SlideShare a Scribd company logo
1 of 2
Download to read offline
CASE STUDY
BACKGROUND
A global defense contractor needed a high performance seal to integrate mating
surfaces between a module for large missile canisters and the deck of a Navy
ship. The seal would serve as a barrier against harsh environmental conditions,
helping to eliminate water below deck and maintain positive interior air pressure
within the vessel while operating at sea.
CHALLENGE
The contractor asked PGC to develop a rubber elastomer seal with complex
performance properties, under tight time and cost constraints. The seal had to:
>	 Maintain a certain footprint and extend as long as 40 feet.
>	 Meet demanding tolerances and specifications.
>	 Be delivered in six weeks.
PGC’s engineers knew the application required a
multi-pronged solution:
>	 Develop a manufacturable design for the seal.
SEALING OUT TROUBLE ON A NAVY SHIP DECK.
Navy Ship Deck Sealing
INDUSTRY:
Defense
APPLICATION:
Navy ship deck
PRODUCT:
Elastomer coaming seal
HEADQUARTERS
5732 Lincoln Drive
Edina, MN 55436
(952) 942-6711
pgc-solutions.com
info@pgc-solutions.com
© 2016 PGC. All rights reserved.
CASE STUDY NAVY SHIP DECK SEALING
>	 Determine the right elastomeric material to address form, fit 	
	 and function requirements, along with fatigue, temperature 		
	 and space constraints.
>	 Design a mechanical interface that made mounting the part to 	
	 the ship deck as easy as possible.
SOLUTION
To prototype the extrusion without building a die, PGC developed a
basic design profile at a limited length that allowed the contractor
to evaluate the concept at significantly reduced development
time and cost. While the company finalized designed parameters,
PGC presented five highly engineered material options, ranging
from a Nitrile/PVC blend to an EPDM formulation, to a Viton®
fluoroelastomer, which the contractor selected for its balance of
performance and cost.
If you would like more technical information on this case story, or have questions you’d like to discuss with
one of our engineers, contact us at: sales@pgcsolutions.com or call (952) 942-6711
Our engineers then provided concepts and drawings for the
drilling fixture that allowed a secondary operation to create thru
holes in the elastomer part, used for installation to the deck and
module.
PGC played a significant role in designing and managing all
aspects of the process, from extrusion, splicing and forming
tools, to the curing and drilling jig.
RESULT
Asked to meet steep requirements for a large-scale project on an
extremely tight timeline PGC delivered, earning the confidence of
a demanding customer and even more demanding end-user—
the US Navy.

More Related Content

What's hot (11)

N c group presentation
N c group presentationN c group presentation
N c group presentation
 
Profile Heritage Infraspace India Pvt Ltd
Profile  Heritage  Infraspace India Pvt LtdProfile  Heritage  Infraspace India Pvt Ltd
Profile Heritage Infraspace India Pvt Ltd
 
FWP 2017 l Pierre PEYSSON, WPD Offshore France
FWP 2017 l Pierre PEYSSON, WPD Offshore FranceFWP 2017 l Pierre PEYSSON, WPD Offshore France
FWP 2017 l Pierre PEYSSON, WPD Offshore France
 
Mark Smith-CV 1(1)2016WORD
Mark Smith-CV 1(1)2016WORDMark Smith-CV 1(1)2016WORD
Mark Smith-CV 1(1)2016WORD
 
David_Wanless_CV
David_Wanless_CVDavid_Wanless_CV
David_Wanless_CV
 
Keith Wilkinson Paint Dept. Head 28-11-15 CV
Keith Wilkinson Paint Dept. Head  28-11-15 CVKeith Wilkinson Paint Dept. Head  28-11-15 CV
Keith Wilkinson Paint Dept. Head 28-11-15 CV
 
Success Stories of IDS in Papua
Success Stories of IDS in PapuaSuccess Stories of IDS in Papua
Success Stories of IDS in Papua
 
