SlideShare a Scribd company logo
1 of 2
Download to read offline
VARUN KUMAR GARG
Contact: +91-7073472161/ 9012317042 ~ E-Mail: varungarg_18@yahoo.co.in
To enhance my working capacities, professional skills, business efficiencies and to serve my organization in best
possible way with sheer determination and commitment.
Profile Summary
• An astute and dynamic professional with 4.6 years of experience in Project Management, Planning & Scheduling, Contract
Management.
• Deft in handling end-to-end project management including estimation, cost control, scheduling, delay analysis, material
requirement planning and liaising with consultants and clients for technical queries.
• Adroit in planning, executing & spearheading projects involving resource planning with a flair for adopting modern
methodologies in compliance to quality standards & time.
• Possess excellent leadership, communication, planning and people management skills.
Employment Details
Duration Organization Designation
Feb, 2014 – Till date Isolux Corsan India Engineering Planning Engineer
& Construction Pvt. Limited
Mar, 2011 – Feb, 2014 Petron Engineering Construction Limited Executive Engineer
Platform:
Microsoft Project 2007, Primavera P6, AutoCAD2007, SAP-MM.
Key Result Areas
Project Management
• Controlling the project cost within the budget, monitoring cash flow – cost control, preparing program of work for all projects
and directing team to finish the project in time.
• Scrutinizing of contract / tender documents for review tech. specifications, estimates, review of tenders and evaluations of
day to day activities.
Isolux Corsan India Engineering & Construction Pvt. Limited,
Period: Since Feb ‘14
Role: Planning Engineer
Project: DMRC (Mundka-Bahadurgarh, Phase-3) & NH-15 Jaisalmer
Key result Areas:
• Responsible for generation of documents such as project plan, work breakdown structure, overall and detailed schedule,
progress reports, construction methodology and presentations during the stage of proposal and execution.
• Data collection for scheduling, Actual vs. Schedule progress, Forecasting, Resource planning.
• Monitor critical path & overall schedule on a daily basis by collecting necessary data for the same.
• Prepares progress measurement system procedures and carry-out project progress update on stipulated intervals and
supports Project Control Team.
• Identify the requirement of revision in schedule, raise alert of same to Project Control Manager and carry out revision in
schedules.
• Track quantities of bulks and tagged items across the life cycle of the project i.e. stages of E.P.C.
• Cost control report generation & Analysis of over/ under expenditure causes.
• Responsible for the Certification of Construction invoices.
• Liaison, preparation and issue of all time impact due to change orders and time extension claims.
• Coordinate with Cost Controller with respect to level of congruence between planning and cost WBS.
Petron Engineering Construction Ltd., Mumbai (H.O.)
Projects: AVU Heater Package (Paradip Refinery Project), Cracker Furnace Package for Petrochemical
Complex - II
Period: From Mar’11 to Feb’14
Role: Executive Engineer
Key Result Areas:
• Collaborates with the projects team to define the project phases (planning, execution) and milestones which forms the
basis for execution.
• Participate in the value engineering meetings on the documents submitted by the consultants and identify areas to improve
cost effectiveness and increase efficiency in terms of faster completion of projects.
• Provides input into project planning including activity development.
• Develop baseline schedule.
• Responsible to develop and maintain the project management methodology and developing the required documents and
templates.
• Coordinates with the project execution team to get daily update on the project progress.
• Maintains records and data of project schedules and regularly reviews the actual progress vis--vis the plan and generate
project progress reports on timelines and costs.
• Develop and implement MIS system within the projects department to facilitate the review process.
• Produce periodic reports in defined templates to be used by executive management and projects team to track progress of
the project.
• Study of Contract documents to monitor the project implementation in Petrochemical Project & Refinery Projects.
• Review and analysis of the estimated target cost proposed by the proposals dept. and approval.
• Preparation of Projected cash flow statement of the project and Approval.
• Processed & tracked budget transfers & change orders.
• Review and analysis for the project schedule submitted by HO planning dept./ Site planning dept.
• To track the material required at site by means of updating of MR tracking sheet for EPC projects and co-ordinate with
Central Procurement Department.
• Review of achievement with respect to the completion schedule and follow up for corrective measures.
• To coordinate with Engineering Department for preparation of BOQ and MTO.
• Co-ordination with the Central Procurement Department for the bought out items and follow up with vendors for inspection
& delivery and acceptance of the material at site.
Academic Details
• PGP (Project Engineering Management) from NICMAR, Pune in 2011 with 7.49 CPI
• B.Tech. (Chemical Engineering) from Kurukshetra University, JMIT in Radaur (Haryana) 2008 with 67.3%
• 12
th
from M.L.N. Public School, Jind (Haryana), C.B.S.E. Board in 2004 with 60.8%
• 10
th
from M.L.N. Public School, Jind (Haryana), C.B.S.E. Board in 2002 with 69.6%
Personal Details
Date of Birth: 18
th
September 1986
Address H.No. 145, Sector-14, Vasundhara, Ghaziabad (U.P.) - 201012
Languages Known: English and Hindi

