives
  Supports

 Individual     Knowledge        Capacity        Motives
Repertory of
  Behavior
Human Performance Focus


                                           Organization
                   BUT ALSO
NOT JUST
                                    Processes          Policy
                                    Equipment        Information

                                              Team


                                              Unit

Individual
                                            Individual

             Primary Focus on Organizational / Enterprise Outcomes
Driskell et al. Team Performance Model
   POTENTIAL
                           PROCESS                    OUTCOME
(INPUT FACTORS)

INDIVIDUAL LEVEL
    FACTORS
Group member:
Skills
Status
Personality

                                           PROCESS
  GROUP LEVEL                                GAIN
    FACTORS
Group structure                                         GROUP
                       GROUP INTERACTION
Group Norms                                          PERFORM ANCE
                           PROCESS
Group Size

                                           PROCESS
ENVIRONM ENTAL                               LOSS
LEVEL FACTORS
Task characteristics
Rew ard structure
Level of
environmental stress
Hybrid Team Performance Model
                                                                                             Horizontal
Analysis Level                Input                   Process                  Output
                                                                                             Alignment
                                               · Within Role
                 · Knowledge
                                               Behavior
                                                                        · Task
  Individual     · Capacity
                                               · Extra-Role             Accomplishments
                                               Behavior
                 · Motives

                 · Team Structure & Size
                                               · Communication

                 · Norms / Culture                                      · Team
Team or Group
                                               · Coordination           Accomplishments

                 · Shared goals
                                               · Allocation of Effort

                 · Information & Materials     · Goals & Strategy

                 · Selection & Placement
                                               · Performance
Environmental                                  Measurement
                 · Instruments & Tools                                  · Business Results
  Supports

                 · Incentives / Consequences
                                               · Feedback
                 · Policy & Procedures

   Vertical
  Alignment
Case Study
What Seabees Provide
• Forward Presence             • Construction Support            • Crisis Response:
   – Exercise Related             – SRM Backlog Reduction           Force Enablers
     Construction (ERC)           – AT/FP upgrade                     – Contingency
   – Joint Forward Operating      – Critical infrastructure             Engineering
     Locations (JFOL)               improvements                      – OPLAN/CONPLAN
   – Range improvements                                                 support including
   – Humanitarian Aid                                                   Consequence
     projects                                                           Management (CM)
                                  Exercise        Disaster
                                  Related          Relief
                                Construction                     Limited
                     Humanitarian                               Regional
                       Action                                 Contingencies

             Forward-Deployed                                      Major Theater
                Engineers                                              War

      Requirements span the spectrum from Construction Skills to Combat Skills
Case Study: Seabee Teams

• Presenting problem: Lack of confidence in
  current assessments of operational readiness
  - Build a versatile construction team
     Make it able to build and repair most anything
     Make it ready to land anywhere within 72 hours
     Make it able to defend itself in a hostile environment
  - Predict its performance in the field with
    accuracy
     Multiple threat levels
     Multiple construction tasks
     Multiple environmental conditions
Alignment to Fleet Readiness
Fleet Readiness

Combatant CDR
Missions & Tasks                                                                  PROCESS MAPPING
                  JTF CDR                                                             IN WORK
               Missions & Tasks
    JMETL                          Group                 CFFC
                              Missions & Tasks
                    JTF                       Warfare CDR
                   NMETL                     Missions & Tasks
                                   Group
                                  NMETL                              Unit
                                                               Missions & Tasks
                                                 Warfare CDR
                                                  NMETL
                                                                    Unit
                                                                   NMETL

                                                                                        TRAINING
Measuring Team/Unit Readiness



                                      NMETLS /
                                       Mission


                   Budget              Planning



         Equipment            Manning          Training
        Requirements        Requirements     Requirements


 Actual                                                     Actual
                   Actual
Equipment                                                   Training
                   Manning
Phase I: Identify “As Is” Model

• As Is analysis will provide:
   - Comprehensive picture of current readiness model
       Readiness requirements - for each mission area, for each level
        of measurement
          • Are stated requirements comprehensive / adequate?
       Readiness criteria - standards to be met for each requirement
          • Are criteria clearly stated for each requirement?
          • Are criteria adequate to meet Seabee missions?
       Readiness assessments - tied to each requirement
          • Is performance measured & assessed for each
            requirement and at each organizational level?
          • Are assessments valid and reliable?
       Map where current gaps and missing links exist
Case Study: Seabee Teams

• In the course of reviewing ‘AS IS’ measures, a number
  of issues started to emerge
   -   Padded estimates
   -   Bad estimating standards
   -   Missing training / training with no requirements
   -   Lack of objective measures
   -   Some reports are not credible
   -   Can do culture unwillingness to report deficiencies
   -   Some equipment is seriously outdated
   -   Lack of measurement integration
   -   Measurement policies do not always match reality
   -   Team skills not linked to individuals (for example, 1
       individual can have multiple skills. This person may not
       be able to work on all projects, leaving skill gap)
Surface-Level Sort of Barriers
                                                 Barriers                                                The Goal
                                                      Raw
        Manpower
                                                    Materials

