SlideShare a Scribd company logo
1 of 9
ASHRAFUL AZIZ
Senior CADD Drafter
9101 WESTCHESTER LN NE
ATLANTA, GA 30345
PHONE: (718) 607-6789 (C)
EMAIL: ashraful.aziz@gmail.com
EDUCATION
 Bachelor of Science in
Computer Science,
Warren National
University (fr Kennedy-
Western),2005
ADDITIONAL
COURSEWORK/TRAINING
 MicroStation 3D
EssexCounty College,
Newark,NJ, 2006
 AutoCAD Professional
Level I &II
New York University
New York, NY, 2011
 Revit 2015
New York City College of
Technology
Brooklyn, NY, 2015
LANGUAGES
 Bengali
 Hindi
COMPUTER/SOFTWARE
SKILLS
 Adobe Photoshop
 AutoCAD R14, 2007,
2010,2012, 2014
 Microsoft Office
 MicroStation V8i/V8/J/95
 Projectwise
 Revit 2015
 Visio
 Visual Studio
 Windows 95,98, 2000,
XP, NT
EXPERIENCE PROFILE:
I have over 16 years of experience as a CADD professional. I have experience
setting up CADD standards and back checking junior drafters’ work, and
preparing drawings for rail, bridge, tunnel, and roadway projects for various
transportation agencies in New York, New Jersey, and Washington. I am
experienced in disciplines ranging from civil, communications, electrical, fire
alarm, security, signal, and structural systems to tunnel lighting, single-line and
network diagrams, conduit routing plans, cable routing and distribution, and
circuit breakers. I have extensive knowledge of Sheet Set Manager, Xrefs and
external images. My experience also includes geotechnical boring and
instrumentation, tunnel and cavern initial rock support, open-cut support of
excavation, ground treatment, construction and excavation sequence, and the
preparation of geotechnical figures for geotechnical baseline reports. I prepared
drawings of topographic survey maps, utility base mapping, and conceptual
schemes of utility rearrangements for tunnels and stations. I have also prepared
construction staging plans, maintenance-and protection-of-traffic plans and
sections and presentation boards.
FIRM EXPERIENCE:
AECOM Technology Corporation
Atlanta, GA
07/2015 – Present
HNTB Corporation
New York, NY
04/2012 - 06/2015
STV Incorporated
New York, NY
09/2009 - 03/2012
PARSONS Corporation
New York, NY
10/2007 - 08/2009
PARSONS Corporation
Bellevue and Seattle, WA
09/2006 - 09/2007
KS ENGINEERS, P.C.
Newark, NJ
07/1999 - 08/2006
Ashraful Aziz 2 of 9
PROJECT EXPERIENCE:
AECOM Technology Corporation
Atlanta, GA
07/2015 - Present
Project: Rapid Transit General Engineering Consulting Services 2013-2018
Project Location: Atlanta, Georgia
Client: Metropolitan Atlanta Rapid Transit Authority (MARTA)
Project Role: CADD Drafter
Start Date, End Date: 07/2015 - Present
Project Description: AECOM, as a joint venture partner, is providing a variety of general
engineering consulting services for MARTA. The joint venture team provides the general
engineering services for MARTA's entire system including project management, design,
construction management, and seconded staffing. The engineering projects/disciplines include
civil, structural, architectural, MEP, power, signals, controls, communications, tunnel ventilation,
fire protection, and corrosion control. The heavy rail system consists of a 51.6-mile network of
double-tracked, fixed guideway with 38 passenger stations and 338 rail cars. MARTA's bus service
consists of a paratransit service with a fleet of 110 buses and regular bus service with a fleet of 556
buses over 124 routes covering 1,500 route miles.
Project Responsibilities: Responsibilities include supervision and design of CADD drawings
specifically in multiple systems coordination and representation having to do with MARTA.
HNTB Corporation
New York, NY
04/2012-06/2015
Project: 46345 NJ TRANSIT/Amtrak, Portal Bridge Capacity Enhancement
Project Location: Secaucus, New Jersey
Client: NJ Transit
Project Role: CADD Drafter
Start Date, End Date: 06/2012-02/2013
Project Description: This project will eliminate the bottleneck by replacing the bridge with two new
high-level structures over the river that will support five new tracks.
Project Responsibilities: Responsible for preparing drawings.
Project: 50130 MTA-Bridges and Tunnels (TBTA), Design Services for Project VN-86, New Ramp
at the Verrazano-Narrows Bridge
Project Location: New York, NY
Client: MTA
Project Role: CADD Drafter
Start Date, End Date:05/2012-09/2013
Project Description: CADD technician on the addition of a new Bus/HOV lane on the structure.
To add an additional elevated lane to the Brooklyn approach, a new ramp is required. Work includes
foundation design, highway geometry, structure design, lighting, and fire standpipes. To achieve
desirable grades for the new ramps, two of the existing entrance ramps are to be reconstructed.
Approach spans will be modified to accommodate a seventh lane.
Project Responsibilities: Responsible for preparing drawings.
Ashraful Aziz 3 of 9
STV Incorporated
Project: East Side Access
Project Location: New York, NY
Client: MTA Long Island Rail Road
Project Role: CADD Drafter
Start Date, End Date: 2009-2012
Project Description: The project involved connecting the Long Island Rail Road’s main and Port
Washington Lines with the Grand Central Terminal (GCT) in Manhattan.
Project Responsibilities: Responsible for preparing drawings with the following Electrical
Systems:
 26.4 KV (60 Hz),13.2 KV (60 Hz),12 KV traction feeders (25 Hz), 2.4 KV Signal power
feeders (60 Hz and 91 2/3 Hz), 480 V power feeders, 120 V AC power feeders and control
cables for sectionalizing switches in ‘Harold’, ‘Point’ and ‘F’ Interlockings.
 Correct and add existing ducts and cable routes in survey drawings.
 Design new route for cables overhead & underground, ducts, cable troughs, manholes,
designed catenary structure’s fixing details to reroute the existing above mentioned cables
affected by the new ESA installations.
 Design Electrical Riser diagrams and control diagrams.
 Coordinate works with civil, track, catenary etc. works and related packages CQ031,
CQ032, CH053, CH054
 Design new power cables and routing for 60 Hz, 91.6 Hz power supplies of different
voltages for new CILs (LIRR), CIHs (Amtrak) , RTU houses, Rail road control towers 'Q' &
'R" existing trailers and other facilities in Harold area.
 Design yard lighting for ‘F’ Interlocking.
 Participate in QA/QC procedure.
PARSONS Corporation
New York, NY
10/2007-8/2009
I was responsible for set up CADD standards, back check junior drafters work, preparing drawings
for rail, bridge, tunnel, and roadway projects for various transportation agencies in the New York
area.
Project: Indefinite Quantity Engineering Services
Project Location: New York, NY
Contract #: 645600
Project #: 645600
Client: MTA New York City Transit (NYCT)
Project Role: Lead CADD Drafter
Start Date, End Date: 2008-2009
Project Description: The project involves providing the design of a wireless closed circuit
television (CCTV) system for 19 NYCT train yards. The systems are intended to enhance security
and surveillance in these yards at various gates and portals. The system involves wireless CCTV
image data at 60 and 5 GHz, use of solar panels for power at some locations, CCTV analytics,
and remote connections to NYCT’s SONET/ATM network and data storage requirements.
Project Responsibilities: Responsible for set up CADD standards for the project, preparing
drawings and back check junior drafters work.
Ashraful Aziz 4 of 9
Project: Permanent World Trade Center PATH Terminal
Project Location: New York, NY
Contract #: 645887
Project #: 645887
Client: Port Authority of New York and New Jersey
Project Role: CADD Drafter
Start Date, End Date: 2008
Project Description: The $2.2 billion permanent World Trade Center (WTC), Port Authority
Trans-Hudson (PATH) terminal project involves designing the main terminal, PATH train station,
east-west/north-south connectors to WTC structures 2, 3, and 4 at the site, and the Liberty Street
