Tomasz Prymas is a senior project architect and project manager with over 20 years of experience in architecture. He has extensive experience managing rail and infrastructure projects in Europe and the Middle East. Some of his recent projects include designing upgrades to Bath Spa Station for Network Rail and feasibility studies for step free access projects at London Underground stations. He is proficient in BIM and various architectural software.
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Cv tomasz prymas senior architect+pf2
1. TOMASZ PRYMAS, Architect, MSc, Mobile: +48 781 690 708,
+44 782 146 2447
Profile: Senior ProjectArchitect/Project Manager/Designer. Email: t.prymas@gmail.com
Tomasz Prymas, Architect - Page 1
EDUCATION
Poznan University of Technology,
1996
Master of Science in Architecture and
Spatial Planning.
Various CPD completed in Ireland
Poland, UAE, UK.
PROFESSIONAL AFFILIATIONS
Building Certificate, No.
7131/8/P/2003 obtained in 2003 in
Poland and recognized in EU
(Equivalent to RIBA part III).
Member of Chamber of Architects of
the Republic of Poland from 2003.
COMPUTER/SOFTWARE SKILLS
Architectural Software: AutoCAD,
AutoCAD LT, AutoCAD Architecture,
Sketch-up Pro 2016,
Auto Desk Revit (basic),
understanding of BIM,
Microstation Power Draft V8i (2D),
Archi-Cad 13, ArtLantis,
Microsoft Software Microsoft Word,
Microsoft Excel, Microsoft
PowerPoint, MS Project.
Adobe Photoshop,
RECENT CPD/ COURSES
Cybersecurity Awareness Training
Safety at the workplace: Preventing
Slips, Trips, and Falls
Time Management: CPM Lab
LEED v4 for BUILDING DESIGN AND
CONSTRUCTION (BD+C) course.
CMAA SOP10Q - Sustainability
CMAA SOP09 - Building Information
Modeling
Communicating with Professionalism
and Etiquette
Personal Effectiveness:
Personal Productivity Improvement:
Managing Tasks and Maximizing
Productivity
Personal Productivity: Self-
organization and Overcoming
Procrastination
Personal Productivity Improvement:
Managing Your Workspace
Developing Character for
Perseverance and Resilience
PROJECT EXPERIENCE
ACANTHUS LW ARCHITECTS, April 2016 – to date. (RAIL EXPERIENCE)
Senior Architect at Rail Section, London, UK.
Ongoing projects:
Baths Spa Station – part of Great Western Route Modernization project for the West of
England Area, Baths Corridor Works for Network Rail.
- Main Project Objectives: New Bath Spa Station Track Alignment, New OLE masts
within station environs, Platform Widening and Platform 1 Lengthening, resurfacing
works to both platforms -Multidisciplinary design as part of Tender Package, Listed
Building Consent.
- Preliminary Design (Tender Stage), Detail Design to include multidisciplinary
coordination, production of detail drawings, information/specification to materials and
finishes (approved by Bath Spa and Somerset City Council and Historic England), fit
out to platforms and bridge extension. (to include gates, screens, stairs, ramps,
lighting columns, PA/CCTV columns, signage etc.)
Knightsbridge Station Step Free Access Project for London Underground
(as part of Sloane Street – Basil Street - Brompton Road – Hooper’s Court commercial
development).
- Concept Design Statement (CDS) for sterilization works to Sloane St. Ticket Hall to
include structural works, MEP works, temporary accommodation to LU premises
affected by works.
- Coordination with LU Operational Department and Developer’s Design Team on
technical issues. Provision of options for link between Ticket Hall and new
Brompton Road entrance to station as part of the development above the station.
- DevelopingFeasibility Study up to CDS Stage for Knightsbridge Station Step Free
Accessfrom Hooper’s Court new entrance up to Platform level. Relocation to
existing services, provision of new lifts within existing shafts, refurbishment to
existing disused passageways and stairs, access to platform via lift, provision of
new technical premises, enabling works, coordination with Cooling the Tube
Program (CTP) by LU, provision of the design to include internal finishes to LUL
premises to comply with London Underground Idiom and Engineering standards.