Understaffed                                Mission in flux
planning                                                            Incomplete
function                   Slow data entry                          requirements
                           by unit clerks           No field data
Individuals do not                                                         Poor articulation of
monitor training jackets                                                   equip & manning
                                   M+1 is                     Inadequate
                                   not reality                funding                                  Increase
                                                                                                      predictive
                                                                                                      accuracy
               PISTOL skill                             ‘Can Do’ culture
                                                                                                        to 100%
               database is not                          masks problems
               complete
                                 No tool to                                 Skill shelf life policy
                                 capture OJT                                not comprehensive
 Incomplete analytic                               No skill
 model of readiness                                weighting
                       Training providers                        Discretionary
                       not fully aligned                         unit-level training


        Machines                                   Methods &
         & Tools                                     Policy
Hybrid Team Performance Model                                                    Horizontal
Analysis Level                Input                   Process                  Output
                                                                                                  Alignment
                                               · Within Role
                 · Knowledge
                                               Behavior
                                                                        · Task
  Individual     · Capacity                                                                         Good
                                               · Extra-Role             Accomplishments
                                               Behavior
                 · Motives

                 · Team Structure & Size
                                               · Communication

                 · Norms / Culture                                      · Team
Team or Group                                                                                        Poor
                                               · Coordination           Accomplishments

                 · Shared goals
                                               · Allocation of Effort

                 · Information & Materials     · Goals & Strategy

                 · Selection & Placement
                                               · Performance
Environmental                                  Measurement
                 · Instruments & Tools                                  · Business Results           Poor
  Supports

                 · Incentives / Consequences
                                               · Feedback
                 · Policy & Procedures

   Vertical
                              Poor                      Poor                     Fair
  Alignment

                 Enabler to Performance                     Neutral                       Barrier to Performance
Performance Architecture
                                    Training
                                 Deliver the right
                               individual and unit
                            training at the right time

    Organizational              Team / Unit                   Equipment
      Outcomes                  Readiness
 Execute the mission in      Man, equip, train, &            Deliver the right
the most effective, safe,   maintain units to deliver       equipment with the
   timely and efficient        a capable Force           right quality to the right
     manner possible                                      place at the right time

                                 Manpower /
                                  Personnel
                            Deliver the right quantity
                            and quality of personnel
                                at the right time
Establishing Linkages
                                  Inputs                  Processes                    Outputs
                              (Ingredients)           (Assembly Methods)              (Products)

                           CB Skills (NECs)        Fitness Reports                 Task completion
                                                    Role-specific behavior
                           Motivation                   Driving the trucks        Reports
                                                        Firing the weapons
              Individual   Knowledge, Skills, &                                    Skill acquisition
                           Abilities               Extra-role or teamwork          through OJT and
Readiness                                          behavior
                                                    Backing each other up
                                                                                   practice

                                                    Taking the initiative

                                                   Skill decay and cert. lapse

                           TOA                     Leadership / Chain of           Mission complete
                                                   Command
                           Budget                   Appropriate utilization of    Field data
                                                      personnel                     On time
Performance   Team
                           Composition and
                           Structure (1500.1 and
                                                    Clear direction and vision
                                                    Shared mental models
                                                                                    On location
                                                                                    No casualties
                           BA)
                                                   CBCRES                          Team Maturity
                           Command Climate          7.1 Convoy Planning and        Cohesion
                            Morale                  Organization                   Viability
                            Cohesion               7.2 Route Reconnaissance       Experience
                            Norms                  7.3 Vehicle Protection         Skill attainment
                                                    7.4 Convoy Operations
                           Membership Stability     7.5 Convoy
                           and Experience            Communications
                            OPTEMPO                7.6 Immediate Action Drills
                            PERSTEMPO
                            Transfers
The Vision

• Interlocking layers of metrics at different levels
• Roll up summaries &
  drill down analyses
• Different views for
  different purposes
• Identified KPI’s,
  leading &
  lagging indicators,
  & links
• Standard set of
  metrics across domain
• User friendly
• Integrated IT solution
Case Study:
Navy Music ROI
The Charge

• Increase the value of the music program to the
  Navy
    -   Define the most appropriate metrics
    -   Establish baseline measures
    -   Demonstrate measurable value of Navy Music
        products
    -   Determine cost effectiveness of different
        organizational configurations
    -   Identify opportunities for improvements

•   From discussion with Navy Music Program Director
Mission Goal

• Increase the return on investment of the
  Navy Music program by 10% over
  baseline in FY06.
ROI Baseline

 Time                 Navy Music Program Performances
Period
             Performance Value           Estimated Cost             ROI
 2003                $43.3M                   $45.8M               -5.6%

