Woo-young Jung is a project manager and engineer based in Ulsan, Korea, seeking a position in offshore project management. He has over 10 years of experience managing offshore oil and gas projects for National Oilwell Varco. He is skilled in project planning, budgeting, scheduling, risk management, and ensuring timely delivery, quality construction, and cost control. His experience includes managing projects like BOP equipment, compensators, repair jobs, bulk tanks, and drawworks. He aims to utilize his strong communication and leadership abilities to drive project success.
1. Woo-young Jung
304-1107 Hyundai Hometown, Shinjung-Dong, Nam-Gu, Ulsan, Korea
Date of Birth : 11.22.1982
010-9439-6048 • wooyoung.jung@nov.com
OBJECTIVE A Project manager, engineer, outsourcing manager related in Offshore field
SUMMARY - Strong ability to lead a successful team and drive to achieve exceptional results such as
construction completion within budget, delivery on time and good quality.
- Execute project in accordance with contractual obligation
- Act as liaison between each departments, sub-contractor and customer for timely
performance of all project activities.
- Act for progress development
- Act as key person to lead the all internal and external meetings for construction,
progress, trouble shooting, quality and finance.
- Present project closing report including planning for production cost reduction and
progress improvement.
EDUCATION
TRAINING
TRANSCRIPT
Kyung-sung University, Pusan, Korea, 2008
New advance material engineering (GPA: 3.5/4.5)
Project management Fundamental (Online Course)
Project management Essential (Online Course)
Hydraulic Fundamental (Online Course)
Drawworks Operating in Edmonton Canada
EXPERIENCE National Oilwell Varco / Oct. 2007 ~ Current
Project Supervisor / Project management Dep’t
SKILLS - Strong analytical, written, and oral communication skills.
- Ability to interpret drawing like Structure, Flow diagram, P&ID, and ISO as well
- Microsoft Project, WordPerfect, Excel, PowerPoint,
- Spoken and written English
2. AWARDS Won ‘Scholarship’ in the first, second semester of 2006, Kyung-sung University
Won ‘staff award” in the 2011,
ACTIVITIES President: Kyung-sung University New advance material engineering, 2006.
DESCRIPTION - Support on all sides so that team member’s ability is to be exerted as well.
- Monitor all projects’ implementation activities and Support site team in investigating and
resolving with regards to occurred field problem.
- Prepare budget and Monitor all activities to be completed within allocated resources.
- Act for production cost reduction through the improvement of work sequence, negotiation
and any other suitable way.
- Prepare project plan based on project backlog, workload and forecast.
- Review project requirement and Impress it to be following up.
- Manage all procedures to be prepared and approved on time.
- Prepare CAPEX for facility building or upgrade, staff training, etc.
- Report progress status to customer regularly.
- Announce progress internally and impress to meet milestone date.
- Investigate how big impact is to be occurred to progress and cost caused by Variation
Order Requisition from customer and Deal expense and postponed delivery with customer.
- Coordinate important meeting as Kick Off Meeting, Pre-Inspection Meeting, etc.
- Prepare and Lead all internal meeting to find best way against of any issues.
- Prepare and Propose Corrective Action Plan, Preventive Action Plan and Root Cause
Analysis against of any problems.
- Review production cost against of budget and Prepare production cost saving plan.
- Review all processes and Prepare lead time reduction plan through engineering
improvement, change of work sequence and any other suitable way.
EXPERIENCE
PROJECTS
- Bop Equipment (Bop Crane, Bop Trolley, Baseplate Trolley / 2007~2009)
* Stena, Mosvold, TPM, Petrobras, Odjfell, Pride, etc
* Prepare Annual Project plan according to backlog and forecast.
* Report progress to Customer.
* Reduce manufacture lead time through work sequence improvement.
* Prepare dimension control procedure.
* Set Test facility as HPU, ring line system.
* Support Internal test and F.A.T.
* Shoot issued problem on board.
* Prepare and Invoice VOR to Customer.
3. - Crown Mounted Compensator (2009~2014)
* Seadrill, Pride, QGOG, Ocean Rig, Rowan, Noble, etc.
* Prepare Annual Project plan according to backlog and forecast.
* Report progress to Customer.
* Build Assembly & Transportation jig.
* Save production cost through drawing improvement.
* Issue technical query to improve manufacture progress.
* Support Internal test and F.A.T.
* Prepare and Invoice VOR to Customer.
- Repairing Job for Finger Board, Riser tension Cylinder (2009~2010)
* Prepare Repair Works Procedure.
* Report progress to Customer.
* Act and Manage material purchasing, fabrication, assembly.
* Coordinate dispatched engineer from specified maker.
* Calculate repair cost and invoice to Customer.
- Bulk Tank (2011)
* QGOG#1&2
* Prepare Test procedure for pressure test.
* Report progress to Customer.
- Solid Control Module (2011)
* SHWE
* Prepare the all of required procedure such as load test, Flushing and hydro test, etc.
* Report progress to Customer.
* Act and Manage the mechanical and pipe spool assembly works.
* Act Flushing and Hydro test.
* Prepare As-built drawing of pipe spool assembly works.
* Act and Coordinate modification work caused by drawing error at HHI.
* Prepare and Invoice VOR to Customer.
- WTIV Main Crane (2012)
* ATL60
* Manage the assembly progress.
* Report progress to Customer.
* Perform modification work caused by wrong drawing at SHI.
* Support and Coordinate commissioning work at SHI.
4. * Prepare As-built drawing
* Prepare and Invoice VOR to Customer
- Drawworks (2014 ~ Current)
* Prepare Capex for facility building. (Fabrication, Assembly and Test)
* Coordinate facility building.
* Coordinate personal training.(Engineering, Fabrication, Assembly and Test)
* Receive In house training for Fabrication, Assembly and Test in Edmonton Canada.
* Prepare Fabrication, Assembly and Test procedure.
* Prepare Annual Project plan according to backlog and forecast.
* Report progress to Customer.
* Supervise Fabrication and Assembly
* Act Internal Test and F.A.T.
* Save production cost and Reduce lead time through work sequence improvement.