- PRO JECTSK A T J A M A R T I N I
North Terminal Extension and Interchange. Gatwick.
2008 - 2011
- PRO JECTSK A T J A M A R T I N I
North Terminal Landside Development
Gatwick. 2008 - 2011
Extension and upgrade project which includes provid-
ing a new state of the art transport interchange, depar-
tures and arrivals concourse extensions, baggage sys-
tem extensions, a new multi-storey car park, improved
forecourt and drop off area. The design incorporates
the latest ASIAD guidelines for increased safety and
security as well as implementing new strategies (way
finding, commercial facilities) for an improved passen-
ger experience. This project is being delivered within
the confines of a fully operational airport and with lim-
ited disruption.
Role	 Project Leader
Capacity/Area	 24 mppa. /100 000 m²
Client 	 Gatwick Airport Limited
Contractor	 Morgan Sindall
Project Value 	 £ 150M
Status: 	 Construction
Consultants	 WSP, Hoare Lea , FirstCo
Suppliers	 Vector Foiltec, Bombardier, 		
	 Prater, Watsons
North Terminal Extension and Interchange. Gatwick.
2008 - 2011
- PRO JECTSK A T J A M A R T I N I
Responsibilities	 Work Stages E-J
Management of team of 15 architects, technicians
and visualization specialists
Client and contractor liaison, stakeholder consulta-
tion and approval process coordination
Coordination of all project deliverables (system pack-
ages, specification, shield studies)
Consultant team coordination (Structural, M&E, Bag-
gage, IT/ELV/Security)
Coordination of interface between NT Forecourt, NT
Interchange and MSCP6 projects
Statutory and Local Authorities submissions (Build-
ing Control, Planning, ASIAD)
Supervision of material selection process, stakehold-
er approval (mock ups, samples)
Supplier information coordination, commenting and
approval process oversight
Contract and finance administration
Project programme, resource allocation and fee pro-
posal
-
-
-
-
-
-
-
-
-
-
Queen Alia International Airport. Amman.
2005 - 2011
- PRO JECTSK A T J A M A R T I N I
Queen Alia International Airport
Amman / Jordan. 2008 - 2011
Redevelopment and extension project which displaces
two existing terminals and allows a capacity increase
from currently approx. 3mppa to 6mmppa / 12mppa
(phase 1 / 2) by 2030. The project aims to make Am-
man a gateway to the region with state of the art facili-
ties but also to display a distinctly local character.
Role	 Project Architect
Capacity/Area	 12 mppa. /130 000 m²
Client 	 Marawed
Contractor	 J&P
Project Value 	 $ 500 M
Status: 	 Construction
Consultants	 Dar-al Handasah, ADPi
Local Architect	 Maisam
Queen Alia International Airport. Amman.
2005 - 2011
- PRO JECTSK A T J A M A R T I N I
Queen Alia International Airport
Amman, Jordan
Foster + Partners
Pre-cast Concrete – Roof Shells (Edge Module)
Queen Alia International Airport
Amman, Jordan
Foster + Partners
Pre-cast Concrete – Roof Shells
Queen Alia International Airport
Amman, Jordan
Foster + Partners
Approach Ramp to Departures Curb Side
Responsibilities	 Work Stages D-H
Management of team of up to 12 architects, techni-
cians and visualization specialists
Client liaison, commercial & operational stakeholder
consultation & approval coordination
Coordination of all project deliverables (system pack-
ages, material and facilities studies)
Design and consultant team coordination (France/
Jordan/Lebanon/UK/Greece/Germany)
Terminal planning, interiors design, detailing
Environmental impact and energy saving studies
Special system coordination (baggage, security) with
international consultant team
Implementation coordination with local architect and
regional structural and M&E
Supervision of material selection process, stakehold-