Design to finishes and fit out to follow heritage principles to existing station and
current standards for long life-span to finishes (quality, durability, robustness,
architectural appearance, maintenance, etc.).
2. TOMASZ PRYMAS, Architect, MSc, Mobile: +48 781 690 708,
+44 782 146 2447
Profile: Senior ProjectArchitect/Project Manager/Designer. Email: t.prymas@gmail.com
Tomasz Prymas, Architect - Page 2
PARSONS INTERNATIIONAL LIMITED, April 2014- February 2016. (RAIL EXPERIENCE)
Projects completed as Principal Architect/Senior Architect at Rail & Transit Design Center,
Abu Dhabi/Dubai, UAE.
Route 2020_Dubai Red Line Metro Extension Project (for Dubai EXPO 2020).
Construction to start July 2016.
- Preliminary Design (Tender Stage) for the new extension of the existing Red Line
Metro line in Dubai to include approx. 14 km of new line with elevated and
underground stations on the line. This to include also new interchange station and
new Iconic EXPO 2020 metro station at EXPO site.
- Responsibilities: to assist Design Manager Architecture on internal tender process
to award sub consultants for Advertisings, Retail and Security. Preparation of scope
of works and tender process management.
- Take part in weekly Architectural Design Meetings and manage Clients
requirements.
- Act as Lead Engineer to design Emergency Egress Points and Ancillary Structures
on the line in compliance with NFPA regulations and RTA Guidelines.
- To coordinate multidisciplinary preliminary design to electrical buildings to include
Main Power Substation and Track Power Substation.
- To prepare, coordinate and check technical drawings to include: site plans, layouts,
sections, elevations. To manage internal Quality Check process.
Oman National Railway Project – Oman, Design Stage.
- Stations, Landscaping, Fire Systems – Tender Bid Period – work based on
Preliminary Design prepared by Italferr, Italy.
- Analysis of proposed technical and architectural solutions and measures to the
design with relation to architecture of the stations, other rail facilities and buildings,
also bridges and viaducts.
- Proposing new architectural approach to viaducts and bridges to suit landscape
demands.
- Assessing potential risks and uncertainties in terms of architecture, fire systems
and landscaping based on preliminary design for pricing the tender.
- Value engineering and improved solutions to achieve optimized design for Tender
Bid purposes with inclusion of added value for the Client in terms of better design
approach.
Doha South and Ras Laffan Passenger Train Stations – Doha, Ras Laffan, Qatar. Design
Stage.
Preliminary Design at Pre-Tender Stage based on Concept design prepared by others.
Responsibilities:
- Liaising with the Client Representatives to achieve most optimized and efficient
design layout and station footprint.
- Coordinating structural and MEP preliminary design with architecture and
landscaping.
3. TOMASZ PRYMAS, Architect, MSc, Mobile: +48 781 690 708,
+44 782 146 2447
Profile: Senior ProjectArchitect/Project Manager/Designer. Email: t.prymas@gmail.com
Tomasz Prymas, Architect - Page 3
- Incorporating changes and comments to the design based on Clients requirements.
New luggage facility for international train services.
- Conducting internal and external Quality Check process and achieve relevant
approvals.
Etihad Rail Khalifa Port Onshore Freight Facility. Design Stage.
Pre-Concept Planning Submission preparation, submission to UPC Abu Dhabi, obtaining
Planning Approval. Site to the facility of approx. 63.5ha located north-east from Abu Dhabi
adjacent to Khalifa Industrial Zone Abu Dhabi and Khalifa Port to include new truck layout,
new internal roads and links to external road layout, building facilities, bonded/unbounded
containers area, bulk material silos, parking spaced for cars and trucks, and other relevant
facilities.
Responsibilities:
- Liaising with Client’s Representative on design issues.
- Preparation of all relevant studies and analysis.
- Site visits and photo survey.
- Briefing with UPC Planners.
- Site layout drawings and schedules to proposed building facilities preparation.
- Perspectives and elevations.
- Managing team of sub-consultants (road and traffic, Estidama)
ICAD 1 Freight Facility Development. Design Stage.
Pre-Concept Planning Submission preparation, submission to UPC. Site of approx. 27.7 ha in
the outskirts of Abu Dhabi city within Industrial City Abu Dhabi to include new track alignment,
building facilities, new road layout (internal/external), car park spaces, conveyors
(underground/elevated), storage domes, concrete bulk material silos and other relevant
facilities.
