Successfully reported this slideshow.
We use your LinkedIn profile and activity data to personalize ads and to show you more relevant ads. You can change your ad preferences anytime.
Upcoming SlideShare
Narender_resume
Next
Download to read offline and view in fullscreen.

0

Share

Download to read offline

WB K4 Geert Smits Structural Engineer-GS

Download to read offline

Related Audiobooks

Free with a 30 day trial from Scribd

See all
  • Be the first to like this

WB K4 Geert Smits Structural Engineer-GS

  1. 1. TECH – 6 (continued) CV Geert Smits Technical Proposal Studies and preparation of DPR (Detailed Project report) for development of NW-5 TECH 6 (cont.) – page 1 Position Title and No. K4 – Structural Engineer Name of Expert: Geert Smits Date of Birth: 1962 Country of Citizenship / Residence The Netherlands Education:  1985 Polytechnical High School, BSc degree in Civil Engineering Employment record relevant to the assignment: Period Employing organization and your title/position. Contact information for references Country Summary of activities performed 2008-to date Royal HaskoningDHV B.V. Senior Structural Engineer Netherlands Senior structural/civil Engineer/Advisor for various civil works. Design manager for 1,5 years in Brasil. 2000-2008 RWS Ministry of Public Works Team Leader, Senior Advisor dep. Civil Engineering Netherlands Design team leader/senior advisor for various civil works, from feasibility studies to detail design. Main focus on inland waterways infrastructure. 1997-2000 Ballast Nedam Team Leader/ Advisor/ Structural Engineer dep. Engineering Netherlands Design team leader for a project in Indonesia, responsible for all the civil works as pumping stations, railway- road bridge and various foundation plans. 1991-1997 Grontmij BV Structural Engineer Netherlands Structural/Civil Engineer/ Geotechnical Engineer for various civil works, from feasibility studies to detail design. Project leader for relative small projects. 1985-1997 RWS Ministry of Public Works Structural Engineer Netherlands Structural/Civil Engineer for various civil works, from feasibility studies to detail design. Main focus on inland waterways infrastructure.
  2. 2. TECH – 6 (continued) CV Geert Smits Technical Proposal Studies and preparation of DPR (Detailed Project report) for development of NW-5 TECH 6 (cont.) – page 2 Membership in Professional Associations and Publications:  CUR committee Publications:  “Innovations in navigation lock design” 2009, Contribution to Pianc report no 106 Language Skills (indicate only languages in which you can work):  English Excellent  German Good  French Fair  Portuguese Fair  Dutch Native Adequacy for the Assignment: Detailed Tasks Assigned on Consultant’s Team of Experts: Reference to Prior Work/Assignments that Best Illustrates Capability to Handle the Assigned Tasks Canal del Dique. Navigation locks, discharge sluices 2015 to date, Colombia Expert / Advisor. Stuctural and geotechnical design of two sets of navigation locks combined with discharge sluices. Both structures equipped with vertical lifting gates. Advisor during design phase. FarolJV Technical director. 2013 to date, Brasil Farol JV is a joint venture between RHDHV and ATP. Main market is the private sector that w ill develop a range of services in the Maritime and Waterw ays sector such as shipyards, container terminals, concessions, etc. As technical director responsible to provide overall technical direction within the JV on technical design work for maritime structures and facilities. To train local staff. To support Marketing and Proposal Activities. To take the Project Manager
  3. 3. TECH – 6 (continued) CV Geert Smits Technical Proposal Studies and preparation of DPR (Detailed Project report) for development of NW-5 TECH 6 (cont.) – page 3 role and lead overall delivery of individual projects Ho Cheh Minh Flood Management project. 