RINA@WORK 3/2015
RINA@WORK 3/2015RINA@WORK 3/2015
RINA@WORK 3/2015
 
KANNAN RESUME
KANNAN RESUMEKANNAN RESUME
KANNAN RESUME
 
11:9:16 Resume
11:9:16 Resume11:9:16 Resume
11:9:16 Resume
 
Jeff Cartwright CV May 2016
Jeff Cartwright CV May 2016Jeff Cartwright CV May 2016
Jeff Cartwright CV May 2016
 

Similar to case_study_3_shipdeck

case_study_2_windshield
case_study_2_windshieldcase_study_2_windshield
case_study_2_windshieldDan Ganfield
 
WaterProof Lift Pit Brochure - Web
WaterProof Lift Pit Brochure - WebWaterProof Lift Pit Brochure - Web
WaterProof Lift Pit Brochure - WebJeff Heath
 
Gg cs centralia_4.07
Gg cs centralia_4.07Gg cs centralia_4.07
Gg cs centralia_4.07Tensar
 
2011 CTM Session 2: Terminology for Products
2011 CTM Session 2: Terminology for Products2011 CTM Session 2: Terminology for Products
2011 CTM Session 2: Terminology for Productsnovacsi
 
AK Cladding/Centria - Intro Brochure/Pre Qualification
AK Cladding/Centria - Intro Brochure/Pre QualificationAK Cladding/Centria - Intro Brochure/Pre Qualification
AK Cladding/Centria - Intro Brochure/Pre QualificationKeith Evans
 
Prima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptxPrima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptxZiyad Zaidi
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDFWorldofAllLyrics
 
Airodek notable projects
Airodek   notable projectsAirodek   notable projects
Airodek notable projectsjd_stu
 
Hazard Mitigation of the Building Envelope
Hazard Mitigation of the Building EnvelopeHazard Mitigation of the Building Envelope
Hazard Mitigation of the Building EnvelopeRick De La Guardia
 
Corrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
Corrocoat USA Lowers Costs and Increases Reliability at Chemical PlantCorrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
Corrocoat USA Lowers Costs and Increases Reliability at Chemical PlantEd Cilli
 
Modern Construction Technologies
Modern Construction TechnologiesModern Construction Technologies
Modern Construction TechnologiesRahul Saraswat
 
The Drone Brothers Playbook
The Drone Brothers PlaybookThe Drone Brothers Playbook
The Drone Brothers PlaybookDrone Brothers
 
culverts-channeline-international.pptx
culverts-channeline-international.pptxculverts-channeline-international.pptx
culverts-channeline-international.pptxraviyemmadi
 

Similar to case_study_3_shipdeck (20)

case_study_2_windshield
case_study_2_windshieldcase_study_2_windshield
case_study_2_windshield
 
WaterProof Lift Pit Brochure - Web
WaterProof Lift Pit Brochure - WebWaterProof Lift Pit Brochure - Web
WaterProof Lift Pit Brochure - Web
 
Csc Presentation
Csc PresentationCsc Presentation
Csc Presentation
 
Gg cs centralia_4.07
Gg cs centralia_4.07Gg cs centralia_4.07
Gg cs centralia_4.07
 
SCC WITH KIM.PPTX
SCC WITH KIM.PPTXSCC WITH KIM.PPTX
SCC WITH KIM.PPTX
 
2011 CTM Session 2: Terminology for Products
2011 CTM Session 2: Terminology for Products2011 CTM Session 2: Terminology for Products
2011 CTM Session 2: Terminology for Products
 
AK Cladding/Centria - Intro Brochure/Pre Qualification
AK Cladding/Centria - Intro Brochure/Pre QualificationAK Cladding/Centria - Intro Brochure/Pre Qualification
AK Cladding/Centria - Intro Brochure/Pre Qualification
 