Responsibilities:
- Liaising with Client’s Representative on design issues.
- Preparation of all relevant studies and analysis (road network existing/proposed; rail
network,)
- Site visits and photo survey
- Site layout drawings and schedules of proposed building facilities preparation to
include Universal Access Plan, proposed Traffic Access/Egress Routes.
- Briefing UPC Planners and ER Commercial representatives.
- Perspectives and elevations.
- Managing team of sub-consultants (road and traffic, Estidama,)
Qetaifan Islands– Doha, Qatar – Master Planning, Concept Design Stage.
Parsons was commissioned by Lusail Real Estate Development Company (LREDC) in
August 2012, to complete a concept and final master plan for the Qetaifan Islands. The
project task is to propose a comprehensive concept master plan. Parsons designed the
master plan for the 270 hectare man-made islands.
Responsibilities:
4. TOMASZ PRYMAS, Architect, MSc, Mobile: +48 781 690 708,
+44 782 146 2447
Profile: Senior ProjectArchitect/Project Manager/Designer. Email: t.prymas@gmail.com
Tomasz Prymas, Architect - Page 4
- Develop 3D analyses (initial hand sketches) and transform this into 2 D drawings to
show the relationship between the levels of the development within the area
adjacent to the waterfront.
- The concept design (Concept, 2D+3D) to VIP Center at the waterfront.
- Public realm facilities like small and mid-size parks, playgrounds, pedestrian routes,
small architecture, public facilities to include retails.
- To participate in the preparation of the Design Guidelines Manual (the textbook)
that set up requirementsto all construction activity related to the developable land of
the project like Land Use Range of units GFA (sqm), No. of units, total GFA (sqm),
Floor Parking Demand Land Area (sqm), sub-category retail (non- community)
Marine stores etc.
https://www.parsons.com/projects/pages/lusail-development-project.aspx
ERDB Employees Accommodation Facility, Al Mirfa (Western Region). Construction
completed.
- Preliminary Concept Design and Feasibility Study to proposed development.
- Client’s Requirement Specification and Key Performance Indicators preparation.
- Advising on Consultancy services on:
- Optimized design footprint and functional schedule.
- Schedule of living, leisure, ancillary facilities to the building.
- Schedule and proposed layout to car park
- Preliminary cost assessment.
- Building methodology to building envelope.
-
CONTRACT/PROJECT ARCHITECT (Self-employed), April 2011- March 2014
Position: Project/Senior Architect, Designer, Project Manager Construction Stage.
Projects:
Temple Dome in Torun – detail design. Construction completed.
Comprehensive detail design to steel structure to dome and external and internal finishes to
roof.
Phase I – steel structure and details to roof layers. Concrete base by others.
Value: not applicable. Client: Private.
Responsibilities:
Detail drawings, coordination to building branches - Structural and Fire Protection, project
management to detail design.Planning drawing prepared by others, permission granted.
Liaising with Client and Main Contractor at site meetings.
Warehouses for Rent - Facility Complex. Construction completed.
Vast comprehensive refurbishment to existing facility from 70/80-ies in Bydgoszcz/Poland
within Industrial Park area toinclude: demolition works, provision of new dock-yard for HGVs,
refurbishment to slabs, facades, roofs, adjacent areawith new road circulation layout for
trucks. Major upgrade to existing mains.
Total area of c.a.14,000 sgm. under the roof. Value: approx. 10 M PLN (€ 2,5M). Completion
– 60% at Phase I.
Responsibilities:
Management at Feasibility study and Concept Design. Stage completed. Planning drawings,
coordination to all building branches. New
Architectural, M&E and Civil design, Fire Cert completion, project management to all
consultants. Planning permission granted.
Project Supervision Construction Stage (PSCS). Liaising with Client and Main Contractor at
weekly site meetings.
