SlideShare a Scribd company logo
James F Burton II
50 Lee Rd 2194 Phenix City, AL 36870
(705)392-7031 / jamesfburton@gmail.com
Objective Highly qualified Manager with over 20 years of diversified operations including
Engineering, Maintenance and Production seeking professional employment in a
responsible team oriented position.
Skill Summary Extensive Engineering, Maintenance, Production/automation experience.
Proven project management skills Capable of managing multiple projects
Simultaneously. Proficient Logistics Coordinator.
Proficient in Microsoft Office, Word Excel, PowerPoint, Project, AutoCAD, AutoCAD
Inventor Fusion and Solid Works Solid edge Modeling
Experienced in multiple areas of manufacturing processes to include:
- Project management - Capital RFA/CEA creation
- Material logistics - Machine Design/Fabrication
- Robotics -Welding Steel/Aluminum
- Hydraulics & Pneumatics - Machine layout and set up
- Problem Analysis - Quality Assurance/SPC
- Level II U.T. /M.T - Programming
Employment 11/15/2013-Present Alexanders/Brenford/Aqua-Jet
Experience (Environmental/Mechanical)
Project Manager/Designer New business startup for the mechanical Division including
Creating the business plan model, Employee hiring, new customer acquisition with job bidding,
Project management,Producing CAD concept drawings for various projects and employee
management. In charge of maintenance and machine improvement for Brenford sewer Hog Fleet
including parts acquisition,Research and development and management of repair crew. Vice
president/Designer for the Aqua jet Interceptor machine which includes product research and
Development, Product design, Prototyping and testing, Production fabrication shop management
including logistics of materials, employee oversight and CAD shop drawings for fabrication.
Test facility development to find quicker and easier methods of cleaning large diameter pipe.
Specific accomplishments include:
• Developed a dual nozzle design that has a patent pending
• Developed a dual pressure machine that has a patent pending
• Developed electronically controlled large diameter pipe cleaning
equipment to reduce employee train up and increase productivity
August 2011 – 11/12/2013 Chassix/DMI, Columbus GA
(Ductile Iron Foundry)
Project Manager: Responsible for planning and managing multiple projects
As well as creating and controlling the Capex budget. Also creating and
monitoring the maintenance budget to help reduce the R&M Budget. Machine
Design and production cell layout to increase cycle time efficiency.
Management of the Fabrication Shop including logistics of materials, employee
oversight and CAD shop drawings for fabrication.
Specific accomplishments include:
• Recreate the maintenance PM program to initiate 7i Program
• Controlled $8.4 million in Capital projects
• Reduced downtime and increased plant efficiency
April 2009 – August 2011 Powertech America, West Point, GA
(Advanced manufacturing Facility)
Maintenance Team Leader: Responsible for The creation and implication of the
PM Program, Supervision of 5Technicians. Maintenance of CNC, Robotic, Vision,
Testing, PLC Trouble shooting and program modification, CAD Machine design and
Fabrication, Advanced Automation and Controls.
November 2007 – April 2009 ICForm Columbus, GA
(Plastic injection Molding)
Department Manager: Employee Supervision, Material Logistics, Quality
Assurance, Machine Set up and maintenance, Robotic Programming,
Problem Analysis, Welding and fabrication of ongoing projects.
May 2005-2007 Eagle Grading &Construction
(General construction)
Heavy Equipment Operator and Maintenance: Equipment operation of
Skid steers, Front end loaders and back hoes. Welding and maintenance of equipment.
New employee Training.
September 2000-2005 US Army 121st
INF Airborne LRSU
(Infantry Airborne Special Operations)
Airborne Special Operations 2003 Deployment in support of Operation Iraqi Freedom
Worked with Secret service and Georgia State patrol in support of the Global Eight
Summit 2004.
June 1991-Febuary 2003 Intermet Columbus Foundries
(Ductile Iron foundry)
Non Destructive testing Team Leader: Responsible for 4 technicians
And meeting finishing line and production goals. Helped established
Procedures for QS9000 certification. Robot Programming, Machine setup and
Calibration. Performed setups for Magnetic Particle, Immersion and contact flaw
Inspection and resonance frequency systems. PLC trouble shooting and PC
Building.
Training Summary
■ 2002 Industrial Robotics and Electronics NRI School of Robotics
■ Ultrasonic Level II Krautkramer NDT
■ Magnetic Particle Level II Intermet
■ Statistical Process Control Intermet
■ Kiazen Lean Manufacturing Intermet
■ CNC set up and Calibration Hyundai WIA
■ Siemens S7 Maintenance and Programming, Profibus Hyundai WIA
■ LRSU Leaders Course US Army)
■ OSUT US Army
■ Airborne School US Army
■ Advanced CQB Tactics MPRI
Certificates and
Awards
• Letter of Appreciation Office Of Naval Intelligence
• Certificate of Appreciation Chatham Metropolitan Police
• Certificate of Commendation Governor Sonny Perdue
• Global War on Terrorism Medal United States Army
• Combat Infantryman’s Badge United States Army
References Available upon request