underpass. Project challenges include maintaining traffic operations within the existing temporary
PATH station during the construction of the new permanent project, in addition to required
construction staging and the construction of temporary exits and entrances. The terminal, a world -
class transportation facility, will replace a temporary station at the WTC site that restored service
to lower Manhattan from New Jersey after the events of September 11, 2001, coordinate with the
existing and future transportation infrastructure and WTC development, and enhance facilities that
existed at the WTC complex prior to September 11, 2001.
Project Responsibilities: Responsible for preparing drawings.
Project: 9th Avenue and 31st Street Development
Project Location: New York, NY
Contract #: 646950
Project #: 646950
Client: Brookfield Properties Developers LLC
Project Role: CADD Drafter
Start Date, End Date: 2008
Project Description: Parsons is performing program management on an air rights project over
the Long Island Rail Road, Amtrak, and New Jersey Transit tracks west of Penn Station. The
project includes the construction of 3.5 million sq. ft. of structures on a site that is traversed by
1,200 trains per day.
Project Responsibilities: Responsible for preparing drawings.
Project: MTA System wide Security Program
Project Location: New York, NY
Contract #: 646089
Project #: 646089
Client: New York City Transit Authority / Metropolitan Transportation Authority
Project Role: CADD Drafter
Start Date, End Date: 2008
Project Description: Parsons is responsible for developing an overall security program for the
MTA system and designing individual security applications for specific facilities.
Project Responsibilities: Responsible for preparing drawings.
Project: North Corridor Metrorail Extension, New Starts
Project Location: Miami, Florida
Contract #: 646331
Project #: 646833
Client: Miami-Dade Transit (MDT) / Miami-Dade County
Project Role: CADD Drafter
Start Date, End Date: 2008
Project Description: The project involves final design and design services during construction for
the North Corridor Metrorail Extension of the Miami heavy rail system. The 9.5-mile elevated,
double track rail extension includes seven stations serving the NW 27th Avenue corridor, northern
Miami-DadeCounty, Opa-Locka, Miami Gardens communities, Miami-Dade College North, the
Calder Race Track, and Dolphin Stadium.
Project Responsibilities: Responsible for preparing drawings.
Ashraful Aziz 5 of 9
Project: International Bridge Inspection and Other Engineering Services
Project Location: Sault Saint Marie, Michigan
Contract #: 646732
Project #: 646732
Client: International Bridge Authority
Project Role: CADD Drafter
Start Date, End Date: 2008
Project Description: The project involves providing engineering support services for placement
of fixed and movable painting platforms on the main arch and approach spans, rehabilitation of
the south abutment, and all annual and special inspections and condition evaluations.
Project Responsibilities: Responsible for preparing drawings.
Project: Williamsburg Bridge, Reconstruction
Project Location: New York, NY
Contract #: 645587
Project #: 645587
Client: New York City Department of Transportation
Project Role: CADD Drafter
Start Date, End Date: 2008
Project Description: The project involved construction support services, which entailed
strengthening and reinforcing structural members of main tower columns and main stiffening truss
members; seismic retrofit of intermediate tower bases; new maintenance travelers, platforms,
hoisting systems, and adjustment of suspender lengths; installation and integration of the
Intelligent Transportation System (ITS) at the Traffic Management Center; intelligent traffic
operation signals and lane control signals; and the study and design of contraflow scheme using
a movable barrier and barrier transfer machine, including a new storage and maintenance facility.
A bearing replacement at intermediate towers (PP 10 and 15) was added to contract.
Project Responsibilities: Responsible for preparing drawings.
Project: VN-80 Verrazano Narrows Upper-Level Deck
Project Location: New York, NY
Contract #: 645926
Project #: 645926
Client: Triborough Bridge and Tunnel Authority
Project Role: CADD Drafter
Start Date, End Date: 2007-2008
Project Description: The project involves rehabilitating the upper-level deck of the bridge’s
suspended spans. The concrete roadway deck will be replaced by an orthotropic steel deck with
new subfloor beams and longitudinal shear connectors. The project work also involves relocating
utilities affected by the deck replacement with new standpipe branch lines; new lighting; and a
communication control system, including security access control, data backbone, and the
supervisor control and data acquisition (SCADA) system.
Project Responsibilities: Responsible for preparing drawings.
Project: Major Deegan Expressway
Project Location: New York, NY
Contract #: 640449
Project #: 640449
Client: New York State Department of Transportation, Region 11
Project Role: CADD Drafter
Start Date, End Date: 2007
Project Description: Parsons has been selected to provide services for 11 bridges between
Albany Crescent and the Westchester County Line on the Major Deegan Expressway, the heavily
trafficked New York City stretch of the New York State Thruway. Eight of these bridges are steel
multi-girder bridges (two are one-span simple, one is three-span simple, four are two-span
continuous, and one is three-span continuous). The remaining three are one-bay concrete rigid
frame bridges. Of the eleven, five are overpass structures, two are access/exit ramp structures,
Ashraful Aziz 6 of 9
three are mainline structures, and one is a local street structure. Parsons' services include in-depth
inspections; load ratings; surveys; substandard features evaluations; preparation of preliminary
design plans, including maintenance and protection of traffic plans; and bridge reconstruction
project reports and/or equivalent design approval documents.
Project Responsibilities: Responsible for preparing drawings.
PARSONS Corporation
Bellevue and Seattle, WA
9/2006-9/2007
I was responsible for preparing drawings for bridge and roadway projects in the Bellevue and
Seattle areas of Washington.
Project: Tacoma High-Occupancy Vehicle (HOV)
Project Location: Tacoma, Washington
Contract #: 646592
Project #: 646592
Client: CH2MHILL / Washington State Department of Transportation
Project Role: CADD Drafter
Start Date, End Date: 2007
Project Description: The project involves the overall design and management of the $1.1 billion,
eight-mile, high-occupancy vehicle (HOV) freeway. The project work includes the preparation of
conceptual, preliminary, and final engineering plans and construction documents for the roadway
and HOV lanes, as well as numerous bridge designs, construction staging plans, signalization,
utilities, lighting, detours, right-of-way, signing and striping, retaining walls, drainage, urban design,
landscaping, and use of geographic information systems data. The design includes the
development and evaluation of interchange alternatives to update the existing interchanges to
federal interstate design standards. The freeway design includes the evaluation of alternative HOV
concepts in accommodating travel demand on the highly traveled route and four local
interchanges. An environmental assessment and public involvement program was conducted for
the corridor.
Project Responsibilities: Responsible for preparing drawings.
Project: Interstate 405 General Engineering Consultant Contract
Project Location: Puget Sound, Washington
Contract #: 645180
Project #: 645180
Client: HNTB Corporation (WA) / Washington State Department of Transportation (WSDOT)
