SlideShare a Scribd company logo
1 of 4
Woo-young Jung
304-1107 Hyundai Hometown, Shinjung-Dong, Nam-Gu, Ulsan, Korea
Date of Birth : 11.22.1982
010-9439-6048 • wooyoung.jung@nov.com
OBJECTIVE A Project manager, engineer, outsourcing manager related in Offshore field
SUMMARY - Strong ability to lead a successful team and drive to achieve exceptional results such as
construction completion within budget, delivery on time and good quality.
- Execute project in accordance with contractual obligation
- Act as liaison between each departments, sub-contractor and customer for timely
performance of all project activities.
- Act for progress development
- Act as key person to lead the all internal and external meetings for construction,
progress, trouble shooting, quality and finance.
- Present project closing report including planning for production cost reduction and
progress improvement.
EDUCATION
TRAINING
TRANSCRIPT
Kyung-sung University, Pusan, Korea, 2008
New advance material engineering (GPA: 3.5/4.5)
Project management Fundamental (Online Course)
Project management Essential (Online Course)
Hydraulic Fundamental (Online Course)
Drawworks Operating in Edmonton Canada
EXPERIENCE National Oilwell Varco / Oct. 2007 ~ Current
Project Supervisor / Project management Dep’t
SKILLS - Strong analytical, written, and oral communication skills.
- Ability to interpret drawing like Structure, Flow diagram, P&ID, and ISO as well
- Microsoft Project, WordPerfect, Excel, PowerPoint,
- Spoken and written English
AWARDS Won ‘Scholarship’ in the first, second semester of 2006, Kyung-sung University
Won ‘staff award” in the 2011,
ACTIVITIES President: Kyung-sung University New advance material engineering, 2006.
DESCRIPTION - Support on all sides so that team member’s ability is to be exerted as well.
- Monitor all projects’ implementation activities and Support site team in investigating and
resolving with regards to occurred field problem.
- Prepare budget and Monitor all activities to be completed within allocated resources.
- Act for production cost reduction through the improvement of work sequence, negotiation
and any other suitable way.
- Prepare project plan based on project backlog, workload and forecast.
- Review project requirement and Impress it to be following up.
- Manage all procedures to be prepared and approved on time.
- Prepare CAPEX for facility building or upgrade, staff training, etc.
- Report progress status to customer regularly.
- Announce progress internally and impress to meet milestone date.
- Investigate how big impact is to be occurred to progress and cost caused by Variation
Order Requisition from customer and Deal expense and postponed delivery with customer.
- Coordinate important meeting as Kick Off Meeting, Pre-Inspection Meeting, etc.
- Prepare and Lead all internal meeting to find best way against of any issues.
- Prepare and Propose Corrective Action Plan, Preventive Action Plan and Root Cause
Analysis against of any problems.
- Review production cost against of budget and Prepare production cost saving plan.
- Review all processes and Prepare lead time reduction plan through engineering
improvement, change of work sequence and any other suitable way.
EXPERIENCE
PROJECTS
- Bop Equipment (Bop Crane, Bop Trolley, Baseplate Trolley / 2007~2009)
* Stena, Mosvold, TPM, Petrobras, Odjfell, Pride, etc
* Prepare Annual Project plan according to backlog and forecast.
* Report progress to Customer.
* Reduce manufacture lead time through work sequence improvement.
* Prepare dimension control procedure.
* Set Test facility as HPU, ring line system.
* Support Internal test and F.A.T.
* Shoot issued problem on board.
* Prepare and Invoice VOR to Customer.
- Crown Mounted Compensator (2009~2014)
* Seadrill, Pride, QGOG, Ocean Rig, Rowan, Noble, etc.
* Prepare Annual Project plan according to backlog and forecast.
* Report progress to Customer.
* Build Assembly & Transportation jig.
* Save production cost through drawing improvement.
* Issue technical query to improve manufacture progress.
* Support Internal test and F.A.T.
* Prepare and Invoice VOR to Customer.
- Repairing Job for Finger Board, Riser tension Cylinder (2009~2010)
* Prepare Repair Works Procedure.
* Report progress to Customer.
* Act and Manage material purchasing, fabrication, assembly.
* Coordinate dispatched engineer from specified maker.
* Calculate repair cost and invoice to Customer.
- Bulk Tank (2011)
* QGOG#1&2
* Prepare Test procedure for pressure test.
* Report progress to Customer.
- Solid Control Module (2011)
* SHWE
* Prepare the all of required procedure such as load test, Flushing and hydro test, etc.
* Report progress to Customer.
* Act and Manage the mechanical and pipe spool assembly works.
* Act Flushing and Hydro test.
* Prepare As-built drawing of pipe spool assembly works.
* Act and Coordinate modification work caused by drawing error at HHI.
* Prepare and Invoice VOR to Customer.
- WTIV Main Crane (2012)
* ATL60
* Manage the assembly progress.
* Report progress to Customer.
* Perform modification work caused by wrong drawing at SHI.
* Support and Coordinate commissioning work at SHI.
* Prepare As-built drawing
* Prepare and Invoice VOR to Customer
- Drawworks (2014 ~ Current)
* Prepare Capex for facility building. (Fabrication, Assembly and Test)
* Coordinate facility building.
* Coordinate personal training.(Engineering, Fabrication, Assembly and Test)
* Receive In house training for Fabrication, Assembly and Test in Edmonton Canada.
* Prepare Fabrication, Assembly and Test procedure.
* Prepare Annual Project plan according to backlog and forecast.
* Report progress to Customer.
* Supervise Fabrication and Assembly
* Act Internal Test and F.A.T.
* Save production cost and Reduce lead time through work sequence improvement.