More Related Content

What's hot

CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)Albert Aivan Laguador
 
TF Resume 1pg word 97 to 2003
TF Resume 1pg word 97 to 2003TF Resume 1pg word 97 to 2003
TF Resume 1pg word 97 to 2003Thomas Fosnaught
 
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWaell Azmy
 
CV-Mechanical engineer
CV-Mechanical engineerCV-Mechanical engineer
CV-Mechanical engineerMuhammad Umair
 
Professional Presentation
Professional PresentationProfessional Presentation
Professional Presentation
jorgedemorais
 
Christine Quinn Resume_Aug2015
Christine Quinn Resume_Aug2015Christine Quinn Resume_Aug2015
Christine Quinn Resume_Aug2015Christine Quinn
 
Cv padmanabh
Cv padmanabhCv padmanabh
Cv padmanabh
Padmanabh Dhobale
 
Mark Mazanec resume
Mark Mazanec resumeMark Mazanec resume
Mark Mazanec resume
Mark Mazanec
 
Refayet Amin
Refayet AminRefayet Amin
Refayet Amin
refayet
 
LAL Rajashekharan Mahendar p6
LAL Rajashekharan  Mahendar p6LAL Rajashekharan  Mahendar p6
LAL Rajashekharan Mahendar p6Rajshekharan M
 
MechanicalEng_UofM2
MechanicalEng_UofM2MechanicalEng_UofM2
MechanicalEng_UofM2Do Brach
 
Marumo_Resume(Mechanical Interior designer)
Marumo_Resume(Mechanical Interior designer)Marumo_Resume(Mechanical Interior designer)
Marumo_Resume(Mechanical Interior designer)Kagisano Marumo
 
Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015Miguel Ramirez
 

What's hot (20)

Senior Mechanical Engineer CV
Senior Mechanical Engineer CVSenior Mechanical Engineer CV
Senior Mechanical Engineer CV
 
Steven Morris 2015
Steven Morris 2015Steven Morris 2015
Steven Morris 2015
 
Brian_sResume1
Brian_sResume1Brian_sResume1
Brian_sResume1
 
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
CV- Albert Aivan Laguador - (Mechanical Engineer- Equipment,Maintenance)
 
Resume Eng_Mgmt 10.16
Resume Eng_Mgmt 10.16Resume Eng_Mgmt 10.16
Resume Eng_Mgmt 10.16
 
TF Resume 1pg word 97 to 2003
TF Resume 1pg word 97 to 2003TF Resume 1pg word 97 to 2003
TF Resume 1pg word 97 to 2003
 
sai-charan-das-katla-CV
sai-charan-das-katla-CVsai-charan-das-katla-CV
sai-charan-das-katla-CV
 
Wael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp LettersWael Azmy_CV + Exp Letters
Wael Azmy_CV + Exp Letters
 
CV-Mechanical engineer
CV-Mechanical engineerCV-Mechanical engineer
CV-Mechanical engineer
 
Professional Presentation
Professional PresentationProfessional Presentation
Professional Presentation
 
Christine Quinn Resume_Aug2015
Christine Quinn Resume_Aug2015Christine Quinn Resume_Aug2015
Christine Quinn Resume_Aug2015
 
Cv padmanabh
Cv padmanabhCv padmanabh
Cv padmanabh
 
Mark Mazanec resume
Mark Mazanec resumeMark Mazanec resume
Mark Mazanec resume
 
Refayet Amin
Refayet AminRefayet Amin
Refayet Amin
 
LAL Rajashekharan Mahendar p6
LAL Rajashekharan  Mahendar p6LAL Rajashekharan  Mahendar p6
LAL Rajashekharan Mahendar p6
 