er approval (mock ups, samples)
Local Authorities consultation and submissions
Project programme, resource allocation and fee pro-
posal for variation/ additional scope
-
-
-
-
-
-
-
-
-
-
-
Bao’an Airport Terminal 3. Shenzhen.
2007
- PRO JECTSK A T J A M A R T I N I
Bao’an Airport. Terminal 3
Shenzhen / China. 2007
Two stage design competition for a new terminal at
Shenzhen which is to serve transfer traffic from Hong
Kong and the Far East. The projects ambition is to
showcase a truly 21st century airport environment,
complete with entertainment and leisure facilities
which are tightly integrated within the commercial and
terminal planning strategy.
Role	 Project Architect
Capacity/Area	 400 000 m²
Client 	 Shenzhen Airport Group Co. Ltd	
Status 	 Design Competition Runner Up
Consultants	 Arups. BIAD. Jason Bruges.
Bao’an Airport Terminal 3. Shenzhen.
2007
- PRO JECTSK A T J A M A R T I N I
Responsibilities	 Stages A-C
Management of team of up to 4 architects, techni-
cians and visualization specialists
Coordination of all project deliverables (report, mod-
els, presentation boards)
Complete Interiors, facilities and space planning (re-
tail, furniture, check in, reclaim etc.)
Terminal Planning and detailing
Concept and scheme design based on reference
studies flow studies
Master planning review and improvement assess-
ment
Passenger flow and capacity studies (vertical circula-
tion and transport, infrastructure)
Environmental impact and energy saving studies
深圳宝安国际机场T3航站楼建筑设计
on
ed
al
ly
th
nd
he
m
al
he
d,
ge
is
he
he
th
Dynamic structural system
航站楼动态结构系统
。
深圳宝安国际机场T3航站楼建筑设计
-
-
-
-
-
-
-
-
Smithsonian Institute. Washington DC.
2005 - 2008
- PRO JECTSK A T J A M A R T I N I
Smithsonian Institute.
Washington DC / USA. 2005 - 2008
The enclosed courtyard forms the centrepiece of the
building’s long-term renovation programme, which
also includes a redesign of the galleries with contem-
porary interactive displays and the addition of a con-
servation laboratory, an auditorium, and 30 per cent
more exhibition space. Visitors are able to enter the
surrounding galleries from the courtyard, and out of
museum hours the space can also host a variety of
social events, including concerts and public perform-
ances. Designed ‘to do the most with the least,’ the
sensuous, fully glazed roof canopy allows the bathing
the courtyard with natural light and naturally ventilating
the space through louvres concealed in the eaves.
Role	 Architect
Capacity/Area	 2600 m² (courtyard)
Client 	 Smithsonian Institute
Project Value	 undisclosed
Status 	 Completed
Consultants	 Buro Happold
Smithsonian Institute. Washington DC.
2005 - 2008
- PRO JECTSK A T J A M A R T I N I
Responsibilities	 Stage D
Member of team of up to 4 architects, technicians
and visualization specialists
Roof structure and acoustic studies
Environmental impact and energy saving studies
-
-
-
Charles Square Center. Prague.
1998 - 2001
- PRO JECTSK A T J A M A R T I N I
Charles Center.
Prague / Czech Republic. 1998 - 2001
Role	 Architect
Capacity/Area
Client 	 Golub
Project Value	 undisclosed
Status 	 Completed
Consultants
Responsibilties Stage C
- Cladding studies
Boulogne Billantcourt. Office and Mixe Use
2004 - 2008
- PRO JECTSK A T J A M A R T I N I
Boulogne Billantcourt Office & Mixed Use.
Paris / France. 2004 - 2008
Role	 Architect
Capacity/Area	 128000 m²
Client 	 Hines France
Project Value	 undisclosed
Status 	 Completed
Consultants
Responsibilties Stages A-C
- Concept
- Cladding and sustainability studies
Fleeting - Master of Architecture Thesis
2003
- PRO JECTSK A T J A M A R T I N I
Fleeting. Master of Architecture Thesis
London. 2003