Project Role: CADD Drafter
Start Date, End Date: 2006-2007
Project Description: The project involves the implementation of a $10.9 billion program for
improvements along a congested 30-mile corridor in the Seattle-Bellevue metropolitan area.
Parsons is providing program management services to assist the WSDOT with overseeing the
Interstate 405 program of projects, which include project management, programmatic planning,
environmental documentation, and engineering services. The project proposes to alleviate traffic
congestion, enhance safety, mitigate increased traffic volume, and decrease noise pollution while
maintaining or improving the environmental integrity of the corridor. The project includes the use
of expanded polystyrene (EPS) geofoam lightweight fill as a design method to create zero
surcharges on adjacent hospital parking garage foundations.
Project Responsibilities: Responsible for preparing drawings.
Ashraful Aziz 7 of 9
KS ENGINEERS, P.C.
Newark, NJ
1999-2006
I was responsible for preparing drawings for rail, bridge, tunnel, and roadway projects for various
transportation agencies in the New York and New Jersey area.
Project: No. 7 Line Extension
Project Location: New York, NY
Client: New York City Transit
Project Role: CADD Drafter
Start Date, End Date: 2004-2006
Project Description: The project involved 11,000 ft. of new twin running tunnels excavated using
the tunnel boring machine and drill-and-blast methods, two deep stations (one rock cavern and
one cut-and-cover excavation), inclined elevator shafts, and associated systems structures. The
project extended the No. 7 Line southwest by approximately 1.5 miles from Times Square to the
Jacob Javits Convention Center at 10th Avenue and 34th Street.
Project Responsibilities: Responsible for several drawings for the preparation of existing utility
base mapping and conceptual schemes of utility rearrangements for new tunnels and stations.
The drawings included structural boring and instrumentation drawings for plans, longitudinal
profiles, transverse sections, and details. Contract drawing production duties for the Geotechnical
and Tunneling Group included geotechnical boring drawings, including plans, longitudinal profiles,
and transverse sections; geotechnical instrumentation drawings, including plans, longitudinal
profiles, transverse sections, and details; tunnel and cavern initial rock support drawings; open-
cut support of excavation drawings; construction/excavation sequence drawings; ground
treatment drawings; existing building data drawings; and geotechnical figures for geotechnical
baseline reports.
Ashraful Aziz 8 of 9
Project: East Side Access
Project Location: New York, NY
Client: MTA Long Island Rail Road
Project Role: CADD Drafter
Start Date, End Date: 2000-2004
Project Description: The project involved connecting the Long Island Rail Road’s main and Port
Washington Lines with the Grand Central Terminal (GCT) in Manhattan.
Project Responsibilities: Responsible for preparing communication drawings, including
communication systems plans for the mezzanine and lower and upper platforms; a supervisory
control and data acquisition system block diagram and communications room layouts; fire alarm
and security drawings, including fire alarm plans, point identification, riser and block diagrams, and
security plans; signal drawings, including signal block layouts, single-line diagrams, cable plans,
vital processors, control lines, track circuit layouts, route and aspect charts, panel lighting circuits,
rack layouts, and remote terminal unit inputs and outputs; structural drawings, including drawings
for escalator installation between the new concourse level and Biltmore room, which included the
modification of framing plans at the suburban, express, and street levels, as well as drawing
sections through the GCT at every street location; and traction power drawings, including the
tunnel lighting system, single-line and network diagrams, conduit routing plan, cable routing and
distribution, and circuit breaker.
Project: Plainfield Bridges
Project Location: Plainfield, NJ
Client: New Jersey Transit Corporation
Project Role: CADD Drafter
Start Date, End Date: 1999-2000
Project Description: The product involved conducting a detailed conceptual study for the
rehabilitation and replacement of 13 railroad bridges and the replacement of the historic Grant
Avenue Railroad Bridge. All structures were located on the Raritan Valley Line between Mile Post
21.47 and Mile Post 24.87.
Project Responsibilities: Responsible for the structural CADD design of structures, track age,
signals, communications, and associated systems to support the detailed conceptual study.
Project: Realignment of Sparta Munson-Corner Road
Project Location: Sussex County, New Jersey
Client: New Jersey Department of Transportation
Project Role: CADD Drafter
Start Date, End Date: 1999-2000
Project Description: The project involved reconstructing and realigning 0.3 miles of Sparta
Munson-Corner Road (County Route 517) from the intersection of County Route 517 and Fox Hill
Drive to 1,600 ft. north. The realignment replaced the substandard reverse curve with a single
curve and provided two 3.6 m lanes with 2.4 m shoulders.
Project Responsibilities: Responsible for preparation of CADD drawings.
Project: Concrete Vulnerability Study for 450 Bridges
Project Location: New York, NY
Client: New York Department of Transportation
Project Role: Junior Engineer
Start Date, End Date: 1999-2000
Project Description: The project involved conducting a concrete vulnerability study for 450
bridges in New York City.
Project Responsibilities: Responsible for conducting a field study and the preparation of in-depth
inspection reports for KS Engineers’ portion of the project, which included 75 bridges (810 spans)
out of a total of 450 bridges (4,200 spans).
Project: Design of New Townley Railroad Station
Project Location: Union, New Jersey
Ashraful Aziz 9 of 9
Client: New Jersey Transit Corporation
Project Role: CADD Drafter
Start Date, End Date: 1999-2000
Project Description: The project involved the design of New Townley Railroad Station.
Project Responsibilities: Responsible for the civil CADD design of a 420-vehicle park-and-ride
site, which included grading and drainage, a detention basin, on-site geometrics, signing and
striping, pavement design, and civil CADD design of off-site improvements. The off-site work
included designing the revision of an existing traffic signal to accommodate the new ingress and
egress, as well as the revision of existing pavement markings and signage.
Project: Redesign of Applegarth Road
Project Location: Monroe, New Jersey
Client: New Jersey Department of Transportation
Project Role: CADD Drafter
Start Date, End Date: 1999-2000
Project Description: The project involved the redesign of Applegarth Road.
Project Responsibilities: Responsible for the civil CADD design of utility relocations and a new
drainage system to replace ditches along a 3.8-mile stretch of roadway. Work performed included
verification of the location of all existing utilities, preparation of a utility relocation report, and
development of utility relocation plans. Work performed also included the development of two
alternative drainage system designs; the design of remedial work, including pavement milling,
resurfacing, repair of potholes, and repair and replacement of sidewalks; and the preparation of
existing and proposed drainage system reports and a final concept study report. The drainag e
system redesign included the determination of storm water runoff, as well as the size, length,
slope, invert elevation, and route of the storm drain system. The existing and proposed drainage
systems for storm water runoff were evaluated and analyzed for recurrence interval.