MechanicalEng_UofM2
MechanicalEng_UofM2MechanicalEng_UofM2
MechanicalEng_UofM2
 
RESUME DJT van der Merwe
RESUME DJT van der MerweRESUME DJT van der Merwe
RESUME DJT van der Merwe
 
Marumo_Resume(Mechanical Interior designer)
Marumo_Resume(Mechanical Interior designer)Marumo_Resume(Mechanical Interior designer)
Marumo_Resume(Mechanical Interior designer)
 
DansResume 12-02-16
DansResume 12-02-16DansResume 12-02-16
DansResume 12-02-16
 
Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015Resume-Miguel Ramirez-March 2015
Resume-Miguel Ramirez-March 2015
 

Similar to James F BurtonII Resume 2016

Jonathan Todd, P.E. Resume 4-29-18
Jonathan Todd, P.E. Resume 4-29-18Jonathan Todd, P.E. Resume 4-29-18
Jonathan Todd, P.E. Resume 4-29-18
Jonathan Todd, P.E.
 
Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15Javier Davila
 
Cv Dab 2009a
Cv Dab 2009aCv Dab 2009a
Cv Dab 2009a
brown2464
 
Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Dane Wise
 
0 b a levine mfg qc eng resume
0 b a levine mfg   qc eng resume0 b a levine mfg   qc eng resume
0 b a levine mfg qc eng resumeAndy Levine
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateMohamed Zawam
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Dylan Gonsalves
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_ResumeJit Roy
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa
 

Similar to James F BurtonII Resume 2016 (20)

Jonathan Todd, P.E. Resume 4-29-18
Jonathan Todd, P.E. Resume 4-29-18Jonathan Todd, P.E. Resume 4-29-18
Jonathan Todd, P.E. Resume 4-29-18
 
John Scrowston CV v11
John Scrowston CV v11John Scrowston CV v11
John Scrowston CV v11
 
Michael Olinski Resume
Michael Olinski ResumeMichael Olinski Resume
Michael Olinski Resume
 
Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15Javier Davila rev final 5-20-15
Javier Davila rev final 5-20-15
 
JAS Resume
JAS ResumeJAS Resume
JAS Resume
 
Cv Dab 2009a
Cv Dab 2009aCv Dab 2009a
Cv Dab 2009a
 
Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933Presentation_Resume.p164007.f1586933
Presentation_Resume.p164007.f1586933
 
James McCann CV
James McCann CVJames McCann CV
James McCann CV
 
0 b a levine mfg qc eng resume
0 b a levine mfg   qc eng resume0 b a levine mfg   qc eng resume
0 b a levine mfg qc eng resume
 
Eng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last updateEng. Mohamed Zawam CV last update
Eng. Mohamed Zawam CV last update
 
CV
CVCV
CV
 
Ankur Parmar Jan 17
Ankur Parmar Jan 17Ankur Parmar Jan 17
Ankur Parmar Jan 17
 
Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)Resume_Dylan_Estimator(1)
Resume_Dylan_Estimator(1)
 
Scott E Huston Resume
Scott E Huston ResumeScott E Huston Resume
Scott E Huston Resume
 
Suvajit_Resume
Suvajit_ResumeSuvajit_Resume
Suvajit_Resume
 
Derek Paquette Resume
Derek Paquette ResumeDerek Paquette Resume
Derek Paquette Resume
 
CV-Anto-2016
CV-Anto-2016CV-Anto-2016
CV-Anto-2016
 
cv@sanjaychaubey REV
cv@sanjaychaubey REVcv@sanjaychaubey REV
cv@sanjaychaubey REV
 
cv@sanjaychaubey REV
cv@sanjaychaubey REVcv@sanjaychaubey REV
cv@sanjaychaubey REV
 
Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017Anas Khalifa's CV_JAN.-2017
Anas Khalifa's CV_JAN.-2017
 

