Curriculum Vitae
Instrumentation and Control Engineer
ULFAT HUSSAIN
Cell Phone: 00923049791247
email: engr.pitafi2014@gmail.com
Date of birth: 20-12-1977
Nationality: Pakistani
Passport No: HC6898092
Availability: Immediately available
Objective:
To work in a challenging environment
demanding all my skills and efforts in the field of
Electronics, Instrumentation & Control systems;
to explore and adapt myself in different fields,
realize my potential and contribute to the
development of organization.
Role and Responsibilities
Senior Instrumentation and Control Engineer (June 2004 ~ to date),
Chashma Power Plant-1, Mianwali, Pakistan.
Supervise all corrective and preventive maintenance activities on I&C related systems/equipments of the plant,
which includes:
 To ensure reliable and efficient performance of I&C related equipments/instruments.
 Preparing master data sheet for Preventive Maintenance (PM) schedule; ensuring safe and efficient
performance of Corrective Maintenance (CM) activities.
 Supervising Plant Shutdown jobs.
 Design, implementation and commissioning new control loops as per plant/system requirements.
 Review of Control logic and algorithm, P&I diagrams, cause and effect analysis, Instrument lists and Flow
charts.
 Technical support for the Instrumentation team; necessary training and the know-how of latest market
trends.
 Experienced in Procurement activities for Spare Management; ensuring minimum Plant Instrumentation
Inventory for Routine, Shutdown and Emergency Maintenance jobs.
 Developing the Procedures for the Operation and Maintenance of different Control and Instrumentation
systems and Equipment.
 Scheduling regular meetings for maintenance Activities.
 Supervising the team of 15 technical personnel for day to day maintenance activities.
 Documentation and control of inventory procurement, release and management.
 Coordinating and liaising with other Divisions including Electrical/Mechanical maintenance divisions for
Scheduling routine and emergency maintenance activities, and with Operation and Technical divisions for
preparing weekly/monthly Reports of corrective and Preventive maintenance activities at the Plant.
 Excellent communication interpersonal skills.
 Preparing Quality plans for the execution of routine and shutdown jobs, technical reports about the incidents,
Experience feedback for the Plant management.
 Evaluation of set points of the safety related instrumentation of the Plant.
Technical Skills
About 11 years of experience as an Instrumentation and Control Engineer in efficient and effective maintenance,
commissioning and development of I&C systems in Power Plant and on-site projects; which are summarized
below:
 Design and Commissioning Experience
Designed and implemented Instrumentation and Control system for the HVAC system of newly built Mechanical
Maintenance Workshop (MMW) for routine and Plant shutdown activities, below is the summary of my jobs
during the project:
 In this project, I worked as I&C design and commissioning Engineer of HVAC system.
 Prepared detailed engineering drawings on AutoCAD 2007 (Version 17.0) which helped me to evaluate the
area of the building (Floor space=2708m², Building area=5433 m²) and calculated total cooling load of MMW
(1843kW).
 Worked out for the necessary instrumentation to monitor different process parameters of air ducts, process
piping, Chillers, Air Handling Units (AHU), Air Control Units (ACU).
 Developed HVAC system flow sheet, Flow diagram (FD), PID Instrumentation layout, wiring drawing, building
roof lightning plan using AutoCAD and Office Visio 2007 (Version 12.0).
 Inspected equipment/instruments before commissioning.
 I have used MATLAB 7.1 (R14SP3) programming technique to analyze over all behavior of designed control
system.
 Developed a mechanism to handle the time constraint, ensuring that project should be completed in time and