2012-2014, Vietnam Senior Advisor for Feasibility Study. Design leader for prelimanary design of several sluices and barriers for various variants in this Study. Focus on feasibility and costs. Wilhelmina Lock 2012-2013, The Netherlands Senior Advisor. Tender Design Lock. i.c.w. Contractor VHB. Teamleader for tender design of a navigation lock 14x160m with mitre gates. Design of LRT Metro in Tel Aviv 2011-to date, Israel Team leader. Structural and Geotechnical design of 9 metro stations, a two lanes bored tunnel. Contribution writing technical specifications for contract. Fermoy 2010-to 2014, Ireland Ireland. Senior advisor/structural engineer for a flood defence system in Fermoy. During design, contract and execution phase. Mekong Delta Infrastructure project 2010-2014, Vietnam Senior designer/advisor. Deepening and widening of two rivers. The design of a navigation lock, 16x180m with lifting gates. The renovation and/or redesign for 18 bridges. Supervisor for client during construction time. Construction will start in 2013. Seaport Ijmuiden 2011-2012, The Netherlands Project leader/ design leader for the structural and geotechnical design of a new large navigation lock, 500x65m with rolling gates. The design of the gates, the lock heads, lock chamber, filling&emptying system, lock approaches and waiting areas. Team leader for hydrological and environmental study.
  4. 4. TECH – 6 (continued) CV Geert Smits Technical Proposal Studies and preparation of DPR (Detailed Project report) for development of NW-5 TECH 6 (cont.) – page 4 Kyung In Canal 2009-2012, Korea, Republic of Senior Advisor/specialist. Project:. Design of two lock complexes at both sides of the canal. Lock at seaside with double lock chambers 22x225m with rolling gates. Lock at canal side 16x150m with mitre gates. Layout and design of container terminal. Advisor for client during construction. Locks are in operation. Philipsdam 2010-2012, The Netherlands Senior Advisor/Structural Engineer for the design of a new discharge sluice. Renovation of existing discharge sluice. Modification of existing sluices and navigation locks. Extension 2nd Nakdong barrier 2009-2011, Korea, Republic of Project leader/specialist. Cooperation with Yooshin company. A storm surge barrier and discharge sluice with vertical hydraulic driven lifting gates with a span of 60m. A navigation lock with single leaf gates for recreational vessels. Barrier is under construction now. Yongam Barrier 2009-2011, Korea, Republic of Senior Advisor/designer. Structural and architectural design of the Yongam Barrier. Cooperation with Hanyan company. A storm surge barrier and discharge sluice with hydraulic driven vertical lifting gates (max span of 90m). Barrier is under construction now. Panama 2008-2011, The Netherlands Senior advisor/engineer expansion of navigation Locks at Panama. During design and contract stage. Civil and structural design of the reference design of a 3 steps locks 55x500m with rolling gates. Contribution writing specifications in contract documents. Review of the contractors designs & biddings. Lock complex Terneuzen 2009-2010, The Netherlands Senior advisor structural engineer. Structural (partly) renovation and adjustments of the existing three navigation locks to new mean high
  5. 5. TECH – 6 (continued) CV Geert Smits Technical Proposal Studies and preparation of DPR (Detailed Project report) for development of NW-5 TECH 6 (cont.) – page 5 water levels. Design of 14 fishery harbors 2008-2009, Ghana Head of a design team.. Including breakwater structures, quay walls, infrastructure with maintenance and office buildings. Lock Complex Weurt 2009, The Netherlands Senior advisor Lock Complex Weurt. Alternative study. Technical feasibility of sill lowering of the west side lock chamber. Project expansion of 3 lock complexes in river 'Maas 2007-2008, The Netherlands Senior advisor/specialist.. Design of different types of lock chambers, lock heads with different types of gates. During contract stage. Renovation Barrier at 'Sambeek'. During building stage. Several civil projects 2000-2008, The Netherlands Senior advisor/structural engineer for. Environmental study/design expansion 'Beatrix' lock complex at 'Utrecht'. Two lift bridges at lock complex 'Weurt'. During design and building stage. Pumping stations at 'Zeeburg' and 'IJmuiden'. Renovation and expansion of the existing complexes. During design, contract and building stages. Aquaduct at highway 'A4'. During design and contract stage. Expansion canal 'Twente'. During contract en building stage. 'Naviduct' at 'Enkhuizen 2000-2004, The Netherlands Head of a design team/advisor project. A navigation lock combined with a road traffic tunnel. Two sets of locks with steel mitre gates. During all design and building stages. Flood risk analyses embankments 2004, The Netherlands Senior advisor/Member of a study project. in the Netherlands.