More Related Content

What's hot

Scott Frisa Resume
Scott Frisa ResumeScott Frisa Resume
Scott Frisa Resume
Scott Frisa
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
Dave Thompson
 
EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015
Mohamad Khalid Nawawi
 
CV_Updated.11
CV_Updated.11CV_Updated.11
CV_Updated.11
Kamesh P
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manager
Edwardo Figuracion
 
Boiler Supporting structure-Steel detailing
Boiler Supporting structure-Steel detailingBoiler Supporting structure-Steel detailing
Boiler Supporting structure-Steel detailing
Gaurav Kumar
 

What's hot (19)

RESUME 2016
RESUME 2016RESUME 2016
RESUME 2016
 
Scott Frisa Resume
Scott Frisa ResumeScott Frisa Resume
Scott Frisa Resume
 
Construction phases
Construction phasesConstruction phases
Construction phases
 
Curriculum vitae updated as of 01 April,2017
Curriculum vitae updated as of 01 April,2017Curriculum vitae updated as of 01 April,2017
Curriculum vitae updated as of 01 April,2017
 
D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1D_David_ Thompson_resume_15_1
D_David_ Thompson_resume_15_1
 
EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015EPC Contract - M. Khalid Quantity Surveyor 2015
EPC Contract - M. Khalid Quantity Surveyor 2015
 
CV_Updated.11
CV_Updated.11CV_Updated.11
CV_Updated.11
 
CV
CVCV
CV
 
CV (1)
CV (1)CV (1)
CV (1)
 
sjtcv_2016
sjtcv_2016sjtcv_2016
sjtcv_2016
 
emf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manageremf CV MEP Project-Construction Manager
emf CV MEP Project-Construction Manager
 
EPC Business Model
EPC Business ModelEPC Business Model
EPC Business Model
 
CV NGUYEN DINH VI KHAI
CV NGUYEN DINH VI KHAICV NGUYEN DINH VI KHAI
CV NGUYEN DINH VI KHAI
 
CE Resume
CE ResumeCE Resume
CE Resume
 
Moath ahmad cv (1)
Moath ahmad cv (1)Moath ahmad cv (1)
Moath ahmad cv (1)
 
Boiler Supporting structure-Steel detailing
Boiler Supporting structure-Steel detailingBoiler Supporting structure-Steel detailing
Boiler Supporting structure-Steel detailing
 
Ravi kumar-CV 2015
Ravi kumar-CV 2015Ravi kumar-CV 2015
Ravi kumar-CV 2015
 
resume'2016.docx
resume'2016.docxresume'2016.docx
resume'2016.docx
 
Resume
ResumeResume
Resume
 

Similar to CV in 2015 except self introduction

Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
Abi Joseph
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016
belal alrwadieh
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
Abu Dhabi Oil Company (JAPAN)
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
Sidharth Sunny
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
John Raj BE, MBA
 
joseph_resume UPDATED 08192015
joseph_resume UPDATED 08192015joseph_resume UPDATED 08192015
joseph_resume UPDATED 08192015
Joseph. Gaon
 