successful as well.
 Maintenance Experience
 Responsible Engineer for smooth working of DCS (SUPMAX 800) based Electro-Hydraulic system (DEH) of
three Cylinder 325MWe Turbine, (Model # HN325-5.34; Shanghai Turbine Company) for Regulating four
Governor Valves (GVs), two Main Stop Valves (MSV), four Reheat Stop Valves (RSV) and four Main Intercept
Valves (MIV) for Moisture Separator and Re-heater.
 Bentley Nevada 3500 Turbine Supervisory Instrumentation (TSI) for measuring (Phase, Acceleration,
Eccentricity, Differential Expansion, Thrust Position, Velocity, Vibration…)
 All other instrumentation of Turbine Auxiliaries including Moisture Separator and Re-heater system, Steam
Water system of De-Aerator and its Pressure and Level Control system, Steam Dump system, Turbine Steam
Extraction System, Turbine Lubrication system, Condensate Vacuum System, Electro Hydraulic Oil circuit,
Lubrication oil circuit etc.
 Configuration and fault diagnosis of DCS (PCS 7, V 6.0 Siemens, Centum CS3000 Yokogawa, SUPMAX 800,
SUPCON for HVAC systems) and in PLCs (Siemens Simatic S7 200, 300, 400).
 Routine inspection of I/O Cabinets, Engineering Operating Work-Station, Protocols, Power supply,
connectors, Data Highway for DCS based systems.
 Hydraulic ON/OFF two Main Steam Isolation valves (MSIV) and two Main Feed Water Isolation Valves (MFIV),
Pneumatic Regulating Main and By-pass Feed Water Valves, Emergency Steam relief valves; including related
instrumentation of above vales i.e. Solenoids (ASCO), I/P converter, Booster Relay, Pressure Switches (United
Electrical UE, UEDA), Flow switches (SOR) etc.
 Chiller's Instrumentation; Compression type 02 Chillers (LG Korea) and 04 Absorption Type Chillers (Two-
stage Lithium Bromide).
 Periodic Functional checking of Air-compressors/Emergency Compressors and Boiler Related
Instrumentation; three element Boiler Pressure and Level control system.
 Configuration of PID controllers (Chino, KMP (Programmable), KMS (Fixed programmed) etc.
 Checking and calibration of Pressure reducing valves, Manual valves and Pneumatic Actuators and valve
Positioners.
 Maintenance and calibration of all types of Level, Flow, Pressure (Emerson, Rosemount, Barton Model#752
etc.) Humidity Transmitters, pH meters, Conductivity meters.
 Checking, set-point verification and tripping mechanism of Limit switches, Level, Pressure, Temperature and
Flow Switches.
 Checking and loop calibration of RTDs (WZP Series Pt100 Type), Thermocouples (J, K-type).
 Participated in the team responsible of removal of old and installation of new Chillers at the plant.
Academic Qualification, Courses and Trainings
 [Management course, June 2015], two weeks Managerial training; mandatory before promotion in next
group, under 4Q HRD (QS-3) program.
 [PIMS course, January 2015], one week Maintenance Management training conducted by Pakistan Institute
of Management Sciences.
 [Management course, January 2014], two weeks Professional Management training under 4Q HRD (QS-2)
program.
 [PID Controller lab demonstration, May 2013], Controller’s behavior on varying different process
parameters.
 [Short Technical Course, March, 2010] SHIANGLANG Multinational Company, the designer of LiBr Chillers
and on SUPCON DCS based HVAC Systems. (Chashma Nuclear site, Pakistan).
 [Hands on workshop, December, 2009] Vacuum Sciences and Technology, (Quaid-e-Azam University Islamabad,
Pakistan).
 [Short Technical Course, July, 2007] Distributed Control System (SUPMAX 800), Chashma Nuclear site, Pakistan.
 [Overseas Training, December, 2007] Comprehensive training session on Instrumentation and Control QNPP-1
China.
 [Postgraduate Diploma, June 2004] in Plant Instrumentation Engineering (Chashma Plant site, Pakistan).
 [Bachelor of Engineering, December, 2001] in Electronic Engineering (Mehran Engineering University
Jamshoro, Pakistan.