More Related Content

What's hot (19)

SRC_Resume
SRC_ResumeSRC_Resume
SRC_Resume
 
150809-WSP CV-Mohamed Hassan-General-Short Form
150809-WSP CV-Mohamed Hassan-General-Short Form150809-WSP CV-Mohamed Hassan-General-Short Form
150809-WSP CV-Mohamed Hassan-General-Short Form
 
AL SARABI CV
AL SARABI CVAL SARABI CV
AL SARABI CV
 
Winning strategy for Moscow St Petersburg for Deutsche Bahn
Winning strategy for Moscow St Petersburg for Deutsche BahnWinning strategy for Moscow St Petersburg for Deutsche Bahn
Winning strategy for Moscow St Petersburg for Deutsche Bahn
 
Cv Presentation
Cv PresentationCv Presentation
Cv Presentation
 
FRANK SARRISCV282015
FRANK SARRISCV282015FRANK SARRISCV282015
FRANK SARRISCV282015
 
Kcn 2016 March Resume
Kcn 2016 March ResumeKcn 2016 March Resume
Kcn 2016 March Resume
 
1 Engr. Mohammad Faizal CV (1) - Copy
1 Engr. Mohammad Faizal CV (1) - Copy1 Engr. Mohammad Faizal CV (1) - Copy
1 Engr. Mohammad Faizal CV (1) - Copy
 
Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13Iain Cameron CV presentation jun13
Iain Cameron CV presentation jun13
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
DB_Engineering1
DB_Engineering1DB_Engineering1
DB_Engineering1
 
ashraf frieg CV
ashraf frieg CVashraf frieg CV
ashraf frieg CV
 
0.Khalid - Project Manager
0.Khalid  - Project Manager0.Khalid  - Project Manager
0.Khalid - Project Manager
 
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and RoadsEngr Noor updated Cv for Senior Project Manager infrastructure and Roads
Engr Noor updated Cv for Senior Project Manager infrastructure and Roads
 
muneer qc cv
muneer qc cv muneer qc cv
muneer qc cv
 
Ronnie CV 2015
Ronnie CV  2015Ronnie CV  2015
Ronnie CV 2015
 
Samih.CV docx
Samih.CV docxSamih.CV docx
Samih.CV docx
 
Cv aniruddha
Cv aniruddhaCv aniruddha
Cv aniruddha
 
Cv of tanvir shahrier mahmud
Cv of tanvir shahrier mahmudCv of tanvir shahrier mahmud
Cv of tanvir shahrier mahmud
 