James F BurtonII Resume 2016
James F BurtonII Resume 2016James F BurtonII Resume 2016
James F BurtonII Resume 2016
Frank Burton
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
Anas Khalifa
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
Anas Khalifa
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
Aminul Haque
 

Similar to CV in 2015 except self introduction (20)

Peter L. Cabbab.
Peter L. Cabbab.Peter L. Cabbab.
Peter L. Cabbab.
 
LI, GUANGYA
LI,  GUANGYALI,  GUANGYA
LI, GUANGYA
 
Sathishkumar mechanical engineer - 2016
Sathishkumar   mechanical engineer - 2016Sathishkumar   mechanical engineer - 2016
Sathishkumar mechanical engineer - 2016
 
Zahur Resume Updated
Zahur Resume UpdatedZahur Resume Updated
Zahur Resume Updated
 
Ramanuja CV-
Ramanuja CV-Ramanuja CV-
Ramanuja CV-
 
RESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISORRESUME PIPING SUPERVISOR
RESUME PIPING SUPERVISOR
 
Abi Ninan Joseph cv 10-01-2016
Abi Ninan Joseph cv  10-01-2016Abi Ninan Joseph cv  10-01-2016
Abi Ninan Joseph cv 10-01-2016
 
Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016Belal Khalid Alrwadieh-25 Oct 2016
Belal Khalid Alrwadieh-25 Oct 2016
 
Farrukh ali hassan civil engineer cv
Farrukh ali hassan   civil engineer cvFarrukh ali hassan   civil engineer cv
Farrukh ali hassan civil engineer cv
 
CV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project EngineerCV-Sidharth Sunny- Project Engineer
CV-Sidharth Sunny- Project Engineer
 
CV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project EngineerCV-Sidharth Sunny Project Engineer
CV-Sidharth Sunny Project Engineer
 
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1LEAD MECHANICAL CONSTRUCTION ENGINEER 1
LEAD MECHANICAL CONSTRUCTION ENGINEER 1
 
joseph_resume UPDATED 08192015
joseph_resume UPDATED 08192015joseph_resume UPDATED 08192015
joseph_resume UPDATED 08192015
 
James F BurtonII Resume 2016
James F BurtonII Resume 2016James F BurtonII Resume 2016
James F BurtonII Resume 2016
 
CV-Sounder
CV-SounderCV-Sounder
CV-Sounder
 
balaji cv
balaji cvbalaji cv
balaji cv
 
Mohamed Fazil CV
Mohamed Fazil CVMohamed Fazil CV
Mohamed Fazil CV
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 
CV AMINUL 19-05-2015
CV AMINUL 19-05-2015CV AMINUL 19-05-2015
CV AMINUL 19-05-2015
 