More Related Content

What's hot

Resume_Rémi_Baneras_Site_Engineer_1207
Resume_Rémi_Baneras_Site_Engineer_1207Resume_Rémi_Baneras_Site_Engineer_1207
Resume_Rémi_Baneras_Site_Engineer_1207Rémi BANERAS
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed El Banna
 
Senior quantity surveyor/Contracts administrator
Senior quantity surveyor/Contracts administratorSenior quantity surveyor/Contracts administrator
Senior quantity surveyor/Contracts administratorEhab Al-Attar
 
Cv tomasz prymas senior architect+pf2
Cv tomasz prymas senior architect+pf2Cv tomasz prymas senior architect+pf2
Cv tomasz prymas senior architect+pf2Tomek Prymas
 
Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed Ahmed
 
Projects Handled As A Logistics Manager In Current And Former Positions
Projects Handled As A Logistics Manager In Current And Former PositionsProjects Handled As A Logistics Manager In Current And Former Positions
Projects Handled As A Logistics Manager In Current And Former PositionsAsela Rathnasiri
 
RFNY2013: Invest In Moscow - Zelenograd
RFNY2013: Invest In Moscow - ZelenogradRFNY2013: Invest In Moscow - Zelenograd
RFNY2013: Invest In Moscow - ZelenogradОlеg Сhursin
 
Projects List 2010 to 2015
Projects List 2010 to 2015Projects List 2010 to 2015
Projects List 2010 to 2015Randy Lay
 
Eng Jihad Amro C.V-2015 new
Eng Jihad Amro C.V-2015 newEng Jihad Amro C.V-2015 new
Eng Jihad Amro C.V-2015 newJihad Amro
 
doaa mohamed cv -1
doaa mohamed  cv -1doaa mohamed  cv -1
doaa mohamed cv -1doaa saber
 

What's hot (20)

Ehab Radwan
Ehab RadwanEhab Radwan
Ehab Radwan
 
Mina 2016
Mina 2016Mina 2016
Mina 2016
 
C.V -moh-8-16
C.V -moh-8-16C.V -moh-8-16
C.V -moh-8-16
 
CV
CVCV
CV
 
Resume_Rémi_Baneras_Site_Engineer_1207
Resume_Rémi_Baneras_Site_Engineer_1207Resume_Rémi_Baneras_Site_Engineer_1207
Resume_Rémi_Baneras_Site_Engineer_1207
 
Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]Mohamed Sabry El Banna's CV-Final[1]
Mohamed Sabry El Banna's CV-Final[1]
 
Senior quantity surveyor/Contracts administrator
Senior quantity surveyor/Contracts administratorSenior quantity surveyor/Contracts administrator
Senior quantity surveyor/Contracts administrator
 
Cv tomasz prymas senior architect+pf2
Cv tomasz prymas senior architect+pf2Cv tomasz prymas senior architect+pf2
Cv tomasz prymas senior architect+pf2
 
mahmoud elsadat
mahmoud elsadatmahmoud elsadat
mahmoud elsadat
 
Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)Mohamed ahmed hamed 2013 (1) (1)
Mohamed ahmed hamed 2013 (1) (1)
 
Projects Handled As A Logistics Manager In Current And Former Positions
Projects Handled As A Logistics Manager In Current And Former PositionsProjects Handled As A Logistics Manager In Current And Former Positions
Projects Handled As A Logistics Manager In Current And Former Positions
 
RFNY2013: Invest In Moscow - Zelenograd
RFNY2013: Invest In Moscow - ZelenogradRFNY2013: Invest In Moscow - Zelenograd
RFNY2013: Invest In Moscow - Zelenograd
 
Senior Land surveyor
Senior Land surveyorSenior Land surveyor
Senior Land surveyor
 
CV Amr Zaki - PMP®
CV Amr Zaki - PMP®CV Amr Zaki - PMP®
CV Amr Zaki - PMP®
 
A.H Resume
A.H ResumeA.H Resume
A.H Resume
 
Akhila CV
Akhila CVAkhila CV
Akhila CV
 
kenan Alnamous CV
kenan Alnamous CVkenan Alnamous CV
kenan Alnamous CV
 
Projects List 2010 to 2015
Projects List 2010 to 2015Projects List 2010 to 2015
Projects List 2010 to 2015
 
Eng Jihad Amro C.V-2015 new
Eng Jihad Amro C.V-2015 newEng Jihad Amro C.V-2015 new
Eng Jihad Amro C.V-2015 new
 
doaa mohamed cv -1
doaa mohamed  cv -1doaa mohamed  cv -1
doaa mohamed cv -1
 

Viewers also liked

Laws of exponents
Laws of exponentsLaws of exponents
Laws of exponentstreitmeier
 
Laura patricia-flores-dominguez
Laura patricia-flores-dominguezLaura patricia-flores-dominguez
Laura patricia-flores-dominguezlaura flures
 
Taller#6 walter rojas hurtado 8°c
Taller#6 walter rojas hurtado 8°cTaller#6 walter rojas hurtado 8°c
Taller#6 walter rojas hurtado 8°cwalter rojas hurtado
 
Sustainable developmentgoal12
Sustainable developmentgoal12Sustainable developmentgoal12
Sustainable developmentgoal12Tigist Zelleke
 
Lesson 1 multiplying exponents - assignment
Lesson 1   multiplying exponents - assignmentLesson 1   multiplying exponents - assignment
Lesson 1 multiplying exponents - assignmentjulienorman80065
 
Google Preferred Research Presentation
Google Preferred Research PresentationGoogle Preferred Research Presentation
Google Preferred Research PresentationModicum
 