 2004                $51.3M                   $45.8M               11.8%

 2005                $52.6M                   $45.8M              14.8%

Average              $49.1M                   $45.8M               7.0%

          Note: Values are expressed in FY04 dollars. Navy Music
          provides additional tangible and intangible value beyond music
          performances that is not captured in the current analyses.
Performances & Market Demand
                                                2003-2005 Average Market Demand, Performance,
                                                              and Cost by Activity
                             Naval Academy Band
                                    US Navy Band
                             Navy Band Northwest
                                                                                                    Allied Forces + 6th Fleet
                         Allied Forces Band Naples
                               Seventh Fleet Band
                                                                                                    Pay $3.5M for 58 billets
                                                                                                      Get $2.5M of Music
Value in FY-04 Dollars




                                  Sixth Fleet Band
                             Navy Band Mid-South
                                Pacific Fleet Band                                                         GLAKES
                              Navy Band Northeast                                                   Pay $2.9M for 45 billets
                           Navy Band New Orleans                                                      Get $6.5M of Music
                             Navy Band Southeast
                               Navy Band GLAKES
                             Navy Band Southwest
                                Atlantic Fleet Band
                                                      $-     $2,000,000   $4,000,000   $6,000,000    $8,000,000   $10,000,000   $12,000,000   $14,000,000


                                                      Cost            Performances                   Market Demand
Hybrid Team Performance Model
                                                                                                 Horizontal
Analysis Level                Input                   Process                  Output
                                                                                                 Alignment
                                               · Within Role
                 · Knowledge
                                               Behavior
                                                                        · Task
  Individual     · Capacity                                                                        Good
                                               · Extra-Role             Accomplishments
                                               Behavior
                 · Motives

                 · Team Structure & Size
                                               · Communication

                 · Norms / Culture                                      · Team
Team or Group                                                                                      Poor
                                               · Coordination           Accomplishments

                 · Shared goals
                                               · Allocation of Effort

                 · Information & Materials     · Goals & Strategy

                 · Selection & Placement
                                               · Performance
Environmental                                  Measurement
                 · Instruments & Tools                                  · Business Results         Poor
  Supports

                 · Incentives / Consequences
                                               · Feedback
                 · Policy & Procedures

   Vertical
                              Poor                      Poor                     Fair
  Alignment

                 Enabler to Performance                    Neutral                      Barrier to Performance
Key Performers & Goals

• Groups with the most potential for impact

  - Bandleaders – increase efficiency by 10% over
    baseline, measured as value added per billet, by
    FY06 end.
Ideal vs. Actual Performance

                Mission Goal    Performance Goal
                Music Program      Value Added
                     ROI            per Billet
Ideal               17%              $75,254
Performance
Actual               7%              $68,413
Performance
Gap                 10%              $6,841
Root Causes

1. Sub-optimal resource alignment to demand.
2. Direction on how to prioritize performance
   categories and rate bandleader performance
   is missing.
3. Current policy to manage customer demand is
   not uniform across activities.
4. Performance data is not detailed enough to
   accurately capture full value.
Recommendations

Recommendations                        Implementer(s)    Root       Est.    Est.
                                                        Cause(s)   Costs   Annual
                                                                           Benefit


1. Realign billets to match customer     PERS-64           1       $180K   $3.4M
demand and optimize ROI.

2. Develop and communicate               PERS-64         2, 3, 4   $25K    $916K
bandleader performance standards;
collect better performance data.

3. Re-position activities closer to      PERS-64           1       $450K   $75K
customer concentrations.
Questions and Comments
For More Information Contact:
  Aaron U. Bolin
  Phone: 901-874-2961
  aaron@planetbolin.com
  aaron.bolin@navy.mil

More Related Content

What's hot

Mastering the language and practice of ISO50001 Energy Management System
Mastering the language and practice of ISO50001 Energy Management SystemMastering the language and practice of ISO50001 Energy Management System
Mastering the language and practice of ISO50001 Energy Management SystemCamfil UK
 
Agile2011 - What do we supposed to do with these managers now?
Agile2011 - What do we supposed to do with these managers now?Agile2011 - What do we supposed to do with these managers now?
Agile2011 - What do we supposed to do with these managers now?skipangel
 
Organisational Competitiveness - Presentation
Organisational Competitiveness - PresentationOrganisational Competitiveness - Presentation
Organisational Competitiveness - PresentationSukesh Ned
 
Inspire Management at Scrum Australia 2013
Inspire Management at Scrum Australia 2013Inspire Management at Scrum Australia 2013
Inspire Management at Scrum Australia 2013Bernd Schiffer
 
Technical people to effective leaders v3
Technical people to effective leaders v3Technical people to effective leaders v3
Technical people to effective leaders v3C J Ng
 
Leadership Development Workshop - Quick Cards
Leadership Development Workshop - Quick CardsLeadership Development Workshop - Quick Cards
Leadership Development Workshop - Quick Cardsmalpascoe
 
Building credibility in the boardroom david cotton
Building credibility in the boardroom   david cottonBuilding credibility in the boardroom   david cotton
Building credibility in the boardroom david cottonRefresh PR
 
Per Astra Management Group
Per Astra Management GroupPer Astra Management Group
Per Astra Management GroupJanas
 
Harrison Assessments by HR Central K.K.
Harrison Assessments by HR Central K.K.Harrison Assessments by HR Central K.K.
Harrison Assessments by HR Central K.K.HR Central K.K.
 