Presentation FFFT
Presentation FFFTPresentation FFFT
Presentation FFFT
 
Prima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptxPrima Vera Final Project PPT.pptx
Prima Vera Final Project PPT.pptx
 
Pathak resume
Pathak resumePathak resume
Pathak resume
 
2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF2136-872A-X003-001-VER-A4000C (1).PDF
2136-872A-X003-001-VER-A4000C (1).PDF
 
Airodek notable projects
Airodek   notable projectsAirodek   notable projects
Airodek notable projects
 
Assembly_Line_Adhesives
Assembly_Line_AdhesivesAssembly_Line_Adhesives
Assembly_Line_Adhesives
 
Csc Presentation2
Csc Presentation2Csc Presentation2
Csc Presentation2
 
Hazard Mitigation of the Building Envelope
Hazard Mitigation of the Building EnvelopeHazard Mitigation of the Building Envelope
Hazard Mitigation of the Building Envelope
 
I R B Project Ver 3
I R B  Project   Ver  3I R B  Project   Ver  3
I R B Project Ver 3
 
Corrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
Corrocoat USA Lowers Costs and Increases Reliability at Chemical PlantCorrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
Corrocoat USA Lowers Costs and Increases Reliability at Chemical Plant
 
Modern Construction Technologies
Modern Construction TechnologiesModern Construction Technologies
Modern Construction Technologies
 
The Drone Brothers Playbook
The Drone Brothers PlaybookThe Drone Brothers Playbook
The Drone Brothers Playbook
 
culverts-channeline-international.pptx
culverts-channeline-international.pptxculverts-channeline-international.pptx
culverts-channeline-international.pptx
 

case_study_3_shipdeck

  • 1. CASE STUDY BACKGROUND A global defense contractor needed a high performance seal to integrate mating surfaces between a module for large missile canisters and the deck of a Navy ship. The seal would serve as a barrier against harsh environmental conditions, helping to eliminate water below deck and maintain positive interior air pressure within the vessel while operating at sea. CHALLENGE The contractor asked PGC to develop a rubber elastomer seal with complex performance properties, under tight time and cost constraints. The seal had to: > Maintain a certain footprint and extend as long as 40 feet. > Meet demanding tolerances and specifications. > Be delivered in six weeks. PGC’s engineers knew the application required a multi-pronged solution: > Develop a manufacturable design for the seal. SEALING OUT TROUBLE ON A NAVY SHIP DECK. Navy Ship Deck Sealing INDUSTRY: Defense APPLICATION: Navy ship deck PRODUCT: Elastomer coaming seal
  • 2. HEADQUARTERS 5732 Lincoln Drive Edina, MN 55436 (952) 942-6711 pgc-solutions.com info@pgc-solutions.com © 2016 PGC. All rights reserved. CASE STUDY NAVY SHIP DECK SEALING > Determine the right elastomeric material to address form, fit and function requirements, along with fatigue, temperature and space constraints. > Design a mechanical interface that made mounting the part to the ship deck as easy as possible. SOLUTION To prototype the extrusion without building a die, PGC developed a basic design profile at a limited length that allowed the contractor to evaluate the concept at significantly reduced development time and cost. While the company finalized designed parameters, PGC presented five highly engineered material options, ranging from a Nitrile/PVC blend to an EPDM formulation, to a Viton® fluoroelastomer, which the contractor selected for its balance of performance and cost. If you would like more technical information on this case story, or have questions you’d like to discuss with one of our engineers, contact us at: sales@pgcsolutions.com or call (952) 942-6711 Our engineers then provided concepts and drawings for the drilling fixture that allowed a secondary operation to create thru holes in the elastomer part, used for installation to the deck and module. PGC played a significant role in designing and managing all aspects of the process, from extrusion, splicing and forming tools, to the curing and drilling jig. RESULT Asked to meet steep requirements for a large-scale project on an extremely tight timeline PGC delivered, earning the confidence of a demanding customer and even more demanding end-user— the US Navy.