Similar to ASHRAFUL AZIZ Resume

Similar to ASHRAFUL AZIZ Resume (20)

Aziz, Ashraful resume
Aziz, Ashraful resumeAziz, Ashraful resume
Aziz, Ashraful resume
 
EZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural Engineer
 
Borapureddi Ashok_present
Borapureddi Ashok_presentBorapureddi Ashok_present
Borapureddi Ashok_present
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
 
MERAJ UL HUDA CV
MERAJ UL HUDA CVMERAJ UL HUDA CV
MERAJ UL HUDA CV
 
Matt Dutton CV
Matt Dutton CVMatt Dutton CV
Matt Dutton CV
 
Auto CAD Civil 3D
Auto CAD Civil 3DAuto CAD Civil 3D
Auto CAD Civil 3D
 
CV_subandhu dutta
CV_subandhu duttaCV_subandhu dutta
CV_subandhu dutta
 
PaulR.Blaetz021816RR
PaulR.Blaetz021816RRPaulR.Blaetz021816RR
PaulR.Blaetz021816RR
 
Electrical Draftsman
Electrical DraftsmanElectrical Draftsman
Electrical Draftsman
 
DML CV 17
DML CV 17DML CV 17
DML CV 17
 
Dhanam Sathiya Nathan_CV_02032016
Dhanam Sathiya Nathan_CV_02032016Dhanam Sathiya Nathan_CV_02032016
Dhanam Sathiya Nathan_CV_02032016
 
Graeme Hannah CV
Graeme Hannah CVGraeme Hannah CV
Graeme Hannah CV
 
Narendra Singh_2016
Narendra Singh_2016Narendra Singh_2016
Narendra Singh_2016
 
khd-new1[1]
khd-new1[1]khd-new1[1]
khd-new1[1]
 
anand_IBS imp eng cv
anand_IBS imp eng cvanand_IBS imp eng cv
anand_IBS imp eng cv
 
Basil Resume
Basil Resume Basil Resume
Basil Resume
 
DEVI_001
DEVI_001DEVI_001
DEVI_001
 
eBook-MicroStation-Civil-Engineering.pdf
eBook-MicroStation-Civil-Engineering.pdfeBook-MicroStation-Civil-Engineering.pdf
eBook-MicroStation-Civil-Engineering.pdf
 
GOPAL
GOPALGOPAL
GOPAL
 

Recently uploaded

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...ranjana rawat
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 

Recently uploaded (20)

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
The Most Attractive Pune Call Girls Manchar 8250192130 Will You Miss This Cha...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 

