This document provides details for the structural glazing system on a primary health care center building, including:
1) A concrete kicker/foundation reinforced to engineer's specifications supports a hollowcore floor and proprietary insulation.
2) A reinforced screed with polypropylene fibers is installed over the insulation.
3) Aluminum spider clamps hold structural glazing panels in place that are connected to the foundation kicker via expansion bolts for stability.