3. Formwork is a mould including all supporting
structure , used to shape and support the concrete
until it attains sufficient strength to carry its own
weight.
It should be capable of carrying all imposed dead &
live loads apart from its own weight.
FORMWORK
7. Formwork has been in use since the beginning of
concrete construction.
New materials such as steel, plastics & fibreglass are
used in formwork.
Greater attention is being given to the design,
fabrication, erection, and dismantling of formwork
Formwork is designed according to the ACI document
SP-4.
9. It should be water tight.
It should be strong.
It should be according to the size of member.
Its contact surface should be uniform.
* Qualities of formwork
10. The material should be cheap and reusable.
Swelling and shrinkage should be minimum.
Deflection should be minimum.
Light in weight , so that easy to transfer.
* Requirement of Formwork
11. Wall * Chimneys
Column * Water tank
Slabs & Beams * Cooling towers
Stairs etc…….
* Uses of Formwork
12. A temporary elevated platform to stand safely and
carry on the construction.
Provide platform to keep necessary materials of
construction , tools such as bricks, mortar, trowel,
plumb bob, etc…
Scaffolding is also needed for the repairs or even
demolition of a building.
SCAFFOLDING