Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
TNEB AE Power System Practice Question Part 1
1. Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
TNEB / TANGEDCO AE
ELECTRICAL ENGINEERING
POWER SYSTEM
Practice Question Set
2. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
In circuit breaker operating condition, at the instant of
current zero point, the fault current is.
1. Leads the arc voltage by 𝟗𝟎𝟎
2. Lags the arc voltage by 𝟑𝟎𝟎
3. Leads the arc voltage by 𝟑𝟎𝟎
4. Lags the arc voltage by 𝟗𝟎𝟎
3. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
In circuit breaker operating condition, at the instant of
current zero point, the fault current is.
1. Leads the arc voltage by 𝟗𝟎𝟎
2. Lags the arc voltage by 𝟑𝟎𝟎
3. Leads the arc voltage by 𝟑𝟎𝟎
4. Lags the arc voltage by 𝟗𝟎𝟎
4. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
During arcing period of circuit breaker, the current flowing
through the electrodes is depends on.
1. Degree of ionization
2. Length of arc
3. Arc resistance
4. All of the above
5. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
During arcing period of circuit breaker, the current flowing
through the electrodes is depends on.
1. Degree of ionization
2. Length of arc
3. Arc resistance
4. All of the above
6. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
Which of the following gases used as arc quenching medium
in Air blast circuit breaker?
1. Nitrogen
2. Carbon dioxide
3. Hydrogen
4. All of the above
7. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
Which of the following gases used as arc quenching medium
in Air blast circuit breaker?
1. Nitrogen
2. Carbon dioxide
3. Hydrogen
4. All of the above
8. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The operating time for circuit breaker is about.
1. 0.002 sec
2. 0.5 sec
3. 0.18 sec
4. 0.05 sec
9. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The operating time for circuit breaker is about.
1. 0.002 sec
2. 0.5 sec
3. 0.18 sec
4. 0.05 sec
10. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The operating time of distance relay is depends on.
1. Voltage
2. Current
3. Distance
4. All of the above
11. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The operating time of distance relay is depends on.
1. Voltage
2. Current
3. Distance
4. All of the above
12. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
Which of the following relay used to protect the system of
transformer?
1. Earth fault relay
2. Over current relay
3. Merz-Price relay
4. All of the above
13. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
Which of the following relay used to protect the system of
transformer?
1. Earth fault relay
2. Over current relay
3. Merz-Price relay
4. All of the above
14. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
Which of the following expression denotes the volume of
conductor material affected by power factor in transmission
line?
1. 𝑪𝒐𝒔𝟐𝝋
2. 𝟏
𝑪𝒐𝒔𝟐𝝋
3. 𝑪𝒐𝒔𝝋
4. 𝟏
𝑺𝒊𝒏𝟐𝝋
15. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
Which of the following expression denotes the volume of
conductor material affected by power factor in transmission
line?
1. 𝑪𝒐𝒔𝟐𝝋
2. 𝟏
𝑪𝒐𝒔𝟐𝝋
3. 𝑪𝒐𝒔𝝋
4. 𝟏
𝑺𝒊𝒏𝟐𝝋
16. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
In the power transformer is connected with Delta-Star, then
the current transformer should be in.
1. Delta – Star
2. Star – Delta
3. Star – Star
4. Delta – Delta
17. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
In the power transformer is connected with Delta-Star, then
the current transformer should be in.
1. Delta – Star
2. Star – Delta
3. Star – Star
4. Delta – Delta
18. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The maloperation of differential protection of transformer due to
magnetizing inrush current is prevented by filtering.
1. 2nd harmonic content with rate of change of core flux and supply
voltage is 𝟗𝟎𝟎 out of phase.
2. 2nd harmonic content with rate of change of core flux and supply
voltage is 𝟏𝟖𝟎𝟎 in-phase.
3. 5th harmonic content with rate of change of core flux and supply
voltage is 𝟗𝟎𝟎
out of phase.
4. 5th harmonic content with rate of change of core flux and supply
voltage is 𝟏𝟖𝟎𝟎 in-phase.
19. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The maloperation of differential protection of transformer due to
magnetizing inrush current is prevented by filtering.
1. 2nd harmonic content with rate of change of core flux and supply
voltage is 𝟗𝟎𝟎 out of phase.
2. 2nd harmonic content with rate of change of core flux and supply
voltage is 𝟏𝟖𝟎𝟎 in-phase.
3. 5th harmonic content with rate of change of core flux and supply
voltage is 𝟗𝟎𝟎
out of phase.
4. 5th harmonic content with rate of change of core flux and supply
voltage is 𝟏𝟖𝟎𝟎 in-phase.
20. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The annual load duration curve of a certain power station can be
considered as a straight line from 20 MW to 4 MW. To meet this
load, three turbine-generator units, two rated at 10 MW each and
one rated at 5 MW are installed. The installed capacity is.
1. 10 MW
2. 20 MW
3. 25 MW
4. 4 MW
21. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The annual load duration curve of a certain power station can be
considered as a straight line from 20 MW to 4 MW. To meet this
load, three turbine-generator units, two rated at 10 MW each and
one rated at 5 MW are installed. The installed capacity is.
1. 10 MW
2. 20 MW
3. 25 MW
4. 4 MW
Installed Capacity = 10 +10 +5
= 25 MW
22. TNEB / TANGEDCO AE – POWER
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192
The annual load duration curve of a certain power station can be
considered as a straight line from 20 MW to 4 MW. To meet this
load, three turbine-generator units, two rated at 10 MW each and
one rated at 5 MW are installed. The installed capacity is.
1. 10 MW
2. 20 MW
3. 25 MW
4. 4 MW
Installed Capacity = 10 +10 +5
= 25 MW
23. THANK YOU
For Practice Question paper Set order
Contact: 9345779192
Test Shopping
Innovative e-Learning Org
www.testshopping.in
9345779192