CV in 2015 except self introduction

  • 1. Woo-young Jung 304-1107 Hyundai Hometown, Shinjung-Dong, Nam-Gu, Ulsan, Korea Date of Birth : 11.22.1982 010-9439-6048 • wooyoung.jung@nov.com OBJECTIVE A Project manager, engineer, outsourcing manager related in Offshore field SUMMARY - Strong ability to lead a successful team and drive to achieve exceptional results such as construction completion within budget, delivery on time and good quality. - Execute project in accordance with contractual obligation - Act as liaison between each departments, sub-contractor and customer for timely performance of all project activities. - Act for progress development - Act as key person to lead the all internal and external meetings for construction, progress, trouble shooting, quality and finance. - Present project closing report including planning for production cost reduction and progress improvement. EDUCATION TRAINING TRANSCRIPT Kyung-sung University, Pusan, Korea, 2008 New advance material engineering (GPA: 3.5/4.5) Project management Fundamental (Online Course) Project management Essential (Online Course) Hydraulic Fundamental (Online Course) Drawworks Operating in Edmonton Canada EXPERIENCE National Oilwell Varco / Oct. 2007 ~ Current Project Supervisor / Project management Dep’t SKILLS - Strong analytical, written, and oral communication skills. - Ability to interpret drawing like Structure, Flow diagram, P&ID, and ISO as well - Microsoft Project, WordPerfect, Excel, PowerPoint, - Spoken and written English
  • 2. AWARDS Won ‘Scholarship’ in the first, second semester of 2006, Kyung-sung University Won ‘staff award” in the 2011, ACTIVITIES President: Kyung-sung University New advance material engineering, 2006. DESCRIPTION - Support on all sides so that team member’s ability is to be exerted as well. - Monitor all projects’ implementation activities and Support site team in investigating and resolving with regards to occurred field problem. - Prepare budget and Monitor all activities to be completed within allocated resources. - Act for production cost reduction through the improvement of work sequence, negotiation and any other suitable way. - Prepare project plan based on project backlog, workload and forecast. - Review project requirement and Impress it to be following up. - Manage all procedures to be prepared and approved on time. - Prepare CAPEX for facility building or upgrade, staff training, etc. - Report progress status to customer regularly. - Announce progress internally and impress to meet milestone date. - Investigate how big impact is to be occurred to progress and cost caused by Variation Order Requisition from customer and Deal expense and postponed delivery with customer. - Coordinate important meeting as Kick Off Meeting, Pre-Inspection Meeting, etc. - Prepare and Lead all internal meeting to find best way against of any issues. - Prepare and Propose Corrective Action Plan, Preventive Action Plan and Root Cause Analysis against of any problems. - Review production cost against of budget and Prepare production cost saving plan. - Review all processes and Prepare lead time reduction plan through engineering improvement, change of work sequence and any other suitable way. EXPERIENCE PROJECTS - Bop Equipment (Bop Crane, Bop Trolley, Baseplate Trolley / 2007~2009) * Stena, Mosvold, TPM, Petrobras, Odjfell, Pride, etc * Prepare Annual Project plan according to backlog and forecast. * Report progress to Customer. * Reduce manufacture lead time through work sequence improvement. * Prepare dimension control procedure. * Set Test facility as HPU, ring line system. * Support Internal test and F.A.T. * Shoot issued problem on board. * Prepare and Invoice VOR to Customer.
  • 3. - Crown Mounted Compensator (2009~2014) * Seadrill, Pride, QGOG, Ocean Rig, Rowan, Noble, etc. * Prepare Annual Project plan according to backlog and forecast. * Report progress to Customer. * Build Assembly & Transportation jig. * Save production cost through drawing improvement. * Issue technical query to improve manufacture progress. * Support Internal test and F.A.T. * Prepare and Invoice VOR to Customer. - Repairing Job for Finger Board, Riser tension Cylinder (2009~2010) * Prepare Repair Works Procedure. * Report progress to Customer. * Act and Manage material purchasing, fabrication, assembly. * Coordinate dispatched engineer from specified maker. * Calculate repair cost and invoice to Customer. - Bulk Tank (2011) * QGOG#1&2 * Prepare Test procedure for pressure test. * Report progress to Customer. - Solid Control Module (2011) * SHWE * Prepare the all of required procedure such as load test, Flushing and hydro test, etc. * Report progress to Customer. * Act and Manage the mechanical and pipe spool assembly works. * Act Flushing and Hydro test. * Prepare As-built drawing of pipe spool assembly works. * Act and Coordinate modification work caused by drawing error at HHI. * Prepare and Invoice VOR to Customer. - WTIV Main Crane (2012) * ATL60 * Manage the assembly progress. * Report progress to Customer. * Perform modification work caused by wrong drawing at SHI. * Support and Coordinate commissioning work at SHI.
  • 4. * Prepare As-built drawing * Prepare and Invoice VOR to Customer - Drawworks (2014 ~ Current) * Prepare Capex for facility building. (Fabrication, Assembly and Test) * Coordinate facility building. * Coordinate personal training.(Engineering, Fabrication, Assembly and Test) * Receive In house training for Fabrication, Assembly and Test in Edmonton Canada. * Prepare Fabrication, Assembly and Test procedure. * Prepare Annual Project plan according to backlog and forecast. * Report progress to Customer. * Supervise Fabrication and Assembly * Act Internal Test and F.A.T. * Save production cost and Reduce lead time through work sequence improvement.