5. TOMASZ PRYMAS, Architect, MSc, Mobile: +48 781 690 708,
+44 782 146 2447
Profile: Senior ProjectArchitect/Project Manager/Designer. Email: t.prymas@gmail.com
Tomasz Prymas, Architect - Page 5
Multi-story Car-Park of approx.300 spaces. Construction completed
Design for planning of car-park in Bydgoszcz/Poland within boundaries of Old Town protected
area. To include newfacades, site plan, layouts, sections. Protected structure within site
boundaries.
Total area of 7,200 sqm. Value: approx. 7 M PLN. (€ 1,5M)
Responsibilities:
Planning Application Drawings,
Design coordination with team of consultants i.e.: civil, structural, M&E, fire safety.
To manage and consult planning conditions with local City Council and Heritage Department.
To prepare Planning Application.
Planning permission granted in January 2013. Detail design –completed.
Structural steel-building workshop facilitywith fabrication and storage depot, office building
facility and premises for employees within boundaries of IndustrialPark in Bydgoszcz.
Construction completed.
Post planning detail design, tender drawings preparation. Site plan layout design.
Total area of 10.300 sqm. Value: approx. 20 M PLN (EUR 5M)
Responsibilities:
Detail Design drawings preparation,
Design coordination with team of consultants i.e.: civil, structural, M&E, fire safety.
Full project management in architecture and multidisciplinary design team. Project
Supervision Construction Stage (PSCS).Site meetings on regular basis.
Green Energy - Electric Power plant (compacted version)
Feasibility study and design for planning. Plant to be powered by earth gas/ plant oil, located
within outskirts ofInowroclaw, Poland. Maximum output power approx. 17,5 MW.
To include site plan analysis, formulating and preparing relevant formal documents-
applications to mains operators,preparation of Client Requirement Specification (CRS), initial
sketches and coordination.
Total area of 800 sqm, plot area of approx. 1200 sqm. Value: not set.
Responsibilities:
Full project management at planning stage, Feasibility study, preliminary design/concept
design, coordination with local authorities.
6. TOMASZ PRYMAS, Architect, MSc, Mobile: +48 781 690 708,
+44 782 146 2447
Profile: Senior ProjectArchitect/Project Manager/Designer. Email: t.prymas@gmail.com
Tomasz Prymas, Architect - Page 6
PANTA RHEI SP. Z O.O. (PANTA RHEI LTD), March 2010 – March 2011
Position: Project Architect, Design Team Member.
Project:
Silesian University of Technology in Gliwice– Scientific-didactical Centre of New Technology.
Construction completed.
Detail design. Total area c.a. 14.000 sqm with site plan design, external infrastructure and
landscape, fit-out design.
Concept and Planning design by others.
Value: approx.. 50 M PLN. Duration of detail design preparation: Mar. 2010- Feb. 2011.
Responsibilities:
Design coordination in multidisciplinary team of consultants i.e. structural, civil, M&E, fire
safety, health&safety, energy saving etc.
Site supervision and site project management on regular basis, management to relations with
local city council. Project SupervisionConstruction Stage (PSCS) on behalf of Leading
Designer.
TRASKOSTAL SP. Z O.O. (TRASKOSTAL LTD), January 2009- February 2010
Position: Project Architect/Senior Architect
Projects:
Warehouse for goods stored in standard pallet high racking system in city of Gdynia/Polandto
consist: brand new facility designed as two separated units under one roof. Area for storage,
cross-docking, employees’ accommodation, offices, technical facilities etc. New site layout to
be included. Total area of c.a. 8.300
Shopping Centre within the city of town Ostrow, Poland
Three-story building to consist: shopping units to let at first two story and offices to let at third
story.Approx. area c.a. 1.400 sq.m.Value: PLN 5,5 M.
Planning permission submission drawings and specification.
Duration: 3 months. Client: Ostrow City Council.
Responsibilities:
Detailed Drawings for Planning.
Design coordination in multidisciplinary team of Consultants.
To prepare Planning Application. Planning Permission procedure obtained.
Used AutoCAD R2008, Archicad 9.0, MS Office.
IARNROD ÉIREANN, (IRISH RAIL), ARCHITECTS SECTION
October 2004- December 2008 (RAIL EXPERIENCE)
Position: Project Manager, Senior Architect
Projects:
General refurbishment and Extension, Multi-story Car Park at Olivier Plunkett Train Station
inWaterford to consists:
New facade to existing office building, Extension to Concourse with station facilities at ground
(~700m2) and mezzaninefloor (~150m2), New multi-story car park for customers (~2,200m2).