More Related Content

What's hot

Cost management plan tyre recycling plant
Cost management plan  tyre recycling plantCost management plan  tyre recycling plant
Cost management plan tyre recycling plantabhishekthakur309
 
SamGhoshProjectmanagement7
SamGhoshProjectmanagement7SamGhoshProjectmanagement7
SamGhoshProjectmanagement7Sam Ghosh
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2mahmood mansor
 
OLA CV doc NRx (1)
OLA CV doc NRx (1)OLA CV doc NRx (1)
OLA CV doc NRx (1)Saheed Taiwo
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - LatestPeter White
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_shailendra kumar
 
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.iFour Institute - Sustainable Learning
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Aew Sanmai
 
Resume_2016_full
Resume_2016_fullResume_2016_full
Resume_2016_fullJason Cole
 
Resume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS BamadefahResume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS BamadefahMohamed Bamadhaf
 
Danielle Gomm Resume
Danielle Gomm ResumeDanielle Gomm Resume
Danielle Gomm ResumeDanielle Gomm
 
Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2Kenneth Ifidon
 

What's hot (20)

Cost management plan tyre recycling plant
Cost management plan  tyre recycling plantCost management plan  tyre recycling plant
Cost management plan tyre recycling plant
 
SamGhoshProjectmanagement7
SamGhoshProjectmanagement7SamGhoshProjectmanagement7
SamGhoshProjectmanagement7
 
Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2Mahmood Ibrahim Mansoor - Resume - Final 2
Mahmood Ibrahim Mansoor - Resume - Final 2
 
C.V
C.VC.V
C.V
 
OLA CV doc NRx (1)
OLA CV doc NRx (1)OLA CV doc NRx (1)
OLA CV doc NRx (1)
 
Peter White CV - Latest
Peter White CV - LatestPeter White CV - Latest
Peter White CV - Latest
 
CJM Construction Consulting PowerPoint Presentation
CJM Construction Consulting PowerPoint PresentationCJM Construction Consulting PowerPoint Presentation
CJM Construction Consulting PowerPoint Presentation
 
Appli. for the Const. Mngr
Appli. for the Const. MngrAppli. for the Const. Mngr
Appli. for the Const. Mngr
 
Project Execution
Project ExecutionProject Execution
Project Execution
 
Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_Shailendra_Kumar_Resume_V01__1_
Shailendra_Kumar_Resume_V01__1_
 
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
Project management : Project Monitoring and Control by iFour Technolab Pvt. Ltd.
 