More Related Content

What's hot

Maintenance Supervisor Resume template
Maintenance Supervisor Resume templateMaintenance Supervisor Resume template
Maintenance Supervisor Resume templateBobby Key
 
Commissioning of Offshore Installations
Commissioning of Offshore InstallationsCommissioning of Offshore Installations
Commissioning of Offshore Installationswan saiful arini
 
AS_TD_en_SAFE-Audit-Tools_1304
AS_TD_en_SAFE-Audit-Tools_1304AS_TD_en_SAFE-Audit-Tools_1304
AS_TD_en_SAFE-Audit-Tools_1304Niels Inderbiethen
 
Maintenance plan
Maintenance planMaintenance plan
Maintenance planNauman khan
 
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...GSE Systems, Inc.
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e bookjericfreimuth
 
110921 commissioning of offshore installations
110921 commissioning of offshore installations110921 commissioning of offshore installations
110921 commissioning of offshore installationslaithu2908
 
Safe work procedure1
Safe work procedure1Safe work procedure1
Safe work procedure1Jahanzeb Khan
 
Maintenance & its types
Maintenance & its typesMaintenance & its types
Maintenance & its typeszohaib moin
 

What's hot (20)

venkat resume
venkat resumevenkat resume
venkat resume
 
Maintenance Supervisor Resume template
Maintenance Supervisor Resume templateMaintenance Supervisor Resume template
Maintenance Supervisor Resume template
 
RAbella CV
RAbella CVRAbella CV
RAbella CV
 
luai_cv
luai_cvluai_cv
luai_cv
 
Commissioning of Offshore Installations
Commissioning of Offshore InstallationsCommissioning of Offshore Installations
Commissioning of Offshore Installations
 
AS_TD_en_SAFE-Audit-Tools_1304
AS_TD_en_SAFE-Audit-Tools_1304AS_TD_en_SAFE-Audit-Tools_1304
AS_TD_en_SAFE-Audit-Tools_1304
 
Mohamed elsayed updated
Mohamed elsayed updatedMohamed elsayed updated
Mohamed elsayed updated
 
Maintenace management and TPM
Maintenace management and TPMMaintenace management and TPM
Maintenace management and TPM
 
Maintenance 2sp
Maintenance 2spMaintenance 2sp
Maintenance 2sp
 
Maintenance plan
Maintenance planMaintenance plan
Maintenance plan
 
5546
55465546
5546
 
PM and CAlibration
PM and CAlibrationPM and CAlibration
PM and CAlibration
 
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
High-Fidelity Operator Training Simulator for CCGT Implemented Before Plant C...
 
Oil & Gas Maintenance Guide
Oil & Gas Maintenance GuideOil & Gas Maintenance Guide
Oil & Gas Maintenance Guide
 
MAINTENANCE MANAGEMENT
MAINTENANCE MANAGEMENT MAINTENANCE MANAGEMENT
MAINTENANCE MANAGEMENT
 
Preventive maintenance e book
Preventive maintenance e bookPreventive maintenance e book
Preventive maintenance e book
 
Zaheer-CV- 2015
Zaheer-CV- 2015Zaheer-CV- 2015
Zaheer-CV- 2015
 
110921 commissioning of offshore installations
110921 commissioning of offshore installations110921 commissioning of offshore installations
110921 commissioning of offshore installations
 
Safe work procedure1
Safe work procedure1Safe work procedure1
Safe work procedure1
 
Maintenance & its types
Maintenance & its typesMaintenance & its types
Maintenance & its types
 

Viewers also liked

Gov proj mgmt for multi locations v 0.1
Gov proj mgmt for multi locations v 0.1Gov proj mgmt for multi locations v 0.1
Gov proj mgmt for multi locations v 0.1Reshma Agarwal
 
5+ years experience_MTech_Thermal_Design & Application (5)
5+ years experience_MTech_Thermal_Design & Application (5)5+ years experience_MTech_Thermal_Design & Application (5)
5+ years experience_MTech_Thermal_Design & Application (5)jagadeesha KT
 
posibilidad del conocimiento
posibilidad del conocimiento posibilidad del conocimiento
posibilidad del conocimiento Cornelio Aptl
 
Декларації Терещука Ю В за 2014, 2015 роки
Декларації Терещука Ю В за 2014, 2015 рокиДекларації Терещука Ю В за 2014, 2015 роки
Декларації Терещука Ю В за 2014, 2015 рокиYurii Horbach
 
Report on ndf_cycas_thouarsii_final
Report on ndf_cycas_thouarsii_finalReport on ndf_cycas_thouarsii_final
Report on ndf_cycas_thouarsii_finalankita thakur
 
BUILDINGSERVICE - Project 2 Final Report
BUILDINGSERVICE - Project 2 Final Report BUILDINGSERVICE - Project 2 Final Report
BUILDINGSERVICE - Project 2 Final Report Vicky Lee
 