ASHRAFUL AZIZ Resume

  • 1. ASHRAFUL AZIZ Senior CADD Drafter 9101 WESTCHESTER LN NE ATLANTA, GA 30345 PHONE: (718) 607-6789 (C) EMAIL: ashraful.aziz@gmail.com EDUCATION  Bachelor of Science in Computer Science, Warren National University (fr Kennedy- Western),2005 ADDITIONAL COURSEWORK/TRAINING  MicroStation 3D EssexCounty College, Newark,NJ, 2006  AutoCAD Professional Level I &II New York University New York, NY, 2011  Revit 2015 New York City College of Technology Brooklyn, NY, 2015 LANGUAGES  Bengali  Hindi COMPUTER/SOFTWARE SKILLS  Adobe Photoshop  AutoCAD R14, 2007, 2010,2012, 2014  Microsoft Office  MicroStation V8i/V8/J/95  Projectwise  Revit 2015  Visio  Visual Studio  Windows 95,98, 2000, XP, NT EXPERIENCE PROFILE: I have over 16 years of experience as a CADD professional. I have experience setting up CADD standards and back checking junior drafters’ work, and preparing drawings for rail, bridge, tunnel, and roadway projects for various transportation agencies in New York, New Jersey, and Washington. I am experienced in disciplines ranging from civil, communications, electrical, fire alarm, security, signal, and structural systems to tunnel lighting, single-line and network diagrams, conduit routing plans, cable routing and distribution, and circuit breakers. I have extensive knowledge of Sheet Set Manager, Xrefs and external images. My experience also includes geotechnical boring and instrumentation, tunnel and cavern initial rock support, open-cut support of excavation, ground treatment, construction and excavation sequence, and the preparation of geotechnical figures for geotechnical baseline reports. I prepared drawings of topographic survey maps, utility base mapping, and conceptual schemes of utility rearrangements for tunnels and stations. I have also prepared construction staging plans, maintenance-and protection-of-traffic plans and sections and presentation boards. FIRM EXPERIENCE: AECOM Technology Corporation Atlanta, GA 07/2015 – Present HNTB Corporation New York, NY 04/2012 - 06/2015 STV Incorporated New York, NY 09/2009 - 03/2012 PARSONS Corporation New York, NY 10/2007 - 08/2009 PARSONS Corporation Bellevue and Seattle, WA 09/2006 - 09/2007 KS ENGINEERS, P.C. Newark, NJ 07/1999 - 08/2006
  • 2. Ashraful Aziz 2 of 9 PROJECT EXPERIENCE: AECOM Technology Corporation Atlanta, GA 07/2015 - Present Project: Rapid Transit General Engineering Consulting Services 2013-2018 Project Location: Atlanta, Georgia Client: Metropolitan Atlanta Rapid Transit Authority (MARTA) Project Role: CADD Drafter Start Date, End Date: 07/2015 - Present Project Description: AECOM, as a joint venture partner, is providing a variety of general engineering consulting services for MARTA. The joint venture team provides the general engineering services for MARTA's entire system including project management, design, construction management, and seconded staffing. The engineering projects/disciplines include civil, structural, architectural, MEP, power, signals, controls, communications, tunnel ventilation, fire protection, and corrosion control. The heavy rail system consists of a 51.6-mile network of double-tracked, fixed guideway with 38 passenger stations and 338 rail cars. MARTA's bus service consists of a paratransit service with a fleet of 110 buses and regular bus service with a fleet of 556 buses over 124 routes covering 1,500 route miles. Project Responsibilities: Responsibilities include supervision and design of CADD drawings specifically in multiple systems coordination and representation having to do with MARTA. HNTB Corporation New York, NY 04/2012-06/2015 Project: 46345 NJ TRANSIT/Amtrak, Portal Bridge Capacity Enhancement Project Location: Secaucus, New Jersey Client: NJ Transit Project Role: CADD Drafter Start Date, End Date: 06/2012-02/2013 Project Description: This project will eliminate the bottleneck by replacing the bridge with two new high-level structures over the river that will support five new tracks. Project Responsibilities: Responsible for preparing drawings. Project: 50130 MTA-Bridges and Tunnels (TBTA), Design Services for Project VN-86, New Ramp at the Verrazano-Narrows Bridge Project Location: New York, NY Client: MTA Project Role: CADD Drafter Start Date, End Date:05/2012-09/2013 Project Description: CADD technician on the addition of a new Bus/HOV lane on the structure. To add an additional elevated lane to the Brooklyn approach, a new ramp is required. Work includes foundation design, highway geometry, structure design, lighting, and fire standpipes. To achieve desirable grades for the new ramps, two of the existing entrance ramps are to be reconstructed. Approach spans will be modified to accommodate a seventh lane. Project Responsibilities: Responsible for preparing drawings.
  • 3. Ashraful Aziz 3 of 9 STV Incorporated Project: East Side Access Project Location: New York, NY Client: MTA Long Island Rail Road Project Role: CADD Drafter Start Date, End Date: 2009-2012 Project Description: The project involved connecting the Long Island Rail Road’s main and Port Washington Lines with the Grand Central Terminal (GCT) in Manhattan. Project Responsibilities: Responsible for preparing drawings with the following Electrical Systems:  26.4 KV (60 Hz),13.2 KV (60 Hz),12 KV traction feeders (25 Hz), 2.4 KV Signal power feeders (60 Hz and 91 2/3 Hz), 480 V power feeders, 120 V AC power feeders and control cables for sectionalizing switches in ‘Harold’, ‘Point’ and ‘F’ Interlockings.  Correct and add existing ducts and cable routes in survey drawings.  Design new route for cables overhead & underground, ducts, cable troughs, manholes, designed catenary structure’s fixing details to reroute the existing above mentioned cables affected by the new ESA installations.  Design Electrical Riser diagrams and control diagrams.  Coordinate works with civil, track, catenary etc. works and related packages CQ031, CQ032, CH053, CH054  Design new power cables and routing for 60 Hz, 91.6 Hz power supplies of different voltages for new CILs (LIRR), CIHs (Amtrak) , RTU houses, Rail road control towers 'Q' & 'R" existing trailers and other facilities in Harold area.  Design yard lighting for ‘F’ Interlocking.  Participate in QA/QC procedure. PARSONS Corporation New York, NY 10/2007-8/2009 I was responsible for set up CADD standards, back check junior drafters work, preparing drawings for rail, bridge, tunnel, and roadway projects for various transportation agencies in the New York area. Project: Indefinite Quantity Engineering Services Project Location: New York, NY Contract #: 645600 Project #: 645600 Client: MTA New York City Transit (NYCT) Project Role: Lead CADD Drafter Start Date, End Date: 2008-2009 Project Description: The project involves providing the design of a wireless closed circuit television (CCTV) system for 19 NYCT train yards. The systems are intended to enhance security and surveillance in these yards at various gates and portals. The system involves wireless CCTV image data at 60 and 5 GHz, use of solar panels for power at some locations, CCTV analytics, and remote connections to NYCT’s SONET/ATM network and data storage requirements. Project Responsibilities: Responsible for set up CADD standards for the project, preparing drawings and back check junior drafters work.