“Using Simulations to Train Future Project Leaders at NASA” By Lawrence Suda-...
“Using Simulations to Train Future Project Leaders at NASA” By Lawrence Suda-...“Using Simulations to Train Future Project Leaders at NASA” By Lawrence Suda-...
“Using Simulations to Train Future Project Leaders at NASA” By Lawrence Suda-...SeriousGamesAssoc
 
Summary of Organizational Behavior's book
Summary of Organizational Behavior's bookSummary of Organizational Behavior's book
Summary of Organizational Behavior's bookFSPPP - UiTM ( AM225 )
 
Edc brochure
Edc brochureEdc brochure
Edc brochurebas03
 
Strategic od
Strategic odStrategic od
Strategic odDani
 
GICD Attract Retain Advance Women Sample Program Presentation
GICD Attract Retain Advance Women Sample Program PresentationGICD Attract Retain Advance Women Sample Program Presentation
GICD Attract Retain Advance Women Sample Program PresentationElmer Rich
 

What's hot (17)

Mastering the language and practice of ISO50001 Energy Management System
Mastering the language and practice of ISO50001 Energy Management SystemMastering the language and practice of ISO50001 Energy Management System
Mastering the language and practice of ISO50001 Energy Management System
 
Agile2011 - What do we supposed to do with these managers now?
Agile2011 - What do we supposed to do with these managers now?Agile2011 - What do we supposed to do with these managers now?
Agile2011 - What do we supposed to do with these managers now?
 
Ob11 08st
Ob11 08stOb11 08st
Ob11 08st
 
Organisational Competitiveness - Presentation
Organisational Competitiveness - PresentationOrganisational Competitiveness - Presentation
Organisational Competitiveness - Presentation
 
Inspire Management at Scrum Australia 2013
Inspire Management at Scrum Australia 2013Inspire Management at Scrum Australia 2013
Inspire Management at Scrum Australia 2013
 
Technical people to effective leaders v3
Technical people to effective leaders v3Technical people to effective leaders v3
Technical people to effective leaders v3
 
Leadership Development Workshop - Quick Cards
Leadership Development Workshop - Quick CardsLeadership Development Workshop - Quick Cards
Leadership Development Workshop - Quick Cards
 
Building credibility in the boardroom david cotton
Building credibility in the boardroom   david cottonBuilding credibility in the boardroom   david cotton
Building credibility in the boardroom david cotton
 
Hr intro
Hr introHr intro
Hr intro
 
Per Astra Management Group
Per Astra Management GroupPer Astra Management Group
Per Astra Management Group
 
Harrison Assessments by HR Central K.K.
Harrison Assessments by HR Central K.K.Harrison Assessments by HR Central K.K.
Harrison Assessments by HR Central K.K.
 
“Using Simulations to Train Future Project Leaders at NASA” By Lawrence Suda-...
“Using Simulations to Train Future Project Leaders at NASA” By Lawrence Suda-...“Using Simulations to Train Future Project Leaders at NASA” By Lawrence Suda-...
“Using Simulations to Train Future Project Leaders at NASA” By Lawrence Suda-...
 
Summary of Organizational Behavior's book
Summary of Organizational Behavior's bookSummary of Organizational Behavior's book
Summary of Organizational Behavior's book
 
Edc brochure
Edc brochureEdc brochure
Edc brochure
 
Strategic od
Strategic odStrategic od
Strategic od
 
GICD Attract Retain Advance Women Sample Program Presentation
GICD Attract Retain Advance Women Sample Program PresentationGICD Attract Retain Advance Women Sample Program Presentation
GICD Attract Retain Advance Women Sample Program Presentation
 
Neqc poster
Neqc posterNeqc poster
Neqc poster
 

Viewers also liked

WAFIC Developing A Team
WAFIC Developing A TeamWAFIC Developing A Team
WAFIC Developing A TeamJustin Tamsett
 
Tips To More Effective Coaching
Tips To More Effective CoachingTips To More Effective Coaching
Tips To More Effective CoachingJelmore
 
Creating a High Performance Team
Creating a High Performance TeamCreating a High Performance Team
Creating a High Performance Teamtholtz11
 
High Performance Team Zone
High Performance Team ZoneHigh Performance Team Zone
High Performance Team ZoneCarol Moxam
 
The Project Management Process - Week 6 Leadership
The Project Management Process - Week 6   LeadershipThe Project Management Process - Week 6   Leadership
The Project Management Process - Week 6 LeadershipCraig Brown
 
Leadership concepts and theories
Leadership concepts and theoriesLeadership concepts and theories
Leadership concepts and theoriesalaguraja76
 