Narrative Theory in Brief
Narrative Theory in BriefNarrative Theory in Brief
Narrative Theory in BriefKim Fyson
 
Plan educaţional individualizat
Plan educaţional individualizatPlan educaţional individualizat
Plan educaţional individualizatCristina Moraru
 

Viewers also liked (13)

Gov proj mgmt for multi locations v 0.1
Gov proj mgmt for multi locations v 0.1Gov proj mgmt for multi locations v 0.1
Gov proj mgmt for multi locations v 0.1
 
5+ years experience_MTech_Thermal_Design & Application (5)
5+ years experience_MTech_Thermal_Design & Application (5)5+ years experience_MTech_Thermal_Design & Application (5)
5+ years experience_MTech_Thermal_Design & Application (5)
 
posibilidad del conocimiento
posibilidad del conocimiento posibilidad del conocimiento
posibilidad del conocimiento
 
Nana si vas en moto, tu ets la carrosseria
Nana si vas en moto, tu ets la carrosseriaNana si vas en moto, tu ets la carrosseria
Nana si vas en moto, tu ets la carrosseria
 
Edital convocação reda 001.2013 7 (1)
Edital convocação reda 001.2013   7 (1)Edital convocação reda 001.2013   7 (1)
Edital convocação reda 001.2013 7 (1)
 
adebayor c.v
adebayor c.vadebayor c.v
adebayor c.v
 
Salt social media
Salt social mediaSalt social media
Salt social media
 
nonbox marketing summit
nonbox marketing summitnonbox marketing summit
nonbox marketing summit
 
Декларації Терещука Ю В за 2014, 2015 роки
Декларації Терещука Ю В за 2014, 2015 рокиДекларації Терещука Ю В за 2014, 2015 роки
Декларації Терещука Ю В за 2014, 2015 роки
 
Report on ndf_cycas_thouarsii_final
Report on ndf_cycas_thouarsii_finalReport on ndf_cycas_thouarsii_final
Report on ndf_cycas_thouarsii_final
 
BUILDINGSERVICE - Project 2 Final Report
BUILDINGSERVICE - Project 2 Final Report BUILDINGSERVICE - Project 2 Final Report
BUILDINGSERVICE - Project 2 Final Report
 
Narrative Theory in Brief
Narrative Theory in BriefNarrative Theory in Brief
Narrative Theory in Brief
 
Plan educaţional individualizat
Plan educaţional individualizatPlan educaţional individualizat
Plan educaţional individualizat
 

Similar to Curriculum Vitae

Similar to Curriculum Vitae (20)

Adil Field Instrument without apprentice Cv
Adil Field Instrument  without apprentice CvAdil Field Instrument  without apprentice Cv
Adil Field Instrument without apprentice Cv
 
M.Yesrub Iqbal
M.Yesrub IqbalM.Yesrub Iqbal
M.Yesrub Iqbal
 
ROHIT JOSHI JI
ROHIT JOSHI JIROHIT JOSHI JI
ROHIT JOSHI JI
 
AVINASH . Basrur
AVINASH . BasrurAVINASH . Basrur
AVINASH . Basrur
 
Instrument Supervisor
Instrument SupervisorInstrument Supervisor
Instrument Supervisor
 
MyCV
MyCVMyCV
MyCV
 
CV Nagashiva
CV Nagashiva CV Nagashiva
CV Nagashiva
 
Resume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experienceResume_Instrumentation Engineer_7.5 year experience
Resume_Instrumentation Engineer_7.5 year experience
 
Jai kishore Tiwari resume
Jai kishore Tiwari resume Jai kishore Tiwari resume
Jai kishore Tiwari resume
 
Lingeswaran CVe
Lingeswaran CVeLingeswaran CVe
Lingeswaran CVe
 
social profile _sachin soni_220715
social profile _sachin soni_220715social profile _sachin soni_220715
social profile _sachin soni_220715
 