  • 4. Ashraful Aziz 4 of 9 Project: Permanent World Trade Center PATH Terminal Project Location: New York, NY Contract #: 645887 Project #: 645887 Client: Port Authority of New York and New Jersey Project Role: CADD Drafter Start Date, End Date: 2008 Project Description: The $2.2 billion permanent World Trade Center (WTC), Port Authority Trans-Hudson (PATH) terminal project involves designing the main terminal, PATH train station, east-west/north-south connectors to WTC structures 2, 3, and 4 at the site, and the Liberty Street underpass. Project challenges include maintaining traffic operations within the existing temporary PATH station during the construction of the new permanent project, in addition to required construction staging and the construction of temporary exits and entrances. The terminal, a world - class transportation facility, will replace a temporary station at the WTC site that restored service to lower Manhattan from New Jersey after the events of September 11, 2001, coordinate with the existing and future transportation infrastructure and WTC development, and enhance facilities that existed at the WTC complex prior to September 11, 2001. Project Responsibilities: Responsible for preparing drawings. Project: 9th Avenue and 31st Street Development Project Location: New York, NY Contract #: 646950 Project #: 646950 Client: Brookfield Properties Developers LLC Project Role: CADD Drafter Start Date, End Date: 2008 Project Description: Parsons is performing program management on an air rights project over the Long Island Rail Road, Amtrak, and New Jersey Transit tracks west of Penn Station. The project includes the construction of 3.5 million sq. ft. of structures on a site that is traversed by 1,200 trains per day. Project Responsibilities: Responsible for preparing drawings. Project: MTA System wide Security Program Project Location: New York, NY Contract #: 646089 Project #: 646089 Client: New York City Transit Authority / Metropolitan Transportation Authority Project Role: CADD Drafter Start Date, End Date: 2008 Project Description: Parsons is responsible for developing an overall security program for the MTA system and designing individual security applications for specific facilities. Project Responsibilities: Responsible for preparing drawings. Project: North Corridor Metrorail Extension, New Starts Project Location: Miami, Florida Contract #: 646331 Project #: 646833 Client: Miami-Dade Transit (MDT) / Miami-Dade County Project Role: CADD Drafter Start Date, End Date: 2008 Project Description: The project involves final design and design services during construction for the North Corridor Metrorail Extension of the Miami heavy rail system. The 9.5-mile elevated, double track rail extension includes seven stations serving the NW 27th Avenue corridor, northern Miami-DadeCounty, Opa-Locka, Miami Gardens communities, Miami-Dade College North, the Calder Race Track, and Dolphin Stadium. Project Responsibilities: Responsible for preparing drawings.
  • 5. Ashraful Aziz 5 of 9 Project: International Bridge Inspection and Other Engineering Services Project Location: Sault Saint Marie, Michigan Contract #: 646732 Project #: 646732 Client: International Bridge Authority Project Role: CADD Drafter Start Date, End Date: 2008 Project Description: The project involves providing engineering support services for placement of fixed and movable painting platforms on the main arch and approach spans, rehabilitation of the south abutment, and all annual and special inspections and condition evaluations. Project Responsibilities: Responsible for preparing drawings. Project: Williamsburg Bridge, Reconstruction Project Location: New York, NY Contract #: 645587 Project #: 645587 Client: New York City Department of Transportation Project Role: CADD Drafter Start Date, End Date: 2008 Project Description: The project involved construction support services, which entailed strengthening and reinforcing structural members of main tower columns and main stiffening truss members; seismic retrofit of intermediate tower bases; new maintenance travelers, platforms, hoisting systems, and adjustment of suspender lengths; installation and integration of the Intelligent Transportation System (ITS) at the Traffic Management Center; intelligent traffic operation signals and lane control signals; and the study and design of contraflow scheme using a movable barrier and barrier transfer machine, including a new storage and maintenance facility. A bearing replacement at intermediate towers (PP 10 and 15) was added to contract. Project Responsibilities: Responsible for preparing drawings. Project: VN-80 Verrazano Narrows Upper-Level Deck Project Location: New York, NY Contract #: 645926 Project #: 645926 Client: Triborough Bridge and Tunnel Authority Project Role: CADD Drafter Start Date, End Date: 2007-2008 Project Description: The project involves rehabilitating the upper-level deck of the bridge’s suspended spans. The concrete roadway deck will be replaced by an orthotropic steel deck with new subfloor beams and longitudinal shear connectors. The project work also involves relocating utilities affected by the deck replacement with new standpipe branch lines; new lighting; and a communication control system, including security access control, data backbone, and the supervisor control and data acquisition (SCADA) system. Project Responsibilities: Responsible for preparing drawings. Project: Major Deegan Expressway Project Location: New York, NY Contract #: 640449 Project #: 640449 Client: New York State Department of Transportation, Region 11 Project Role: CADD Drafter Start Date, End Date: 2007 Project Description: Parsons has been selected to provide services for 11 bridges between Albany Crescent and the Westchester County Line on the Major Deegan Expressway, the heavily trafficked New York City stretch of the New York State Thruway. Eight of these bridges are steel multi-girder bridges (two are one-span simple, one is three-span simple, four are two-span continuous, and one is three-span continuous). The remaining three are one-bay concrete rigid frame bridges. Of the eleven, five are overpass structures, two are access/exit ramp structures,
  • 6. Ashraful Aziz 6 of 9 three are mainline structures, and one is a local street structure. Parsons' services include in-depth inspections; load ratings; surveys; substandard features evaluations; preparation of preliminary design plans, including maintenance and protection of traffic plans; and bridge reconstruction project reports and/or equivalent design approval documents. Project Responsibilities: Responsible for preparing drawings. PARSONS Corporation Bellevue and Seattle, WA 9/2006-9/2007 I was responsible for preparing drawings for bridge and roadway projects in the Bellevue and Seattle areas of Washington. Project: Tacoma High-Occupancy Vehicle (HOV) Project Location: Tacoma, Washington Contract #: 646592 Project #: 646592 Client: CH2MHILL / Washington State Department of Transportation Project Role: CADD Drafter Start Date, End Date: 2007 Project Description: The project involves the overall design and management of the $1.1 billion, eight-mile, high-occupancy vehicle (HOV) freeway. The project work includes the preparation of conceptual, preliminary, and final engineering plans and construction documents for the roadway and HOV lanes, as well as numerous bridge designs, construction staging plans, signalization, utilities, lighting, detours, right-of-way, signing and striping, retaining walls, drainage, urban design, landscaping, and use of geographic information systems data. The design includes the development and evaluation of interchange alternatives to update the existing interchanges to federal interstate design standards. The freeway design includes the evaluation of alternative HOV concepts in accommodating travel demand on the highly traveled route and four local interchanges. An environmental assessment and public involvement program was conducted for the corridor. Project Responsibilities: Responsible for preparing drawings. Project: Interstate 405 General Engineering Consultant Contract Project Location: Puget Sound, Washington Contract #: 645180 Project #: 645180 Client: HNTB Corporation (WA) / Washington State Department of Transportation (WSDOT) Project Role: CADD Drafter Start Date, End Date: 2006-2007 Project Description: The project involves the implementation of a $10.9 billion program for improvements along a congested 30-mile corridor in the Seattle-Bellevue metropolitan area. Parsons is providing program management services to assist the WSDOT with overseeing the Interstate 405 program of projects, which include project management, programmatic planning, environmental documentation, and engineering services. The project proposes to alleviate traffic congestion, enhance safety, mitigate increased traffic volume, and decrease noise pollution while maintaining or improving the environmental integrity of the corridor. The project includes the use of expanded polystyrene (EPS) geofoam lightweight fill as a design method to create zero surcharges on adjacent hospital parking garage foundations. Project Responsibilities: Responsible for preparing drawings.