Viewers also liked (8)

WAFIC Developing A Team
WAFIC Developing A TeamWAFIC Developing A Team
WAFIC Developing A Team
 
Tips To More Effective Coaching
Tips To More Effective CoachingTips To More Effective Coaching
Tips To More Effective Coaching
 
Creating a High Performance Team
Creating a High Performance TeamCreating a High Performance Team
Creating a High Performance Team
 
Effective team performance
Effective team performanceEffective team performance
Effective team performance
 
High Performance Team Zone
High Performance Team ZoneHigh Performance Team Zone
High Performance Team Zone
 
The Project Management Process - Week 6 Leadership
The Project Management Process - Week 6   LeadershipThe Project Management Process - Week 6   Leadership
The Project Management Process - Week 6 Leadership
 
Effective Team Management - The Secret of Team Success
Effective Team Management - The Secret of Team SuccessEffective Team Management - The Secret of Team Success
Effective Team Management - The Secret of Team Success
 
Leadership concepts and theories
Leadership concepts and theoriesLeadership concepts and theories
Leadership concepts and theories
 

Similar to Team Performance Improvement V3.0

49981473 managerial-effectiveness
49981473 managerial-effectiveness49981473 managerial-effectiveness
49981473 managerial-effectivenessShri Banu
 
Assessment Centers in recruitment & selection
Assessment Centers in recruitment & selectionAssessment Centers in recruitment & selection
Assessment Centers in recruitment & selectionRahila Narejo
 
Copy of foundations group behavior
Copy of foundations group behaviorCopy of foundations group behavior
Copy of foundations group behaviorSehal Kapoor
 
Managing Large Scale Agile Transformation
Managing Large Scale Agile TransformationManaging Large Scale Agile Transformation
Managing Large Scale Agile TransformationTathagat Varma
 
The Performance Puzzle 10 Steps To Unlock Your People With 5 Week Plan V...
The Performance Puzzle   10 Steps To Unlock Your People With 5 Week  Plan   V...The Performance Puzzle   10 Steps To Unlock Your People With 5 Week  Plan   V...
The Performance Puzzle 10 Steps To Unlock Your People With 5 Week Plan V...redpoint
 
Team dynamics & creativity in team decision making
Team dynamics & creativity in team decision makingTeam dynamics & creativity in team decision making
Team dynamics & creativity in team decision makingSalman Ahmed
 
Groups in organizations
Groups in organizationsGroups in organizations
Groups in organizationsrenessmee
 
Best competency mapping
Best competency mappingBest competency mapping
Best competency mappingnishashu11
 
chapter 8 teamworl
chapter 8 teamworlchapter 8 teamworl
chapter 8 teamworlabata1111
 
Agile Pathologies: Backyards of Agile Shops
Agile Pathologies: Backyards of Agile ShopsAgile Pathologies: Backyards of Agile Shops
Agile Pathologies: Backyards of Agile Shopsudairaj
 
Agile pathologies
Agile pathologiesAgile pathologies
Agile pathologiesudairaj
 
Agile Developers Create Their Own Identity[1]
Agile Developers Create Their Own Identity[1]Agile Developers Create Their Own Identity[1]
Agile Developers Create Their Own Identity[1]Surajit Bhuyan
 

Similar to Team Performance Improvement V3.0 (20)

49981473 managerial-effectiveness
49981473 managerial-effectiveness49981473 managerial-effectiveness
49981473 managerial-effectiveness
 
Assessment Centers in recruitment & selection
Assessment Centers in recruitment & selectionAssessment Centers in recruitment & selection
Assessment Centers in recruitment & selection
 
Copy of foundations group behavior
Copy of foundations group behaviorCopy of foundations group behavior
Copy of foundations group behavior
 
P A5
P A5P A5
P A5
 
Managing Large Scale Agile Transformation
Managing Large Scale Agile TransformationManaging Large Scale Agile Transformation
Managing Large Scale Agile Transformation
 
The Performance Puzzle 10 Steps To Unlock Your People With 5 Week Plan V...
The Performance Puzzle   10 Steps To Unlock Your People With 5 Week  Plan   V...The Performance Puzzle   10 Steps To Unlock Your People With 5 Week  Plan   V...
The Performance Puzzle 10 Steps To Unlock Your People With 5 Week Plan V...
 