Antony Praveen
Antony PraveenAntony Praveen
Antony Praveen
 
Resume_Rajeev
Resume_RajeevResume_Rajeev
Resume_Rajeev
 
Resume Ravindra K Maheshwari - CC
Resume Ravindra K Maheshwari -  CCResume Ravindra K Maheshwari -  CC
Resume Ravindra K Maheshwari - CC
 
RESUME
RESUMERESUME
RESUME
 
Resume
ResumeResume
Resume
 
Praveen Kumar (Resume)
Praveen Kumar (Resume)Praveen Kumar (Resume)
Praveen Kumar (Resume)
 
Balaram_Panda_Resume
Balaram_Panda_ResumeBalaram_Panda_Resume
Balaram_Panda_Resume
 
MY_CV_1
MY_CV_1MY_CV_1
MY_CV_1
 
Eng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments EngineerEng Ahmed Mostafa Helmy_ Instruments Engineer
Eng Ahmed Mostafa Helmy_ Instruments Engineer
 

Curriculum Vitae

  • 1. Curriculum Vitae Instrumentation and Control Engineer ULFAT HUSSAIN Cell Phone: 00923049791247 email: engr.pitafi2014@gmail.com Date of birth: 20-12-1977 Nationality: Pakistani Passport No: HC6898092 Availability: Immediately available Objective: To work in a challenging environment demanding all my skills and efforts in the field of Electronics, Instrumentation & Control systems; to explore and adapt myself in different fields, realize my potential and contribute to the development of organization. Role and Responsibilities Senior Instrumentation and Control Engineer (June 2004 ~ to date), Chashma Power Plant-1, Mianwali, Pakistan. Supervise all corrective and preventive maintenance activities on I&C related systems/equipments of the plant, which includes:  To ensure reliable and efficient performance of I&C related equipments/instruments.  Preparing master data sheet for Preventive Maintenance (PM) schedule; ensuring safe and efficient performance of Corrective Maintenance (CM) activities.  Supervising Plant Shutdown jobs.  Design, implementation and commissioning new control loops as per plant/system requirements.  Review of Control logic and algorithm, P&I diagrams, cause and effect analysis, Instrument lists and Flow charts.  Technical support for the Instrumentation team; necessary training and the know-how of latest market trends.  Experienced in Procurement activities for Spare Management; ensuring minimum Plant Instrumentation Inventory for Routine, Shutdown and Emergency Maintenance jobs.  Developing the Procedures for the Operation and Maintenance of different Control and Instrumentation systems and Equipment.  Scheduling regular meetings for maintenance Activities.  Supervising the team of 15 technical personnel for day to day maintenance activities.  Documentation and control of inventory procurement, release and management.  Coordinating and liaising with other Divisions including Electrical/Mechanical maintenance divisions for Scheduling routine and emergency maintenance activities, and with Operation and Technical divisions for preparing weekly/monthly Reports of corrective and Preventive maintenance activities at the Plant.  Excellent communication interpersonal skills.  Preparing Quality plans for the execution of routine and shutdown jobs, technical reports about the incidents, Experience feedback for the Plant management.  Evaluation of set points of the safety related instrumentation of the Plant.
  • 2. Technical Skills About 11 years of experience as an Instrumentation and Control Engineer in efficient and effective maintenance, commissioning and development of I&C systems in Power Plant and on-site projects; which are summarized below:  Design and Commissioning Experience Designed and implemented Instrumentation and Control system for the HVAC system of newly built Mechanical Maintenance Workshop (MMW) for routine and Plant shutdown activities, below is the summary of my jobs during the project:  In this project, I worked as I&C design and commissioning Engineer of HVAC system.  Prepared detailed engineering drawings on AutoCAD 2007 (Version 17.0) which helped me to evaluate the area of the building (Floor space=2708m², Building area=5433 m²) and calculated total cooling load of MMW (1843kW).  Worked out for the necessary instrumentation to monitor different process parameters of air ducts, process piping, Chillers, Air Handling Units (AHU), Air Control Units (ACU).  