Reiki Ryoho Introduction
Reiki Ryoho Introduction Reiki Ryoho Introduction
Reiki Ryoho Introduction dpreiki
 
Rebecca T. Davis: Educational Policy: Advancing Social Work's Commitment to E...
Rebecca T. Davis: Educational Policy: Advancing Social Work's Commitment to E...Rebecca T. Davis: Educational Policy: Advancing Social Work's Commitment to E...
Rebecca T. Davis: Educational Policy: Advancing Social Work's Commitment to E...THL
 

Viewers also liked (16)

Sector económico
Sector económicoSector económico
Sector económico
 
Counselling 1
Counselling 1Counselling 1
Counselling 1
 
Laws of exponents
Laws of exponentsLaws of exponents
Laws of exponents
 
Botticelli
BotticelliBotticelli
Botticelli
 
Laura patricia-flores-dominguez
Laura patricia-flores-dominguezLaura patricia-flores-dominguez
Laura patricia-flores-dominguez
 
Taller#6 walter rojas hurtado 8°c
Taller#6 walter rojas hurtado 8°cTaller#6 walter rojas hurtado 8°c
Taller#6 walter rojas hurtado 8°c
 
Presentación1
Presentación1Presentación1
Presentación1
 
Sustainable developmentgoal12
Sustainable developmentgoal12Sustainable developmentgoal12
Sustainable developmentgoal12
 
Lesson 1 multiplying exponents - assignment
Lesson 1   multiplying exponents - assignmentLesson 1   multiplying exponents - assignment
Lesson 1 multiplying exponents - assignment
 
Percentages amounts
Percentages amountsPercentages amounts
Percentages amounts
 
Walter prueba unica
Walter prueba unicaWalter prueba unica
Walter prueba unica
 
Google Preferred Research Presentation
Google Preferred Research PresentationGoogle Preferred Research Presentation
Google Preferred Research Presentation
 
Reiki Ryoho Introduction
Reiki Ryoho Introduction Reiki Ryoho Introduction
Reiki Ryoho Introduction
 
Advertisements
AdvertisementsAdvertisements
Advertisements
 
Rebecca T. Davis: Educational Policy: Advancing Social Work's Commitment to E...
Rebecca T. Davis: Educational Policy: Advancing Social Work's Commitment to E...Rebecca T. Davis: Educational Policy: Advancing Social Work's Commitment to E...
Rebecca T. Davis: Educational Policy: Advancing Social Work's Commitment to E...
 
Advertising
Advertising Advertising
Advertising
 

Similar to Gatwick Airport Terminal Extension by Martin Jamartini

Michael labib portofolio 2017
Michael labib portofolio 2017Michael labib portofolio 2017
Michael labib portofolio 2017Michael Labib
 
Mahmoud.F.Taha _c.v_
Mahmoud.F.Taha _c.v_Mahmoud.F.Taha _c.v_
Mahmoud.F.Taha _c.v_Mahmoud Taha
 
Hina Gazi select projects 2015
Hina Gazi select projects 2015Hina Gazi select projects 2015
Hina Gazi select projects 2015Hina Gazi
 
Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell
 
Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Mohamed Sayed
 
Kcn 2016 March Resume
Kcn 2016 March ResumeKcn 2016 March Resume
Kcn 2016 March ResumeKurt Nicholas
 
Suvo's portfolio
Suvo's portfolioSuvo's portfolio
Suvo's portfolioSuvo Ghosh
 
KONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.pptKONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.pptudayRavi10
 
Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis
 
Mohab Samoil_Resume
Mohab Samoil_ResumeMohab Samoil_Resume
Mohab Samoil_ResumeMohab Samoil
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CVmohamed ezz
 
RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18Mauritz Kruger
 

Similar to Gatwick Airport Terminal Extension by Martin Jamartini (20)

Michael labib portofolio 2017
Michael labib portofolio 2017Michael labib portofolio 2017
Michael labib portofolio 2017
 
My Resume Full
My Resume FullMy Resume Full
My Resume Full
 
Mahmoud.F.Taha _c.v_
Mahmoud.F.Taha _c.v_Mahmoud.F.Taha _c.v_
Mahmoud.F.Taha _c.v_
 
Hina Gazi select projects 2015
Hina Gazi select projects 2015Hina Gazi select projects 2015
Hina Gazi select projects 2015
 
Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2Bob Goswell CV - December 2015 Mk2
Bob Goswell CV - December 2015 Mk2
 
Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3Eng.Mohamed Sayed Resume R3
Eng.Mohamed Sayed Resume R3
 
Singular Projects Gibraltar
Singular Projects GibraltarSingular Projects Gibraltar
Singular Projects Gibraltar
 
Kcn 2016 March Resume
Kcn 2016 March ResumeKcn 2016 March Resume
Kcn 2016 March Resume
 
C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)C V-OSAMA-Revised 2014(PDF)
C V-OSAMA-Revised 2014(PDF)
 
Suvo's portfolio
Suvo's portfolioSuvo's portfolio
Suvo's portfolio
 
Career Portfolio
Career PortfolioCareer Portfolio
Career Portfolio
 
KONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.pptKONA Hub Master Planning Report.ppt
KONA Hub Master Planning Report.ppt
 
CV- Project Control Manager PMP
CV- Project Control Manager PMPCV- Project Control Manager PMP
CV- Project Control Manager PMP
 
Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1Theodosios Skortsis - Portfolio v5.1
Theodosios Skortsis - Portfolio v5.1
 
Mohab Samoil_Resume
Mohab Samoil_ResumeMohab Samoil_Resume
Mohab Samoil_Resume
 
KWKCV16
KWKCV16KWKCV16
KWKCV16
 
MOHMED EZZ 2014CV
MOHMED EZZ 2014CVMOHMED EZZ 2014CV
MOHMED EZZ 2014CV
 
FRANK SARRISCV282015
FRANK SARRISCV282015FRANK SARRISCV282015
FRANK SARRISCV282015
 
Salakidis Savvas
Salakidis SavvasSalakidis Savvas
Salakidis Savvas
 
RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18RHDHV Buildings Architecture 2008-18
RHDHV Buildings Architecture 2008-18
 