Project monitoring lecture 1
Project monitoring lecture 1Project monitoring lecture 1
Project monitoring lecture 1
 
Peter White CV
Peter White CV Peter White CV
Peter White CV
 
project monitoring and control
project monitoring and controlproject monitoring and control
project monitoring and control
 
Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16Contract Administrator Aew_Sanmai_RV10.2.16
Contract Administrator Aew_Sanmai_RV10.2.16
 
Resume_2016_full
Resume_2016_fullResume_2016_full
Resume_2016_full
 
Resume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS BamadefahResume - Mohamed Ahmed MS Bamadefah
Resume - Mohamed Ahmed MS Bamadefah
 
Danielle Gomm Resume
Danielle Gomm ResumeDanielle Gomm Resume
Danielle Gomm Resume
 
Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2Ken's_Resume_April 2015 r2
Ken's_Resume_April 2015 r2
 
Monitoring the control
Monitoring the control Monitoring the control
Monitoring the control
 

Similar to Varun Garg_CV

Similar to Varun Garg_CV (20)

sravankumar
sravankumarsravankumar
sravankumar
 
Raghu CV 30_12_15
Raghu CV 30_12_15Raghu CV 30_12_15
Raghu CV 30_12_15
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 
CV
CVCV
CV
 
Nawaz Eng-OCT
Nawaz Eng-OCTNawaz Eng-OCT
Nawaz Eng-OCT
 
Gaurav Shukla_CV
Gaurav Shukla_CVGaurav Shukla_CV
Gaurav Shukla_CV
 
UCM-CV
UCM-CVUCM-CV
UCM-CV
 
Sohaib_CV-
Sohaib_CV-Sohaib_CV-
Sohaib_CV-
 
bingsusu.pptx
bingsusu.pptxbingsusu.pptx
bingsusu.pptx
 
ac (1)
ac (1)ac (1)
ac (1)
 
Resume- Project Management Analyst
Resume- Project Management AnalystResume- Project Management Analyst
Resume- Project Management Analyst
 
Senior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik AsanSenior Planning Engineer -Mohidee Sheik Asan
Senior Planning Engineer -Mohidee Sheik Asan
 
projectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptxprojectmanagement-130721095616-phpapp01-converted.pptx
projectmanagement-130721095616-phpapp01-converted.pptx
 
Prashant Wani1
Prashant Wani1Prashant Wani1
Prashant Wani1
 
Suraj Kumar-Resume Program Management
Suraj Kumar-Resume Program ManagementSuraj Kumar-Resume Program Management
Suraj Kumar-Resume Program Management
 
Samsul Alam Resume
Samsul Alam ResumeSamsul Alam Resume
Samsul Alam Resume
 
Anand resume scm
Anand resume scmAnand resume scm
Anand resume scm
 
Project management
Project managementProject management
Project management
 
Ali Abbas - Premises Engineer
Ali Abbas - Premises EngineerAli Abbas - Premises Engineer
Ali Abbas - Premises Engineer
 
Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01Projectmanagement 130721095616-phpapp01
Projectmanagement 130721095616-phpapp01
 