Teamwork
TeamworkTeamwork
Teamwork
 
Team dynamics & creativity in team decision making
Team dynamics & creativity in team decision makingTeam dynamics & creativity in team decision making
Team dynamics & creativity in team decision making
 
Groups in organizations
Groups in organizationsGroups in organizations
Groups in organizations
 
Best competency mapping
Best competency mappingBest competency mapping
Best competency mapping
 
Als slides
Als slidesAls slides
Als slides
 
chapter 8 teamworl
chapter 8 teamworlchapter 8 teamworl
chapter 8 teamworl
 
Performance management 2013 webinar
Performance management 2013 webinarPerformance management 2013 webinar
Performance management 2013 webinar
 
Agile Pathologies: Backyards of Agile Shops
Agile Pathologies: Backyards of Agile ShopsAgile Pathologies: Backyards of Agile Shops
Agile Pathologies: Backyards of Agile Shops
 
Agile pathologies
Agile pathologiesAgile pathologies
Agile pathologies
 
4 ps
4 ps4 ps
4 ps
 
Job post presentation 12 feb 2013
Job post presentation 12 feb 2013Job post presentation 12 feb 2013
Job post presentation 12 feb 2013
 
Agile Developers Create Their Own Identity[1]
Agile Developers Create Their Own Identity[1]Agile Developers Create Their Own Identity[1]
Agile Developers Create Their Own Identity[1]
 