James F BurtonII Resume 2016

  • 1. James F Burton II 50 Lee Rd 2194 Phenix City, AL 36870 (705)392-7031 / jamesfburton@gmail.com Objective Highly qualified Manager with over 20 years of diversified operations including Engineering, Maintenance and Production seeking professional employment in a responsible team oriented position. Skill Summary Extensive Engineering, Maintenance, Production/automation experience. Proven project management skills Capable of managing multiple projects Simultaneously. Proficient Logistics Coordinator. Proficient in Microsoft Office, Word Excel, PowerPoint, Project, AutoCAD, AutoCAD Inventor Fusion and Solid Works Solid edge Modeling Experienced in multiple areas of manufacturing processes to include: - Project management - Capital RFA/CEA creation - Material logistics - Machine Design/Fabrication - Robotics -Welding Steel/Aluminum - Hydraulics & Pneumatics - Machine layout and set up - Problem Analysis - Quality Assurance/SPC - Level II U.T. /M.T - Programming Employment 11/15/2013-Present Alexanders/Brenford/Aqua-Jet Experience (Environmental/Mechanical) Project Manager/Designer New business startup for the mechanical Division including Creating the business plan model, Employee hiring, new customer acquisition with job bidding, Project management,Producing CAD concept drawings for various projects and employee management. In charge of maintenance and machine improvement for Brenford sewer Hog Fleet including parts acquisition,Research and development and management of repair crew. Vice president/Designer for the Aqua jet Interceptor machine which includes product research and Development, Product design, Prototyping and testing, Production fabrication shop management including logistics of materials, employee oversight and CAD shop drawings for fabrication. Test facility development to find quicker and easier methods of cleaning large diameter pipe. Specific accomplishments include: • Developed a dual nozzle design that has a patent pending • Developed a dual pressure machine that has a patent pending • Developed electronically controlled large diameter pipe cleaning equipment to reduce employee train up and increase productivity August 2011 – 11/12/2013 Chassix/DMI, Columbus GA (Ductile Iron Foundry) Project Manager: Responsible for planning and managing multiple projects As well as creating and controlling the Capex budget. Also creating and monitoring the maintenance budget to help reduce the R&M Budget. Machine
  • 2. Design and production cell layout to increase cycle time efficiency. Management of the Fabrication Shop including logistics of materials, employee oversight and CAD shop drawings for fabrication. Specific accomplishments include: • Recreate the maintenance PM program to initiate 7i Program • Controlled $8.4 million in Capital projects • Reduced downtime and increased plant efficiency April 2009 – August 2011 Powertech America, West Point, GA (Advanced manufacturing Facility) Maintenance Team Leader: Responsible for The creation and implication of the PM Program, Supervision of 5Technicians. Maintenance of CNC, Robotic, Vision, Testing, PLC Trouble shooting and program modification, CAD Machine design and Fabrication, Advanced Automation and Controls. November 2007 – April 2009 ICForm Columbus, GA (Plastic injection Molding) Department Manager: Employee Supervision, Material Logistics, Quality Assurance, Machine Set up and maintenance, Robotic Programming, Problem Analysis, Welding and fabrication of ongoing projects. May 2005-2007 Eagle Grading &Construction (General construction) Heavy Equipment Operator and Maintenance: Equipment operation of Skid steers, Front end loaders and back hoes. Welding and maintenance of equipment. New employee Training. September 2000-2005 US Army 121st INF Airborne LRSU (Infantry Airborne Special Operations) Airborne Special Operations 2003 Deployment in support of Operation Iraqi Freedom Worked with Secret service and Georgia State patrol in support of the Global Eight Summit 2004. June 1991-Febuary 2003 Intermet Columbus Foundries (Ductile Iron foundry) Non Destructive testing Team Leader: Responsible for 4 technicians And meeting finishing line and production goals. Helped established Procedures for QS9000 certification. Robot Programming, Machine setup and Calibration. Performed setups for Magnetic Particle, Immersion and contact flaw Inspection and resonance frequency systems. PLC trouble shooting and PC Building. Training Summary ■ 2002 Industrial Robotics and Electronics NRI School of Robotics ■ Ultrasonic Level II Krautkramer NDT ■ Magnetic Particle Level II Intermet ■ Statistical Process Control Intermet
  • 3. ■ Kiazen Lean Manufacturing Intermet ■ CNC set up and Calibration Hyundai WIA ■ Siemens S7 Maintenance and Programming, Profibus Hyundai WIA ■ LRSU Leaders Course US Army) ■ OSUT US Army ■ Airborne School US Army ■ Advanced CQB Tactics MPRI Certificates and Awards • Letter of Appreciation Office Of Naval Intelligence • Certificate of Appreciation Chatham Metropolitan Police • Certificate of Commendation Governor Sonny Perdue • Global War on Terrorism Medal United States Army • Combat Infantryman’s Badge United States Army References Available upon request