  6. 6. TECH – 6 (continued) CV Geert Smits Technical Proposal Studies and preparation of DPR (Detailed Project report) for development of NW-5 TECH 6 (cont.) – page 6 Study of expansion of the existing lock complex "IJmuiden" 2001, The Netherlands A fourth lock for atlantic vessels equipped with roller gates and a coffer dam lock chamber. During design stage. High speed Railroad South Line 1999, The Netherlands Senior advisor/structural engineer at project. During design stage. Project 'Musi-Pulp 1997-1998, Indonesia Factory Sumatra/Indonesia. Head of design team civil works during building stage. Structures; Rail road bridge, a pumping station, waste water plant, several foundations for a chemical plant. Floating jettys 1991-1997, The Netherlands Structural engineer for floating jettys, mooring places at several locations at lock approaches. During design and building stage. Bascule bridge 1991-1997, The Netherlands Structural engineer for bridges. Bascule bridge at 'Groningen'. Cable stayed bridge at 'Zwolle'.Both during preliminary en definite design. Draw bridge at 'Mijnden'. During all project stages. Several small bridges for slow traffic. Timber and steel structures. During design and contract stage. 'Betuwe' railroad line 1996-1997, The Netherlands Assistant project manager/ senior engineer 'Betuwe' railroad line. During design and contract stage. Aquaduct at 'Harderwijk' 1996, The Netherlands Structural engineer/advisor Aquaduct at 'Harderwijk'. During design and building stage. Guard lock/bridge 'Mook'
  7. 7. TECH – 6 (continued) CV Geert Smits Technical Proposal Studies and preparation of DPR (Detailed Project report) for development of NW-5 TECH 6 (cont.) – page 7 1995-1996, The Netherlands Structural engineer Guard lock/bridge 'Mook'. A lock with steel mitre gates for recreation vessels. During engineering and building stage. 'Larser' lock 1993-1995, The Netherlands Structural engineer preliminary en definite design 'Larser' lock. Specifications, detailing of a navigation lock and bridge for inland recreation vessels. A concrete U-shaped lock chamber and lock heads with mitre gates. Viaducts at 'Helmond', 'Almere' and 'Oldenzaal' 1992-1994, The Netherlands Structural engineer viaducts at 'Helmond', 'Almere' and 'Oldenzaal'. Prestressed concrete structures. During design and building stage. Tunnel at 'Western Circus' London 1994, United Kingdom Structural engineer Tunnel at 'Western Circus' London. During definite design stage. A project in cooperation with 'Maunsell' London. Projects 'Schokkerhaven' en 'Lelystad' 1991-1994, The Netherlands Project manager/Structural engineer for projects 'Schokkerhaven' en 'Lelystad'. Floating breakwater structures and jetties. During design and building stage. Waste water treatment plant at 'Delfzijl' 1993, The Netherlands Structural engineer waste water treatment plant at 'Delfzijl'. During preliminary and definite design Navigation lock 'Mijnden' for inland recreation vessels 1991-1992, The Netherlands Structural engineer/advisor navigation lock 'Mijnden' for inland recreation vessels. During design and building stage. Preliminary studies and design 1985-1991, The Netherlands A road tunnel underneath 'Westerschelde' see arm Navigation locks at
  8. 8. TECH – 6 (continued) CV Geert Smits Technical Proposal Studies and preparation of DPR (Detailed Project report) for development of NW-5 TECH 6 (cont.) – page 8 Engelen','IJmuiden','Panheel','Orange locks Amsterdam','Reide'. Navigation locks at 'Hansweert', locks 'Aadorp' 1985-1991, The Netherlands Structural Engineer navigation locks at 'Hansweert', locks 'Aadorp', locks 'de Haandrik' during design and building stage. Lock at 'Nieuwe Statenzijl' 1987-1990, The Netherlands A navigation and scouring lock combined with a pumping station. A sheet pile lock chamber and lock heads with a single steel mitre gate. During design and building stage. "Hartel" Barrier 1986-1990, The Netherlands Senior Structural Engineer Project "Hartel" Barrier. 95m span vertical lifting gate. combined with a navigation lock with mitre gates Project "Maeslant kering" Barrier with sector gates. Expert’s contact information: Email : geert.smits@rhdhv.com Phone : +31 88 348 3221 Cell phone : +31 6 10 538 269 Certification: I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my experience, and I am available to undertake the assignment in case of an award. I understand that any misstatement or misrepresentation described herein may lead to my disqualification or dismissal by the Client, and/or sanctions by the Bank. Geert Smits April 15th 2016 Name of Expert Signature Date Johan van Voorthuizen April 15th 2016 Name of authorized Signature Date Representative of the Consultant

Views

Total views

359

On Slideshare

0

From embeds

0

Number of embeds

12

Actions

Downloads

5

Shares

0

Comments

0

Likes

0

×