1. DM APPROVED (G+4)
Ahmad Anis
Dubai, United Arab Emirates
Mobile: (+971) 553628405
Email: ahmad_anis87 @yahoo.com
P e r s o n a l I n f or m a t i o n
W O R K E X P E R I EN C E& R E L E V A N T P R O JE C T S
Since January 2014 CONSULTANT HSS (CHSS)
Structural Engineer
Projects:
1- Light Industrial Unit no 10 (LIU-10) Phase-1
a. Client: Jafza (Jebel Ali Free Zone Authority)
b. Project Location: Dubai – Jebel Ali
c. Project description: Steel structural design and amenities RC design
2- Ajman Showroom @ AL Jurf
a. Client: Shk.Ahmad Al Nuaymi
b. Project Location: Ajman –Al Jurf
c. Project description: Steel structural design and amenities RC design
3- Al Saadiyat Island Service Tunnel
a. Client: TDIC
b. Project Location: Abu Dhabi –Al Saadiyat Island
c. Project description: 1.4Km Burred Tunnel (Closed Section) structural design using
Sap 3d modeling
4- Swehan Labor Camp
a. Client: Nurol LLC Contracting
b. Project Location: Swehan – Abu Dhabi
c. Project description: structural analysis design for 2000 sq.m two blocks concrete
Labor camp
5- Wet Well Facility Design Check
a. Client: Al Rajhi Contracting
b. Project Location: Abu Dhabi
c. Project description: third party structural design.
6- Ajman Free Zone (Gate 4 Development)
a. Client: Ajman Petroleum Company
b. Project Location: Ajman
c. Project description: entrance gate/guard and security blocks structural design.
7- Light Industrial Unit no 10 (LIU-10) Phase-2
a. Client: Jafza (Jebel Ali Free Zone Authority)
b. Project Location: Dubai – Jebel Ali
Project description: Steel structural design and amenities RC design.
Full Name: Ahmad Anis
Telephone: (+971) 553628405
(+971) 563427553
Email: ahmad_anis87@yahoo.com
Nationality: Syrian
Marital Status: Single
2. Ahmad Anis
Dubai, United Arab Emirates
Mobile: (+971) 553628405
Email: ahmad_anis87 @yahoo.com
8- Fujairah Underpass Concept Study
a. Client: BATCO
b. Project Location: Fujairah – Fujairah Port Intersection
c. Project description: concept structural design of the underpass (closed and
Opened section).
9- Dubai Parks Lagoon & Bridges Design
a. Client: MERAS
b. Project Location: Dubai – Jebel Ali
c. Project description: structural design & analysis for 3 pedestrian bridges and
1 vehicular bridges using CSI.Bridge in addition to the lagoon structure and
Related under water circulation structures.
10- Al Garhoud Maintenance Facility
a. Client: RTA-Maine DEPT
b. Project Location: Dubai – The Creek Water Front
c. Project description: RTA vessels maintenance facility workshops,
Management office and underground structures design.
11- AFZA Phase 4
a. Client: Ajman Petroleum Company
b. Project Location: Ajman
c. Project description: Warehouses structural Steel design.
12- Warehouses Phase 3 @ DIC -Tamdeen
a. Client: TAMDEEN
b. Project Location: Dubai industrial city
c. Project description: Warehouses structural Steel design.
13- Dubai Parks Back of House
a. Client: Dubai Parks & Resorts
b. Project Location: Dubai Parks
c. Project description: Structural design for special buildings
(civil defense G+3/ police station G/
data center G+4/facility management G+4/Tram Storage G)
14- CT1 Reefer Maintenance & CT2 Management Building
a. Client: DP World
b. Project Location: Dubai-Mina Jebel Ali
c. Project description: Structural design check
Since December
2012 till 2014
Campbell Reith Hill International Limited (CRHI)
Structural Engineer
Dubai - UAE
Projects:
15- Al Nasser Tower
a. Client: Naser & Ahmad Al Nuwais
b. Project Location: Abu Dhabi Sector E/9
c. Project description: Structural design for the proposed 6-Basements + Ground +
Mezz. + 18 Floors + Lower & Upper Roof tower.
3. Ahmad Anis
Dubai, United Arab Emirates
Mobile: (+971) 553628405
Email: ahmad_anis87 @yahoo.com
16- Private Car Park & Staff Accommodation
a. Client: IMCC Group
b. Project Location: Swehan-Abu Dhabi
c. Project description: Structural design for the labor camp (Concrete).
17- JW Marriot Hotel
a. Client: Campbell Reith (UK Office)
b. Project Location: Jeddah-KSA
c. Project description: Structural modeling for the residential tower.
18- Al Bustan Mixed Use Development
a. Client: United Al Saqer Group
b. Project Location: Abu Dhabi
c. Project description: Assessment of the structural strength of the basement flat
slabs.
19- Al Ain Road Irrigation Pumping Station
a. Client: Al Nasser Contracting
b. Project Location: Al Ain Road- Dubai
c. Project description: Structural design.
20- Al Saadiyat Island Booster Pumping Station and Chambers
a. Client: Al Nasser Contracting
b. Project Location: Saadiyat Island- Abu Dhabi
c. Project description: Structural design.
E D U C A T I O N
2004 – 2009
University of Aleppo, Aleppo, Syria
Bachelors of Science in Civil Engineering
T E C H N I C A L a n d C O M P U T E R SK I L L S
• MS Office
• AutoCAD.
• ETABS
• SAP 2000
• CSI Bridge
• SAFE
• MS Project
• Staad Pro
• Prokon
S K I L L S & C E R T I F I CA T IO N S
• ICDL (Syllabus Version 4.0)
• RTA E-NOC submission
• DM portal submission
• Interpersonal & Presentation skills
• Good Team player
• Highly Motivated and Result oriented
• Perform well under pressure
• Able to work independently with limited supervision
• Quality Assurance and Quality control
• Project planning & Management
• Design and Drawings co-ordination
• Monitoring and Tracking activities
• Progress reporting
• Co-ordination with Client and Contractor
4. Ahmad Anis
Dubai, United Arab Emirates
Mobile: (+971) 553628405
Email: ahmad_anis87 @yahoo.com
L a n g u a g e s
NOTE:
References/Project Portfolios available upon request.
English Reading, Writing, and Speaking Excellent
Arabic Reading, Writing, and Speaking Mother tongue