Developed HVAC system flow sheet, Flow diagram (FD), PID Instrumentation layout, wiring drawing, building roof lightning plan using AutoCAD and Office Visio 2007 (Version 12.0).  Inspected equipment/instruments before commissioning.  I have used MATLAB 7.1 (R14SP3) programming technique to analyze over all behavior of designed control system.  Developed a mechanism to handle the time constraint, ensuring that project should be completed in time and successful as well.  Maintenance Experience  Responsible Engineer for smooth working of DCS (SUPMAX 800) based Electro-Hydraulic system (DEH) of three Cylinder 325MWe Turbine, (Model # HN325-5.34; Shanghai Turbine Company) for Regulating four Governor Valves (GVs), two Main Stop Valves (MSV), four Reheat Stop Valves (RSV) and four Main Intercept Valves (MIV) for Moisture Separator and Re-heater.  Bentley Nevada 3500 Turbine Supervisory Instrumentation (TSI) for measuring (Phase, Acceleration, Eccentricity, Differential Expansion, Thrust Position, Velocity, Vibration…)  All other instrumentation of Turbine Auxiliaries including Moisture Separator and Re-heater system, Steam Water system of De-Aerator and its Pressure and Level Control system, Steam Dump system, Turbine Steam Extraction System, Turbine Lubrication system, Condensate Vacuum System, Electro Hydraulic Oil circuit, Lubrication oil circuit etc.  Configuration and fault diagnosis of DCS (PCS 7, V 6.0 Siemens, Centum CS3000 Yokogawa, SUPMAX 800, SUPCON for HVAC systems) and in PLCs (Siemens Simatic S7 200, 300, 400).  Routine inspection of I/O Cabinets, Engineering Operating Work-Station, Protocols, Power supply, connectors, Data Highway for DCS based systems.
  • 3.  Hydraulic ON/OFF two Main Steam Isolation valves (MSIV) and two Main Feed Water Isolation Valves (MFIV), Pneumatic Regulating Main and By-pass Feed Water Valves, Emergency Steam relief valves; including related instrumentation of above vales i.e. Solenoids (ASCO), I/P converter, Booster Relay, Pressure Switches (United Electrical UE, UEDA), Flow switches (SOR) etc.  Chiller's Instrumentation; Compression type 02 Chillers (LG Korea) and 04 Absorption Type Chillers (Two- stage Lithium Bromide).  Periodic Functional checking of Air-compressors/Emergency Compressors and Boiler Related Instrumentation; three element Boiler Pressure and Level control system.  Configuration of PID controllers (Chino, KMP (Programmable), KMS (Fixed programmed) etc.  Checking and calibration of Pressure reducing valves, Manual valves and Pneumatic Actuators and valve Positioners.  Maintenance and calibration of all types of Level, Flow, Pressure (Emerson, Rosemount, Barton Model#752 etc.) Humidity Transmitters, pH meters, Conductivity meters.  Checking, set-point verification and tripping mechanism of Limit switches, Level, Pressure, Temperature and Flow Switches.  Checking and loop calibration of RTDs (WZP Series Pt100 Type), Thermocouples (J, K-type).  Participated in the team responsible of removal of old and installation of new Chillers at the plant. Academic Qualification, Courses and Trainings  [Management course, June 2015], two weeks Managerial training; mandatory before promotion in next group, under 4Q HRD (QS-3) program.  [PIMS course, January 2015], one week Maintenance Management training conducted by Pakistan Institute of Management Sciences.  [Management course, January 2014], two weeks Professional Management training under 4Q HRD (QS-2) program.  [PID Controller lab demonstration, May 2013], Controller’s behavior on varying different process parameters.  [Short Technical Course, March, 2010] SHIANGLANG Multinational Company, the designer of LiBr Chillers and on SUPCON DCS based HVAC Systems. (Chashma Nuclear site, Pakistan).  [Hands on workshop, December, 2009] Vacuum Sciences and Technology, (Quaid-e-Azam University Islamabad, Pakistan).  [Short Technical Course, July, 2007] Distributed Control System (SUPMAX 800), Chashma Nuclear site, Pakistan.  [Overseas Training, December, 2007] Comprehensive training session on Instrumentation and Control QNPP-1 China.  [Postgraduate Diploma, June 2004] in Plant Instrumentation Engineering (Chashma Plant site, Pakistan).  [Bachelor of Engineering, December, 2001] in Electronic Engineering (Mehran Engineering University Jamshoro, Pakistan.