Value: €19M, duration: 1.5 year (incl. Appeals period).
7. TOMASZ PRYMAS, Architect, MSc, Mobile: +48 781 690 708,
+44 782 146 2447
Profile: Senior ProjectArchitect/Project Manager/Designer. Email: t.prymas@gmail.com
Tomasz Prymas, Architect - Page 7
Responsibilities:
Concept and Client Requirements Specification production andPlanning Application drawings,
Design coordination in multidisciplinary team of Consultants.To prepare Planning Application.
Planning Permission granted.
Used AutoCAD R2008,
New Concourse Extension at Connolly Station, Dublin. Construction completed.
1.500m2 extension to existing station premises within protected structure of XIX century
station with new facilities toinclude: seating/waiting area, retail units, new toilet facilities,
Belfast Train Lounge, station facilities, new CustomerInformation System, new flooring to
extension and existing concourse, new Signage throughout.
Value: €5M, Duration 3 years
New Locomotive Drivers Accommodation Building at Connolly Station, Dublin. Construction
completed.
470m2 premises for locomotive drivers with office facilities, toilets, locker rooms, common
areas.
Value: €3M, Duration 2 years
Responsibilities (both above):
Concept design.Planning Application Drawings and Planning Submission preparation.
Detailed design, Construction drawings, multidisciplinary design team coordination.
Tender documentation preparation under GCCC regulations for public works financed by
Exchequer.Contract documentation preparation.Full project management and Project
Supervision Construction Stage (PSCS) during construction on behalf of the Client. On site
visitsand meetings on regular basis. Completion of both in 2009.
Used AutoCAD R2008, ArchiCad 9.0, Photoshop,
POLPROJEKT, Architectural Practice, Poznan,March 2002-September 2004
Position: Senior Architect’s Assistant.
Projects:
Various projects with relation to refurbishment, adaptation, upgrade of existing premises for
discountwarehouses and whole sale. (various areas from 400 up to 2000m2).
Clients: international retail/wholesale networks. Value: various.
Responsibilities:
Site survey of existing premises, concept layout drawing preparation, planning application
submissions, fire cert applications, H&Sapplications, construction works management on
request, as-built docs/drawings and close out.
STUDIO DNA Architectural Practice, Poznan, October 1999-February 2002
Position: Architect’s Assistant.
Projects:
Various residential housing projects for private clients. Detached houses in Poznan and
environs.
Multidisciplinary design works to refurbishment and upgrade of whole-sale malls.
8. TOMASZ PRYMAS, Architect, MSc, Mobile: +48 781 690 708,
+44 782 146 2447
Profile: Senior ProjectArchitect/Project Manager/Designer. Email: t.prymas@gmail.com
Tomasz Prymas, Architect - Page 8
Client: Metro AG. MakroCash&Carry whole-sale facilities chain.
Responsibilities:
Feasibility Study: Clients Requirements Specification to obtain. Concept design, budgeting,
phasing planning. Planning Application,fire cert application, H&SA application.
Detail Design Stage: specification, schedules, drawings production.
New Fire Brigade Station in Poznan- Old Town Conservation Area. Construction completed.
Client: Poznan Fire Brigade Authority on behalf of Poznan City Council. Value: ~ PLN 8M
Responsibilities:
Project supervision design stage at Feasibility Study: development of the concept obtained
from external architectural practice; preplanningconsultation/submission to City Council,
conservation architect report, City Council Planning Permission granted. Fire Certand H&SA
permission granted.
Project Supervision Construction Stage: Detail design production, scope change register
management, site supervision on behalf of
Project Architect. Duration: approx. 18 months.
CONDIX
Building Contractor, Poznan, March 1998- September 1999
Position: Assistant to Site Manager.
Project:
Malta-Decor Paper facility. Poznan. Construction completed.
Client: Krono Holding AG Austria.
Responsibilities:
Full time site supervision, reporting to Site Manager re work progress at dedicated section.
Material purchase / delivery management and coordination, works timing, quality supervision
and reporting to Site Manager.
Construction Stage: site visits and management on demand.