  • 7. Ashraful Aziz 7 of 9 KS ENGINEERS, P.C. Newark, NJ 1999-2006 I was responsible for preparing drawings for rail, bridge, tunnel, and roadway projects for various transportation agencies in the New York and New Jersey area. Project: No. 7 Line Extension Project Location: New York, NY Client: New York City Transit Project Role: CADD Drafter Start Date, End Date: 2004-2006 Project Description: The project involved 11,000 ft. of new twin running tunnels excavated using the tunnel boring machine and drill-and-blast methods, two deep stations (one rock cavern and one cut-and-cover excavation), inclined elevator shafts, and associated systems structures. The project extended the No. 7 Line southwest by approximately 1.5 miles from Times Square to the Jacob Javits Convention Center at 10th Avenue and 34th Street. Project Responsibilities: Responsible for several drawings for the preparation of existing utility base mapping and conceptual schemes of utility rearrangements for new tunnels and stations. The drawings included structural boring and instrumentation drawings for plans, longitudinal profiles, transverse sections, and details. Contract drawing production duties for the Geotechnical and Tunneling Group included geotechnical boring drawings, including plans, longitudinal profiles, and transverse sections; geotechnical instrumentation drawings, including plans, longitudinal profiles, transverse sections, and details; tunnel and cavern initial rock support drawings; open- cut support of excavation drawings; construction/excavation sequence drawings; ground treatment drawings; existing building data drawings; and geotechnical figures for geotechnical baseline reports.
  • 8. Ashraful Aziz 8 of 9 Project: East Side Access Project Location: New York, NY Client: MTA Long Island Rail Road Project Role: CADD Drafter Start Date, End Date: 2000-2004 Project Description: The project involved connecting the Long Island Rail Road’s main and Port Washington Lines with the Grand Central Terminal (GCT) in Manhattan. Project Responsibilities: Responsible for preparing communication drawings, including communication systems plans for the mezzanine and lower and upper platforms; a supervisory control and data acquisition system block diagram and communications room layouts; fire alarm and security drawings, including fire alarm plans, point identification, riser and block diagrams, and security plans; signal drawings, including signal block layouts, single-line diagrams, cable plans, vital processors, control lines, track circuit layouts, route and aspect charts, panel lighting circuits, rack layouts, and remote terminal unit inputs and outputs; structural drawings, including drawings for escalator installation between the new concourse level and Biltmore room, which included the modification of framing plans at the suburban, express, and street levels, as well as drawing sections through the GCT at every street location; and traction power drawings, including the tunnel lighting system, single-line and network diagrams, conduit routing plan, cable routing and distribution, and circuit breaker. Project: Plainfield Bridges Project Location: Plainfield, NJ Client: New Jersey Transit Corporation Project Role: CADD Drafter Start Date, End Date: 1999-2000 Project Description: The product involved conducting a detailed conceptual study for the rehabilitation and replacement of 13 railroad bridges and the replacement of the historic Grant Avenue Railroad Bridge. All structures were located on the Raritan Valley Line between Mile Post 21.47 and Mile Post 24.87. Project Responsibilities: Responsible for the structural CADD design of structures, track age, signals, communications, and associated systems to support the detailed conceptual study. Project: Realignment of Sparta Munson-Corner Road Project Location: Sussex County, New Jersey Client: New Jersey Department of Transportation Project Role: CADD Drafter Start Date, End Date: 1999-2000 Project Description: The project involved reconstructing and realigning 0.3 miles of Sparta Munson-Corner Road (County Route 517) from the intersection of County Route 517 and Fox Hill Drive to 1,600 ft. north. The realignment replaced the substandard reverse curve with a single curve and provided two 3.6 m lanes with 2.4 m shoulders. Project Responsibilities: Responsible for preparation of CADD drawings. Project: Concrete Vulnerability Study for 450 Bridges Project Location: New York, NY Client: New York Department of Transportation Project Role: Junior Engineer Start Date, End Date: 1999-2000 Project Description: The project involved conducting a concrete vulnerability study for 450 bridges in New York City. Project Responsibilities: Responsible for conducting a field study and the preparation of in-depth inspection reports for KS Engineers’ portion of the project, which included 75 bridges (810 spans) out of a total of 450 bridges (4,200 spans). Project: Design of New Townley Railroad Station Project Location: Union, New Jersey
  • 9. Ashraful Aziz 9 of 9 Client: New Jersey Transit Corporation Project Role: CADD Drafter Start Date, End Date: 1999-2000 Project Description: The project involved the design of New Townley Railroad Station. Project Responsibilities: Responsible for the civil CADD design of a 420-vehicle park-and-ride site, which included grading and drainage, a detention basin, on-site geometrics, signing and striping, pavement design, and civil CADD design of off-site improvements. The off-site work included designing the revision of an existing traffic signal to accommodate the new ingress and egress, as well as the revision of existing pavement markings and signage. Project: Redesign of Applegarth Road Project Location: Monroe, New Jersey Client: New Jersey Department of Transportation Project Role: CADD Drafter Start Date, End Date: 1999-2000 Project Description: The project involved the redesign of Applegarth Road. Project Responsibilities: Responsible for the civil CADD design of utility relocations and a new drainage system to replace ditches along a 3.8-mile stretch of roadway. Work performed included verification of the location of all existing utilities, preparation of a utility relocation report, and development of utility relocation plans. Work performed also included the development of two alternative drainage system designs; the design of remedial work, including pavement milling, resurfacing, repair of potholes, and repair and replacement of sidewalks; and the preparation of existing and proposed drainage system reports and a final concept study report. The drainag e system redesign included the determination of storm water runoff, as well as the size, length, slope, invert elevation, and route of the storm drain system. The existing and proposed drainage systems for storm water runoff were evaluated and analyzed for recurrence interval.