12
1212
12
 
Learning
LearningLearning
Learning
 

Team Performance Improvement V3.0

  • 1. Team Performance Improvement: Special Challenges and Opportunities Aaron U. Bolin, Ph.D., CPT Patricia F. Butler, M.A., & Mark Steele, M.A. U.S. Navy Human Performance Center 44th Annual Convention of the International Society for Performance Improvement Dallas, Texas April 2006
  • 2. Agenda • Background Brief - Definitions - Special Challenges and Opportunities - Hybrid model adapted for the analysis of teams • Case Study Applications - Seabees - Navy Music • Evaluations
  • 3. Defining a Team • A distinguishable set of two or more people who interact dynamically, interdependently, and adaptively toward a common and valued goal- objective-mission, who have each been assigned specific roles or functions to perform • Salas, Dickinson, Converse & Tannenbaum (1992)
  • 4. Team as an Emergent System • Configural: every piece matters - CAT <> CAP • Emergent value > process loss by design - C + A + T = CAT • Focus on the big rocks - The number of variables that impact team performance is virtually infinite. However, only a dozen or so factors make an appreciable difference.
  • 5. The Promise of Teams • Teams - drive big performance gains - tackle larger and more complex tasks - specialization and divide labor - self-manage tasks - are more satisfying for the employees
  • 6. Team Performance Paradox • Teams with - average players often perform better than teams composed of star players - scarce resources often perform better than teams with abundant resources - higher incentives often have lower performance - the same number of people often perform worse than individuals - counterproductive sub-cultures create division and dissatisfaction
  • 7. Special Challenges and Opportunities • Challenges • Opportunities - Levels of Measurement - Cascading Performance - Culture and Norms - Culture and Norms - Process Loss - Process Gain - Team Life Cycle - Mental Model Development
  • 8. Levels of Measurement • Individual, Team, Organization - Different variables, different relationships • Mapping aggregate business goals to individual performance is what HPI is all about - Slippage across levels is common • Interventions must target appropriate level - Higher levels of analysis have farther reaching solutions - Higher level of analysis have higher potential for payback
  • 9. Team Metrics Systems Should Be - Team/Unit Focused – org. group is the unit of analysis - Hierarchical – relevant to all levels of the organization - Expandable – drill down to specific areas of concern - Standardized – common set of measures across units - Interrelated – both leading and lagging indicators - Weighted – some measures are more important - Meaningful – must predict important outcomes - Vision Directed – contain a ‘should be’ element - Objective – hard measures rather than ‘gut feel’
  • 10. Culture and Norms • All performance takes place in a social setting - When the social situation is structured so that goals are interdependent, teams often emerge • Counterproductive norms are common - Safety climate - Shunning rate-busters - Discrimination • Sub-cultures may develop within teams
  • 11. Potential Process Loss Play #1: The Pick and Roll Call Dribble no Covered? Shoot GUARD Play Around Pick yes Pass Set Move to Guard yes Catch no Covered? Shoot Pick Open Spot Covered? Pass no yes Position for Rebound Pass
  • 12. Individual Performance Requirements • Guard • Forward - Call plays - Set picks - Dribble - Move to open positions - Make decisions - Make decisions - Pass - Position for rebound - Shoot - Catch - Pass - Shoot
  • 14. TEAM COMPETENCIES Team Collective cohesion orientation Knowledge of Collective Inter-positional Knowledge teammates’ task efficacy knowledge about signs expectations of stress Belief in the Knowledge Knowledge of importance of about the teammates’ teamwork components of performance teamwork characteristics Team-Specific Team-Generic
  • 15. Team Lifecycle Performance Curve 200 180 160 140 Performance 120 100 80 60 40 20 0 Time
  • 16. Gilbert’s Behavioral Engineering Information Instrumentation Motivation Environmental Data Instruments Incentives Supports Individual Knowledge Capacity Motives Repertory of Behavior
  • 17. Human Performance Focus Organization BUT ALSO NOT JUST Processes Policy Equipment Information Team Unit Individual Individual Primary Focus on Organizational / Enterprise Outcomes
  • 18. Driskell et al. Team Performance Model POTENTIAL PROCESS OUTCOME (INPUT FACTORS) INDIVIDUAL LEVEL FACTORS Group member: Skills Status Personality PROCESS GROUP LEVEL GAIN FACTORS Group structure GROUP GROUP INTERACTION Group Norms PERFORM ANCE PROCESS Group Size PROCESS ENVIRONM ENTAL LOSS LEVEL FACTORS Task characteristics Rew ard structure Level of environmental stress
  • 19. Hybrid Team Performance Model Horizontal Analysis Level Input Process Output Alignment · Within Role · Knowledge Behavior · Task Individual · Capacity · Extra-Role Accomplishments Behavior · Motives · Team Structure & Size · Communication · Norms / Culture · Team Team or Group · Coordination Accomplishments · Shared goals · Allocation of Effort · Information & Materials · Goals & Strategy · Selection & Placement · Performance Environmental Measurement · Instruments & Tools · Business Results Supports · Incentives / Consequences · Feedback · Policy & Procedures Vertical Alignment
  • 21. What Seabees Provide • Forward Presence • Construction Support • Crisis Response: – Exercise Related – SRM Backlog Reduction Force Enablers Construction (ERC) – AT/FP upgrade – Contingency – Joint Forward Operating – Critical infrastructure Engineering Locations (JFOL) improvements – OPLAN/CONPLAN – Range improvements support including – Humanitarian Aid Consequence projects Management (CM) Exercise Disaster Related Relief Construction Limited Humanitarian Regional Action Contingencies Forward-Deployed Major Theater Engineers War Requirements span the spectrum from Construction Skills to Combat Skills
  • 22. Case Study: Seabee Teams • Presenting problem: Lack of confidence in current assessments of operational readiness - Build a versatile construction team Make it able to build and repair most anything Make it ready to land anywhere within 72 hours Make it able to defend itself in a hostile environment - Predict its performance in the field with accuracy Multiple threat levels Multiple construction tasks Multiple environmental conditions
  • 23. Alignment to Fleet Readiness Fleet Readiness Combatant CDR Missions & Tasks PROCESS MAPPING JTF CDR IN WORK Missions & Tasks JMETL Group CFFC Missions & Tasks JTF Warfare CDR NMETL Missions & Tasks Group NMETL Unit Missions & Tasks Warfare CDR NMETL Unit NMETL TRAINING
  • 24. Measuring Team/Unit Readiness NMETLS / Mission Budget Planning Equipment Manning Training Requirements Requirements Requirements Actual Actual Actual Equipment Training Manning
  • 25. Phase I: Identify “As Is” Model • As Is analysis will provide: - Comprehensive picture of current readiness model  Readiness requirements - for each mission area, for each level of measurement • Are stated requirements comprehensive / adequate?  Readiness criteria - standards to be met for each requirement • Are criteria clearly stated for each requirement? • Are criteria adequate to meet Seabee missions?  Readiness assessments - tied to each requirement • Is performance measured & assessed for each requirement and at each organizational level? • Are assessments valid and reliable?  Map where current gaps and missing links exist