Varun Garg_CV

  • 1. VARUN KUMAR GARG Contact: +91-7073472161/ 9012317042 ~ E-Mail: varungarg_18@yahoo.co.in To enhance my working capacities, professional skills, business efficiencies and to serve my organization in best possible way with sheer determination and commitment. Profile Summary • An astute and dynamic professional with 4.6 years of experience in Project Management, Planning & Scheduling, Contract Management. • Deft in handling end-to-end project management including estimation, cost control, scheduling, delay analysis, material requirement planning and liaising with consultants and clients for technical queries. • Adroit in planning, executing & spearheading projects involving resource planning with a flair for adopting modern methodologies in compliance to quality standards & time. • Possess excellent leadership, communication, planning and people management skills. Employment Details Duration Organization Designation Feb, 2014 – Till date Isolux Corsan India Engineering Planning Engineer & Construction Pvt. Limited Mar, 2011 – Feb, 2014 Petron Engineering Construction Limited Executive Engineer Platform: Microsoft Project 2007, Primavera P6, AutoCAD2007, SAP-MM. Key Result Areas Project Management • Controlling the project cost within the budget, monitoring cash flow – cost control, preparing program of work for all projects and directing team to finish the project in time. • Scrutinizing of contract / tender documents for review tech. specifications, estimates, review of tenders and evaluations of day to day activities. Isolux Corsan India Engineering & Construction Pvt. Limited, Period: Since Feb ‘14 Role: Planning Engineer Project: DMRC (Mundka-Bahadurgarh, Phase-3) & NH-15 Jaisalmer Key result Areas: • Responsible for generation of documents such as project plan, work breakdown structure, overall and detailed schedule, progress reports, construction methodology and presentations during the stage of proposal and execution. • Data collection for scheduling, Actual vs. Schedule progress, Forecasting, Resource planning. • Monitor critical path & overall schedule on a daily basis by collecting necessary data for the same. • Prepares progress measurement system procedures and carry-out project progress update on stipulated intervals and supports Project Control Team. • Identify the requirement of revision in schedule, raise alert of same to Project Control Manager and carry out revision in schedules. • Track quantities of bulks and tagged items across the life cycle of the project i.e. stages of E.P.C. • Cost control report generation & Analysis of over/ under expenditure causes. • Responsible for the Certification of Construction invoices. • Liaison, preparation and issue of all time impact due to change orders and time extension claims. • Coordinate with Cost Controller with respect to level of congruence between planning and cost WBS. Petron Engineering Construction Ltd., Mumbai (H.O.) Projects: AVU Heater Package (Paradip Refinery Project), Cracker Furnace Package for Petrochemical Complex - II Period: From Mar’11 to Feb’14 Role: Executive Engineer
  • 2. Key Result Areas: • Collaborates with the projects team to define the project phases (planning, execution) and milestones which forms the basis for execution. • Participate in the value engineering meetings on the documents submitted by the consultants and identify areas to improve cost effectiveness and increase efficiency in terms of faster completion of projects. • Provides input into project planning including activity development. • Develop baseline schedule. • Responsible to develop and maintain the project management methodology and developing the required documents and templates. • Coordinates with the project execution team to get daily update on the project progress. • Maintains records and data of project schedules and regularly reviews the actual progress vis--vis the plan and generate project progress reports on timelines and costs. • Develop and implement MIS system within the projects department to facilitate the review process. • Produce periodic reports in defined templates to be used by executive management and projects team to track progress of the project. • Study of Contract documents to monitor the project implementation in Petrochemical Project & Refinery Projects. • Review and analysis of the estimated target cost proposed by the proposals dept. and approval. • Preparation of Projected cash flow statement of the project and Approval. • Processed & tracked budget transfers & change orders. • Review and analysis for the project schedule submitted by HO planning dept./ Site planning dept. • To track the material required at site by means of updating of MR tracking sheet for EPC projects and co-ordinate with Central Procurement Department. • Review of achievement with respect to the completion schedule and follow up for corrective measures. • To coordinate with Engineering Department for preparation of BOQ and MTO. • Co-ordination with the Central Procurement Department for the bought out items and follow up with vendors for inspection & delivery and acceptance of the material at site. Academic Details • PGP (Project Engineering Management) from NICMAR, Pune in 2011 with 7.49 CPI • B.Tech. (Chemical Engineering) from Kurukshetra University, JMIT in Radaur (Haryana) 2008 with 67.3% • 12 th from M.L.N. Public School, Jind (Haryana), C.B.S.E. Board in 2004 with 60.8% • 10 th from M.L.N. Public School, Jind (Haryana), C.B.S.E. Board in 2002 with 69.6% Personal Details Date of Birth: 18 th September 1986 Address H.No. 145, Sector-14, Vasundhara, Ghaziabad (U.P.) - 201012 Languages Known: English and Hindi