Gatwick Airport Terminal Extension by Martin Jamartini

  • 1. - PRO JECTSK A T J A M A R T I N I
  • 2. North Terminal Extension and Interchange. Gatwick. 2008 - 2011
  • 3. - PRO JECTSK A T J A M A R T I N I North Terminal Landside Development Gatwick. 2008 - 2011 Extension and upgrade project which includes provid- ing a new state of the art transport interchange, depar- tures and arrivals concourse extensions, baggage sys- tem extensions, a new multi-storey car park, improved forecourt and drop off area. The design incorporates the latest ASIAD guidelines for increased safety and security as well as implementing new strategies (way finding, commercial facilities) for an improved passen- ger experience. This project is being delivered within the confines of a fully operational airport and with lim- ited disruption. Role Project Leader Capacity/Area 24 mppa. /100 000 m² Client Gatwick Airport Limited Contractor Morgan Sindall Project Value £ 150M Status: Construction Consultants WSP, Hoare Lea , FirstCo Suppliers Vector Foiltec, Bombardier, Prater, Watsons
  • 4. North Terminal Extension and Interchange. Gatwick. 2008 - 2011
  • 5. - PRO JECTSK A T J A M A R T I N I Responsibilities Work Stages E-J Management of team of 15 architects, technicians and visualization specialists Client and contractor liaison, stakeholder consulta- tion and approval process coordination Coordination of all project deliverables (system pack- ages, specification, shield studies) Consultant team coordination (Structural, M&E, Bag- gage, IT/ELV/Security) Coordination of interface between NT Forecourt, NT Interchange and MSCP6 projects Statutory and Local Authorities submissions (Build- ing Control, Planning, ASIAD) Supervision of material selection process, stakehold- er approval (mock ups, samples) Supplier information coordination, commenting and approval process oversight Contract and finance administration Project programme, resource allocation and fee pro- posal - - - - - - - - - -
  • 6. Queen Alia International Airport. Amman. 2005 - 2011
  • 7. - PRO JECTSK A T J A M A R T I N I Queen Alia International Airport Amman / Jordan. 2008 - 2011 Redevelopment and extension project which displaces two existing terminals and allows a capacity increase from currently approx. 3mppa to 6mmppa / 12mppa (phase 1 / 2) by 2030. The project aims to make Am- man a gateway to the region with state of the art facili- ties but also to display a distinctly local character. Role Project Architect Capacity/Area 12 mppa. /130 000 m² Client Marawed Contractor J&P Project Value $ 500 M Status: Construction Consultants Dar-al Handasah, ADPi Local Architect Maisam
  • 8. Queen Alia International Airport. Amman. 2005 - 2011
  • 9. - PRO JECTSK A T J A M A R T I N I Queen Alia International Airport Amman, Jordan Foster + Partners Pre-cast Concrete – Roof Shells (Edge Module) Queen Alia International Airport Amman, Jordan Foster + Partners Pre-cast Concrete – Roof Shells Queen Alia International Airport Amman, Jordan Foster + Partners Approach Ramp to Departures Curb Side Responsibilities Work Stages D-H Management of team of up to 12 architects, techni- cians and visualization specialists Client liaison, commercial & operational stakeholder consultation & approval coordination Coordination of all project deliverables (system pack- ages, material and facilities studies) Design and consultant team coordination (France/ Jordan/Lebanon/UK/Greece/Germany) Terminal planning, interiors design, detailing Environmental impact and energy saving studies Special system coordination (baggage, security) with international consultant team Implementation coordination with local architect and regional structural and M&E Supervision of material selection process, stakehold- er approval (mock ups, samples) Local Authorities consultation and submissions Project programme, resource allocation and fee pro- posal for variation/ additional scope - - - - - - - - - - -
  • 10. Bao’an Airport Terminal 3. Shenzhen. 2007
  • 11. - PRO JECTSK A T J A M A R T I N I Bao’an Airport. Terminal 3 Shenzhen / China. 2007 Two stage design competition for a new terminal at Shenzhen which is to serve transfer traffic from Hong Kong and the Far East. The projects ambition is to showcase a truly 21st century airport environment, complete with entertainment and leisure facilities which are tightly integrated within the commercial and terminal planning strategy. Role Project Architect Capacity/Area 400 000 m² Client Shenzhen Airport Group Co. Ltd Status Design Competition Runner Up Consultants Arups. BIAD. Jason Bruges.
  • 12. Bao’an Airport Terminal 3. Shenzhen. 2007
  • 13. - PRO JECTSK A T J A M A R T I N I Responsibilities Stages A-C Management of team of up to 4 architects, techni- cians and visualization specialists Coordination of all project deliverables (report, mod- els, presentation boards) Complete Interiors, facilities and space planning (re- tail, furniture, check in, reclaim etc.) Terminal Planning and detailing Concept and scheme design based on reference studies flow studies Master planning review and improvement assess- ment Passenger flow and capacity studies (vertical circula- tion and transport, infrastructure) Environmental impact and energy saving studies 深圳宝安国际机场T3航站楼建筑设计 on ed al ly th nd he m al he d, ge is he he th Dynamic structural system 航站楼动态结构系统 。 深圳宝安国际机场T3航站楼建筑设计 - - - - - - - -
  • 15. - PRO JECTSK A T J A M A R T I N I Smithsonian Institute. Washington DC / USA. 2005 - 2008 The enclosed courtyard forms the centrepiece of the building’s long-term renovation programme, which also includes a redesign of the galleries with contem- porary interactive displays and the addition of a con- servation laboratory, an auditorium, and 30 per cent more exhibition space. Visitors are able to enter the surrounding galleries from the courtyard, and out of museum hours the space can also host a variety of social events, including concerts and public perform- ances. Designed ‘to do the most with the least,’ the sensuous, fully glazed roof canopy allows the bathing the courtyard with natural light and naturally ventilating the space through louvres concealed in the eaves. Role Architect Capacity/Area 2600 m² (courtyard) Client Smithsonian Institute Project Value undisclosed Status Completed Consultants Buro Happold
  • 17. - PRO JECTSK A T J A M A R T I N I Responsibilities Stage D Member of team of up to 4 architects, technicians and visualization specialists Roof structure and acoustic studies Environmental impact and energy saving studies - - -
  • 18. Charles Square Center. Prague. 1998 - 2001
  • 19. - PRO JECTSK A T J A M A R T I N I Charles Center. Prague / Czech Republic. 1998 - 2001 Role Architect Capacity/Area Client Golub Project Value undisclosed Status Completed Consultants Responsibilties Stage C - Cladding studies
  • 20. Boulogne Billantcourt. Office and Mixe Use 2004 - 2008
  • 21. - PRO JECTSK A T J A M A R T I N I Boulogne Billantcourt Office & Mixed Use. Paris / France. 2004 - 2008 Role Architect Capacity/Area 128000 m² Client Hines France Project Value undisclosed Status Completed Consultants Responsibilties Stages A-C - Concept - Cladding and sustainability studies
  • 22. Fleeting - Master of Architecture Thesis 2003
  • 23. - PRO JECTSK A T J A M A R T I N I Fleeting. Master of Architecture Thesis London. 2003