  • 26. Case Study: Seabee Teams • In the course of reviewing ‘AS IS’ measures, a number of issues started to emerge - Padded estimates - Bad estimating standards - Missing training / training with no requirements - Lack of objective measures - Some reports are not credible - Can do culture unwillingness to report deficiencies - Some equipment is seriously outdated - Lack of measurement integration - Measurement policies do not always match reality - Team skills not linked to individuals (for example, 1 individual can have multiple skills. This person may not be able to work on all projects, leaving skill gap)
  • 27. Surface-Level Sort of Barriers Barriers The Goal Raw Manpower Materials Understaffed Mission in flux planning Incomplete function Slow data entry requirements by unit clerks No field data Individuals do not Poor articulation of monitor training jackets equip & manning M+1 is Inadequate not reality funding Increase predictive accuracy PISTOL skill ‘Can Do’ culture to 100% database is not masks problems complete No tool to Skill shelf life policy capture OJT not comprehensive Incomplete analytic No skill model of readiness weighting Training providers Discretionary not fully aligned unit-level training Machines Methods & & Tools Policy
  • 28. Hybrid Team Performance Model Horizontal Analysis Level Input Process Output Alignment · Within Role · Knowledge Behavior · Task Individual · Capacity Good · Extra-Role Accomplishments Behavior · Motives · Team Structure & Size · Communication · Norms / Culture · Team Team or Group Poor · Coordination Accomplishments · Shared goals · Allocation of Effort · Information & Materials · Goals & Strategy · Selection & Placement · Performance Environmental Measurement · Instruments & Tools · Business Results Poor Supports · Incentives / Consequences · Feedback · Policy & Procedures Vertical Poor Poor Fair Alignment Enabler to Performance Neutral Barrier to Performance
  • 29. Performance Architecture Training Deliver the right individual and unit training at the right time Organizational Team / Unit Equipment Outcomes Readiness Execute the mission in Man, equip, train, & Deliver the right the most effective, safe, maintain units to deliver equipment with the timely and efficient a capable Force right quality to the right manner possible place at the right time Manpower / Personnel Deliver the right quantity and quality of personnel at the right time
  • 30. Establishing Linkages Inputs Processes Outputs (Ingredients) (Assembly Methods) (Products) CB Skills (NECs) Fitness Reports Task completion  Role-specific behavior Motivation  Driving the trucks Reports  Firing the weapons Individual Knowledge, Skills, & Skill acquisition Abilities Extra-role or teamwork through OJT and Readiness behavior  Backing each other up practice  Taking the initiative Skill decay and cert. lapse TOA Leadership / Chain of Mission complete Command Budget  Appropriate utilization of Field data personnel  On time Performance Team Composition and Structure (1500.1 and  Clear direction and vision  Shared mental models  On location  No casualties BA) CBCRES Team Maturity Command Climate  7.1 Convoy Planning and  Cohesion  Morale Organization  Viability  Cohesion  7.2 Route Reconnaissance  Experience  Norms  7.3 Vehicle Protection  Skill attainment  7.4 Convoy Operations Membership Stability  7.5 Convoy and Experience Communications  OPTEMPO  7.6 Immediate Action Drills  PERSTEMPO  Transfers
  • 31. The Vision • Interlocking layers of metrics at different levels • Roll up summaries & drill down analyses • Different views for different purposes • Identified KPI’s, leading & lagging indicators, & links • Standard set of metrics across domain • User friendly • Integrated IT solution
  • 33. The Charge • Increase the value of the music program to the Navy - Define the most appropriate metrics - Establish baseline measures - Demonstrate measurable value of Navy Music products - Determine cost effectiveness of different organizational configurations - Identify opportunities for improvements • From discussion with Navy Music Program Director
  • 34. Mission Goal • Increase the return on investment of the Navy Music program by 10% over baseline in FY06.
  • 35. ROI Baseline Time Navy Music Program Performances Period Performance Value Estimated Cost ROI 2003 $43.3M $45.8M -5.6% 2004 $51.3M $45.8M 11.8% 2005 $52.6M $45.8M 14.8% Average $49.1M $45.8M 7.0% Note: Values are expressed in FY04 dollars. Navy Music provides additional tangible and intangible value beyond music performances that is not captured in the current analyses.
  • 36. Performances & Market Demand 2003-2005 Average Market Demand, Performance, and Cost by Activity Naval Academy Band US Navy Band Navy Band Northwest Allied Forces + 6th Fleet Allied Forces Band Naples Seventh Fleet Band Pay $3.5M for 58 billets Get $2.5M of Music Value in FY-04 Dollars Sixth Fleet Band Navy Band Mid-South Pacific Fleet Band GLAKES Navy Band Northeast Pay $2.9M for 45 billets Navy Band New Orleans Get $6.5M of Music Navy Band Southeast Navy Band GLAKES Navy Band Southwest Atlantic Fleet Band $- $2,000,000 $4,000,000 $6,000,000 $8,000,000 $10,000,000 $12,000,000 $14,000,000 Cost Performances Market Demand
  • 37. Hybrid Team Performance Model Horizontal Analysis Level Input Process Output Alignment · Within Role · Knowledge Behavior · Task Individual · Capacity Good · Extra-Role Accomplishments Behavior · Motives · Team Structure & Size · Communication · Norms / Culture · Team Team or Group Poor · Coordination Accomplishments · Shared goals · Allocation of Effort · Information & Materials · Goals & Strategy · Selection & Placement · Performance Environmental Measurement · Instruments & Tools · Business Results Poor Supports · Incentives / Consequences · Feedback · Policy & Procedures Vertical Poor Poor Fair Alignment Enabler to Performance Neutral Barrier to Performance
  • 38. Key Performers & Goals • Groups with the most potential for impact - Bandleaders – increase efficiency by 10% over baseline, measured as value added per billet, by FY06 end.
  • 39. Ideal vs. Actual Performance Mission Goal Performance Goal Music Program Value Added ROI per Billet Ideal 17% $75,254 Performance Actual 7% $68,413 Performance Gap 10% $6,841
  • 40. Root Causes 1. Sub-optimal resource alignment to demand. 2. Direction on how to prioritize performance categories and rate bandleader performance is missing. 3. Current policy to manage customer demand is not uniform across activities. 4. Performance data is not detailed enough to accurately capture full value.
  • 41. Recommendations Recommendations Implementer(s) Root Est. Est. Cause(s) Costs Annual Benefit 1. Realign billets to match customer PERS-64 1 $180K $3.4M demand and optimize ROI. 2. Develop and communicate PERS-64 2, 3, 4 $25K $916K bandleader performance standards; collect better performance data. 3. Re-position activities closer to PERS-64 1 $450K $75K customer concentrations.
  • 42. Questions and Comments For More Information Contact: Aaron U. Bolin Phone: 901-874-2961 aaron@planetbolin.com aaron.bolin@navy.mil